Loading...
APPROVED BLD BLD2023-0477+Plumbing_Plan+4.17.2023_9.00.04_AM+3486059® PLUMBING FIXTURE --- ---- ----- -SAN- ------- COLD WATER PIPE (CW) HOT WATER PIPE (HW) HOT WATER RECIRC PIPE (HWC) SANITARY PIPE (SAN) VENT PIPE (V) STORM PIPE (5) RAIN LEADER (RL) ROOF DRAIN (RD) OVERFLOW DRAIN (OD) GAS PIPE (G) -S - --oRL O RD @ OD -G - -STM- STEAM PIPE (STM) -COND- CONDENSATE RTN. PIPE (COND) 11 HOSE 5155/WALL HYDRANT �KJ*- BALL VALVE ---Do-- GATE VALE -D-411 GATE VALVE WCAP -DP*- BALANCING VALVE ­�- GAS COCK/VALVE -DO*- GLOBE VALVE ANGLE GLOBE VALVE 3-WAY MOTORIZED VALVE CONTROL VALVE CHECK VALVE PRESSURE RELIEF VALVE PRESSURE REDUCING VALVE PRESSURE REDUCING STATION �- BACKFLOW PREY. STATION PIPE CAP PIPE BREAK PIPE UP PIPE DOWN ___1I -a? �c �a PIPE TEE UP PIPE TEE T DOWN ii PIPE FLANGE UNION FLEX CONNECTION (PIPE) STRAINER AIRVENT PRESSURE GUAGE THERMOMETER -HW - HYDRONIC WATER SUPPLY -HM- HYDRONIC WATER RETURN -CAS- CONDENSER WATER SUPPLY -CWR- CONDENSER WATER RETURN CHILLED WATER SUPPLY -CHS- -CHR- CHILLED WATER RETURN NP HVAC EQUIPMENT NUMBER/ FLUM51NG FIXTURE DESIGNATION KITCHEN EQUIPMENT NUMBER SEE KITCHEN DWG5 FOR INFO S li 21 0 66 ro rm N 0 N Plumbing Fixture Calculations Updated: 4/14/2023 SYMBOL DESCRIPTION Number W/V Cold Water Hot Water Remarks Fixtures FU (EA) FU (Total) FU (EA) FU (Total) FU (EA) FU (Total) GPH (Each) GPH (Total) WC-1/2 Water Closet 2 3 4 6 2 2.5 5 1 2 -- -- 0.5 -- 5 -- 10 L-1/2 Lavatory 2 1 1 1 1.5 1.5 KS-1 / DW-1 Kitchen Sink w/dishwasher connection 2 2 3 3 10 10 S-1 Sink - Retail 1 2 2 2 2 1 1 10 10 10 30 S-2 Sink - Jeweler's Room 3 2 6 2 6 1 3 Totals 18 17 8 60 Service Size: Cold Water Service Demand CW HW Tank (HWT) Sizing Based on Table 703.2, a 4" service is rated for 256 FU's Total Fixture Units: 24 FU's 60 GPH (vertical), 216 FU's (horizontal) at 1/4"/L.F. slope & Total GPM required: 18 GPM 0.3 Demand Factor 173 FU's (horizontal) at 1/8"/L.F. slope. 18 Total Demand Building pressure after meter & RPBP: 80 psi Domestic Water Service: Pressure required at Fixture: 25 psi 1.25 Storage Factor 1" Service ( 1" Service @ 8 FPS = 25 Fixture Units or 18 GPM Pressure loss in RP & meters: 0 psi 22.5 Total Storage Pressure loss due to elevation, see calc below: 10 psi HWT sizing is based on ASHRAE 2019 Applications Pip Loss Estimate, see calc below: 10 8 FU's Chapter 51 Table 10. Total pressure required to serve fixtures: 45 psi 10 GPM 1" Pipe Size CW piping shall be sized for a maximum flow of 8 fps. HW piping shall be sized for a maximum flow of 5 fps. General Notes: 1. Plumbing permit is provided by this subcontractor 2. This project is subject to the following codes: Updated: 4/14/2023 2015 Uniform Plumbing Code. 2015 International Building Code. 2015 International Mechanical Code. 2015 International Fire Code. 2015 Washington State Energy Code. All plumbing systems are prescriptively designed based on requirements and methods outlined in Uniform Plumbing Code Chapters 2 thru 11. 3. Waste line cleanout sizing shall be as follows: 1 „ 4 waste pipe: 4 cleanout with 3/s plug. Pp P 9 ,„ 3" waste pipe: 3" cleanout with 2 2 plug. pp P 9 2" waste pipe: 2" cleanout with 1'/2' plug. 4. Piping material shall be as noted in the Piping Material Schedule on this sheet. 5. Domestic water piping will be insulated w/Micro-Lok insulation. Thickness of insulation will be required b UPC pP 9 q Y & Washington State Energy Code see Pipe Insulation Schedule this sheet. 9 9Y P 6. Roof drain rainwater & Storm systems are existing &/or provided by others. 7. Fire sprinkler contractor will furnish and install all fire service lines & D.C.V.A. 8. Domestic potable water system shall be disinfected and sanitized as required by Uniform Plumbing Code Section 609.9. Final report shall be provided upon request of the Authority Having Jurisdiction (AHJ). City Of Edmonds Building Department Work PLUMBING FOR T/I Address 100 ❑TH AVE N ----------------------------------- ---- --------------------------------------------- Owner . CLINE JEWELERS -- ------------------------------------------------ Approved Date 5/04/2023 Building Official Do-m_owmL`t W. if c4AQu Permit Number BLD2023-0477 REVISIONS DATE - PAGES - CHANGES REV1 REV2 REV3 REV4 REV5 APPROVED PLANS MUST BE ON JOB SITE ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE PLUMBING FIXTURE SCHEDULE Updated 4/13/23 SYM DESCRIPTION SPECIFICATIONS see submittals for more info WASTE VENT CW HW WC-1 Water closet, Flush tank Geberit #111.335.005 3„ 2„ 1/2„ -- wall mounted, 1.28 GPF w/open front seat 2" 1-1/2" 1/2" 1/2" L-1 Lavatory, undermount American Standard #0614.000.20 lavatory w/0.5 GPM Aerator w/Delta #D573LF-PP faucet assembly KS-1 Kitchen sink Elkay #ECTRU21179 sink 2" 1-1/2" 1/2" 1/2" w/dishwasher connection w/Kohler #K-596-CP faucet assembly S-1 Sink - Retail Elkay #ECTRU21179 sink 211 1 1/2" w/Kohler #K-596-CP faucet assembly S-2 Sink - Jewelers Room Elkay #LRAD-1517653 2" 1-1/2" 1/2" 112" w/Chicago #11000N8AE faucet assembly PIPING INSULATION SCHEDULE PIPE SERVICE PIPE SIZES INSULATION WALL TYPE OF INSULATION REMARKS/NOTES THICKNESS DOMESTIC HOT WATER & '/2" - 1'/4" 1" HOT WATER RECIRC 1 'h" & LARGER 1'/2" ....................................DOMESTIC COLD ..................................................................................WATER................................................................... .........................................- :............................................................................ ALL................................................. ......................................................1_...................................................... :......................................................... ........................................................................................................................................... ; .............................. ............................................................................................................................... ............................. RAINWATER PIPING, HORIZONTAL -................................................................. ALL .................................................................... 1" ...... ..... AT ROOF LEVEL....................................................................................................................................................................................... ....................................................: FIBERGLAS .......................................................................................................................................... PIPING EXPOSED TO FREEZING ALL 1'/2' k FACTOR OF 0.23 @ 75F OR SEMI -HEATED SPACES S . .......ALL..........................................................................................................................1„ .................................................................. w/WHITE KRAFT PAPER.................................................................................................................................................... CONDENSORWATER FACING < - < 50F 110E HEATING WATER /2 -1 1 /2„ &LARGER 1 /2 „ FITTINGS ALL AS NOTED ABOVE I AS NOTED ABOVE PROVIDE w/ZESTON PVC COVERS ELECTRIC WATER HEATER SCHEDULE SYMBOL MANUF/MODEL SERVES TANK SIZE INPUT RECOVERY ELECTRICAL WEIGHT REMARKS (GALLONS) (MBH) GPH @ °F MCA-VOLTS/PHASE /NOTES RISE (see Note 1) EWH-1 AO SMITH TENANT 50 (2) @ 21 GPM @ 23.4 MCA 550 #ENT-52 4.5 kW 90°f RISE 240/10 (WE] NOTES: 1. ELECTRICAL DISCONNECT, POWER WIRING, CONDUIT & CONNECTIONS BY E.C. 2. SET DISCHARGE TEMPERATURE AT 120°F. 3. PROVIDE w/AMTROL ST-5 NON-ASME RATED EXPANSION TANK. 4. PROVIDE w/T&P VALVE w/3/4" CPVC DRAIN PIPING TO LOCAL DRAIN.. 5. UNIT HEATING ELEMENTS ARE NON -SIMULTANEOUS OPERATION. Project Site Project Information 1. Project Address: 100 5" Ave N Edmonds, WA 98020 2. Project Owner. Andy Cline, CLINE Jewelers 105 51h Ave S Edmonds, A 98020 3. APN: 00434202103100 4: Legal Description: CITY OF EDMONDS, BLK 021 D-00-LOT 31 & FRAC OF LOTS 32 & 33 SLK D Amonds ore City of Edmonds® Rusty Pelican Cafe Breakfast - SS Daphnes Bar 19 19 Santa Fe Mexir=t, Grill & Cantin Mexicar MOTO R Pizza Starbucks e 10 IF Centennial Plaza vPpst 19 MARKET Edmonds Seafood - SS D cn per( Ti,,jrl (`afc Maize & Barley Q 19 The Wishing Stone Jewelry store Skin by Sorine 919 Fire & The Feast Italian VicinitvMa NORTH Not To Scale 2,3,4&5 Ke QReliable UZ U Z O LLl � 1.L 0 LL Z 0 � C� 0 LLl � 'Q LLl � �n 0 � LLl Z a CI � U 0 Z Q LU af V QS Cn � L" Cn Q Z _0 :Z CS) -1 L" Q U Z LLI 0- U �o U� LIA Z � Z n U Z l LLI -1 z Z 'Q QknU � CD Z > Z LLl LLl Q jLJ cf� LLI () E3 LLI O 0 CD Z > v LLl Z LLt C � cL LLI a O F- - U %MECHANICAL Commercial Plumbing Heating and Gas Piping GS MECHANICAL, LLC PO Box 1917, Renton, WA 98057 Phone 206 372 0332, Fax 425 226 2692 PLUMBING DESIGNER OF RECORD THORNE,. DAMIEN A. EL01 THORNDA85000 GBMEML'J28P U,Bl: 602- 4-'160 VeURFr,.ERS COMP 119,947-0 Cline Jewelers Renovation 100 5th Ave N Edmonds, WA 98020 REVIEWER'S STAMP RECEIVED Apr 17 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT DRAWING CONTENTS: Title Sheet, Bldg Info, Symbols, Schedules & Calculations REVISIONS: DRAWING ISSUED FOR: PERMIT DRAWINGS April 14, 2023 PROJECT NUMBER: REVIEWED BY: DRAWN BY: SHEET NO P 0000 G6/P'ITW MTIll CLEANOUT E ACCESS COVER TOP OF COVER FIN. FLOOR TO BE FLUSH W/TOP OF FIN. FLOOR ` I 1/6 C.I. BEND BALANCE OF PIPING SAME AS S.C.O. BRASS CLEANOUT PLUG W/COUNTER SUNK HEAD. FINISHED GRADE. 16 "SQ. CONCRETE PAD TROWEL SMOOTH E EDGE, 1/6 C. I. BEND C.I. WASTE LINE LENGTH TO SUIT. WASTE L INE. 1/6 BEND IF CLEANOUT OCCURS AT END OF LINE. FLOOR CLEANOUT (F.C.O.) SURFACE CLEANOUT (S.C.O. CLEANOUT DETAILS N.T.S. 19 21 66 m ro N O N \ 411SAN EXISTING 4" SANITARY (49 DR) I c^v M N N ^ POINT OF CONNECTION TO EXISTING SERVICE. (TYPICAL) -rA 11A 311111 (3) 311SAN (9) 411SAN (S) Sanitary Riser Diagram Diagrammatic Underground Plumbing Floor Plan m Scale: 1 /4" = V-0" j i 1 2"VTR (6 DR1) 1 I 2"V (4) F+---------- N I N I I 4I 4� N �N I17 VIA (3) WC-1 Uz U O Z U � LI O 1.L OLL Z O� C� O 1ZU � �O �II oII LIJ �L" Z Q � o LLI � U O� Z -1 Q afLLI V �LLI (� Z II � Z _O :z Ll� Q � U Z LI O-1 U �o U� LIA Z � �II U Z w-1 Z CIA ZQ Q _kn U cn Z O�a: Q Lvi IILLI � O� �n z > v a: LIB Z LLt II�U 1L/ LII LLI a O F- F U %MECHANICAL Commercial Plumbing Heating and Gas Piping GS MECHANICAL, LLC PO Box 1917, Renton, WA 98057 Phone 206 372 0332, Fax 425 226 2692 PLUMBING DESIGNER OF RECORD THORNE,. D MIEN A EL01 THORNDA850 S UBI_ 602- 4-'160 Cline Jewelers Renovation 100 5th Ave N Edmonds, WA 98020 REVIEWER'S STAMP RECEIVED Apr 17 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2023-0477 DRAWING CONTENTS: Underground Plumbing Floor Plan & Details REVISIONS: DRAWING ISSUED FOR: PERMIT DRAWINGS April 14, 2023 PROJECT NUMBER: REVIEWED BY: GS/h1TW DRAWN BY: MTW SHEET NO P 1.00 19 21 _66 ro ro N O N CIO P4T RELIEF, PIPE FULL CHECK VALVE (TYP) SIZE DISCHARGE TO TIMER/AQUASTAT i DRAIN I"CW (18) SHUT-OFF VALVE (TYP) I$TING I" Clll I"CW (26) 0 _ 1"HW (12) 3�a"CW (35) -- IIIHW (10) 3/4"CW (6) 3�4"CW ��s"CW (55) l35) POINT OF CONNECTION 3/4"CW (6) 1z11NX— r TO EXISTING SERVICE, UNION (TYP) VERIFY LOCATION ON -SITE Cq ' S S S S 1 ET L KS L WC 2 2 2 1 I 1 I I I 112IIH4CW 11/2"H4CW 1i21IH4CW 112"H4CW I"H#CW I/ZIICW 11/2"H4CW 1112"H4CW I/211144CW 112"CW (2) (2) (2) (2) (12 WITYP(TYPICAL)AL) SFU) SIESMIBRACE (25) (1) (2) (1) (25) Domestic Water Diaaram Diagrammatic Plumbing Floor Plan m Scale: 1 /4" = V-0" UZ U O U � Lu O 1..L OD O� CI O 1.0 � LIJ f--II oII �LIJ �L" z II � o =3 LLI LLI � U O� Z � II a LU �LLI II � z _O :z 1.0 � II � U Z L11 O-1 U �o U � LIA �II UZ w-1 Z CIA z Q IIinU Z }III IILLJ � O� Cn z > v a: w� Z LLt C � � II� � a O F- F U MECHANICAL Commercial Plumbing Heating and Gas Piping GS MECHANICAL, LLC PO Box 1917, Renton, WA 98057 Phone 206 372 0332, Fax 425 226 2692 PLUMBING DESIGNER OF RECORD THORNE,. D MIEN A EL01 THORNDA850 S ME ML928R UBI_ 602- 4-'160 Cline Jewelers Renovation 100 5th Ave N Edmonds, WA 98020 REVIEWER'S STAMP RECEIVED Apr 17 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2023-0477 DRAWING CONTENTS: Plumbing Floor Plan & Diagrams REVISIONS: DRAWING ISSUED FOR: PERMIT DRAWINGS April 14, 2023 PROJECT NUMBER: REVIEWED BY: DRAWN BY: SHEET NO P 1010 GS/MTW Mtl