ENG2023-0459 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMIT NUMBER
City of Edmonds
- N, Edmonds WA •: •
www -. •. i
Description: OVWSD-RESTORATION FOR EMERGENCY WATER LINE REPAIR
ISSUED: 10/19/2023
Address: 23812 107TH PL W EDMONDS WA 98020-5239
EXPIRES: 04/19/2024
Permit
rmit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00689500003000
i
NAME TYPE NAME ADDRESS PHONE
APPLICANT
MARTY HENNINGER
8128 228TH ST SW, EDMONDS WA 98026
(425)774-7769
CONTACT
OLYMPIC VIEW WATER AND SEWER
8128 228TH ST SW, EDMONDS WA 98026
(425)774-7769
DISTRICT
CONTRACTOR
OLYMPIC VIEW WATER & SEWER
8128 228TH ST SW, EDMONDS WA 98026
(425)670-1856
DISTRICT
OWNER SMITH SCHUYLER J & KIMBERLY A 23812 107TH PL W, EDMONDS WA 98020-5239
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00
ENG - INSPECTIONS $252.00 $252.00
RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 10/19/2023
Printed: Thursday, October 19, 2023 9:17:46 AM 1 of 2
RIGHT OF WAY EUC PERMIT
PERMIT NUMBE
City of Edmonds
....121
Sth Ave
-. •.v / 425.771.0220
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on
SOUND AND NOISE
weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL**
E-7 RESTOR LIMITS
Printed: Thursday, October 19, 2023 9:17:46 AM 2 of 2
c��� pF �z7tirQti��e
C. 1 sq4
SECTION A
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Requirements outlined in Right -of -Way permit Handout E&I.
RECEIVED
Sep 08 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
If any field is not applicable to your project, write "N/A' instead of leaving blank.
All fields required. Incomplete Applications will be denied.
Project Name 23812 107th PL W
Site Address or if no site address use Property Address at NW comer of project area:
23812 107th PI W
Associated Permits: BLD PIN
ENG
applicable)Oivncr and Entity Holding Franchise (if
Name of Company Olympic VIEW Water and Sewer District
Franchise Ordinance No:
PointofContact Marty Henninger
'nfie Utility Lead
Address 8128 228th St SW
city Edmonds state Wa
Zip 98026
Phone (425)774-7769
Email marty@ovwater.com
Primary Name
Name of Company Olympic View Water and Sewer District
Agent Name Marty Henninger
Title
Title Utility Lead
Mobile
Mdreis-8TM 228tht SVV
Email
City Edmonds I State Wa Zip 98026
SecondaryName
Phone (425)774-7769
Title
Email marty@ovwater.com
Mobile
City of Edmonds Business License No:
Email
State License No:
❑ Contractor verifies it is currently bonded
p Contractor verifies it currently has general liability insurance
NOTE: ECDC i8.6o. ozo requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development •(check one o f the above boxes as weln
❑ Traffic Control Only (no associated development)
rs Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application —Page i of 3 Updated 3/25/2021
Project Description
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
This was an emergency water service repair. It required an asphalt cut in two locations. The water service will require
replacement in the near future. Please include this in the permit. It was hydro excavated.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 2- hours +
LF
x
LF
SF
Alley 72 hours +
LF
x
LF
SF
Parldng 72. hours +
LF
x
LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTIONC.
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable ❑ power ❑ gas
* water ❑ sewer ❑ storm
Details of Work to beCompleted
i. I Does the utilityowner have existing overhead infrastructure in the area of work?
Yes
No
x
2. 1 Will any equipment be added underground or above ground e.. pedestals, vaults etc.)?
x
If es, describe:
-
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
x
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an eodsting underground common utility stem?
x
5.
Does the work involve proposed additions to an aboveground utility system? If es:
x
Are the additions for the purpose of serving new commercial development?
x
Are the additions for the purpose of serving a singje-family residential subdivision?
x.
Details
6.
of Worl, to be Completed
Does your project involve rebuilding or replacing utility equipment which currently serves more
Yes
,
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
x
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
x
How many are a dstin ? How many are to be added?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b. Does your project involve poles? If yes: X
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? What is the height of the additionalpoles?
6c. Are any poles to be modified/rebuilt/replaced? If yes: X
How many? What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-3o5 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE:
APPLICANT PRINTED NAME:
APPLICANT TITLE:
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
8" DI 23914 8" DI
23918 A5—V37 0 x
\\ �f 23910
M N
O rn
d- o
o /
N /
2390
23922 \\ A5—V44 A5—V45 ! \
— — �m 23614
5-14
23902
23620
23926 \
23921 23913 — — — - -
- BO 1 23628
23903
23930 23909 23702
23929 I
! m
23708
of
23934 A5-15
23712
23933 I ��
23718
23938
W 23937 23722
Cb
23942 — — — — f 23726
I
23941 ! '
----
23946 A5-16
> do
20009, 2t�
23945 1 o 8" DI 1403 23730 -''
j 12" REPAIR BAND �^� 2410 p, c IQ 2— — B5-
0 0 4" HOLE IN 9 �
---
fil
-- � -- 23812 21
23950 24103
23951
A5-12 23824
2
— — 24105 o
23954 — —
� � I
23910
cfl I
— — i 24107 I `:
A5-17 f
— — 23924 BO 2,'
'.L
23958 i E j 23928 \
A5-13 24109
A5—
( \\
�
24112 —1
A5—V41 —
A5—V42
's
1
24111
24114
\ 23962 i >n71
m
C� C/)
�O
z
00
zz
mr
m�
cn
^Z !�
^
U J
z0
ma
(-) 0
--jm
O---1
�m
z
m
0
DO
r
C 0 z
izm
r co x
:::i :::i-0
m
ccnCZ
K��
r
��n
mccn0
m
m0-u
D
n0
m��
m O o0
Z r
m
m -n
m<O
acoX
M0r
�ZO
�O�
Dz
OZ O
mZ
Xm
0—
Wn
o0 D 0O
c o o fl A
OLYMPIC VIEW WATER & SEWER DISTRICT
EDMONDS BLANKET PERMIT BEGINNING
NOTIFICATION
Site Address: 23812 1071h pl W
Scope of Work: Emergency leak repair. Service to be upgraded after permit approval
Asphalt or Concrete Cut: Yes Start date: 8/30/2023
Olympic View Water & Sewer District
8128 228th ST SW
Edmonds WA. 98026
Phone Number 425 774 7769
Fax Number 425 670 1856
Contact: Marty Henninger
E-mail: marty@ovwater.com
Olympic View Water & Sewer District
8128 228th ST SW
Edmonds WA. 98026
Phone Number 425 774 7769
Fax Number 425 670 1856
Contact: Bob Danson
E-mail: Bobd@ovwater.com
• Traffic control shall be in accordance with the MUTCD.
• All flaggers shall be trained and certified as required by WAC 296-155-305.
• Restoration shall be in accordance with City of Edmonds standards.
• All asphalt or concrete cut surfaces shall be patched with City of Edmonds
approved materials prior to the end of the day.
0:1SHAREIPERMITS RIGHT OF WAYS1Edmonds
RECEIVED
Sep 08 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
MINIMUM LANE CLOSURE TAPER LENGTH = L (feat)
I'm
Posted Speed (mph)
Y
(1-*
25
30
1 35 1 40
1 45
50
SS 60
6S
M
10
105
,SO
205 27O
4SO
we
$50
II
11S
165
1 225 1 295
1495
SSD
50.5 WD
-
-
12
125
Ito
245 1 MO
1 $40
600
SAC i 720
700
W
MINIMUM SHOULDER TAPER LENGTH = i (foot)
Posted Speed (mph)2-1
I )D 35
40
df
So
R
60
65
'a47
EWXTXER
I 40 I so
9D
t2o
IV
,SO
160
17D
19040
60 90
90
,SD
170
to
200
220
T40
USE A MTDMUM 3 DEVICES TAPER FOR SHOULDER LESS THIN X.
SIGN SPACING = X
WAYS SS 170
RURAL ROADS & CRBAN ARTERIALS 25 130 ;,PH 2O I (2)
RESIDENTIAL L BUSINESS O,STRi=
UR9AN STREE7S 25 MPH OR LESS 10C-
(1)ALL SPACINC MAY BE ADJUSTED TO ACCO.WKIOATE 102
RAMPS.ATGRADE INTERSECTIONS AND DRIVEWAYS.
M THIS SPADING MAY BE REDi> = IN URBAN AREAS TO FIT
ROADWAY CONDITIONS,
CHANNELIZATION DEVICE
SPACING fee
LWN
-rA PM TANGENT
SOND
0 6D
35N5
30 60
25/30
2D 40
�Av
IWL
USE FLAGGERS IF LESS THAN TWO 11'
TRAVEL LANES (SEE ATTACHED TCP)
BUFFER DATA
LONGITUDINAL BUFFER SPACE = 8
:PEED (MPp 25
31
35 40
45 50
SS I W
65
70
LENGTH (1ea0 155
20D
250 345
760 425
495 S7C
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R
HOST VDf=- WEIGHT
91 TO 2ZOOD be
HOST VEHICLE WEG)IT
a ZLOW Lt
< 45 MPH
45.5$ LIPN a SS MPH
< 45 1.!i+H 45.ss NPH a 55 Y.PH
t0a
,ZY 177
74 I= 1W
ENGINEERING DIVISION
A r-.r, r„-.. ,� r . — L "DTED
10
G1__ 2V 0/13/2023
PCMs
RIGHT
WORK
ARE ® IANS 1 ueL
1 ARPAD
00049 IO M M 6 6
I
In •� 6EE 2.c SEC 2A SC-C
N�7E 4
R.1D LOANS , c : R!
X 1 X % L B R 10p'L ADVANCE OF LANE CLOSURE Si
I
Applicant shall repair/replace all 4r 6V
damage to utilities or frontage ROAD OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
improvements in City right-of-way a
per city standards that is caused or WORK E ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
occurs during the permitted project. AHEAD e UTILITIES MAY REQUIRE A SEPERATE PERMIT.
W20-1 w4.2(L} ES
RIBHT LANE L v 1.) SEE SPECIAL PROVISIONS FOR WORK HOUR RESTRICTIONS
CLOSED
2=JCTEND DEVICE TAPER AT 113 ACROSS SHOULDER.
LEGEND lAHEAD 46' OWNER/CONTRACTOR IS RESPONSIBLE FOR
3. DEVICES Si NOT ENCROACH INTO THE ADJACENT LANE
Di TEMPORARY SIGN LOCATION EROSION CONTROL AND DRAINAGE
WZOSR d. USE TRANSVERSE DEVICES IN CLOSED LANE EVERY TOCO'(FT]
Q TRAFFIC SAFETY DRUM (RECOMMENDED).
Go> SECUEh.J+t ARROW SIGN SINGLE -LANE CLOSURE FOR MULTI -LANE ROADWAYS �'27 SPACING FOR THE DCm sraEArr. TAPER sHat! BE
t• TRANSPORTABLE ATTENUATOR
6. ALL SIGNS ARE RUCK ON ORANGE
PCMS PORTABLE CHANGEABLE MESSAGE SIGN NOT TO SCALE
FILE tattle Sme�l R PS si � Us,W+n Strout A2.16L Work M MY,Ti iM�Due ebb n T AWOL PW I
Twe 9.1e71 AM 1PROUNO. ^"-`
DATE 11=9 � WAS UP
LOTTED BE601t Y 1
DESIGNED BY .a MFdShin9ton SUf6
•NIL
ENTERED -..T' w
D Department of TraTlsportatfoD
CMCK
TRAFFIC CONTROL PLAN .«•.
REGIONAL POLL REVISION DATE BT
RECEIVED
Sep 08 2023
CITY OF EDMONDS
"—DEVELOPMENT SERVICES
DEPARTMENT
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
25
30
35
40
45
50
55
60
65
70
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R
HOST VEHICLE WEIGHT
9,900 TO 22,000 Ibs.
HOST VEHICLE WEIGHT
I > 22,000 lbs.
< 45 MPH
45-55 MPH
> 55 MPH
< 45 MPH
45-55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150,
PROTECTIVE VEHICLE (WORK VEHICLE) = R
NO SPECIFIED DISTANCE REQUIRED
300'
ONE LANE .�
ROAD
AHEAD
48"
48" W20-4 48. W20-7A
ROAD BE
WORK PREPARED
AHEAD TO STOP
48" 48"
W20.1 W20-7111
W20.7B (OPTIONAL IF
40 MPH OR LESS)
LEGEND
FLAGGING STATION
b TEMPORARY SIGN LOCATION
D CHANNELIZING DEVICES
PROTECTIVE VEHICLE
SIGN SPACING = X (1)
RURAL HIGHWAYS 60 165 MPH
800't
RURAL ROADS 45/55 MPH
500'i
RURAL ROADS & URBAN ARTERIALS 35/40 MPH
350't
RURAL ROADS, URBAN ARTERIALS, 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200't (2)
URBAN STREETS 25 MPH OR LESS
100'i (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE
INTERSECTIONS AND DRIVEWAYS.
(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT
ROADWAY CONDITIONS.
50. TO 100'
6 DEVICE
MIN I I R
O RK
AREA
59TO 100'
6 DEVICE
W20-7A
ONE LANE
ROAD
AHEAD�
W20-4
W20_7B (OPTIONAL IF
40 MPH OR LESS)
481, 48'
BE ROAD
PREPARED WORK
To STOPrr AHEAD
48" 48" 48. 48'
Or . W20.713 ONE LANE W20.1
ROAD
AHEAD
48" 48"
W20-7A W20-4
BE
PREPARED > W20-713 IONAL IF
40 MPH OR(OPTLESS)
TO STOP
48'
W20-7B
48'
ROAD
CHANNELIZATION DEVICE
SPACING (FEET)
MPH
TAPER
TANGENT
50/65
10 TO 20
80
35/45
10 TO 20
60
25/30
1 10 TO 20
40
WORK NOTES
AHEAD
48' 1. ALL SIGNS ARE BLACK ON ORANGE.
ONE -LANE, TWO-WAY TRAFFIC CONTROL
WITH FLAGGERS
NOT TO SCALE
2. EXTENDING THE CHANNELIZING DEVICE TAPER ACROSS
SHOULDER IS RECOMMENDED.
3. NIGHT WORK REQUIRES ADDITIONAL ROADWAY LIGHTING AT
FLAGGING STATIONS. SEE THE STANDARD SPECIFICATIONS
FOR ADDITIONAL DETAILS.
4. SEE SPECIAL PROVISIONS FOR WORK HOUR RESTRICTIONS.
Plot 1
TIME 3:05:14 PM
s•"•s
"WAS
FED.AID PROJ.NO.
.e
" E
Amokxnx
�
�I/
Washington State
Department of Transportation
.ss
TC7�
DATE 1/212018
PLOTTED BY Ilddelf
DESIGNED BY
+". x... Ex
sx.E.
o.
ENTERED BY
CHECKED BY
c"x.xnm x"wnox
xo.
TRAFFIC CONTROL PLAN
PROJ. ENGR.
REGIONAL ADM.
REVISION
DATE
BY
RECEIVED
CITY OF EDMONDS
Right -of -Way Application #1372090 - 23812 107th PI W
M BuildingPermit.com Sep 08 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Applicant
First Name Last Name Company Name
Marty Henninger Olympic View Water and Sewer District
Number Street Apartment or Suite Number E-mail Address
8128 228th St SW marty@ovwater.com
City State Zip Phone Number Extension
Edmonds WA 98026 (425) 774-7769
Contractor
Company Name
Contractor Unknown
Number Street Apartment or Suite Number
City State Zip Phone Number Extension
State License Number License Expiration Date UBI # E-mail Address
Project Location
Number Street Floor Number Suite or Room Number
City Zip Code County Parcel Number
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
23812 107th PI W
Property Owner
First Name Last Name or Company Name
Number Street Apartment or Suite Number
City State Zip
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 9/6/2023 Submitted By: Marty Henninger
Page 1 of 2
CITY OF EDMONDS M BuitdingPermit.com
Right -of -Way Application #1372090 - 23812 107th PI W
Project Contact
Company Name: Olympic View Water and Sewer
District
Name: Marty Henninger Email: marty@ovwater.com
Address: 8128 228th St SW Phone #: (425) 774-7769
Edmonds WA 98026
Project Type Activity Type Scope of Work
Utility Purveyor Utility Work Disturbance of Surface
Project Name: 23812 107th PI W
Description of Work: Emergency repair of water service. Replace existing poly water service.
Project Details
Project Information
Job Number
14
Page 2 of 2