Loading...
Building PermitType: PLUMBING Subtype: COMMERCIAL PLUMBING I Status: ISSUED Parcel No: 00434202103100 Subdivision: 004342 Fire Sprinklers: Valuation: $0.00 Code Edition: 0 Site Address: 100 5TH AVE N EDMONDS,WA 98020-3145 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: CLINE JEWELERS- PLUMBING FOR T/I BLD2023-04 Applied: 4/17/2023 Issued:5/10/2023 Final: Expiration Date: 5/4/2024 Issued by: NED I WA State Contractor L & I #: GSMECML795RW I CONTACTS NAME TYPE NAME A PHONE EMAIL APPLICANT GREG SMALLING PO BOX 65, REDMOND WA (206)372-0332 GREG@GSMECHANICALSHOP.COM 98073-0065 CONTACT GS MECHANICAL LLC PO BOX 65, REDMOND WA (206)372-0332 greg@gsmechanicalshop.com 98073-0065 CONTRACTOR GS MECHANICAL LLC- PO BOX 65, REDMOND WA (206)372-0332 greg@gsmechanicalshop.com PLUMBING 98073-0065 1404 GOAT TRAIL LOOP RD, OWNER CAMWEST INC MUKILTEO WA 98275 7LOWDESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # - OVER 2 INCH 001.000.345.83.000.00 $51.00 $51.00 5/10/23 R28545 CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 4/17/23 R27884 PERMIT COMMERCIAL PLUMBING - PLAN 001.000.345.83.000.00 $315.00 $315.00 5/10/23 R28545 REVIEW DRAINS WITHIN FOOTPRINT OF 001.000.345.83.000.00 $34.00 $34.00 5/10/23 R28545 BUILDING EACH PLUMBING FIXTURE ON ONE 001.000.345.83.000.00 $136.00 $136.00 5/10/23 R28545 TRAP PLUMBING BASE FEE 001.000.322.10.000.00 $57.00 $57.00 4/17/23 R27884 WATER HEATER - INC EXPANSION 001.000.345.83.000.00 $17.00 $17.00 5/10/23 R28545 TANK TOTALS: $655.00 $655.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Wednesday, May 10, 2023 12:00:22 PM 1 of 2 PLUMBING Permit - City of • • • •: i 1 177 www.edmondswa.gov - 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES X-0 PLUMBING FINAL" B-3 PLUMB ROUGH IN B-3 PLUMB GROUND WK Printed: Wednesday, May 10, 2023 12:00:22 PM 2 of 2