TAB and comissioning reportFIGURE C408.1.4.1 COMMISSIONING COMPLIANCE CHECKLIST Project Name: CL I Project Project Address: (tab Ste` fl ti( I� D IM 6Vi ij LA) #9 � UO Zv Certified Commissioning Professional: C)N I-WD S \ Sfi- Information Type of ISO Certification and Number: Manuals, record documents and training have been completed or are scheduled (Section C103.6) Supporting • Building operations and maintenance information (C103.6.2) have been submitted to the owner Documents or scheduled date: • Manuals (C103.6.2.1) have been submitted to the owner or scheduled date: • Compliance documentation (C103.6.3) has been provided to the owner or scheduled date: : • System operation training (C103.6.4) has been provided to the owner or scheduled date: Commissioning Commissioning Plan was used during construction (Section C408.1.2) Commissioning Report Commissioning Report has been submitted (Section C408.1.3) Mec hical Systems were included in the commissioning process (Section C408.2) Commissioned Testing, adjusting and balancing is complete (Section C408.2.2) ' Systems are unresolved deficiencies with the mechanical systems. These are described in the attached El Commissioning Commissioning Report submitted to the Owner. Service Water Heating Systems were Included In the commissioning process (Section C408.3) 1 There are unresolved deficiencies with the service water heating systems. These are described in the attached Commissioning Report submitted to the Owner. Controlled receptacles and lighting control systems were Included in the commissioning process (Section C408.4) There are unresolved deficiencies with the electrical power and/or automatic lighting controls. These are described in the attached Commissioning Report submitted to the Owner. Additional systems were Included In the commissioning process (Section C408.5) e There are unresolved deficiencies with systems required by C406 or C407. These are described in the : attached Commissioning Report submitted to the Owner. Metering systems were included in the commissioning process (Section C408.6) t There are unresolved deficiencies with the metering system. These are described in the attached Commissioning Report submitted to the Owner. : d Refrigeration systems ore included in the commissioning process (Section C408.7) ElThere are un of deficiencies with systems required by Section C410. These are described in the attached C issing Report submitted to the Owner. I he by tha req ' ements for Section C408 System Commissioning have been completed in ac rd ce with th shington State Energy Code, including all items above. 2 : Cued Commission g Professional Date Certification I hereby certify that r quirements for Section C408 System Commissioning have been completed in accordance with the Washington State Energy Code, including all items above. : Building Owner or Owner's Representative Date CE-128 2018 Washington State Energy Code U M 1 T E C7 Sys—rEMS MECHA,N1 AL — PROJECT Ca Ld� C J �t_E S SYSTEM TEST APPARATUS FLOWNOOD • ®' REMARKS: NCLj f-I TEST DATE 10 /, READINGS BY: W ILL L — � �, �j PAGE C:Wsers\Will Lindamood%Documentsl[Copy of outlet test form.xlsx]Sheetl U tom! 1 1 C E> SYSTC m s L. 1." S I MIECHANICAl PROJECT (lam-Nf,- Jc-Vk_-ER-S TEST APPARATUS FLOWHOOD SYSTEML�12 V mazzomam• �� � � REMARKS: TEST DATE O - READINGS BY: �/U� �L L J PAGE C:\Users\Will Lindamood\Documents\[Copy of outlet test form.xlsx]Sheet1