Loading...
K1 - Equipment PlanUNPUBLISHED WORK 02022 CMA. INC. General Notes • IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND ALL SUB -CONTRACTORS TO VERIFY THE ACTUAL SPACE AND MECHANICALREQUIREMENTS OF ALL ITEMS SHOW AS FUTURE, N.I.C., SUPPLIED BY "OTHERS", ETC. WITH THE OWNER PRIOR TO ROUGH -IN AND CONNECTION • THE GENERAL CONTRACTOR SHALL IMMEDIATELY INFORM CMA RESTAURANT SUPPLY & DESIGN PROJECT MANAGER AND THE OWNER OF ANY RED LINES, CORRECTIONS, ETC. ON THE PERMIT PLANS AND OF ANY INSPECTION CORRECTIONS REQUESTED CONCERNING THESE DRAWINGS OR EQUIPMENT AS LISTED FOR THIS PROJECT. • THE GENERAL CONTRACTOR SHALL PROPERLY SEAL ALL WALL AND FLOOR PENETRATIONS AFTER THE INSTALLATION OF RELATED EQUIPMENT AND FURNISHING. • IT SHALL BE NOTED BY THE GENERAL CONTRACTOR AND ALL SUB -CONTRACTORS THAT THIS SET OF PLANS AND THE INFORMATION CONTAINED WITH -IN IN NOW WAY RELIEVES SAID PARTIES OF THEIR RESPONSIBILITIY TO INVESTIGATE AND COMPLY WITH ALL APPLICABLE CODES AND ORDINANCES, AND TO PERFORM ALL WORK TO THE HIGHEST STANDARDS. • THE GENERAL CONTRACTOR SHALL PROVIDE ALL FLOOR, CEILING, WALL AND ROOF PENETRATIONS AND FIRE RATED SHAFTS FOR EXHAUST DUCTWORK. • IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO PROVIDE WEATHER PROTECTION FOR ALL ROOF AND ALL WALL PENETRATIONS PRIOR TO AND DURING THE INSTALLATION OF EQUIPMENT AND FURNISHINGS. • SUITABLE WALL BACKING AS SHOWN ON THESE PLANS AND AS REQUIRED BY THE OWNER SHALL BE PROVIDED AND INSTALLED BY THE GENERAL CONTRACTOR. • THE EXHAUST SYSTEM SHALL BE SUBJECT TO A PERFORMANCE TEST AS REQUIRED PRIOR TO ISSUANCE OF BUILDING PUBLIC OCCUPANCY BY LOCAL BUILDING OFFICIALS. • PLANS FOR WALK-IN COOLER SHALL BE SUBMITTED PRIOR TO CONSTRUCTION. • THESE PLANS SHALL BE READ IN CONJUNCTION WITH THE EQUIPMENT CUT SHEET BOOK SUPPLIED BY CMA RESTAURANT SUPPLY & DESIGN, INC. AND BY THIS REFERENCE IS MADE A PART HEROF. ROOF / REMOTE LOCATION SEE ARCHITECTS / ENGINEERS DRAWINGS 63 65 112 NIMUM OF R-25 IINIMUM OF R- 2 )RS, WALLS AND CEILINGS DRS - MINIMUM ; OF R-28 -I.rOn MARN FT 7 T gym. VERIFY EQUIPMENT REQUIREMENTS WITH FINAL EQUIPMENT SELECTIONS M dui V ) ui 1..O H ry W 0 0 O O N O O CO O Z .50 C/) O O Co l'J1 Ca 0 � O O E W u') m M CV 6) N O � co O � � M fl_ co LO O N N � U U O U Z Q C) V ) ui L.L Q Lu I� V W z W U II-___ Date: 10-25-2022 JG WINTER Scale: 1 /4"= V-0" Project #: 1652