Loading...
APPROVED RESUB1 BLD2022-1087+Transportation_Impact_Form+10.20.2022_10.47.10_AM+3175797RESUB Oct 20 2022 , ov h Dn CITY OF EDMONDS� ' DEVELOPMENT SERVI DEPARTMENT Oc' 1� PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov BLD2022-1087 APPENDIX A Page I of 2 Transportation Impact Analysis Worksheet Name of Proposed Project: 7918 203rd St. SW, BLD2021-1087 (Lot 1 of 203rd St SW Short Plat, PLN2021-0039) Owner/Applicant Applicant Contact Person: Select Homes Name Edmonds WA 98026 Street/Mailing Address Edmonds WA 98026 City State Zip Telephone: (425) 742-6044 Kayla Clark Nichols Name Edmonds WA 98026 Street/Mailing Address Edmonds WA 98026 City State Zip Telephone: (206) 963-3365 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): RAM Engineering, Inc. Rob Long, PE Firm Name Contact Name Telephone: (425) 678-6960 1. PROJECT DESCRIPTION E-mail: RobL@RAMengineeringlnc.com a. Location - Street address: 7918 203rd St. SW ( Lot 1 of 7918 203rd St SW Short Plat) (Attach a vicinity map and site plan.) b. Specify existing land use: Single Family Residential c. Specify proposed type and size of development: Single Family Residential, One Lot/SFR (# of residential units and/or square footage of building) d. Date construction will begin and be completed: Start November 2022 / End July 2023 e. Define proposed access locations: Shared driveway from 203rd St SW per Short Plat. APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: Shared driveway access to 203rd St SW, adequate access sight distance. 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. ® CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. ITE Land Use Category New Use I SFR, ITE 210 Prior Use I SFR, ITE 210 Units in Per Unit square feet, Fee Rate # of dwelling, vfp, etc. $ 6,249.14 X 1 = $ 6,249.14 X 1 = Fee i New Use Fee: $ 6,249.14 - Prior Use Fee: $ 6,249.14 = $ 0.00 Lot 1 to recieve credit for existing SFR ❑ NEW DEVELOPMENT removed with short plat development. Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X ❑ OTHER MITIGATION FEE RECOMMENDATION: INDEPENDENT FEE CALCULATION: $240.00 + consultant fee $ TOTAL TRANSPORTATION IMPACT FEE $ ENGINEERING DIVISION City of Edmonds, Engineering Division App �� Date 1 /15/2022 ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.