ENG COMPACTION REPORT 10.27.21GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION November 3, 2021 Ms. Kendra Leeman (E-Mail) A-1 LANDSCAPING & CONSTRUCTION INC. 20607 SR 9 SE Snohomish, WA 98296 RE: CONSTRUCTION TESTING AND INSPECTION Kisan Edmonds Way 22810 Edmonds Way Edmonds, Washington Dear Mr. Leeman, KA No. 096-21521 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. i. ej�• I CIATES, INC. CorberProject 1 ab Manager Pacifiest Division CWNVlkj 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09621521 DFR Page 1 of 1 g lmqm M(=an &Associates,InC. Field ftw Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Report NO.: 09621521DFR10272021AL DATE: 10/27/2021 Set Count: CONTRACTOR: Al Landsca e PROJECT #: 09621521 PERMIT #: PROJECT: Kisan Townhomes INSPECTOR: Amelia Leonl! LOCATION: 22810 Edmonds Wav JURISDICTION: Ciry of Edmonds KA P.M.: JM WEATHER: Cloud TEMP: 561 F A Krazan representative visited the project site today to test the compaction of aggregate fill and obtain a sample. Upon arrival on site, the representative met with the contractor to discuss locations for testing and other relevant information about the aggregate in place. There were two (2) requested locations for testing: the NE and NW corners of the site extending into the main road (Edmonds Way). These locations were 8-ft below the base of the surrounding asphalt road on a 6" layer of 1 %-in aggregate from CalPortland. The contractor provided a proctor for the material used as fill. A total of two (2) nuclear gauge tests were taken at a depth of approximately 6-in, and the results met or exceeded the minimum required 95% compaction. The Krazan representative also obtained a sample of the 1 %-in minus material from a stockpile located on site. Site photos are attached below. See soil compaction report no. 09621521 SCR1 0272021 AL for additional details on nuclear gauge tests. Site Photos Reviewed By F 1ASTM Test #: I Asset Numbe s To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and KraTan & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. The test results apply only to the specific locations, and items inspected or tested yA!M ratan&Associates, Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection DATE: 10/27/2021 PROJECT #: 09621521 COMPACTION REPORT NO.: 09621521SCR102721-AL CONTRACTOR: Al Landscape PERMIT #: PROJECT: Kisan Townhomes INSPECTOR: Amelia Leong LOCATION: 22810 Edmonds Way JURISDICTION: City of Edmonds KA P.M.: JM WEATHER: Clouds TEMP: 56 FASTM 6938NUCLEAR ENSOMETER ❑ ASTM DO5 6 ❑ NE OTHER LOCATION MAP rV Paved Areas: O Building Pad(s) O Utility: 0 Other: Curve Unified Soils Classification or Description Maximum Dry Density / Rice -, optimum Moisture A 1 1/4-in minus 131.2 4.8% f TEST ELEVATION LOCATION CURVE MODE & DEPTH DENSITY (PCF) MOISTURE COMPACTION REQUIRED COMPACTION 1 e' < asphalt base NE corner of site extending into Edmonds Way A 61' 130.1 5.1 % 99% 95% 2 8' < asphalt base NW corner of site extending into Edmonds Way A 611 129.6 4.2% 99% 95% EQUIPMENT NO.: B-269 DAILY AVERAGE STANDARD DENSITY COUNT: 2270 DAILY AVERAGE STANDARD MOISTURE COUNT: 684 Reviewed By: This testing does not preclude the possibility that the soil or hot mix asphalt may be loosened by future construction or rainfall events. The compaction tests were performed at the approximate locations and elevations shown, and indicate relative compaction at those locations. Horizontal and vertical limits of the compacted areas were determined by others. Our firm does not guarantee earthwork or paving construction, nor does our work relieve the contractor's responsibility to conform to the approved project plans and specifications. To the best of my knowledge, the above WAS performed in accordan ith the approved plans, specifications and regulatory requirements. REMARKS: Superintendent/Representative: Technician: Offices Serving the Western United States Compaction Report Effective 12/15/2020 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Krio n & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same mI tmation has been provided by others on site. The test results apply only to the sped locations, and items inspected or tested. Page 1 of 1 GEOTECHNICAL ENGINEERING • ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION October 28, 2021 Ms. Kendra Leeman (E-Mail) A-1 LANDSCAPING & CONSTRUCTION INC. 20607 SR 9 SE Snohomish, WA 98296 RE: CONSTRUCTION TESTING AND INSPECTION Kisan Edmonds Way 22810 Edmonds Way Edmonds, Washington Dear Mr. Leeman, KA No. 096-21521 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & A OCIATES, INC. Corbett W. Mercer Project Manager/Lab Manager Pacific Northwest Division CWM/lkj 4303 198th Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09621521 DFR Page 1 of 1 Kr�Van& Ass ociate s,Inc. Geotechnical Engineering . Environmental Engineering Construction Testing and Inspection Field Report NO.: 09621521DFRIO272021AL DATE: 10/27/2021 Set Count: CONTRACTOR: Al Landscape PROJECT #: 09621521 PERMIT #: PROJECT: Kisan Townhomes INSPECTOR: Amelia Leong LOCATION: 22810 Edmonds Wav JURISDICTION: City of Edmonds KA P.M.: JM WEATHER: Cloud TEMP: 56° F A Krazan representative visited the project site today to test the compaction of aggregate fill and obtain a sample. Upon arrival on site, the representative met with the contractor to discuss locations for testing and other relevant information about the aggregate in place. There were two (2) requested locations for testing: the NE and NW corners of the site extending into the main road (Edmonds Way). These locations were 8-ft below the base of the surrounding asphalt road on a 6" layer of 1 '/-in aggregate from CalPortland. The contractor provided a proctor for the material used as fill. A total of two (2) nuclear gauge tests were taken at a depth of approximately 6-in, and the results met or exceeded the minimum required 95% compaction. The Krazan representative also obtained a sample of the 1 %-in minus material from a stockpile located on site. Site photos are attached below. See soil compaction report no. 09621521 SCR10272021AL for additional details on nuclear gauge tests. Site Photos T-- ReviewedBy: _Vl'a I ASTM Test #: Asset Number(s) s To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for the exclusive use of the client. This report may not be reproduced in any format without the written permission of the client and Kmaen & Associates. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. This information is subject to review prior to final submittal. By signing this report, our inspector does not accept responsibility for validity of results. The same information has been provided by others on site. The test results apply only to the specific locations, and items impeded or tested. A , 1-gt M, K ra7jan&Associates,Inc. Geotechnical Engineering a Environmental Engineering Construction Testing and Inspection DATE: 10/27/2021 PROJECT #: 09621521 PROJECT: Kisan Townhomes LOCATION: 22810 Edmonds Way KA P.M.: JM COMPACTION REPORT NO.: 09621521SCR102721-AL CONTRACTOR: Al Landscape PERMIT #: INSPECTOR: Amelia Leong JURISDICTION: City of Edmonds WEATHER: Cloudy TEMP: 56 d ASTM 6938ENSOMETER SANDCONE ❑ ASTM D115 6 ❑ OTHER LOCATION MAP © Paved Areas: O Building Pad(s) O Utility: O Other: Curve Unified Soils Classification or Description Maximum Dry Density / Rice Optimum p Moisture A 1 1/4-in minus 136.0 TEST ELEVATION LOCATION CURVE MODE & DEPTH DENSITY (PCF) MOISTURE COMPACTION REQUIRED COMPACTION 1 8' < asphalt base NE corner of site extending into Edmonds Way A 611 130.1 5.1 % 96% 95% 2 8' < asphalt base NW corner of site extending into Edmonds Way A 6" 129.6 4.2% 95% 95% EQUIPMENT NO.: B-269 DAILY AVERAGE STANDARD DENSITY COUNT: 2270 DAILY AVERAGE STANDARD MOISTURE COU 684 Reviewed By: This testing does not preclude the possibility that the soil or hot mix asphalt may be loosened by future construction or rainfall events. The compaction tests were performed at the approximate locations and elevations shown, and indicate relative compaction at those locations. Horizontal and vertical limits of the compacted areas were determined by others. Our firm does not guarantee earthwork or paving construction, nor does our work relieve the contractor's responsibility to conform to the approved project plans and specifications. To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. REMARKS: Su perintendent/Representative: Technician: Offices Serving the Western United States Compaction Report Effective 12/15/2020 Lynnwood (425) 485-5519 • Poulsbo (360) 598-2126 • Tacoma (253) 939-2500 The information provided on this report is prepared for dte exclusive use ofdteclient. This reponntay trot be reprodta:od in any format without the wridat parruissiou ofthe client and Krazan&Assn iatm. This report indicates our inspectors observation and testing results based on site conditions and contractor activities. Thds ini nation is subject to review prior to final submittal. By signing this repot; our impeder does not accept responsibility for validity ofresults. The same information has been provided by others on site. The rest results apply only to the specific locations, and item impeded or tested. Page 1 of 1 V GEOTECHNICAL ENGINEERING . ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION November 3, 2021 Ms. Kendra Leeman (E-Mail) A-1 LANDSCAPING & CONSTRUCTION INC. 20607 SR 9 SE Snohomish, WA 98296 RE: SOILS LABORATORY TESTING Kisan Edmonds Way 22810 Edmonds Way Edmonds, Washington Dear Mr. Leeman, KA No. 096-21521 Lab Report No. 1 Page 1 of 2 In accordance with your request and authorization, we have performed laboratory tests for the above referenced project. Laboratory testing was performed in accordance with ASTM standards. The results of the laboratory tests are presented on the following pages. If you have any questions; or if we can be of further assistance, please do not hesitate to contact our office. hesitate to contact our office. Sample ID No: 76702 Description: 1 '/a" -minus C.S.B.0 Sample Location: Site Stockpile Relative Density of Soils (ASTM D-4253) Density & Moisture: 131.2 @ 4.8% Respectfully submitted; KRAZAN & ASSpCIATES, Corbett W. Mercer Project Manager/Lab M ag© Pacific Northwest Divis�n CWNVIki 4303 198" Street SW, Lynnwood, Washington 98036 • (425) 485-5519 • FAX (425) 485-6837 With Offices Serving the Western United States 09621521 LAB I 100 90 80 70 Ix w Z 60 LL Z 50 W w 40 W 30 20 10 n Krazan & Associates Sieve Analysis C e Q 0 0 _9;�s�� o 0000a�o i 100 10 1 0.1 0.01 0.001 GRAIN SIZE - mm. % +3„1 % Gravel % Sand Coarse Fine Coarse Medium Fine 0.0 41.1 41.1 6.8 5.7 2.7 Test Results (ASTM C-136 & ASTM C-117) Opening Percent Spec." Pass? Size Finer (Percent) (X=Fail) 1.25 100.0 99.0 - 100.0 1 88.1 80.0 - 100.0 .75 58.9 .625 46.0 50.0 - 80.0 X .5 33.4 .375 26.0 .25 20.9 #4 17.8 25.0 - 45.0 X #10 11.0 #20 7.2 440 5.3 3.0 - 18.0 460 4.2 #100 3.4 #200 2.6 0.0 - 7.5 1 1/4"-minus, C.S.B.C. 9-03.9(3) Location: Site Stockpile ,a, - . qmdK=,a % Fines Silt Clay 2.6 Material Description 1 1/4" -minus C.S.B.0 Atterbern Limits (ASTM D 4318 PL= NP LL= NP PI= NP Classification USCS (D 2487)= GP AASHTO (M 145)= A-1-a Coefficients D90= 26.0410 D85= 245111 D60= 19.2834 D50= 16.9149 D30= 11:5780 D95= 3.4991 D10= 1.6654 Cu= 11.58 Cc= 4.17 Remarks Sample ID: 76702. Sample Date: 10/27/2021. Date Received: 10/27/2021 Date sted: 10/28/2021 Tested By: Cole Demas Checked By: Corbett Mercer Title: Lab Manager Date Sampled: 10/27/2021 Client: A-1 Landscaping & Construction, Inc. Project: Kisan Edmonds Way Project No: 09621521 Figure