Loading...
FIR2022-0043+Calculations+4.15.2022_9.12.08_AM+2804685State of Washington Sprinkler License # Designer: Kenneth H. RO-BI-NP-*272C2, Level Robinson-Elmslie Robinson 1230121st Pl SE State of Washington Sprinkler E tt WA 98208 D' C if f vere , esigner, ert irate o Plumbing Inc 360-403-7462 Competancy #7659-0106-CE 13 FI R2022-0042 Builder: CC Construction RECEIVED Property address: 8354 Olympic View DR., Edmonds (Lot A) Total quantity of sprinkler heads: 25 Apr 15 2022 CITY OF EDMONDS DEVELOPMENT SERVICES Fire sprinkler system notes: DEPARTMENT * Fire sprinkler system design per NFPA 13d (standard for houses and duplexes). * Fire sprinkler system to be pressure tested and flow tested. * Sprinkler piping and fittings to be C.P.V.C. "Flameguard" by Speers Mfg. * Installation of C.P.V.C. pipe and fittings to be done by manufacturer certified installers * Sprinkler system to supply water connection for toilets, providing "flow through" in lieu of backflow prevention. Dead end branch lines shall be kept to no more than 20' in length * Sprinkler heads to be Victaulic FL-RES/C concealed pendant with escutcheons per listing. SIN # V4906. * Lines in attic to be protected from freezing with tent insulation (by others). * Design spacing for Victaulic concealed pendant is 16' x 16' (256 square feet). * Design Density is minimum .05 gpm/square foot * Design area is for 2 head simultaneous flow. * Minimum flow requirements (concealed pendant) are: (1) head flow = 13 gpm @ 7.0 psi (flat or sloped ceilings up to 8/12) (2) head flow = 13 gpm (ea) @ 7.0 psi (flat or sloped ceilings up to 8/12) JOB: CC CONSTRUCTION ADDRESS: 8354 OLYMPIC VIEW DR, EDMONDS (LOT A) DESIGNER: KENNETH H. ROBINSON-ELMSLIE CALCULATIONS FOR 26 GPM FLOW (2 HEADS) IND. LOSS NET TOTAL A. WATER PRESSURE IN STREET 80.00 B: SELECT PIPE SIZE: 1" C: DEDUCT METER & SETTER LOSS (1") 12.00 68.00 DEDUCT BACKFLOW DEVICE LOSS (NONE) 0.00 68.00 D: DEDUCT HEAD LOSS FOR ELEVATION HEIGHT 20 X .434 LBS/FT 8.68 59.32 E. DEDUCT PRESSURE LOSS FROM MAIN TO SRINKLER 1-1/4" WATER SERVICE ITEM QUANTITY EQUIV FT. TOTAL FT. PIPE: 180 1 180 ELLS: 8 2 16 R-TEES 7 3 21 B-TEES 3 2 6 TOTAL: 223 TOTAL EQUIVALENT FT. X .04 PSI/FT = 8.92 50.40 F: DEDUCT PRESSURE LOSSES FOR 1-1/2" PIPING FROM CONTROL VALVE TO MOST REMOTE SPRINKLER ITEM QUANTITY EQUIV FT. TOTAL FT. PIPE: 0 1 0 ELLS: 0 7 0 R-TEES 0 1 0 B-TEES 0 8 0 TOTAL: 0 TOTAL EQUIVALENT FT. X .0178 PSI/FT = 0 50.40 F: DEDUCT PRESSURE LOSSES FOR 1-1/4" PIPING FROM CONTROL VALVE TO MOST REMOTE SPRINKLER ITEM QUANTITY EQUIV FT. TOTAL FT. PIPE: 65 1 65 ELLS: 7 6 42 R-TEES 9 1 9 B-TEES 4 6 24 TOTAL: 140 TOTAL EQUIVALENT FT. X .0343 PSI/FT = 4.802 45.60 F: DEDUCT PRESSURE LOSSES FOR 1" PIPING FROM CONTROL VALVE TO MOST REMOTE SPRINKLER ITEM QUANTITY EQUIV FT. TOTAL FT. PIPE: 38 1 38 ELLS: 0 5 0 R-TEES 5 1 5 B-TEES 1 5 5 TOTAL: 48 TOTAL EQUIVALENT FT. X .1067 PSI/FT = 5.12 40.48 F: DEDUCT PRESSURE LOSSES FOR 3/4" PIPING FROM CONTROL VALVE TO MOST REMOTE SPRINKLER ITEM QUANTITY EQUIV FT. TOTAL FT. PIPE: 9 1 9 ELLS: 0 4 0 R-TEES 0 1 0 B-TEES 1 3 3 TOTAL: 12 TOTAL EQUIVALENT FT. X .0296 PSI/FT = 0.36 40.12 REMAINING PRESSURE FOR SPRINKLER OPERATION 40.12 CALCULATIONS PER NFPA 13D A.10.4.3 (A) (2013 ED.) • WASHINGTON STATE • CERTIFICATE OF COMPETENCY • • FME'ROTlCTION •PRINRLER SYSTIMS • • Kenneth H. Robinson-Elmslie • • 7659-0106-CE Level 3 ' ' Robinson Plumbing, Inc. ROSINP'2 2C2 �l tr • • ' sae s�. • .�•••••.....•••.• ...•