K1 - Equipment PlanUNPUBLISHED WORK
02022 CMA. INC.
General Notes
• IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND ALL SUB -CONTRACTORS
TO VERIFY THE ACTUAL SPACE AND MECHANICALREQUIREMENTS OF ALL ITEMS SHOW AS
FUTURE, N.I.C., SUPPLIED BY "OTHERS", ETC. WITH THE OWNER PRIOR TO ROUGH -IN AND
CONNECTION
• THE GENERAL CONTRACTOR SHALL IMMEDIATELY INFORM CMA RESTAURANT SUPPLY & DESIGN
PROJECT MANAGER AND THE OWNER OF ANY RED LINES, CORRECTIONS, ETC. ON THE PERMIT
PLANS AND OF ANY INSPECTION CORRECTIONS REQUESTED CONCERNING THESE DRAWINGS OR
EQUIPMENT AS LISTED FOR THIS PROJECT.
• THE GENERAL CONTRACTOR SHALL PROPERLY SEAL ALL WALL AND FLOOR PENETRATIONS
AFTER THE INSTALLATION OF RELATED EQUIPMENT AND FURNISHING.
• IT SHALL BE NOTED BY THE GENERAL CONTRACTOR AND ALL SUB -CONTRACTORS THAT THIS SET
OF PLANS AND THE INFORMATION CONTAINED WITH -IN IN NOW WAY RELIEVES SAID PARTIES
OF THEIR RESPONSIBILITIY TO INVESTIGATE AND COMPLY WITH ALL APPLICABLE CODES AND
ORDINANCES, AND TO PERFORM ALL WORK TO THE HIGHEST STANDARDS.
• THE GENERAL CONTRACTOR SHALL PROVIDE ALL FLOOR, CEILING, WALL AND ROOF
PENETRATIONS AND FIRE RATED SHAFTS FOR EXHAUST DUCTWORK.
• IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO PROVIDE WEATHER
PROTECTION FOR ALL ROOF AND ALL WALL PENETRATIONS PRIOR TO AND DURING THE
INSTALLATION OF EQUIPMENT AND FURNISHINGS.
• SUITABLE WALL BACKING AS SHOWN ON THESE PLANS AND AS REQUIRED BY THE OWNER
SHALL BE PROVIDED AND INSTALLED BY THE GENERAL CONTRACTOR.
• THE EXHAUST SYSTEM SHALL BE SUBJECT TO A PERFORMANCE TEST AS REQUIRED PRIOR TO
ISSUANCE OF BUILDING PUBLIC OCCUPANCY BY LOCAL BUILDING OFFICIALS.
• PLANS FOR WALK-IN COOLER SHALL BE SUBMITTED PRIOR TO CONSTRUCTION.
• THESE PLANS SHALL BE READ IN CONJUNCTION WITH THE EQUIPMENT CUT SHEET BOOK
SUPPLIED BY CMA RESTAURANT SUPPLY & DESIGN, INC. AND BY THIS REFERENCE IS MADE A
PART HEROF.
ROOF / REMOTE LOCATION
SEE ARCHITECTS / ENGINEERS DRAWINGS
63 65 112
NIMUM OF R-25
IINIMUM OF R- 2
)RS, WALLS AND CEILINGS
DRS - MINIMUM ; OF R-28
-I.rOn MARN
FT 7 T gym.
VERIFY EQUIPMENT REQUIREMENTS WITH FINAL EQUIPMENT SELECTIONS
M
dui
V )
ui
1..O
H
ry
W
0
0
O
O N
O O
CO
O
Z
.50
C/) O
O
Co
l'J1
Ca 0
� O
O E
W
u') m
M CV
6) N
O �
co
O �
�
M fl_
co LO
O N
N �
U U
O
U
Z
Q
C) V )
ui
L.L
Q
Lu
I�
V
W
z
W
U
II-___
Date: 10-25-2022
JG WINTER
Scale: 1 /4"= V-0"
Project #: 1652