Loading...
BLD2023-1360_Site_Plan_10.31.2023_9.04.39_AM_3870599Equipment Summary Modules: (31) Q.Peak DUO BLK ML-G10+ 405 Inverter(s): (1) SolarEdge 1000OH-US Racking: Ironridge XR100 Table of Contents: Cover Page Al Site Overview A2 Roof Layout E1 Single Line E2 Electrical Calculations G1 Roof As Built G2 Electrician As -Built G3 Micro/optimizer map G4 Placards G5 Equipment BOM General Notes: Additional Electrical Work: Site &ffl. A&RSOL_AR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. U C Q 0 0 0 0o Brnu)rn �v �00 rub vi V > o Lr) N ^>� ��� o E O Ln -a L U) W a N 7_ 1 REVISIONS Rev. #: IDate: IDesioned bv: Thomas N I Project Manager: Will MacArthur (206)307-1741 Current Date:Apr 11, 2023 Cover Page Batteries, Battery Comt Attachment Detail Side View (Portrait) FLASHING AS REQUIRED TO SEAL ROOF MINIMUM (1) 5/16 X 4.75 LAC BOLT EMBEDDED 2" MINIMUM CENTER ON ROOF FRAMINC PV MODULE, BY OTHERS IRONRIDGE RAIL (E) COMPOSITION SHINGLE ROOF IRONRIDGE FLASHFOOT2 (E) ROOF FRAMING Modules not to exceed height of existing ridge — — — — — — — — — — — — — — — — — — — — — — � 18" �6" (sample) Attachment point layout for array. 72" OC Max. &*41. A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. U =Q (A� 0 0 0 E 00 ornu�rn Vi U E_� � � .. V (n o N n cn �o � �_Ile 0 0 O L Ln Ln -a W a N ,--1 REVISIONS Rev. #: Date: 1 1 Oct 23, 2023 Designed by: Thomas N Project Manager: Will MacArthur (206) 307-1741 Current Date:Oct 23, 2023 Al Site Overview Required Setbacks from Ridge: Maximum Mount Spacing: Roof Type: Roof Slope: Array Tilt : Array Azimuth(s): Roof Area: Array Area Array to Roof Coverage 18" 72" Comp 9°,18° Flush 900,180°,270° 3751ft2 655ft2 17% * * *Roof Attachments/ Fastners: see pg. G5 Equip. BOM* * * "All uB" I Module and Rail Selection Guide Q.Peak DUO BLK ML- 41.1 x 74 G 10+ 405 Clamp Zone "A" 0.79-11.8" Clamp Zone "B" 0.79-25.6" Mods per Row Rail typel+ rail type2 (6)Portrait, (1)row (2)14', (2)split 17' (4)Portrait, (4)rows (2)17', (3)Portrait, (1)row (2)14', (2)Landscape, (1)row (2)14', (1)Landscape, (4)rows (2)split 14', _ I A&RSOL-AR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. U cQ 0 O O N O a0O(3)(nm Vi U 00 .. U 0 U olnI'D� N Vi �O Se Ln � L Ln Ln -� W aN REVISIONS Rev. #: I Date: Designed by: Thomas N Project Manager: Will MacArthur (206)307-1741 Current Date:ADr 11. 2023 A2 Roof Layout A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. = Q � a 0 .. V O Ln aLr) N O O O V>N� V) o n"o� (1) O O LU REVISIONS Rev. #: Date: Designed by: Thomas N Project Manager: Will MacArthur (206) 307-1741 Current Date:Apr 11, 2023 G5 Equipment BOM Electrical Schedule/ BOM Category Equipment QTY Notes Modules Q.Peak DUO