BLD2023-1087+Application_Instructions+8.30.2023_11.07.37_AM+3755563Application Type:Mechanical
Project Type: Single Family Condominium Unit
Activity Type: Alteration
Scope of Work: Mechanical
Based on your selections, the following information and requirements apply to your application.
Submittal Information
NOTE: Only upload each document once. Do not duplicate. Each set of documents are required to be separate. A scan of all documents into one
file will be rejected.
1) MANUFACTURER'S SPECIFICATIONS
2) ROOFTOP UNITS:
1. Provide seismic anchoring details. For units weighing over 400 lbs. provide calcs. & details stamped and signed by Washington State Licensed
Engineer.
2. Provide elevation view. Height of exhaust outlet above adjoining grades, roof lines, parapet or elevator shaft, etc.
3. Location of proposed exhaust hood outlet on exterior of building.
3) LETTER OF AUTHORIZATION SIGNED BY THE HOMEOWNER ASSOCIATION PRESIDENT (HOA).
Waiving a Required Document
If you believe that a required submittal document does not apply to your project, please upload a simple explanation as to why in place of the
required document. Please note that during project review, a reviewer may require you to submit a document that was originally waived at submittal
to evaluate the application for compliance with codes and standards.
Please review the Requirements for Electronic Plans prior to uploading documents.
Required Documents
• Manufacturer Specifications and Installation Instructions
Please review the Requirements for Electronic Plans prior to uploading documents.
Required Supplementals
• Mechanical Equipment Counts
• Authorization and Acknowledgment - Mechanical
View Supplementals
General Process Info
What to Expect After You Submit Your Application and Electronic Plans
We will look at your application and plans within two business days of your online submittal. You will receive an email from us stating the status of
your application. There are two possible outcomes for your application:
1. We will accept your application and send you an invoice via email.
2. We will not accept your application, and we will tell you what we need to complete the application screening. You will have 30 days to submit the
requested documents through your MyBuildingPermit.com Plan Review Dashboard.
Important information about completeness and vesting:
3. Application acceptance for screening is not a determination of completeness.
4. The submittal date is not your vesting date; your application is vested after we receive payment of all submittal fees.
Re -submittals
5. Identify revised/added information by circling, noting, or otherwise consistently marking changes on the plans.
6. Include a response letter addressing each of the comments.
7. Submit your revisions to Permit Processing, not the reviewer, through your MyBuildingPermit.com Dashboard by clicking Submit Additional
Files.
8. If your permit has not been issued, submit a full plan set.
Who to Call If You Have Questions
If you have any questions concerning application submittal, please contact the City of Edmonds Permit Center at (425) 771-0220 between 8
a.m. and 4:30 p.m., Monday through Friday and ask to speak with a permit technician or email: onlinepermits@edmondswa.gov
Please Note
The property owner bears the responsibility for the accuracy and completeness of all information provided with or affecting the application
submittal.
If the property contains or is adjacent to critical areas (streams and stream buffers, wetlands, floodplains, and geological hazard areas),
additional information may be required.