Loading...
ENG2023-0301 ROW PERMITRIGHT OF WAY PERMIT PERMIT NU BEq City of Edmonds Edmonds WA 980201 1 1 www.edmondswa.gov i Description: RIGHT OF WAY-SPEE REMOVE STREET TREES ISSUED: 10/16/2023 Address: 307 BELL ST EDMONDS WA 98020 EXPIRES: 12/18/2023 Permit Type: RIGHT OF WAY Permit Subtype: MIXED USE Parcel Number: 00434400501100 CONTACTS NAME TYPE NAME ADDRESS PHONE APPLICANT DOUGLAS SPEE 307 BELL ST. SUITE 101, EDMONDS WA 98020 (206)284-7733 CONTACT SPEE WEST CONSTRUCTION 307 BELL ST. SUITE 101, EDMONDS WA 98020 (206)284-7733 CONTRACTOR SPEE WEST CONSTRUCTION CO 307 BELL STREET SUITE 101, EDMONDS WA 98020 (206)284-7733 OWNER DOUGLAS SPEE WEST 307 BELL ST #101, EDMONDS WA 98020 (206)284-7733 CONSTRUCTION CO FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00 ENG - INSPECTIONS $378.00 $378.00 RIGHT-OF-WAY PERMIT -STANDARD $378.00 $378.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: MAJ DATE: 10/16/2023 Printed: Monday, October 16, 2023 3:02:00 PM 1 of 2 RIGHT OF WAY PERMIT PERMIT NU �!BEJ City of Edmonds SID www.edmondswa.gov • • CONDITIONS CONDITION TYPE It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. INSP PRIOR TO BACKFILL Call for all required inspections. All work shall be inspected prior to backfill. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on SOUND AND NOISE weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. • INSPECTION TYPE DATE RESULT NOTES COMPLETE X-2 ENGINEERING FINAL** E-7 TREE ROOT BALL A-1 TESC AND MOBILIZE E-7 CONCRETE SIDEWALK E-7 RESTOR LIMITS E-7 TRAFFIC CTRL E-7 TREE GRATE Printed: Monday, October 16, 2023 3:02:00 PM 2 of 2 RECEIVED J U L 28 2023 of E D tro�l� �'vC. 1890 SECTION A RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit handout E6�. CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. General Project Name Site Address of if no site addre-4 use Property Address at NW corner of project area: Associated Permits: BLD PLN ENG Owner and Entity Holding Franchise (if applicable) Name cif Company f - Franchise Ordinance No: Point of Contact Title Address City State Zip Phone Email Contractor and Name of Company Authorized Agent of Owner (see note below) <' Contractor Contacts Primary Name During Construction Agent Name -f' Tale Title r L{ mobile 4 of Address "3 L'-T L . Email f % City pt4tJ State', Zip Secondary N me Phone L' . Z ? Title Email ekg QQ L A Mobile City of Edmonds B iness License No: [! Email State License No: �' f7� W C' C / L7 J� a [ ' + ` Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. Type of •• ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial • Demo and rebuild or from vacant land? V Other, please specify: �/J aSP ❑ Utility Franchise Work associated with development (check one of the above boxes as upeln ❑ Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 ❑ Utility Franchise Work (no associated development) Project Desci-iption Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities. etc.) m/d w n l' zp-� -/ A;) � -1e Oh / J- RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF x v LF SF Alley 72 hours + C2 LF x 0 LF SF Parking 72 hours + 0 LF x Z) LF SF v SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. Ty pe of Utility Facilities 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm - Details of • to bCompleted 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes No 2. 1 Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? L1 If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? y 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? 5. Does the work involve proposed additions to an aboveground utility system? If yes: Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of Work to be Completed Yes No 6. 1Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the ro'ect is ro osed: 6a. Does your project involve wires/cables/lines? If yes: k How many are existing? I I How many are to be added? 6b. I Does your project involve poles? If yes: How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bi o r to this application. Fees. The Applicant is responsible forAll/Ae fees, APPLICANT SIGNATURE: TE: APPLICANT PRINTED NAME: DJA APPLICANT TITLE: Prexf L NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 - SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM RESTORATION LIMITS TO BE DETERMINED BY CITY ENGINEERING INSPECTOR Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. ENGINEERING DIVISION APPROVED AS NOTED 1p11 W&J,,,.,44,g 08/10/2023 VV RECEIVED JUL 28 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 2 3 Y 4 ,---,,51TE/R00F FLAN scale: Iu = Imp-m�� /\ r CQlR �N.atOA_ INSPECTION REQUIRED PRIOR TO BACK FILL CITY ARBORIST SHALL INSPECT THE ROOTBALLS OF ALL 4 TREES PRIOR TO PLANTING. rH)+Pec ! : T 48 HOUR ADVANCED NOTICE REQUIRED TO SCHEDULE ROOT BALL "" INSPECTION. EMAIL ENGINEERINGPERMITS@EDMONDSWA.GOV TO SCHEDULE ROOTBALL INSPECTION. ALL OTHER INSPECTIONS CAN BE SCHEDULED THROUGH MBP. e400 e 00 !A 981Og I" MCI ENTIRE ROOTBALL OF EXISTING TREES SHALL BE REMOVED. IF , �`�a THE SIDEWALK IS UNDERMINED DURING THE REMOVAL FO THE ROOTBALL THAN FULL SIDEWALK PANEL REPLACEMENT PER CITY STANDARD DETAIL TR-531 SHALL BE REQUIRED. COMMERCIAL SPACE "A"� w to— COMNERCIAL SPACE "B' IAbS CC _RCIAL SPADE "C• (SPELT CON5TRL'CrIpNJ Ii2O L^6g- S85 CORRIDOR AND STAIR AREA 250 0VM1 CR =-PALE (ENTRY PLAZA) 585 TOTAL PRC-R=T PIR:T FLOOR IC!91pEyTT,AL TO'AL IAUT AREA TOTAL DECK AREA g3s�O TOTAL CORRIDCR A'o STAIR AREA 2,217 TOTAL CC�AR� I975 TOTAL P"JISar sac 9e1Cc7iD PI.00¢ RgIDnTr,V, L P3302 TC. +L LhIT ARLA TOTAL DE--K AREA ,_ TOTAL C :RR— AND STAIR AREA 1,400 TOTAL PRO.CT _ IZPSJ TOTAL PR;,gL'T 9G1hKE PQ?TA6E PARKING CALCULATIONS MULTI-1Af11LT: PER :ITT OF F*" C& IIElIDENTW- .: X'Y JaS . 3i W,,, MAC! - A • MlNF. �4�0=.i: Y={Ca &PA=M-e .IT2p aF .I 200aBlr:cF! Ila71C i PIlCv-Cfl"ltALL! . 9 APACE! TOTAL 18TALLp CQl�,.k AND lIBC,R4DE LE`.ELlA TOTAL 1PACE5 Al TOTAL YA-[9 TOTAL 3RD AVE N TREES JACK PEAR (PYRUS CALL ERYANA 'JACZAM') BELL ST TREES (CHOOSE ONE) JACK PEAR (PYRUS CALLERYANA'JACZAM') OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY OWNER/CONTRACTOR IS RESPONSIBLE FOR UTILITIES MAY REQUIRE A SEPERATE PERMIT. EROSION CONTROL AND DRAINAGE CITY TO PROVIDE TREE GRATE COVERS 311"7 PROJECT: 3RD & BELL ST. MIXED USE PROJECT CLIENT SPEE WEST CONSTRUCTION DOUG SPEE 307 BELL ST. EDMONDS. Wh T�EVIBION: AiFLMw.1R'/REVIGW o-2I-pE ECI10.1ATC REVIEW 0.2o-p0 PEBI(3N REVIEW it-1�G! RJE+IT APPgovALa: tz o..an aerom.eu _ Pem�¢ Draww, - aa _ > a i a SITE c PLAN A1.2 f 5/15/23, 2:09 PM RECEIVED Google Maps Go, gie [Aaps JUL 28 2023 CITY OF EDMONDS DEVELOPMENT` . SERVICES DEPARTMENT ,, . i 40 l� t ' — ALL Imagery �c'2023 Google, Imagery'�2023 Maxar Technologies, Map data ":2023 20 ft ENGINEERING DIVISION ` APPROVED AS NOTED Jill tVZzj,,,4z 08/10/2023 (� • vv � �� https://www.google.com/maps/@47.8125313,-122.3783828,81 m/data=!3m 1 ! 1 e37authuser=0 1/1 RECEIVED J U L 28 2023 CITY OF EDMONDS M BuildingPermit.com CITY OF EDMONDS Right -of -Way Application #1338704 - 307 Bell Tree Replacement SERVICESLOPMENT DEPARTMENT Applicant First Name Last Name Company Name Douglas Spee Spee West Construction Number Street Apartment or Suite Number E-mail Address 307 Bell St. Suite 101 dspee@speewest.com City State Zip Phone Number Extension Edmonds WA 98020 (206) 284-7733 Contractor Company Name SPEE WEST CONSTRUCTION CO Number Street Apartment or Suite Number 307 Bell Street Suite 101 City State Zip Phone Number Extension Edmonds WA 98020 (206) 284-7733 (206) 719-4844 State License Number License Expiration Date UBI # E-mail Address SPEEWCC101 MF 2/21/2024 FD1 g5B1 95 dspee@speewest.com Project Location Number Street Floor Number Suite or Room Number 307 BELL ST City Zip Code County Parcel Number EDMONDS 98020 00434400501100 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name DOUGLAS Spee West Construction Co. Number Street Apartment or Suite Number 307 Bell St #101 City State Zip Edmonds WA 98020 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 6/26/2023 Submitted By: Douglas Spee Page 1 of 2 CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1338704 - 307 Bell Tree Replacement Project Contact Company Name: Spee West Construction Name: Douglas Spee Email: dspee@speewest.com Address: 307 Bell St. Suite 101 Phone #: (206) 284-7733 Edmonds WA 98020 Project Type Activity Type Mixed Use Modification Scope of Work Landscaping Maintenance Project Name: 307 Bell Tree Replacement Description of Remove existing trees at existing tree wells and replace with 7 new street trees. Tree Work: selection yet to be determined. Tree grates were removed by COE Public Works and will need to be returned if grates are desired. Project Details Tree Removal There are no significant trees being removed Page 2 of 2