ENG2023-0301 ROW PERMITRIGHT OF WAY PERMIT
PERMIT NU BEq
City of Edmonds
Edmonds WA 980201 1 1
www.edmondswa.gov i
Description: RIGHT OF WAY-SPEE REMOVE STREET TREES ISSUED: 10/16/2023
Address: 307 BELL ST EDMONDS WA 98020
EXPIRES: 12/18/2023
Permit Type: RIGHT OF WAY Permit Subtype: MIXED USE Parcel Number: 00434400501100
CONTACTS
NAME TYPE NAME ADDRESS PHONE
APPLICANT DOUGLAS SPEE 307 BELL ST. SUITE 101, EDMONDS WA 98020
(206)284-7733
CONTACT SPEE WEST CONSTRUCTION 307 BELL ST. SUITE 101, EDMONDS WA 98020
(206)284-7733
CONTRACTOR SPEE WEST CONSTRUCTION CO 307 BELL STREET SUITE 101, EDMONDS WA 98020
(206)284-7733
OWNER DOUGLAS SPEE WEST 307 BELL ST #101, EDMONDS WA 98020 (206)284-7733
CONSTRUCTION CO
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT
$45.00 $45.00
ENG - INSPECTIONS
$378.00 $378.00
RIGHT-OF-WAY PERMIT -STANDARD $378.00 $378.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 10/16/2023
Printed: Monday, October 16, 2023 3:02:00 PM 1 of 2
RIGHT OF WAY PERMIT
PERMIT NU �!BEJ
City of Edmonds
SID
www.edmondswa.gov • •
CONDITIONS
CONDITION TYPE
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
INSP PRIOR TO BACKFILL
Call for all required inspections. All work shall be inspected prior to backfill.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on
SOUND AND NOISE
weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
•
INSPECTION TYPE
DATE
RESULT
NOTES
COMPLETE
X-2 ENGINEERING FINAL**
E-7 TREE ROOT BALL
A-1 TESC AND MOBILIZE
E-7 CONCRETE SIDEWALK
E-7 RESTOR LIMITS
E-7 TRAFFIC CTRL
E-7 TREE GRATE
Printed: Monday, October 16, 2023 3:02:00 PM 2 of 2
RECEIVED
J U L 28 2023
of E D tro�l�
�'vC. 1890
SECTION A
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Requirements outlined in Right -of -Way permit handout E6�.
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
General
Project Name
Site Address of if no site addre-4 use Property Address at NW corner of project area:
Associated Permits: BLD PLN ENG
Owner and Entity Holding Franchise (if applicable)
Name cif Company f - Franchise Ordinance No:
Point of Contact
Title
Address
City
State
Zip
Phone
Email
Contractor and
Name of Company
Authorized Agent of Owner (see note below)
<'
Contractor Contacts
Primary Name
During Construction
Agent Name
-f'
Tale
Title r L{
mobile
4 of
Address "3 L'-T
L
.
Email f %
City pt4tJ
State',
Zip
Secondary N me
Phone L' .
Z ?
Title
Email ekg
QQ
L A
Mobile
City of Edmonds B
iness License No: [!
Email
State License No:
�' f7� W C' C / L7 J� a
[ ' + `
Contractor verifies it is currently bonded
Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
Type of ••
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
• Demo and rebuild or from vacant land?
V Other, please specify: �/J aSP
❑ Utility Franchise Work associated with development (check one of the above boxes as upeln
❑ Traffic Control Only (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
❑ Utility Franchise Work (no associated development)
Project Desci-iption
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities. etc.)
m/d w n l' zp-� -/ A;) � -1e
Oh /
J-
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
x
v LF
SF
Alley 72 hours +
C2 LF
x
0 LF
SF
Parking 72 hours +
0 LF
x
Z) LF
SF
v
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
Ty
pe of Utility Facilities
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
-
Details of • to bCompleted
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
2. 1 Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)?
L1
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
y
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility system?
5.
Does the work involve proposed additions to an aboveground utility system? If yes:
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
Details of Work to be Completed Yes No
6. 1Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
If yes, answer the following questions related to project area, i.e. the actual area in which the
ro'ect is ro osed:
6a.
Does your project involve wires/cables/lines? If yes:
k
How many are existing? I I How many are to be added?
6b.
I Does your project involve poles? If yes:
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bi o r to this application.
Fees. The Applicant is responsible forAll/Ae fees,
APPLICANT SIGNATURE:
TE:
APPLICANT PRINTED NAME:
DJA
APPLICANT TITLE: Prexf L
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
- SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
RESTORATION LIMITS TO BE DETERMINED
BY CITY ENGINEERING INSPECTOR
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
ENGINEERING DIVISION
APPROVED AS NOTED
1p11 W&J,,,.,44,g 08/10/2023
VV
RECEIVED
JUL 28 2023
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
2
3
Y
4
,---,,51TE/R00F FLAN
scale: Iu = Imp-m��
/\
r
CQlR �N.atOA_
INSPECTION REQUIRED
PRIOR TO BACK FILL
CITY ARBORIST SHALL INSPECT THE ROOTBALLS OF ALL 4 TREES
PRIOR TO PLANTING. rH)+Pec
! : T
48 HOUR ADVANCED NOTICE REQUIRED TO SCHEDULE ROOT BALL ""
INSPECTION. EMAIL ENGINEERINGPERMITS@EDMONDSWA.GOV TO
SCHEDULE ROOTBALL INSPECTION. ALL OTHER INSPECTIONS CAN
BE SCHEDULED THROUGH MBP. e400
e 00
!A 981Og
I" MCI
ENTIRE ROOTBALL OF EXISTING TREES SHALL BE REMOVED. IF , �`�a
THE SIDEWALK IS UNDERMINED DURING THE REMOVAL FO THE
ROOTBALL THAN FULL SIDEWALK PANEL REPLACEMENT PER CITY
STANDARD DETAIL TR-531 SHALL BE REQUIRED.
COMMERCIAL SPACE "A"� w
to—
COMNERCIAL SPACE "B'
IAbS
CC _RCIAL SPADE "C• (SPELT CON5TRL'CrIpNJ
Ii2O
L^6g-
S85
CORRIDOR AND STAIR AREA
250
0VM1 CR =-PALE (ENTRY PLAZA)
585
TOTAL PRC-R=T
PIR:T FLOOR IC!91pEyTT,AL
TO'AL IAUT AREA
TOTAL DECK AREA
g3s�O
TOTAL CORRIDCR A'o STAIR AREA
2,217
TOTAL CC�AR�
I975
TOTAL P"JISar
sac
9e1Cc7iD PI.00¢ RgIDnTr,V,
L P3302
TC. +L LhIT ARLA
TOTAL DE--K AREA
,_
TOTAL C :RR— AND STAIR AREA
1,400
TOTAL PRO.CT
_
IZPSJ
TOTAL PR;,gL'T 9G1hKE PQ?TA6E
PARKING CALCULATIONS
MULTI-1Af11LT:
PER :ITT OF F*" C&
IIElIDENTW- .: X'Y JaS . 3i W,,,
MAC! - A • MlNF. �4�0=.i: Y={Ca
&PA=M-e .IT2p aF .I 200aBlr:cF!
Ila71C i PIlCv-Cfl"ltALL! . 9 APACE!
TOTAL 18TALLp CQl�,.k AND lIBC,R4DE LE`.ELlA
TOTAL 1PACE5 Al
TOTAL YA-[9
TOTAL
3RD AVE N TREES
JACK PEAR (PYRUS CALL ERYANA 'JACZAM')
BELL ST TREES (CHOOSE ONE)
JACK PEAR (PYRUS CALLERYANA'JACZAM')
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY OWNER/CONTRACTOR IS RESPONSIBLE FOR
UTILITIES MAY REQUIRE A SEPERATE PERMIT. EROSION CONTROL AND DRAINAGE
CITY TO PROVIDE TREE GRATE COVERS
311"7
PROJECT:
3RD & BELL ST.
MIXED USE
PROJECT
CLIENT
SPEE WEST
CONSTRUCTION
DOUG SPEE
307 BELL ST.
EDMONDS. Wh
T�EVIBION:
AiFLMw.1R'/REVIGW o-2I-pE
ECI10.1ATC REVIEW 0.2o-p0
PEBI(3N REVIEW it-1�G!
RJE+IT APPgovALa:
tz
o..an aerom.eu _
Pem�¢ Draww, -
aa _
>
a
i
a
SITE c
PLAN
A1.2 f
5/15/23, 2:09 PM RECEIVED Google Maps
Go, gie [Aaps JUL 28 2023
CITY OF EDMONDS
DEVELOPMENT`
. SERVICES DEPARTMENT
,, .
i 40
l� t
' — ALL
Imagery �c'2023 Google, Imagery'�2023 Maxar Technologies, Map data ":2023 20 ft
ENGINEERING DIVISION `
APPROVED AS NOTED
Jill tVZzj,,,4z 08/10/2023 (� •
vv � ��
https://www.google.com/maps/@47.8125313,-122.3783828,81 m/data=!3m 1 ! 1 e37authuser=0 1/1
RECEIVED
J U L 28 2023
CITY OF EDMONDS M BuildingPermit.com
CITY OF EDMONDS
Right -of -Way Application #1338704 - 307 Bell Tree Replacement SERVICESLOPMENT DEPARTMENT
Applicant
First Name Last Name Company Name
Douglas Spee Spee West Construction
Number Street Apartment or Suite Number E-mail Address
307 Bell St. Suite 101 dspee@speewest.com
City State Zip Phone Number Extension
Edmonds WA 98020 (206) 284-7733
Contractor
Company Name
SPEE WEST CONSTRUCTION CO
Number Street Apartment or Suite Number
307 Bell Street Suite 101
City State Zip Phone Number Extension
Edmonds WA 98020 (206) 284-7733 (206) 719-4844
State License Number License Expiration Date UBI # E-mail Address
SPEEWCC101 MF 2/21/2024 FD1 g5B1 95 dspee@speewest.com
Project Location
Number Street Floor Number Suite or Room Number
307 BELL ST
City Zip Code County Parcel Number
EDMONDS 98020 00434400501100
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
Property Owner
First Name Last Name or Company Name
DOUGLAS Spee West Construction Co.
Number Street Apartment or Suite Number
307 Bell St #101
City State Zip
Edmonds WA 98020
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 6/26/2023 Submitted By: Douglas Spee
Page 1 of 2
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1338704 - 307 Bell Tree Replacement
Project Contact
Company Name: Spee West Construction
Name: Douglas Spee Email: dspee@speewest.com
Address: 307 Bell St. Suite 101 Phone #: (206) 284-7733
Edmonds WA 98020
Project Type Activity Type
Mixed Use Modification
Scope of Work
Landscaping Maintenance
Project Name: 307 Bell Tree Replacement
Description of Remove existing trees at existing tree wells and replace with 7 new street trees. Tree
Work: selection yet to be determined. Tree grates were removed by COE Public Works and will
need to be returned if grates are desired.
Project Details
Tree Removal
There are no significant trees being removed
Page 2 of 2