Loading...
REV1 REVIEWED BLD2023-0200+Structural_Analysis_or_Calculations+5.16.2023_9.24.21_AM+3546825REVISION May 16 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ,.,.,.,.,., REVIEWED BY CITY OF EDMONDS BUILDING DEPARTMENT: BLD2023-0200 Clint Jewelers Tenant Improvement 100 5th Ave N Edmonds, Washington 98020 Structural Engineering Calculations Post Permit Revisions M Dihong Shao, SE May 15, 2023 Project Name Page No. Bm/Jst Location/Description: ROOF BM FOR 8'-8"SQ SKYLIGHT 5.5x13.5 GL Roof dead load (psf) 20.00 live load (psf) 25.00 additional total point load (kips) 0.00 tributary width (ft) 9.84 point load location to farthest support (ft) 0.00 Floor dead load (psf) 15.00 live load (psf) 40.00 additional total point load (kips) 0.00 tributary width (ft) 0.00 point load location to farthest support (ft) 0.00 Wall wall weight (psf) 10.00 RATIOS 0.65 height (ft) 0.00 1.13 5.5/5.125=1.07 Beam Span (ft) 21.00 0.53 load duration/repetitive factor 1.15 1.00 Beam Data Base Number 36 2.0E PSL tributary load (plf) 442.58 #N/A Beam No.61-88 moment (kip-ft) 24.40 Provided M #N/A shear/reaction (kips) 4.65 Provided V #N/A Provided I #N/A DF#2 Provided 24F-V4 or 24F-V8 DF GL Provided Required S (in^3) 203.66 280.73 106.07 163.65 Required I (in A4) 1184.89 2456.38 1184.89 1050.79 Required A (in^2) 63.81 96.25 36.73 69.19 Size 6x18 Beam No.1-20 5-1/8x13-1/2 Beam No.20-60 Project Name Page No. Bm/Jst Location/Description: ROOF BM FOR REMOVED POSTS AT 26'-6" SPAN Roof dead load (psf) 15.00 live load (psf) 25.00 additional total point load (kips) 5.88 tributary width (ft) 6.50 point load location to farthest support (ft) 13.00 Floor dead load (psf) 10.00 live load (psf) 60.00 additional total point load (kips) 0.00 tributary width (ft) 0.00 point load location to farthest support (ft) 0.00 Wall wall weight (psf) 10.00 RATIOS 0.65 height (ft) 0.00 1.02 Beam Span (ft) 26.00 0.38 load duration/repetitive factor 1.15 1.00 Beam Data Base Number F--5-2---1 2.0E PSL tributary load (plf) 260.00 #N/A Beam No.61-88 moment (kip-ft) 60.21 Provided M #N/A shear/reaction (kips) 6.32 Provided V #N/A Provided I #N/A DF#2 Provided 24F-V4 or 24F-V8 DF GL Provided Required S (in A3) 502.62 280.73 261.78 405.31 Required I (in A4) 4266.96 2456.38 4266.96 4170.88 Required A (in A2) 86.80 96.25 49.97 131.87 Size 6x18 Beam No.1-20 6-3/4x19-1/2 Beam No.20-60 Bm/Jst Location/Description: ROOF BM FOR REMOVED POSTS AT 21'-6" SPAN Roof dead load (psf) 15.00 live load (psf) 25.00 additional total point load (kips) 5.33 tributary width (ft) 3.00 point load location to farthest support (ft) 10.50 Floor dead load (psf) 10.00 live load (psf) 60.00 additional total point load (kips) 0.00 tributary width (ft) 0.00 point load location to farthest support (ft) 0.00 Wall wall weight (psf) 10.00 RATIOS 0.61 height (ft) 0.00 1.04 Beam Span (ft) 21.00 0.31 load duration/repetitive factor 1.15 1.00 Beam Data Base Number 49 2.0E PSL tributary load (plf) 120.00 #N/A Beam No.61-88 moment (kip-ft) 34.59 Provided M #N/A shear/reaction (kips) 3.92 Provided V #N/A Provided I #N/A DF#2 Provided 24F-V4 or 24F-V8 DF GL Provided Required S (in^3) 288.73 280.73 150.38 246.93 Required I (in A4) 1979.76 2456.38 1979.76 1898.44 Required A (in^2) 45.80 96.25 31.02 101.25 Size 6x18 Beam No.1-20 6-3/4x15 Beam No.20-60 Project Name Page No. Bm/Jst Location/Description: CEILING GRID FRAMING AT 12'-0" Roof dead load (psf) 5.00 live load (psf) 5.00 additional total point load (kips) 0.00 tributary width (ft) 7.38 point load location to farthest support (ft) 0.00 Floor dead load (psf) 10.00 live load (psf) 60.00 additional total point load (kips) 0.00 tributary width (ft) 0.00 point load location to farthest support (ft) 0.00 Wall wall weight (psf) 10.00 height (ft) 0.00 Beam Span (ft) 25.50 load duration/repetitive factor 1.00 1.00 Beam Data Base Number �� 2.0E PSL tributary load (plf) 73.85 #N/A Beam No.61-88 moment (kip-ft) 6.00 Provided M #N/A shear/reaction (kips) 0.94 Provided V #N/A Provided I #N/A DF#2 Provided 24F-V4 or 24F-V8 DF GL Provided Required S (in A3) 57.62 82.73 30.01 #N/A Required I (in A4) 417.19 392.96 417.19 #N/A Required A (in A2) 14.87 52.25 8.56 #N/A Size 6x10 Beam No.1-20 #N/A Beam No.20-60 Bm/Jst Location/Description: ROOF BM FOR REMOVED POSTS AT 21'-6" SPAN - WEST Roof dead load (psf) 12.00 live load (psf) 25.00 additional total point load (kips) 0.00 tributary width (ft) 14.00 point load location to farthest support (ft) 0.00 Floor dead load (psf) 10.00 live load (psf) 60.00 additional total point load (kips) 0.00 tributary width (ft) 0.00 point load location to farthest support (ft) 0.00 Wall wall weight (psf) 10.00 RATIOS 1.09 height (ft) 0.00 1.86 BM EACH SIDE Beam Span (ft) 21.00 0.88 load duration/repetitive factor 1.15 1.00 Beam Data Base Number 27 2.0E PSL tributary load (plf) 518.00 #N/A Beam No.61-88 moment (kip-ft) 28.55 Provided M #N/A shear/reaction (kips) 5.44 Provided V #N/A Provided I #N/A DF#2 Provided 24F-V4 or 24F-V8 DF GL Provided Required S (in^3) 238.37 280.73 124.15 114.32 Required I (in A4) 1634.47 2456.38 1634.47 878.81 Required A (in^2) 63.48 96.25 42.99 48.88 Size 6x18 Beam No.1-20 3-1/8x15 Beam No.20-60 Project Name Page No. Bm/Jst Location/Description: REPLACE (E) GIRDER LINE - EAST 18'-0" Roof dead load (psf) 15.00 live load (psf) 25.00 additional total point load (kips) 0.00 tributary width (ft) 24.00 point load location to farthest support (ft) 0.00 Floor dead load (psf) 10.00 live load (psf) 60.00 additional total point load (kips) 0.00 tributary width (ft) 0.00 point load location to farthest support (ft) 0.00 Wall wall weight (psf) 10.00 RATIOS 1.48 height (ft) 0.00 2.17 BM EACH SIDE Beam Span (ft) 18.00 1.40 load duration/repetitive factor 1.15 1.00 Beam Data Base Number F--2-7----1 2.0E PSL tributary load (plf) 960.00 #N/A Beam No.61-88 moment (kip-ft) 38.88 Provided M #N/A shear/reaction (kips) 8.64 Provided V #N/A Provided I #N/A DF#2 Provided 24F-V4 or 24F-V8 DF GL Provided Required S (in A3) 324.56 280.73 169.04 114.32 Required I (in A4) 1907.56 2456.38 1907.56 878.81 Required A (in A2) 118.63 96.25 68.29 48.88 Size 6x18 Beam No.1-20 3-1/8x15 Beam No.20-60 Bm/Jst Location/Description: REPLACE (E) GIRDER LINE - MIDDLE 22'-0" Roof dead load (psf) 15.00 live load (psf) 25.00 additional total point load (kips) 0.00 tributary width (ft) 24.00 point load location to farthest support (ft) 0.00 Floor dead load (psf) 10.00 live load (psf) 60.00 additional total point load (kips) 0.00 tributary width (ft) 0.00 point load location to farthest support (ft) 0.00 Wall wall weight (psf) 10.00 RATIOS 1.57 height (ft) 0.00 2.15 BM EACH SIDE Beam Span (ft) 22.00 1.48 load duration/repetitive factor 1.15 1.00 Beam Data Base Number 29 2.0E PSL tributary load (plf) 960.00 #N/A Beam No.61-88 moment (kip-ft) 58.08 Provided M #N/A shear/reaction (kips) 10.56 Provided V #N/A Provided I #N/A DF#2 Provided 24F-V4 or 24F-V8 DF GL Provided Required S (in^3) 484.84 280.73 252.52 161.32 Required I (in A4) 3482.81 2456.38 3482.81 1618.75 Required A (in^2) 144.99 96.25 83.47 56.26 Size 6x18 Beam No.1-20 3-1/8x18 Beam No.20-60 Project Name Page No. Bm/Jst Location/Description: REPLACE (E) GIRDER LINE - WEST 20'-0" Roof dead load (psf) 15.00 live load (psf) 25.00 additional total point load (kips) 0.00 tributary width (ft) 24.00 point load location to farthest support (ft) 0.00 Floor dead load (psf) 10.00 live load (psf) 60.00 additional total point load (kips) 0.00 tributary width (ft) 0.00 point load location to farthest support (ft) 0.00 Wall wall weight (psf) 10.00 RATIOS 1.52 height (ft) 0.00 2.24 BM EACH SIDE Beam Span (ft) 20.00 1.47 load duration/repetitive factor 1.15 1.00 Beam Data Base Number F--2-8----1 2.0E PSL tributary load (plf) 960.00 #N/A Beam No.61-88 moment (kip-ft) 48.00 Provided M #N/A shear/reaction (kips) 9.60 Provided V #N/A Provided I #N/A DF#2 Provided 24F-V4 or 24F-V8 DF GL Provided Required S (in A3) 400.70 280.73 208.70 136.87 Required I (in A4) 2616.69 2456.38 2616.69 1169.82 Required A (in A2) 131.81 96.25 75.88 51.56 Size 6x18 Beam No.1-20 3-1/8x16-1/2 Beam No.20-60