Loading...
APPROVED-TIA-BLDGS A B C DGTC Gibson Traffic Consultants, Inc. 2813 Rockefeller Avenue Suite B Everett, WA 98201 428.339.8266 Independent Fee Calculation 18 new apartment units - 1 SFR (demo) = $54,903.80 $54,903.80/4 buildings = $13,725.95/ea bldg ENGINEERING DIVISION APPROVED AS NOTED NOTEDY/ 4"3/26/2021 APPROVED AS NUIr RY EN IN ING Date CITY COPY 13L a �D JAJ0!xv) BUILDING bt-D2-0ZU - 19 22810 Edmonds 'Way Traffic Impact Analysis Prepared For: Kisan Enterprises Jurisdiction: City of Edmonds April 2019 42322 � 70NA1 GTC # 19-071 22810 Edmonds Way Traffic Impact Analysis TABLE OF CONTENTS 1. PROJECT DESCRIPTION............................................................--......................;.............-..1 2. METHODOLOGY..................................................................................................................1 3. TRIP GENERATION.............................................................................................................. 4 4. TRIP DISTRIBUTION........................................................................................................... 4 5. SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY.--.......- � ............................... — 6 5.1 Level of Service Analysis .................................................... ............................................ 6 5.2 Collision Summary .............................................................._.......................................... 8 6. LEVEL OF SERVICE ANALYSIS........................................................................................ 8 7. MITIGATION RECOMMENDATIONS............................................................................... 9 8. CONCLUSIONS..................................................................................................................... 9 LIST OF FIGURES Figure1: Site Vicinity Map........................................................................................................... 2 Figure 2: Development Trip Distribution...................................................................................... 5 Figure 3: 2021 Future with Development Traffic Volumes.......................................................... 7 LIST OF TABLES Table 1: Level of Service Criteria for Intersections....................................................................... 3 Table2: Trip Generation Summary ................................................................................................;. 4 ATTACHMENTS Trip Generation Calculations........................................................................................................... A Existing Turning Movement Counts and Turning Movement Calculations....................................B PM Peak -Hour Level of Service Analysis...................................................................................... C WSDOTCollision Data................................................................................................................. D City of Edmonds Traffic Mitigation Fee Table.............................................................................. E SitePlan........................................................................................................................................ F Gibson Traffic Consultants, Inc. April 2019 infoe. ibsontraffic.com GTC #19-071 i 22810 Edmonds Way Traffic Impact Analysis 1. PROJECT DESCRIPTION The 22810 Edmonds Way development is located along the south side of SR-104 (Edmonds Way), east of 951h Place W. A site vicinity map is shown in Figure 1. The 22810 Edmonds Way is proposed to consist of 18 multifamily low-rise units with the existing house on the site to be removed. The units will gain access to the Cascadian In Edmonds apartment complex parking lot to the west of the existing single-family house and the signal at the intersection of SR- 104/95th Place W. The development is proposed to be constructed/occupied before 2021. The development will modify the access to the Cascadian In Edmonds apartment complex by creating two 12-foot ingress lanes and one 12-foot egress lane. The existing c-curbing will be removed. 2. METHODOLOGY The Institute of Transportation Engineers (ITE) Trip Generation, loth Edition (2017) is the nationally accepted source for trip generation estimates for specific land uses. The trip generation estimates include trip generation rates and equations for time periods such as average daily traffic, morning and evening peak -hours for typical weekday, Saturday and Sunday. The ITE rates represent the national averages and may vary from area to area as demonstrated by the range of rates included in ITE Trip Generation, loth Edition for specific land uses. The peak -hour level of service (LOS) analysis calculations were completed using the Synchro 10, software. This software applies the operational analysis methodology of the current Highway Capacity Manual (HCM). Traffic congestion is generally measured in terms of level of service. In accordance with the HCM 6th Edition, road facilities and intersections are rated between LOS A and LOS F, with LOS A being free flow and LOS F being forced flow or over -capacity conditions. The level of service criteria is summarized in Table 1. The level of service at two-way stop -controlled intersections is based on the average delay of the worst approach. The level of service at signalized and all -way stop -controlled intersections is based on the average delay for all approaches. Geometric characteristics and conflicting traffic movements are taken into consideration when determining level of service values. Gibson Traffic Consultants, Inc. April 2019 info@gibsontraffic.com GTC #19-071 1 BELLA COOLA Ya' a ELM ST 9�l z31" 5T SW N j a �+ x a o � S GIBSON TRAFFIC CONSULTANTS 22810 EDMONDS WAY LEGEND 18 MULTIFAMILY LOW-RISE UNITS DEVELOPMENT SITE CITY OF EDMONDS STUDY INTERSECTION ?� a a a 220TH ST SW 3 a x 222ND ST SW 224TH ST SW 224TH ST SW 3 d a a $ 226TH ST SW #1 I 228TH ST SW SITE 230TH ST SW 231ST ST SW 232ND PL SW L 99 233RD PL SW a a ST SW 234THLO 234TH PL SW n 23M ST SW 3 2WTH ST SW 10 a 3 a 240TH ST SW (� 242ND ST SW 242ND ST SW TRAFFIC IMPACT STUDY GTC #19-071 FIGURE 1 SITE VICINITY MAP 22810 Edmonds Way Traffic Impact Analysis Table 1: Level of Service Criteria for Intersections Level of 1 Service Expected Delay Intersection Control Delay Seconds r Vehicle Unsignalized Intersections Signalized Intersections A Little/No Delay <10 <10 B Short Delays >10 and <15 >10 and <20 C Average Delays >15 and <25 >20 and <35 D Long Delays >25 and <35 >35 and <55 E Very Long Delays >35 and <50 >55 and <80 F Extreme Delays2 >50 >80 Per the June 2015 Comprehensive Transportation Plan; the acceptable level of service for City of Edmonds intersections is LOS D for arterials and LOS C for collectors. Highways of Statewide Significance, SR-104, are not subject to local concurrency standards; however, WSDOT has established a standard of LOS D for these facilities. The City of Edmonds monitors these roadways and coordinates with WSDOT to address any deficiencies. The analysis has been performed for the existing conditions, 2021 baseline conditions, and 2021 future with development conditions during the PM peak -hour. Existing counts were collected by Traffic Data Gathering (TDG) on April 16, 2019 for the PM peak -hour. That count was compared to the count taken at the intersection on September 13, 2013 which showed no growth during the PM peak -hour; however, 2021 baseline turning movements were calculated by applying an annually compounding growth rate of 1% to the existing turning volumes to be conservative. The 2021 future with development turning movements have been calculated by adding the development's trips to the 2021 baseline turning movements. The traffic volume calculations are included in the attachments. i Source: Highway Capacity Manual 611 Edition LOS A: Free -flow traffic conditions, with minimal delay to stopped vehicles (no vehicle is delayed longer than one cycle at signalized intersection). LOS B: Generally stable traffic flow conditions. LOS C: Occasional back-ups may develop, but delay to vehicles is short term and still tolerable. LOS D: During short periods of the peak hour, delays to approaching vehicles may be substantial but are tolerable during times of less demand (i.e. vehicles delayed one cycle or less at signal). LOS E: Intersections operate at or near capacity, with long queues developing on all approaches and long delays. LOS F: Jammed conditions on all approaches with excessively long delays and vehicles unable to move at times. 2 When demand volume exceeds the capacity of the lane, extreme delays will be encountered with queuing which may cause severe congestion affecting other traffic movements in the intersection. Gibson Traffic Consultants, Inc. April 2019 iiifo@gibsoittiial-tic.coin GTC #19-071 3 22810 Edmonds Way Traffic Impact Analysis 3. TRIP GENERATION Trip generation calculations for the 22810 Edmonds Way development are based on national statistics contained in the Institute of Transportation Engineers' (ITE) Trip Generation, 10 Edition (2017). The average trip generation rates for the following ITE Land Uses were utilized: ■ Land Use Code 220, Multi -Family Housing (Low -Rise) — 18 Units ■ Land Use Code 210, Single -Family Detached — I Unit (Removed) The development will generate 122.32 new daily trips, 7.54 new AM peak -hour trips and 9.09 new PM peak -hour trips. The trip generation is summarized in Table 2. Table 2: Trip Generation Summary Land Use Size Average Daily AM Peak -Hour Trips PM Peak -Hour Trips Trips Inbound Outbound Total Inbound Outbound Total Multi -Family Housing (Low -Rise) 18 Units 131.76 1.90 6.38 8.28 6.35 3.73 10.08 ITE LUC 220 Single -Family ITE LUC 210 -1 Unit -9.44 -0.19 -0.55 -0.74 -0.62 -0.37 -0.99 Removed TOTAL NEW 122.32 1.71 5.83 7.54 5.73 3.36 9.09 The trip generation calculations are included in the attachments. 4. TRIP DISTRIBUTION The distribution of trips generated by the 22810 Edmonds Way residential development are based on recent PM peak -hour counts performed for the adjacent intersection of SR-104 at 95'i' Place W, which included the adjacent apartment complex as the south leg. It has been assumed that distribution for the 22810 Edmonds Way development will be similar to the adjacent apartment complex. The count data showed that approximately 30% of the total inbound and outbound trips travel to and from the west and 50% travel to and from the east. The remaining 20% travel to and from the north through the signalized intersection. This distribution has therefore been applied to the trips generated by the 22810 Edmonds Way development. The distribution of daily and PM peak -hour trips generated by the development are shown in Figure 2. Gibson Traffic Consultants, Inc. info@,gibsontraffic.com April 2019 GTC #19-071 Ll BELLA COOLA RD 4 ELMNq �N RD rz Go o II 4 224TH ST SW 226TH ST S ¢ d 201 a_ a LppNpUtN R 104 1 $ 37 1 �2 SITE 3 502 Ya' a N 3 z J Q W t 238TH ST SW 3 a a g GIBSON TRAFFIC CONSULTANTS 22810 EDMONDS WAY LEGEND 18 M U LTI FAMI LY AWDT NEW DAILY TRAFRC PM H PEAK NEW PM PEAK HOUR TRIPS LOW-RISE UNITS 25 CITY OF EDMONDS TRIP DISTRIBUTION 238TH ST SW 240TH ST SW 242ND ST SW � 3 a 220TH ST SW 3 a 222ND ST SW 224TH ST SW 3 a 22M ST SW 231ST ST SW 228TH ST SW 230TH ST SW i. 99 _ 232ND PL SW 233RD PL SW 234TH ST SW 234TH PL SW rc�!F7ri�1 a � a 242ND ST SW TRAFFIC IMPACT STUDY GTC #19-071 FIGURE 2 DEVELOPMENT TRIP DISTRIBUTION 22810 Edmonds Way Traffic Impact Analysis 5. SITE ACCESS ROADWAY/DRIVEWAYS AND SAFETY All the multifamily units will gain access to the Cascadian In Edmonds apartment complex parking lot to the west of the existing single-family house and the signal at the intersection of SR-104/951h Place W. The frontage of the development currently has curb, gutter and sidewalk. SR-104 is a 5-lane section along the development's frontage, which provides two lanes in each direction and a center two-way-left-turn-lane/left-turn pocket. The 50th percentile queuing for the westbound left -turn at the signal is anticipated to be less than 22 feet. 5.1 Level of Service Analysis Level of service analysis has been performed for the signalized intersection of SR-104 at 95th Place W to ensure it would continue to operate at an acceptable level of service. The analysis has been performed for the year 2021, which is when it would be anticipated the residential units would become fully occupied. The 2021 turning movement volumes are based on the counts performed for the intersection of SR-104 at 95th Place W. These counts were performed by the independent count firm of Traffic Data Gathering (TDG) on Tuesday, April 16, 2019 between 4:00 PM and 6:00 PM. An annually compounding growth rate of 1%, which accounts for development in the area, was applied to the existing volumes to determine the 2021 baseline volumes. The 2021 baseline volumes represent the future volumes before the development is constructed. The 2021 future with development volumes were calculated by adding the development trips to the 2021 baseline volumes. The 2021 future with development volumes at the site accesses are shown in Figure 3. The level of service analysis shows that the signalized intersection of SR-104 at 95' Place W will operate at LOS C with 31.6 seconds of delay. The level of service analysis also shows that the 50th percentile queue length at the intersection will be less than 1 westbound vehicle. Gibson Traffic Consultants, Inc. i nfo�r)�gl bsontraft f c. coil] April 2019 GTC # 19-071 on GIBSON TRAFFIC CONSULTANTS 22810 EDMONDS WAY LEGEND 18 MULTIFAMILY ,x� LOW-RISE UNITS CITY OF EDMONDS PM PEAK HOUR TURNING MOVEMENT VOLUMES TRAFFIC IMPACT STUDY GTC #19-071 FIGURE 3 FUTURE 2021 WITH DEVELOPMENT TRAFFIC VOLUMES m 22810 Edmonds Way Traffic Impact Analysis 5.2 Collision Summary The latest 5-year collision history from January 1, 2014 through December 2018 was obtained from WSDOT. The development's access is located at MP 26.80 (signalized intersection of SR- 104/95a' Place W). There were 16 collisions in the 5-year reporting period that were at the signalized intersection. There were: 1 sideswipe, 1 opposite direction, 1 pedestrian/bike, 5 at angle, 5 rear end, and 3 fixed object collisions. Based on the existing count showing 2,144 PM peak -hour trips, a K factor of 10 to estimate 21,440 daily trips at the intersection; the 16 collisions result in a collision rate of 0.41 collisions per million entering vehicles (NEV). The WSDOT 2011 Washington State Collision Data Summary, the most recent one available from WSDOT, shows that the collision rate for an Urban Principal Arterial in the Northwest Region, which are roadways similar to SR-104, is 2.27 collisions per million vehicle miles of travel. The collision rate at the development's accesses should therefore be considered acceptable since the collision rate is below the state average. 6. LEVEL OF SERVICE ANALYSIS Future intersection level of service analysis is typically only required at off -site intersections that are impacted with 25 or more PM peak -hour development trips. The 22810 Edmonds Way development will not impact any off -site intersections with 25 PM peak -hour trips. Therefore, off -site intersection level of service analysis would not be required. The level of service analysis at the site access intersection has discussed under section 5.3 Level of Service Analysis. The analysis shows that the site access intersection will operate at acceptable LOS C. Gibson Traffic Consultants, Inc. infood gibsontraffic.com April 2019 GTC #19-071 H 22810 Edmonds Way Traffic Impact Analysis 7. MITIGATION RECOMMENDATIONS The applicable traffic mitigation fees are from City of Edmonds Code 3.36.125. The City of Edmonds has calculated traffic mitigation fee of $5,530.21 per PM peak -hour trip for 2019 and beyond. The development will generate 10.08 PM peak -hour trips before credit for the existing home which will require $55,744.52 in mitigation fees. The existing house is credited based on the 2004 Impact Fee Rate Table which identified $840.72 as the mitigation fee for a single- family house. With the single-family house credited towards the mitigation fees the 22810 Edmonds Way development would have mitigation fees of $54,903.80. 8. CONCLUSIONS The 22810 Edmonds Way development is a proposed 18 multifamily low-rise unit development with the existing house to be removed. The site is located on the south side of SR-104, east of 95'' Place W. However, all the units will access the public road system via the adjacent signal. The development will have an easement to the adjacent apartment complex to the west and the signal of SR-104/95"' Place W. The development will have traffic mitigation fees of $54,903.80, based on the City of Edmonds updated traffic mitigation fee. The development will not have a significant impact on the surrounding intersections. Gibson Traffic Consultants, Inc. April 2019 info ,gibsontra c.cam GTC #19-071 9 Trip Generation Calculations A 22810 Edmonds Way GTC #19-071 Trip Generation for: Weekday (a.k.a.): Average Weekday Daily Trips (AWDT) NET EXTERNAL TRIPS BY TYPE IN BOTH DIRECTIONS DIRECTIONAL ASSIGNMENTS TOTAL PASS -BY DIVERTED DIVERTED NEW Gross Trips Internal Crossover LINK LINK USES VARIABLE ITE Trip LU ° /o ° /° In+Out % of Gross Tri ps In+Out In+Out % of Ext. In+Out % of Ext. In+OutLAND dPASS-BY Out In Out In Out Rate code IN OUT (Total) Trips (Total) (Total) Trips (Total) TripsMultifamily (Total)In [Low-Risai 18 units 220 732 50% 50% 132 0% 0 132 0% 0 0% 0 0 0 0 0 65.88 65.88 Single -Family (Removed) -1 units 210 9.44 50% 50% -9 0% 0 -9 0% 0 0% 0 0 0 0 0 -4.72 -4.7Totals 122 0 122 0 0 0 0 11 0 1 0 11 61.16 61.16 H:\2019\19-071\22810 Edmonds WayTG a 22810 Edmonds Way GTC #19-071 Trip Generation for: Weekday, Peak Hour of Adjacent Street Traffic, One Hour between 7 and 9 AM (a.k.a.): Weekday AM Peak Hour NET EXTERNAL TRIPS BY TYPE IN BOTH DIRECTIONS DIRECTIONAL ASSIGNMENTS TOTAL PASS -BY DIVERTED NEW PASS -BY DIVERTED NEW Internal Gross Trips Crossover LINK LINK LAND USES VARIABLE ITE LU Trip % % In+Out % of Gross Trips In+Out In+Out % of Ext. In+Out % of Ext. In+Out In+Out In Out In Out In Out code Rate IN OUT (Total) Trips (Total) (Total) Trips (Total) I Trips (Total) (Total) Multifamily (Low -Rise) 18 units 220 0.46 23% 77% 8 0% 0 8 0% 0 0% 0 8.28 0 0 1 0 0 1.90 6.38 Single -Family (Removed) -1 units 210 0.74 25% 75% -1 0% 0 -1 0% 0 0% 0 -0.74 0 0 0 0 -0.19 -0.55 Totals 1 8 0 1 8 0 0 7.54 0 0 0 0 1. 11 5.83 H:\2019\19-071 \22810 Edmonds Way TG 22810 Edmonds Way GTC #19-071 Trip Generation for: Weekday, Peak Hour of Adjacent Street Traffic, One Hour between 4 and 6 PM (a.k.a.): Weekday PM Peak Hour NET EXTERNAL TRIPS BY TYPE IN BOTH DIRECTIONSJ1n+0ut ASSIGNMENTS TOTAL PASS -BY DIVERTED DIVERTED NEW Gross Trips Internal Crossover LINK LINK LAND USES VARIABLE ITE LU Trip , /o , /, In+Out % of Gross Trips In+Out In+Out % of Ext. In+Out % of Ext. In+Out :DITIONAL In Out In Out code Rate IN OUT (Total) Trips (Total) (total) Trips (Total) TripsMultifamily (Total) (Low -Rise) 18 units 220 0.56 63% 37% 10 0% 0 10 0% 0 0% 0 0 0 6.35 3.73Single-Family (Removed) -1 units 210 0.99 63% 37% 1 0% 0 -1 0% 0 0% 0 0 0 -0.62 -0.37Totals 90 9 0 0 0 0 5.73 3.36 H:\2019\19-071\22810 Edmonds WayTG a W 22810 Edmonds Way GTC #19-071 AM Peak -Hour % New ADT New AM Peak Hour Tri s In I Out aTotal 100% 1221 21 611 7.54 1 % 1.22 0.02 o.oq 0.08 2% 2.45 0.03 0.1 0.15 3% 3.67 0.05 0.17 0.23 4% 4.89 0.07 0.23 0.30 5% 6.12 0.09 0.29 0.38 6% 7,341 0.10 0.35 0.45 7% 8-561 0.12 0.41 0.53 8% 9.79 0.14 0.47, 0.60 9% 11.01 0.15 0.5 0.68 10% 12.23 0.17 0.581 0.75 11 % 13.46 0.19 0.64 0.83 12% 14.68 0.21 0.70 0.90 13% 15.90 0.22 0.76 0.98 14% 17.12 0.24 0.82 1.06 15% 18.35 0.26 0.87 1.13 16% 19.57 0.27 0.93 1.21 17% 20.79 0.29 0.99 1.28 18% 22.02 0.31 1.05 1.36 19% 23.24 0.32 1.11 1.43 20% 24.46 0.34 1.17 1.51 21 % 25.69 0.36 1.221 1.58 22% 26.91 0.38 1.2N 1.66 23% 28.13 0.39 1.341 1.73 24% 29.36 0.41 1.4 1.81 25% 30.58 0.43 1.461 1.89 26% 31.80 0.44 1.54 1.96 27% 33.03 0.46 1.57 2.04 28% 34.25 0.48 1.63 2.11 29% 35.47 0.50 1.69 2.19 30% 36.70 0.51 1.75 2.26 31 % 37.92 0.53 1.81 2.34 32% 39.14 0.55 1.87 2.41 33% 40.371 0.56 1.92 2.49 34% 41.59 0.58 1 .98 2.56 35% 42.81 0.60 2.04 2.64 36% 44.04 0.62 2.10 2.71 37% 45.26 0.63 2.1 2.79 38% 46.48 0.65 2.2A 2.87 39% 47.70 0.67 2.27 2.94 40% 48.93 0.68 2.33 3.02 41 % 50.15 0.70 2.39 3.09 42% 51.37 0.72 2.45 3.17 43% 52.60 0.74 2.51 3.24 44% 53.821 0.75 2.57 3.32 45% 55.04 0.77 2.62 3.39 46% 56.27 0.79 2.68 3.47 47% 57.49 0.80 2.74 3.54 48% 58.71 0.82 2.801 3.62 49% 59.94 0.84 2.8 3.69 50%1 61.161 0.861 2,921 3.77 HA2019\19-071 \22810 Edmonds Way TG % New ADT New AM Peak Hour Tri s In Out I Total 100% 122 2 N8 51 % 62.38 0.87 2.97 3.85 52% 63.61 0.89 3.03 3.92 53% 64.83 0.91 3.09 4.00 54% 66.05 0.92 3.15 4.07 55% 67.28 0.94 3.21 4.15 56% 68.50 0.961 3.26 4.22 57% 69.72 0.97 3.32 4.30 58% 70.95 0.99 3.38 4.37 59% 72.17 1.01 3.44 4.45 60% 73.39 1.03 3.50 4.52 61%1 74.62 1.04 3.56 4.60 62% 75.84 1.06 3.61 4.67 63% 77.06 1.08 3.67 4.75 64% 78.28 1.09 3.73 4.83 65% 79.51 1.11 3.79 4.90 66% 80.73 1.13 3.85 4.98 67% 81.95 1.15 3.91 5.05 68% 83.18 1.16 3.96 5.13 69% 84.40 1.18 4.02 5.20 70% 85.62 1.20 4.08 5.28 71 % 86.85 1.21 4.14 5.35 72% 88.07 1.23 4.20 5.43 73% 89.29 1.25 4.261 5.50 74% 90.52 1.27 4.31 5.58 75% 91.74 1.28 4.37 5.66 76% 92.96 1.30 4.43 5.73 77%1 94.19 1.32 4.49 5.81 78%1 95.41 1.33 4.55 5.88 79%1 96.63 1.35 4.61 5.96 80% 97.86 1.37 4.66 6.03 81 % 99.08 1.39 4.72 6.11 82% 100.30 1.40 4.78 6.18 83% 101.53 1.42 4.84 6.26 84% 102.75 1.44 4.90 6.33 85% 103.97 1.45 4.96 6.41 86% 105.20 1.47 5.01 6.48 87% 106.42 1.49 5.07 6.56 88% 107.64 1.50 5.13 6.64 89% 108.86 1.52 5.19 6.71 90% 110.09 1.54 5.25 6.79 91 % 111.31 1.56 5.31 6.86 92% 112.53 1.57 5.36 6.94 93% 113.76 1.59 5.42 7.01 94% 114.98 1.611 5.48 7.09 95%1 116.20 1.621 5.54 7.16 96% 117.43 1.641 5.60 7.24 97% 118.65 1.66 5.66 7.31 98% 119.87 1.68 5.71 7.39 99% 121.10 1.69 577 7.46 100% 122.32 1.71 5.831 7.54 A-4 22810 Edmonds Way GTC #19-071 PM Peak -Hour % New ADT New PM Peak Hour Trips In I Out 11 Total 100% 1221 61 3 9.09 1 % 1.22 0.06 0.04 0.09 2% 2.45 0.11 0.0 0.18 3% 3.67 0.17 0.10 0.27 4% 4.89 0.23 0.13 0.36 5% 6.12 0.29 0.17 0.45 6% 7.341 0.34 0.20 0.55 7% 8.561 0.40 0.2 0.64 8% 9.79 0.46 0.27 0.73 9% 11.01 0.52 0.30 0.82 10% 12.23 0.57 0.34 0.91 11 % 13.46 0.63 0.37 1.00 12% 14.68 0.69 0.40 1.09 13% 15.90 0.74 0.44 1.18 14% 17.12 0.80 0.47 1.27 15% 18.35 0.86 0.50 1.36 16% 19.57 0.92 0.54 1.45 17% 20.79 0.97 0.57 1.55 18% 22.02 1.03 0.60 1.64 19% 23.24 1.09 0.64 1.73 20% 24.46 1.15 0.67 1.82 21% 25.69 1.20 0.71 1.91 22% 26.91 1.26 0.74 2.00 23%1 28.13 1.32 0.77 2.09 24% 29.36 1.38 0.81 2.18 25% 30.58 1.43 0.84 2.27 26% 31.80 1.49 0.87 2.36 27% 33.03 1.55 0.91 2.45 28% 34.25 1.60 0.94 2.55 29% 35.47 1.66 0.9 2.64 30% 36.70 1.72 1.01 2.73 31 % 37.92 1.78 1.0 2.82 32% 39.14 1.83 1.0 2.91 33% 40.371 1.89 1.11 3.00 34% 41.591 1.95 1.14 3.09 35% 42.811 2.01 1.18 3.18 36% 44.04 2.06 1.21 3.27 37% 45.26 2.12 1.24 3.36 38% 46.48 2.18 1.28 3.45 39% 47.70 2.23 1.31 3.55 40% 48.93 2.29 1.34 3.64 41 % 50.151 2.35 1.38 3.73 42% 51.371 2.41 1.41 3.82 43% 52.60 2.46 1.44 3.91 44% 53.82 2.52 1.48 4.00 45% 55.04 2.58 1.51 4.09 46% 56.27 2.64 1.55 4.18 47% 57.49 2.69 1.58 4.27 48% 58.71 2.75 1.61Lj 49% 59.94 2.81 1.650%61.16 2.87 168 HA2019\19-071 \22810 Edmonds Way TG % New ADT New PM Peak Hour Trips In Out Total 100% 122 6 311 9 51 % 62.38 2.92 1.71 4.64 52% 63.61 2.98 1.75 4.73 53% 64.83 3.04 1.78 4.82 54% 66.05 3.09 1.81 4.91 55% 67.28 3.15 1.85 5.00 56%1 68.50 3.21 1.881 5.09 57% 69.72 3.27 1.92 5.18 58% 70.95 3.32 1.95 5.27 59% 72.17 3.38 1.98 5.36 60% 73.39 3.44 2.02 5.45 61 % 74.62 3.501 2.05 5.54 62% 75.84 3.55 2.08 5.64 63% 77.06 3.61 2.12 5.73 64% 78.28 3.67 2.15 5.82 65% 79.51 3.72 2.18 5.91 66% 80.73 3.78 2.22 6.00 67% 81.95 3.841 2.25 6.09 68% 83.18 3.90 2.28 6.18 69% 84.40 3.95 2.32 6.27 70% 85.62 4.01 2.35 6.36 71 % 86.85 4.07 2.39 6.45 72%1 88.07 4.13 2.42 6.54 73% 89.29 4.18 2.45 6.64 74% 90.52 4.24 2.49 6.73 75% 91.74 4.30 2.52 6.82 76% 92.96 4.35 2.55 6.91 77% 94.19 4.41 2.59 7.00 78% 95.41 4.47 2.62 7.09 79% 96.63 4.53 2.65 7.18 80% 97.86 4.58 2.69 7.27 81 % 99.08 4.64 2.72 7.36 82% 100.30 4.701 2.76 7.45 83%1 101.53 4.761 2.79 7.54 84% 102.75 4.81 2.82 7.64 85% 103.97 4.87 2.86 7.73 86% 105.20 4.93 2.89 7.82 87% 106.42 4.99 2.92 7.91 88% 107.64 5.04 2.961 8.00 89%1 108.86 5.10 2.99 8.09 90% 110.09 5.16 3.02 8.18 91 % 111.31 521 3.06 8.27 92% 112.53 5.27 3.09 8.36 93% 113.76 5.33 3.12 8.45 94% 114.98 5.39 3.16 8.54 95% 116.20 5.441 3.19 8.64 96% 117.43 5.50 3.23 8.73 97% 118.65 5.56 3.26 8.82 98% 119.87 5.62 3.291 8.91 99% 121.10 5.67 3.33 9.00 100%1 122.32 5.73 3.36 9.09 A-5 Existing Turning Movement Counts and Turning Movement Calculations V TTRA FRC DATA GATHERING TURNING MOVEMENTS DIAGRAM 4:00 PM - 6:00 PM PEAK HOUR: 4:30 PM TO 5:30 PM HV I PHF SIB 1.7% 0.87 NB 0.0% 0.50 WB 1.1% 0.94 EB 1.6% 0.85 INTRS. 1.49/6 0.93 PHF = Peak Hour Factor HV = Heavy Vehicle 95th Place W @ Edmonds Way Edmonds, WA COUNTED BY: TDG DATE OF COUNT: Tue. 4/16/19 REDUCTION DATE: Wed. 4/17/19 TIME OF COUNT: 4:00 PM - 6:00 PM B -l m s- IIIIIIIIIIIIIIIIIIIIIIMINIII � ■v PAYE�11�0�1� . 0v■�vvv�v■,v� O��IO�v��NA0. 1 1 95th Place W @ Edmonds Way Page 1 of 1 Synchro ID: 1 Existing 229 490 261 Average Weekday 165 1 1 1 63 PM Peak Hour t2 b 95th Place W a 111 Year: 4/16119 1,063 a 897 1,013 5 Data Source: TDG 1,959 Edmonds Way (SR-104) 2,144 Edmonds Way (SR-104) 1,824 896 745 b 811 3 b Apartment Dwy 1 1 2 1 3 9 15 1 6 Future without Project 1 233 1 499 266 Average Weekday 168 1 1 1 64 PM Peak Hour b b 95th Place W q 113 Year: 2021 1,084 a 915 1,033 Growth Rate = 1.0% i2 5 Years of Growth = 2 1,998 Edmonds Way (SR-104) F2,Tifl Edmonds Way (SR-104) 1,860 Total Growth = 1.0201 914 760 b 827 3 b Apartment Dwy 1 1 2 1 3 9 15 1 6 �^ Total Project Trips 1 2 1 Average Weekday 0 1 0 PM Peak Hour b 95th Place W R 0 1 a 0 3 " 3 3 Edmonds Way (SR-104) F16-1 Edmonds Way (SR-104) 5 0 � 2 0 b 2 2 b Apartment Dwy 1 1 2 6 10 1 4 Future with Project 234 1 501 267 Average Weekday 168 1 2 1 64 PM Peak Hour ,2 4 b 95th Place W Q 113 1,085 a 915 1,036 0 8 2,001 Edmonds Way (SR-104) 2,196 Edmonds Way (SR-104) 1.865 151 916 760 b 829 5 b Apartment Dwy 2 1 3 1 5 15 25 1 10 North T North North T North B - 3 PM Peak -Hour Level of Service Analysis IN H A201 9\1 9-071 \Synch ro\2021 Future With Conditions.syn 1: Access/95th Place W & Edmonds Way 22810 Edmonds Way Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 1 0 1 ♦T 4 r Traffic Volume (veh/h) 151 760 5 8 915 113 2 3 5 64 2 168 Future Volume (veh/h) 151 760 5 8 915 113 2 3 5 64 2 168 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A-pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 162 817 5 9 984 122 2 3 5 69 2 181 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 198 1652 10 20 1132 140 142 217 315 619 17 629 Arrive On Green 0.11 0.46 0.46 0.01 0.36 0.36 0.40 0.40 0.40 0.40 0.40 0.40 Sat Flow, veh/h 1781 3621 22 1781 3182 394 249 545 794 1378 43 1585 Grp Volume(v), veh/h 162 401 421 9 549 557 10 0 0 71 0 181 Grp Sat Flow(s),veh/h/In 1781 1777 1866 1781 1777 1799 1589 0 0 1421 0 1585 Q Serve(g_s), s 8.8 15.8 15.8 0.5 28.7 28.7 0.0 0.0 0.0 2.7 0.0 7.7 Cycle Q Clear(g_c), s 8.8 15.8 15.8 0.5 28.7 28.7 0.4 0.0 0.0 3.1 0.0 7.7 Prop In Lane 1.00 0.01 1.00 0.22 0.20 0.50 0.97 1.00 Lane Grp Cap(c), veh/h 198 810 851 20 632 640 674 0 0 635 0 629 V/C Ratio(X) 0.82 0.49 0.49 0.46 0.87 0.87 0.01 0.00 0.00 0.11 0.00 0.29 Avail Cap(c_a), veh/h 484 810 851 484 715 724 674 0 0 635 0 629 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 43.2 19.0 19.0 48.9 29.9 29.9 18.2 0.0 0.0 19.0 0.0 20.4 Incr Delay (d2), s/veh 8.0 0.5 0.4 15.6 10.2 10.2 0.0 0.0 0.0 0.4 0.0 1.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 We BackOfQ(50%),veh/In 4.3 6.3 6.6 0.3 13.5 13.6 0.1 0.0 0.0 1.1 0.0 3.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 51.2 19.5 19.4 64.5 40.1 40.1 18.2 0.0 0.0 19.3 0.0 21.6 LnG LOS D B B E D D B A A B A C Approach Vol, veh/h 984 1115 10 252 Approach Delay, s/veh 24.7 40.3 18.2 20.9 Approach LOS C D B C Timer - Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 44.0 5.6 49.9 44.0 15.6 39.9 Change Period (Y+Rc), s 4.5 4.5 4.5 4.5 4.5 4.5 Max Green Setting (Gmax), s 39.5 27.0 40.0 39.5 27.0 40.0 Max Q Clear Time (g_c+l1), s 2.4 2.5 17.8 9.7 10.8 30.7 Green Ext Time (p-c), s 0.0 0.0 5.1 1.0 0.4 4.7 Intersection Summary HCM 6th Ctrl Delay 31.6 HCM 6th LOS C GTC (MJP) 2021 Future With Conditions HCM 6th Signalized Intersection Summary C-1 WSDOT Collision Data u DIST JCOUNlY FROM MI I 1 Y ! PRIMARY REF REPORT IURISDICTION :ISV TRAFFICWAY POIM FT MILEPOST NUMBER DATE I4.1F MOST SEVERE INIURY TYPE I t rl ', 5 VEHICLE IIVPE VFHI(LF2TVPE JUNCTION RELATIONSHIP WEAt"R ROADWAY SU RFAC E CONDI110N --- •--•_ ----•------•-•- �� ��-ram c. �4883 201 r-va-c i .a.av .--" Serious injury r u r u t .mup,eanel I rucs or vaneae under 1 u,ODD Ib Ar Inlamaohoa and Ralefad Clear or Party Claudy Dry State Route Snohomis Edmond 104 0 Z6.80 E443424 2015-07-15 07:54 Suspected Minor Injury 2 0 2 0 0 Pickup,Panel Truck or Vanette under 10,000 lb Pickup,Panel Truck or Venette under 10,000 lb At Intersection and Related Clear or Party Cloudy Dry State.Raute S1lohamisEdndnd 1O4 0 2&W E421557 241"&M 09,VS 54NpaGad M]rcr niuy 1 0 2 0 OPldkap,Penel Truck orVakette under IDAM 1b Mdomyde At Driveway Cleeror Pertly Claudy Dry State Route Snohomis Edmond 104 0 Oil" E572530 2016-08-10 11:44 Possible Injury 1 0 2 0 0 Passenger Car Passenger Car At Intersection and Related Clear or Partly Cloudy Dry State Route Snohomis Edmond 104 0 26.80 E592698 2016-1 MIS 19:50 Suspected Minor Injury 1 0 2 0 0 Pickup, Panel Truck or Vanette under 10,000 lb Passenger Car At Intersection and Related Clear or Party Cloudy We State Route Snoharnis Edmond 104 0 26.80 E515398 2016-02-12 16:44 Possible Injury 1 0 2 0 0 Passenger Car Passenger Car At Intersection and Related Clear or Party Clardy Dry Stele Route Snohamis Ednond 104 0 26.80 E559215 2016-0629 i6:i 1 Possible Injury 1 0 2 0 0 Passenger Car Pickup,Panel Truck or Vanette under 10,000 It, W k lionloodan arl6 RNegd Clear or Party Clardy Dry State Route %ohornis EAnond 104 0 26.80 E593301 2016-10-07 02.45 No Apparent Injury 0 0 1 0 O Pickup, Panel Truck or Vanette under 10,000 lb At Intormalon and Not R*I tad Raining Wet State Route Snohomis Ednond 104 0 28.80 E623140 2016-12-2002:25 No Apparent Injury 0 0 1 0 0Passenger Car At Inlmmd6on and Ratatad Raining Wet State Route Snohomis Edmond 104 0 2%0 E606353 201611-07 15:29 No Apparent Injury 0 0 2 0 0 Rckup,Panel Truck or Vanette under 10,000 lb Pickup,Panel Truck or Vanette under 10,000 lb At Intersection and Related Clear or Party Cloudy Dry State Route Snohomis Edmond 104 0 2680 E352498 2014-08-16 20:19 Suspected Serious Injury 1 0 2 0 0 Motorcycle Pickup,Panel Truck or Venetia under 10,0001b At lat— en and 401 Rested Clear or Party Cloudy Dry State Route Snohomis Edmond 104 0 2680 E615248 2016-12-01 16:38 Possible Injury 1 0 2 0 0 Passenger Car Pickup,Panel Truck or Vanette under 10,0001b At Intersection and Not Related Clear or Party Cloudy Dry State Route Snoh-1 Edmond 104 0 2680 E590795 2016-09-30 18:28 Possible Injury 1 0 2 0 0 Pickup ,Pane1 Truck or Vanette under 10,000 lb Passenger Car At kda/a= and Kok"d Clonr or Party Cloudy Dry Slate Roue Snohomis Edmond 104 0 26 80 E673126 2017-06-21 14:11 No Apparent Injury 0 0 2 0 0 PI.up,Panel Trucc or Van tie under 10,0001b Passenger Car At Ntamadion and RakW Clear or Party Cloudy Dry State Route Snoh-1 Edmond 104 0 26 80 E697304 2017-08-01 15:25 Possible Injury 1 0 2 0 0 Pickup,Pane1 Truck or Vanette under 10,000 Ib Piclalp,Panel Truck or Vanette under 10,000 Ib At Intate.9dort arid Raleaad Clear or Party Cloudy Dry State Route Snohomis Edmond 104 0 26 80 E749383 2017-12-19 16:13 Possible Injury 1 0 1 0 0 Pi kup,Panel Truck or Van Ito under I O'DDO Ib At IntanaCwe rid NIX R@LNM Wercast Wet State Route Snohamis Edmond 104 0 26 81 E830351 2018-08-20 14:40 No Apparent Injury 0 0 2 0 0 Mckup,Panel Truck or Vanette under 10,000 lb Truck (Flatba4Van,etc) Intersection Related but Not at Intersection Clear or Party Cloudy Dry Slate Route Snohomis Ednond104 0 2683 E401853 2015-02.17 14;30 No Apparent Injury 0 0 2 0 0 Rdtup,Panel Truck or Van10,000e under 10,O Ib Pldorp,Pano] Truk or Vanette under 10,DDOlb At Driveway Clear or Partly Cloudy Dry Sete R." Snahomis Edrnond104 0 26-84 E646102 2017-02-27 02:37 No Apparent Injury 0 0 1 0 0 Passenger Car Wa! Iftow"cW end Not Retarad Clear or Pertly Cloudy Dry State Route Snohomis Edmond 104 0 28.84 E634382 2017-01-16 12:33 Possible Injury 1 0 2 0 0 Rdkup,Penat Truck or Vanef under 10,0D016 Not at Intamectlon and Not Related Clear or Party Cloudy Dry z 0 0 Z. Z.. u93u9u9z3 wui D-2 ee s gg rv�a��mm��`"anmr�a m� �Ea Y Z C z z°zzz S S zzzz z zz s .e N �m W r rmr HIS 3 � � m fi UUZS �Sd sgx 5� oLL�LLLL�b�� A zci D-3 City of Edmonds Traffic Mitigation Fee Table E 3.36.125 Street impact fee rates. The street impact fee rates in this section are generated from the formula for calculating impact fees set forth in the rate study, which is incorporated herein by reference. Except as otherwise provided for herein, all new developments in the city will be charged the street impact fee applicable to the type of development as follows in the table below. For momnies zoned BD - Downtown Business_ an TTE Land Use Code of 814 - Snecsinity Retail rhn11 he nnnlind 2016 2017 2018 (w/ (with (w/ 2019 and $1,049.41 $2,543.01 4,036.61 beyond (w/ Fee cost per cost per cost per $5,530.21 ITE Land Use Code - Description Calculation trip) trip) trip) cost per trip) per square 110 - Light Industrial foot $1.50 $3.64 $5.77 $7.91 per square 140 - Manufacturing foot $1.12 $2.72 $4.32 $5.92 per square 151 - Mini -warehouse foot $0.40 $0.97 $1.54 $2.10 per dwelling 210 - Single-family house unit $1 196.33 $2,873.60 $4 561.37 $6,249.14 per dwelling 220 - Apartment unit $776.56 $1 881.83 $2 987.09 $4,092.36 per dwelling 230 - Condominium unit $629.65 $1,525.81 $2,421.97 $3,318.13 per dwelling 240 - Mobile home unit $671.62 $1.627.53 $2 583.43 $3 539.33 per dwelling 251 - SeniorHousin unit $157.41 $584.89 $928.42 $1,271.95 320 - Motel per room $629.65 $1,525.81 $2,421.97 $3,318.13 per boat 420 - Marina berth $188.89 $457.74 $726.59 $995.44 444-Movie theater perscreens $13,166.00 $31.905.90 $50,645.37 $69,384.85 per square 492 - Health/fitness club foot $2.78 $6.74 $10.98 $14.66 per square 530 - High school foot $0.82 $1.98 $3.15 $4.31 per square 560 - Church foot $0.69 $1.68 $2.67 $3.65 per square 565 - Day care center foot $6.57 $15.77 $25.02 $34.29 620- Nursing home perbed $199.39 $483.17 $766.96 $1,050.74 per square 710 - General office foot $2.07 $5.01 $7.95 $10.89 per square 720 - Medical office foot $3.81 $9.54 $15.14 $20.74 per square 820 - Shopping center foot $1.34 $3.26 $5.17 $7.08 per square 826 - Specialty retail foot $0.93 $2.06 $3.27 $4.48 per square 850 - Supermarket foot $4.80 $10.50 $16.84 $22.84 per square 850 - Convenience market 15-16hrs foot $5.80 $14.07 $22.38 $30.58 per square 912 - Drive-in bank foot 1 $7.00 1 $15.97 $25.41 1 $34.73 E-1 2004 - Impact Fee Rate Table Edmonds Road lrrtpnct Fee Rote Study TABLE 4 IMPACT FEE RATES (1) (2) (3) (4) (5) (6) Trip ITE ITE Land Use Trip % New Length Net New Trips per impact Fee Per Unit $ Cade Category Rate' Tri s' Factor' Unit of Measure 763.66 per Trip 110 Light Industrial 0.98 100% 1.59 1.56 1,000 sq ft 1.19 per square foot 140 Manufacturing 0.74 100% 1.59 1.18 1,000 sq ft 0.90 per square foot 151 MW-warehouse 0.26 100% 1.59 0.41 1 000 sq ft 0.32 per square foot 210 Single family 1.01 100% 1.09 1.10 dwelling 840.72 per dwelling unit House 220 Apartment 0.62 100% 1.15 0.71 dwelling 544.49 per dwelling unit 230 Condominium 0.5_4 0.56 100% 1.15 0.62 dwelling 474.24 per dwelling unit 240 Mobile Home 100% 1.09 0.61 dwelling 466.14 per dwelling unit 310 Hotel 0.61 100% 1.25 0.76 room 582.29 per room 320 Motel 0.47 100% 1.25 0.59 room 448.65 per room 420 Marina 0.19 100% 0,97 0,18 berth 140.74 per boat berth 430 Golf course 0.30 100% 1.00 0.30 acre 229.10 per acre 444 Movie Theater 3.80 100% 0.72 2.74 1,000 so ft 1.36 per square foot 492 Racquet club 1.83 100% 0.97 1.78 1,000 sq ft 3.58 Fer square foot 530 High School 1.02 100% 0.62 0.63 1,000 sq ft 0.48 per square foot _560 Church 0,66 100% 1.15 0.76 1.000 sq ft 0.58 rer square foot 610 Hospital 0.92 100% 1.56 1.44 1,000 sq ft 1.10 per square foot 620 Nursing home 0.20 100% 0.87 0.17 bed 132.88 per bed 710 General Office 1.49 100% 1.59 2.37 1 000 ft 1.81 per square foot 720 Mecical office 3.66 100% 1.50 5.49 1,000 sq ft 4.19 per square foot 820 Shoaping Center 3.74 81% 0.40 1.21 1,000 sq ft 0.93 per square foot 832 Restaurant: sit 10.86 56% 1.06 6.45 1,000 sq ft 4.9z per square toot dohn 833 Fast food, no 26.15 52% 0,62 8.43 1,000 sq ft 6,44 per square foot drive -up 834 fast food, w/ 33.48 51 % 0.62 10.59 1,000 sq ft 8,08 per square foot drive -up 844 Gas station 14.56 60% 0.53 4.63 pump 3,535.82 per of 845 Gas station 13.38 47% 0.53 3.33 pump 2,545.26 per vfp' W/convenience 850 Sulacrmarket 11.51 SS% 0.65 4.11 1,000 sq ft 3.14 per square foot 851 Convenience 53.73 39% 0.40 8.38 1,000 sq ft 6.40 per square foot market-24 hr 912 Drive -In Bank 54.77 51%1 0.47 1 13.13 1,000 sq ft 10.03 per square foot ITE Trip Generation (6th Edition): 4-6 PM Pook Hour Trip Ends ' Excludes pass -by trips: see "Trip Generation Handbook: An ITE Proposed Recommended ptaclico. (1988) " Walica to average trip length. 3 vfp: vot icle furling position Henderson, Youn6 & Company EFFECTIVE 9/12/2004 City of Edmonds. Washington April 15, 2003 Page 18 Revised on 6124110 E82 - Traffic Impact Analysis Page 4 of 4 E-2 Site Plan EDMONDS WAY 110• CHERRY �� $� • j. l . 4 5 4 ......... i iy -• i81 SS C � SO / 10" FIR TO REMOVED.0 - !Invm BE 3' RETAINING 1, B A- 1,97152 SQ FT.. BLD B = 3222 00 SQ FE BLD C = 1111 1"1 BLD D =3334 37 TOTAL SO. FT. = 12,00189 KL FP. LOT COVERAGE = 12,0-89/31226.5] SQET. IMPERVIOUS BULDNC 067A(Wf E4R.=13,6)]"63 SQ FP. DRIVEWAY2 9 SF F6. TOTAL + 22644 95Q. •• • GSSIISf GSA_'f PROPOEEO LRP➢E I2NBED•1UIREMENT2S B f2)3 EO 4 TOL-335 A-365O1 B BLQA IL" 5030 C 35230" 0 353 os• AtlE ORAOE•3— AVE GRADE. dS3]i' 9 QS RLoo 9 35i 02' 04. 99' B30 SOJtlS RCR R, PO.RUORT uD, 3r 18 D t8 t g1,jp w I7 i0 h 1 A 12a �• i 11 y 73 z Y P • M 1' f VICI ITY n.._AR PREL 1�IFL � INARY DRAINAGE & PLOT PLAN ALE::--3a-�• LOCATION: Michel Design 22810 EDMONDS WAY EDMONDS, WA. 98020 BUI LDI N G DESIGN