REV1 RESUB 2 - REVIEWED STM_Response letter 06-29-2021BLD2021 -001RECEIVED Jul 02 2021 CITY OF EDMONDS DEVELOPMENT SERVICES 10; DEPARTMENT INSIGHT ENGINEERING CO. July 2, 2021 Zack Richardson, PE Clarifications added by Z.Richardson 7/15/2021 City of Edmonds, Stormwater Engineer Re: Kisan — BLD2020-0017 IECO No. 20-1062 Dear Zack, The project referenced above is revised in response to the review comments dated June 15, 2021. The review comments are numbered on the letter and have been addressed in italics as follows: 1. The city elects to continue its prohibition of CMP detention pipes; please revise the tank material to acceptable alternative material and revise all associated details and notes as needed. Per email communication with Zack, the CMP pipe shall be used for Clarification: City did not direct -use of CMP; City response simply indicated CMP would permitted if the design engineer felt it was the most appropriate product. All responsability for selected materials remains with design engineer. further attention. Upon updating buoyancy calculations for new tank material, ensure the following are addressed: a. Reviewer's experience is that buoyancy calculations typical include a factor of safety which does not appear to be applied in this case; consider addition of a factor of safety and/or provide additional text in report addressing engineer's level of confidence in this calculation as submitted. Based on Buoyancy calculations and further discussions with Clarification: Again, City did not direct or approve buoyancy calcs; we simply accept the professional opinion of the design engineer as submitted. All responsibilities for adequate buoyancy protection remains with the design engineer. dimension is provided on plans; however, if this dimension is taken from the very end of the pipe, is appears to only measure 2.5'. Update design/or calculations as needed to ensure adequate buoyancy control. PO Box 1478 • Everett, WA 98206 • Phone: (425) 303-9363 Fax: (425) 303-9362 • Email:info@insightengineering.net The pipe has been moved to the south to provide a minimum cover of 2.6' Please refer to Sheet C3.1. Please feel free to contact me with any questions or comments you may have. Sincerely, Brian. R. Kalab, P.E. PO Box 1478 • Everett, WA 98206 • Phone: (425) 303-9363 Fax: (425) 303-9362 • Email:info@insightengineering.net