TAB and comissioning reportFIGURE C408.1.4.1
COMMISSIONING COMPLIANCE CHECKLIST
Project
Name: CL I
Project
Project Address: (tab Ste` fl ti( I� D IM 6Vi ij LA) #9 � UO Zv
Certified Commissioning Professional: C)N I-WD S \ Sfi-
Information
Type of ISO Certification and Number:
Manuals, record documents and training have been completed or are scheduled (Section C103.6)
Supporting
• Building operations and maintenance information (C103.6.2) have been submitted to the owner
Documents
or scheduled date:
• Manuals (C103.6.2.1) have been submitted to the owner or scheduled date:
• Compliance documentation (C103.6.3) has been provided to the owner or scheduled date: :
• System operation training (C103.6.4) has been provided to the owner or scheduled date:
Commissioning
Commissioning Plan was used during construction (Section C408.1.2)
Commissioning
Report
Commissioning Report has been submitted (Section C408.1.3)
Mec hical Systems were included in the commissioning process (Section C408.2)
Commissioned
Testing, adjusting and balancing is complete (Section C408.2.2) '
Systems
are unresolved deficiencies with the mechanical systems. These are described in the attached
El
Commissioning
Commissioning Report submitted to the Owner.
Service Water Heating Systems were Included In the commissioning process (Section C408.3)
1
There are unresolved deficiencies with the service water heating systems. These are described in the
attached Commissioning Report submitted to the Owner.
Controlled receptacles and lighting control systems were Included in the commissioning process
(Section C408.4)
There are unresolved deficiencies with the electrical power and/or automatic lighting controls. These are
described in the attached Commissioning Report submitted to the Owner.
Additional systems were Included In the commissioning process (Section C408.5)
e
There are unresolved deficiencies with systems required by C406 or C407. These are described in the :
attached Commissioning Report submitted to the Owner.
Metering systems were included in the commissioning process (Section C408.6)
t
There are unresolved deficiencies with the metering system. These are described in the attached
Commissioning Report submitted to the Owner. :
d
Refrigeration systems ore included in the commissioning process (Section C408.7)
ElThere are un of deficiencies with systems required by Section C410. These are described in the
attached C issing Report submitted to the Owner.
I he by tha req ' ements for Section C408 System Commissioning have been completed in
ac rd ce with th shington State Energy Code, including all items above.
2
:
Cued Commission g Professional Date
Certification
I hereby certify that r quirements for Section C408 System Commissioning have been completed in
accordance with the Washington State Energy Code, including all items above.
:
Building Owner or Owner's Representative Date
CE-128 2018 Washington State Energy Code
U M 1 T E C7
Sys—rEMS
MECHA,N1 AL —
PROJECT Ca Ld� C J �t_E S SYSTEM
TEST APPARATUS FLOWNOOD
•
®'
REMARKS:
NCLj f-I
TEST DATE 10 /, READINGS BY: W ILL L — � �, �j PAGE
C:Wsers\Will Lindamood%Documentsl[Copy of outlet test form.xlsx]Sheetl
U tom! 1 1 C E>
SYSTC m s
L. 1." S I
MIECHANICAl
PROJECT (lam-Nf,- Jc-Vk_-ER-S
TEST APPARATUS FLOWHOOD
SYSTEML�12 V
mazzomam•
��
� �
REMARKS:
TEST DATE O - READINGS BY: �/U� �L L J PAGE
C:\Users\Will Lindamood\Documents\[Copy of outlet test form.xlsx]Sheet1