Loading...
APPROVED BLD PLN RESUB1 BLD2023-0054+Mechanical_Plan+3.2.2023_3.56.49_PM+3399009O C'� O M (V O N L�C��ND ® PLUMBING FIXTUI� GOLD WATER PIPE CGWI ---- HOT WATER PIPE CHW) NOT WATER RECIRG PIPE CNWG) -BAN- SANITARY PIPE CSAN) ---- VENT PIPE CV) —0— STORM PIPE CS) �RL RAIN LEADER CRLJ ® RD ROOF DRAM (RD) ® OD OVERFLOW DRAIN COD) —G— GAS PIPE CG) -BTM- STEAM PIPE CSTM) -COND- CONDENSATE RTN. PIPE CGOND) �F NOSE BIBBAUALL HYDRANT �� BALL VALVE —0� GATE VALE —0GII GATE VALVE w/CAP � BALANCING VALVE �j— GAS COGK/VALVE �� GLOBE VALVE ANGLE GLOBE VALVE 3-WAY MOTORIZED VALVE � CONTROL VALVE �— CHECK VALVE P�SSURE RELIEF VALVE �i� PRESSURE REDUCING VALVE F'�SSURE REDUCING STATION � BACKFLOW PREY. STATION � PIPE CAP OR 6ANITARY GLEANOUT � PIPE BREAK �o PIPE UP � PIPE DOLLN �� PIPE TEE UP �� PIPE TEE DOU.N �� PIPE FLANGE �� UNION f FLEX CONNECTION CPIPE) STRAMER � AIR VENT PRESSURE GUAG£ THERMOMETER ®HVAC EQUIPMENT NUMBER/ PLUMBING FIXTURE DESIGNATION 2MG RECTANGULAR DUCT SIZE C'0 ROUND/SPIRAL DUCT 61ZE $4/170 OVAL DUCT SIZE CEILING DIFFUSER - BQUARE ® CEILING DIFFUSER -ROUND I� LINEAR/SLOT DIFFUSER Q+ RETURN AIR/EXNAUST GRILLE a WEATHER LOUVERNIALL GRILLE � SUPPLY AIR ARROW �'h RETURN AIR/EXHAUST ARROW ® THERMOSTAT/SENSOR $ SPIN-M wNOLUME DAMPER IIIIIIIIII FLEX DUCT (0) DUCT, I�CT CO) / R011ND CO) SOUNDLINED DUGT/DUGTBORD ® SUPPLY AIR DUCT DOUl1 ® SUPPLY AIR DUCT UP ® RET/EXN DUCT DOU.N COJ m RET/EXH DUCT UP CO) ® ROl1ND/SPIRAL DUCT DOLLN CO) � ROUND/SPIRAL DUCT UP COJ RECT DUCT BREAK C ROUND/SPIRAL DUCT BREAK RECT ELESOW w/TURJ VANES RADIUS ELBOW (0 / O) a rRANSrnoN •�7 SQUARE -ROUND TRANSITION FLEX CONNECTOR � EQPT. }}' FIRE DAMPER i-}® SMOKE DAMPER +{' VOLUME DAMPER CVO) �-}� VOL. DMPR w/REMOTE OF'ER �® MOTORIZED DAMPER -F�U9- HYDRONIG WATER SUPPLY -F�YAl- HYDR.ONIC WATER RETURN -QUS- CONDENSER WATER SUPPLY -CWR- CONDENSER WATER RETURN -CN6- CHILLED WATER SUPPLY -CNR- GRILLED WATER RETURN AAV AUTOMATIC AIR VENT AG AIR GOMPRESSCR, AIR CONDITIONNG AD AIR DRYER ADA AMERICANS WITH DISABILITIES ACi AFF ABOVE FINISHED FLOOR AHU AIR HANDLMG UNIT AL ALUMMUM ALi ALTERNATOR, ALTERJATIVE APD AIR PRESSURE DROP ARG AIR RECEIVER ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AND AIR CONDITIONING ENGMEERS, ING ASME AMERIGAN SOCIETY OF MECHANICAL ENGINEERS B BOILER BC BRANCH CONTROL BDD BFF BOD BTUH B� GA GG CD CFH GFM CLG CN GONT GOP GP MECHANICAL ABBREVIATIONS DSN DOWN SPOUT NOZZLE HWR HEATNG WATER RENRN RL RAIN LEADER DWv DRAIN, WASTE AND VENT HWS HEATING WATER SUPPLY RFBFP REDUCED PRESSURE BAGKFLOW F1�VENTOR DX DIRECT EXPANSION HX NEAT EXCHANGER RFtM REVOLUTIONS PER MINUTE. EA EACH OR EXHAUST AIR HZ HERTZ S SINK EDB ENTERING DRY BULB TEMPERATURE ID INSIDE DIAMETER OR DIMENSION SA SUPPLY AIR EER ENERCsY EFFICIENCY RATIO IE INVERT ELEVATION SAD SUPPLY AIR DAMPER EF EXHAUST FAN IN INCH SD SUPPLY DIFRISER EFF EFFICIENCY KW KILOWAft SF SUPPLY FAN OR SQUARE Fi EG EXHAUST GRILLE L LAVATORY SG SUPPLY GRILLE ERV ENERGY RECOVERY VENTILATOR L-X LOUVER SHR SHOIWER ESP EXTERdAL STATIC PRESSURE LBS POUNDS SHT SHEET ET EXPANSION TANK EWB ENTERING WET BULB TEMPERATURE EWC ELECTRIC WATER COOLER BACKDRAFi DAMPER EWr BELOW FNISHED FLOOR EXH BOTTOM OF DUCT EXST BRITISH THERMAL UNITS F PER HOUR BALANCING VALVE FG COMPRESSED AIR FCO COOLMG COIL FD CONDENSATE DRAIN FF CUBIC FEET PER HOUR FLR CUBIC FEET PER MINUTE FP1 CEILING FOB CONDENSATE NUMBER FOi GLEANOUT FRD CONTINUATION FRP COEFFICIENT OF PEfi�OPoMANCE FSD CIRCULATION PUMP FT ENTERING WATER TEMPERATURE EXHAUST EXISTMG FILTER FAN COIL FLOOR CLEANOUr FLOOR DRAIN FINISHED FLOOR FLOOR FLUSHOMEIER FLAT GN BOTTOM FLAT ON TOP FIRE DAMPER FIBER.'aLA58 REINFORCED PLASTIC FIRE 1 BMOKE DAMPER FEET, FOOT GU CONDENSING UNIT GAL GALLON CUH CABMET UNIT HEATER GALV GALVANIZED Cv CONTROL VALVE CsFi1 GALLONS PER MNUTE D DRAIN HG HEATNG COIL DGW DOMESTIC GOLD WATER HPDE HIGH DENSITY POLYTHYLENE DG DOOR GRILLE HP HEAT PUMP DHU DEHUMIDIFICATION UNIT HT HEIGHT DI DUCTILE IRON HVAC HEATING, VENTILATION AND AIR CONDITIONING DIA DIAMETER HW HOT WATER (DOMESTIC) DN DOILN HWP HEATING WATER PUMP �UiLDiNC� INFO LWT LEAVING WATER TEMPERATURE SIM SIMILAR MAX MAXMMUM MCA MINIMUM CIRCUIT AMPACITY MEGH MECHANICAL MFR MANUFACTURER MIN MINIMUM, MINUTE MOP MAXIMUM OVERGURRENi PROTECTION MiD MOUNTCED) CING) NG NORMALLY CLOSED NG NATURAL GAS NIC NOi IN CONTRACT NO NUMBER OR NOPo'1ALLY OPEN NOM NOMINAL OD OUTSIDE DIAMETER/DIMENSION OA OUTSIDE AIR P PLUMP PF PLUMBING FIMURE PH PHASE PIG PORTABLE MSifdIIMENi CONNECTION POG POMi OF CONNECTION SL SLOPE SMACNA SHEET METAL AND AIR CONDITIONNG CONTR4CTORS NATIONAL ASSOCIATION SP STATIC PRESSURE SR SUPPLY REGISTER SS STAMLESS STEEL STL STEEL T TD TG TSP TYP UR v VAG vav w VrR W m� PRV PRESSURE REDUCM's VALVE WGO PSI FOUNDS PER SGl INCH W:a PSIG POUNDS PER SQ INCH GAGE WH PVC POLriINYL CHLORIDE WPD R RADIUS, RISER �TUF3d YCO RA �iUR�I AIR MC RAD �iU(dd AIR DAMPER EC TEE OR TANK ?BENCH DRAM TRANSFER GRILLE TOTAL STATIC PRESSURE TYPICAL URINAL VALVE, VOLT, VENT VACUUM VARIABLE AIR VO VOLUME DAMPER VENT THROUGH WASTE WATER CALUMN WATER CLOSET WALL GLEANOUT WATER GAGE WATER HEATER WATER PRESSURE YARD CLEANOUT PROJECT GENERAL NOTES (APPLIES TO ALL SHEETS): 1. THIS PROJECT IS BASED ON A DESIGN BUILD CONCEPT &DEPICT SCOPE, EQUIPMENT, CAPACITIES, ZONING, GENERAL ROUTING &ARE INTENDED FOR PERMIT APPLICATION. THEY ARE DEVELOPED FOR EXCLUSIVE USE OF DB SOLUTIONS &THEIR SUBCONTRACTORS ONLY. COORDINATION/SHOP DRAWINGS WILL BE DEVELOPED AS REQUIRED FOR INSTALLATION AND IN CONJUNCTION WITH OTHER TRADES AND THE EXISTING ARCHITECTURAL AND STRUCTURAL BUILDING ELEMENTS. COORDINATION AND PLACEMENT OF EQUIPMENT AND SYSTEMS SHALL INCLUDE CONSIDERATION FOR MAINTENANCE, CEILING HEIGHTS, LIGHTING AND ELECTRICAL CLEARANCES. 2. THE INSTALLATION OF THIS PROJECT IS BASED ON THE 2018 VERSION OF ALL BUILDING, PLUMBING, MECHANICAL STATE &LOCAL CODES ALL EQUIPMENT &DUCTWORK SHALL BE INSTALLED IN ACCORDANCE WITH ALL STATE, LOCAL AND APPLICABLE CODES. PROVIDE SEISMIC RESTRAINTS, HANGERS &SUPPORTS AS REQUIRED &OUTLINED IN SMACNA DUCT STANDARDS MANUAL. 3. DUCT SYSTEMS WITHIN THIS PROJECT SCOPE ARE EXPOSED IN THE CONDITIONED SPACE &SHALL BE INSTALLED PARALLEL TO BUILDING LINES IN A NEAT WORKMANSHIP TYPE MANNER. ALL DUCTWORK SHALL BE SEALED IN ACCORDANCE WITH WSEC CHAPTER C403.10.1 AND INSULATED PER C403.10.1.1 & C403.10.1.2. PROVIDE R-8 INSULATION ON OSA 8 EA DUCTS BETWEEN THE ERV UNIT &AUTOMATIC SHUTOFF DAMPER AT INTAKE OR EXHAUST LOUVER. 4. MAINTAIN A COMPLETE SET OF CLEAN DRAWINGS ON SITE WITH "RED -LINE" MARK-UPS OF ANY FIELD MODIFICATIONS. DRAWINGS WILL BE PROVIDED TO OWNER AT END OF PROJECT FOR "RECORD AS-BUILTS". 8. HVAC EQUIPMENT TO BE PROVIDED w/NEW 7 DAY PROGRAMMABLE THERMOSTATS w/5F DEADBAND, SETBACK, MANUAL 3 HOUR OVERRIDE AND OPTIMAL START/STOP FUNCTIONS AS OUTLINED IN WSEC C403.4.2.3 9. ELECTRICAL SERVICES, PERMITS AND DRAWINGS SHALL BE BY THE ELECTRICAL CONTRACTOR AS REQUIRED FOR INSTALLATION OF WORK. 10. HVAC SYSTEMS SHALL BE AIR BALANCED w/IN 10 % OF THE CFM'S INDICATED ON FLOOR PLANS IN ACCORDANCE w/WSEC REQUIREMENTS. A REPORT IS TO BE PROVIDED TO LOCAL JURISDICTION UPON 11. HV ALL WORK SUBJECT TO FIELD 12 PF INSPECTION FOR CODE COMPLIANCE 'EMS SHALL BE COMMISSIONED IN ACCORDANCE WITH WASHINGTON STATE ENERGY CODE & PROVIDED TO LOCAL AUTHORITY UPON REQUEST. f DOCUMENTS (I.E. ASBUILTS, O&M MANUALS, TAB REPORTS & Cx REPORT) SHALL BE TO THE OWNER UPON COMPLETION OF PROJECT. APPROVED BY PLANNING Mar03 2023 APPROVED PLANS MUST BE ON JOB SITE '� City Of Edmonds RIIII('lln(7 I7PY1AYtrYlPrlt F wor< -MECHANICAL FOR TI Addreaa; --,. ...... ..,� ....,.,. - --O-O-i�.-PIl1HIlV -J � �FLVU - - Owner �------ -------------------- Approved Date; �3�0$�2�23 '---------------------- Building Official i E�rlfi Ca-r'ffr �--- — �rmit Number; MECHANICAL CONTRACTOR ELECTRICAL CONTRACTOR RD ROOF DR41N GG GENERAL CONTRACTOR RG �TUrdl GRILLE PG PLUMBING CONTR4GTOR ADDRESS LEGAL DESCRIPTION � ° _. t ° o o -° 550 MAIN STREET, SEATTLE, WA 98020 LOTS 15 AND 16, BLOCK 120, CITY OF EDMONDS PROPERTY OWNER: ADDITION, ACCORDING TO THE PLAT THEREOF, ° r/I � � ° v v—P; MIKE MCMURRAY, SEATTLE-SNOHOMISH MILL COMPANY, INC RECORDED IN VOLUME 2 OF PLATS, PAGE 39, RECORDS q...,....,..::. ° o • � sir@ 533 5TH AVE S OF SNOHOMISH COUNTY, WASHINGTON. 1 0: �:.� ° O o EDMONDS, WA98020 o ^ o °°p "' `-` ` GECK08080@GMAIL.COM AND; ° (425) 263-2474 PROPERTY TAX ACCOUNT NUMBER LOTS 17, 18, 19 AND 20, BLOCK 120, CITY OF EDMONDS ADDITION, ACCORDING TO THE PLATE THEREOF, RECORDED ION VOLUME 2 OF PLATS, PAGE 39, RECORDS 004342-120-015-00 AND 004342-120-017-00 (BEING COMBINED UNDER SEPARATE APPLICATION OF SNOHOMISH COUNTY, WASHINGTON. VICINITY MAP MAIN STREET WEST BUILDING UNDER SEPARATE PERMIT 558 MAIN STREET EAST BUILDING AREA OF WORK 2,353 SF L—� Q T it 2 ENTRY �� ALLEY \ \ \ \ \ \ \�� `C//A ICI �1 SITE PLAN A0.00 aeuE. ute-r-v HVAC Schedules, Calculations &Sequence of Operation Level2 HVAC Plan Roof Level HVAC Plan HVAC Details HVAC Details (KEF-S Submittals) a O 0 W N N 0 N N U-1 a w — � a� C � a � � 3 � } I� I.JmI W ; 0 a �� — n z 0 tt rn N O Z to c O .� .� d Q -� O N C � � � N m E N N J � ,— a 'o a > N � fZ i/i J ODD ✓� � Q � -O — N Q 00 0��� C N � � .� � � U � g o °—�� Q � pp E _ i Q � -v H 2�LnW oA� 12/27/2022 ow,MTW �E�DB M0.00 OF G d Ln M O (V M GV N HVAC SEQUENCE OF OPERATION: SCHEDULES/SETTINGS: 1. SCHEDULE SHALL BE AS DIRECTED &ADJUSTED BY OWNER. INITAL SETTINGS SHALL BE: OCCUPIED: 6 AM - 9 PM UNOCCUPIED: 9 PM - 6 AM 2. TEMPERATURE SETTINGS SHALL BESET AS LISTED BELOW & IN ACCORDANCE w/WSEC REQUIREMENTS. COOLING: OCCUPIED 75°F UNNOCCUPIED 80°F HEATING: OCCUPIED 72°F UNNOCCUPIED 65F AH-8 & 9 (SHELL &CORE VRF SYSTEMS: OCCUPIED MODE: 1. SYSTEM SHALL OPERATE PER MANUFACTURE'S CONTROL SYSTEM TO MAINTAIN OCCUPIED SPACE TEMPERATURES. 2. FAN SHALL BE AVAILABLE &SHALL BE ENERGIZED UPON CALL FOR HEATING OR COOLING. FAN SHALL BE OFF WHEN SPACE TEMPERATURE IS SATISIFIED. TWO STAGE FAN CONTROL SHALL BE PROVIDED TO OPERATE FANS AT MAXIMUM OF 50 % CFM DURING LOW COOLING/HEATING MODES PER WSEC C403.8.5.1. 3. OUTDOOR UNIT COMPRESSOR SHALL CYCLE AS REQUIRED TO MAINTAIN SPACE TEMPERATURE. 4. HVAC SYSTEM SHALL BE INTERLOCKED w/A DOOR SWITCH AT THE PATIO DOORS TO RESET THE OPERATIONAL MODE TO UNOCCUPIED WHEN THE PATIO DOOR IS OPEN FOR 5 MINUTES OF MORE AS REQUIRED BU WSEC C403.3.5.2. UNOCCUPIED MODE: 1. SYSTEM SHALL OPERATE PER MANUFACTURE'S CONTROL SYSTEM TO MAINTAIN SPACE SETBACK TEMPERATURES. 2. FAN SHALL BE OFF R SHALL BE ENERGIZED UPON CALL FROM THERMOST. 3. OUTDOOR UNIT COMPRESSOR SHALL BE OFF &SHALL CYCLE UPON CALL FROM THERMOSTAT. ERV-3: 1. UNIT SHALL BE NORMALLY "OFF" &WILL BE INTERLOCKED WITH KEF-1. 2. UPON SIGNAL FROM KEF-1, THE MANUFACTURE'S CONTROL PANEL SHALL OPERATE UNIT TO MAINTAIN A MAXIMUM 60°F OSA/SUPPLY AIR (SA) DISCHARGE TEMPERATURE. a. FANS SHALL BE ENERGIZED TO PROVIDE OUSTSIDE (OSA) &EXHAUST (EXH) AIRFLOW. b. ENERGY RECOVERY WHEEL SHALL OPERATE PER MANUFACTURES REQUIREMENTS. c. ELECTRIC DUCT HEATER (EDH-1) SHALL BE ENERGIZED SHOULD THE ERV SA TEMP NOT BE MAINTAINED BY THE ENERGY RECOVERY WHEEL OPERATION. 3. OSA & EA DAMPERS (LOCATED AT THE WEATHER LOUVER) SHALL BE NORMALLY CLOSED &SHALL OPEN UPON ACTIVATION OF ERV UNIT. DAMPERS SHALL CLOSE WHEN UNIT IS DE -ENERGIZED PER WSEC C403.7.8.4. ERV-4: 1. OCCUPIED/UNOCCUPIED TIME SCHEDULE SHALL BE AS NOTED ABOVE. 2. OSA 8 EA DAMPERS (LOCATED AT THE WEATHER LOUVER) SHALL BE NORMALLY CLOSED &SHALL OPEN DURING OCCUPIED MODE. DAMPERS SHALL BE CLOSED DURING UNOCCUPIED SCHEDULE PER WSEC C403.7.8.4. OCCUPIED MODE: 1. THE MANUFACTURE'S CONTROL PANEL SHALL OPERATE UNIT TO MAINTAIN A MAXIMUM 60°F OSA/SUPPLY AIR (SA) DISCHARGE TEMPERATURE DURING AH-8 & 9 COOLING MODE PER WSEC C403.7.3. a. FANS SHALL BE ENERGIZED TO PROVIDE OSA &EXH AIRFLOW. b. ENERGY RECOVERY WHEEL SHALL OPERATE PER MANUFACTURES REQUIREMENTS. c. ELECTRIC DUCT HEATER (EDH-2) SHALL BE ENERGIZED SHOULD THE ERV SA TEMP NOT BE MAINTAINED BY THE ENERGY RECOVERY WHEEL OPERATION. UNOCCUPIED MODE: 1. UNIT SHALL BE "OFF". 2. EDH-2 SHALL BE "OFF". KEF-1: 1. UNIT SHALL BE NORMALLY "OFF" R SHALL BE ENERGIZED BY MANUAL WALL "PILOT LIGHT" SWITCH. HVAC EQUIPMENT SCHEDULE Updated: 12126/22 SYMBOL DEBCRIPTION LomBan/ COOLING HEATING FAN ELECTRICAL (See Note #1) WGT MIN REMARKS/NOTES CFM ESP MfR HP Area Serietl TOT SENS EER SEER IPLV FUEL HP AUX %EFF MCA V/PH OSA (ax Submlaals for compleb (MBH) (MBH) (MBH) (kWIMBH) unN info) AHU-8 Existing 6 Ton VRF Air Handling UnN Seating Area 2400 0.5 ZOB/3 Note 2 (installed under Shell 8 Core) West 8 North AHU-9 ExisOng 4 Ton VRF Air Handling Un0 SeaOng Area 1800 0.5 Note 2 (installed under Shell 8 Core) SlxJ01 ERV3 Ezistlng Energy Recovery Ven0lator Kitchen 600 0.05 Note 9 Energy Rewvery Ventllalor ERVd Renew Aire #HE1X1N Seating Area - - - - - -- - - - 350 0.5 7PL)N�P 10.8 208N 278 700% Notes 0. 5 8 7 ECM EDHsI Electrtc Duct Heater ERV.9 - - - - - Elx 9.0 10 _ 800 - - 73 20&f 20 700% RenOwAire #RH$kW kW MBH EDH-2 Electdc Duct Heabr ERV - - - - - Elee 5.0 f7 _ f000 - - 90 20&f 20 f00% RenewAire #RHdkW kW MBH RooRop Exhaust Fan KEF-1 Captiveaire #CASREI3BD Ovens - - - - - - - - - 400 0.5 7/2 HP 9.5 720M 2p WA Note #8 (See submittal info in Sheet M2.f0) 1 Disc Sw's, motor starters, conduit, wiring 8 electrical connections are provided by others. 2 Outside air shall be provided via ERV-3 8 4 wICFM as noted on floor plans. See OSA calculations on Sheet M0.01. 3 Interconnect w/KEF-f wall switch. 4 ERV-4 to be controlled via time clock 8 factory controls. Set Time Clock schedule to match building Occupancy Schedules. 5 Provided w/MERV 8 filters, 68%Sensible Effectiveness, Total Recovery EtFciency is 70%, 38d6 sound level. I � 6 See Captiveaire submittal data on sheet M2.10. Fan "ON-0FF" wntrol via a wall mountetl pilot light switch. I 7 SWSEC C403.3.5.1 calculation: Per manufacturers data, the OSA supply fan =-424 Walls / 850 CFM =- 0.5 WatWCFM. GRD SCHEDULE SYMBOL DESCRIPTION MANUF MODEL CFM NR MOUNTING FACE SIZE NECK COLOR REMARKS PATTERN SIZE CD CEILING TITUS MODULAR CORE PER PER SURFACE NECK SIZE PER WHITE BORDER TYPE 1 DIFFUSER #MCD PLANS PLANS +59/18' PLANS rorAL 3WG1 31DEWALL TITUS 300RL SERIES PER PER SURFACE NECK SIZE PER WHITE BORDER TYPEI SUPPLY GRILLE PLANS PLANS +2'TOTAL PLANS RWG-1 SIDEWALL TITUS 350 RL SERIES PER PER SURFACE NECK SIZE PER WHITE BORDER TYPEI RET/RELIEF I PLANS PLANS +1^TOTAL PLANS � GRILLE � � � � � � � � EWG1 SIDEWALL TITUS 350 ZRL SERIES PER PER SURFACE NECK SIZE PER WHITE BORDER TYPEI EXHAUST PLANS PLANS +1�^TOTAL PLANS GRILLE WL WEATHER BY OTHERS, SEE PER PER WALL LOWER ARCH DWGS PLANS PLANS OUTSIDE AIR (OSA) VENTILATION CALCULATIONS UPDATED: f212612022 OCCUPANCY OSA CFM DESCRIPTION �� OCC / 1000 s.f. # OCC R / ZONE I S.F. / OCC j CFM/OCC CFM/S.F. OCC (Note#1) (Note fRT S.F. TOTAL NOTES ROOM NO. SEATING AREA t -4 1550 70 14 74 7.5 0.18 555 (Restaurant Dining) 279 834 2 KITCHEN 5-7 1000 20 50 10 7.5 0.18 75 (Kitchen -Cooking) 180 255 2 NOTES: 1 OCCUPANCY values based on the number of OCC per 7000 s.f. as listed in ASHRAE 62.1 Table 6-1 MINIMUM VENTILATION RATES IN BREATHING ZONE & as outlined in the IMC Table 403.3.1.7. 2 OSA values are based on ASHRAE 62.1 Table 6-1 MINIMUM VENTILATION RATES IN BREATHING ZONE for DEFAULT values 8 as outlined in the IMC Table 403.3.1.1. 3 NUMBER of OCCUPANTS is based on the ACTUAL SEATING arrangement 8/or information provided by the Architect 8 Owner. This value superceeds the ASHRAE MINIMUM. System Checksums System Checksums Johnny Mos Pizza By MTW Design Services LLC By MTW Design Services LLC SEATING AREA Fan Coil KITCHEN AREA Fen Coil Building owner Johnny Mosp Program user MTW Company DBS Comments By MTW Design Services LLC Detests name W:122 PROJECT5122-053-Johnny Mo Pizza DBS \LOAD122053afVAC LOAD.trc ( ) Calculation Dme 04:10 PM on 12/1412022 TRACE®700 version 6.3.5 I -pear seattla, waanington Wetude 47.0 deg Longitude 122.0 deg Time Zone 8 ElevaBon 386 tt Barometric pressure 29.5 n. Hg Air tlensiry 0.0749 IWcuK Alr specific heat 0.2444 Btullb °F Density -specific heat pradum 1.0968 Btulh�Mm 'F Latent heat factor 4,836.9 Btu�miNh�cutt Enthalpy factor 4.4953 Ib•mlNhncutt Summer design dry bulb 80.0 °F Summer design wet bulb 64.0 °F Winter design dry bulb 26.0 °F Summer clearness number 0.95 Winter clearness number 0.95 Summerground reflechance 0.20 Winterground reflectance 0.20 Carbon Dioxide Level 400 ppm Design simulation period January -December Cooling load meth000lo9y TETD-TA1 Heating load methodology UATD COOLING COIL PEAK CLG SPADE PEAK HEATING COIL PEAK TEMPERATURES Pxkea at Tlma: MOMr: BI1] Mdl#: SumM MdHr: Heating Design Cooling HxOng OulaMa Air. OAD&WBMR: ]8/82I80 OADB:Pxks OAOB: 28 SADB Ra Plenum 55.8 ]4.8 ]5.0 ]0.0 Spex Pknum Net Percent Space Percent Spars Pxk Coil Paak Perext RRum T5.0 ]0.0 San a� BWIh na. BWh Total gTobl BkVh I%1 8enekble BDVh Or Tobl (%) pe oe Blum Tot aenaIXTolal ReWA Bluth (%) Fn MIrTD ]fi.b 80.] 0.0 0.0 Envelope Loatls Skylile Solaz 0 0 0 0 0 Envelope Lxas 0 Skylile Sdar 0 Fn BMN 0 0.00 Fn FdR 0.0 0.0 0.0 0.0 Skylile Contl Roof COM clxa solar 0 9]] 4z,5z] 0 0 a 0 9T] 4z,5z] 0 1 a] 0 99e 55,]eo 0 Skylile Contl 1 Rcof Contl fie claaa solar 0 -z.915 o 0 0.00 -2,315 3.81 o a.00 AIRFLOWS GbsslDarCarts 861 0 881 1 -835 -1 GlasslDoor Contl -15,84] -15,94] 25.91 Ccoling HMing Well Cond Perlitl9nNar 25] 0 0 25] 0 0 0 99 0 0 Wall Cona 0 PartilioNDoar -2,053 0 -2,D53 3.36 0 0.00 DlRuxr 4,018 4,018 Fba Atl)acanl Floor D 0.00 0.00 D 0.00 0 0.00 0.00 0.00 0 Floor 0.00 Atljacent Floor 0 0.00 0 0.00 Terminal 0.00 0.00 Meln Fan 4,018 4,m8 4,018 4,018 Infiltration Sub TOWy 0 4d,d22 0 0 4d,422 0 49 0 55,934 0 IMltralipn 68 SuD TRM=y 0 -20,396 0 0.00 Sec Fan -20,315 33.06 Nom Vent 0 0 852 852 AXU Vent 852 852 IMamal Laatls L'ghb 5,836 0 5,836 8 5,838 IMamal Loaas ] Ughb 0 IMII 0 0.00 MinStopBiM1 0 0 0 0 Pxpb Mix 40,]00 2,819 0 0 40,]00 2,819 45 3 20,350 2,81g 24 People 3 Mix 0 0 0 0.00 RNum 0 0.00 Exhaust 4,D16 4.016 852 852 Sub Tufal o d9,15] 0 69,15] 56 28,80] 30 Sub TOW =� 0 0 OAO Rm Exh 0 0 Gelling LAetl 0 0 D 0 0 0 filling Load 0 AlWllary 0 0.00 Leakage Dwn 0 0 0 0 WnHlMion Loatl 0 0 J,3]2 d 0 o wntllMion Load o i1,210 88.95 Leakage Ups 0 0 Aaj Air Trens Heat 0 0 0 0 0 Ay Air Trans Heat 0 0 0 Denvmla.asl:lne OvNnar Sairlg D o D o o 0 OVNMr Shing o Exhaust Heat o o D.00 o 0.00 ENGINEERING CKS Exhaust Heat Sup. Fen Heat Rat Fan Heel 0 0 0 0 0 0 0 0 OA Preheat OiH. RA Preheat OiR. Adtlhianal ReM1xl 0 0.00 0 0.00 0 0.00 %OA Cooling XxOng 21.2 21.2 DUR Heat Pkup 0 0 0 thole' 2.43 2.43 Untlamr Sup Ht Pkup Supply AlrLukage 0 0 0 0 0 DrM"Hlr 6up Ht Pkup Supply AlrLxkage 0 0.00 eM1Mon 0 0.00 IPROn 534.2] 219.]8 OrsMTOWm 93,5]9 0 80,20] 100.00 84,]82 f00.00 OnM TOWm -20,395 emmrm e1,555 100.00 No. Paapk 5a.eo e]ss ]4 COOLING COIL SELECTON AREAS HEATING COIL SELECTION TOW Gpae ron MB Sena Gp. CM AIMow Eller DBIWBIHR MBh cfin °F °F gMb LBew DBIWBIHR Groh Tool °F °F gMb GMes CBpaM oIINmOW M (%) MB EM Lvg dm °F °F MMn Clg ].5 90.2 ]4.5 4,016 ]5.3 62.] 66.6 55A 55] 65.1 Fkwr 1,652 In Hm e1.6 4,016 60.] ]4.6 Ax CIg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 OA 0.0 Pet 0 R1p 0.0 0 0.0 0.0 Opt VaM 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 OA Int Door EzFh 1 o sat 0.0 0 0.0 0.0 TWd ].5 80.2 Roof 1,852 0 0 nlNf 0.0 0 0.0 0.0 Wall 1,920 ]66 39 pt VMa 0.0 D 0.0 OA ExeOxr o 0 o row eve COOLING COIL PEAK CLG BPACE PEAK HEATING COIL PEAK TEMPERATURES Pxkea at Tlma: MOTIc ]I12 MtlHr. SumR MOMr: Hxtlng Design Cooling Healing Olfsitla Air: OADBANa�HR: ]8I82I84 OADB:Pxks OADB: 28 SADB Ra Plenum 58.0 T2.8 ]5.0 ]0.0 Span Plenum NR Percent Spare Percent Spew Pxk Coll Peek Percent Realm ]5.0 T0.0 San a. Bhdh na� Bblh IXTool BhJh (%) axOlble BIWh Or Total (%) 9pm San" Bluth Tot Sens Of Total RagOA Bblh (%I Fn MNTD ]6.0 e1.6 0.0 0.0 Envelope Loatls Skylhe Solar o 0 0 0 0 Envelope Loatls 0 Bkyllte Solar 0 0 Fn M4TD a00 Fn Fria 0.0 0.0 0.0 0.0 skyllm cone Root COM o 29 0 0 0 0 29 0 0 488 o skyliM cons 1 RcofCwM o -1,232 0 -1,232 0.00 ].0] Glax Solar 18,119 0 16,119 24 18,304 25 Glax Solar o 0 0.00 AIRFLOWS GlasyDocr Gld b0] 0 4i0] -1 -252 0 Gbss�Dpor Carts e,310 A,310 38.22 Cooling HeaBrlg Wall Cord PeNBDnl09Dr 188 0 0 1B6 0 0 0 183 0 0 WaIICmd 0 Partilionl0ar -1,218 0 -1,218 0 8.99 0.00 Oiffuwr 3,093 3,093 Fbor AejaceM Floor 0 0.00 0.00 0 0 0.00 0.00 0.00 0.00 0 Fba 0.00 Atljaoxl Fbor D 0.00 0 0.00 0.00 Terminal 0.00 Maln Fan 3,093 3,093 3,093 3,093 InfiMatian 0 0 0 0 0 InfilDation 0 0 0.00 Beo Fan 0 0 Sub Tofal=y 1fi,B8] 0 15,a8] 23 16,T20 28 Sub TaMl=a e.781 e.781 60.28 Nom VeM AXU WM 1l9 1]9 1l9 1l9 InbmalLxtls hxamM Lxtls IMII 0 0 L'ghb 4,988 0 4,989 ] 4,98B B LigMa D 0 0.00 MinStoplRM1 0 0 Pxpb Miac 5,500 40,13] 0 0 5,500 B 40,13] 58 2,]50 40,13) 4 People 82 Mix 0 D 0 0 0.00 RaWm 0.00 Exhaust 3,083 3,099 1l9 170 Sub TeW =a 50,808 0 50,808 ]5 d],856 ]d Sub Tdel =_� 0 0 0.00 Rm Exh Auxiliary 0 0 0 0 Celling Loea 0 0 0 0 0 0 Celling Loatl D 0 D.00 Lxkage Dwn 0 0 WMIIMIon Load Atlj Air Trena Hut 0 0 0 1,15a 2 0 0 0 0 0 WMilalbn Lxa 0 Atli Air Trens Hxt 0 0 e,B82 0 4g.i2 Lxkage Ups 0 0 0 Dehumltl.OV Sizing Ovlunar Sizing o 0 o 0 0 0 OvlUntlr Slsing o Exhaust xeat 0 0 o 0.00 oAo ENGINEERING CKS Exhaust Hxt Sup. Fan Heat Rat. Fan Hea[ 0 0 D 0 0 0 0 0 OA Preheat DiH. RA Pnahaet OiR. Atltlitional Rehxt 0 0 0 O.OD 0.00 0.00 %OA Cooling Healing 5.8 5.8 OUR Heat Pkup 0 0 0 ohnRP 3.56 3.58 Unaarflr Sup Ht Pkup Supply Air Leakage 0 D 0 0 0 UntlaHlr Sup Ht Pkup Supply AlrLxka9e 0 0 0.00 clmlton 0.00 MAon 548.88 153.98 OrarMTOWm BBp93 0 B],B4] 10D.Oo B4,5T1 1W.W rLaM ioWm e,]81 -1]p23 etgmnfr 100.00 No. PaoPk n.s3 -zo.m 10 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Tohl Gpx Wn MB Sens Gp. Coll AImOW Eller DBIPIWHR MBh dm °F °F gMb Leave DBIWBINR Gross Tool °F °F gMb Glees ft° (%) Cepael oil MB Alrxow EM Lvp dm °F °F Mein Clg S.fi Aux Clg 6].] fi3.9 0.0 3.093 ]5.0 60.5 0 0.0 0.0 56.6 0.0 56.0 52A 55.2 Flaar 0.0 0.0 0.0 Part BBB 0 Main Ntg -1].4 ux HIg 0.0 3,093 6'].5 ]2.6 0 0.0 0.0 Opl Ven[ 0.0 0.0 0.0 0 0.0 0.0 0.0 O.D OA 0.0 Int Dear 1 Preheat 0.0 0 0.0 D.0 TOMI 5.fi e].] ExFk Roof o B88 0 0 XumI4H 0.0 0 a0 0.0 wall ego zee 3o ptwm D.o o a.D o.o Era Dom 0 0 0 TOW -1].4 IfifN.C700 '��'^�'"�' Projxt Noma: JahnnY Mx Pcm TRACE®]00 v6.3.5 mlwlMaa at 04:10 PM On 12/14TN122 Prelect Name: Johnny Moa Phm TRACE® ]00 v8.3.5 calwleDxl a104:10 PM an 12114T1(122 Dekree[Nema: 22053HVAC LOAO.hc Allamelhre-1 System Chedmuma Repotl Pagel R2 Oalax[Neme: 22053HVAC LOAD.hc Allemelive-1 Syalem Chackauma Repel Paga2 M2 tJ I a w P C � a � O� ; � } II�^ l-JmI W ; 0 a __ o � n O LL rn y N O N N N Z 0 N w tt N CV oa >� CV CQ _(/i J ODD C O - � c�N Q in� � � •� a U � � o i () � � 2 � 117 W � 12/27/2022 ow,MTW BE DB M0.01 OF N N C'') O N M (V O 1 a I 10 11 12 13 I I I I I I I I I I I I I I I I I I I I —.—._._._._.—._._.t._._._._.—._._.—._.—._._.—._._L_._.—._._.—._._._._.—._._.—._._._._.—._._.—._._.t._.—._._.—._._._._.—._.t.—._._._._.—._._.—._._._._.—._._.—._._._._.—._.�.—._._._._.—._._.—._.�a1 _ _ _ _._ _ _._ _ t _ _._ _ _._ _ _ _ _._ _ _ _ _.I_ _ _._ _ _ _ _._ _ _._ _ _ _ _._ _ _._ _ _ _ _._L_ _._ _ _ _ _._ _ _._ _ _ _ _._ _ _._ _ _ _ _. _ _._ _ _ _ _._ _ _ _ L_ _ _._ _ _._ �ii I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I � � I I I I I I I sEE suEEr Ms I —._.—._._.—._._.�._.—. _._.—. _._.—._.—._._.—._. L_._—._._.—._.—. _._._ _._ _._. _._.—. _._.—._. +._ —. _._.—._.—. _._.— �.—. —. _._.—. _._.—._ _._ _._ —. _. _.�. _.—. _._.—._._.—._. A.8 I I �/. �� �/. �re�n� /� I n l'J 9_� I LEVEL 2 HVAC PLAN SCALE: 1/4" = 1'—D" I I�� I I SEE SV♦EEi MZIDO D.4 E.5 CONStRUCtION NOtES: Oj IP"6 STAINLESS STEEL FLUE UP TO KEF-I, SEE SHEET M7.IO FOR SUBMI1rAL RFO. O2 8"o STAINLESS STEEL FLUE DOWN TO PIZZA OVENS w/6"o CONNECTION TO EACH OVEN (7 COMIECTION51. SEE SFEET M1.10 FOR DUCT RFOfdNATION. ONOLD TOP OF DUCT TIGHT i0 BEAM BOD � 6'-T': ABOVE UPPER FLOOR, II'-6"s ABOVE MAM BOOR ONOLD TOP OF DUCT TIGHT TO BEAM BOD • b'-S'i ABOVE UPPER FLOOR II'-8"s ABOVE MAM FLOOR OHOLD TOP OF DUGi/GRILLE TIGHT i0 BEAM BOD • T'-3"s ABOVE UPPER FLOOR O° RLMED sUPPLY AIR F'LENW wiFLEX COMIECTICN sIZED TO MATCH WI7 DISCHARGE, VERIFY ON SITE. ObOINDLRIED RENF31 AIR PLENUM wifLEX GOMIECTION < SCFfENED OF'ENMG, 91ZED TO MATCH WIi R4 OPENING, VERIFY ON 911E. PROVIDE wRiILL SIZE ELBOW 1URJED UP FOR NOISE ATIENJATIOK OB DOOR &WITCH CONJECTED i0 HVAC 673TET'I. PER WSEC C403351, THE HVAC SYSTEM SHALL BE f�SEi TO'WOCGIPIED" MODE bHOULD 1HE EMERIOR DOOR BE OPEN FOR S MMUTES OR MORE ONOR'1ALLY CLOSED (F'OLLERED OF'EN1 OSA 1 EXHAUST MOTORIZED DAMPER DMIPER PER LLl4EC C403.TBA wBLADE EDGE SEALS ( A RATED MAXIMUM LEAKAGE ROTE OF 4 giT5F. a I' W.C. DAMPERS SHALL OPEN UPON CALL FROhI EGtIIFT'IENi SERvED. a � a C� <� O� ; � } I vmI � W ; 0 a �� _ � K w a O LL C] W N y N N O N N N z 0 W K _O C � N E N N 'oo � > o CV � Q � J W d � O - 6) Q (6 � � V1 = H � � � N U � � o Q E � > O � =��w DaIE 12/27/2022 oRAMTW HEcD6 PROJECT P Eo. No. NORTH cowrxocT oRwc. acr. 0 2' 4' 8' 16' � Aw�Hc Ho^ A ^ .no DRAWING SCALE: 1/4" = 1'-0" (UNLESS NOTED OTHERWISE) IVI I GOF 1 a 1 10 11 12 13 I I I I I I I I I I I I I I I I I I I I —-—-fit—I--—-—-—-—--- I -—-— I I I I I I I I A.1 I I _ I I i i EXISTING DRAINAGE I I I i i i II�II i I I I i i . i �E �gET r�� i i i I I � i i i i I I I I i i I I I I i I I i i � I I �0 i I � I i I i I I � I I I �� I f I I ��� I Q_ I I � I II I �= I I I I I � I I I I �� `� � SUBMITTAL E DATA 9 u I Sit l � SHEET M1.10 �i/ ! dBA v I I � I w 2T'-®! TO PROPERTY L!E I I 1 �� � I II I I r Q0� I I I 3 �j 1 � I i I i EXISTING ARCH - SCREENING w 9�% I I Z i i I i I i I I I I i — — — — — — — — — — — — — — — — — — — — — — � I I � I I � � �� �I�TING (;.11-I �, I i — I I I � I I --------, I -( �Y� ExISTI / �� R PIPE SHAFT i ` Fi I I / I `�N I I I I � �'� U ALLEY LINE � ❑ � I o z ti� ----- -- I d � '��P I A- I � p�� I I I v N ti� O I I I I'�XISTING I II� II ELEVAT❑R T❑WER SEE SVffET H7D0 ROOF LEVEL HVAC PLAN SCALE: 1/4" = 1'-0" M N C'') O N M (V O N ___.� CE) ELAT R❑❑E ASSEMBLY CE) SINGLE MEMBRANE R❑❑EING ❑/ TAPERED RIGID INSUL 7" MIN, CR-38 MIND CLASS -A RATED R❑❑EING LAYER 1/2" PLYW❑❑D DECK ❑/ 2X CAR DECKING ❑/ GLB PURLINS ❑N STEEL BEAMS C. Architectural Screening will he utiliud to conceal EF-1 hom street MECHANICAL EQUIPMENT ACCESS --------- D.4 EXISTING C❑❑LING C❑NDENSER -EXISTING DRAINAGE E.5 PROJECT NORTH 0 2' 4' 8' 16' DRAWING SCALE: 1/4" = 1'-0" (UNLESS NOTED OTHERWISE) a � a C� <� O� ; � �� II�^ l-JmI W ; 0 a = ry � w tr O w rn N 0 N N 0 w tt _O C E N N � o� �o CV U a � � � > � O � Q _ ���� C � � � � N � J U � � o °o > O�� =�L�w DaIE 12/27/2022 oeAMTW HEcD6 M 1.30 of T, EAST FIN GRA ri1 N C'') O N M (V O N 9UPPLY AIR !SA) DUCT SIZE PER PLANS VOLUME DAMPER wiLOCKING HANDLE '\ ANGLE FRLI'I HOPoZONTAL A.S MDICATED ON FLOOR PLANE SUPPLY GRILLE, SIZE PER PLANS NECK SIZE TO MATCH GRD OD. DIMENSION �W�=1 DEt141L NOT TO SCALE Service access shall be provided and maintained. IXISTING MECHANICAL A/C CONDENSORS EXISTING ARCHITECNRAL ENCLOSURE M FOFtEGRCUND, SEE ROOF PLAN —� � IN FOT�GROUND, SEE ROOF PLAN SECTION "A"-"ASECTION "-�KEF-1 ELEVATION-1 ELEVATION APPROXIMATE SCALE: 1/4" = 1'-0" LATE SLAB IGER JTRY a � a C� <� O��; ; � � N } I IJmI W 0 a �� n i W a O LL N y N N O N N N O w C � N E N N 'oL � > o CV !1 _(/i J W O � tq � � N >Q �(D (6 � � � � � � H U U � � o = 2�L�r�W one 12/27/2022 ow,MTW �E DB M2.00 of 7 rn N C'') O N M N O N DG NOT LEAK TEST USING SMOKE BGMBS CGNTAINING CHLURINES/CHLORIDES. CONSULT WITH CAPTIVEAIRE FOR PRGPER LEAK TESTING METHODS. DUCTWORK #1 FRONT VIEW DUCTWURK #1 SIDE VIEW DUCTWORK #1 TDP VIEW r%.e.y racy _,��...�.®„�a�M��������.��. �` .,.. = a�,..,�, ➢UCTWORK kl SE VIEW tpP Dent n"v`evrmeisu°�mn"u" v�mi \tttt ®® �� t� a� ` r i' —, ��t. ,� .��m� .s.�e� �. ® \.J'Ir//�01I%� � � ® \.rlr//�IQY� n' ® \.rPI/�IQYi� � - !Ei11) tiD © - Ezhevat Fen Wiring - s :a - on s <e ]� J .0L___3 nesscinsm -ot rw taw tag a � a C� <� O� ; � �� O l.Il m O a� -_ o ry Q w � .� � � N N 'o a > N W fl-fnJa�o Y E � -� v, �� aL°�iQ .� 0 H � � v Q Q � � � > > Ot°n°a 2 2�tnW one 12/27/2022 ow,MTW �E DB COMMCr DRwG. REF. M2.10 of