Building PermitType: SOLAR Subtype: SOLAR RESIDENTIAL I Status: ISSUED
Parcel No: 27032500205600 Site Address: 712 7TH AVE S EDMONDS,WA 98020-4012 Applied: 10/26/2023
Subdivision: SP S-16-85 Lot: 0 Issued: 10/26/2023
Fire Sprinklers: Lot Area: Zoning: Final:
Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 4/23/2024
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED
Scope of Work: NILSEN- ROOFTOP SOLAR
I WA State Contractor L & I #: PUGETSS920RH I
CONTACTS
m
NAME TYPE
NAME
ADDRESS I
PHONE
EMAIL
APPLICANT
NAZIFULLAH NAZIF
805 RAINIER AVE S, SEATTLE WA
(206)706-1931
PERM ITTING@PUGETSOUNDSOLAR.0
98144
Om
CONTACT
PUGET SOUND SOLAR
805 RAINIER AVE S, SEATTLE WA
(206)706-1931
permitting@pugetsoundsolar.com
98144
5308 BAKER AVE NW SEATTLE,
PERMITTING@PUGETSOUNDSOLAR.0
CONTRACTOR
PUGET SOUND SOLAR
(206)706-1931
SEATTLE WA 98107
OM
DAMES & BAURECHT
MAGR
712 7TH AVE S, EDMONDS WA
OWNER
(425)672-9760
N I LSE N
198020
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
BLD - PERMIT BASE FEE
001.000.322.10.000.00
$100.00
$100.00
10/26/23
R32268
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
10/26/23
R32268
PERMIT
SOLAR - RESIDENTIAL
001.000.345.83.000.00
$38.00
$38.00
10/26/23
R32268
STATE BUILDING CODE SURCHARGE
001.000.237.150
$6.50
$6.50
10/26/23
R32268
RES
TOTALS: $189.50
$189.50
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, October 26, 2023 12:31:59 PM 1 of 2
SOLARPerCity mit
-
• • •
98020 1
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
EQUIPMENT USAGE
FOR
manufacturer's specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufacture's installation instructions on site for Building Inspector.
INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR COMPLETED RESULT
NOTES
X-1 FIRE FINAL
X-3 BUILDING FINAL"
Printed: Thursday, October 26, 2023 12:31:59 PM 2 of 2