Loading...
REVIEWED BLD2022-0797+Storm_Drainage_Report+6.19.2022_11.54.48_AM+2941073RECEIVED Jul 11 2GONDS STORMWATER ADDENDUM CITY OF EDM---------- DEVELOPMENT SERVICES DEPARTMENT BLD2022-0797 1UNE 2017 Does the project result in 2,000 square feet, or greater, of new plus replaced hard surface area? OR Does the land disturbing activity total 7,000 square feet or greater? Yes Minimum Requirements No_ I through 5 apply Minimum Requirement No. 2 applies Next Question Does the project add 5,000 square feet or more of new plus replaced hard surfaces? OR Convert 0.75 acres or more of vegetation to lawn or landscaped areas? OR Convert 2.5 acres or more of native vegetation to pasture? No Yes Is this a road related project? All Minimum Requirements apply to the new and replaced Yes hard surfaces and converted �- vegetation areas. All Minimum Requirements apply to the new hard surfaces and converted vegetation areas. No Yes Does the project add 5,000 square feet or No more of new hard surfaces? Yes Do new hard surfaces add 50% or more to the existing hard surfaces within the project limits? No Figure 3.1. Flow Chart for Determining Requirements for Development. 9 1 APPLICABILITY OF THE MINIMUM REQUIREMENTS No additional requirements.