Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
2023-11-09 Hearing Examiner PacketOF BbMG
ti Agenda
Edmonds Hearing Examiner
1,00
REGULAR MEETING
BRACKETT ROOM
121 5TH AVE N, CITY HALL- 3RD FLOOR, EDMONDS, WA 98020
NOVEMBER 9, 2023, 3:00 PM
MEETING INFORMATION
This meeting is Hybrid per ECDC ECDC 10.35.010(F) and is located at the Edmonds City Hall 121
5th Ave N, 3rd Floor Brackett Room
Zoom Link Meeting Info: https://edmondswa-
gov.zoom. us/j/82688031743?pwd=U EROW k5 hd U5 DN 1d RK1V3 M kR2 WTRSdzO9
Passcode: 308007
Or join by phone: 253 215 8782
1. CALL TO ORDER
2. APPROVED MINUTES
3. PUBLIC PORTION
A. HEARING MATERIALS
1. Greenwalk Park Preliminary Planned Residential Development (PLN2022-0049) and
Formal Subdivision (PLN2022-0053)
B. PUBLIC COMMENT
4. ADJOURNMENT
Edmonds Hearing Examiner Agenda
November 9, 2023
Page 1
Hearing Examiner Agenda Item
Meeting Date: 11/9/2023
Greenwalk Park Preliminary Planned Residential Development (PLN2022-0049) and Formal Subdivision
(PLN2022-0053)
Staff Lead: Mike Clugston
Department: Planning Division
Prepared By: Michael Clugston
Background/History
This is a new project.
This project was originally scheduled for a public hearing on October 26 but was re -noticed due to an
error with the original mailed notice to property owners within 300 feet of the site.
Fernandez and Barnes LLC is proposing a preliminary formal subdivision of a 3-acre site at 540 and 550
Edmonds Way into 16 single family residential lots using the planned residential development (PRD)
process. Both existing houses, outbuildings and most other existing improvements would be removed
and a new plat road and easement drives constructed to serve the new lots with access from Edmonds
Way (SR-104). Stormwater, utility and frontage improvements are required.
Staff Recommendation
After taking testimony from staff, the applicant and the public, staff recommends that the Hearing
Examiner approve the proposed project with conditions as noted in the staff report.
Narrative
The staff report and 29 exhibits are attached. Exhibit 29, a letter from Jacie Carson who is an attorney
representing adjacent neighbor Dale Bonn, arrived as the agenda packet was being finalized. It is
included in the packet but staff has not had time to review it.
Attachments:
PLN2022-0049 & -0053 Staff report to HE Greenwalk Park updated
Exhibit 1- Pre -application staff meeting materials
Exhibit 2 - Neighborhood Meeting Information
Exhibit 3 - Land Use Applications PLN2022-0049 & PLN2022-0053
Exhibit 4 - PRD code ECDC 20.35
Exhibit 5 - ADB staff report and attachments PLN2022-0049
Exhibit 6 - ADB July 27, 2023 minutes approved
Exhibit 7 - Applicant response to ADB conditions
Exhibit 8 - Title Report
Exhibit 9 - EUC Contact Form
Exhibit 10 - Zoning map & site photos
Exhibit 11- Incomplete, applicant response, complete letters
Exhibit 12 - Notice of application and ADB public meeting
Packet Pg. 2
Exhibit 13 - Public comments on Notice of Application
Exhibit 14
- Geotech report
Exhibit 15
- Arborist Report
Exhibit 16
- Prelim Tree Plan
Exhibit 17
- Preliminary plat map
Exhibit 18
- Prelim landscape plan
Exhibit 19 - Prelim stormwater report & SWPPP
Exhibit 20 - Prelim development plans
Exhibit 21 - Draft CCRs
Exhibit 22 - Engineering and Fire feasibility memos and requirements
Exhibit 23 - Greenwalk Park SEPA checklist and DNS
Exhibit 24 - Notice of SEPA determination and public hearing
Exhibit 25 - Ecology and WSDOT SEPA comments
Exhibit 26 - Urban Forest Planner comments and proposed conditions
Exhibit 27 - Renotice of SEPA and Public Hearing
Exhibit 28 - PUD Comment
Exhibit 29 - Carson comment
Packet Pg. 3
1.a
`nc. 18y\3
Xk_i We] 9411LTA [91U011
121 51" Avenue North, Edmonds WA 98020
Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.edmondswa.gov
PLANNING & DEVELOPMENT DEPARTMENT • PLANNING DIVISION
PLANNING DIVISION
REPORT & RECOMMENDATION TO THE HEARING EXAMINER
Project: Greenwalk Park Planned Residential Development
File Number: PLN2022-0049 (Preliminary Planned Residential Development)
PLN2022-0053 (Preliminary Formal Subdivision)
Date of Report: November 3, 2023
Reviewed By:
_IIIZ441110�
Mike Clugston, AICP, Acting Planning Manager
Meeting: Thursday — November 9, 2023 at 3:00 P.M.
Brackett Room, 3rd Floor City Hall
121 5th Avenue North, Edmonds WA 98020
Or on Zoom at: https://edmondswa-
Rov.zoom.us/I/82688031743?pwd=UEROWk5hdU5DN1dRK1V3MkR2WTRSdz
09
Passcode: 308007
Or join by phone: 253 215 8782
Persons wishing to provide audience comments using a computer or smart
phone are instructed to raise a virtual hand to be recognized. Persons
wishing to provide audience comments by dial -up phone are instructed to
press *9 to raise a hand. When prompted, press *6 to unmute.
I. SUMMARY
Fernandez and Barnes LLC is proposing a preliminary formal subdivision of a 3-acre site
at 540 and 550 Edmonds Way into 16 single family residential lots using the planned
residential development (PRD) process. Both existing houses, outbuildings and most
other existing improvements would be removed and a new plat road and easement
drives constructed to serve the new lots with access from Edmonds Way (SR-104).
Packet Pg. 4
1.a
Stormwater, utility and frontage improvements are required, and the Engineering
Division has indicated that the project is feasible from an engineering perspective. The
project meets the standards and criteria in the zoning ordinance as well as the planned
residential development code and subdivision codes in Chapters 20.35 and 20.75 of the
Edmonds Community Development Code (ECDC), and therefore staff recommends
approval of the preliminary planned residential development and plat with conditions.
This project was originally scheduled for a public hearing on October 26 but was re -
noticed for November 9 due to an error with the original mailed notice to property
owners within 300 feet of the site.
II. PROCESS
Consistent with the planned residential development code in ECDC 20.35.080.A, the
applicant is required to schedule a pre -application meeting with staff to discuss the
scope of the project and then hold a pre -application neighborhood meeting. The
applicant then applies to the City for preliminary review of the planned residential
development and preliminary subdivision.
1. Pre -Application Staff Review. The preliminary plans of the proposal shall be
submitted to the planning manager for review and comment. This provides an
opportunity for the developer to work with the city staff to design a total plan
which best meets the goals of the city and the needs of the developer. Such
potential problems as drainage, topography, circulation, site design and
neighborhood impact should be identified and addressed before the proposal
is submitted for formal review.
2. Pre -Application Neighborhood Meeting. The applicant shall host a public
pre -application neighborhood meeting to discuss and receive public comment
on the conceptual proposal. The applicant shall provide notice of this meeting
to all property owners within 300 feet of the subject site by depositing written
notice in the U.S. Mail postage paid at least 14 calendar days in advance of the
meeting to all persons and entities shown as having an ownership interest in
the land records of Snohomish County. An affidavit of mailing shall be provided
to the city by the applicant attaching its mailing list.
While this meeting will allow immediate public response to the proposal in its
conceptual form, comments submitted during this meeting are not binding to
the applicant or staff. However, staff may make general recommendations to
the applicant as part of the formal application based on the input from this
meeting to the extent that said comments are consistent with the adopted
provisions of the Edmonds Community Development Code and the
comprehensive plan. As a courtesy, the applicant shall provide summary
minutes of the meeting to all of those in attendance within two weeks of the
date of the meeting.
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053 Q
Page 2 of 23
Packet Pg. 5
1.a
3. Review by the Architectural Design Board. The design board will review the
project for compliance with the urban design guidelines, landscaping, and/or
the single-family design criteria in ECDC 20.35.060 and forward their
recommendation of the site and building design on to the hearing examiner for
his consideration. Their review will be at one of their regularly scheduled
meetings, but will not include a public hearing or the ability for the public to
comment on the project.
4. The Public Hearing with the Hearing Examiner. The hearing examiner shall
review the proposed PRD for compliance with this section as a Type 111-A
decision.
If, after all appeals are exhausted, the proposal is denied, a similar plan for the
site may not be submitted to the planning and development department for
one year. A new plan which varies substantially from the denied proposal, as
determined by the planning and development director, or one that satisfies the
objections stated by the final decision -maker may be submitted at any time.
An applicant who intends to subdivide the land for sale as part of the project
shall obtain subdivision approval in accordance with Chapter 20.75 ECDC
before any building permit or authorization to begin construction is issued, and
before sale of any portion of the property. The preferred method is for the
applicant to process the subdivision application concurrently with the planned
residential development proposal.
The pre -application meeting with staff and the neighborhood meeting were held
virtually on November 4, 2021, and May 10, 2022, respectively (Exhibits 1 & 2). It
should be noted that the project was still in conceptual phase during these meetings;
the project did not vest until the preliminary PRD and plat applications were submitted
to the city, and determined to be complete by staff, on October 3, 2022.
The preliminary PRD application in PLN2022-0049 was reviewed by the Architectural
Design Board (ADB) on July 27, 2023 (Exhibit 5). Their recommendation regarding site
and building design is included as Exhibit 6 and the applicant's response to that
recommendation is included as Exhibit 7. The Hearing Examiner will make a
consolidated Type III -A decision on both the preliminary PRD in PLN2022-0049 and
preliminary formal subdivision application in PLN2022-0053 following a public hearing
consistent with ECDC 20.01.003.
If preliminary approval is granted, City staff must review and approve civil subdivision
improvement plans. Once improvements are installed or bonded for, the final plat and
PRD are reviewed and approved by staff prior to recording at the County Auditor.
III. EXHIBITS
1. Pre -application staff meeting materials
2. Pre -application neighborhood meeting materials
3. Land use applications
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053 Q
Page 3 of 23
Packet Pg. 6
1.a
4. PRD code in ECDC 20.35
5. ADB staff report and attachments for PLN2022-0049
6. ADB minutes from July 27, 2023
7. Applicant cover letter on ADB compliance
8. Title report
9. Edmonds Utilities Consortium Form
10. Photos of project site
11. Letter of incomplete application and complete application
12. Notice of application and ADB public meeting
13. Public comments on notice of application
14. Geotech report
15. Arborist report
16. Preliminary tree plan
17. Preliminary plat map
18. Preliminary landscaping plan
19. Preliminary stormwater report
20. Preliminary development plans
21. Draft conditions, covenants and restrictions
22. Engineering Memo of Compliance and Technical Requirements
23. SEPA Checklist and Determination of Nonsignificance
24. Notice of SEPA Determination and Public Hearing
25. Comments on SEPA and public hearing notice
26. Urban Forest Planner comments and proposed conditions for trees
27. Re -notice SEPA Determination and Public Hearing
28. PUD comment
IV. FINDINGS OF FACT, ANALYSIS, AND CONCLUSIONS
A. Setting
1. Address: 540 & 550 Edmonds Way (Tax IDs: 27032500308300 &
27032500308400)
2. Zoning: Single Family Residential - Master Plan (RS-MP). The PRD process is the
appropriate master plan process for the location.
3. Neighborhood: The project site is located at the western end of the Westgate
commercial area on the south side of Edmonds Way (SR-104) where the road
splits off to the ferry lanes and begins to descend into the Edmonds Bowl (Exhibit
10). To the west is the Town of Woodway, which is characterized by large lots
and homes. To the north and south are parcels zoned RS-MP, which are
developed with houses of varying size. Across SR-104 is an area of mixed zoning
and development including single and multifamily residential together with small
businesses.
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053 Q
Page 4 of 23
Packet Pg. 7
1.a
B. Public Notice and Comments
These applications were submitted on July 7, 2022 and determined to be incomplete
on August 4, 2022. After a resubmittal by the applicant, the applications were
determined to be complete on October 3, 2022.
In accordance with ECDC 20.03, a "Notice of Application" was posted at the subject
site, Public Safety Complex, and Planning and Development Department on October
17, 2022 (Exhibit 12). The notice was not posted at the Edmonds Library since it was
closed for renovations. The notice was also published in the Herald Newspaper and
mailed to property owners within 300 feet of the site. Notice was also provided to
the Town of Woodway since that jurisdiction is within one mile of the project site.
Public Comments: Four public comments were received in response to the Notice of
Application (Exhibit 13).
Bonn: The comments touched on a variety of topics, including: access, impacts
during construction, and impacts to trees.
Staff Response: With respect to the construction process, sound from temporary
construction sites is limited to 7AM-6PM on weekdays, 10AM-6PM on Saturdays.
Additional property performance standards in ECDC 17.60 apply. Any off -site
impacts to infrastructure caused during the project must be repaired at the
developer's expense.
Regarding access from SR-104, WSDOT controls that and so will have to approve
the eventual access and may add conditions to that (for example, right turn only
going out). WSDOT has already reviewed the project and will be consulted
throughout the remainder of the development process to establish access.
Tree retention and replacement must be managed in accordance with the
adopted tree code in ECDC 23.10. The City's urban forest planner reviewed the
project and found that it meets code with several proposed conditions.
Lemas/Martinelli: The commentor's property is south of and adjacent to the
project site and is on septic and he wondered if his lot could be connected to a
nearby sewer line as part of the subdivision project.
Staff Response: There are existing sewer mains nearby but those are owned and
operated by Olympic View Water and Sewer District, not the City of Edmonds.
Any connection request would have to be directed to Olympic View. See page 2
of Exhibit 22 for additional information. o
Lecky: The comments touched on several topics, including: stormwater and M
trees and construction impacts.
0
0
Staff Response: Construction impacts are addressed above. A 6-foot wood fence c
is proposed on the exterior of the project site and that could be installed as part z
of the civil subdivision improvements. A number of existing trees will be a
retained on the edges of the project site. Supplemental landscaping with trees,
shrubs and ground covers will also be needed on the exterior of the site to s
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053 Q
Page 5 of 23
Packet Pg. 8
1.a
achieve compliance with Type III landscaping in ECDC 20.13. Regarding
stormwater, it must be managed onsite but see page 3 of Exhibit 22 for
additional information.
Helleren: The commentor provided a letter describing a fence encroachment
near a portion of the south property line of the project site adjacent to the
Johannessen property at 10727 2261" St. SW.
Staff response: The city has no jurisdiction to determine title disputes. The city
relies upon the applicant to accurately describe its interest in the subject
property and to not knowingly misrepresent that interest. Under state law, an
application that contains a knowing misrepresentation would not be a valid
application. Lauer v. Pierce Cnty., 173 Wn.2d 242, 262, 267 P.3d 988, 997 (2011).
So, the applicant bears the risk of continuing to entitle and develop the property
before the encroachment question is resolved. The applicant has provided a title
report for the project site (Exhibit 8) that describes it exclusive of any fence
encroachment. Should an adverse possession claim be granted in favor of
Johannessen by a court of competent jurisdiction, the plat / permits resulting
from this application (particularly the building footprints and related setbacks)
would presumably be subject to further challenge as in Lauer.
A Notice of Public Hearing and SEPA Determination was published in the Everett
Herald and posted at the subject site, Public Safety Complex, and Planning and
Development Department on October 4, 2023 (Exhibit 24). The notice was not
posted at the Edmonds Library since it is closed for renovations. The notice was also
mailed to property owners within 300 feet of the site. Notice was also provided to
the Town of Woodway since that jurisdiction is within one mile of the project site.
As noted previously, an updated notice of public hearing and SEPA determination
was issued on October 26, 2023 due to an error in the original mailed notice. The
updated notice was published in the Everett Herald and posted at the subject site,
Public Safety Complex, and Planning and Development Department on October 26,
2023 (Exhibit 27). The notice was not posted at the Edmonds Library since it is
closed for renovations. The notice was again mailed to property owners within 300
feet of the site and provided to the Town of Woodway since that jurisdiction is
within one mile of the project site.
Snohomish County PUD submitted a comment after the re -notice was issued (Exhibit
28). They noted that while the District has sufficient capacity to serve the proposed
development, the developer must pay for any service upgrades and easements
would be required for clearance and maintenance.
C. Environmental Assessment
1. Critical Area: A critical area determination was completed for the project site in
2022 (file CRA2022-0009) and found potential erosion hazard areas across the
site consistent with the generally rolling topography. There is a small steep slope
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053 Q
Page 6 of 23
Packet Pg. 9
1.a
off the site in the SR-104 right-of-way that will not be disturbed as part of the
proposed project. No streams or wetlands were found on or adjacent to the site
but there are two artificial ponds on the property. The site contains a mix of
native and ornamental trees around the more open areas near the existing
houses, driveways, outbuildings, and ponds.
2. Shoreline: The subject property is not located within shoreline jurisdiction.
3. SEPA: Review under the State Environmental Policy Act (SEPA) is required for
formal subdivisions. The applicant submitted a completed SEPA checklist and
the City issued a Determination of Nonsignificance (DNS) for the proposed
project on October 4, 2023 (Exhibit 23). The DNS was posted, mailed to adjacent
property owners and published in accordance with ECDC 20.03.004 (Exhibit 24).
As noted previously, the City re -issued a Determination of Nonsignificance (DNS)
for the proposed project on October 26, 2023, due to the error in the original
mailed notice. The DNS was posted, mailed to adjacent property owners and
published in accordance with ECDC 20.03.004 (Exhibit 27).
A SEPA DNS indicates that while there may be some environmental impacts
resulting from a project, those can be adequately mitigated by applying existing
environmental regulations and best management practices for stormwater,
traffic, critical areas, and the like.
SEPA comments. The Departments of Ecology and Transportation submitted
comments (Exhibit 25). Ecology noted that underground storage tanks may be
present on site and require remediation. If tanks are located on the site, they
would be decommissioned according to Fire District #1 standards through a
permit. If contamination is encountered, it would be remediated consistent with
Ecology requirements. WSDOT has approved an updated access point on
Edmonds Way (SR-104) but indicated that they cannot approve the final access
design until plat approval is granted. The Engineering requirements in Exhibit 22
note that WSDOT must approve the access during civil subdivision plan review,
the next phase of review if preliminary approval is granted.
SEPA appeals. No appeals of the SEPA determination were received at the time
this report was issued.
Trees: Chapter 23.10 ECDC contains the adopted tree code that applies to this
subdivision (Ordinance 4227). An arborist report and tree retention and
protection plan were submitted as required in ECDC 23.10.060 (Exhibits 15 &
16). The City's urban forest planner reviewed these documents and indicated
that proposal is generally consistent with ECDC 23.10. Since the applicant is
choosing to use the phased review process for trees allowed in ECDC
23.10.060.B.3, updated tree retention and protection plans will be required at
each subsequent development phase, including civil subdivision plan review and
building permits. Proposed conditions of approval are included with this report
to address retention, replacement, and tree impact fees.
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053 Q
Page 7 of 23
Packet Pg. 10
1.a
D. ECDC 20.75.080 General Subdivision Findings
A proposed subdivision may only be approved if all the general findings listed in
ECDC 20.75.080 can be made for the proposal as approved or as conditionally
approved.
1. Subdivision Ordinance. The proposal is consistent with the purposes of this
chapter (as listed in ECDC 20.75.020) and meets all requirements of this chapter
As conditioned, the proposed preliminary subdivision is consistent with ECDC
20.75.020 and all the requirements of Chapter 20.75 ECDC. The subdivision will
not negatively impact public health, safety or general welfare, will not negatively
impact congestion on streets and highways, will have adequate access to water,
utilities, sewerage, storm drainage, and will provide proper ingress and egress as
well as be uniformly monumented.
2. Comprehensive Plan. The proposal is consistent with the provisions of the
Edmonds Comprehensive Plan, or other adopted city policy, and is in the public
interest.
The project site is designated "Single Family - MP" within the Westgate Corridor
overlay in the Comprehensive Plan. The Comprehensive Plan has the following
stated goals and policies for Residential Development that apply to this project:
A. Goal. High quality residential development which is appropriate to the
diverse lifestyle of Edmonds residents should be maintained and
promoted. The options available to the City to influence the quality of
housing for all citizens should be approached realistically in balancing
economic, social, aesthetic and environmental considerations.
A.1. Encourage those building custom homes to design and construct
homes with architectural lines which enable them to harmonize
with the surroundings, adding to the community identity and
desirability.
A.3. Minimize encroachment on view of existing homes by new
construction or additions to existing structures.
A.S. Protect residential areas from incompatible land uses through the
careful control of other types of development and expansion
based upon the following principles:
A.S.d. Private property must be protected from adverse
environmental impacts of development including noise,
drainage, traffic, slides, etc.
A.6. Require that new residential development be compatible with the
natural constraints of slopes, soils, geology, drainage, vegetation
and habitat.
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053 Q
Page 8 of 23
Packet Pg. 11
1.a
B. Goal. A broad range of housing types and densities should be encouraged
in order that a choice of housing will be available to all Edmonds
residents, in accordance with the following policies:
B.1. Planned Residential Development. Provide options for planned
residential development solutions for residential subdivisions:
B.1.a. Encourage single-family homes in a PRD configuration
where significant benefits for owner and area can be
demonstrated (trees, view, open space, etc.).
B.1.b. Consider attached single-family dwelling units in PRD's
near downtown and shopping centers as an alternative to
multiple family zoning.
Compliance with the Residential Development goals and policies: The proposed
planned residential development and subdivision would provide for the creation
of 16 new lots and the construction of 16 new homes (a maximum of 17 would
be allowed by the density of the zone).
As noted in the ADB's review of the applicable design criteria in ECDC 20.35.060
(Exhibits 5 & 6), the Board found that the proposed site improvements and
buildings were consistent with the single-family design guidance for PRDs and
recommended approval of the project's design with several conditions.
Traffic impact fees consistent with Chapter 3.36 ECDC will be collected with the
associated building permits to mitigate traffic impacts. By following existing
adopted codes for stormwater management, critical areas, and the like, the
proposal should not cause any adverse impacts and appears to be consistent
with the residential development goals and policies of the Comprehensive Plan.
Vegetation and Wildlife
A. Goal. The city should ensure that its woodlands, marshes and other areas
containing natural vegetation are preserved, in accordance with the
following policies:
A.2. The removal of trees should be minimized particularly when they
are located on steep slopes or hazardous soils. Subdivision layouts,
buildings and roads should be designed so that existing trees are
preserved.
A.3. Trees that are diseased, damaged, or unstable should be removed.
A.4. Grading should be restricted to building pads and roads only.
Vegetation outside these areas should be preserved.
Compliance with Vegetation and Wildlife goals and policies: The tree code in
ECDC 23.10 requires retention of at least 30% of the healthy significant trees on
the developable site. Using the flexibility provided for planned residential
developments in ECDC 20.35, lot and site layouts are proposed that will allow
retention of many trees around the exterior of the site. Replanting and fees in -
lieu will also be required.
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053 Q
Page 9 of 23
Packet Pg. 12
1.a
Staff finds that the proposal is consistent with the Comprehensive Plan.
3. Zoning Ordinance. The proposal meets all requirements of the zoning ordinance,
or a modification has been approved as provided for in this chapter.
The subject site is zoned RS-MP (Single -Family Residential — Master Plan) and is
subject to the requirements of Chapter 16.20 ECDC. According to ECDC
16.20.045, development in the RS-MP zone can be done at RS-12 standards
without a master plan. However, development to RS-8 standards is possible if a
master plan (like a planned residential development) can demonstrate the
following in ECDC 16.20.045.B:
1. That access and lot configurations shall not result in additional curb
cuts or unmitigated traffic impacts on SR-104; at a minimum, a traffic
study prepared by a traffic engineer approved by the city shall clearly
demonstrate this requirement.
2. That the configuration and arrangement of lots within the master plan
area provide for setbacks on the perimeter of the proposed
development that are compatible with the zoning standards applied to
adjoining developed properties. For example, a master plan adjoining
developed lots in an RS-MP zone that were developed under RS-12
standards shall have RS-12 setbacks along common property lines,
although the lot sizes, widths, and other bulk standards may conform
to the higher density lot configuration approved through the master
plan.
Regarding access in Sub 1 above, the Washington State Department of
Transportation controls access onto SR-104, not the City of Edmonds. WSDOT
has provided preliminary approval to the applicant to purchase additional access
rights and will ultimately review and must approve traffic control, frontage
improvements, and final access to the intersection of the plat road and SR-104
(Attachment 25).
The applicant is proposing a planned residential development so according to
ECDC 16.20.030, the base development standards for the subdivision are:
Minimum
Minimum
Minimum
Maximum
Maximum
Minimum Lot
Minimum
Zone
Street
Side
Rear
Structural Lot
1
Density
Area (net)
Lot Width
Setback
Setback
Setback
Coverage
RS-MP 5
3.7
12,000
80 feet
25 feet
10 feet
25 feet
35%
RS-8
5.5
8,000
70 feet
25 feet
7.5 feet
15 feet
35%
Density means "dwelling units per acre" determined by dividing the total lot area by the
density allowed by the underlying zoning; the number of lots or units permitted shall be
rounded down to the nearest whole number.
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053 Q
Page 10 of 23
Packet Pg. 13
1.a
5 "MP" signifies "master plan." The standards in this section show the standards applicable to
development without an approved master plan. Properties in this zone may be developed at
a higher urban density lot pattern equivalent to RS-8 but this shall only be permitted in
accordance with a duly adopted master plan adopted under the provisions of ECDC 16.20.045.
Alternative standards for planned residential developments. The planned
residential development process also allows for alternative development
standards to be used that are found in ECDC 20.35.030:
A. Alternative development standards may be established through the
PRD process. Such alternative standards shall be limited to the bulk
standards specifically set forth in this chapter. Absent specific
authorization the standard may not be waived or varied through the
PRD process.
1. Bulk development standards which may be established are as
follows:
a. Building Setbacks. An applicant shall in every event comply with
Uniform Building Code separation requirements for fire safety. See
ECDC 20.35.040(B) for setback requirements.
b. Lot Size. Lot sizes may be reduced ("clustering") to allow dwelling
units to be shifted to the most suitable locations on residential PRD
sites so long as the overall density of the project complies with the
comprehensive plan and zoning ordinance.
c. Lot width.
d. Lot coverage.
e. Street and Utility Standards Alternative. Street standards may be
established by the city engineer and alter utility standards
established by the public works director so long as such alternatives
provide the same or greater utility to the public system, safety and
long-term maintenance costs as the standards established by ECDC
Title 18.
f. The enhanced design standards contained in this title.
2. No modification of height limits shall be permitted in the PRD
process.
3. Since the PRD process does not authorize the division of land, housing
types that require the division of land will require a short or long
subdivision.
B. PRDs are not rezones. In no event shall use of a PRD result in an
expansion of the uses permitted by the underlying zone, or in density in
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053 Q
Page 11 of 23
Packet Pg. 14
1.a
excess of the maximum established by the comprehensive plan and zoning
ordinances.
To use these standards, certain PRD criteria need to be met in ECDC 20.35.040.
Criteria for establishing alternative development standards.
Approval of a request to establish an alternative development standard
using a PRD differs from the variance procedure in that rather than being
based upon a hardship or unusual circumstance related to a specific
property, the approval of alternative development standards proposed by
a PRD shall be based upon the criteria listed in this section. In evaluating a
PRD which proposes to modify the development standards of the
underlying zone, the city shall consider and base its findings upon the ability
of the proposal to satisfy all of the following criteria, if applicable:
A. The proposed PRDs shall be compatible with surrounding properties in
the following respects:
1. Provide landscaping for projects seeking to cluster lots under ECDC
20.35.030(A)(1)(b) through the design review process and greater
buffering of buildings, parking and storage areas than would otherwise
be provided through the subdivision process,
2. Providing safe and efficient site access, on -site circulation and off-
street parking, and
3. Architectural design of buildings and harmonious use of materials as
determined by the ADB in accordance with ECDC 20.35.060,
B. No setback from the exterior lot lines of the PRD may be reduced from
that required by the underlying zoning unless a variance or subdivision
modification is approved,
C. Minimize the visual impact of the planned development by reduced
building volumes as compared with what is allowable under the current
zoning or through landscape or other buffering techniques,
D. Preserve unique natural features or historic buildings or structures, if
such exist on the site; and/or
E. Reduction of impervious surfaces through the use of on -site or common
parking facilities rather than street parking.
Zoning Analvsis of PRD Standards and Criteria
Density: The project site could be developed to RS-8 density since the PRD
process is being used (5.5 du/acre) which would yield a maximum lot 17 lots. 16
lots are proposed (Exhibit 17).
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053 Q
Page 12 of 23
Packet Pg. 15
1.a
Minimum Lot Area: The RS-8 zone typically requires a minimum net lot area of
c
8,000 square feet per lot. However, lot sizes can be reduced using the PRD
E
process so long as the overall density of the project meets the RS-8 standard. As
CL
c
noted above, the proposed density is consistent with RS-8 standard so lot area
a)
a')
can be altered from the standard 8,000 sq. ft. As shown on Exhibit 17, proposed
o
lot areas range from 5,022 sq. ft. to 7,889 sq. ft.
Lot Width: Pursuant to ECDC 21.55.050, lot width is the minimum diameter of a
as
lot width circle that must fit within a lot (70 feet in RS-8). The PRD allows for
reduction of lot width and, in this case, widths are proposed to range from 60 to
75 feet.
c�
Setbacks: As shown on Exhibit 17, PRD setbacks are proposed for this project
a
rather than standard RS-MP and RS-8 setbacks. Those lots on the exterior of the
development have RS-MP setbacks and are applied as appropriate for a
E
standard, corner or flag lot:
a
Standard — 25' street, 10' sides, 25' rear (Lots 2, 3, 4, 16)
a
Corner — two 25' streets, two 10' sides (Lot 1)
Flag — all 10' sides (Lots 5 — 10, 14 and 15)
c�
The internal lots (Lots 11-13) have reduced setbacks as allowed through the
a�
PRD process.
a�
Retaining walls, rockeries and similar improvements of a minor character may be
no taller than 3' above original grade when located within a required setback
area. Residential fences may be up to 6', consistent with ECDC 17.30.
a
Lot Coverage: The RS-MP and RS-8 zones establish a maximum structural lot
Y
coverage of 35% on each lot. "Coverage means the total ground coverage of all
ca
=
buildings or structures on a site measured from the outside of external walls or
L
supporting members or from a point two and one-half feet in from the outside
edge of a cantilevered roof, whichever covers the greatest area." However, the
LU
=
PRD process allows flexibility for coverage on individual lots. As shown on
w
Exhibit 17, lot coverage ranges from 24% to 38%.
a
Q
Height: All buildings must be a maximum of 25 feet tall above average original
grade; this will be verified for each house during building permit review.
N
Access and Parking: The PRD process allows for variation in parking lot design
c
and driveway access requirements. No changes are proposed with this project;
c
each lot will be able to provide at least two off-street parking stalls. According to
M
ECDC 17.60.040.D.1, the improved surface in the front yard may not exceed 50
le
0
percent of the required front yard area and the driveway for a two -car garage
N
may not be wider than 24 feet and for a three -car garage may not be wider than
z
30 feet, unless otherwise approved by the city engineer for public safety
_J
a
purposes.
a�
E
s
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053
Q
Page 13 of 23
Packet Pg. 16
1.a
Staff finds that, as conditioned, the proposal is consistent with the zoning
requirements for the RS-MP zone as contained in Chapter 16.20 ECDC and the
five criteria for establishing alternative PRD standards in ECDC 20.35.040 (as
further described in Section E below:
• The proposal is compatible with surrounding properties as identified by
the Architectural Design Board (Exhibits 5 & 6) and provides safe access
and circulation.
• No exterior setback is reduced below that required by the RS-MP zone
• Proposed homes are consistent is scale with surrounding homes.
• The existing pond is preserved.
• Impervious surfaces are reduced.
Compliance with all zoning requirements for all new structures will be reviewed
with future building permit applications.
4. Flood Plain Management. The proposal meets all requirements of the Edmonds
Community Development code relating to flood plain management.
The proposed project is not located within a designated flood plain management
area.
E. ECDC 20.35.050 — Decision Criteria for PRDs. Because PRDs provide incentives to
applicants by allowing for flexibility from the bulk zoning requirements, a clear
benefit should be realized by the public. To ensure that there will be a benefit to the
public, a PRD which seeks alternative bulk standards shall be approved, or approved
with conditions, only if the proposal meets the following criteria:
1. Design Criteria. The project must comply with the city's urban design guidelines
set forth in subsection (A)(1) of this section and provide two or more of the
results set forth in subsections (A)(2) through (A)(5) of this section:
a. Architectural design consistent with the city's urban design guidelines for
multifamily projects or ECDC 20.35.060 for single-family projects for the
design, placement, relationship and orientation of structures.
The Architectural Design Board reviewed the proposed PRD and found that it
was consistent with the standards in ECDC 20.35.060 as noted in Exhibits 5 &
6.
Staff finds that the proposed PRD is consistent with this criterion.
b. Improve circulation patterns by providing connections (a) to the city's street
system beyond those which may be compelled under state law, or (b) to the
city's alternative transportation systems, such as bike or pedestrian paths
accessible to the public.
WSDOT controls how vehicular access will take place from the plat's private
road to SR-104. Sidewalks on both sides of the plat road will connect with
existing sidewalks at SR-104. No other public pedestrian or bike paths are
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053 Q
Page 14 of 23
Packet Pg. 17
1.a
proposed through the site since it is adjacent to private property on all other
sides (Exhibit 10).
Staff finds that the proposed subdivision is consistent with this criterion.
c. Minimize the use of impervious surfacing materials through the use of
alternate materials or methods such as open -cell grid pavers or shared
driveways.
Ajoint driveway is proposed for Lots 14 and 15 and pavers are proposed for
pedestrian walkways from the sidewalk to the houses (Exhibit 17). While the
proposed plat road and easement drives are narrower than standard as
allowed through the PRD, asphalt paving and concrete sidewalks are
proposed (Exhibit 20); a condition is proposed that alternative materials are
further considered for the roads, driveways and sidewalks during civil
subdivision plan review.
Staff finds that the proposed subdivision is consistent with this criterion.
d. Increase through the addition of usable open space or recreational facilities
on site above the minimum open space required by ECDC 20.35.060(8)(6).
The project meets and slightly exceeds the 10% area standard for usable
open space (13,412 sq. ft. required, 14,096 sq. ft proposed).
Staff finds that the proposed subdivision is consistent with this criterion.
e. Preserve, enhance or rehabilitate significant natural features of the subject
property such as woodlands, wildlife habitats or streams, historic or landmark
structures or other unique features of the site not otherwise protected by the
community development code.
An existing artificial water feature will be retained within the western usable
open space area but the site does not have other unique features that are
not otherwise protected by the community development code.
Staff finds that the proposed subdivision is consistent with this criterion.
2. Public Facilities. The PRD shall be served by adequate public facilities including
streets, bicycle and pedestrian facilities, fire protection, water, storm water
control, sanitary sewer, and parks and recreation facilities.
According to the Engineering requirements in Exhibit 22, the project will be
served by adequate public facilities.
Staff finds that the proposed PRD is consistent with this criterion.
3. Perimeter Design. The design of the perimeter buffer shall either:
a. Comply with the bulk zoning criteria applicable to zone by providing the same
front, side and rear yard setbacks for all lots adjacent to the perimeter of the
development; and/or
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053 Q
Page 15 of 23
Packet Pg. 18
1.a
b. In addition to the setback required by the underlying zone (see ECDC
20.35.040(8)), provide a landscape buffer, open space or passive use
recreational area (hereafter "buffer"). The depth of the buffer shall be at
least equal to the depth of the rear yard setback applicable to the zone;
provided, that where the exterior lot line abuts a public way, the buffer shall
be at least equal to the depth of the front yard setback required by the zone.
The depth of the buffer shall be measured perpendicular to the boundary of
the exterior property line setback. If such a buffer is provided, interior
setbacks may be flexible and determined in accord with ECDC 20.35.030.
The proposed project complies with Sub (a) above by using RS-MP setbacks
on all exterior lots as are appropriate for standard, flag and corner lots
(Exhibit 17).
Staff finds that the proposed PRD is consistent with this criterion.
4. Open Space and Recreation. Usable open space and recreation facilities shall be
provided and effectively integrated into the overall development of a PRD and
surrounding uses and consistent with ECDC 20.35.060(8)(6). "Usable open space"
means common space developed and perpetually maintained at the cost of the
development. At least 10 percent of the gross lot area and not less than 500
square feet, whichever is greater, shall be set aside as a part of every PRD with
five or more lots. Examples of usable open space include playgrounds, tot lots,
garden space, passive recreational sites such as viewing platforms, patios or
outdoor cooking and dining areas. Required landscape buffers and critical areas
except for trails which comply with the critical areas ordinance shall not be
counted toward satisfaction of the usable open space requirement.
The proposed usable open spaces shown on Exhibit 17 include small sport
courts, play areas, and passive recreation areas. There are no required
landscape buffers and no critical areas such as streams, wetlands or landslide
hazard areas are present or being counted toward the open space
requirement.
Staff finds that the proposed PRD is consistent with this criterion.
F. ECDC 20.75.085 — Subdivision Review Criteria. In addition to staff from the Planning
Division, staff from South Snohomish County Fire and Rescue, and the City's Public
Works, Building and Engineering Divisions reviewed the proposal. The Washington
State Department of Transportation and Olympic View Water and Sewer District
have also analyzed the project.
The following criteria are used to review proposed subdivisions:
1. Environmental.
a. Where environmental resources exist, such as trees, streams, ravines or
wildlife habitats, the proposal shall be designed to minimize significant
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053 Q
Page 16 of 23
Packet Pg. 19
1.a
adverse impacts to the resources. Permanent restrictions may be imposed on
the proposal to avoid impact.
While the project area has gentle topography, there is a steeper slope along
the east side of the site within the state right-of-way that will remain
undisturbed. Trees are being retained consistent with ECDC 23.10 using the
planned residential development process. A notice to title for tree retention
will be required for the plat or individual building lots, as necessary.
Staff finds that the proposed subdivision is consistent with this criterion.
b. The proposal shall be designed to minimize grading by using shared
driveways and by relating street, house site and lot placement to the existing
topography.
The project area slopes down gradually toward the northwest and southeast
(Exhibit 14). To meet engineering and fire standards for right-of-way width
and road grade, excavation for the private plat road, easements, utilities and
building sites would lead to a balancing of 3,500 cubic yards of cut and 2,000
cubic yards of fill (Exhibit 20).
Staff finds that the proposed subdivision is consistent with this criterion.
c. Where conditions exist which could be hazardous to the future residents of
the land to be divided, or to nearby residents or property, such as flood
plains, steep slopes or unstable soil or geologic conditions, a subdivision of
the hazardous land shall be denied unless the condition can be permanently
corrected, consistent with paragraphs A(1) and (2) of this section.
No known hazardous conditions exist at the site. While there are small steep
slopes around the property, the geotechnical report (Attachment 14)
indicates that the project can be constructed safely, consistent with standard
engineering practices.
Staff finds that the proposed subdivision is consistent with this criterion.
d. The proposal shall be designed to minimize off -site impacts on drainage,
views and so forth.
The proposed development must be designed to meet current code and
minimize stormwater impacts. Stormwater runoff from all new hard surfaces
must be mitigated as required by Chapter 18.30 ECDC and the Engineering
Requirements in Attachment 22. The maximum height for new houses in the
RS-MP zone is 25 feet from average original grade, which serves to minimize
any negative impact to existing territorial views in the vicinity. Beside the
height limits, City codes do not contain specific regulations regarding private
view protection in single-family zones.
Staff finds that the proposed subdivision is consistent with this criterion.
2. Lot and Street Layout.
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053 Q
Page 17 of 23
Packet Pg. 20
1.a
a. Lots shall be designed to contain a usable building area. If the building area
would be difficult to develop, the lot shall be redesigned or eliminated, unless
special conditions can be imposed on the approval which will ensure that the
lot is developed properly.
Each of the proposed lots has been designed to accommodate a dwelling
unit.
Staff finds that the proposed subdivision is consistent with this criterion.
b. Lots shall not front on highways, arterials or collector streets unless there is
no other feasible access. Special access provisions, such as shared driveways,
turnarounds or frontage streets may be required to minimize traffic hazards
The project site is adjacent to Edmonds Way (State Route 104). A private
plat road off SR-104 and additional interior access easements will provide
vehicular access to the site. WSDOT must ultimately approve the
intersection of the plat road with SR-104.
Staff finds that the proposed subdivision is consistent with this criterion.
c. Each lot shall meet the applicable dimensional requirements of the zoning
ordinance.
The project site is located in the RS-MP zone. The project is using the lot and
layout flexibility available for planned residential developments in ECDC
20.35 (see Section IV.D.3).
Staff finds that the proposed subdivision is consistent with this criterion.
d. Pedestrian walks or bicycle paths shall be provided to serve schools, parks,
public facilities, shorelines and streams where street access is not adequate
Citywide efforts to provide safe transportation include enforcement of traffic
regulations, provision of crosswalk and sidewalks for pedestrians, and
provision of well -designed streets for safe driving. Safety also involves
ongoing coordination with emergency service providers to ensure access for
their emergency equipment. Recommendations to address safety issues are
based on assessment of historical collision data, focused sub -area or corridor
safety studies, or on citizen feedback.
The City of Edmonds applies a Walkway Prioritization Process provided in the
Transportation Element of the Comprehensive Plan in assessing where
sidewalks should be required or upgraded. Criteria have been developed to
evaluate and prioritize walkway improvement projects. These criteria (which
include distance from schools) are used to prioritize improvements to
walkway sections that are identified based on input from public meetings,
Walkway Committee meetings, and deficiencies determined from a review of
the existing city walkway inventory. The criteria are weighted according to
their importance. A system of points evaluate each proposed project against
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053 Q
Page 18 of 23
Packet Pg. 21
1.a
each criterion. The result is a weighted average score that helps to compare
and prioritize proposed projects. The City's policy is to consider these criteria
in conjunction with City code and the Sidewalk Comprehensive Plan Map in
determining sidewalk requirements for subdivisions.
There are existing sidewalks along the south side of Edmonds Way.
Sidewalks interior to the project site on both sides of the private plat road
will connect to the existing sidewalks at the SR-104 frontage (Exhibit 20).
Staff finds that the proposed subdivision is consistent with this criterion.
3. Dedications
a. The city council may require dedication of land in the proposed subdivision for
public use.
b. Only the city council may approve a dedication of park land to satisfy the
requirements of ECDC 20.75.090. The council may request a review and
written recommendation from the planning advisory board.
c. Any approval of a subdivision shall be conditioned on appropriate dedication
of land for streets, including those on the official street map and the
preliminary subdivision.
According to the Engineering Division requirements (Exhibit 22), no dedications
are required for the proposal. See Section II.F below regarding the dedication of
parkland.
4. Improvements.
a. Improvements which may be required, but are not limited to, streets, curbs,
pedestrian walks and bicycle paths, sidewalks, street landscaping, water
lines, sewage systems, drainage systems and underground utilities.
b. The person or body approving a subdivision shall determine the
improvements necessary to meet the purposes and requirements of this
chapter, and the requirements of.•
i. ECDC Title 18, Public Works Requirements,
ii. Chapter 19.75, Fire Code, as to fire hydrants, water supply and access.
This determination shall be based on the recommendations of the
community development director, the public works director, and the fire
chief.
This project was reviewed by South County Fire and the Public Works
Department - Engineering Division. The Engineering Division indicated the
project is feasible from an engineering perspective. Specific civil designs,
including final utility system design and location, as well as compliance with
Title 18 Edmonds Community Development Code, will be reviewed during
the civil subdivision improvement plan phase of this project.
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053 Q
Page 19 of 23
Packet Pg. 22
1.a
With the conditions of approval included in the Engineering Requirements
for both Fire and Engineering (Exhibit 22), staff finds that the proposed
subdivision is consistent with this criterion.
c. The use of septic systems may be approved if all of the following conditions
are met:
i. It is more than 200 feet, multiplied by the number of lots in the proposed
subdivision, from the nearest public sewer main to the nearest boundary
of the land to be divided.
ii. The land to be divided is zoned RS-20.
iii. The public works director and city health officer determine that soil,
drainage and slope conditions are satisfactory for septic use and that all
requirements of WAC 248-96-090 are met.
There are no septic systems included as part of the proposed project. The
project site is located in the City of Edmonds but Olympic View Water and
Sewer District (OVWSD) is the water and sewer supplier for the project site
OVWSD preliminarily approved connection and will be involved in the civil
subdivision plan review process to approve the water and sewer
improvements.
5. Flood Plain Management. All subdivisions shall comply with the criteria set forth
in the Edmonds community Development code for flood plain management.
The subject property is not located within a Flood Plain Management area.
G. ECDC 20.75.090 — Park Land Dedication. According to ECDC 20.75.090, before or
concurrent with the approval of the final plat of any subdivision, the subdivider shall
dedicate land, pay a fee in -lieu of dedication, or do a combination of both, for park
and recreational purposes. With the adoption of Ordinance 3934 in 2013, park
impacts are addressed through the assessment of park impact fees in accordance
with Chapter 3.36 Edmonds City Code (ECC). No park dedication or fees are required
with the subdivision. Park impact fees will be assessed with issuance of the building
permits on the new lots consistent with Chapter 3.36 ECC.
V. STAFF RECOMMENDATION
Based on the Findings of Fact, Conclusions, and Attachments to this report, staff
recommends the Hearing Examiner APPROVE the Greenwalk Park preliminary planned
residential development and formal subdivision in files PLN2022-0049 and PLN2022-
0053, subject to the following conditions:
If underground storage tanks are found on the site, they must be decommissioned
consistent with the requirements of South County Fire by obtaining a permit
through the City. If contamination is encountered, it must be remediated consistent
with Ecology requirements (WAC 173-340).
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision w
File No. PLN2022-0049 & PLN2022-0053 Q
Page 20 of 23
Packet Pg. 23
1.a
2. A 6-foot tall wood fence and Type III landscaping is required along the north, west
and south sides of the project site.
3. Guest parking is not permitted within the required open space areas.
4. Street tree species will be determined by the City during the civil phase of the
subdivision review in PLN2022-0053.
5. Any transformers, utility meters and similar features must be screened from view or
camouflaged to minimize their visual obtrusiveness from the sidewalk along
Edmonds Way and internal plat roads and drives.
6. Staff will verify compliance of the proposal with all relevant codes and land use
permit conditions through review of building, engineering, and fire permits. Minor
changes to the approved design may be approved by staff at the time of building
permit without further design review by the Architectural Design Board if the design
is substantially similar to that originally approved.
7. Prior to recording, the applicant must complete the following requirements:
a. Civil plans must be approved prior to recording. In completing the civil plans, the
following must be addressed:
Complete the Engineering Division conditions listed "Required as a
Condition of Subdivision" on Exhibit 22.
ii. Alternative materials other than asphalt pavement and concrete must be
considered for the roads, driveways and sidewalks.
iii. Comply with the tree conditions found in Exhibit 26.
iv. Implement tree protection measures required in ECDC 23.10.070.
V. Provide a cost estimate to be used to determine the performance tree
bond required in ECDC 23.10.090.
b. Make the following revisions to the subdivision:
Ensure that all existing easements are indicated.
ii. Indicate the locations of all new easements and provide easement
descriptions and maintenance provisions for all new easements.
iii. Include the addresses for each of the lots on the final subdivision (new
addresses will be assigned following preliminary approval and provided
prior to submitting for final review).
iv. Add to the face of the subdivision: "Conditions of approval must be met
and can be found in the approval for the planned residential
development in File No. PLN2022-0049 and the formal subdivision
located in File No. PLN2022-0053 in the City of Edmonds Planning
Division."
V. The zoning setbacks and related zoning standards established as part of
the planned residential development process must be shown on the face
of the final plat map.
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053 Q
Page 21 of 23
Packet Pg. 24
1.a
vi. Include on the subdivision all required information, including owner's
certification, hold harmless agreement, and Planning and Development
and Public Works director's approval blocks.
vii. Make sure all documents to be recorded meet the Snohomish County
Auditor's requirements for recording.
c. Submit an updated copy of the title report (subdivision certificate) with the
documents proposed to be recorded. The title report must be prepared within
30 days of submittal for final review.
d. Submit two copies of the documents to be recorded for the Planning Division
and Engineering Division's approval. Once approved, the documents will be
recorded by the City Clerk at the Snohomish County Auditor's office.
e. Record a protected tree notice on title for the plat as required by ECDC
23.10.085, as amended.
8. After recording the subdivision and in conjunction with future building permit
applications, the applicant must complete the following:
a. Complete the Engineering Division conditions listed "Required as a Condition of
Building Permit" in Exhibit 22.
b. Comply with the tree conditions found in Exhibit 26.
c. A notice to title for tree retention must be recorded for each lot, consistent with
ECDC 23.10.085, as amended.
VI. RECONSIDERATION
According to ECDC 20.06.140, a party of record may submit a request to reconsider a
Type III -A decision to the Planning and Development Director within 10 calendar days
after the date of issuance of the decision. The request must be made in writing and
include all required information stated in ECDC 20.06.140(D) as well as the applicable
fee.
VII. APPEAL
Type III -A decisions are not administratively appealable. The Hearing Examiner's final
decision on the application may be appealed by commencing a land use petition in
Snohomish County superior court consistent with Chapter 36.70C RCW. [ECDC
20.06.150]
VIII. LAPSE OF APPROVAL
Approval of a preliminary plat shall expire and have no further validity at the end of the
time period established under RCW 58.17.140, unless the applicant has acquired final
plat approval prior to the expiration date established under RCW 58.17.140. The time
period for subdivisions shall commence upon the date of preliminary plat approval by
the issuance of a written decision by the Edmonds hearing examiner. In the event that
the decision of the hearing examiner is appealed to Snohomish County superior court,
the time period shall commence upon the date of final confirmation of the preliminary
plat decision by the judiciary. [ECDC 20.75.100.A]
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053 Q
Page 22 of 23
Packet Pg. 25
1.a
IX.
0
NOTICE TO COUNTY ASSESSOR
The property owner may, as a result of the decision rendered by the Hearing Examiner,
request a change in the valuation of the property by the Snohomish County Assessor's
Office.
PARTIES OF RECORD
City of Edmonds
121— 5t" Ave. N
Edmonds, WA 98020
Applicant: Fernandez and Barnes LLC
(Steve Barnes rep.)
sbarnes@cornerstonearch.com
Persons who submitted written
comments:
Kim Helleren
nordicgall@comcast.net
Lisa and John Lecky
Imlecky@yahoo.com
XI. INTERESTED PARTIES
Peter Alm, WSDOT
almp@wsdot.wa.gov
Mary Wicklund, PUD
mlwicklund@snopud.com
Dale Bonn
dalepatience@icloud.com
Mitch Lemas and Kathy Martinelli
mitch@pacificrepworks.com
Kelli Price, Ecology
nwsepa@ecy.wa.gov
Greenwalk Park Preliminary Planned Residential Development and Formal Subdivision
File No. PLN2022-0049 & PLN2022-0053
Page 23 of 23
Packet Pg. 26
1.b
CITY OF EDMONDS MyBuildingPermit.com
Land Use Application #1037472 - 540 & 550 Edmonds Way
Applicant
First Name Last Name Company Name
Steve Barnes Cornerstone Architectural Group
Number Street Apartment or Suite Number E-mail Address
6161 NE 175th Street 101 sbarnes(Lbcornerstonearch.com
City State Zip Phone Number Extension
Kenmore WA 98028-4800 (206) 550-9296
Contractor
Company Name
Number Street
City
State License Number
Project Location
State Zip
License Expiration Date UBI #
Number Street
540 EDMONDS WAY
City Zip Code County Parcel Number
EDMONDS 98020 27032500308300
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions).
Work Location
Property Owner
Apartment or Suite Number
Phone Number Extension
E-mail Address
Floor Number Suite or Room Number
First Name Last Name or Company Name
Theresa Molnar
Number Street Apartment or Suite Number
390 SUNSET AVE N
City State Zip
EDMONDS WA 98020
Certification Statement - The applicant states:
certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application.
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 10/19/2021 Submitted By: Steve Barnes
Exhibit 1 - Green
PLN2022-004 Packet Pg. 27
Page 1 of 2
1.b
CITY OF EDMONDS MyBuildingPermit.com
Land Use Application #1037472 - 540 & 550 Edmonds Way
Project Contact
Company Name: Cornerstone Architectural
Group
Name: Steve Barnes Email: sbarnes@cornerstonearch.com
Address: 6161 NE 175th Street 101 Phone #: (206) 550-9296
Kenmore WA 98028-4800
Project Type Activity Type Scope of Work
Any Project Type Preapplication Services Preapplication Meeting
Project Name: 540 & 550 Edmonds Way
Description of Work: Plat two existing parcels into 16 lots with right of way and common space.
Project Details
Development Type
Land Use
Pre -submittal Activity
Plat
Additional Parcels:
27032500308300,400
Exhibit 1 - Green
PLN2022-004 Packet Pg. 28
Page 2 of 2
. of to.y
� v d
4 ;P
Jurisdiction: Edmonds
Project Name: 540 & 550 Edmonds Way
Appfication 1D: 1037472
Supplemental Name: Pre -Application Questionaire
Assessor tax parcel number(s) for all lots
27032500308300 & 400
Site address(es) and lot number(s) - Type N/A if none are assigned
540 & 550 Edmonds way
Existing occupancy(ies) and uses
Single family residences
Proposed occupancy(ies) and uses
Single family residences
Building type of construction (ex: VB, VA, IIIB). Type N/A if property is vacant
VB
Zoning designation
RS-MP
Existing fire sprinkler and fire alarm system types. Type N/A or none if not applicable
N/A
Lot area
2.88 acres
This Pre -Application is for:
Land Use Only
1.b
MyBuildingPermitxom
I understand that questions, plans, and documents for the meeting must be submitted at least one week prior to the scheduled date
Any received after will not be reviewed by staff and may result in the meeting being rescheduled.
Please enter your electronic signature to acknowledge:
Steve Barnes
Exhibit 1 - Green
PLN2022-004 Packet Pg. 29
1.b
Property Owner's Authorization
Alex Molnar
,certify under the penalty of
perjury under the laws of the State of Washington that the following is a true and
correct statement:
1 have authorized Pteve Barnes
to be the Applicant/Agent to apply for the subject land use application, and grant my
permission for the public officials and the staff of the City of Edmonds to enter the
subject property for the purposes of inspection and posting attendant to this
application.
SIGNATURE OF OWNER
DATE
Exhibit 1 - Green
PLN2022-004 Packet Pg. 30
1.b
540 & 550 EDMONDS WAY
Parcel ID: 27032500308300 & 400
Property Address: 540 & 550 EDMONDS WAY
City: EDMONDS
Zip Code: 98026
Owner: MOLNAR ALEXANDER & THERESA TRUST
SW1/4 SEC25 T27N R3E
Existing and proposed occupancy: Single family residential
Number of stories: 2 story individual dwelling units
Zoning: RS-MP (plan to use RS-8 for underlying zoning requiring a PRD with master plan).
Number of dwelling units: 13 on 540 & 3 on 550.
Lot area: 2.33 + .55 acres = 2.88 acres
SEC 25 TWP 27 RGE 031RT-106) N1/2 NW1/4 SW1/4 SW1/4 LESS RDSLESS N 35FT OF
W 262.9FT LY W OF CO RD LESS PTN LY NELY ST HWY 1 W & LESS BEG 321. 83FT S &
30OFT E OF NW COR NW1/4 SW1/4 SW1/4 TH CONT E 327.80FT M/L TO E LNNW1/4
SW1/4 SW1/4 TH N ALG SD E LN TO SWLY MARG ST HWY TH NWLY ALG SD MARG
175FT M/L TO A PT 20OFT SELY OF INT N LN SW1/4 SW1/4 & WLY LN ST RD TH SWLY
285FTM/L TPB LESS ST HWY
Develop this site in accordance with RS-MP zoning criteria by developing a master plan for the two lots
complying with the requirements or a PRD currently under control by the Molnar's and Molnar Building
LLC. This includes two lots parcels 27032500308300 2.33 acres & 27032500308400 .55 acres.
Compliance with ECDC 16.20.045 Site development standards — Single-family master plan.
A. The site at 540 & 550 resides within the area designed MP. We are submitting a design that is
intended to occur at RS-8 densities and higher.
B. This project shall participate in the PRD (planned residential development) process.
1. Access and lot configurations are designed to reduce the number of curb cuts and
unmitigated traffic impacts on SR-104. A traffic study will be prepared to clearly
demonstrate the proposed design.
The configuration and arrangement of lots provide setbacks for all the perimeter lots
that abut neighboring zoning to utilize setback requirements for those lots, in this case
RS-12 setbacks. Some of the neighboring lots are in the same RS-MP zone, in these cases
we have maintained the RS-12 setbacks. Only lots that are internal or do not physically
touch neighboring lots are we proposing different setback requirements.
Compliance with ECDC 20.35
A. Our design promotes a higher density development than the base zoning of RS-8 which is
allowed through the PRD process.
B. The layout has different size lots and a variety of different orientations to so there are a number
of different size houses and their design will be arranged to work with existing contours and
maintain as many significant trees as possible.
Exhibit 1 - Green
PLN2022-004 Packet Pg. 31
1.b
C. We have provided vehicle circulation systems using finger lots and access easements to reduce
the environmental impact of publicly owned roads, a significant portion of the site will be set
aside for shared use (Common Spaces) which will contain water feature, walking and viewing
areas and outdoor play areas for children.
D. The design promotes an variety of different building designs and the relationships of houses to
one another are varied with a combination of two story houses, some with daylight basements
and others with parking in the basement. The architectural style will be contemporary in order
for us to meet current housing needs.
E. Our proposal has combined the two adjacent parcels which have the most significant vehicular
constraints since the both front on SR-104 and combines access to a single new road with
controlled access to the highway that will comply with WSDOT requirements.
F. The intent of the RS-MP zoning is to increase density in this somewhat under developed corner
of the city that is within walking distance of downtown but is still a single family neighborhood.
By saving existing site features such as the water feature and perimeter trees along with a good
portion of the existing orchard we can maintain the privacy of neighbors. A portion of the short
plat will include dedicating property to the neighbor to the south who feels that he has rights to
a portion of the property that extends past the fence on the south side of the property.
G. It is the intent to have 4 different price groups for housing within this community to meet the
needs of a wide range of income and age groups.
H. Existing site amenities are being preserved as previously discussed.
I. Permanent usable commonly owned open space is being provided for both active and passive
recreation which will be owned by the community and under the direction of the HOA that will
be established.
J. In order to create the open space we have clustered the housing onto smaller lots and created
two separate open space areas for different types of activities. There are no steep slopes or
environmentally critical areas on this site.
K. We have reduced the amount of impervious surfaces but minimizing the amount of road we
need to building and have provided narrower access easements which will need to meet the
width requirements of the fire marshal.
L. The comprehensive plan designation for our sites is Single Family— MP. Our design willfully
comply with all tree retention standards.
1. Since we will be building the houses they will all meet current Washington State
Energy code and Built Green standards providing outdoor covered space in both the
front and rear of the homes for outdoor cooking and living.
2. Our storm drainage systems will be designed to meet low impact development
requirements and we will use pervious paving wherever it is allowed by code.
3. Natural elements such as the water fall feature on the site along with it's
surrounding landscaping will be maintained.
4. By teaming up with multiple property owners we are doing all we can to create a
consistent environment that goes beyond our own site.
5. The new road we are building will provide access to city utilities and public
transportation.
Exhibit 1 - Green
PLN2022-004 Packet Pg. 32
1.b
6. By creating a higher density development near to the downtown core of Edmonds
meets the much loftier goal of reducing sprawl and increasing the livability of the
urban environment.
7. We are doing what we can for affordable housing but within this portion of the city
the only way to increase affordable housing is to allow ADU and DADU development
for further increase densities on these sites. Since this is not allowed we cannot take
advantage of this opportunity.
REGIONAL GOALS
By developing these pieces of land to allow for more inhabitants in a restrained manner that doesn't
move any vehicular traffic on to any adjacent city streets, only on to the state highway we are
promoting the goals for the central Puget Sound region. This is the strategy of urbanization that is
designed to minimize environmental impacts, support economic prosperity, promote adequate and
affordable housing, improve mobility and make efficient use of existing infrastructure.
Due to the site's proximity to the downtown core and adjacent services such as grocery stores and
restaurants we have a unique ability to create this community where people can walk to downtown, to
grocery stores, banks, restaurants, etc. A truly pedestrian oriented location that is also well service by
existing public transportation.
By combining multiple property owners and parcels within our project we are moving towards a small
solution toward combining access from multiple sites that will benefit good pedestrian and transit
access to the already vibrant downtown area. This will also provide the new residents convenient access
to the waterfront and other city owned parks.
SUSTAINABILITY
Fernandez Barnes LLC are committed to sustainable development as has been a part of their
development and contraction processes since the company began. This commitment is enhanced when
they are able to control the land development from a pre -developed condition to a fully integrated
design which includes roads, driveways, access walks, the buildings, how the buildings are oriented to
take advantage of the sun, covered outdoor spaces to combine outdoor and indoor living spaces so they
work together seamlessly. This is why we prefer to be able to do our own short platting prior to building
design so we can define the perimeters of the sites and setbacks to meet the needs of the new
residences and how they interact with adjacent houses and access points. We are always willing to
participate in green built technologies and processes because we feel our buildings will be better and
longer lasting but being included in design and construction. There are small things we do in our
buildings to implement climate change policies on a micro level such as always providing charging
stations for electric cars, providing ductless heating systems and highly efficient ventilation systems into
each house to maintain good indoor air quality while minimizing the amount of greenhouse gas that is
created. We do include access to natural gas for cooking appliances for practical reasons.
COMMUNITY HEALTH
Our community spaces will be designed to encourage outdoor activities and just provide a good reason
to get out of the house and go for a walk. A good connection to transit and sidewalks that lead to
downtown Edmonds and other locale businesses further encourages people to get out and walk rather
Exhibit 1 - Green
PLN2022-004 Packet Pg. 33
1.b
than driving to the store. Most of our developments have been in urban areas and our designs have
enhanced the new owners access to activities outside the home.
ENVIRONMENTAL QUALITY GOALS AND POLICIES
We will be fully landscaping the sites where we build homes using native species and laid out in a
natural way to maintain existing wildlife habitat as much as possible.
RESIDENTIAL DEVELOPMENT GOALS AND POLICIES
Residential Goal A:
A. The homes designed by Greenwalk Designs have been consistently varied and provide changes
of materials and opening designs along with roof designs that enable them to harmonize with
one another without duplicating the exact same design over and over again.
B. Although we can't keep people from adding on to their houses in the future our initial designs
will discourage future additions because they will be included within the original design and our
use of property configurations will not allow a lot of room outside of setbacks that will allow for
future additions.
C. Although we are situated and the top of a hill there are not real views within this new
neighborhood except the peaceful neighborhood and it's amenities. No views from adjacent
properties will be interrupted by this development.
D. There are a few houses on this site that are not historic and are not very well designed so
rehabilitation of these older buildings is not practical and would not provide the
environmentally sensitive solutions we will be proposing.
E. The new neighborhood we are designing will be built but us so we will control compatibility of
the entire community which will enhance the value of neighboring properties.
F. The houses we design are already planned to work with existing topography, trees, soils,
drainage and vegetation.
Residential Goal B:
A. Our ability lay out the lots that will allow for good residential design where the interior spaces
and flow to exterior spaces providing significant benefits for the owner.
B. We specifically comply with "single family dwelling units near downtown" although the zoning
doesn't allow for attached dwelling units or ADU/DADU development.
C. Our site is located right on SR-104 but all access off the new residential street we will be
building.
D. Preservation of privacy and views of surrounding buildings will be maintained.
E. Building heights will comply with same codes that surrounding neighbors had to comply with.
F. We will be constructing single family residences adjacent to existing single family residences.
G. Since we are designing and building nearly all the structures they will have a unified yet varied
design.
H. We have done out best to preserve natural features and have maintained some existing natural
features.
Exhibit 1 - Green
PLN2022-004 Packet Pg. 34
1.b
SITE AND TOPOGRAPHY GOALS & POLICIES
As we have presented in this project description we intend to comply with all the comprehensive plan
policies that apply to the relatively small land locked piece of property. Such as we intend to minimize
impervious surfaces and cuts and fills. Streets and access will conform to the natural topography and be
designed to reduce runoff.
We have no hazardous soil conditions and will comply with all the soils and topography goals defined in
'GOAL B". Of course erosion control will be built into our permitting packages.
VEGETATION AND WILDLIFE
As previously mentioned we are committed to maintaining and enhancing native vegetation plantings.
There are no wildlife habitats or critical areas on this site that will be disturbed. Removal of trees will
comply with new city ordinances and the open areas we will be leaving will include the existing
vegetation that are within or surround these areas.
AIR POLLUTION GOALS & POLICIES
We will do everything we can on this micro scale to reduce air pollutants from providing power charging
stations at each home for electric cars to providing only contained gas fireplaces within the houses. Our
location will do the most for reduction in vehicle pollution but being close to the downtown core and
services. There will not be any noticeable noise pollutants from this site with the possible exception of
playing children in peoples back yards. Our outdoor play areas are mostly well withing the heart of the
development keeping this type of noise as far as possible from existing neighbors.
20.35.040 Criteria for establishing alternative development standards
A. The new residential development will respect the neighbors and building massing will be the
same as adjacent properties.
1. It is our intent to fully landscape all lots taking care to buffer buildings and parking from
neighbors.
2. Provide safe and efficient site access, on -site circulation and off-street parking in
driveways.
3. Provide a consistent yet varied use of materials and building shapes to create
individually designed dwellings.
B. No setbacks from the exterior lot lines are reduced from that required by the underlying zoning.
C. Minimize the visual impact of the planned development by reducing building volumes by having
front and rear covered porches and other techniques to reduce building scale such as changes in
materials.
D. Preserve unique natural features or historic buildings which does not apply to this site although
the existing water feature has been saved and will be enhanced with play areas for children,
seating and lighting.
E. Reduction of impervious surfaces is a standard design feature currently used in all our
development projects.
20.35.060 Single family design criteria for PRD's.
A. Building design.
Exhibit 1 - Green
PLN2022-004 Packet Pg. 35
1.b
1. Characteristics of Single -Family Development.
a. All homes will have a strong physical connection to the street or access easement
to show a strong sense of entry and ownership.
b. Most of the housing will be designed so that the garage is stepped back 10 feet from
the front of the house or front porch to create separation through the use of
massing.
2. Entries and Porches:
a. All houses will have front porches and some will have varied roof lines and other will
have the second floor extending over the front porch to create variety.
b. All main entries will be prominent and face the street or access easement.
3. Materials: Materials will be used in a consistent yet varied manner to create consistency
and interest. All materials will be used around all sides of the home including window
trim and various materials, there will not be a front wall with different materials than
the rest of the house.
c. All houses will have front porches and some will have varied roof lines and other will
have the second floor extending over the front porch to create variety.
d. All main entries will be prominent and face the street or access easement.
Exhibit 1 - Green
PLN2022-004 Packet Pg. 36
1.b
540 & 550 Edmonds Way Housing type
Exhibit 1 - Green
PLN2022-004 Packet Pg. 37
1.b
a
Exhibit 1 - Green
PLN2022-004 Packet Pg. 38
1.b
Exhibit 1 - Green
PLN2022-004 Packet Pg. 39
1.b
Exhibit 1 - Green
PLN2022-004 Packet Pg. 40
1.b
540 & 550 Edmonds Way Questions
1. Confirm that lot sizes and setbacks are acceptable for proceeding to plat engineering.
2. Confirm suggested entry drive is correct width, that sidewalk on one side is acceptable and any
other ways it may not meet city engineering requirements.
3. Confirm that amount of area set aside as common space is acceptable.
4. Send to fire marshal to ensure the access easement tee at the end of the new right of way is
acceptable at the turn around for fire trucks (complies with standard detail TR-514). We know
we will need at least one new fire hydrant, if we need more it would be nice to know as soon as
possible. We can work directly with the fire marshal.
5. Verify what other requirements besides the arborist report that will be required to meet tree
retention besides what is shown on sheet L1.
6. We know that we'll be required to extend utilities up from SR-104 for water, sewer easement
with main already runs through the site. We will work with Olympic View water district for these
utility extensions. If the city needs to provide input let us know what you are looking for.
7. Confirm if the city or state will take lead on right of way improvements (sidewalk, planting strip,
etc.)
S. Our intent is to do infiltration if the soils will allow it (soils test being conducted this week) if not
we will be providing drywells for individual houses (which we will do in any case) and retention
system (similar to what is shown on drawings) for right of way and driveways if we don't make
the driveways out of pervious paving.
9. Is there any advantage for built green in reduction of plan review times period for buildings? We
do this anyway so we would take advantage of any encouragement from the city.
10. We know the state will be telling us how to configure the new intersection. If the city has some
say please let us know your concerns.
11. Will the city name the street or can we name it ourselves?
Exhibit 1 - Green
PLN2022-004 Packet Pg. 41
1.b
DATE
STAFF:
M.
City of Edmonds
PRE -APPLICATION COMMENTS
BUILDING DIVISION
November 4, 2021
Leif Bjorback, Building Official
Project: PRE2021-0008
Edmonds Way PRD
540 Edmonds Way
A preliminary review was done with the pre -application materials provided and we have the
following comments.
General comments
1) Codes in effect at the time of this meeting:
a) 2018 International Building Code with State Amendments
b) 2018 International Residential Code with State Amendments
c) 2018 International Fire Code with State Amendments
d) 2018 Uniform Plumbing Code with State Amendments
e) 2018 Washington State Energy Code (WAC 5 1 -11)
f) Edmonds Community Development Code
2) Basic Design Loads specific to Edmonds
a) Snow load 25 psf — nonreducible
b) IBC Seismic design category D; IRC Seismic design category DI
c) Basic Wind speed 85 mph, 3 sec gust
d) Wind exposure is likely B for this location.
3) Separate demolition permits will be issued for the existing structures. The regulations of
Puget Sound Clean Air Agency will apply.
4) A soils report will be required for all homes where the slopes exceed 15%. The soil type and
design bearing capacity shall be specified on the construction drawings.
5) In general, retaining walls greater than 4 feet in height will require an engineered design.
Rockeries are not considered retaining walls by the City of Edmonds and have certain
restrictions.
6) Property line setbacks will need to be verified by a surveyor.
7) Height check for the structure must be done by a surveyor if the proposed height is within 12
inches of the maximum allowable height.
8) A Parks Impact Fee of $2734.05 will be assessed for each new house, with credit given for the
existing structures being demolished.
Building Division Pre -application Comments 1
Exhibit 1 - Green
PLN2022-004 Packet Pg. 42
d
1.b
Pre -Application Meeting
• V. 1 a -
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
www.edmondswa.gov
Pre Application File #
PRE2021-0008
Pre Application Date:
November 4, 2021
Project Name:
Greenwalk Park
Project Address:
540 and 550 Edmonds Way
Subdivision - # of Lots:
16 Lot Plat and Planned Residential Development
Owner/Applicant
Steve Barnes (Cornerstone Architectural Group)
sbarnes@cornerstonearch.com
Engineering
Representative
Jeanie McConnell, Engineering Program Manager
jeanie.mcconnell@edmondswa.gov
Subdivision Phases of Approval (Refer to City Handouts for more information):
Step 1: PreliminaU plat review and approval
• Preliminary Plat submittal shall include a preliminary development plan (preliminary
civil plans). A stormwater report shall be provided addressing, at a preliminary stage,
stormwater requirements and project feasibility.
Step 2: Civil improvement plan review and approval
• Complete civil construction plans and stormwater management report.
• Performance Bond Required prior to civil plan issuance
Step 3: Final plat approval — recording of short plat
• Recording documents showing street dedication (if required), public and private
easements, easement and maintenance provisions, stormwater covenant, etc.
• All civil plan improvements shall be constructed or a performance bond posted to
guarantee the construction of the improvements.
Exhibit 1 - C r
PLN2022-004 Packet Pg. 43
1.b
PROPERTY DEVELOPMENT LIMITATIONS AS ESTABLISHED BY WSDOT:
• A 16-lot development is currently being proposed with access to Edmonds Way.
• Edmonds Way is a State Route (SR-104) and the subject property falls within a designated
limited access area as established and managed by WSDOT.
• WSDOT has informed the City that limited access rights were purchased (deeded to
WSDOT) in the early 1970's and said deed limits the land use of 540 and 550 Edmonds Way
to one single-family residence on each lot.
• WSDOT has indicated a real estate transaction would be required to alter the existing deed
restrictions.
• The property owner is responsible for obtaining approval from WSDOT to develop each
property beyond one single-family residence.
THE FOLLOWING INFORMATION IS PROVIDED BASED ON CURRENT CITY
CODES AND STANDARD DETAILS. THIS PRE -APPLICATION MEETING DOES
NOT PROVIDE ANY VESTING RIGHTS.
STREETS, DRIVEWAYS, FRONTAGE IMPROVEMENTS
1. Edmonds Way (SR-104)
a. Intersection of plat road and Edmonds Way to be designed per WSDOT
requirements.
b. Left turn movement from plat road onto Edmonds Way may be restricted
c. Frontage improvement design along Edmonds Way, including potentially wider
sidewalks, to be per WSDOT requirements.
d. Existing failing, damaged or non-ADA compliant sidewalk will need to be removed
and replaced.
e. Lighting at intersection of plat road and Edmonds Way per WSDOT.
2. Plat Road
a. Private road based on allowance by Olympic View Water and Sewer District for
water and sewer mains to be located within easements.
b. Engineering street standards (ECDC 18.80.010) includes the following:
i. 3-4 lots: 20-ft of right-of-way (easement) and 16-ft of pavement
ii. 5-9 lots: 30-ft of right-of-way (easement) and 20-ft of pavement w/ turn
around
iii. 10-15 lots: 40-ft of right-of-way with 22-ft of pavement w/ cul-de-sac
iv. 16+ lots: dependent on design w/ cul-de-sac
c. Street slope not to exceed 12% (ECDC 18.80.070). NOTE: Slope stated does not
account for any design restrictions that may exist based on the proposed material.
d. Street Design per PRD Site Design requirements (ECDC 20.35.060):
i. Sidewalks on both sides of the street
ii. Street trees and planting/parking strips
3. Driveways
a. Driveway slope not to exceed 14% (ECDC 18.80.060). NOTE: Slope stated does not
account for any design restrictions that may exist based on the proposed material.
b. Vehicular Access per PRD Site Design requirements (ECDC 20.35.060):
i. Driveway widths shall not exceed 20-ft at curb cuts
ii. Shared driveways encouraged
Exhibit 1 - C r
PLN2022-004 Packet Pg. 44
1.b
4. PRD Alternative Standards (ECDC 20.35.030) includes a provision that could allow for
alternative street and utility standards.
5. PRD Application Requirements (ECDC 20.35.070) states the applicant may submit to the
development services director proposed development standards as an alternative process.
Please review this code section for more details.
6. Street restoration per WSDOT standards. Typically, patches shall be combined, and full
width or half width overlay will be required depending on the extent of disturbance. Where
utility patches fall entirely within one travel lane, the overlay shall extend to the centerline of
roadway. Where utility patches extend into both travel lanes then a full width overlay is
required.
7. No work shall be performed with Edmonds Way right-of-way without approval from
WSDOT.
WATER SYSTEM IMPROVEMENTS
1. Purveyor: Olympic View Water and Sewer District (OVWSD)
a. Contact OVWSD for water main and meter requirements.
2. Wellhead Protection:
a. Site appears to be close to one of OVWSD's wellhead zones based on DOH GIS.
Applicant needs to verify with OVWSD. https://fortress.wa.gov/doh/swap/index.html
3. Fire Sprinkler systems: When fire sprinklers are required per the Fire Department, a flow
through system on a single-family residence can typically be serviced with a 1" meter and 1
%2" service line.
4. Irrigation & Premise Isolation
a. City Cross Connection Control Specialist: Jeff Koblyk
Phone: 425.771.0235 x1644 or e-mail: jeff.koblykgedmondswa.gov
b. Show separate irrigation meter. Irrigation Sprinkler Permit to be obtained from City
Public Works Water Division.
c. RPBA shall be located in a hot box just after the water meter.
SEWER SYSTEM IMPROVEMENTS
1. Purveyor: City of Edmonds; however, sewer main is owned by OVWSD
a. Contact OVWSD for requirements on connecting to their sewer main line
b. General Facility charges and monthly utility charges will be to the City of Edmonds
2. Sewer Laterals:
a. 10 lots or more; 8" minimum and must install manhole at main
b. 9 lots or less; 6" minimum
STORM SYSTEM IMPROVEMENTS
1. City Stormwater Engineer: Zack Richardson, P.E.
phone: 425.771.0220 x1323, email: Zachary.richardsonkedmondswa.gov
2. New storm code update planned for Jan 2022, based upon the 2019 DOE manual. Please
note, with the new update, the Edmonds Way exemptions will expire.
3. Engineer of record should pay attention to TDA (Threshold Discharge Area); the subject site
appears to be a high point between two basins.
Exhibit 1 - C
PLN2022-004 Packet Pg. 45
1.b
a. Potential issues with how overflows will be managed and maintaining TDA
requirements; may be easier to design for 100% infiltration.
4. Drainage report to address interaction with drainage and proposed pond feature (or lack
thereof)
a. Also address any source control needs around proposed uses in that space.
5. Infiltration as proposed seems fine but managing other utilities in vicinity of infiltration
facility may be a challenge.
6. If concrete storm vault is proposed, structural drawings and calculations will be sent out for
peer review. Cost will be passed through to the applicant.
7. How is garbage managed? Apply source control to any common or exterior trash facilities as
needed.
8. Ecology General Construction Stormwater permit required for over 1 acre.
9. Pollution generating impervious surfaces over 5000sf require water quality — this includes the
road and driveways.
DRY UITLITIES - UNDERGROUND WIRING & ELECTRICAL POWER SOURCE
1. Underground Wiring Requirements of ECDC 18.05 shall be followed. All utility services
shall be installed underground.
2. Pad mounted transformer to be located on private property.
3. Dry utilities to be 5-ft from City utilities or main lines and 3-ft from water/sewer/storm
utilities on private property.
RESPONSES TO APPLICANT QUESTIONS
2. Entry drive width, sidewalk, and other road requirements noted above.
6. Water and sewer improvement requirements noted above.
7. Right-of-way (Edmonds) improvements will be determined by WSDOT.
8. Stormwater management requirements noted above.
10. Plat road and Edmonds Way configuration will be determined by WSDOT. See notes above.
11. The street name will be determined by the City Engineer in accordance with grid system and
city official street map. Refer to ECDC 19.75.
GENERAL INFORMATION AND FEES:
Complete Civil Construction Plans
• City of Edmonds Standard Details, Fees, Handouts, Edmonds Community
Development Code (ECDC), etc: www.edmondswa.gov
• GIS utility maps, asbuilts & City easements: www.maps.edmondswa.gov
• Drawings shall be 24 x 36 in size and scaled at 1:20 minimum
• Include full extent of property and adjoining right of ways
• Details/Profiles as well as City of Edmonds Standard Details shall be provided as
necessary
• Include Civil Plan Sheet Index
• Include Utility Purveyor Information
Exhibit 1 - C r
PLN2022-004 Packet Pg. 46
1.b
• Include "Approved by Engineering" approval block — example on City website.
• Provide General Notes and Construction Sequence — example on City website.
Transportation Impact Analysis
• Refer to and follow the requirements outlined in the ECC Chapter 3.36.
• If the proposed project creates over 25 peak hour trips, a transportation study shall be
submitted to the City.
• Transportation impact fees are assessed and due at the time of building permit
issuance. Refer to Engineering Handout E82 Transportation Impact Fees.
Subdivision Civil Plan Review Fee
• $4670 (2021 fee)
General Facility Charges
Edmonds Public Utilities
• Sewer — calculation per single-family dwelling unit - $4417/SFR
• Storm — calculation is based on impervious surface area. $799/ESU (IESU = 3000sf);
except each SFR = 1 ESU (unless individual SFR site development includes over
5000sf impervious area then it's based on a calculation.
o Fee established for plat road is to be paid at civil plan approval for plat
o Fee established for single-family residences to be paid with building permits
Olympic View Water and Sewer District
• Water — to be determined by Olympic View Water Sewer District.
Cost Estimate, Bonds and 3.3% Inspection Fee
• Provide an itemized engineers cost estimate for both on -site and off -site (right-of-
way) improvements, including traffic control and all utility installations. Use the
King County Bond Quantity Worksheet (available on the county website-most current
version) and utilize "write-in" sections where appropriate.
o In order to record the subdivision ahead of constructing the required
improvements, the performance bond amount shall be based on the entire
scope of the project.
o The amount of the bond will be based on 120% of the City approved estimate.
The City will inform of the appropriate bond amount after review of the cost
estimate. Please obtain the appropriate subdivision improvement bond forms
from the City — available on the City website.
o Inspection fees are calculated at 3.3% of the 100% City approved estimate for
all improvements.
• At construction final approval, Performance Bond will be released upon securing a
Maintenance Bond. Maintenance bond will be held for 2 years and is 15% of the total
cost estimate.
ATTACHMENTS
• AFN 217113 — Warranty Deed — Limited Access
• WSDOT Limited Access Map
• Superior Court Judgement and Decree — Access limitations
Exhibit 1 - Cl� r
PLN2022-004 Packet Pg. 47
r
S..F. No..-3005-B—OS-11-67.
WARRANTY DEED 1,JR f r,D .b
1..3.Es t
r-I i In the Matter of State Route 104 (............SH No ...............................) -�
Edmonds Ferry Terminal to 5th Avenue G1
KNOW ALL MEN BY THESE PRESENTS, That the Grantor
Richard J. Blandau and Olive L. Bla.ndau also know'Las Olive Lewellen Blandau, his wif
c
2
for and in consideration of the sum of TEN AND NO/100 ($10.00)---------- -------- Dollars, T'
and other valuable consideration
hereby convey and warrant to the STATE OF WASHINGTON, the following described real estate situ-
ated in Snohomish County, in the State of Washington, to the same N
extent and purpose as if the rights herein granted had been acquired under Eminent Domain statute of E
the State of Washington: o
a_
All that portion of the following described Parcel "All lying Northeasterly of the �
following line:
Beginning at a point apposite Highway Engineer's Station (hereinafter referred to as W
H.E.S.) L 77+00 and a distance of 110 feet Southwesterly, when measured at right angles a
and/or radially to the L Line Survey of SR 104, Edmonds Ferry Terminal to 5th Avenue; _
thence Southeasterly parallel with said center line to a point opposite H.E.S. L 79+00; E
thence Southeasterly in a straight line to a point opposite H.E.S. L 80+00 and a distance c
of 50 feet Southwesterly therefrom; thence Southeasterly parallel with said center line
to a point opposite H.E.S. 81+00 and the end of this line description. o
PARCEL "All w
That portion of Southwest quarter of Northwest quarter of Southwest quarter of Section 2!
Township 27 North, Range 3 East, W.M., Snohomish County, Washington, described as follow:'
Beginning at a point on the South line of said Northwest quarter of Southwest quarter 26; W )
feet East of the Southwest corner thereof; thence East along South line thereof 54.2 feet 0)
the Southerly line of State Road No. 1-W; thence Northwesterly along an arc to the right =
having a radius of 995,37 feet a distance of 71.66 feet; thence South parallel to West 11
of said Northwest quarter of Southwest quarter 46.47 feet to point of beginning.EXCEPT �
portion thereof contained within the West 2 acres of South 5 acres of Southwest quarter c
Northwest quarter of Southwest quarter.
ALSO E
All that portion of Northwest quarter of Southwest quarter of Southwest quarter of Sfttk a
25, Township 27 North, Range 3 East, W,M., Snohomish County, Washington, descr1w as
follows:= a
Beginning at the Northwest corner of Southwest quarter of Southwest quarter ofceld Secti
25; thence East along North line of said Southwest quarter to Southwest quarjjr.�289.:90 fe 3,
more or less, to County Road; thence Southeasterly along said County Road 200At; Aenc a
Southwesterly 300 feet to a point which is 300 feet East and 321.83 feet Sout�i,.fro�r+_ hg11V 2:h-
west corner of Southwest quarter of Southwest quarter of said section; thence -west 50,014 c?
to West line of said subdivision; thence North along said West line of said subdivition N
321.83 feet to the point of beginning.
EXCEPT the North 35 feet of West 262,90 feet thereof.
Situated in Snohomish County, State of Washington. E
as
The lands being conveyed herein contain an area of 10,700 square feet, more or less, the
specific details concerning all of which are to be found within that certain map of defir Q:
locationnow of record and on file in the -office of the Director of Highways at Olympia ar
bearing date of approval January 9, 1969, revised April 23, 1970, and the center line of
which is also shown of record in Volume B of Highway Plats, page 50, records of said cour
Also, the grantors herein convey and warrant to the State of Washington all rights of ing °0s
and egress (including all existing, future or potential easements of access, light, view .21
air, to from and between SR 104, Edmonds Ferry Terminal to 5th Ave.; and the remainder of 5-
said Parcel 1%11; EXCEPT that the state shall construct on its right of way and OFF and ON c
APPROACH, -not to exceed 14 feet in width, for the sole purpose of serving a single family
residence, 6n the Southwesterly side, at or near Highway Engineer's Station 80+00, as she a
on sheet 4 of 7 sheets, of the above -mentioned map of definite location, and of which OFF
and ON APPROACH-*nly, the grantors, their heirs, successors or assigns, reserve a right c
reasonable access, for that purpose only, which APPROACH shall be MW ntained between the x
right of way line and the shoulder line of the state highway by the grantors, their heirs w
successors or assigns. The grantors herein further grant to the State of Washington, or
its agents, the right to enter upon the grantor's remaining lands where necessary to E
construct said approach.
NO SALES TAX
nos rs UlRE.
AN rN
R o0 0 OF W SPON op tyq F r 197
_ Dip t�TON
r(NO aE T Or' lip Syr 91
p T ar ;;dd 'r{}Y��fS
r§ IAL RE
`WLN2455EPacket Pg. 48
1.b
It is understood and agreed that the delivery of this deed is hereby tendered .and that the terms
and obligations hereof shall not become binding upon the State of Washington unless and until accepted
and approved hereon in writing for the State of Washington, Department of Highways; by the Chief
Right of Way Agent.
10th October 1970
Datedthis....................................day of ......... .......................................................
: _
�uc
_ . Accepted and appro ed. `..........-"................
Date.........
f..........:?..%.. .. _ N
STATE _i WAS IATGfiON, _
a
D PARTME OF _ AiGHW'ATSa O
LL
...---� '........,. ...Ch£ef bight o..........
.........
f Way ent.
(Individual ackngwledgment form) :
STATE OF: WASUIN TON _
a SS:
County ,of snohomish E
Q
1, the undersigned; a notary public in and for' -the. State of :Washington, 'hereby certify that on this .2
loth day of .. .........etrsber. 197©.......J ..personally appeared before me o
.Richard_.J. Pland4-4 and_Olive Lew�llel Blandau
to me _known to be the individual ... $ described in; and who executed the foregoing instrument, and
acknowledged . that ..... theX...... igned and sealed the game ds.... fir........ free and voluntary act and deed,
for'the uses ",and purposes therein mentioned.
Given un
der my, .hand..and, official seal the day.- and ye t a.bov written.
otar _Public: in or' -the State of _ , ►z 4ri, c
_ -
Resid£ng at ....... Edmonds
. ........ ........ ......... .
d
- (Corporation acknowledgment form)
STATE` OF` WAS$IN
SS.lid
County ;of........... :......
3
........ ........before -
On, this ..........:..��a :.day of .._ be f or'e me personally appeared
............and .. ... ............. ... .....
to me known to h the.. ........ ........:* *lA .. ...............and: ..:., .. _ .. _.:.
of the'corporatio ecuted the j n instrument, and ackmowledged said instrument to be the
free and volunta d deed of :sa ation,, for the _uses and purposes. therein mentioned- ;and E
_
on oath stated th t.......................................... ......... authorized to execute said instrument and that the seal
affixed is the c seal of said ,ra, on. E
Given unde my, hand and g6iicial seat he day and year last above- written.
0
•.........................
Notary Public in and for -the State of Washington, v
I es£din9 at.:..... ,. �....... a
1t RE M
t X
X
_ Nz L
-� "0 Nso a
00 u u z r
A Z U V4
u S ° tA
aLU
sE0 o t
W C3 ou 6
_. tsar z O
1�
jmW °- 0,1w E V
HL
W W CS
C
Voi Pbjr n Packet Pg. 49
N .6836—OS-1-67.
c Matter" of
Partial Release of Mortgage
SR 104 State Highway No.
Edmonds Ferry Terminal to 5th Avenue
1jM1TEDXti\r 1.b
.3 is',3
Z/ v
(SR No. )
N KNOW ALL MEN BY THESE PRESENTS) That The National Bank of Commerce of Seattle,
a national banking association
the owner and holder of that certain mortgage bearing date of the 80 day of
May ,19 59 .executed by Richard J. Blandau and Olive L. Blandau, also
known as Olive Lewellen Blandau, his wife,
to secure the payment o the sum o ---------------------
� p y f f $24 600.00----------------- Dollars
Wand interest, and recorded in the office of the 'County Auditor of Snohomish County,
State of Washington, on the 1 ith day of May , 19 59 , in Volume 536
of Mortgages, at page 412 , being Auditor's File No. 1336398 , for value received, do hereby
release and discharge from the lien of said mortgage the following described portion of the mortgaged
premises, situate i?? .the County of Snohomish State of Washington, to -wit:
All that porripn-of the following described Parcel "A" lying Northeasterly of the followii
line: "ginning at a point opposite Highway Engineer's Station (hereinafter referred to i
H.E.S.) L � 0,abd a distance of ii0 feet Southwesterly, when measured at right angles
and/or radlalYy`to the L Line Survey of SR 104, Edmonds Ferry Terminal to 5th Avenue;
thence Southeasterly parallel with said center line to a point opposite H.E.S. L 79+00;
thence Southeasterly in a straight line to a point opposite H.E.S. L 80+00 and a distance
of 50 feet Southwesterly -therefrom; thence Southeasterly parallel with said center line
to a point opposite H.E.S. 81+00 and the end of this line description.
.PARCEL I 'A'
That portion of South t quarter of Northwest quarter of Southwest quarter of Section 25,
Township 27 North, Rang "3-East,,W.M, Snohomish County, Washington, described as follows;
Beginning at a point on the South line of said Northwest quarter of Southwest quarter 26:
feet East of the Southwest corner thereof; thence East along South line thereof 54.2 feet
to the Southerly line of State Road No. 1-WL thence Northwesterly along an arc to the rigl
having a radius of �P5.37 feet a distance of 71.66 feet; thence South parallel to West Ili
of said Northwest quarter of Southwest quarter 46,47 feet to point of beginning; EXCEPT ai
portion thereof contained within the West 2 acres of South 5 acres of Southwest quarter o'
Northwest quarter of Southwest quarter.
ALSO
All that portion of Northwest quarter of Southwest quarter of Southwest quarter of Sectioi
25, Township 27 North, Range 3 East, W,M., Snohomish County, Washington, described as
follows:
Beginning at the Northwest corner of Southwest quarter of Southwest quarter of said Sectfi
25; thence East along North line of said Southwest quarter to Southwest quarter 289.90
feet, more or less, to County Road; thence Southeasterly along said County Road 200 feet;
thence Southwesterly 300 feet to a point which is 300 feet East and 321,83 feet South froi
the Northwest corner of Southwest quarter of Southwest quarter of said section; thence
West 300 feet to West line of said subdivision; thence North along said West line of said
subdivision 321.83 feet to the point of beginning.
EXCEPT the North 35 feet of West 262.90 feet thereof.
Situated in Snohomish County, State of Washington.
The lands being released herein contain an area of 10,700 square feet, more or less, the
specific details concerning all of which are to be found within that certain map of
definite location now of record and on file in the office of the Director of Highways at
Olympia and bearing date of approval January 9, 1969, revised April 23, 1970, and the cen•
line of which is also shown of record in Volume B of Highway Plats, page 50, records of
said county.
The undersigned do further release and discharge from the lien of said mortgage all exist
future, or potential easements of access, light, view and air, and all rights of ingress
egress to, from and between said SR 104, Edmonds Ferry Terminal to 5th Ave.; and the rema
der of the real property described in said mortgage; EXCEPT that the state shall construc
on its right of way and OFF and ON APPROACH, not to exceed 14 feet.in width, for -the sole
purpose of serving a single family residence, on the Southwesterly side, at or near Highw,
Engineer's Station 80+00, as shown on sheet 4 of 7 sheets, of the above -mentioned map of
definite location, and to which OFF and ON APPROACH only, the mortgagees, their heirs or
assigns, reserve a right of reasonable access, for that purpose only, which APPROACH shal
be maintained between the right of way line and the shoulder line of the state highway by
J the mortgagees, their heirs or assings. The mortgagees herein further grant to the State
,_of Washington, or its agents, the right to enter upon the mortgagees remaining lends.wher
ni%_to construct said approach.
AN ICIAL R�ttD
R �flo OFNWASylr of rHB
pFt eo qr T NGTpN
�RrMENT Oc H(GH
IS �,,,��� 9b RW�Y$
CE� 0 QR Zxcleff 7
r Vk PW ud Packet Pg. 50
1.b
ANN(
9
TI
This discharge and release shall not be construed as in any manner discharging, releasing or im-
pairing the Hens of' sttid',mortgage , upon any' property covered by the same, other than the property spe-
cifically' here-inJabolbe Aescribeti: ✓ ,
✓ D4te'd this ,. J$th J day of 4et&er,, `1970✓ � ! _ r
J L� '
r
l if�cate on file WiEI} ✓, ......... .... -- ----. ...... ....... r.....: ..
J
✓ t6e 7 reasary IDepartta�enf' - ✓ r
- vJ)ixlstz� on Loans and _
a
e>frl�eJt'-Y, ow
cers c1.E� � I 1 'k ......&H _ { J
'day of 71ave 4cpess .K US J j ' tJ L L. , J I I J
' Lcocp�ae,seal. - -
_J... I L' I .. L
�J r7 LL LJ - �- !_ ,.i =L I � . I )c -- J L i .
Ir.................................................................................................................................................
STATE W, WAAS.M79GTOI)T, r i ; .. ] : 'JJ - ' ✓ L J ,
C��tiityi (Yf i .........._ . ................. L L
„.�I! I �- I . ; L3��� .
J JI the_ andO�/r ig ed a. notar u lic`in a' r L
✓ -- r p f �' the State ofaWashzn9 _, hereby ,ge_tify,that`on this,
....................................day o......................................-•---................................._........._...................-••---•--......................._.....personally appeared before me
uJ
J......� r ........1 .J.........................................................................................................................
..i . i I Y........ .,. _Mii i�....... ..I J ...... .............................................I..........................
to me knO,Wn to'b' dlvidual de&" d nand whoJexecutgd; they fore oing instr m¢ t, a ge=
knowled ged:thaiagned and se the atrte as -.:.free-and voluntary act -and deed, for
' J ,_
the uses_ and pLur ezy� I rrientio_ne ✓
_�. Given, under, avd-=official the, daffy <�xnd zjeat- last abo,6e toitten. L
_ ......................................�..................... I.... ....... ................__.....:........»........ .,......_...........
L, L a- L _ ✓ Notary_Public in and jar the -Mate of LVdshington;
L L ._ L r L° Residing at .................................................................
J
ST�ITE OF �V��?G� x ✓ _ a _ = _ L
L � I _D _ L SS.- L;_ J L `
County 'of ..., ...Snohomil sh ✓ ` . - -
' - ✓ I
t L r ..•. L ✓ i�fore me personally apye L
On th . L8thl day of .. October' 197 ared_
..,...��To . G, ian on L an _ Ross Hoag
, I
- e ... .Gti cl.. l 1 ... .......L{ .1 _ _.....L j . L.....
to me known to be t'he.....!V ge...Pres dent alid Managor J �;s�l l�tbnt,✓Carha.� -.
..... and ... ,......Y.,.,..
of the (corporation that executed the foregoing instrument, and acknowledged said instrument to be the
free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and
on oath` stated that ,- -LA .. Vie.._-, .._..a r,.:atythorized, to _ecute said nstrurrtent and tha4tAtte seal
a L,&is th6'.&*p©idtL seal of said eorporatiolt. !
_ III ✓ �4�I�rt9�ir BL.. I_ =J1_
i
G�ven� u4*'f W stand and b �ial,seal .the`day and; yea t ;abo_Vel wri
✓ tarthe StoPno-ate of Washington,i:ic '
tQ' z Residing at... ...... Lynnwo od j ..........
z
c N h:
F
J IVI
\ EW0 Fag
w
Cq
?
3tvWe
�
ka
z
,o c
�l
�,{ ' DO
I~ MA G
r
*o
45 hi
OFFICIAL R
1.b
L
-j
A PP 4A
t3L�
SPFCo1F1� _
S�
Q
�A �1U Y
T
BROWN
80 # 0o L t.
A
BLANDAU
80� 00 Rt.
A
SMITH
-
80�4Z it.
A
BARRON
80 1- 90 L-f.
A
C;U(Z\/E 0A,TA.
1? 1. S T AT1 a N
&
R
1 91.00,
`T'
zl- W
L
42.1; 4'
KW- 10100. 113
1Z1136.3o11
KW- I 1 100.44
4 S*44'30"
60.0 4`
27. 14'
`30.97`
K)li-13 f6 6.92
15&54'00"
4 5.00'
24 1.62'
124.$V•
KW- t3 t 1 b.35•
4 1*30'00"
4 5.0 O?
1.0 5'
32.60'
F-- I 5+ 10.0 4
24 0 (3
460.00
102.03
20 1. Q 0
REGION NO. STATE FED. All> PROJECT NO. I SHEET NO,
is WASH. F- 104 t
r
/ f r
Fj
< All,
NI
0
0'
:................................................,.......,..:.,.....................................................i
0,
ou
1 =r ' ` r r.
1.
01
t 3 �� j Q• n' '76
T11 N. V3 Et W.M.
•10
� , •'fir i � !
/001 E N 9F PLAN
30
R R L, t �I Q 1 S �1 i1t T G.~ �' _ rr rf ` `�► �0 ,< 'i�, `yam ` f �-' f T �.4
i d- Ix
-� CUL' CITY'_flESA�= �' / r x r pa,2!l!i
ILL Conveyed fb Ci4y o rcdn,onds O -� 4s mm I>il.l P. 15. i.
by deed i-S-�Q f r r , .•. . 1. . r: +..... 3,.
-In r �. ear \ ��� { ` f i. r ■ 4 •t a �.• '►� r rt! •
M w
TrT4 _ r ifi84� e l
N7a�dEs23xw NET QP �.N L�_._ _�__�_._. ._.._._-_ __. ___�r f000
r r� Vafofed 15`[21�J to, 1
f 1r� !J {
3D_ .. ..,,.................... is ❑r hen
y,y '+os.�6 t ' d _ r� , r 9s-� .cv s.g�a _ 5ee 5R 1pq.Q d
- 4 '' gyp• . fr �� 0' Edmonds. SthAve to 236",SA S.`nl.
4& oFt3+ �r !i ` `� :F Sp o s*� Sheet 2 of 6 Sheets
a O�� F�3-Q ►" } rfr� , . 0 �`�� !d '�, -I' n�° �`? .A. pproved= � 4ri1;
_ ia5-- �.- 4OST�f CT1QN Fi -35 1 Q, :f 'ryi� - ,
' t�1 t. -x 1.94 1
W 1�4 N III Ia SEC. 2 5 �� z+ a o N W f4 sW,�f4 S E C. 2 5 2 `� xo ,rf , ,�3 �% 1
r , t ,o 00 2 EASt1 EN'T f 1 i~ r , 0 1f ■ ■45 ■ 4 5EC.75
4. ¢ Ln
0 �Uj
� : �.► , = = r t U S3 5S tr F ! + L Ole-ofD' t
rj t.
LL
M air:----w__ , .•' $, �_.���it Y, i _ _,
ANO
S' o
CCESS TEdV
7 gp g A approach is an Off and On upprocich '� $ (��• 4 Imo'- a +
r 4 r •�
rn tegal m anevr,, not fo exceed 14 Feet try wldfh, - Q � ° � � ►� tip 1 0° �0 � I O
�� � " �a
for- aoe ur o e o�'serYlrr o rn le o• ` f Q O e� r: �:� f� �� O
es ld�rtce. 1t may be rese r��c� ,� abut l�'�ra q owner �� \ ��x p �N N , '�f 9A� ; . ��f r`Lio
for scc- f►a. f ffj
Me 5tcie of or between design afec� - � ti �� � s �� �� � , H. i-/-T612 �.� � � a s � � l L__
h ighv oy sfa Ions. � Q F� RELI N QL tSIrlNI T q ;" ,�• r _ _rd
1
Cor�vey2d �n c +y of 4. o ; , :TURN , I N, r `��. ; 6 eo
'`. N o�v ,�'S o °' is ��D d SACK FII� a� - . ` =� '� o
�dn-►onds by d22d t-5 8 � � " f` .�;,' __ - t= \. � � " E tr. � r � �� �f• l � 6� N � vs
CONSTRUCTION EASE-MEN`r �' +' r` �` �` E. 6 I # t ' /ram •' ��'� f 1 �_ �x .l
+'� �i F{n� t I41x i ��'l f f �f ;_� �O�r C��3d ;�.• �� ti , �rO15TRUCT10i�:
OWNERSHIPS
F.7q-CND
NAME
TOT•AR
TAKE
LY REM ND RRTIEA►SEUE
17652
: NOT 'USED.
1-76 5 4
G E R A LB B 1 NNNE WENNN
SEE W
E`T N 13. 3
�
-
1.7 51
ROY A Cot PER
SEE Sri
E-T NO.3
1.76 38
ROBERT ,1EMNETTE,1OHNSON
SE 1 SH
ET NO-3
V7639
LILLIS ST RiNG
35,640S-F.
3,5605F
32 080S.F.
1-1660
MAIELINAJ.SHILOMYER
35,6405.rr.
254305Y
1?,2t0,5.F
5;Q4-aS.F,
I-7b�:1
SEN3AMIN �ZELKDV TK
1 256 10S1
Z8,6105-f
1.76 62
1i11� ANQ K A .
69 4G S.F,
680E
6 5,72OS.f
i1663
VHIl,1A HEtft� 5MW
92,9005�r�-
64,530. S.f.
28,37a.5.f
I-7664
1'lF.LXAtDOROTHi � OHMAN
31,670, S.r
17i aaa .F
1%790 . .
t-7665
NELl1E�0R0�Ft��(.t.4HMAN
37,540
,I QS.f
42'600&f.
343703.F
58,62gS.E
31250sf
3.5705.E
1-1666
VERBAL A,1iktL
101.420%,r.
1-7667
JEWE� Z5}l.-GOMI '
Q,000S.F
Q.O S.
-
-766$
'" C A ,� N l]
ayb92 S.'r
32,200 SE
d,812
1-T6 b 9
W.S - M. . WEIMAN4
19Q.95QS� .
16 20MF
1i2150 SF
1 t44S .
1-767 0
W000Y11� ARK CORD,
97 350Sf.
34,200 SY
63150 &F
1-767 1
CL YT0 O TRY HOUCK
I2,a50 .f.
12,25OSf
1-70 Z,
1\J7 M- "Off _ .
34,300 Sf
21,0Ob5F.
13,300&T,
i-7673
A.f. 14 15E fPE0EA4I:1 ON
8.500S.f.
8,500S,F
1.7674
L.E. HUBWO
5,25OS.f.
5,25011
--
I-767 3
J-E. M. t� MAL f1>J01 KI
93, i SOS f.
10.6105.F
^
83,t4) A. .
1-767 6
HOVIAP0 W ANUERSON
16.000S.f.
16,000S.f.
1-167 7
JESS1E EMW NEVt1.,1_.
65,500S.F
Z5,1005.f
3980b5.F.
85flo5.1
t-'T67 8
00N QWARDS
9 t,135$S.F
3005.F.
91558 51r
1- 761 9
R 1..4 4 ANNEF0EGE13ALEN
88,3563.E
86051-
87,49G :W
t-7680
GGRDf1J WALIERS
40.250S.1^
96SOS.rlr
3�6Q4Srr
4303,f
I-7681
DOROTHY, J: AR.RO , ':'.
10,300ST
9,b70Sf
1-768 2
RICHAR9J1 8LANBAU
113,Z505.F
10,7005..
raT5-5
1.7683
OGNAL9 BROWN
I&Z105.F.
4,605S.T
lit- fo0 f.
1-768 4
WE E. BARRON
11,7205.1'
34201E
1,840SF
8,300S.F
26.3 60S f
W
1-16 8 5
LE ROY B. SU1T4
TO-100 S. f.
►-3 6$ 6
MERV#N W#BE
25,1905.f.
5 605 .
24,630S.F.
1-7687
4TF0R0 5T8EBARNES2i
3 505.E
26,20O F.
& 5SOSF
t-7651
00UGAL _ � ,�`_f : �': f.
SEE S
EE`
. 3
-7689
GtORG1+ IO CULVE R
871 Sf.
0 S..
b 42f 5.
t - 7'655
HARRY I.0� 59 FRr5DRICKso
14 520 aF,
11, b50 $, ,
2 870 S,F
�gsy ' __ :I `° _ ;• .� f x - _- O� v � 1�`� E ASENlENT
60.t ¢ _ . i..... �r... ` per} I�. �a3 �0 ,
E ' -- �-- - -,-. --- ; --;--- 7 -- -r-: �.. _ _ �. _ �, F _ _r _ .. i�l .�"i C �T Y L. _ �1F�1 l �T *.�' Lo .o
�S r I ' �; " rti .., t o ' QQ. • 0 ' �QNF]E�CR45S11•i r'_ -ads. --- �" ,��1� .f _i.r: _ �_�,_ .. f �q. �f{I�II131-3t9 -PAT" p CC i
1.�G4+4 34.94 fo or. w.� _ t r r > Z - ... ►.:: .. .... �• .�.�.r........ � .. �.,.
� =� '�?o�:' � � x ,R W_ ';^ � 4 5BY1 �r .. .; �� =� �- L--76+0 T. t4Pk
SE.14i3 , ,q6L'•�?= A:=o'$ ¢�• '�5'.. :7 .i {ti4`' `F -11+2531 - c•� r+?
N.E.
IV.Eh- 5 .26�} z -QUA AC�^�. IN WOODSAY C IT1� C,1 M1�`�.�'
� `'}' HQ. c.�' s,�� I•iQ` N4. �;AAR-6-5+3D.b P.{: ��. ' m Q, � ,��� � _ 2 $3_E �3 •1>'t1N I1 * 1�.0 P 1I --� yt _ IQ T - . 0 -A A. F-C� 26
0 3 -- -� a •� { �' FOR RLLr N VI NIE•NT ' T C 1TY
6 x �� •0- -K -x 4- ,� o ,�4' , O l �•Y• ° C'or1V2 ad to�� town
lk* l(
0-. ' Q ;?1.a 2� ` ,c T ' 7 6 7
• t] Fes, _ (11►w -� 1v�t-ta;}aC1� I.
i
s �ti [iArC � � �! r F � :S -7� � �i►' •s +' O � .. i
�,uL_�� sA� s [ 5 53 0
>' 11 t kl�'?4�Oz kw9+ I"76'79
76100
I 1r _ . �� :•:� xx �' 4' _: '- 4q LimitQd Attest feo+ures tentafiveiy approved January 9, I969
o
}. f �g �; ' �_��, N •� '% .''r f �� KW-9}44•Q T by authority of Wn�ashington Stole Highway Commission
Y man 4Y- A Q 1if ' , PooY u4•,,- o� _ _ -' , 3..y,� _ lot Lt
x x x >< Q �-,� _.,�' L-T3+97.95 6Z:0,47 F.O.C. �, EXHBIT A
9a �`"' QD ;-�� � '-r6 s3 21 ....... E� W' 9 +Q D. U F? D:T. 52d t •"- - Limited access Established by Commisslon Findings and Order
� 4p p.� ° �. F issued May 11 1969.
, .. to _ >u � � R E t►I�� NT 1A S E f 4' 5 E C . 2
/ ' a 4-7h It
' �►_ ' I , �"' ` �, , c4ri el4d +Q Cit4 _ 8 a.-- � 145 . SR
m a5b�a ,; --, ',' . - 04 MP 24AS TO MP 23.81
qj
4 FERRY TERMINAL TO
NTH AVENUE
Ija. , , , ;� :< r �, :� :. { ; ; - _•}� 1 `
' • ` l� ° `f IN F�� - ''' �� % 41 e ` SN H C40UNN
� R ...... OHOMIS
f fS� r';��J� �` �f rrr �� t F
' �'� D" _~ "' d µo. t ! N4-F�. A 1� L BEAR �N G 5 At�i 1ST AN CF-S 1 1a�1T off' w,4Y� Ll tr,EQ..ACGES :
' �::} `ti paRTiAE.L.Y; Cn4TR.0L1,,ED
F-Dmoivt]q- c STY L.i MiT•:s -
C U QVEje ON, TN.
A 2 6 5 + 50. F65
510 519' 56'►
Ia 11. 04'
4 89. 45'
911, 65,
AL fog +4 5.94
730 59' 35"
500. 00'
3_'76. 73'
645,. 71 `
A L 74 ♦ 58. 15
51' 52' A4"
Sao.OU
2 1 f
451. 75'
7 6 + 07, 14
63° 59' 40"
<)55. 94'
1. 51'
1066. 59,
'30 FFonto 'a
ocd Cup V4 Onto
_ _
Above
P R E C L D E LJ 0 T PAN AST E R I S A A R M sTA. b0:0 0 TO STA, 81+ 53.3 4
TAKEN FROM T1 T L E: 'R E P O R T S AN[)/OR }, wAsr4waror� STArg HIGHWAY Co"SSION
P L-A-T MAPS. DEPARTMENT OF 141GHd1►AX�
# * OLYMPIA• wASHIH(3rpN
Pedestt-pan tral c. 'rn�verne►nt will be Per- mi tted OWANA+
a,#, �u4urow R.wna KNOW"
w i t1n i n the E- ` Avenue I nter6lang8, along the X. WAU• 00" N. RW.
p %kdewaCYs as pmvided.
January 9,1964
(D SOUTH PARK A❑D1TIONl F WOO❑WAY PARKAV41GHLANDS PARK
aao
Leiter 3-24-77
Ca/ 3.25*47 Rev.1.24.78 111oted praperfy conveyed to Cify cf,5dmonds by deed I-5-78
RL.S
{
o,k. Ll* -3- �O
t tt -
tHn i2e Z
3' • 71
-23^70
Per pRrcB S�3 4d d r 1-Ira �� - . rp�! tll rtt_1 !• 6$g thrr1 r 7d
¢�� r 4 tr�an MoVQ Sri• R is t o-YQ4 no 4'or ply ohs$.
L
O i sf. Lt r.1 5� 23- 69
Corn sn. F f 0 S-1 -69
6- [ 2- 69
Own tfshtys.rcK arciiz t7707 L-7663 i I46B E-7�74 .. I IR stx is R! �rosn 5#a RR 62.2 +a •- -fa.L72+t
TG
REFERENCE
AUTHORITY
IJATE
SUDSY CN-r APPROVAL-
SY
SWAT 4 OF -4- SHE#TS
,t]esignoted for Limited Access Control by
Commission Resolutioi-+ No.1977, June 17 1968.
'ir,nnfoimgntn1 R['_(]tiISiTion
Drawer V088 Sequence 01
frL� Exhibit 1s&
PLN2022-004 Packet Pg. 52
9 AJ
A
•{I'Ar,E
_
ACCEPTANCE of sERYICE - CL£Rr.'s $TAN
a
r. _—_
__.-________..________________________________-__-_____-___-____--f___--___-_-______'____-__-_-_.._-____ _-_-______��
- IN THE SUPERIOR COURT OF THE SPATE OF WASHINGTON
I
IN AND FOR SNOHOMISH COUNTY
E
o
2
THE STATE OF WASHINGTON,
as
3 -
Petitioner, ) NO. 107429
_
4
STIPULATED
a
5
JUDGMENT AND DECREE
LE-ROY B.-SMITH a d MABLE A. } OF APPROPRIATION
s
SMITH, his wife; et al., )_
r
a
- Respondents. )
_
•$.-.
This matter coming on before the above entitled court, the State iL
E
9_I
Washington, -appearing by Slade Gorton, Attorney General, and Wm. Thoma:
a
a-
30-
McPhee , Assistant Attorney General, and the respondents
3
I1
Le Roy B.--Smith-and Mable A. Smith, his wife, appearing by Michael R.
12
Donovan, their attorney; Western Life Insurance Comapny, a Minnesota
c?
N
x:.
corporation, appearing by A. L. Dentamaro, Assistant Treasurer,;
1¢
_ _ _ -
M
E
16
I7
-
c
18
M
+
Q
a
19
and the undersigned P o arties having agreed that Three Thousand Nine
T°
a
20
Hundred Ninety and no/100_______________________________________ Dollar;
—
2-L •($3,990.00
) is just compensation for the taking and/or damaging of tl
X
w
22-
property and/or property rights as described in Exhibit "A", being Item
a
23
No. (3-ng le) now therefore,
•:• WM. THOMAS McPHEE
Slade uorton By .............. __ .__.._.._...._ .
a
Assistant Attorney General
3tip .
Attorney General
Temple of Justice 5800 CapL. 21 �i� M
Judgment "' _ ppLN2p"�.. "pQ4 Packet Pg. 53
Olympia, ti9n. 98501 �'111714a:ater'..........,
s.b.t`o.992S—os Wa.....l. .-
Single item �: — o8gn7 Telephone
1.b
IT IS ORDERED ADJUDGED AND•DECREED That petitioner shall pay �
a
the sum of Three Thousand Nine Hundred Ninety and no/100 Dollars
E
($3,990.00), all costs included therein, as just compensation and upon c
a�
.such payment shall become the owner of the property and/or property o
rights as described in Exhibit "A" attached to and made a part of this
judgment.
a�
IT IS FURTHER ORDERED That the property described in Exhibit "A" 0
is subject to a tax lien of Snohomish County in the amount of Three a
Hundred Twenty Six and 12/100 Dollars ($326.12) and that the amount of
E
said lien shall be withheld by petitioner from the above referred to: z
L
a
just compensation and shall be paid to the County Treasurer pursuant to
a
chapter 84.60 RCW.
_ 3
IT IS FURTHER ORDERED, ADJUDGED AND DECREED That respondent shal
L
be limited to one type A road approach to SR 104 for ingress and egress � ML
that use of such approach may be shared by occupants of one additional
�a
residence in the rear of respondents' property. E
IT IS FURTHER ORDERED, ADJUDGED AND DECREED That upon payment of
E
the sum of Three Thousand Six Hundred Sixty Three and 88/100 Dollars
($3,663.88), all costs included therein, into the registry of the c
court, the clerk is hereby•ordered to satisfy said judgment and to hold
• a
a
such sum of money for distribution subject to the further order of this
L
a
court.
s
X
w
c
m
E
c�
27
Stip, Judgment
S. F. No. 9928-A Single Item
Exhibit 1 - Green
-2- PLN2022-004 Packet Pg. 54
c
M
DONE IN OPEN COURT this day of 115 _
-= - -- a
1971.
E
CL
0
0
- J U E
Presented by:
SLADE GORTON-
/Peeo
d as to form and Notice of
Attorney General ation waived: _
a
WM. THOMAS Me—EE L _
R. DON VAN E
Assistant AttorneyGeneral y for Respondents Smith L
Attorneys for Petitioner a
77
L
a
A. L. DENTAMARO, Assistant Treasurer =
for Respondent Western Life Ins. Co. a
E
i
2
Q
a
r
s
x
w
c
• n E
V
I
Sti Exhibit 1 Green
P . Judgment PLN2022-00411'
Packet Pg. 55
i.9928-A Single. Item -3-
SINGLE
PARCEL NO. 1-7685
0
INTERESTED PARTIES: LeROY B. SMITH and MABLE A. SMITH, his wife; WESTERN LIFE
INSURANCE COMPANY, a Minnesota Corporation. a
_
DESCRIPTION E
a
2
All that portion of the following described Parcel "A"/lying northeasterly of a line >
drawn parallel with and 50 feet southv;esterly,.when measured at right angles and/or o
radially from the L Line Survey of SR 104, Edmonds Ferny Terminal to 5th Avenue.
_
PARCEL "All �
`That orlon of � �
p the northwest quarter of the southwest quarter of the southwest ouarEe; �
of Section 215, Township 27 North, Range 3 East, W.M., described as follows: _-
Beginning at the northwest corner of the said northwest quarter of southvtest quarter a
of southtivest quarter; thence South 1002' Hest 3-21.83 .feet; thence South 88031' East
300 feet to ,the true point of beginning; thence South 88031' East 161.22 feet; thence =
North 30025'32" East 210.68 feet to the southwesterly margin of State Road No. 1-,,,I �
thence along said right of vay line North 62°57' West 68.78 feet;,ithence along an arc
to the right of 985.37 feet radius curve, a distance of 21.55 feet; thence South
41028'23" West 291. 51 feet to true point of b.-ginning. Situated in Snohomish County, a
Washirgtcn. ;A fed� 1 3 L� ��..-- O o d l> - Y
_
The lands being condemned herein contain an area of 1,840 square feet, more or less,
the specific details concerning all of which are to be found within that certaim map c?
of definite location now of record and on file in the Office of the Director of Highway
at Olympia, Washington, and bearing date of approval January 19, 1969, revised June 12,•1
1969; and the center line of which is also shown of record in Volume B of Highway Plats
page 50, records of said County. E
ALSO, all rights of ingress and egress (including a71 existing, future or potential
easements of access, light, view and air) to, from and between SR 104, Edmonds Ferry E
Terminal to 5th Avenue, and the remainder of said Parcel "A"; EXCEPT reasonable access r-
to a Type "A" Road Approach opposite Station 80+45 on said L Line.-
_
.2
SR 104, Edmonds Ferry Terminal to 5th Ave. (3-18-71) aAa
e
�L
3,2 .',,
-Z
T'C-2s *it1-Green
AI`0t`: GE PLN2022-04 Packet Pg. 56
1.b
ST 1 PULA?EO
JUDGNM Air DECKE
8P
AP'MPRIATION
STATE OF WASNIMM
7s
SRITH ,
(Single)
IN
SN Wf COUNTY
- SR 10ferry T*Mlfwl 1 Sh Awl►.
RLTUIITO-
D/W
Exhibit 1 - Green
PLN2022-004 Packet Pg. 57
1.b
SOUTH COUNTY FIRE
12425 Meridian Ave S., Everett WA 98208
tel (425) 551-1200 • fax (425) 551-1249
www.southsnofire.org
City of Edmonds
Department of Fire Prevention
Fire Comments:
DATE: 11 /02/2021
PERMIT #: PRE2021-0008
PERMIT DESCRIPTION: 16 lot Plat
JOB NAME/ADDRESS: 540 Edmonds Way
CONTACTS:
FIRE PLAN REVIEW NOTES:
1. All homes over 3,000 square feet of fire area will require fire sprinklers. A
13D flow through system is recommended.
2. Show hydrant on Edmonds Way. Depending fire sprinklers, will need one
additional halfway down driveway (visible from Edmonds Way) or at
entrance of complex. Where drive isle's split would be acceptable. If all units
are not sprinklered, one more additional hydrant will be needed at
hammerhead turnaround.
3. Fire lanes (drive isles) will require signage "NO PARKING FIRE LANE"
Signs are preferred over stripping. Appears only one side on main drive and
both sides of narrower drive isles will require signage. This is determined by
drive isle width.
4. Fire access road slope shall not exceed 12% unless approved by fire official
5. Drive isle will need to meet City of Edmonds driveway standards
6. All vaults in drive isles will need to exceed HS20 engineering standards
7. All turning radii will be minimum 25 inside 45 outside.
Thank you,
AFM Karl Fitterer CFI
Assistant Fire Marshal
12425 Meridian Ave. S, Everett WA 98208
0: 425-771-0213 VM: 425-551-1980
KFitterer@southsnofire.org I www.southsnofire.org
SERVING SOUTH SNOHOMISH COUNTY • BRIER • EDMONDS • LYNNWOOD • MOUNTLAKE TERRACE
Page 1 of 1
Exhibit 1 - Green
PLN2022-004 Packet Pg. 58
1.b
e EDj,
CITY OF EDMONDS
121 5th Avenue North • Edmonds, WA 98020
Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.edmondswa.gov
hoc g90 DEVELOPMENT SERVICES DEPARTMENT: PLANNING DIVISION
Pre -Application Meeting
Date:
November 4, 2021
Review By:
Mike Clugston, AICP, Senior Planner
Project Name:
Greenwalk Park
Site Address:
540 & 550 Edmonds Way
Zone:
Single -Family Master Plan (RS-MP zone)
Contact:
Steve Barnes (Cornerstone Architectural Group)
sbarnes@cornerstonearch.com
Description:
16 lot plat and Planned Residential Development (File # PRE2021-0008)
Materials provided:
Site plan, house facades, code analysis
This pre -application meeting does not vest any standards.
Bulk Standards (Chapter 16.20, Edmonds Community Development Code)
Minimum
Minimum
Minimum
Maximum
Maximum
Minimum Lot
Minimum
Zone
Density 1
Area (net)
Lot Width
Street
Side
Rear
Structural Lot
Setback
Setback
Setback
Coverage
RS-MP 5
3.7
12,000
80 feet
25 feet
10 feet
25 feet
35%
RS-8
5.5
8,000
70 feet
25 feet
7.5 feet
15 feet
35%
Density means "dwelling units per acre" determined by dividing the total lot area by the density allowed by
the underlying zoning; the number of lots or units permitted shall be rounded down to the nearest whole
number.
5 "MP" signifies "master plan." The standards in this section show the standards applicable to development
without an approved master plan. Properties in this zone may be developed at a higher urban density lot
pattern equivalent to RS-8 but this shall only be permitted in accordance with a duly adopted master plan
adopted under the provisions of ECDC 16.20.045.
According to ECDC 16.20.045, development in the RS-MP zone can be done at RS-12 standards
without a master plan. However, development to RS-8 standards is possible if a master plan (a
planned residential development) can demonstrate the following in ECDC 16.20.045.B:
1. That access and lot configurations shall not result in additional curb cuts or
unmitigated traffic impacts on SR-104; at a minimum, a traffic study prepared by
a traffic engineer approved by the city shall clearly demonstrate this
requirement.
1
Exhibit 1 - Green
PLN2022-004 Packet Pg. 59
1.b
2. That the configuration and arrangement of lots within the master plan area
provide for setbacks on the perimeter of the proposed development that are
compatible with the zoning standards applied to adjoining developed properties.
For example, a master plan adjoining developed lots in an RS-MP zone that were
developed under RS-12 standards shall have RS-12 setbacks along common
property lines, although the lot sizes, widths, and other bulk standards may
conform to the higher density lot configuration approved through the master
plan.
Density: Based on a project area of 135,272 sq. ft., up to 17 lots would be possible at the RS-8
density of 5.5 units/acre. A 5' strip of land at the south edge of the project site is labeled "5'
transferred to neighbor 1,092 SF". The project site was previously unplatted, so it is unknown
what the 5' strip is as the City has no record of a subdivision or boundary line adjustment in
that location.
Setbacks: Flag lots have frontage of less than one-half the minimum lot width at the street and
use all side setbacks. Corner lots front two streets and have two street and two side setbacks.
Setback Exceptions: Eaves and chimneys may project into a required setback not more than 30
inches (ECDC 16.20.040.B). Uncovered and unenclosed porches, steps, patios, and decks may
project into a required setback not more than one-third of the required setback, or four feet,
whichever is less; provided, that they are no more than 30 inches above ground level at any
point (ECDC 16.20.040.C).
Height: 25 feet maximum, above average original grade, as determined per ECDC 21.40.030.A
and B. Height exceptions are in ECDC 21.40.030.D. There is no +5' for a sloped roof in the RS
zones.
Coverage: 35% of the lot can be covered consistent with ECDC 21.15.110.
Parking: Each unit requires two off-street parking stalls (ECDC 17.50.020), and they may be
tandem (ECDC 18.95.030).
Environmental Regulations
Critical Area Determination: A critical area checklist is needed for 550 Edmonds Way. That
checklist can apply to both parcels in this project site. A'waiver' from further critical area study
was previously given for 540 Edmonds Way in 2006 but that will be re-evaluated with this new
project.
SEPA Review: A threshold determination will be required (ECDC 20.15A).
Tree Code: The proposed project must meet the tree requirements of ECDC 23.10. A report by
a certified arborist and tree retention and protection plan are required at application. Tree
analysis can occur in a phased manner during each subsequent review step in the project per
23.10.060.B.3. At least 30% of the significant trees on the developable site need to be retained
and protected during development; trees must be replaced and in -lieu fees paid per 23.10.080.
The City's Urban Forest Planner will evaluate compliance.
2
Exhibit 1 - Green
PLN2022-004 Packet Pg. 60
1.b
Planned Residential Development (ECDC 20.35)
At application, include a cover letter describing how the proposal meets the Purposes of the
PRD code in ECDC 20.35.010 and the following requirements:
Alternative standards: Per ECDC 20.35.030, building setbacks, lot size and width, lot coverage,
and street and utility standards can be altered through the PRD process.
Criteria for establishing alternative standards: The criteria in ECDC 20.35.040 must be met.
Decision criteria for PRDs: The criteria in ECDC 20.35.050 must be met for a PRD to be
approved.
A. Design criteria. The project must meet the single-family design criteria in ECDC
20.35.060 and at least two of the other criteria in ECDC 20.35.050.A. In the project
narrative, address compliance with all of the PRD single family design criteria including
20.35.060.A.4 and 060.13.1— 7. Shared driveways should be used, garages de-
emphasized, with sidewalks on both sides of the road.
B. Public facilities. City of Edmonds Engineering and Public Works, South County Fire, PUD,
Olympic View Water and Sewer District, and Washington State DOT will determine
adequacy.
C. Perimeter design. Per ECDC 20.35.050.C, the design of the perimeter buffer must
either:
1. Comply with the bulk zoning criteria applicable to zone by providing the
some front, side and rear yard setbacks for all lots adjacent to the
perimeter of the development, and/or
2. In addition to the setback required by the underlying zone (see ECDC
20.35.040(B)), provide a landscape buffer, open space or passive use
recreational area (hereafter "buffer"). The depth of the buffer shall be at
least equal to the depth of the rear yard setback applicable to the zone;
provided, that where the exterior lot line abuts a public way, the buffer
shall be at least equal to the depth of the front yard setback required by
the zone. The depth of the buffer shall be measured perpendicular to the
boundary of the exterior property line setback. If such a buffer is provided,
interior setbacks may be flexible and determined in accord with ECDC
20.35.030.
As shown, the wide exterior site buffer envisioned in Sub 2 was not attempted. As a
result, each of the lots adjacent to the perimeter of the development must provide the
same front, side and rear setbacks as required in Sub 1. Setbacks on interior lots would
be flexible.
In this case, because the properties adjacent to the project site are zoned RS-MP and
are developed using standard RS-12 setbacks, RS-12 setbacks must be used on each of
the lots on the perimeter of the proposed development in accordance with ECDC
16.20.045.B.2:
3
Exhibit 1 - Green
PLN2022-004 Packet Pg. 61
1.b
That the configuration and arrangement of lots within the master plan area
provide for setbacks on the perimeter of the proposed development that are
compatible with the zoning standards applied to adjoining developed
properties. For example, a master plan adjoining developed lots in an RS-MP
zone that were developed under RS-12 standards shall have RS-12 setbacks
along common property lines, although the lot sizes, widths, and other bulk
standards may conform to the higher density lot configuration approved
through the master plan.
Most of the exterior lots are shown to meet this requirement, except for Lots 1 and 2.
Lot 1 would have a 25' street setback from the north (WSDOT right-of-way), east and
south property lines. Lot 2 would have a 25' street setback from the northeast property
line (WSDOT right-of-way). The other lots on the exterior of the project appear to apply
appropriate RS-12 setbacks for corner, flag, and standard lots.
D. Open space. Usable open space and recreation facilities must be provided in an area
that is separate from critical areas. At least 10% of the gross project area must meet the
standards for open space (13,527 sq. ft. required, 12,215 sq. ft. shown). Examples of
usable open space include playgrounds, tot lots, garden space, passive recreational sites
such as viewing platforms, patios or outdoor cooking and dining areas. Required
landscape buffers and critical areas, except for trails which comply with the critical area
ordinance (ECDC 23.40.220.C.7), are not counted toward the usable open space
requirement.
Single-family design criteria: The building and site design criteria in ECDC 20.35.060 must be
met. Shared driveways should be used and garages should be de-emphasized. Single bay
garages would reduce hard surface and garage appearance.
Land Use Permits and Process
After the pre -application meeting, the applicant must hold a neighborhood pre -application
meeting consistent with ECDC 20.35.080.A.2:
The applicant shall host a public pre -application neighborhood meeting to discuss
and receive public comment on the conceptual proposal. The applicant shall
provide notice of this meeting to all property owners within 300 feet of the
subject site by depositing written notice in the U.S. Mail postage paid at least 14
calendar days in advance of the meeting to all persons and entities shown as
having an ownership interest in the land records of Snohomish County. An
affidavit of mailing shall be provided to the city by the applicant attaching its
mailing list.
While this meeting will allow immediate public response to the proposal in its
conceptual form, comments submitted during this meeting are not binding to the
applicant or staff. However, staff may make general recommendations to the
applicant as part of the formal application based on the input from this meeting
to the extent that said comments are consistent with the adopted provisions of
4
Exhibit 1 - Green
PLN2022-004 Packet Pg. 62
1.b
the Edmonds Community Development Code and the comprehensive plan. As a
courtesy, the applicant shall provide summary minutes of the meeting to all of
those in attendance within two weeks of the date of the meeting.
Preliminary PRD and plat applications are Type III -A permits and are typically processed
together. The Architectural Design Board would review the PRD at a public meeting and make a
recommendation to the Hearing Examiner on the project's design. The Hearing Examiner
reviews the preliminary plat and the ADB's recommendation on the preliminary PRD and issues
a decision on both permits following a public hearing.
It typically takes about six months to get to a decision on preliminary plat/PRD, but it can take
longer depending on the responsiveness of the application. The same applies for civil plan
review. Final plat/PRD review can be a little shorter.
Land Use Permit Review Fees
Critical area checklist = $110
PRD preliminary review = $6,510.00 (see ECDC 20.35.070 for application requirements)
Tech fee = $40
SEPA threshold determination = $740
Preliminary plat review = $6,510.00 (see Handout P73a for application materials)
Hearing Examiner's time = $1,000 deposit (could be more or less based on his review time)
Modification request = $970 per requested change
Civil plan review = $4,670.00
Final plat review = $1,590.00
Recording = $400 (approx.)
All Applications Processed through MyBuildingPermit.com
Applicant Questions:
1. Confirm lot sizes and setbacks shown are acceptable. Lot sizes would work if the PRD
were approved. Setbacks for Lots 1 and 2 do not work — they are on the exterior of the
site and must meet RS-12 standards (Street setback means the minimum distance
required for a building or structure to be set back from the street lot line. Street lot line
means the line or lines along the edge of a street or access right-of-way or easement.)
Lot 1 has a 25' setback on the south and north property lines as well as the east. Lot 2
has a 25' street setback from the northeast line.
5
Exhibit 1 - Green
PLN2022-004 Packet Pg. 63
1.b
No setback from the exterior lot lines of the PRD may be reduced from that required by
the underlying zoning unless a variance or subdivision modification is approved.
Subdivision modifications are addressed in ECDC 20.75.075 and must meet the findings
for a variance in ECDC 20.85. Since the project could otherwise be redesigned to meet
standards, it's unlikely a modification could be approved but that would be a decision
also made by the Hearing Examiner.
Decks can encroach setbacks 1/3 of the required distance or 4', whichever is less, only if
they are less than 30" tall — those on Lots 3 & 4 would not meet the exemption.
2. Confirm suggested entry drive is correct width, that sidewalk on one side is acceptable,
etc. Sidewalks need to be used on both sides of the road to connect to the existing
sidewalks going each direction on SR-104.
3. Confirm the area of required open space is acceptable. It's not —10% of the site area is
required (13,527 sf) and about 9% is shown (12,215 sf).
5. The tree materials identified in ECDC 23.10.060.13 must be submitted with an
application. Note on the plans or in the cover letter whether phased tree review will be
used. Have the arborist address the retention, protection, and replacement elements.
6
Exhibit 1 - Green
PLN2022-004 Packet Pg. 64
1.b
a
Exhibit 1 - Green
PLN2022-004 Packet Pg. 65
1.b
Q
a>
v�
Q
0
w
0
Lo
0
w
Q
z
z
Q
n,
0
N
L=qL \ ' ss HIM=266.00
IE(NW)=250.46' 48"
IE(SE)250.80 48
IE(S)-262.08' 8"CONC
11 \ \\\ _---------
_ N 8 8 °I3 a' o
1 ` 0t 97 83'-o
° 1\I \\\ \\\ o 72.0 �fd' 72.0' - - 9.2 '� '� �2� \ Ss
-\ - � `
1 \ -_-------- O / \
o OT 4 i - =- o i o
i i `
/ LOT 3 \
\ ,
\\ ► S.F. ' -08' 013 y N N / - v�--
o \
HOUSE 1 � r co I - - - - � I^ pi o
IEN � I , ��� f � �� � o
10-0 1 I / DEC
,
\
GARAGE 1'i
N\ l I I I 1 2 ,�4n I / II I _ �'� � v ' So �� v
�, I _--�--- I %
o
1\ \\ I \ / I I � I I ` \ � � j � \ / p I I ° � bV
1 o I I L O 15 \ \ HOUSES l I I - \ / 9 , \ / I \ - \
L I HousE 5 I , I o \ _ 8k ° j(� , I -----
_ �.�
\I i o i ,- 1 S\F. 11\ \\\ I i i 10 -0 I HOUSE 7 I \\\ o \
RAGE I I^ I
1 �! GARAGE I c � I I I - -•L _ I _
o II 9 .83' -I 1 1 1\ I�1 I I GARAGE
1 � I \ \
,
--- I - 1 » 1 \ 1 \ I I I I I o UAHAGyF L� K I \\ j
2-0 \ \
7, 3 I EAII E v �� - -i - - - ° \ - I - - - - I T ENTRY - - - HOUSE 3
r I - I I I \ N Y \ - _ - - - �__ / I \ 1
-� 1 \ o l 0 1 1 NT Y I I i
_ -- - 1 LOT 2
GARAGE I I \ p ^ ` \ i \1 I I I I ENT i / S� / / i so
r DECK , / I i N \\ \\\ I 6, 2 6 6 S.F. 1 I 10 t 0 L / ,'' / / i 0 3 �l
,mot I I Iw , ° ° o p N 6 6 0 -� >>
72.0 \ 172.0' / p C3o 1 / \ 1 0
�i LJ 70.0 w 34.75'/ 1 ° 'o o ° sr
iF10USE 6 EI�TR 11(n �I 11 / 1� `��\\ / / / 52. 2� g / / s,
vl:c
LLJROW 2c) 71>1
/ - - I \� '1` �\ 10, 433 S. F. / ,�' �'''' '---------J' / i�
o b
o \0 0 _-
R
° / 0 97.83/ _\ OMMON SP - -- -- -� -� ---- _ / �� ,-o - , / HOUSES \�
04
� NI I J9,696 S. Q ENTR (N �- -' � D\ -
�•U \j EC
/
`w
l E ° P AY AREA
HO(JSE 1 ' --- - ----- ---------1,200 SF
l l ENT ° \ / I \ I I / \ /
LOT 16
�\ POND
� � ;� I o ,' � I I � / � T 15
I \ /
o ,-''���', p ��� �,,,'f I I I \ I I I o I / F '�' �/� 22 F. \ \ °QS �� \ 7, 855 �. F.
°LF)/ O \\ CONC. i i I �' I I N I \ I o, II 1 _ _ - / S�• \ \ �� \ \
i I / AGAR GE 8_-- \\ I HOUSE 2 I �� �L HOUSE 2 I\\ I I GARAGE / /�T - - - - - \ \ \ \ \// / SITE DATA
o / p l < < < ,- I I L O T 12 I I \� , - I BELOW o�v - - �- o /
/ , / / / � e / SITE AREA 540:111,275 SF 2.55 ACRES
/ r -_J ,- I » 1 r� 1 DECK ,� I - 5, 82 \4 S. d• - J / / / / I ENT I \ '\O \ SITE AREA 550: 23,997 SF 0.55 ACRES
Z 27 ?1 o I ,i / I L T 11 I I -6 - I �� I L ,- » , / i r i r / / r r 4j O I \ \ \ ZONING: RS-MP
1_ 1 2 g Q� ��" ° �' '� 5 2 4 S. ' n 6" _ s , r / �. p• ° TAX ACCOUNT # 540: 27032500308300
/ � - - 1 _'/ �' I I I \\\ ''O �� / �� I TAX ACCOUNT # 550: 270325003084001
1 i - 0 1 i'' I/ ° L O/T 1 HOUSE
/ NUMBER OF LOTS 3.1 X 5.5 acre = 17 LOTS
CDI I �\ I L _ I / / GARAGE I RS-8 LOT WIDTH 70 VARIES
97.83 1 „ - _ - ___ - / /
12 -0 � ° '- - - \`� \\ 0 ° 64.0' \ ° - -" o - - o_- -�� / / rl/•Q� - - - _ DECK I / REARSETBACKS: LOT COVERAGEFRONT YARD '' 7.5' SIDE 15'
rEASEMENT. / , / / _____
- - ��0 -� �\ \ 83.75 0 / $4 ° o 41.5 ° ^ SUGGESTED MODIFIED SETBACKS: FRONT YARD
i r �' G ;; LOT 9 b o / i / / / / - / 10 (20 AT GARAGE), 7.5 SIDE, 15 REAR
\\\- 7 231 F. rc- i- - _ J �- - - LO - 1 �� / / J�� T 0 1 22 83 - - BUILDING HT: 25'+ 5' FOR SLOPED ROOF
r - M\� - - - - - - , n n ° I / / I E M 3 10' o LOT SIZE 8,000 SF MODIFIED FOR VARIED
---- ,'' Imo, 10-0 10-0 6 339 S.F.
' ��'� I N I %,of I I , /' SE ER -T�--------- ------ LOT 14 HOUSING TYPES
--to - ARAGF I '' ,-� _ , D6► I / , c�. A.F.N. 2I01 3162I ---- 6,449 S� .
�DECK ,i Lo �/ 50.42' 0_____ E RY HOU ESA L_ - I HOUSE EN / Q' p�� � I I GARAGE i / HOUSE DATA GREENWALK
I / / �0, o DECK o`V/
- - - - - - - - I \Q, co I - I / o�' HOUSE 1: (2) 3,814 SF 5 BEDROOM, 4 BATH, REC ROOM, 3 CAR GARAGE
° ' E TR \� 14� I / / PLAYAREA I 7°�°ry� HOUSE 2: (2) 2,741 SF 4 BEDROOM, 3 BATH, 2 CAR GARAGE
I � ^ > GARAGE'> � �
�W I- - -� I E RY HOUSE 2 I / HOUSE 3: (1) 2,700 SF 4 BEDROOM, 3 BATH, 2 CAR GARAGE
_ � _ ___ 1 O r- / , /
�%' - - - - _ --- - 1 I r ,� I I GAf�AGE / / C 0 M M 0 N SPACE 10'-0" I L. I / / HOUSE 4: (1) 3,118 SF 4 BEDROOM, 2 BATH, 1 BATH, 1 BATH, REC
_ _ , I / / ROOM, 3 CAR GARAGE
o - - -* - �_ - -� /, ° /���'' ° o ° '� - o t o ''� / - - - - - - LOw / 2, 519 S.F. I - I - - I / / HOUSE 4A: (1) 3,093 SF 4 BEDROOM, 2 BATH, 1 BATH, 1 BATH, REC
/ , ,% 1 0 , o / 9 / o SIC-�__------__------� ROOM, 3 CAR GARAGE
/ 97 83. /r , - - - 134.2 - ) 1 ' 72 17i /
64.75 i HOUSE 5: (2) 2,692 SF 4 BEDROOM, 3 BATH, 3 CAR GARAGE
- I 64.75'
_ l_ -� - - - - - - -
HOUSE 5A: (1) 2,692 SF 4 BEDROOM, 3 BATH, 2 CAR GARAGE
' N 8 g ° 3 g 02 � 3 00 . 0 C E E ��J /' �/ i T 230.75 (� - HOUSE 6: (2) 3,788 SF 5 BEDROOM, 4 BATH, REC ROOM, 3 CAR GARAGE
HOUSE 7: (1) 2,394 SF 4 BEDROOM, 2 BATH, 11 BATH, 2 CAR GARAGE
I 5' TRANSFERED TO
NEIGHBOR 1,092 SF HOUSE DATA MOLNAR
NORTH
SITE PLAN.
SCALE: 1 "= 20'-0"
HOUSE 2: (1) 2,741 SF 4 BEDROOM, 3 BATH, 2 CAR GARAGE
HOUSE 3: (1) 2,700 SF 4 BEDROOM, 3 BATH, 2 CAR GARAGE
HOUSE 7: (1) 2,394 SF 4 BEDROOM, 2 BATH, 11 BATH, 2 CAR GARAGE
LOT COVERAGE LOT 6: 2,363 SF/7,339 SF=32% LOT 12: 2,042 SF/5,824 SF=35%
LOT 1: 2,081 SF/6,690 SF=31% LOT 7: 2,231 SF/7,290 SF=31% LOT 13: 1,656 SF/6,967 SF=24%
LOT 2: 1,885 SF/6,266 SF=30% LOT 8: 2,363 SF/7,192 SF=33% LOT 14: 2,042 SF/6,449 SF=32%
LOT 3: 2,141 SF/8,013 SF=27% LOT 9: 1,922 SF/7,231 SF=27% LOT 15: 2,081 SF/7,222 SF=29%
LOT 4: 2,141 SF/8,010 SF=27% LOT 10: 1,680 SF/6,330 SF=27% LOT 16: 1,885 SF/7,855 SF=247.
LOT 5: 2,231 SF/7,216 SF=31% LOT 11: 2,042 SF/5,824 SF=35%
2
O
U
Q�Q
u7
z
O
U
D,
U c
J
J
O
Q
Z.
z
zLo
Z.
� n
v
N p�
N
vJ
0
O L
rl w
zw
W
w
Z N
Lu
Qof
U
co
w
J
co
W
(N
^C/)
© GREENWALK DESIGNS LLC.
REGISTERED
--AR CT
�STEVEN A. BARNES
STATE OF -WASHING T i7:tt'
3 N
00
Q �3
� wo
wno
cS O
W +o
� gw
z
Q
o
0
J
Ln
0-
O
Lu
�
O
(n
z
W
Q
�
z
0
CC
G
�
J
LLI
W
N
~
o
w
w
w
>
U)
o
0�
Exhibit 1 - Green
PLN2022-004 Packet Pg. 66
1.b
Q
a>
v�
Q
0
w
0
Lo
0
w
Q
z
z
Q
n,
0
N
L=qL \ ' ss HIM=266.00
IE(NW)=250.46' 48"
IE(SE)250.80 48
IE(S)-262.08' 8"CONC
11 \ \\\ _---------
_ N 8 8 °I3 a' o
1 ` 0t 97 83'-o
° 1\I \\\ \\\ o 72.0 �fd' 72.0' - - 9.2 '� '� �2� \ Ss
-\ - � `
1 \ -_-------- O / \
o OT 4 i - =- o i o
i i `
/ LOT 3 \
\ ,
\\ ► S.F. ' -08' 013 y N N / - v�--
o \
HOUSE 1 � r co I - - - - � I^ pi o
IEN � I , ��� f � �� � o
10-0 1 I / DEC
,
\
GARAGE 1'i
N\ l I I I 1 2 ,�4n I / II I _ �'� � v ' So �� v
�, I _--�--- I %
o
1\ \\ I \ / I I � I I ` \ � � j � \ / p I I ° � bV
1 o I I L O 15 \ \ HOUSES l I I - \ / 9 , \ / I \ - \
L I HousE 5 I , I o \ _ 8k ° j(� , I -----
_ �.�
\I i o i ,- 1 S\F. 11\ \\\ I i i 10 -0 I HOUSE 7 I \\\ o \
RAGE I I^ I
1 �! GARAGE I c � I I I - -•L _ I _
o II 9 .83' -I 1 1 1\ I�1 I I GARAGE
1 � I \ \
,
--- I - 1 » 1 \ 1 \ I I I I I o UAHAGyF L� K I \\ j
2-0 \ \
7, 3 I EAII E v �� - -i - - - ° \ - I - - - - I T ENTRY - - - HOUSE 3
r I - I I I \ N Y \ - _ - - - �__ / I \ 1
-� 1 \ o l 0 1 1 NT Y I I i
_ -- - 1 LOT 2
GARAGE I I \ p ^ ` \ i \1 I I I I ENT i / S� / / i so
r DECK , / I i N \\ \\\ I 6, 2 6 6 S.F. 1 I 10 t 0 L / ,'' / / i 0 3 �l
,mot I I Iw , ° ° o p N 6 6 0 -� >>
72.0 \ 172.0' / p C3o 1 / \ 1 0
�i LJ 70.0 w 34.75'/ 1 ° 'o o ° sr
iF10USE 6 EI�TR 11(n �I 11 / 1� `��\\ / / / 52. 2� g / / s,
vl:c
LLJROW 2c) 71>1
/ - - I \� '1` �\ 10, 433 S. F. / ,�' �'''' '---------J' / i�
o b
o \0 0 _-
R
° / 0 97.83/ _\ OMMON SP - -- -- -� -� ---- _ / �� ,-o - , / HOUSES \�
04
� NI I J9,696 S. Q ENTR (N �- -' � D\ -
�•U \j EC
/
`w
l E ° P AY AREA
HO(JSE 1 ' --- - ----- ---------1,200 SF
l l ENT ° \ / I \ I I / \ /
LOT 16
�\ POND
� � ;� I o ,' � I I � / � T 15
I \ /
o ,-''���', p ��� �,,,'f I I I \ I I I o I / F '�' �/� 22 F. \ \ °QS �� \ 7, 855 �. F.
°LF)/ O \\ CONC. i i I �' I I N I \ I o, II 1 _ _ - / S�• \ \ �� \ \
i I / AGAR GE 8_-- \\ I HOUSE 2 I �� �L HOUSE 2 I\\ I I GARAGE / /�T - - - - - \ \ \ \ \// / SITE DATA
o / p l < < < ,- I I L O T 12 I I \� , - I BELOW o�v - - �- o /
/ , / / / � e / SITE AREA 540:111,275 SF 2.55 ACRES
/ r -_J ,- I » 1 r� 1 DECK ,� I - 5, 82 \4 S. d• - J / / / / I ENT I \ '\O \ SITE AREA 550: 23,997 SF 0.55 ACRES
Z 27 ?1 o I ,i / I L T 11 I I -6 - I �� I L ,- » , / i r i r / / r r 4j O I \ \ \ ZONING: RS-MP
1_ 1 2 g Q� ��" ° �' '� 5 2 4 S. ' n 6" _ s , r / �. p• ° TAX ACCOUNT # 540: 27032500308300
/ � - - 1 _'/ �' I I I \\\ ''O �� / �� I TAX ACCOUNT # 550: 270325003084001
1 i - 0 1 i'' I/ ° L O/T 1 HOUSE
/ NUMBER OF LOTS 3.1 X 5.5 acre = 17 LOTS
CDI I �\ I L _ I / / GARAGE I RS-8 LOT WIDTH 70 VARIES
97.83 1 „ - _ - ___ - / /
12 -0 � ° '- - - \`� \\ 0 ° 64.0' \ ° - -" o - - o_- -�� / / rl/•Q� - - - _ DECK I / REARSETBACKS: LOT COVERAGEFRONT YARD '' 7.5' SIDE 15'
rEASEMENT. / , / / _____
- - ��0 -� �\ \ 83.75 0 / $4 ° o 41.5 ° ^ SUGGESTED MODIFIED SETBACKS: FRONT YARD
i r �' G ;; LOT 9 b o / i / / / / - / 10 (20 AT GARAGE), 7.5 SIDE, 15 REAR
\\\- 7 231 F. rc- i- - _ J �- - - LO - 1 �� / / J�� T 0 1 22 83 - - BUILDING HT: 25'+ 5' FOR SLOPED ROOF
r - M\� - - - - - - , n n ° I / / I E M 3 10' o LOT SIZE 8,000 SF MODIFIED FOR VARIED
---- ,'' Imo, 10-0 10-0 6 339 S.F.
' ��'� I N I %,of I I , /' SE ER -T�--------- ------ LOT 14 HOUSING TYPES
--to - ARAGF I '' ,-� _ , D6► I / , c�. A.F.N. 2I01 3162I ---- 6,449 S� .
�DECK ,i Lo �/ 50.42' 0_____ E RY HOU ESA L_ - I HOUSE EN / Q' p�� � I I GARAGE i / HOUSE DATA GREENWALK
I / / �0, o DECK o`V/
- - - - - - - - I \Q, co I - I / o�' HOUSE 1: (2) 3,814 SF 5 BEDROOM, 4 BATH, REC ROOM, 3 CAR GARAGE
° ' E TR \� 14� I / / PLAYAREA I 7°�°ry� HOUSE 2: (2) 2,741 SF 4 BEDROOM, 3 BATH, 2 CAR GARAGE
I � ^ > GARAGE'> � �
�W I- - -� I E RY HOUSE 2 I / HOUSE 3: (1) 2,700 SF 4 BEDROOM, 3 BATH, 2 CAR GARAGE
_ � _ ___ 1 O r- / , /
�%' - - - - _ --- - 1 I r ,� I I GAf�AGE / / C 0 M M 0 N SPACE 10'-0" I L. I / / HOUSE 4: (1) 3,118 SF 4 BEDROOM, 2 BATH, 1 BATH, 1 BATH, REC
_ _ , I / / ROOM, 3 CAR GARAGE
o - - -* - �_ - -� /, ° /���'' ° o ° '� - o t o ''� / - - - - - - LOw / 2, 519 S.F. I - I - - I / / HOUSE 4A: (1) 3,093 SF 4 BEDROOM, 2 BATH, 1 BATH, 1 BATH, REC
/ , ,% 1 0 , o / 9 / o SIC-�__------__------� ROOM, 3 CAR GARAGE
/ 97 83. /r , - - - 134.2 - ) 1 ' 72 17i /
64.75 i HOUSE 5: (2) 2,692 SF 4 BEDROOM, 3 BATH, 3 CAR GARAGE
- I 64.75'
_ l_ -� - - - - - - -
HOUSE 5A: (1) 2,692 SF 4 BEDROOM, 3 BATH, 2 CAR GARAGE
' N 8 g ° 3 g 02 � 3 00 . 0 C E E ��J /' �/ i T 230.75 (� - HOUSE 6: (2) 3,788 SF 5 BEDROOM, 4 BATH, REC ROOM, 3 CAR GARAGE
HOUSE 7: (1) 2,394 SF 4 BEDROOM, 2 BATH, 11 BATH, 2 CAR GARAGE
I 5' TRANSFERED TO
NEIGHBOR 1,092 SF HOUSE DATA MOLNAR
NORTH
SITE PLAN.
SCALE: 1 "= 20'-0"
HOUSE 2: (1) 2,741 SF 4 BEDROOM, 3 BATH, 2 CAR GARAGE
HOUSE 3: (1) 2,700 SF 4 BEDROOM, 3 BATH, 2 CAR GARAGE
HOUSE 7: (1) 2,394 SF 4 BEDROOM, 2 BATH, 11 BATH, 2 CAR GARAGE
LOT COVERAGE LOT 6: 2,363 SF/7,339 SF=32% LOT 12: 2,042 SF/5,824 SF=35%
LOT 1: 2,081 SF/6,690 SF=31% LOT 7: 2,231 SF/7,290 SF=31% LOT 13: 1,656 SF/6,967 SF=24%
LOT 2: 1,885 SF/6,266 SF=30% LOT 8: 2,363 SF/7,192 SF=33% LOT 14: 2,042 SF/6,449 SF=32%
LOT 3: 2,141 SF/8,013 SF=27% LOT 9: 1,922 SF/7,231 SF=27% LOT 15: 2,081 SF/7,222 SF=29%
LOT 4: 2,141 SF/8,010 SF=27% LOT 10: 1,680 SF/6,330 SF=27% LOT 16: 1,885 SF/7,855 SF=247.
LOT 5: 2,231 SF/7,216 SF=31% LOT 11: 2,042 SF/5,824 SF=35%
2
O
U
Q�Q
u7
z
O
U
D,
U c
J
J
O
Q
Z.
z
zLo
Z.
� n
v
N p�
N
vJ
0
O L
rl w
zw
W
w
Z N
Lu
Qof
U
co
w
J
co
W
(N
^C/)
© GREENWALK DESIGNS LLC.
REGISTERED
--AR CT
�STEVEN A. BARNES
STATE OF -WASHING T i7:tt'
3 N
00
Q �3
� wo
wno
cS O
W +o
� gw
z
Q
o
0
J
Ln
0-
O
Lu
�
O
(n
z
W
Q
�
z
0
CC
G
�
J
LLI
W
N
~
o
w
w
w
>
U)
o
0�
Exhibit 1 - Green
PLN2022-004 Packet Pg. 67
1.b
00
(_e
N
w
Ln
0
Ln
Ln
0
0
z
N
Q
0
0
LL-1
0
Ln
/
LEI
75
Q
z
c�
z
Q
n,
0
Jj
N
0
I L-87.42 \x� �r \ss RIM=266.00' \
9 " I E(N W) 250.46' 48„
so IE(SE)-250.80' 48"
I �
�0 IE(S)=262.08' 8"CONC
I � \
SQ
I
N 88°38'01 " W 251 .01'
41
97.83' o - - -
- - 72.0' \ \
i 72.0' 9.2 SS
0
�- - - - - - - - - - - - - - - - -
10'-0" b o _ s°
I N I 0 10,�S \
N I N ( \
ss
----------- LO
M 10I '-0" N
LOT 5 1 i ,-------------�
1 o'- "
0 7, 216 S.F. I �
co N 10'-0" \
SS
I 1 I I ,
I,- I I I I I I � �o *N WV s°
10'-0" 10'-0" I LOT 3 1 I 1 `\ Ss\
1 I LOT 4 w
I I I 8, 013 S.F. � \
--------------------� 8,010 S.F. 1 110'-0" 9�� �o — _ _21 941 W 1 S°
LOT 2 o i23.s2� — _ 23 79
i'CD 1 I I I
— —I IN I 6,266 S.F.
R2 s \ \
5- o
12 -0
I 1 I � I / M � \
Ico
EASEME------------- --- - - - - - - - - - -- j J------- 110'-0" i LOT 1 // ry' air\ \
--- — I 6,690 S.F.CD
\
I CD
,
LOT 6 iz N
71339 S. F. 1 — — 72.0' — — — — 72.0' — — 70.0 Lu o — 34.75(n I - -
_ . / S•
Lu I N ROW o
10, 433 S.F. N
-------- —� J -CD
o / of o 64.0' 30.0' - 9
o 82.82 - — — R/1004.94
I o 97.83' — — 1 Vi �----------7 --� F----�-------------- ^C�- — �.-/ 42
/.81
— 'LOT 16
r— — — — — — — — ----------�---� �il /� // A-2-26tti§55 S.F.
LOT 7 ►o I 1 LOT 12 I LOT 13 / \ ��
LOT 11 I� I o 1 F °o
5,824 S.F. 6,967 S.F.
7,290 S.F. 1 11 5,824 S.F. I i I 1/
1 I C MMON SPACE I
9,696 S.F. X�/ o /
LOT 15
_ _ _ _ _ _ _ _ _ I ► 1 '-s" '-s" I / h o �'/ 7, 222 S. F.
------- I '
_ I I / ACCESS UTILITY EASEMENT
o 97.83' - - 12'-0" o ----- --y , / \ I 0
6
i �i
EASEMEN - 0 64.0 o ' / - - - - - - -
10-0------------------� 83.75 0 - - - - - - - - 64.0' - - 41.5' / i/ D� I --- ----
i D 125.75' b
10-p------------ - - - - -
, �� , ' 0 1 22 83
I I I I�10'-0" 10'-0"E------------� ITEM 3 — 10'0
I;n I j I N 1 I I ,� ,� SE ER LSM'T ------
1 LOT 8 — — .� A. .N. 21013162--------�
1 0 50.42' LOT 9 I o� � I u I i
1 7.192 S.F. 1 � I LOT 10 Flo ���
1 r------------J 71231 S.F.
6, 330 S.F. � ,o.
I I I I I I � � � I LOT 14 ory
61449 S. F. \
M L1 I 1 COMMON SPACE 1o'-o"I
---------------J---------- 2,519 S.F.
-- o---------------J o _ , L
0 97_8372_17
' o - - - - 134.25' - - - - - - - /o �/ // o-----------------�
L
- - _ 64.75'
N 88°38'02 W 300.00' DEED _ — 230.75' — — - — — — — — — —
5' TRANSFERED TO
I NEIGHBOR 1,092 SF
SITE PLAN
E SCALE: 1 "= 20'-0"
2
0
U
U
c
Q
w
Z
O
Lu
01 r"
N 0
C� U
Lc) z
c
CV m
u J
w
© GREENWALK DESIGNS LLC.
I
ECi1STER TR CT A. BARNES
WASHINGTUN
Q
Q
z
2E ~
J �
W �
Q
J
w
U)
Q
3N
Z °8i
wo
uS O
+0
gw
O
C)
O
z
U
Lu
N ..
U)
z
0 0
U)
w >
Q W
o 0�
A2
T
Exhibit 1 - Green
PLN2022-004 Packet Pg. 68
1.b
Greenwdk Parr
540 Edmonds Way
Edmonds, WA 98020
S h o r t p I a t
I �
I \
_ _ N 88138'01" W 251.01' N
�
_ LOT 4 LOT 3
#SDK I 1 I -8,007 S.F. 8,005 S.F.
X I HOUSE 1 1 I
FFE 2741
1
1 1
RAGE
/
rl`�!I/Npj/OI/
10 / to
0)041
I K 1
IyJ I I HOUSE
x I FFE 274
0 li
11
rn I 1
•O I --- RAG
�E q^' ORIVF
r LOT 7 1
Z 8,183 S.F.1 1
7 LOT 8 /
! 8,067 S.F.,
COMMON
5,663
POND
CONC.
DECK
' � o
I j \
I LOT 2
{ 5;350 S.F��\
HOUS`--
G�q
I
'I
6
\
0
- _ N 8k-21'41" W 123.79'
_ --
`ENTRY ( I I 6,1 5JL
----- ----- 28 - 740 STORMTECH CHAMBERS
10,007 S.F. 1 VW x 110' LF TRENCH
ASSUME 2 IN/HR INFILTRATION RATE
-- SMH-----------
RIM=266.25'
SMH
RIM=268.42'
IE(NE)-259.04' 12"
IE(SE)-259.18' 12" \
O
` MoN�s SMH
RIM=272.26'
�'9f� dP IE(NW)=259.58' 12-
IE(SW)=259.65' 12-
L-777',"
\�\
HOUSE
-- `
/ /
R— 0
1
LOT 11
438 S F.
OT 12
6, 38 S.F.-----
— --� %
/ //
<\
=42.
=2
1
30ua"o I
I
� �
cgRgcE I /
cARncE
I 1
HOUSE
/+
t� SLOT 16
^0
�� \ ��I 6,549 S.F.
HOUSE 1 1
/ /\ ELOWnK`✓
USE
s%5 ARAGE
I
--_— ///
1
I
1 J LOT 13 /
r 'fir°
? %`
6,510 S
LOT 15
ry4 7,881 S.F.
-----
LOT 9 I
1 ---- J
I LOT 1fi/ / /
1
/
6,030
S.F.
�00§ / /
'A'T,
11EM 3 10' 1
L
RAGE /
-
H 1
N \
J HOIJSE
/ /
A.F.N. 13162
1 8,061 LOT 1S.F. 7
it
/
II ; 1 ,— ,11 I `. 1 HOUSE
r GARAGE
BELOW
N 88'38'02" Z300.00' DEED — �- - - — - - —L -t— - mror+271.15' - — - - — - — -
IE(NE)=260.59' 12"
Site Plan 1
Scale: 1" = 40'-0"
8-31-21
SITE DATA
SITE AREA 540:111,275 SF 2.55 ACRES
SITE AREA 550: 23,997 SF 0.55 ACRES
ZONING: RS-MP
TAX ACCOUNT # 540: 27032500308300
TAX ACCOUNT # 550: 270325003084001
NUMBER OF LOTS 3.1 X 5.5/acre = 17 LOTS
RS-8 LOT WIDTH 70' (VARIES)
SETBACKS:FRONT YARD 25', 7.5' SIDE 15'
REAR, 35% LOT COVERAGE
SUGGESTED MODIFIED SETBACKS: FRONT YARD
10' (20' AT GARAGE), 7.5' SIDE, 15' REAR
BUILDING HT: 25' SLOPED ROOF
LOT SIZE 8,000 SF MODIFIED FOR VARIED
HOUSING TYPES
Facility Name
15tormTech 1 7771
Outlet 1 Outlet 2 outlet 3
Downstream Connection
KANW= 0�
Auto Chamber I Quick Chamber
Chamber Model af'
740
How Length(fI)
111C Outlet Structure Data j
Number of Chambers
28 Riser Height (fit)F
Number of IRisen
Diameter (in] 12
4
Top Stone Depth (in]
® Riser Type
Bntfom Stone Depth (in)
12 Notch Type
Infiltration Yes =?
Ordice Diameter Height
Measured lnliltraiiorRate (inlhr)
F4-- I
Number (in)
(ft)
Reduction Factor (infill'factor)
p g
1 lu
0 —=I
ihD' y
UseWettedSurfaeeArea (sidewalls)
NO H
2 Fo----lFo--i
Total Volume Infiltrated lack)
52547
3
Total Volume Through Hiser (dc-k)
0
Total Volume Through Facility(ac It)
52.547
StormTech Volume at Riser
Head (ack)
052
Percent Infilhated
100
Show StormTech
Open Table
Initial Volume
I
—
PAVEMENT LAYER (DESIGNED
BY SITE DESIGN ENGINEER)
uIERT. FORl1NPA1✓Bl
5' TRANSFERED TO IE(SW)=260.73' 12' DRYWELL FOR ROOF DRAINS INSTALLATIONS WHERE RUTTINO'ROMIBircLES 18"
'FI h1I �_FI II J INCRenSCcoVeR To 2a'rE0D11T1} jr (2.4 m)
NEIGHBOR 1,092 SF CONSIDERING DRYWELL IN - - - - - - (45omm)MIN' MAX
DRIVEWAY TO HANDLE DRIVEWAY 4 6'(15amm)MIN
10/3/21: STORM MAP & PLAN FOR ROADWAY INFILTRATION SYSTEM
by: Pedro DeGuzman, PE @ Terraforma
All III =1I IIIII —I
_ DEPTH OF STONE TO BE DETERMINED
�� �� -��" n BY SITE DESIGN ENGINEER 6"(150mm)MIN
6' (150 mm) MIN 51" (1295 mm) 12' (300 mm) TYP
y
Cornerstone
A;RCHITECTU;RAL 8ff* :P
Exhibit 1 - Green
PLN2022-004 Packet Pg. 69
1.b
1
i
Cn
Co
0
w
0
Ln
Q
0
0
a_
N 88°j38'01 '9
14"CED'/
36'tE
`�, / I"C
\ , 40VCED 1,42
rl �
° 1 'SPR
6'HOLLY
L
A
4° 42' 1 3
I�/6"APPLL r t� �I \ / � \ �� \ r ; � ��° � �0 F—IDECK ° A
JI_ _ 36 CED �� J
4P.PL�
� 46"CE � � .-' DECKCF)/____(\/42"CED N — — � — ACU „8� 0°°81 \ 50"CED / \ I \ EAVEEMI� — —� — iJ _ — — _ —�8 C ° ° - 81 12;A„D
rI I �i —1= _ =1� c� ( _ 8 c� Z_ I °18ALIICRAWL II ��� ° _� 3\ � PROPANE I \SPACE I I �" — — \-i — `- _ - \ �yLOWER �� ' )TANK / ACCESS I \EPP 6 ' ' I HOUSE I —
\16 M AP
- —
( 1 I T—� 01 — UTILITY BOX I III I
\6 MAP \ / I I I I BLO /�•' ,� / �� i �� —T \ 4"Ad
—1,_----- I-- I \ ' WAIL / I (\ \ \ /
\ I �__CS'pNC EAVE —���------___ --- =�-
112 FIIG _ IL — �I� — —— \ �� , I �/ 58 CED `O
% I `\ �. t STEPS — �—�I? — — r — — L — — AVEEE �__ I i 1„
1 I —1 11— ' I 48 CED \
\ I f \ I EAVE 1 �1-- 4
1 \ 6 D� 1 cj I �� \ I ,
18 PLUM I \ I /\10 DEC \ ---- �
I o I I II CHECK II I —� ---�� POR, I \ �'�—� I _ �� 0 I I /32
IC 11 I EAVE] / Bo�;�'
n I ABANA 111 I / (5)6 MAP
Ll
l —
I BRICK \I/28I j 34"CED
I , PLANTER ��i � ACED / A � � 24 CED I I /1
I , CONC i v� / 1120 CED
�I \I\STEPS kSPR _\3\ 4"CEID
1811C\D V/ /r l
10"BIR I� _ / \ I °/� SP� I �� y
6"BIR\\ �— — ---- / / ��\lo»SPF 1 \\ I 40 CED T
BIR r/ / \\ �� — \ \\ ;18"CEDCE
,9 3C�' C E D
\\ I "� �I BLOCK \1 I \\ _ — CT ; ;'\ /� 42"CED
6o MAP i / , WALL , 1 �� ^ , (Xv
,\�6 CE�, \\ / f� �\ �� \\ \\\�\ I BLOCK
— i ,, j \\ i i I / \ \ �\ \\ GARAGE \\\
r \ \ v ALA-
Ln
„ „
� � � v / � � � I ,� 144 /CE[�1� 30 �E v BLOCK � \v � l I � v �• ,��
O I / �8� CED , \ I �/ < \ i i , \ WALL \ \ \ \\11 i i i ! 24"�-D
o J 11 r _-�y �� ��\� I 1 ` ' �1 ,'� �� I\ 1 �I `� // / I \\\ J l ; '� / \\ �� DASHED LINE TREE OUTLINE
i12"C �� z ` � `� \ 16 S • ° I / \ \ \\ � 30%CEQS / �cp \ i , , 40� ED / SHOW TREES TO BE REMOVED.
' I I o I \ I 42"CED / �� 0'\ / �L\\ i / SHED \\\ /� ',� I
/38"ACED
i I i 1 I -- _\IE_ 1 _— \ r
�' i I to \ I I �\ _ 66"CED / \ _EA -- — —'I �— — ,-� / \/ / '�
6"\MAP > �I� _ _ — 10 EC i WOOD
WALL
12"BIR \ /,__
67MAP /WOOD i �— / / / �x
A'/
nM�QP WALL'
6 SPR ��\ 8, / 4' /
, GR� \ P �\ ° ITEM 3 — 10'
r —Z/
i / SEWER ESM T
/ \\\_- \ �� \`\ > ��- � •\ — \ \, WOOD
-- .� , \� A.F.N. 2013162
12"CED WALL \, �� II II; I /� I /
\U26,
--- f20 CED\I \BROKEN II il GARAGE II ILI j / I / /i6
„CE/20"CED 14CED >D II
�'I I Ilw
I �„F(R(GRAN�) / �I/ /30"CED\ 26�C — \OfC� ;,� �\ —t'= — — — — ,\ \ 28 CED j �r
/° Ir I I\ 3G/ CEDE may\ I \I/ 6' Ivl '�»D / 8--\44"FIR(GRAND���\� �`� �\ I ' Ip��LRI „ •/ ' �/ LL TEPS
12MA� II I \ ; ,� A �°12'D . I� (l �� �I —�� \ \� 6 '� (1
_ , \ 30 CED/ / u/ 2 -_0"CED ,� ; ����r �%
I / /
3�(5:6 f) SEED
RIM=266.00'
IE(NW)=250.46' 48"
IE(SE)=250.80' 48"
IE(S)=262.08' 8"CONC
SITE PLAN
E SCALE: 1 "= 20'-0"
Is
R 1 004.94'
42.81'
A-2°262699
TREE RETENTION CALCULATIONS
THERE ARE A TOTAL OF 111 SIGNIFICANT
TREES ON THE SITE, CURRENTLY THE PLAN IS
TO REMOVE 65 SIGNIFICANT TREES.
CODE ALLOWS REMOVAL OF 30% OF
SIGNIFICANT TREES.
111-65=46/111=41 %>30% ALLOWED.
AN ARBORIST REPORT WILL FURTHER EXPLAIN
THE EXTENT OF WORK.
O
U
U
QcQ
u�
z
O
c
NC
o
U
5uj
z
c
N m
u
Z J
O2
�w
© GREENWALK DESIGNS LLC.
REGISTERED
kR CT
J
TF-VE I A. QARNES
ATE CF WAS! ING 1 UN
W
Q
z
J
W
J
w
w
U)
z
Q
W
z
O
W
W
Q
N
0 00
Z O)
OQ
W Cif
O 0
Z
LoO
O
O
O
z
W
N ..
U)
z
o p
U)
w
Q w
o 0Y
L1
Exhibit 1 -
Packet Pg. 70
1.b
Greenwc k Park Shortph:it
540 Edmonds Way
Edmonds, WA 98020
---------------
I
I
N
I 1
X I HOUSE
FFE 274
1
—
I 1
1
1
I L—'
LOT 6
8,239 S.F. GARAG
xl
I
" W 251.01'
II' LOT 4 �--------_
LOT 3
1 I 8,007 S.F. 8, OS S.F.
F 59--
27211 DR a ROT V5
:if
COMMON
5,663
POND
GONG.
711
1 DECK
1
I � \�f
I LOT 2
{ 5;350 S.F��\
HOUS`--
G�q
I
'I
6
N 8k-21'41" W 123.79'
-�
ENTRY ) I LLL
5
:T ----- 28 - 740 STORMTECH CHAMBERS
10,007 S.F. 1 VW x 110' LF TRENCH
ASSUME 2 IN/HR INFILTRATION RATE
1
-- SMH-----------
RIM=266.25'
SMH
RIM=268.42'
IE(NE)-259.04' 12"
IE(SE)-259.18' 12" \
MoN6s SMH
RIM=272.26'
�'9f� dP IE(NW)=259.58' 12-
IE(SW)=259.65' 12-
o\ �
HOUSE
--
`
R— 0
j
LOT 11
,438 S
OT 12
6, 38 S.F.
— --, %
1 I
—
F-_--
// ///
+
\ =42.
=2*2 a
1
1
1 1
I
1
GARAGE I /
1
3suavG
I cARncE
1
I
'�� 1
1
J HousE
♦+
t� SLOT
I
16
\ ���I
I i
i
I
+/^0
6,549 S.F.
I
L ���
1 I
/`�1
1--°J
1 I
1 1
////
ARAGE
/ /\ ELOWnK`✓
,Fs%5 \sE
ARAGE
I
IHOUSE
---- ///
1
I
1 J
LOT 13
6,510 S
LOT 15
ry4 7,881 S.F.
/7
LOT 9 I 1 ---- ----- I LOT 1fi/ / / 1 -�
J
I 8,030 S.F. ���� .. 00 / / 11EM 3 10° 1 RAGE /
I I� — — --• �' § �/ SEWER A'T, LOT L —
H �j1 N \ J HOUSE / / / A.F.N. 83162 I 8,061 1S.F. 7
ARA
GARAGE I < 1 HOUSE
BELOW
\�, ------ 1 L----- I I — — — — — — — — — 7
N 88'38'130000 .' DEED — �— — — — — — —L —t— — mror+271.15' — — — — — — — -
IE(NE)=260.59' 12" �\.\t�\�\ '-fro ry
Site Plan 1
Scale: 1" = 40'-0"
8-31-21
SITE DATA
SITE AREA 540:111,275 SF 2.55 ACRES
SITE AREA 550: 23,997 SF 0.55 ACRES
ZONING: RS-MP
TAX ACCOUNT # 540: 27032500308300
TAX ACCOUNT # 550: 270325003084001
NUMBER OF LOTS 3.1 X 5.5/acre = 17 LOTS
RS-8 LOT WIDTH 70' (VARIES)
SETBACKS:FRONT YARD 25', 7.5' SIDE 15'
REAR, 35% LOT COVERAGE
SUGGESTED MODIFIED SETBACKS: FRONT YARD
10' (20' AT GARAGE), 7.5' SIDE, 15' REAR
BUILDING HT: 25' SLOPED ROOF
LOT SIZE 8,000 SF MODIFIED FOR VARIED
HOUSING TYPES
Facility Name
15tormTech 1
Outlet 1 Outlet 2 outlet 3
Downstream Connection
KA1115E= 00
Auto Chamber I Quick Chamber
Chamber Model IF
740
How Length (fl)
110 Outlet Structure Data j
Number of Chambers
28 Riser Height (fit)
Number of I4
Risen Diameter (in] 12
Top Stone Depth (in]
® Riser Type
Bottom Stone Depth (in)
12 Notch Type
Infiltration Yes =?
Ordice Diameter Height
Measured lnliltraiionRate (inlhr)
F4-- I
Number (in)
(ft)
Reduction Factor (infill'factor)
p g
1 lu
0 —=I
ihD' y
Use Wetted SurfaeeArea (sidewalls)
NO H
2 5--1Fo--i
Total Volume Infiltrated lack)
52547
3
Total Volume Through Hiser (dc-k)
0
Total Volume Through Facility(ac It)
52.547
StormTech Volume at Riser
Head (ac`0
052
Percent Infilhated
100
Show StormTech
Open Table
Initial Volume
I
—
PAVEMENT LAYER (DESIGNED
BY SITE DESIGN ENGINEER)
uIERT. FORl1NPA1✓Bl
5' TRANSFERED TO IE(SW)=260.73' 12' DRYWELL FOR ROOF DRAINS INSTALLATIONS WHERE RUTnNGFROM VEHICLES 18. 6
'FI hII (2.4 m)
�_FI II i INCRn5I!CO1XRTO24'rE0 ML �r
NEIGHBOR 1,092 SF CONSIDERING DRYWELL IN - - - - - - (450mm)MIN' MAX
DRIVEWAY TO HANDLE DRIVEWAY 6'(150mm)MIN
30"
(760 rnm)
10/3/21: STORM MAP & PLAN FOR ROADWAY INFILTRATION SYSTEM
by: Pedro DeGuzman, PE @ Terraforma
All E =1IHII
_ DEPTH OF STONE TO BE DETERMINED
�� �� -��" n BY SITE DESIGN ENGINEER 6"(150 mm) MIN
6' 51" (1295 mm) 12' (300 Trim) TYP
(150 mm) MIN
y
Cornerstone
A;RCHITECTU;RAL 8ff* :P
Exhibit 1 - Green
PLN2022-004 Packet Pg. 71
1.c
GREENWALK
DESIGNS LLC.
12733 39TH AVE. NE PHONE: 206.550.9296
SEATTLE, WA 98125 EMAIL: SBARNESOCORN[
NOTICE OF PUBLIC ZOOM MEETING
FOR PLANNED RESIDENTIAL DEVELOPMENT
540 & 550 EDMONDS WAY
PROJECT DESCRIPTION: Greenwalk Park Planned Residential Development. Two lots that are accessed
from SR104 (Edmonds Way) are being platted into 16 residential lots that vary in
size from approximately 5,500 sf to 8,100 sf. The homes to be constructed on
these lots will be built by the developer. The houses will vary in size from 2,400 sf
to 3,500 sf and will be designed to relate to one another and will have
approximately 7 completely different designs. The site sits on top of a small hill
that is relatively flat and will not impact any views from neighboring homes.
Development will comply with local tree ordinances and maintain as many trees
around the perimeter of the site as possible. Planned Residential Developments
are required to set aside 10% of the site area for "COMMON SPACE" which
includes play areas for children, park like seating and lighting and we have
incorporated an existing pond and waterfall with viewing deck and landscaping
into the design. All houses will be on public utilities and the city has determined
that the streets will be private drives with access/utility easements. Washington
Department of transportation has given approval for a single drive that will access
SR104 to minimize traffic hazardous. All new electrical and data services will be
underground so no overhead power poles or lines will be installed.
PROJECT LOCATION: 540 & 550 Edmonds Way, Edmonds, WA. Tax Parcel Numbers 27032500308300
& 270325003084001
NAME OF APPLICANT: Steve Barnes (for Fernandez Barnes llc)
REQUESTED PERMIT: 16 Lot Plat and Planned Residential Development
PUBLIC HEARING: May 10,2022
The city of Edmonds requires that a public meeting must be conducted and all
parties within 300 feet of the site shall be invited prior to submitting for
permitting to the city of Edmonds.
PUBLIC HEARING
INFORMATION: A virtual public meeting will be held via zoom by the Developer on May 10, 2022
at 7 p.m.
Join the Zoom meeting at:
https://us06web.zoom.us/i/82671707101?pwd=diVQL2glR3FrMTQ3MnN5WGNYbORLdzO9
Meeting ID: 826 7170 7101
Passcode: 539226
One tap mobile
+12532158782„82671707101# US (Tacoma)
+17207072699„82671707101# US (Denver)
Dial by your location
+1 253 215 8782 US (Tacoma)
+1 720 707 2699 US (Denver)
Exhibit 2 - Green
PLN2022-004 Packet Pg. 72
1.c
+1 346 248 7799 US (Houston)
+1 646 558 8656 US (New York)
+1 301 715 8592 US (Washington DC)
+1 312 626 6799 US (Chicago)
Meeting ID: 826 7170 7101
Find your local number: https://us06web.zoom.us/u/keeMb69Zew
CONTACT: Steve Barnes: Greenwalk Designs
sbarnes@cornerstonearch.com
206-550-9296
PROPOSED SITE PLAN
----------
5 SR 104
\� EDMONDS WAY
COMMON
SPACE
- G PLAY
V AREA \
COMMON --- /
SPACE
POND — -� 13
Lj WATERW 11 12 16
�_____ FALL
i
8 10 14 15 /
,
-----------
VICINITY MAP
P k' Cree4
,� clmP
m w
y_ �11, 411, I'• 9-h S-
s-
1 4
4
♦540 Edmonds
Way, Edmonds, WA...
n FIVE©
s
sw
226th St SW �ss�
nnl n1o'2ethstsv PagliacciPizzaQ
Eleme
a
a
b
14M St SW 2241h SI qW
a �
n
i
©Edmonds Memt
Cemetery
Exhibit 2 - Green
PLN2022-004 Packet Pg. 73
1.c
Greenwalk Park adjacent property information.
1. LECKY JOHN H/LISA M
10820 KULSHAN RD, WOODWAY, WA 98020
2. ECONOMOU CHRIS & MARLA
10828 KULSHAN RD, WOODWAY, WA 98020
3. MILLER GLENN R/CATHERINE A
5916 ST ANDREWS DR, MUKILTEO, WA 98275
4. ZEVENBERGEN JOHNUACLYN
10901 ALGONQUIN RD, WOODWAY, WA 98020
5. KIM BYUNG H/IM HEE-SUNG
10826 KULSHAN RD, WOODWAY, WA 98020
6. JOHANNESSEN KARI J
10727 226TH ST SW, EDMONDS, WA 98020
7. HELLEREN LEIF T & KIMBERLY J
2522 192ND ST, SHORELINE, WA 98177
8. HELLEREN LEIF T & KIMBERLY J
2522 192ND ST, SHORELINE, WA 98177
9. MARTINELLI MICHAEL
10615 226TH ST SW, EDMONDS, WA 98020
10. WILSON JAMES R & SHARON
10703 226TH ST SW, EDMONDS, WA 98020
11. BAYER KIM/AUGUSTAVO ED
10707 226TH ST SW, EDMONDS, WA 98020
12. MAHMOUD MOHAMMED & MAHMOUD-HOWELL BETH
10705 226TH ST SW, EDMONDS, WA 98020
13. GEORGE LORI J
10605 226TH ST SW, EDMONDS, WA 98020
14. PETERS MARVIN T & LLYNDA F
10525 226TH ST SW, EDMONDS, WA 98020
15. NELSON MICHAEL LEE
10607 226TH ST SW, EDMONDS, WA 98020
16. LEMAS MITCHEL J & ALICE
10609 226TH ST SW, EDMONDS, WA 98020
17. SHEPSIS VLADIMIR & ANETA TRUST
8034 CYRUS PL, EDMONDS, WA 98026
Exhibit 2 - Green
PLN2022-004 Packet Pg. 74
1.c
18. KIMMELMAN LEE & SHUI
1054 9TH AVE S, EDMONDS, WA 98020
19. EDMONDS WESTGATE LLC
606 EDMONDS WAY, EDMONDS, WA 98020
Exhibit 2 - Green
PLN2022-004 Packet Pg. 75
1.c
20. 27032500308800
612 EDMONDS WAY, EDMONDS, WA 98020
LEWIS SCOTT F & MARGARITA O
��LI��►�IIIx�1I.�L1I1J
606 EDMONDS WAY, EDMONDS, WA 98020
REDELFS RICHARD HENRY & LIU XIAO WEI
22. 27032500308600
BONN DALE W
PO BOX 72, EDMONDS, WA 98020
23. 27032500308500
600 EDMONDS WAY, EDMONDS, WA 98020
BONN DALE W
PO BOX 72, EDMONDS, WA 98020
24. 27032500307300
620 EDMONDS WAY, EDMONDS, WA 98020
1ST SECURITY BANK OF WASHINGTON
6920 220TH ST SW STE 208, MOUNTLAKE TERRACE, WA 98043
601 EDMONDS WAY, EDMONDS, WA 98020
OWENS OWEN L &JACQUELINE L
PO BOX 12922, BOTHELL, WA 98082
26. 27032500303400
560 PARADISE LN , EDMONDS, WA 98020
NEWKIRK DARALEE L/NEWKIRK SCOTT
13404 NORTH ECHO LAKE RD, SNOHOMISH, WA 98296
��L1��►�1IIx�Ix��1I1J
556 PARADISE LN , EDMONDS, WA 98020
OWENS OWEN L & JACQUELINE L
PO BOX 12922, BOTHELL, WA 98082
28. 27032500302600
546 PARADISE LN , EDMONDS, WA 98020
PARADISE HEIGHTS HLD LLC
190 W DAYTON ST STE 103, EDMONDS, WA 98020
Exhibit 2 - Green
PLN2022-004 Packet Pg. 76
1.c
29. 00384700600900
JACOBS MICHAEL P/SEATHER JANELLE M
10829 KULSHAN RD , WOODWAY, WA 98020
Exhibit 2 - Green
PLN2022-004 Packet Pg. 77
1.c
540 & 550 Edmonds Way
Applicant: Fernandez Barnes He
DECLARATION OF MAILING
On the 19"' day of April, 2022, the attached Notice of public meeting was mailed by Fernandez
Barnes Ile to property owners within 300 feet of the property that is the subject of the above -
referenced application.
I, Steve Barnes, hereby declare under penalty of perjury under the laws of the State of Washington
that the foregoing is true and correct this 19' day of April, 2022, at Kenmore, Washington.
{BFP747887.DOC;M0006.900000\ }
Exhibit 2 -Green
PLN2022-004 Packet Pg. 78
1.c
540 & 550 EDMONDS WAY
Meeting minutes from May 10, 2022 zoom meeting. The following items were discussed.
1. It was explained that this project is a Planned Residential Development complying with City of
Edmonds municipal code.
2. We pointed out that code requires that 10% of the total land area must be set aside for
community use. This Common Space requires recreational and aesthetic features to enhance
the environment of the community. The two areas set aside for this purpose were shown to the
group.
3. Per the pre -application meeting it was pointed out that the new road for this development will
not be a public road, that it will be private, and the ownership group intends to install a gate to
limit access.
4. We pointed out that there will be 16 houses ranging in size from 2,600 sf to 3.600 sf and that
there will be about 7 different building designs.
5. Discussed building height which is a maximum of 25' above average grade per municipal code
6. Reviewed the fact that this is a small family business doing this development and not a large
corporation that does hundreds of subdivisions, but we are experienced and have been doing
this type of project for 15 years.
7. Developer will construct a perimeter 6' cedar fence to shield all existing neighbors from new
construction.
8. Neighbors are concerned with construction & future neighbor noise since this site has been
relatively undeveloped. Developer will show respect to neighbors and avoid starting
construction too early in the morning along with all other construction requirements such as
managing dust created by earthwork. There will be new neighbors with children and pets so
there will be neighborhood noise.
9. Reviewed setbacks which were shown on diagram sent out in meeting request package.
Presented the more detailed plans showing setback dimensions and trees being maintained.
Discussed the fact that we already had a pre -application meeting with the city and worked with
planner to establish correct setbacks.
10. Noted that any street lighting would be shielded fixtures and will be separated from the existing
neighbors by the new houses which will be between their homes and the new drives.
11. Discussed parking, neighbors are concerned that any overflow parking may end up on their
streets (although it is quite a distance from this new development to any of their streets) and
agreed that overflow parking should be provided as a part of the site development since fire
marshal will not allow street parking unless the drives are quite a bit wider. We explained that
creating a sustainable development was our primary goal along with energy efficient buildings
and that we are trying to minimize the amount of impervious paving but agreed that overflow
parking could be pervious paving.
12. Discussed tree retention. We cannot keep all the trees on the site but will be saving as many of
the perimeter trees as possible to maintain some separation between the new development
and existing neighbors. Described the fact that we are required to comply with tree retention
standards in city codes. A city requirement is to remove any trees where the new buildings or
roads will be in the drip line of the tree. We have had our arborist provide procedures for
working within the drip line and will save trees where this can be accommodated.
Exhibit 2 - Green
PLN2022-004 Packet Pg. 79
540 & 550 EDMONDS WAY
1.c
13. Building designs will be contemporary with some flat and some low slope roofs. It was discussed
that this is the current design motif that buyers are looking for and that we will be complying
with the 25' height limit.
14. Developer will be planting the entire site as houses are being completed. Neighbors would like
to see some perimeter vegetation to provide screening which will be accommodated.
15. Trees have been tagged by arborist. The trees to be removed will be identified by the numbers
on the trees. We can tag the trees before cutting so the neighbors will know which trees are
being removed before we take them down.
16. Construction would not begin until we have platting permits from the city which will not be
issued until we have access permits from WSDOT. This could take between 8-12 months.
WSDOT permits are in process and we have received permission to add our access drive to SR
104 but the intersection design has not been approved yet.
17. Greenwalk Park will be an HOA with future building improvement and changes restricted.
18. The city does not allow accessory dwelling units, either attached or detached within planned
residential communities so under current zoning there will not be any rental units allowed
within this development.
Exhibit 2 - Green
PLN2022-004 Packet Pg. 80
1.d
CITY OF EDMONDS MyBuildingPermit.com
Land Use Application #1164143 - Greenwalk Park
Applicant
First Name Last Name Company Name
Steve Barnes Cornerstone Architectural Group
Number Street Apartment or Suite Number E-mail Address
6161 NE 175th Street 101 sbarnes(Lbcornerstonearch.com
City State Zip Phone Number Extension
Kenmore WA 98028-4800 (206) 682-5000
Contractor
Company Name
Number Street
City
State License Number
Project Location
State Zip
License Expiration Date UBI #
Number Street
540 EDMONDS WAY
City Zip Code County Parcel Number
EDMONDS 98020 27032500308300
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions).
Work Location
Property Owner
Apartment or Suite Number
Phone Number Extension
E-mail Address
Floor Number Suite or Room Number
1 None
First Name Last Name or Company Name
Steve FERNANDEZ AND BARNES LLC
Number Street Apartment or Suite Number
10529 NE 58TH ST
City State Zip
KIRKLAND WA 98033
Certification Statement - The applicant states:
certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application.
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 6/24/2022 Submitted By: Steve Barnes
Exhibit 3 - Green
PLN2022-004 Packet Pg. 81
Page 1 of 2
1.d
CITY OF EDMONDS MyBuildingPermit.com
Land Use Application #1164143 - Greenwalk Park
Project Contact
Company Name: Cornerstone Architectural
Group
Name: Steve Barnes Email: sbarnes@cornerstonearch.com
Address: 6161 NE 175th Street 101 Phone #: (206) 682-5000
Kenmore WA 98028-4800
Project Type Activity Type Scope of Work
New Land Division Planned Residential Development
Project Name: Greenwalk Park
Description of Work: Subdivide 540 & 550 Edmonds Way into 16 single family residential lots
Project Details
Development Activity
Subdivision
Clearing and Grading Disturbance
There is more than 1 acre of disturbance
Page 2 of 2
Exhibit 3 - Green
PLN2022-004 Packet Pg. 82
1.d
MyBuildingPermit.com
Jurisdiction: Edmonds
Project Name: Greenwalk Park
Application ID: 1164143
Supplemental Name: Applicant Certification - Planning
The applicant, and his/her/its heirs, and assigns, in consideration on the processing of the application agrees to release, indemnify
defend and hold the City of Edmonds harmless from any and all damages, including reasonable attorney's fees, arising from any
action or infraction based in whole or part upon false, misleading, inaccurate or incomplete information furnished by the applicant,
his/her/its agents or employees. The property affected by the application is in the exclusive ownership of the applicant or that the
application has been submitted with the consent of all owners of the affected property.
I certify, under the penalty of perjury under the laws of the State of Washington, that the information and exhibits herewith submitte
are true and correct to the best of my knowledge and that I am authorized to file this application on behalf of the owner of the subje
property.
I do so certify.
Exhibit 3 - Green
PLN2022-004 Packet Pg. 83
1.d
CITY OF EDMONDS MyBuildingPermit.com
Land Use Application #1168508 - Greenwalk Park
Applicant
First Name Last Name Company Name
Steve Barnes Cornerstone Architectural Group
Number Street Apartment or Suite Number E-mail Address
6161 NE 175th Street 101 sbarnes(Lbcornerstonearch.com
City State Zip Phone Number Extension
Kenmore WA 98028-4800 (206) 550-9296
Contractor
Company Name
Number Street
City
State License Number
Project Location
State Zip
License Expiration Date UBI #
Number Street
540 EDMONDS WAY
City Zip Code County Parcel Number
EDMONDS 98020 27032500308300
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions).
Work Location
Property Owner
Apartment or Suite Number
Phone Number Extension
E-mail Address
Floor Number Suite or Room Number
1 None
First Name Last Name or Company Name
Steve FERNANDEZ AND BARNES LLC
Number Street Apartment or Suite Number
10529 NE 58TH ST
City State Zip
KIRKLAND WA 98033
Certification Statement - The applicant states:
certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application.
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 7/5/2022 Submitted By: Steve Barnes
Exhibit 3 - Green
PLN2022-004 Packet Pg. 84
Page 1 of 2
1.d
CITY OF EDMONDS MyBuildingPermit.com
Land Use Application #1168508 - Greenwalk Park
Project Contact
Company Name: Cornerstone Architectural
Group
Name: Steve Barnes Email: sbarnes@cornerstonearch.com
Address: 6161 NE 175th Street 101 Phone #: (206) 550-9296
Kenmore WA 98028-4800
Project Type
New
Activity Type
Land Division
Scope of Work
Subdivision
Project Name: Greenwalk Park
Description of Work: Subdivide 540 & 550 Edmonds Way into 16 single family residential lots.
Project Details
Development Activity
Subdivision
Clearing and Grading Disturbance
There is more than 1 acre of disturbance
Quantity and Size Specifications
Number of lots 16
Exhibit 3 - Green
PLN2022-004 Packet Pg. 85
Page 2 of 2
1.d
MyBuildingPermit.com
Jurisdiction: Edmonds
Project Name: Greenwalk Park
Application ID: 1168508
Supplemental Name: Applicant Certification - Planning
The applicant, and his/her/its heirs, and assigns, in consideration on the processing of the application agrees to release, indemnify
defend and hold the City of Edmonds harmless from any and all damages, including reasonable attorney's fees, arising from any
action or infraction based in whole or part upon false, misleading, inaccurate or incomplete information furnished by the applicant,
his/her/its agents or employees. The property affected by the application is in the exclusive ownership of the applicant or that the
application has been submitted with the consent of all owners of the affected property.
I certify, under the penalty of perjury under the laws of the State of Washington, that the information and exhibits herewith submitte
are true and correct to the best of my knowledge and that I am authorized to file this application on behalf of the owner of the subje
property.
I do so certify.
Exhibit 3 - Green
PLN2022-004 Packet Pg. 86
9/26/23, 9:59 AM Print Preview 1.e
Chapter 20.35
PLANNED RESIDENTIAL DEVELOPMENT (PRD)
Sections:
20.35.010 Purposes.
20.35.020 Applicability.
20.35.030 Alternative standards.
20.35.040 Criteria for establishing alternative development standards.
20.35.050 Decision criteria for PRDs.
20.35.060 Single-family design criteria.
20.35.070 Application.
20.35.080 Review process.
20.35.090 Final approval.
20.35.100 Administration of an approved PRD.
20.35.110 Modifications to approved PRDs -Final development plan -Amendments
permitted.
20.35.010 Purposes.
The purposes of this chapter are to:
A. Provide an alternative form of development which will promote flexibility and creativity in
the layout and design of new development and which will protect the environment and
critical areas through the use of open spaces above requirements of other provisions of city
code;
B. Provide for small and large scale developments incorporating a variety of housing types
and related uses that are planned and developed as an integral unit;
C. Promote the efficient use of land by allowing flexible arrangement of buildings and lots,
circulation systems, land uses, and utilities;
Exhibit 4 - Green
https://www.codepublishing.com/WA/Edmonds/cgi/menuCompile.pl PLN2022-004 Packet Pg. 87
9/26/23, 9:59 AM Print Preview 1.e
D. Promote the combination and coordination of architectural styles, building forms, and
building relationships within a development;
E. Coordinate development with the value, character, and integrity of surrounding areas
which have been, or are being, developed under the city's comprehensive plan;
F. Provide for the integration of new development into the existing community while
protecting and preserving the value of the surrounding neighborhood to the extent
consistent with the Growth Management Act;
G. Provide the opportunity for affordable housing to meet the needs of a wide range of
income and age groups;
H. Encourage the preservation of existing natural site amenities such as trees, watercourses
and wetlands, topography, and geologic features beyond the requirements of the code;
I. Create permanent, usable and commonly owned open space for both active and passive
recreation which serve the development and which are maintained at its expense;
J. Cluster structures to preserve or create open spaces, especially where steep slopes or
other environmentally sensitive areas exist;
K. Promote a more efficient street and utility system by clustering units, in an effort to
promote affordable housing, land development and maintenance costs and reducing the
amount of impervious surfaces; and
L. Implement policies of the comprehensive plan. [Ord. 3465 § 1, 2003].
20.35.020 Applicability.
A. Planned residential developments (PRDs) may be located in any residential zone of the city
Uses permitted in the PRD shall be governed by the use regulations of the underlying zoning
classification.
1. PRDs in single-family zones shall be comprised of detached dwelling units on
individual lots, and any appurtenant common open space, recreational facilities or other
areas or facilities.
a. The PRD process is not available to single-family lots that are incapable of further
subdivision.
Exhibit 4 - Green
https://www.codepublishing.com/WA/Edmonds/cgi/menuCompile.pl PLN2022-004 Packet Pg. 88
9/26/23, 9:59 AM Print Preview
1.e
b. The PRD process shall not be used to reduce any bulk or performance standard
not specifically referenced herein. Bulk standards not referenced may be varied
only in accordance with Chapter 20.85 ECDC, Variances, or through the modification
provision provided through the subdivision process as outlined in Chapter 20.75
ECDC.
B. Property included in a PRD application must be under the ownership of the applicant, or
the applicant must be authorized pursuant to a durable power of attorney or other binding
contractual authorization in a form which may be recorded in the land records of Snohomish
County to process the application on behalf of all other owners.
C. Accessory dwelling units and home use occupations restricted by ECDC 20.20.015(D) shall
not be permitted within a PRD. [Ord. 3465 § 1, 2003].
20.35.030 Alternative standards.
A. Alternative development standards may be established through the PRD process. Such
alternative standards shall be limited to the bulk standards specifically set forth in this
chapter. Absent specific authorization the standard may not be waived or varied through the
PRD process.
1. Bulk development standards which may be established are as follows:
a. Building Setbacks. An applicant shall in every event comply with Uniform Building
Code separation requirements for fire safety. See ECDC 20.35.040(B) for setback
requirements.
b. Lot Size. Lot sizes may be reduced ("clustering') to allow dwelling units to be
shifted to the most suitable locations on residential PRD sites so long as the overall
density of the project complies with the comprehensive plan and zoning ordinance
c. Lot width.
d. Lot coverage.
e. Street and Utility Standards Alternative. Street standards may be established by
the city engineer and alter utility standards established by the public works director
so long as such alternatives provide the same or greater utility to the public system,
safety and long-term maintenance costs as the standards established by ECDC Title
s
18. a
r
a
f. The enhanced design standards contained in this title.
Exhibit 4 - Green
https://www.codepublishing.com/WA/Edmonds/cgi/menuCompile.pl PLN2022-004 Packet Pg. 89
9/26/23, 9:59 AM Print Preview
2. No modification of height limits shall be permitted in the PRD process.
1.e
3. Since the PRD process does not authorize the division of land, housing types that
require the division of land will require a short or long subdivision.
B. PRDs are not rezones. In no event shall use of a PRD result in an expansion of the uses
permitted by the underlying zone, or in density in excess of the maximum established by the
comprehensive plan and zoning ordinances. [Ord. 3465 § 1, 2003].
20.35.040 Criteria for establishing alternative development
standards.
Approval of a request to establish an alternative development standard using a PRD differs
from the variance procedure in that rather than being based upon a hardship or unusual
circumstance related to a specific property, the approval of alternative development
standards proposed by a PRD shall be based upon the criteria listed in this section. In
evaluating a PRD which proposes to modify the development standards of the underlying
zone, the city shall consider and base its findings upon the ability of the proposal to satisfy all
of the following criteria, if applicable:
A. The proposed PRDs shall be compatible with surrounding properties in the following
respects:
1. Provide landscaping for projects seeking to cluster lots under ECDC 20.35.030(A)(1)(b)
through the design review process and greater buffering of buildings, parking and
storage areas than would otherwise be provided through the subdivision process,
2. Providing safe and efficient site access, on -site circulation and off-street parking, and
3. Architectural design of buildings and harmonious use of materials as determined by
the ADB in accordance with ECDC 20.35.060;
B. No setback from the exterior lot lines of the PRD may be reduced from that required by
the underlying zoning unless a variance or subdivision modification is approved;
C. Minimize the visual impact of the planned development by reduced building volumes as
compared with what is allowable under the current zoning or through landscape or other
buffering techniques;
D. Preserve unique natural features or historic buildings or structures, if such exist on the
site; and/or
Exhibit 4 - Green
https://www.codepublishing.com/WA/Edmonds/cgi/menuCompile.pl PLN2022-004 Packet Pg. 90
9/26/23, 9:59 AM Print Preview 1.e
E. Reduction of impervious surfaces through the use of on -site or common parking facilities
rather than street parking. [Ord. 3465 § 1, 2003].
20.35.050 Decision criteria for PRDs.
Because PRDs provide incentives to applicants by allowing for flexibility from the bulk zoning
requirements, a clear benefit should be realized by the public. To ensure that there will be a
benefit to the public, a PRD which seeks alternative bulk standards shall be approved, or
approved with conditions, only if the proposal meets the following criteria:
A. Design Criteria. The project must comply with the city's urban design guidelines set forth in
subsection (A)(1) of this section and provide two or more of the results set forth in
subsections (A)(2) through (A)(5) of this section:
1. Architectural design consistent with the city's urban design guidelines for multifamily
projects or ECDC 20.35.060 for single-family projects for the design, placement,
relationship and orientation of structures;
2. Improve circulation patterns by providing connections (a) to the city's street system
beyond those which may be compelled under state law, or (b) to the city's alternative
transportation systems, such as bike or pedestrian paths accessible to the public;
3. Minimize the use of impervious surfacing materials through the use of alternate
materials or methods such as open -cell grid pavers or shared driveways;
4. Increase through the addition of usable open space or recreational facilities on site
above the minimum open space required by ECDC 20.35.060(B)(6);
5. Preserve, enhance or rehabilitate significant natural features of the subject property
such as woodlands, wildlife habitats or streams, historic or landmark structures or other
unique features of the site not otherwise protected by the community development
code.
B. Public Facilities. The PRD shall be served by adequate public facilities including streets,
bicycle and pedestrian facilities, fire protection, water, stormwater control, sanitary sewer,
and parks and recreation facilities.
C. Perimeter Design. The design of the perimeter buffer shall either:
1. Comply with the bulk zoning criteria applicable to zone by providing the same front,
side and rear yard setbacks for all lots adjacent to the perimeter of the development;
and/or
Exhibit 4 - Green
https://www.codepublishing.com/WA/Edmonds/cgi/menuCompile.pl PLN2022-004 Packet Pg. 91
9/26/23, 9:59 AM Print Preview
1.e
2. In addition to the setback required by the underlying zone (see ECDC 20.35.040(B)),
provide a landscape buffer, open space or passive use recreational area (hereafter
"buffer"). The depth of the buffer shall be at least equal to the depth of the rear yard
setback applicable to the zone; provided, that where the exterior lot line abuts a public
way, the buffer shall be at least equal to the depth of the front yard setback required by
the zone. The depth of the buffer shall be measured perpendicular to the boundary of
the exterior property line setback. If such a buffer is provided, interior setbacks may be
flexible and determined in accord with ECDC 20.35.030.
D. Open Space and Recreation. Usable open space and recreation facilities shall be provided
and effectively integrated into the overall development of a PRD and surrounding uses and
consistent with ECDC 20.35.060(B)(6). "Usable open space" means common space developed
and perpetually maintained at the cost of the development. At least 10 percent of the gross
lot area and not less than 500 square feet, whichever is greater, shall be set aside as a part of
every PRD with five or more lots. Examples of usable open space include playgrounds, tot
lots, garden space, passive recreational sites such as viewing platforms, patios or outdoor
cooking and dining areas. Required landscape buffers and critical areas except for trails
which comply with the critical areas ordinance shall not be counted toward satisfaction of the
usable open space requirement. [Ord. 4085 § 16 (Exh. A), 2017; Ord. 3822 § 2, 2010; Ord.
3806 § 2, 2010; Ord. 3787 § 4, 2010; Ord. 3465 § 1, 2003].
20.35.060 Single-family design criteria.
Because PRDs may utilize alternative bulk development standards in residential zones, the
following single-family design criteria are established to ensure that development of PRDs in
single-family zones will maintain a single-family character. Although the criteria listed here
are not necessarily consistent with every design characteristic of every single-family
neighborhood in the city of Edmonds, the criteria have been developed to create a
reasonable single-family residential setting. The intent behind these criteria is to ensure a
high quality of design and construction for all buildings located in single-family
neighborhoods where development standards may be modified through the PRD process.
A. Building Design.
1. Characteristics of Single -Family Development.
a. To demonstrate a residential quality, single-family homes should have a strong
connection between the street and the house. This can be accomplished by
providing a pedestrian access or walk from the street to the front door or porch.
Exhibit 4 - Green
https://www.codepublishing.com/WA/Edmonds/cgi/menuCompile.pl PLN2022-004 Packet Pg. 92
9/26/23, 9:59 AM Print Preview 1.e
Provide Inendly" peaestnan access
to front door, preferabty Meth a pore
b. From the street, the design should not emphasize the garage, but rather the
human scale and elements of design (this could include pedestrian entrances,
windows, and details that are a smaller, more human scale and texture).
2. Entries and Porches.
a. Porches contribute to the richness and warmth of a neighborhood, therefore
houses should have front porches consistent with the style and scale of the house
and the neighborhood.
'7 s as opposed to thrs
b. Main entries should be prominent and oriented to the street.
3. Materials. Materials should be used in a consistent manner on all sides of the house
In other words, do not use several materials to enhance the front of the building but
leave the sides and back unembellished.
4. Garages.
a. Garages facing the street or located at the front of a house should be no wider
than one-half the width of the house.
B. Site Design.
1. Retain Significant Features. Significant trees, topography and other environmental
features as well as historic or landmark structures should be retained and/or integrally
included in the design of the project. This might be done by designing homes that are
Exhibit 4 - Green
https://www.codepublishing.com/WA/Edmonds/cgi/menuCompile.pl PLN2022-004 Packet Pg. 93
9/26/23, 9:59 AM Print Preview 1.e
multilevel to respond to the existing topography or buildings which have an irregular
footprint to preserve healthy significant vegetation.
2. Vehicular Access.
a. Driveway widths shall not exceed 20 feet at curb cuts. Curb cuts should never
exceed this width even if they provide direct access to a three -car garage.
b. Shared driveways between adjacent homes are encouraged as a way to reduce
the number and size of curb cuts and impervious surfaces.
3. Garage Locations.
a. Homes should have a visually diminished garage front.
4. Landscaping and Buffering. Landscaping and buffering shall be consistent with the
requirements of the urban design guidelines.
5. Building Entrances.
a. Homes should have a dominant front porch and/or entry expression.
t
T d
Now heu� vADukA Watt porc►m do rut contnbute to
the ri "mm and vmrmth of the block
Exhibit 4 - Green
https://www.codepublishing.com/WA/Edmonds/cgi/menuCompile.pl PLN2022-004 Packet Pg. 94
9/26/23, 9:59 AM Print Preview
1.e
b. A separate pedestrian access should be provided from the sidewalk to the main
building entrance.
6. Open Space Requirements.
a. For PRDs with critical areas, separate open space tracts designated "critical areas
open space" should be created for their protection.
b. Usable open space shall be provided in accordance with ECDC 20.35.050(D).
7. Street Design.
a. Site design should include a residential neighborhood street design which
includes elements such as sidewalks on both sides, street trees and
planting/parking strips.
b. Each residential lot should have at least one associated street tree planted in the
parking strip if present or in the front yard if not. [Ord. 3465 § 1, 2003].
20.35.070 Application.
A. The applicant shall file with the planning and development department a preliminary
development plan, including the following:
1. A legal description of the property proposed to be developed;
2. A map of the subject property and surrounding 300 feet. This map shall indicate all
existing land uses, approximate building footprints and streets;
3. A proposed site plan for the subject property depicting the following:
a. Topography at two -foot contours for slopes 15 percent or less and five-foot
contours for slopes over 15 percent;
b. Individual trees over six inches in trunk diameter measured four feet above the
base of the trunk in areas to be developed or otherwise disturbed; and
c. Designated placement, location, and principal dimensions of lots, buildings,
streets, parking areas, recreation areas and other open space, landscaping areas
and utilities;
4. Drawings and text showing scale, bulk and architectural character of proposed a
structures;
Exhibit 4 - Green
https://www.codepublishing.com/WA/Edmonds/cgi/menuCompile.pl PLN2022-004 Packet Pg. 95
9/26/23, 9:59 AM Print Preview
1.e
S. Special features including but not limited to critical areas and sites or structures of
historic significance;
6. A narrative describing conditions or features which cannot be adequately displayed
on maps or drawings;
7. A narrative stating how the proposed development complies with the criteria, goals
and policies of this PRD chapter and the city of Edmonds comprehensive plan, including
level of service standards and guidelines contained in this and other titles;
8. Draft conditions, covenants and restrictions and other documents relating to
operation and maintenance of the development, including all of its open areas and
recreational facilities.
B. The applicant may submit to the planning and development director proposed
development standards that, if approved, shall become a part of the preliminary PRD for
specifying placement, location and principal dimensions of buildings, streets, and parking
areas. This alternative process is intended to accommodate the need for flexibility, while
ensuring that sufficient information as to the nature of the development is available upon
which to base a decision concerning the preliminary PRD. Proposed development standards
shall specifically set forth parameters for location, dimensions and design of buildings,
streets and parking areas. This information will need to be submitted in the form of a
narrative and drawings which demonstrate and describe how the proposed modifications of
the underlying bulk standards meet the criteria outlined in this chapter. [Ord. 4299 § 49 (Exh
A), 2023; Ord. 3465 § 1, 2003].
20.35.080 Review process.
A. An application for a PRD has two stages. The first stage, the preliminary PRD, includes the
following:
1. Pre -Application Staff Review. The preliminary plans of the proposal shall be submitted
to the planning manager for review and comment. This provides an opportunity for the
developer to work with the city staff to design a total plan which best meets the goals of
the city and the needs of the developer. Such potential problems as drainage,
topography, circulation, site design and neighborhood impact should be identified and
addressed before the proposal is submitted for formal review.
2. Pre -Application Neighborhood Meeting. The applicant shall host a public pre -
application neighborhood meeting to discuss and receive public comment on the
conceptual proposal. The applicant shall provide notice of this meeting to all property
Exhibit 4 - Green
https://www.codepublishing.com/WA/Edmonds/cgi/menuCompile.pl PLN2022-004 Packet Pg. 96
9/26/23, 9:59 AM Print Preview 1.e
owners within 300 feet of the subject site by depositing written notice in the U.S. Mail
postage paid at least 14 calendar days in advance of the meeting to all persons and
entities shown as having an ownership interest in the land records of Snohomish
County. An affidavit of mailing shall be provided to the city by the applicant attaching its
mailing list.
While this meeting will allow immediate public response to the proposal in its
conceptual form, comments submitted during this meeting are not binding to the
applicant or staff. However, staff may make general recommendations to the applicant
as part of the formal application based on the input from this meeting to the extent that
said comments are consistent with the adopted provisions of the Edmonds Community
Development Code and the comprehensive plan. As a courtesy, the applicant shall
provide summary minutes of the meeting to all of those in attendance within two weeks
of the date of the meeting.
3. Review by the Architectural Design Board. The design board will review the project for
compliance with the urban design guidelines, landscaping, and/or the single-family
design criteria in ECDC 20.35.060 and forward their recommendation of the site and
building design on to the hearing examiner for his consideration. Their review will be at
one of their regularly scheduled meetings, but will not include a public hearing or the
ability for the public to comment on the project.
4. The Public Hearing with the Hearing Examiner. The hearing examiner shall review the
proposed PRD for compliance with this section as a Type III -A decision.
If, after all appeals are exhausted, the proposal is denied, a similar plan for the site may
not be submitted to the planning and development department for one year. A new
plan which varies substantially from the denied proposal, as determined by the planning
and development director, or one that satisfies the objections stated by the final
decision -maker may be submitted at anytime.
An applicant who intends to subdivide the land for sale as part of the project shall
obtain subdivision approval in accordance with Chapter 20.75 ECDC before any building
permit or authorization to begin construction is issued, and before sale of any portion of
the property. The preferred method is for the applicant to process the subdivision
application concurrently with the planned residential development proposal.
B. The second stage of the PRD process, the final PRD, consists of the city's review of the final
plans for consistency with the preliminary PRD as approved. The decision at this stage will be
made by city staff. The final PRD will be subject to the following review:
Exhibit 4 - Green
https://www.codepublishing.com/WA/Edmonds/cgi/menuCompile.pl PLN2022-004 Packet Pg. 97
9/26/23, 9:59 AM Print Preview
1.e
1. The applicant shall submit the final development plan to the planning and
development director, conforming to the preliminary plan as approved, and all
applicable conditions of that approval. The planning manager shall review the plan
along with the city engineer and make a final decision. The plan shall contain final,
precise drawings of all the information required by ECDC 20.35.030. The applicant shall
also submit all covenants, homeowners' association papers, maintenance agreements,
and other relevant legal documents.
2. If city staff finds that the final development plan conforms to the preliminary
approval, and to all applicable conditions, staff shall approve the plan and its
accompanying conditions as a covenant which touches and concerns the subject
property, incorporating by reference all maps, drawings and exhibits required to specify
the precise land use authorized. A file shall be maintained by the planning and
development department containing all maps and other documents or exhibits referred
to in the approval. The approval shall also contain a legal description of the boundary of
the proposal. The covenant shall be recorded with the county auditor if no subdivision
plat is to be recorded.
3. The provisions of approval shall be restrictions on the development of the site.
Revocation of approval or abandonment as provided in this chapter shall eliminate all
requirements imposed under the planned residential development plan, such as
alternative bulk development standards, and shall cause the old underlying bulk
development standards to be in full force and effect. [Ord. 4299 § 50 (Exh. A), 2023; Ord
4154 § 20 (Att. D), 2019; Ord. 3822 § 1, 2010; Ord. 3787 § 3, 2010; Ord. 3465 § 1, 2003].
20.35.090 Final approval.
A. Time Limit for Submission - Extension. Within a period of five years following the approval
of the preliminary PRD, the applicant shall file with the planning department a final
development plan. The planning manager, for good cause, may extend for one year the
period for filing of the final development plan.
B. Final Development Plan - Failure to Submit. If the applicant fails to apply for final approval
for any reason within the five-year period, the PRD shall become void. All future permits shall
be subject to the requirements of the underlying use zone unless a new application for a
planned development is submitted and approved.
C. Final Development Plan - Content - Final Approval Procedure.
1. The final development plan shall consist of elements presented for preliminary
approval. The procedure involved in final approval shall consist of the following:
Exhibit 4 - Green
https://www.codepublishing.com/WA/Edmonds/cgi/menuCompile.pl PLN2022-004 Packet Pg. 98
9/26/23, 9:59 AM Print Preview 1.e
a. The final development plan shall be submitted to the planning department.
b. The planning staff shall review the final development plan to see that it is in
substantial compliance with the previously approved preliminary development plan
c. All drawings presented in the preliminary development stage shall be presented
in detailed form, e.g., landscaping, circulation, utilities, building location, and LID
elements.
d. If the final plan is in substantial compliance with the approved preliminary plan, it
shall be sent on to the decision -making body as determined by the underlying
permit process with a recommendation for approval by the planning manager and
the city engineer.
D. Final Review Criteria.
1. A plan submitted for final approval shall be deemed to be in substantial compliance
with the plan given preliminary approval, provided any modification by the applicant
does not:
a. Increase the residential density;
b. Reduce the area set aside for common open space;
c. Relocate the open space in a manner which makes it less accessible or usable to
the tenants of the development or in the case of proposed open space to be
dedicated to the public, less accessible or usable to the public;
d. Reduce any of the landscape buffers in width or density or quality of proposed
landscaping;
e. Change the point(s) of access to different streets or eliminate required
connections to alternative transportation systems such as trails or bike paths;
f. Increase the total ground area covered by buildings or other impervious surfaces;
g. Relocate buildings or impervious surfaces to areas designated as
"environmentally sensitive" or "critical areas"; and/or
h. Fail to preserve trees, historical, other unique natural features or landmark
structures that were required to be preserved by the preliminary planned
development approval. [Ord. 4085 § 17 (Exh. A), 2017; Ord. 3465 § 1, 2003].
Exhibit 4 - Green
https://www.codepublishing.com/WA/Edmonds/cgi/menuCompile.pl PLN2022-004 Packet Pg. 99
9/26/23, 9:59 AM Print Preview 1.e
20.35.100 Administration of an approved PRD.
After the effective date of the final approval, the city shall permit use of the land and erection
of structures in compliance with the plans as approved. Any use or structure inconsistent
with the approved plan shall not be permitted. The application for a building permit or other
authorization to begin work on the project shall be accompanied by:
A. Bond. Any bond required pursuant to these ordinances guaranteeing completion of a
specific portion of the project as authorized and approved, and a standard subdivision bond
if subdivision and sale of lots is a part of the project;
B. Deeds. Deeds to any land or properties intended for public ownership and use in the
completed project;
C. Plans. A complete project site plan and construction plans and specifications for the initial
buildings.
The city may deny issuance of permits if any plan submitted for construction fails to comply
with the conditions of approval imposed by the approved PRD. In that event, the sole appeal
shall be by mandamus to superior court. [Ord. 3465 § 1, 2003].
20.35.110 Modifications to approved PRDs - Final development plan -
Amendments permitted.
A. Minor changes in the location and siting of buildings and structures and minor changes to
lot lines which do not change the number or orientation of the approved lots may be
authorized by the planning manager without additional public hearings if these changes were
required by engineering or public works or are due to circumstances not known at the time
the final plan was approved or if they are located in a portion of the PRD that was already
identified for potential minor changes. Minor location, siting or lot line changes shall be
performed through a lot line adjustment between a property owner of a specific lot and the
homeowners' association as the owner of the open space. No change authorized by this
section may cause any of the following:
1. A change in the use, intensity or character of the development;
2. An increase in the overall ground coverage of structures;
3. A decrease in approved traffic circulation utility; and/or
Exhibit 4 - Green
https://www.codepublishing.com/WA/Edmonds/cgi/menuCompile.pl PLN2022-004 Packet Pg. 100
9/26/23, 9:59 AM Print Preview
1.e
4. Any reduction in public use or tenant use areas which include but are not limited to
perimeter buffers/setbacks, utility easements, required critical areas open space, usable
open space, off-street parking, loading zones, right-of-way or pavement width.
Such minor changes may be approved only if they are shown to be in the best long-term
interests of the residents of the PRD and do not impact the surrounding neighborhood.
B. Changes in uses, rearrangements of lots, blocks, buildings, tracts, or changes in the
provision of common open space changes prohibited under subsections (A)(1) through (4) of
this section and changes other than those specifically permitted above shall be reviewed by
the hearing examiner, following the same notification and public hearing process as required
for the original approval. Such amendments may be made only if they are shown to be in the
best long-term interests of the community as determined under the criteria required. [Ord.
3465 § 1, 2003].
Exhibit 4 - Green
https://www.codepublishing.com/WA/Edmonds/cgi/menuCompile.pl PLN2022-004 Packet Pg. 101
1.f
'12C. 189\3
A IM912a11T1lei �i
121 51h Avenue North, Edmonds WA 98020
Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.edmondswa.gov
PLANNING & DEVELOPMENT DEPARTMENT • PLANNING DIVISION
PLANNING DIVISION REPORT
TO THE ARCHITECTURAL DESIGN BOARD
Project: Greenwalk Park Planned Residential Development
File Number: PLN2022-0049
Date of Report: July 20, 2023
Staff Contact: ��ive�W
Mike Clugston, AICP, Senior Planner
ADB Meeting: Thursday -July 27, 2023 at 6:00 P.M.
Brackett Room, 3rd Floor City Hall
121 5th Avenue North, Edmonds WA 98020
Or on Zoom at: https://edmondswa-gov.zoom.us/m/88959586932
Passcode: 591531
Join by phone at: 253 205 0468
I. PROJECT PROPOSAL
Fernandez and Barnes LLC is proposing a preliminary planned residential development (PRD)
and formal subdivision of a three -acre site at 540 and 550 Edmonds Way into 16 single family
residential lots. The existing houses, outbuildings and most other site improvements would be
removed. A new access road would connect to Edmonds Way (SR-104) and two secondary
drives would serve the new lots.
PRDs provide flexibility in development standards that allow more compact development while
still requiring projects to meet the underlying zoning density. The applicant is proposing to
alter several development standards, and the design review process serves to ensure that the
development is compatible with the surrounding area, which includes larger lots and homes.
Exhibit 5 - Green
PLN2022-004 Packet Pg. 102
Greenwalk Park PRD
PLN2022-0049
1.f
FINDINGS AND ANALYSIS
A. PROCESS
Per ECDC 20.35.080, the preliminary PRD application in PLN2022-0049 is first reviewed by the
Architectural Design Board (ADB), who reviews site layout, landscaping, and the home designs.
ADB review occurs at a regularly scheduled meeting but does not include a public hearing or
the ability for the public to comment on the project. The ADB will make a recommendation on
project design to the Hearing Examiner, who makes the final decision on both the preliminary
PRD (PLN2022-0049) and the associated preliminary formal subdivision application (PLN2022-
0053) following a public hearing.
B. ATTACHMENTS
The following materials are included with this report:
1. Aerial photo of project surroundings
2. Applicant's project narrative
3. Site plan
4. Building plans
5. Preliminary tree retention and landscape plans
C. SITE CONTEXT
1. Address: 540 & 550 Edmonds Way (Tax IDs: 27032500308300 & 27032500308400)
2. Zoning: Single Family Residential — Master Plan (RS-MP). The PRD process is the master
plan process appropriate for the location.
3. Neighborhood: The project site is located at the western end of the Westgate commercial
area on the south side of Edmonds Way (SR-104) where the road splits off to the ferry lanes
and begins to descend into the Edmonds Bowl (Attachment 1). To the west is the Town of
Woodway, which is characterized by large lots and homes. To the north and south are
parcels zoned RS-MP, which are developed with houses of varying size. Across SR-104 is an
area of mixed zoning and development including single and multifamily residential together
with small businesses.
4. Environment: A critical area determination was completed for the project site in 2022 (file
CRA2022-0009) and found potential erosion hazard areas across the site consistent with the
generally rolling topography. There is a small steep slope off the site in the SR-104 right-of-
way that will not be disturbed as part of the proposed project. No streams or wetlands
were found on or adjacent to the site but there are two artificial ponds on the property.
The site contains a mix of native and ornamental trees around the more open areas near
the existing houses, driveways, outbuildings, and ponds.
Page 2 of 9
Exhibit 5 - Green
PLN2022-004 Packet Pg. 103
1.f
Greenwalk Park PRD
PLN2022-0049
D. PLANNED RESIDENTIAL DEVELOPMENT DESIGN CRITERIA
While the Hearing Examiner will ultimately determine whether the proposal meets the criteria
to establish alternate development standards for a PRD, the ADB must evaluate the project
relative to the specific single-family design standards that apply to planned residential
developments:
The design board will review the project for compliance with the urban design
guidelines, landscaping, and/or the single-family design criteria in ECDC
20.35.060 and forward their recommendation of the site and building design on
to the hearing examiner for his consideration. Their review will be at one of their
regularly scheduled meetings, but will not include a public hearing or the ability
for the public to comment on the project. [ECDC 20.35.080.A.3]
Because PRDs may utilize alternative bulk development standards in residential
zones, the following single-family design criteria are established to ensure that
development of PRDs in single-family zones will maintain a single-family
character. Although the criteria listed here are not necessarily consistent with
every design characteristic of every single-family neighborhood in the city of
Edmonds, the criteria have been developed to create a reasonable single-family
residential setting. The intent behind these criteria is to ensure a high quality of
design and construction for all buildings located in single-family neighborhoods
where development standards may be modified through the PRD process. [ECDC
20.35.0601
The applicant provided a narrative addressing compliance with the PRD criteria (Attachment 2)
Staff's analysis of how the project meets the standards in ECDC 20.35.060 for single-family
projects regarding design, placement, relationship, and orientation of structures is provided
below.
1. Site Design
a. Retain Significant Features
Significant trees, topography and other environmental features as well as
historic or landmark structures should be retained and/or integrally included
in the design of the project. This might be done by designing homes that are
multilevel to respond to the existing topography or buildings which have an
irregular footprint to preserve healthy significant vegetation.
The site is characterized by gentle slopes and contains a mix of native and ornamental
trees around more open areas near the existing houses, driveways, outbuildings, and
ponds, as shown on the aerial photo and site plan (Attachments 1 & 3). The applicant is
proposing to remove 84 significant trees to allow for the site development and retain 36
significant trees, as shown on Attachment 5. An existing pond would be retained in an
open space area near the center of the site (Attachment 3). Compliance with the tree
Page 3 of 9
Exhibit 5 - Green
PLN2022-004 Packet Pg. 104
Greenwalk Park PRD
PLN2022-0049
1.f
code in ECDC 23.10, including applicable tree replacement requirements and mitigation
fees, will be verified as part of the subdivision review in PLN2022-0053.
b. Vehicular Access
Driveway widths shall not exceed 20 feet at curb cuts. Curb cuts should never
exceed this width even if they provide direct access to a three -car garage.
Shared driveways between adjacent homes are encouraged as a way to
reduce the number and size of curb cuts and impervious surfaces.
As shown on Attachment 3, most lots would have an individual driveway off the main
plat road or secondary drives. Lots 14 and 15 would share a driveway. Driveway widths
range from 10' to 18', except on Lots 6 — 8, which appear to be about 25' wide. A
condition is proposed to verify driveway widths for those lots.
c. Garage Locations
Homes should have a visually diminished garage front.
The elevations in Attachment 4 show a variety of two- and three -car garages across the
eight proposed home designs. Some garages are more visually diminished than others
from the curb while all are visually diminished or not visible from the exterior of the
development at Edmonds Way. The front entries of each design project out further
than the garages in each case, some more than others. While these designs would
appear to meet the code, side -loaded or one -car garages would further reduce the
visual impact of the garages from inside the development. The code requires a
minimum of two off-street parking stalls for each unit but tandem parking (front -to -back
rather than side -by -side) is permitted for those stalls in single family residences.
d. Landscaping and Buffering
Landscaping and buffering shall be consistent with the requirements of the
urban design guidelines.
The urban design guidelines for landscaping are codified in Chapter 20.13 ECDC.
Because the project is surrounded by larger lot single family zones, a Type II or Type III
landscape buffer could be used along north, west, and south edges of the development
while a Type IV landscape buffer would be appropriate along Edmonds Way. Staff
recommends using the Type III landscaping; a condition is proposed for the Board to
recommend either the Type II or Type III. There are no specific requirements or
recommendations for landscaping on the interior of the development except for street
trees in the PRD design standards in ECDC 20.35.060.B.7 (discussed in section (g) below).
According to ECDC 20.13.030:
Type 11 Landscaping. Type 11 landscaping is intended to create a visual separation
between similar uses.
1. Evergreen and deciduous trees, with no more than 30 percent being
deciduous, a minimum of six feet in height, and planted at intervals no
greater than 20 feet on center, and
Page 4 of 9
Exhibit 5 - Green
PLN2022-004 Packet Pg. 105
1.f
Greenwalk Park PRD
PLN2022-0049
2. Shrubs, a minimum of three and one-half feet in height and other plant
materials, planted so that the ground will be covered within three years.
Type 111 Landscaping. Type 111 landscaping is intended to provide visual separation
of uses from streets, and visual separation of compatible uses so as to soften the
appearance of streets, parking areas and building elevations.
1. Evergreen and deciduous trees, with no more than 50 percent being
deciduous, a minimum of six feet in height, and planted at intervals no
greater than 30 feet on center; and
2. If planted to buffer a building elevation, shrubs, a minimum of three and
one-half feet in height, and living ground cover planted so that the ground
will be covered within three years, or
3. If planted to buffer a parking area, access, or site development other than
a building, any of the following alternatives may be used unless otherwise
noted:
a. Shrubs, a minimum of three and one-half feet in height, and living
ground cover must be planted so that the ground will be covered within
three years.
b. Earth -mounding, an average of three and one-half feet in height,
planted with shrubs or living ground cover so that the ground will be
covered within three years. This alternative may not be used in a
downtown or waterfront area.
c. A combination of earth mounding, opaque fences and shrubs to
produce a visual barrier at least three and one-half feet in height.
Type IV Landscaping. Type IV landscaping is intended to provide visual relief
where clear sight is desired to see signage or into adjacent space for safety
concerns.
1. Trees shall be deciduous and planted 25 feet on center and the trunk shall
be free of branches below six feet in height.
2. Plant materials which will cover the ground within three years, and which
will not exceed three and one-half feet in height.
As shown on the preliminary landscaping plan (Sheet L3.1 of Attachment 5), a mixture of
retained and proposed landscaping will screen the development from the surrounding
area.
Along Edmonds Way, an existing group of trees in the right-of-way north of the entrance
to the plat road would remain undisturbed. South of the entrance, several existing large
evergreens would be retained and several new trees would be installed. Other plant
materials are not shown along that side of the development but the landscaping is
generally consistent with the Type IV standard. Submittal of an updated landscaping
Page 5 of 9
Exhibit 5 - Green
PLN2022-004 Packet Pg. 106
1.f
Greenwalk Park PRD
PLN2022-0049
plan is included as a recommended condition of approval to allow the Hearing Examiner
to verify compliance with the Type IV landscaping requirements.
A mix of retained and proposed trees would buffer the north, west and south edges of
the project. Other plant materials are not shown along that side of the development,
but the landscaping is generally consistent with the Type III standard. The
recommended condition of approval requiring an updated landscaping plan would allow
the Hearing Examiner to verify compliance with the Type III landscaping requirements.
Regarding street trees, 31 deciduous Prunus Cerasifera 'Cripoizam' Crimson Pointe Plum
tree are proposed along the plat road and secondary drives. A condition of approval is
proposed for the City to determine the appropriate street tree during the civil
improvement phase on the associated subdivision.
e. Building Entrances
Homes should have a dominant front porch and/or entry expression. A
separate pedestrian access should be provided from the sidewalk to the main
building entrance.
Each of the eight house designs have front porches or entries that are identifiable, but
some are more dominant than others (Attachment 4). Some designs also have a
separate pedestrian walkway from the entry to the plat road or access easements while
others connect with driveways and broad surface parking areas.
f. Open Space Requirements
For PRDs with critical areas, separate open space tracts designated "critical
areas open space" should be created for their protection. Usable open space
shall be provided in accordance with ECDC 20.35.050(D).
As mentioned previously, there are no critical areas on the site other than erosion
hazard areas so no 'critical area open space' areas are proposed.
Usable open space is required and proposed. ECDC 20.35.050(D) states:
Usable open space and recreation facilities shall be provided and effectively
integrated into the overall development of a PRD and surrounding uses and
consistent with ECDC 20.35.060(8)(6). "Usable open space" means common
space developed and perpetually maintained at the cost of the development.
At least 10 percent of the gross lot area and not less than 500 square feet,
whichever is greater, shall be set aside as a part of every PRD with five or
more lots. Examples of usable open space include playgrounds, tot lots,
garden space, passive recreational sites such as viewing platforms, patios or
outdoor cooking and dining areas. Required landscape buffers and critical
areas except for trails which comply with the critical areas ordinance shall not
be counted toward satisfaction of the usable open space requirement.
Since the project site is approximately 134,121 square feet, a minimum of 13,412 square
feet of usable open space is required (there are no required landscape buffers or critical
Page 6 of 9
Exhibit 5 - Green
PLN2022-004 Packet Pg. 107
Greenwalk Park PRD
PLN2022-0049
1.f
areas). The site plan (Attachment 3) shows two open space tracts totaling 14,096
square feet (10.5% of gross lot area).
The code requires that the open space must also be usable. Tract A (6,850 sq. ft.)
includes a playground area with a basketball court while Tract B (7,246 sq. ft.) retains a
portion of the existing pond and deck and adds a small play area. Guest parking is
shown in both areas. Guest parking is not required for the development and is not
listed in the 'usable open space' examples in the referenced code but nor is it
specifically excluded. The road widths proposed in the development are reduced from
standard width to reduce impervious surfaces so no on -street parking is available. As a
result, the Board must determine whether it considers guest parking to be an
acceptable use of the usable open space areas for the purposes of this project and make
a recommendation on that to the Hearing Examiner.
g. Street Design
Site design should include a residential neighborhood street design which
includes elements such as sidewalks on both sides, street trees and
planting/parking strips. Each residential lot should have at least one
associated street tree planted in the parking strip if present or in the front
yard if not.
As shown on the site plan (Attachment 3), the main plat road would be 24 feet wide at
its intersection with Edmonds Way and includes a right -only turn movement to exit the
development. Further into the development, the road narrows to 18 feet wide with 5-
foot sidewalks on both sides that connect with the existing sidewalks at Edmonds Way.
Parking would be prohibited on the plat road and landscaped parking strips are not
provided. Two secondary access drives off the main plat road are 12 feet wide. No
sidewalks are proposed in those locations due to low traffic volumes. Street trees are
not proposed within a landscaped parking strip (no parking will be allowed on the plat
road due to fire access) but rather on most individual lots along both sides of the plat
road and secondary drives.
An area for a project sign is shown near where the plat road joins Edmonds Way
(Attachment 3). Any signage anticipated for the entrance must meet the requirements
of ECDC 20.60.025.B.2 which states:
The maximum allowable signage area for formal residential subdivisions,
planned residential developments (PRD), or multifamily structures containing
at least 10 dwelling units shall be 10 square feet per main street entrance
into the subdivision or PRD. Only one sign may be provided at each main
entrance.
A monument sign in that location could be up to 6 feet in height if it is set back at least 5
feet from any street or access easement.
2. Building Design
Page 7 of 9
Exhibit 5 - Green
PLN2022-004 Packet Pg. 108
1.f
Greenwalk Park PRD
PLN2022-0049
a. Characteristics of Single -Family Development
To demonstrate a residential quality, single-family homes should have a
strong connection between the street and the house. This can be
accomplished by providing a pedestrian access or walk from the street to the
front door or porch. From the street, the design should not emphasize the
garage, but rather the human scale and elements of design (this could include
pedestrian entrances, windows, and details that are a smaller, more human
scale and texture).
The eight proposed house floor plans range from about 2,750 — 3,700 square feet
(Attachment 4). While fairly large, the houses exhibit human scale elements typical of
most single-family projects using a modern design theme including facades divided
horizontally and vertically with different materials and projections and flat roofs. Most
of the houses have a pedestrian connection to the plat sidewalk or access drives.
b. Entries and Porches
Porches contribute to the richness and warmth of a neighborhood, therefore
houses should have front porches consistent with the style and scale of the
house and the neighborhood. Main entries should be prominent and oriented
to the street.
Each of the house designs in Attachment 4 shows a well -integrated pedestrian entry
oriented toward the primary or secondary access drives. Most of the porches appear to
be large enough to be used for outdoor seating, encouraging an opportunity for
neighborhood interaction.
c. Materials
Materials should be used in a consistent manner on all sides of the house. In
other words, do not use several materials to enhance the front of the building
but leave the sides and back unembellished.
Each of the houses in Attachment 4 shows varied modern design elements on all four
sides of the building.
d. Garages
Garages facing the street or located at the front of a house should be no
wider than one-half the width of the house.
Per the elevation drawings in Attachment 4, all of the garages are less than 50% of the
width of the house; however, a one -door garage using a permitted tandem space would
be less dominant than side -by -side two -car garages.
III. RECOMMENDATION
According to ECDC 20.35.080.A.3, in order to recommend approval of a planned residential
development of single-family residences, the ADB must find that the proposed development is
consistent with the criteria in ECDC 20.35.060. Based on the findings and analysis in this report,
Page 8 of 9
Exhibit 5 - Green
PLN2022-004 Packet Pg. 109
1.f
Greenwalk Park PRD
PLN2022-0049
staff is proposing that the ADB recommend that the Hearing Examiner APPROVE the design for
the proposed Greenwalk Park project in PLN2022-0049, subject to the recommended
conditions. The recommendation is divided into two parts.
THE ARCHITECTURAL DESIGN BOARD ADOPTS THE FINDINGS AND ANALYSIS OF
THE STAFF REPORT AND FINDS THE GREENWALK PARK PROPOSAL IN FILE
PLN2022-0049 IS CONSISTENT WITH THE SINGLE-FAMILY DESIGN CRITERIA IN
ECDC 20.35.060. THE BOARD RECOMMENDS APPROVAL OF THE PROJECT
DESIGN.
PRIOR TO THE HEARING EXAMINER'S REVIEW OF THE PROJECT, THE APPLICANT
MUST PROVIDE THE FOLLOWING:
1. Verification that all curb cuts for all driveways are a maximum of 20 feet
wide.
2. An updated landscaping plan consistent with ECDC 20.13 showing all retained
trees and proposed trees and landscaping throughout the development. Also
show any fencing being considered throughout the project.
THE BOARD ALSO RECOMMENDS THE FOLLOWING DESIGN CONDITIONS TO THE
HEARING EXAMINER:
3. As noted in Section II.D.1.f, guest parking is being proposed over required
usable open space areas. Guest parking is not required for the development,
but it is also not specifically excluded from the definition of usable open
space. No on -street parking would be possible due to the narrower road
widths used in the PRD. Given those facts, the Board has determined that
guest parking [can/cannot] be included as part of the usable open space
areas.
4. Street tree species will be determined by the City during the civil phase of the
subdivision review in PLN2022-0053.
5. Based on the Board's analysis of landscaping and tree retention, Type [II/111]
landscaping is required on the north, west, and south sides of the
development.
6. Any transformers, utility meters and similar features must be screened from
view or camouflaged to minimize their visual obtrusiveness from the sidewalk
along Edmonds Way and internal plat road and drives.
7. Staff will verify compliance of the proposal with all relevant codes and land
use permit conditions through review of building, engineering, and fire
permits. Minor changes to the approved design may be approved by staff at
the time of building permit without further design review by the Board if the
design is substantially similar to that originally approved.
Page 9 of 9
Exhibit 5 - Green
PLN2022-004 Packet Pg. 110
1.f
Map Title
0 225 450 Feet 8/12/2022 O
4' Snohomish County
Assessor wa:hingtc
�< If
;}' , ?� (L
m
d
Legend 0
Parcel
Recent Sales 2022
Recent Sales 2021
Recent Sales 2020
I'---------;
City Boundary
County Park
National Forest
Water
Street Types
Interstate
State Route
Local Road
All maps, data, and information set forth herein CData"), are for illustrative purposes only and are
not to be considered an official citation to, or representation of, the Snohomish County Cade.
Amendments and updates to the Data, ingather with other applicable County Code provisions,
may apply which are not depicted herein. Snohomish County makes no representation or
rt enty concerning the content, accuracy, currency, completeness or quality of the Data
contained herein and expressly disdaims any wemanty of merchantability or fitness for any
particular purpose. All persons accessing or otherwise using this Data assume all responsibility for
se thereof and agree to hold Snohomish County harmless from and against any damage,, loss,
claim or liability arming out of any error, tlemot or omission containetl within said Data.
Washington State Law, Ch. 42.56 RCW, prohibits state and local agencies from providing access
to rats of individuals mt ealfo'r ss�ro�jJ�a ry�➢qfl���� purposes a, rcial use may
be made of any Data co gar 6gWOVwiYlmf It ' s_nq com
Packet Pg. 111
1.f
GREENWALK PARK PLAT
540 & 550 EDMONDS WAY PROJECT NARATIVE
Parcel ID: 27032500308300 & 400
Property Address: 540 & 550 EDMONDS WAY
City: EDMONDS
Zip Code: 98026
Owner: Fernandez Barnes LLC
SW1/4 SEC25 T27N 113E
Existing and proposed occupancy: Single family residential
Number of stories: 2 story individual dwelling units
Zoning: RS-MP (plan to use RS-8 for underlying zoning requiring a PRD with master plan).
Number of dwelling units: 13 on 540 & 3 on 550.
Lot area: 2.33 + .55 acres = 2.88 acres
SEC 25 TWP 27 RGE 031RT-106) N1/2 NW1/4 SW1/4 SW1/4 LESS RDSLESS N 35FT OF
W 262.9FT LY W OF CO RD LESS PTN LY NELY ST HWY 1 W & LESS BEG 321. 83FT S &
30OFT E OF NW COR NW1/4 SW1/4 SW1/4 TH CONT E 327.80FT M/L TO E LNNW1/4
SW1/4 SW1/4 TH N ALG SD E LN TO SWLY MARG ST HWY TH NWLY ALG SD MARG
175FT M/L TO A PT 20OFT SELY OF INT N LN SW1/4 SW1/4 & WLY LN ST RD TH SWLY
285FTM/L TPB LESS ST HWY
Develop this site in accordance with RS-MP zoning criteria by developing a master plan for the two lots
complying with the requirements or a PRD. This includes two lot parcels 27032500308300 2.33 acres &
27032500308400 .55 acres.
Compliance with ECDC 16.20.045 Site development standards — Single-family master plan.
A. The site at 540 & 550 resides within the area designed MP. We are submitting a design that is
intended to occur at RS-8 densities and higher.
B. This project shall participate in the PRD (planned residential development) process.
1. Access and lot configurations are designed to reduce the number of curb cuts and
unmitigated traffic impacts on SR-104. Owners are currently working with WSDOT and
have received preliminary approval for the new access drive which will be an access and
utility easement, not a public road as determined by the City of Edmonds through the
pre -application process.
2. The configuration and arrangement of lots provide setbacks for all the perimeter lots
that abut neighboring zoning to utilize setback requirements for those lots, in this case
RS-12 setbacks. Some of the neighboring lots are in the same RS-MP zone, in these
cases we have maintained the RS-12 setbacks. Only lots that are internal or do not
physically touch neighboring lots are we proposing different setback requirements.
Exhibit 5 - Green
PLN2022-004 Packet Pg. 112
1.f
Compliance with ECDC 20.35
A. Our design promotes a higher density development than the base zoning of RS-8 which is
allowed through the PRD process.
B. The layout has different size lots and a variety of different orientations so there are a number of
different size houses and their design will be arranged to work with existing contours and
maintain as many significant trees as possible.
C. We have provided vehicle circulation systems using finger lots and access easements to reduce
the environmental impact of impervious surfaced roads, a significant portion of the site will be
set aside for shared use (Common Spaces) which will contain water feature, walking and viewing
areas and outdoor play areas for children.
D. The design promotes a variety of different building designs (currently using 8 different building
designs) and the relationships of houses to one another are varied with a combination of two
story houses, some with daylight basements and others with parking in the basement. The
architectural style will be contemporary in order for us to meet current housing needs.
E. Our proposal has combined the two adjacent parcels which have the most significant vehicular
constraints since the both front on SR-104 and combines access to a single new road with
controlled access to the highway that will comply with WSDOT requirements. Intersection will
be designed in accordance with WSDOT requirements.
F. The intent of the RS-MP zoning is to increase density in this somewhat under -developed corner
of the city that is within walking distance of downtown but is still a single family neighborhood.
By saving existing site features such as the water feature and perimeter trees along with a
portion of the existing orchard we can maintain the privacy of neighbors. A portion of the short
plat will include dedicating property to the neighbor to the south who feels that he has rights to
a portion of the property that extends past the fence on the south side of the property.
G. It is the intent to have 4 different price groups for housing within this community to meet the
needs of a wide range of income and age groups.
H. Existing site amenities are being preserved as previously discussed.
I. Permanent usable commonly owned open space is being provided for both active and passive
recreation which will be owned by the community and under the direction of the HOA that will
be established.
J. In order to create the open space, we have clustered the housing onto smaller lots and created
two separate open space areas for different types of activities. There are no steep slopes or
environmentally critical areas on this site.
K. We have reduced the amount of impervious surfaces but minimizing the amount of road we
need to building and have provided narrower access easements which will need to meet the
width requirements of the fire marshal. Since parking will not be allowed on the access
easements we have provided visitor parking areas adjacent to the common spaces.
L. The comprehensive plan designation for our sites is Single Family— MP. Our design willfully
comply with all tree retention standards.
1. Since we will be building the houses they will all meet current Washington State
Energy code and Built Green standards provide outdoor covered space in both the
front and rear of the homes for outdoor cooking and living.
2. Our storm drainage systems will be designed to meet low impact development
requirements and we will use pervious paving wherever it is allowed by code.
Exhibit 5 Green
PLN2022-004 Packet Pg. 113
1.f
3. Natural elements such as the water fall feature on the site along with it's
surrounding landscaping will be maintained.
4. We will be setting a quality standard for future developments within the RS-MP
zone to emulate.
5. The new access easement entry drive we are building will provide access to city
utilities and public transportation.
6. By creating a higher density development near the downtown core of Edmonds we
are meeting the much loftier goal of reducing sprawl and increasing the livability of
the urban environment.
7. We are doing what we can for affordable housing but within this portion of the city
the only way to increase affordable housing is to allow ADU and DADU development
to further increase densities on these sites. Since this is not allowed we cannot take
advantage of this opportunity.
REGIONAL GOALS
By developing these pieces of land to allow for more inhabitants in a restrained manner that doesn't
move any vehicular traffic on to any adjacent city streets, only on to the state highway we are
promoting the goals for the central Puget Sound region. This is the strategy of urbanization that is
designed to minimize environmental impacts, support economic prosperity, promote adequate and
affordable housing, improve mobility and make efficient use of existing infrastructure.
Due to the site's proximity to the downtown core and adjacent services such as grocery stores and
restaurants we have a unique ability to create this community where people can walk to downtown, to
grocery stores, banks, restaurants, etc. A truly pedestrian oriented location that is also well service by
existing public transportation.
By combining multiple parcels within our project we are combining access from multiple sites that will
benefit good pedestrian and transit access to the already vibrant downtown area. This will also provide
the new residents convenient access to the waterfront and other city owned parks.
SUSTAINABILITY
Fernandez Barnes LLC are committed to sustainable development as has been a part of their
development and construction processes since the company began. This commitment is enhanced when
they are able to control the land development from a pre -developed condition to a fully integrated
design which includes roads, driveways, access walks, the buildings, how the buildings are oriented to
take advantage of the sun, covered outdoor spaces to combine outdoor and indoor living spaces so they
work together seamlessly. This is why we prefer to be able to do our own short platting prior to building
design so we can define the perimeters of the sites and setbacks to meet the needs of the new
residences and how they interact with adjacent houses and access points. We are always willing to
participate in green built technologies and processes because we feel our buildings will be better and
last longer. There are small things we do in our buildings to implement climate change policies on a
micro level such as always providing charging stations for electric cars, providing ductless heating
systems and highly efficient ventilation systems into each house to maintain good indoor air quality
while minimizing the amount of greenhouse gas that is created. We do include access to natural gas for
cooking appliances for practical reasons.
Exhibit 5 - Green
PLN2022-004 Packet Pg. 114
1.f
COMMUNITY HEALTH
Our community spaces will be designed to encourage outdoor activities and provide a good reason to
get out of the house and go for a walk. A good connection to transit and sidewalks that lead to
downtown Edmonds and other local businesses further encourages people to get out and walk rather
than driving to the store. Most of our developments have been in urban areas and our designs have
enhanced the new owners access to activities outside the home.
ENVIRONMENTAL QUALITY GOALS AND POLICIES
We will be fully landscaping the sites where we build homes using native species and laid out in a
natural way to maintain existing wildlife habitat as much as possible.
RESIDENTIAL DEVELOPMENT GOALS AND POLICIES
Residential Goal A:
A. The homes designed by Greenwalk Designs have been consistently varied and provide changes
of materials and opening designs along with roof designs that enable them to harmonize with
one another without duplicating the exact same design over and over again.
B. Although we can't keep people from adding on to their home in the future our initial designs will
discourage future additions because they will be included within the original design and our use
of property configurations will not allow a lot of room outside of setbacks that will allow for
future additions.
C. Although we are situated on the top of a hill there are no real views within this new
neighborhood except the peaceful neighborhood and it's amenities. No views from adjacent
properties will be interrupted by this development.
D. There are a few houses on this site that are not historic and are not very well designed so
rehabilitation of these older buildings is not practical and would not provide the
environmentally sensitive solutions we will be proposing.
E. The new neighborhood we are designing will be built by us so we will control compatibility of
the entire community which will enhance the value of neighboring properties.
F. The houses we design are already planned to work with existing topography, trees, soils,
drainage and vegetation.
Exhibit 5 - Green
PLN2022-004 Packet Pg. 115
1.f
Residential Goal B:
A. We have laid out the lots to allow for good residential design where the interior spaces and flow
to exterior spaces provides significant benefits for the owners.
B. We specifically comply with "single family dwelling units near downtown" although the zoning
doesn't allow for attached dwelling units or ADU/DADU development.
C. Our site is located right on SR-104 and we are constructing all access roads and drives.
D. Preservation of privacy and views of surrounding buildings will be maintained.
E. Building heights will comply with same codes that surrounding neighbors had to comply with.
F. We will be constructing single family residences adjacent to existing single family residences.
G. Since we are designing and building nearly all the structures they will have a unified yet varied
design.
H. We have done our best to preserve natural features and have maintained some existing natural
features. The only grading we are proposing is for entry drives and parking. Houses will be built
within the existing contours.
SITE AND TOPOGRAPHY GOALS & POLICIES
As we have presented in this project description we intend to comply with all the comprehensive plan
policies that apply to the relatively small land locked piece of property. Such as, we intend to minimize
impervious surfaces and cuts and fills. Streets and access will conform to the natural topography and be
designed to reduce runoff.
We have no hazardous soil conditions and will comply with all the soils and topography goals defined in
'GOAL B". Erosion control will be built into our permitting packages.
VEGETATION AND WILDLIFE
As previously mentioned we are committed to maintaining and enhancing native vegetation plantings.
There are no wildlife habitats or critical areas on this site that will be disturbed. Removal of trees will
comply with new city ordinances and the open areas we will be leaving will include the existing
vegetation that are within or surround these areas.
AIR POLLUTION GOALS & POLICIES
We will do everything we can on this micro scale to reduce air pollutants by providing power charging
stations at each home for electric cars to providing only contained gas fireplaces within the houses. Our
location will do the most for reduction in vehicle pollution but being close to the downtown core and
services. There will not be any noticeable noise pollutants from this site with the possible exception of
playing children in peoples back yards. Our outdoor play areas are mostly well within the heart of the
development keep this type of noise as far as possible from existing neighbors.
20.35.040 Criteria for establishing alternative development standards
A. The new residential development will respect the neighbors and building massing will be the
same as adjacent properties.
1. It is our intent to fully landscape all lots taking care to buffer buildings and parking from
neighbors.
Exhibit 5 - Green
PLN2022-004 Packet Pg. 116
1.f
2. Provide safe and efficient site access, on -site circulation and off-street parking in
driveways.
3. Provide a consistent yet varied use of materials and building shapes to create
individually designed dwellings.
B. No setbacks from the exterior lot lines are reduced from that required by the underlying zoning.
C. Minimize the visual impact of the planned development by reducing building volumes by having
front and rear covered porches and other techniques to reduce building scale such as changes in
materials.
D. Preserve unique natural features or historic buildings which does not apply to this site although
the existing water feature has been saved and will be enhanced with play areas for children,
seating and lighting.
E. Reduction of impervious surfaces is a standard design feature currently used in all our
development projects.
20.35.060 Single family design criteria for PRD's.
A. Building design.
1. Characteristics of Single -Family Development.
a. All homes will have a strong physical connection to the street or access easement
to show a strong sense of entry and ownership.
b. Home elevation facing the street never have more than 50% of that elevation that is
taken up with the garage. Some of the homes have a 2 car garage and an additional
1 car garage stepped back 10 feet from the front of the house to reduce the impact
on the front elevation. All of the two car garages have a second floor above the
garage so the actual garage door area is never more than 25% of the front elevation.
2. Entries and Porches:
a. All houses will have a front porch facing the access easement. Some will have a
separate roof line over the front porch and others will have the second floor
extending over the front porch to create variety.
b. All main entries will be prominent and face the street or access easement.
3. Materials: Materials will be used in a consistent yet varied manner to create consistency
and interest. All materials will be used around all sides of the home including window
trim and various materials, there will not be a front wall with different materials than
the rest of the house.
Exhibit 5 - Green
PLN2022-004 Packet Pg. 117
LOT COVERAGE
LOT 1: 2,030 SF/6,757 SF=30%
HOUSE DATA GREENWALK
LOT 9: 2,030 SF/7,337 SF=28% HOUSE 1: (2) 3,686 SF 5 BEDROOM, 3 j BATHS, REC ROOM, 3 CARS ARAGE
1.f
0
of
0
N
00
0
0
w
Q
0
CD
a_
LEGEND
LOT 2 1 862 SF/7 627 SF-24% HOUSE 2 (3) 2 561 SF 5 BEDROOM 3 BATH 2 CAR GARAGE
. - LOT 10. 1,657 3F/6,545 SF=25% I . \ \\ \
LOT 3: 2,346 SF/7,889 SF=30% LOT 11: 1,884 SF/5,124 SF=37% HOUSE 3: (3) 2,907 SF 5 BEDROOM, 3 BATHS, 2 CAR GARAGE \ \
LOT 4: 2,346 SF/7,701 SF=30% LOT 12: 1,884 SF/5,022 SF=38% HOUSE 4: (2) 3,195 SF 4 BEDROOM, OFFICE, 31 BATH, REC ROOM, 3 CAR GAR \E \ \ \ \
LOT 5: 2,262 SF/7,213 SF=31% LOT 13: 1,657 SF/5,752 SF=28% HOUSE 5: (1) 3,607 SF 5 BEDROOM, 4 BATHS, REC ROOM, 2 CAR GARAGE \ \ \ \ SDMH
LOT 6: 2,284 SF/6,437 SF=35% LOT 14: 1,862 SF/6,909 SF=27% HOUSE 6: (2) 3,601 SF 5 BEDROOM, 34 BATHS, REC ROOM, 3 CAR GARAGE \ \ \ \ RIM = 266.00'
LOT 7: 2,262 SF/6,397 SF=35% LOT 15: 1,844 SF/6,626 SF=28% HOUSE 7: 2 2,753 SF 4 BEDROOM, 2 BATH, 2 CAR GARAGE \��� "
() � �, � a \ \ IE(NW)=250.46 48
LOT 8: 2,284 SF/6,700 SF=34% LOT 16: 2,030 SF/6,757 SF=30% HOUSE 8: (2) 3,223 SF 5 BEDROOM, 3 BATH, 3 CAR GARAGE �\\ ��\\ ': -_--\ _-- \ \ \ IE(SE)=250.80' 48"
IE(S)=262.08' 8"CONC
U
Im
c
0
LLJ
0
J
Qv�
Lo w
�c
/Il
0
m
Uu
u J
W
prLw
O <
All • ��
VIA
•♦�♦♦IOWN »♦• ��� \.
10.►s-►i`I> I . , ► iv III ;-ty_4jffjji
]aim ��l ,0i��\�•e�,.. - •
N VA MEN, Arm
: �♦♦�I,�►��♦♦♦I,��♦♦�I�►�� �♦�. �♦OI�OI �� �'� ., � i,1.��` i,♦,♦ IO,;� I♦ �♦I♦,►.�7� C .. i
�.♦»♦,♦I»♦♦sr♦»♦♦.- - O�.♦� > �, COI,♦,♦+�♦♦�♦�;I�I�♦j ♦ ♦♦ �-�►� ��� \� ►.
���L.�_�Iw>I„I;�♦I„♦♦♦I„♦j�►� � .�.IO»♦ IO»♦ ,> IO ,, �►I ♦♦di ....,, � ♦✓� ♦ ��/� � � - �r �
♦i, > ♦ orr,♦♦e�� ..._. V»i♦♦ ♦ ♦ ♦i♦ >i, ��>♦♦♦�rr�rei,�>♦i♦ei,♦r,i •• • �:-� �. r',�/
�■�� ►.�♦I ✓♦♦I »�i - IC■nn / yj,>IO, • �I♦♦>II i ►>♦♦♦�»♦♦ ♦I »♦♦♦I,I.. �.�i/�/� \
♦>♦ s►✓»♦�♦O♦� ...1 !♦�♦j♦ ,>♦♦»j♦ I✓�`♦♦♦♦♦ ♦♦♦♦gin .�/i • � '� `I%� �
« 0I ♦♦ I II I♦ II >♦ ��►I »♦♦IO,IO,�♦I♦,I♦,O�/ ��♦I »♦I �'i��� \ �
i♦I ✓ ♦I'i II > II •' i►♦II ♦♦ > I♦ > ♦.sue. `� - �1��
N.♦I,�>♦✓>OI,��OI»♦�♦♦I,♦I � ' � 1♦,I♦„♦♦♦IOj,♦♦♦I♦L� - _ - w♦� �rw�I�I„0♦I„♦♦,�IPER♦IsI,��
�._�i, ��.E ..�_./ ► II»iI>f.- �. � .�♦»♦ I� �% ♦ of ♦♦ei„♦♦♦i„♦♦r♦� IMP
►♦i, ♦i»♦ ei� � - _
._r`� ����d ��I -- .� Rio„„♦ice♦� i�°io♦i♦���i♦„>i♦� �i♦ei��>♦I �. A�w�:� �♦ ♦ir>r 1 • �♦ �ei,�>ei♦�i,���.��, �'�i �� :. , / 1.. .
►. .► �1 � y✓♦„♦♦♦I� � , - , ,>j♦♦v ��!►� ��I,,I♦♦sr>„♦♦♦�� I ♦♦,�y0♦>� �>♦»O♦»♦j♦♦♦»♦�♦s� i • • •
��o, 11:®% IO ♦♦ > ►I: I♦» ► ♦I >I ♦I ►♦I, ♦I »♦♦♦I, ♦I ♦♦» ♦I
�V: ■. ��1 ,� �♦,I♦„♦♦♦I� ►O I♦»✓i, �� /� ►>♦I d>♦♦ .. - . I ►>♦I♦♦I »♦♦� �I♦OI♦ ♦I ♦I,�>♦I ♦�♦��♦ , dw�► - • .
.���/ •..�� �o.Gliml.L! ►s♦I ♦♦jI0♦♦»��isis_I, �✓I;�» '�♦» ♦01,>.✓»♦♦♦♦ •. ►♦>♦ ♦♦>�.�.-� - �,.-, �
SOMEONE mom
mom
IN
000000
polo, mom d-W
:: ��r� � _ �_♦♦�► �, ��i �I♦�♦�♦ Ii .♦� � :! ►!�♦ ICI �I ♦♦♦,> II�i� iuu♦♦ ��' _ � IIi ♦♦.♦,ion .. i0�♦ ♦� �♦ � �>�♦ ♦� �♦ ♦� I � , �!��'� ♦i � ®-��
ice:+' �Sv�O- i��� - �t�' .i�, „♦♦ �,♦♦ �� ", - ,�♦. � .1 • •. � � ��
_ �»i♦,i♦»i' � ,::, ..:� ��,♦♦♦�� �:_.�� ♦,e♦„♦, a � `� �> ' • � - � • ;,, ,fib• . ��� .,� � i
II r
- ,I� - IIIIa ♦ I♦ >j�s„>♦I,'sI, • • - .:
Y A•♦Y YY Y v Y I •
- %)YY G ♦YV Y YYY Y�
,.IO
y,I1„>I♦♦I♦„♦I♦�►I>j,>IO,,� ��� e e - �'�,�i.► •;'•:� ,.Y • � �� Yip,, �. ► �,
.�♦v♦♦;0,�>jp♦I♦��>-♦I j0��♦Ii 1 e II ;� .. -a. � . • - /�-�-�•��YY..YY��:=.�•`•�=_ �,.Y.,►�Y! ��
1I � �� l4YY► Y�.•..YY. .YYV O
•
,�7 _ � _ ii:i � 0 �Yi♦Yi•Yi�Y`i19�YYYYv-�YYYY•, .��
Y Y Y Y Y
'. i � �� �- I�r.■n - � �����`s 1V► L'.�t•Y aY•,Y YYYY YYYYYY
..WINv � •w►^ �Y Y Y Y Yr �
�_ ! gyp... � ► . ��� `� l• SLY � ,�/ ,- ,IVY, •�
pc
,� :r • • ►DMrI♦„>I♦»♦,♦I♦»♦.>,O I, ■ e ���,� w��.�c�fv�� 001, ,♦O>0�� ��♦s,,.+�s►I,♦;►.I♦;/vi♦I� \!�� ,.Y-.��.,,
►♦I,,O ✓✓»► >♦♦,>�I�\►►I I >O I ►•11 I ♦> ►♦>♦♦�j��. �> ✓v♦ I♦ I, I♦I> ♦O .Y�►••�'
;��II ��I : •1\r, ��•.■� ,1_' �Iy�,�r■iI�sII<Iy�va�:Ij'II♦�'III,�Id„'>� ♦I,,hy!I,>;♦I�,�IJO�IwIyIO�i'>�3!IIL��♦�I �� i ,i.:.��.:.:.:.:.:.=..: II``i - • �� '��N�� y1♦I O ♦>,j _ , ♦O»,,I�� /��♦I'�1JyIII»0II»Ij»I> O♦♦I,j'IIs"0II'1I����� ��►e1♦.♦>0I♦II ♦I» ♦»♦»j,♦>jO♦♦IamI'A�0r�♦I.I+1I�� ►1�♦IIIjH„z♦I♦���� -s-♦I'y-I�'♦'.3->,-I,.v1;-., , 1 ;�►,,I!.'III1>III,
II♦I„I»IIO,II,v II�s♦.I�►♦♦Ip♦IIIIA1�;♦ „III�I♦� >,♦I>III♦s♦+I♦'I
II'I►►Ir�J>I♦>IIj�y,I ♦�♦III�♦II�♦ I �� ' �J����rI,-�...■.■.■.■�.■-■-■■■■. �� ' ���'♦��,.YY,�. .:.���► p�..=,Y.�,�«.�.��.,.YvYY.�Y�YYYYY.YY.vY'YYY'� �YYY►'YY'� �YYi�.r.�..YY.•YvY
•,
�
• YYYY,.••Y► O.
1 ►s♦+,II»j♦II»I,,+II>III - ,r, I ���� ►II„♦III,y�I♦,.♦II„�I 1I»j�I„♦, - 1 ►a'III « , yI1>vI ........... '�I� -,,, �.Y..Yv=@►.�•Y.'= "YYYYY�.' �O '
11� ►III>♦♦I'I»♦♦II»� i II♦♦j�7►II, >j ►III»IIII>�'II, III>v�»j II» I ►II> 7►II »j♦ ,:v�YY ..�Y•��..vY YY�.••
• `.�� III'>♦♦I�►I>j♦✓I,II,, �I„>II I>♦♦III Iv�II,II„♦I>j♦♦II »j�,� ►♦I„III >♦jvI I C♦II ✓I A>♦♦Ij �.Y v �. YY �Y Y YY r `
►.II►„♦♦,IIII>:►t IIII i IIdI♦ II� / �'.> ♦II'1►IIII♦II>j I ►>♦♦II»j �AsII�.♦♦ I� • •�.1♦II>I'►III►,II>�►I♦Iv �!�' �+ ,n�� .'�YYYw ��YYY ►�YYY�'
--♦ II ♦♦IO ♦•t II II ►1> IO >j II •� �1♦,►IIi�O_.LG� II» �i I♦>, ,I ►AII 1I>� �> II > II» II _ - '� ,+y Y Y�•Y ►Y YYYY •.
��:�,jl''sII>�►II,,,I♦I,III��j,♦+'I0>I '♦9z 1 1 I I -. , .y.�-- III>I .� - �♦ ♦ II � Ise;» III II L►II' I►II'�I>� . u►�YY� Y Y Y� v�Y► •
-_O.►�✓o�..ia_I,.I+ IIIe �► I r��� I/II�♦'j I>I»♦�s►I IOIII,II,�� ��i♦1:R;.If,I ►�I»♦♦ II♦>j+►-I_.�►�/.� • ►-
►III»I ►I> - . I�, I� ► ��/� ►♦II»j ♦II»♦♦IOC - yII»j♦II �Ip��.►>>JI�1 � ISIIIII IIII r �i �li `9iY�YYY= i�YYY�Yi�YYY�� l�/ II»isI III' .' \�, .. ►II,II > II»j♦I� III»j III--�.��.1!�.� II„III�y♦♦�� \ e�:�,.YYY �L.��_Y..YVY�_Y•►�
., II• - - • �i . A � � �I > II»' ►II>j 'sllly��f- �s�. .II >I ►II � I �-yY�Y►..Y�►�YY•.v�YYY..Y�
�/ Y Y Y► • �� L�j ��'sII,♦slls ♦;♦I�! : / �' IO♦> • >♦♦I� �♦>IO,II>♦j�I,,.��,IO �rtIIII,���I,�>I 's: , - . 4 � ,� � L. ��= vYYw���c�Y=��iiY�� v.- ..
•sue --OOI .►I» II II II II � Ij,♦ II I: I I >II>� ✓I � � ��►��� .. YryYY►. ,.v Y Y �..�
• �I�►»♦��III'♦./d�I ,`'_ ,II> II »-I-♦i�,I♦ I«Ii.♦II ►L►•I,♦I,✓II,I - . �'`. - ���r� �..�Yv ��^•.�•YYYYYY�Y Y.
• • .. r♦I,III,II„> �II / ��/ � ►II♦jp♦II>,♦II ♦» • ♦O� r♦y,♦♦I��,I� ., �� �. �� .. ..�,,�Y,�..Y�,.Y.. •
i�",� �♦II si♦I It O ►II„I♦II,II„ �IO�II ♦I♦� II» I✓I!>/h : �.- � .. ► .. �. Y == �Y� ► � .
��/� �»♦♦I I,� ���� � 10i�.�I>I , I• ► I0, ► I♦II I•.� , s�� ►��t ��Y..�� r.«,.Y�
.. ►II>II � � � - II>I»j � > I,>I > I Ij,♦� lIl-.r►h �%ir\ �Cr� �� .,YY i • 1
.YY Yv
► I♦♦♦ I �>I > III> -_�sl4is/0.. 10j�� .■Y ter/ I,�I������� ,.�`�.� ��� � � i > ♦III � - II >♦jI'sII >♦�� ..
i��; .�®�.� Jj •�• III„II> � �I �I»j II»♦'sI � 1 �► ::�. � ■
-. � � ♦ . � � ►♦IO>,jIII �,II, Ij♦IIyI�,:�� -- I: I��� yY, • � 1 I,1 ' 1 • 1 e • ,
II0 • � • - e 1 1
♦ • ��-w! i iiiiiii ` • O •
- • '..� Ali � : � - ' �. .. ,�♦ilNSil�♦ ► ;...1 .. •
e • - .- - - . . � � _; •-_ . _ �r[ . _,--� �i�- - O♦ II, III �Ir . W��� � �
• 'v �N�►' I) .. ��- emu■■■, - . II _ • 1 1 I1 1: 11
►ol
III ♦♦II ->� .♦II»♦,iI
\ I
►♦♦Lh„♦♦I � `�.:.� - � ty�� �-.-"•;��•���✓;�-�•„�i - .� = � ► � -- .-� • C ' � ,, - fI♦,:♦II>rI Iv � 's=.���- � 1.►�j♦II„>Ii \
iELI
►I,III,♦♦♦II`i� --w ' ���� ►I �,♦� ��i♦I,I♦♦♦♦II,I III�Ih�♦♦Od II,>jv I♦>Ij,>II! •� ,Iv„♦I ✓♦'j♦I ,»j♦III» `. • ' ' •' • 1
�. Ij✓II ♦•II I O.�ras» »I♦�» ♦III>j II o - ►'I»I's•IIII - - �.,/ ,,�/ II»y L.II,�♦♦I, II»III♦II�♦I♦>I♦>I • ��% �
�'�I♦I>Ii,>i1-II,�I♦s� � _ �,♦,.�►,�'iI1,II,I>�r♦,♦I♦I � s �J ,II �I'♦/�!y>� �'- f..II,I♦iI •.,II>� ►I >,I'siI»� III>I'si ° ,, - • 1 1
►r,,�>iI I,►,� _ 1 �,rli�,►♦♦r ♦rI♦i� ,.�, �i,�•!�.►�ovr��i. :: , � ��•;.�>ir„>io°i���>iov ►, ���,♦�♦ril,�>i� .. .
♦i�i.Iy-.v-�rl: ►>I , .. ✓, II , ► ♦iI ♦�I . Ivlst►I - III s:��►♦♦II �:�� TAMAN
9»j II ♦j♦IIII I♦ ♦pI♦„I, ►I„♦III„� ♦I♦♦,I♦Iv1
u�I II»j II» III> II, > � }� ■ -- II �.I♦II II II � li II II ,+II ♦ ♦ I I�'
s9 I�' II ♦ II , +-.. �.:T., � _-III ♦.. `.>I .. II ♦♦II I` ••% -�.. . III II ►II ,II>I �1♦II >II�!
-- II II ► I II L . - rr ay II .+II I ► II II ...► , I ♦ II i II 10>I ♦ II II 1 •1 1 - • - 1 / 1 .! II I ♦ � .I' 1 . ♦ ♦� I I
♦ I I ♦ II
i► s-ice ♦ �►+ I I✓ Cv ♦ is+ II . II I ♦ II ♦ ♦ - .� ,WedII ♦ p I I ►I ♦I
I I I► II II' _ I ♦ II II I ♦ ♦ I o I r
I I I
�II,II„♦✓I,III,II„ �.�IIi�2Owli�.1, ::',♦♦,Iv'„'II,IIII; II »jI♦s►,,♦♦„IL♦II„ , e��'� 1 1 I,III_ . r I ♦III»j,`. ►♦.►IIi�,�O.LO �Ij♦II„�i♦ 1
>?ISi♦,�'II,II,,,II,�yII fir♦�'Ii�s'.♦BSI 11�.. ` • ►III♦II »♦ II ,III >I♦,,II »♦�I„I j�>♦♦III►��OI,II I>♦♦I�I - iiiii ► \ ,♦II »♦�I„♦v►♦III ���-I0,♦I,OsII �+♦v
�II,�III>,♦♦III »♦,+II »♦♦II,II,I v♦� I � T.00 s �I> y♦♦III„♦♦p,Ij,IO„� . , •III, >♦II„I, • ,�I>Ij♦IIIIjrs>II>Ij� y>I�. Il,ysII�II,�O„� �,� • . 1
!J�slvOr��♦q�,II„♦II ,II�IIy,�.� NAME ` I,♦' sIO�>jII• , �':•y m II,�� �� �: � .II„♦II„>I/ I>j�Ily 1 u 1 1 ►II,w I. i/I„� , ��
� II„♦♦`♦,� � ,.►.iII • • ,I,�,I►r.II _ ♦> I II,� �.r►�-Ili�� I► ♦s� I ♦I ►n; O IIII �!,� ♦♦ �I ► II I / 2��i
o.II Imo=✓s' ♦ Is+>I »iov� �I=y-�> II _.- s•♦,� ♦�II,y, ,� • •♦♦II s♦s!� IO� >iI>v
II II I y �,�.♦II ,. II/>Ir>A II ♦/♦•/• . i7L1���iIhC$"•"■"' • • II /► II I♦w�
�♦�t`I IIl♦>III� � ■■■■■�/� I>�'�e: � ,IL♦ , I�-- :
,II„♦,►s.II„♦♦II,4,♦♦IIIIII '• �o,L,�Ivy��I/jIv :.sI
►III��✓II, II »♦�'il�-•, •�a•� II ►I ♦>II I> I,
� ,»>♦'j,'II »jII�,♦♦IIIII>v • • • 1►II`>✓ >II�►I >♦♦II III„♦III ♦,
►II> II» IIo+>I♦ II »♦� � III�.,�Ilsc�♦II„ arI» II ..�►�.I/jIIII,;
►I;,II
►_GI�`!si_o.�>i�, sI4�.,i�.Glis. � `� fir.►>.rs�»♦♦II»♦�♦III ♦ I» II _
14
16
.0 •
.0
4.75'
NORTH
PRELIMINARY SITE PLAN
1-� E SCALE: 1 "= 20'-0"
0 20 40
GRAPHIC SCALE
Exhibit 5 - Green
PLN2022-004 Packet Pg. 118
1.f
UP
Q
/
N
Q
O
O
/
T
O
Co
7D
O
E
7D
W
0
/
LL-
Ln
6j
0
N
N
O
N
W
Q
O
J
n
O
U
U
QcQ
u�
z
O
ui
N C
C�
U
L Z
c
CV m
u N
.
Z J
O2
a-w
Z N
u �
Q
Q
i=
O-
C� LLJ
J
Co Q
N uJ
Cn
© GREENWALK DESIGNS LLC.
3954 REGISTERED
AR CT
STEVEN A. BARN ES
STATE CF WASHI NG l CN
�
N
Co
Coo
O
Zo
�
J
M
CO3
r
�
W
W
0
Z
O
O
Q
LO
O
O
O
z
u
w
w
G
z
ry
w
In
w
cn
Q
m
N
W
N
U)
N
_O
w
U)
w
w
>
�
U)
o
Exhibit 5 -
Packet Pg. 119
1.f
2
O
U
U
c
Q
w
Z
O
Lu
01 c
N 0
C� U
L z
c
CV m
u .
Z J
OQ
�Lu
© GREENWALK DESIGNS LLC.
3054 REGISTERED I
AR CT
STEVEN A. BARN ES
STATE OF WASHING I CN
Q)
co
FIRST FLOOR PLAN
/
SCALE: 1 /4"= 1'-O"
cn
O
BASEMENT 834 SF
z
Q
FIRST FLOOR 1,292 SF
SECOND FLOOR 1.560 SF
LLJ
TOTAL FINISHED AREA OF HOUSE 3,686 SF
o
j
GARAGE 686 SF
0
J
LL-
L�
75
Q
z
z
Q
n,
0
of
0
N
N
O
N
AVERAGE GRADE:
51.17X263+67.42X269+51.17X272+67.42X267=63,513/237.2=267.8
51.17X270+67.42X271+51.17X278+67.42X275=64,852/237.2=273.4
()
ry
Li
L Ij
J
F-
w
w
2
Cn
4w
0
O
O
z
U
w
O
ry
n
z
O
Cn
w
W
Q
0
a_
Exhibit 5 - Green
PLN2022-004 Packet Pg. 120
1.f
r
c
I
N
Q
O
a_
N
Q
N
O
/
O
cn
O
F
w
0
LO
/
LL-
L�
75
Q
z
c�
z
Q
n,
0
of
0
N
N
O
N
1 A'—P" 1 A'—(1°/ i n'—r" 11 I—ra -4°-1 er
2
O
U
U
c
Q
w
Z
O
LU
01 c
N O
C� U
Lf? Z
Is c
CV m
u .
Z J
OQ
�Lu
© GREENWALK DESIGNS LLC.
3054 REGISTERED I
AR CT
STEVEN A. BARNES STATE CF WAS! ING 1 CN
Z
Q
SECOND FLOOR PLAN
1,560 SF SCALE: 1 /4"= 1'-0" 0
W
J
H
F—
W
2
Cn
w
O
O
coj
03
0z
w0
9o
W
C)
0
L0
C)
r
O
z
U
W
0
ry
n
N
N
N �
z
N 0
Cn
LU Q W
o 0�
W
Q
0
a_
Exhibit 5 - Green
PLN2022-004 Packet Pg. 121
1.f
I
r�
Q
w
J
W
Q
/
N
O
/
O
O
F
LLJ
O
Ln
LL-
of
0
N
N
CD
w
Q
0
0
a_
0
000
1=1 Lm
M[--j
FRONT ELEVATION
El El
Efl Efl
------------------
ELEV SCALE: 1 /8"= 1'-0"
0
u
SIDE ELEVATION
-L- SCALE: 1 /8"= 1'-0"
00
---------------
-- ---------- --------
292.8
o
—
U
U
QcQ
u�
z
O
-00
z
J
QU)
Ln w
c
Il
0
m
`)
Uu
u .
o
O <
a-w
zw
04
u
W
N
Q �
i=
i�
O-
w
Co
C�
N uJ
Cn
© GREENWALK DESIGNS LLC.
3954 REGISTERED
AR CT
i-JCTEVEN A. BARNES
IATE OF 'WASHING-1 UN,
—9'-4 F
U)
N
U)
Co
�
0
oa
z�
0
03
— 292.8
W
00
w
z
0
w
0
M:
A3ml
Exhibit 5 - Greens—u-O—L,—
Packet Pg. 122
1.f
LL-
L�
75
Q
z
z
Q
n,
0
0
N
N
CD
292.8�
1'—11
0' —0 11
267.8'
--�--- ---- — — — — — L
—
��---I---- IL ---------
REAR ELEVATION
EEEV SCALE: 1 /8"= 1'-0"
292.8�
- - - - - - - - - - - - - - - -7)0
SIDE ELEVATION
EL- SCALE: 1/8"= 1'-0"
J
Q U)
rZ
V
C1�
zw
0
w
L.0
V
O
U
QcQ
u�
z
O
CL
c
LLJ
C
C� O
O
s
z
c
CV m
u N
.
Z J
O2
�w
© GREENWALK DESIGNS LLC.
3954 REGISTERED
AR CT
STEVEN A. BARNES
`` STATE OF WASHING T UN,
�
N
cl)
Go
O
Zo
�
J
M
03
r
�
W
�
�
W0
n
v /
C)
z
Lo
0
0
Q
0
>
z
w
J
u
w
w
ry
0
w
ry
I
n
L�J
N
6i
N
N
_O
w
U)
w
w
>
�
U)
o
A302
Exhibit 5 - Greens—u-O—L,—
Packet Pg. 123
1.f
59'-3"
3'-3"
41'-6"
14'-6"
11'-6"
10'-0" 7'-6"
13'-0"
4'-0" 6'-0" ol 4'-6"
r—
I
— — — — — — — — — — — — — — —
— — — — — — — — — — —
— — — — — —
10
— —
— — — — — —
— — — — — —
— — — — —
—
I
0
00
o
I
o
I L
BEDROOM 5
10'0"x11'0"
BATH — — FRIG-
1
I
DINING
L —
--— — — — — — — -----
I 0
I
14'0"x13'0"
z
CD
PANTRY
— — — — — —
— — — ol 7'-4"
Ln
GREAT ROOM
I
i lo
14
15'0"x16"0"
I
I
DN 3'-6,lo
I
2'-8" 3'-6" 3'-6" '_8
6" 2'-10"
I
PARCH-
7SF
TT—F -7
r
`�_
DN FRIG I
1
I
1
1
6'-9" 1
------�--
I
Lj
OVENS
I
0
I
1
1 II
1 0 I
II
00
I 1
I �
1 II
I 001
I COVERED I
1
11
GARAGE
464 SF
I
i 1
KITCHEN
PORCH
i ss SF 1
1 II
I
I DN
D/W 1
II
-- I�
I
II
— — — — —
— — — — —
BBQ
— — — — — — — — — — —
II
UTILITY
0
4'-0"
6'-9"
26'-6"
I,
17'-0"
9'-0"
FIRST FLOOR PLAN
1,239 SF SCALE: 1 /4"= 1'-0"
AREA:
FIRST FLOOR 1,239 sf
SECOND FLOOR 1,367 sf
TOTAL LIVING AREA 2,606 sf
GARAGE
464 sf
— —
-11
co
I
LLI
Z N
w�;
Qol
co LL;
J
co
Q
N W
co
© GREENWALK DESIGNS LLC.
S4 REGISTERED
-AR CT
�STEVEN A. BARNES
STATE DF WA HINC TO.
T
aN
co
cl)
co
O0
M
0z
ca
CV
Wg
O
"�
w
�
0
O
L0
0
Q
O
J
z
U
Of
LU
0
0
1
ry
LL-
n
cn
ry
Li
N
LLI
N
0
w
U)
w
w
>
�
U)
o
O
O
N
N
O
N
Z
J
a
m
E
c�
0
CL
m
w
m
0
a
X
LU
a�
s
0
a
A2ml
Exhibit 5 - Green
PLN2022-004 Packet Pg. 124
W
Q
O
a_
1.f
c
I
c
I
a
c
I
d
c
I
N
N
N
CU
O
SECOND FLOOR PLAN
1,367 SF SCALE: 1 /4"= 1'-0"
2
O
U
U
c
Q
w
Z
O
LU
01 c
N 0
C� U
S
Lo
z
c
CV m
u .
Z J
CQ
�Lu
© GREENWALK DESIGNS LLC.
3054 REGISTERED I
AR CT
STEVEN A. BARNES STATE CF WAS! ING 1 CN
LO
T
N
r
o
--
r
Q
o
oo
oa
Oow
O
CO
n
N
w0
W
o
cj)
w
O
0
Z
Ln
O
J
a
O
z
r
O
0
w
LL-
0
o
n
z
0
U
W
()
N
6i
N
IJ-
0
w
U)
w
w
>
�
U)
o
W
Q
O
a_
Exhibit 5 - Green
PLN2022-004 Packet Pg. 125
1.f
Q
/
W
W
Q
/
N
N
U)
O
/
T
O
O
E
LLJ
O
O
N
O
N
O
O
Z
Q
O
N
/
O
cn
/
cn
co
/
0
N
N
CD
- -
I I
I
- - - - - -T
I
I
I I
I
I
i
FRONT ELEVATION
SCALE: 1 /8"= 1'-0"
10.0'
I I I I I I
I I I I I I
I I I I I
L------ -
SIDE ELEVATION
9.0' h
J
J
rzn
V
U)
LLJ
0
u
© GREENWALK DESIGNS LLC.
0
Im
U
QcQ
u�
0
c
LLJ
N 0
C, s U
L Z
C
CV m
u N
.
Z J
O2
�w
3954 REGISTERED
AR CT
STEVEN A. BARN ES
STN
ATE OF WASHI G l CN,
N
o
--
r
Q
o
co
oa
00
w
O
CO
n
N
w0
m
LJJ
go
w
n
LO
0
0
Q
0
>
z
w
J
u
w
W
ry
0
w
ry
I
n
L�J
N
W
N
Un
f6
~
TL
T—
_0
W
07
w
w
>
�
U)
o
Q
0
0
a_
SCALE: 1 /8"= 1'-0"
A3ml
Exhibit 5 - Greens—u-O—L,—
Packet Pg. 126
1.f
I
Q
/
W
W
Q
/
N
N
U)
O
T
O
O
E
LLJ
O
O
N
O
N
O
z
/
Q
0
0
cn
/
cn
Co
/
0
N
N
CO
0
w
Q
0
0
a_
L
REAR ELEVATION
nn�
SCALE: 1 /8"= 1'-0"
------------------- -----------------------------------------
SIDE ELEVATION
ELEV SCALE: 1 /8"= 1'-0"
10.0'
279.0' h
I
I
I
I
— — — — — — — — — — — — —
10.0'
_279.0' h
0
Im
U
QcQ
u�
0
"
c
LLJ
0
J
U
QU)
Lo w
c
Il
0
m
"'
Uu
u .
o
O <
�w
zw
w
W
Z N
�
N
Q
i=
O-
co ui
co Q
I
N uJ
� N
© GREENWALK DESIGNS LLC.
3954 REGISTERED
AR CT
STEVEN A. BARN ES
STATE OF WASHING �N,
r
N
o
^Qo
r
Go
oa
00
w
O
Co
n
N
w0
L
u)
W
O
U/
O
z
Lf 7
0
0
Q
0
�>
z
W
J
u
w
W
r
0
n
L�J
N
W
N
�
z
~
TL
T—
_0
W
U)
W
w
>
LU
U)
C)
0�
A302
Exhibit 5 - Greens-u-O-L,-
Packet Pg. 127
1.f
Q
Q
/
LLJ
LLJ
Q
/
N
N
Cn
O
T
O
Co
O
E
LLJ
O
Co
O
N
O
N
0
O
Z
Q
O
N
/
O
cn
/
cn
Co
/
N
N
CD
10.0' ,`
4'
279.0' h
------------ ------ ------------------------
FRONT ELEVATION
EEEV SCALE: 1 /8"= 1'-0"
I I I I I I
I I I I I I
I I I I I I
I I I I I I
L-- ----- -- — —
SIDE ELEVATION
ELEV SCALE: 1 /8"= 1'-0"
79.0' �
{
0
U
U
QcQ
u�
z
0
CL
c
ui
N 0
C,
U
L Z
c
CV m
u N
.
Z J
O2
�w
© GREENWALK DESIGNS LLC.
3954 REGISTERED
AR CT
STEVEN A. BARN'ES
STATE OF WASHI NG I UN,
N
T
a�
3
Co
�
3
Oo
M
CO
N
WgO
w
�W
0
n
C)
z
LO
0
0
Q
0
�>
z
w
J
u
w
W
ry
0
w
ry
I
n
L�J
N
W
N
_0
W
Cn
W
Lu
>
LU
Cn
C)
0�
A301A
Exhibit 5 - Greens—u-O—L,—
Packet Pg. 128
1.f
Q
I
Q
/
W
W
Q
/
N
N
Cn
O
/
T
O
co
O
E
LLJ
O
co
O
N
N
O
O
Z
Q
O
co
N
/
O
cn
/
cn
co
/
N
N
CO
O
10.0'
279.0'
I I I I--7
I I I I
I I I I I
I I I I
_-�- -- =====------==== lz========�
REAR ELEVATION
ELEV SCALE: 1 /8"= 1'-0"
II II I
I I
---- -- ----------------I
Z ------------------�
SIDE ELEVATION
ELEV SCALE: 1 /8"= 1'-0"
Mll�vwwll
279.0'
� U
J
J
Q co
rzn
V
U)
zw
0
w
NW
V
© GREENWALK DESIGNS LLC.
0
Im
U
QcQ
u�
z
0
c
LLJ
N 0
C, s U
z
c
CV m
u N
.
Z J
O2
�w
3954 REGISTERED
AR CT
STEVEN A. BARN ES
STN
ATE OF WASHI G l CN,
N
o
^Qo
r
Go
oa
00
w
O
CO
n
N
w0
m
LJJ
go
w
VJ
0
CIO
z
0
Q
w
w
ry
0
W
J
w
w
U)
C)
U)
LO
C)
0
z
u
w
G
N
i
f6
i
TL
T-
w
Q
0
Un
z
_0
Un
LU
W
Q
O
a_
A302A
Exhibit 5 - Greens—u-O—L,—
Packet Pg. 129
1.f
Q
/
cn
C
(Z
N
Q
cn
O
/
N
0
o�
N
N
O
O
77'_n» 1 Q'_n» 9 A'—Q»
FIRST FLOOR PLAN
SCALE: 1 /4"= 1'-0"
FIRST FLOOR 1,244 sf
SECOND FLOOR 1.640 sf
TOTAL FINISHED AREA OF HOUSE 2,884 sf
GARAGE 482 sf
COVERED PORCH 90 sf
COVERED DECK 193 sf
2
O
U
U
c
Q
w
Z
O
Lu
01 c
N 0
C� U
L z
c
CV m
u .
Z J
OQ
�Lu
© GREENWALK DESIGNS LLC.
3054 REGISTERED I
AR CT
STEVEN A. BARN ES
STATE CF WASHING l CN
Z
J
I
Of
0
0
LL-
(n
ry
Li
W
J
W
2
U)
cv:)
a�3
03
0z
w0
90
w
O
C)
V i
0
O
z
U
W
0
ry
n
W
Q
0
a_
Exhibit 5 - Green
PLN2022-004 Packet Pg. 130
1.f
77'_n" 1 s2'_n" 1 A'_R"
N
N
Q
cn
C
N
Q
cn
O
/
NORTH
SECOND FLOOR PLAN
1,640 SF SCALE: 1/8"= 1'-opt
0
o�
N
N
O
O
2
O
U
U
c
Q
w
Z
O
LU
01 c
N O
C� U
S
Lo
z
c
CV m
u .
Z J
OQ
�Lu
© GREENWALK DESIGNS LLC.
3054 REGISTERED I
AR CT
STEVEN A. BARN ES
STATE OF WASHING l CN
Z
Q
a-
ry
0
0
1
LL
0
0
U
W
()
W
J
W
2
U)
C�
r
C1)
H
0
cv:)
a�3
000
M co
w0
�0
w
C)
0
L)
C)
r
O
z
U
w
O
ry
n
W
Q
O
a_
Exhibit 5 -
Packet Pg. 131
1.f
I I I I I
I I I I I
— — L — — — — — — — — — — — — — — — — — — — — — — —
FRONT ELEVATION
ELEV SCALE: 1 /8"= 1'-0"
SIDE ELEVATION
EL- SCALE: 1 /800= 1'-0"
N
N
O
O
L� J
Q
0
a_
297.0'*
10'-0"
0'-0�
— 272.0�
297.0�
W5
o�
272.0'
O
U
U
QcQ
u�
z
O
z
CN 0
J
CN O
QU�
Ln w
c
Il
0
m
"'
Uu
u .
o
O <
�w
zw
w
W
Z N
�
N
Q
i=
O-
co ui
co Q
I
N uJ
N
© GREENWALK DESIGNS LLC.
3954 REGISTERED
AR CT
STEVEN A. BARN ES
STATE OF WASHING �N,
Cfl
T
r
N
H
a
��
�
z3
C'7
p
co
Z
gO
w
0
W
U/
O
z
Lo
O
o
Q
O
>
z
w
J
u
w
w
O
n
L�J
N
W
N
J
Cn
z
N
_O
W
07
W
w
>
LU
Cn
C)
0�
A3ml
Exhibit 5 - Green`�'`'�
PLN2022-004 Pa9 Cket Pa
.132
1.f
REAR ELEVATION
ELEV SCALE: 1 /8"= 1'-0"
�0
m
L�
75
Q
z
z
Q
n,
0
N
N
O
O
0
297.0'
op vp
272.0�
U
J
z
0
(1)
LLJ
0
u
© GREENWALK DESIGNS LLC.
0
U
Im
QcQ
u�
z
O
c
N 0
o,
U
L Z
c
CV m
u N
.
Z J
O2
�w
3954 REGISTERED
AR CT
STEVEN A. BARN ES
STN
ATE OF WASHI G l CN
r
+ C>
r >- N
Q �
4o
F— ca
0 oQ
z�
J 0
M CO
CV3 0Q
0
LJJ w 0
297.0� 0
w
0
A302
Exhibit 5 - Greens—u-0-1—
W
Q
O
a_
Packet Pg. 133
1.f
r,o'_a»
0
0 I
N
0
Im
U
QcQ
u�
z
0
CL
c
LLJ
N 0
C� 0
S U
L Z
c
CV m
u U) .
Z J
O2
�w
© GREENWALK DESIGNS LLC.
3954 REGISTERED
AR CT
STEVEN A. BARN ES
STATE CF WASHING l CN
0
w
O
22'-0"
0
0
z
0 BASEMENT FLOOR PLAN Q o
0
Cf) 490 SF SCALE. 1 /4"= 1'-0" LO
836 SF GARAGE J Q
r
O
O z
LL LU
ry
w
w In
Q w
C-D
z
Q
z m
N
o J Lid
T- z
VL _0
W T— U)
N
W w
LU
U)C) 0.
N
N
W
Q
A2ml
O
J
n Exhibit 5 - Greenw'°`-n�
Packet Pg. 134
1.f
c
c
c
co
O
E
LLJ
O
O
N
O
/
0
z
Q
O
co
0
cn
/
cn
L�
75
Q
z
c�
z
Q
n,
0
�o
N
N
FN—a"
FIRST FLOOR PLAN
SCALE: 1 /4"= 1'-0"
.N1116100i
2
0
U
U
c
Q
w
Z
O
Lu
01 c
N 0
C� U
L z
c
CV m
u .
Z J
OQ
�Lu
© GREENWALK DESIGNS LLC.
3054 REGISTERED I
AR CT
STEVEN A. BARN ES
STATE CF WASHING l CN
O
ho
■
w
O
V♦
Z
0
w
Q
V
Z
0
w
BASEMENT 490 sf
FIRST FLOOR 1,368 sf
O
SECOND FLOOR 1,337 sf
O
TOTAL FINISHED AREA OF HOUSE 3,195 sf
Ln
O
GARAGE 840 sf
COVERED PORCH 69 sf
z
COVERED DECK 220 sf
Q
d
J
z
a
U
AVERAGE GRADE:
Of
W
52.5X280+43.83X272+52.5X276+43.83X282=53,482/193=277
52.5X280+43.83X273+52.5X274+43.83X280=53,323/193=276.2
O
J
0
0
Li
n
()
ry
Li
N
N
W
J
Lo
W
Cn
W
w
>
Cn
o
0�
Exhibit 5 - Green
PLN2022-004 Packet Pg. 135
1.f
c
I
c
C,
co
O
E
LLJ
O
co
O
N
O
N
0
z
Q
O
0
cn
cn
cn
/
L�
75
Q
z
c�
z
Q
n,
0
N
N
NORTH
SECOND FLOOR PLAN
1,337 SF SCALE: 1 /8"= 1'-0"
riiI_R."
2
O
U
U
c
Q
w
Z
O
LU
01 c
N O
C� U
S
Lo
z
c
CV m
u .
Z J
OQ
�Lu
© GREENWALK DESIGNS LLC.
3054 REGISTERED I
AR CT
STEVEN A. BARN ES
STATE CF WASHING l CN
C)
C)
r aC)
- oa
p z�
J O V♦
Q
LU
W Z O
L
O
O
O
Z Ln
Q O
J
a O
z
r
O
0 w
LL- O
0 n
Z
0
U
W
V) N
6i N
H T- z
O
w U)
w w >
U) o �
W
Q
0
a_
Exhibit 5 - Green
PLN2022-004 Packet Pg. 136
1.f
Q
/
W
W
Q
0
V)
0
0
0
E
w
0
0
0
0
0
0
0
z
Q
0
0
/
cn
/
cn
Co
/
N
N
FRONT ELEVATION
ELEV SCALE: 1 /8"= 1'-0"
----------------------------- I I - - - - - - - - -
SIDE ELEVATION
ELEV SCALE: 1 /81p= 1'-0"
— MAX ELEV. 301.2'
MAX ELEV. 301.2'
78.4�
?76.2'
m3h
2
0
U
U
QcQ
u�
z
O
CL
c
ui
rl
N 0
C�
U
L Z
c
CV m
u U) .
Z J
O2
�w
© GREENWALK DESIGNS LLC.
3954 REGISTERED
AR CT
STEVEN A. BARN ES
STATE OF WAS! INC LAN,
CIO
z
O
Q
w
w
ry
O
ry
w
x
W
w
J
w
LU
U)
O
O
LO
O
O
z
u
w
0
w
In
N
N
Lo
z
TL 0
T— U)
w >
Q w
o 0�
A3ml
Exhibit 5 - Greens—u-O—L,—
Packet Pg. 137
1.f
Q
/
LL1
LL1
Q
0
U)
0
0
0
E
w
0
0
0
0
0
0
0
z
Q
0
0
0
cn
/
cn
Co
L�
Q
z
z
Q
0
— MAX ELEV. 301.2'
hw vrw ci0�
I I I
I I
I I
I I
I I
I I
I I _
I I
I
REAR ELEVATION
ELEV SCALE: 1 /8"= 1'-0"
I
I
I
I
SIDE ELEVATION
ELEV SCALE: 1 /8"= 1'-0"
I
0'-0" 269.5.E
— MAX ELEV. 301.2'
78.4�
276.2'
0'-0" 269.5.�
2
0
Im
U
QcQ
u�
z
O
c
LLJ
J
0,
CN O
QU)
Lo w
c
Il
0
m
"'
Uu
u .
o
O <
�w
zw
w
W
Z N
�
N
Q
i=
O-
co ui
co Q
I
N uJ
� N
© GREENWALK DESIGNS LLC.
3954 REGISTERED
AR CT
STEVEN A. BARN ES
STATE OF WAS! INC LAN,
�J
ME
■ ■
CD
a�
3
~
0
z3
�
w�
LU
�0
w
0
O
C/)
O
z
Lo
O
o
Q
O
�>
Z
w
J
u
w
w
O
w
17�1
EL
N
N
6i
J
Lo
TL
~
T-
_O
W
Cn
LU
w
>
LU
Cn
C)
0�
A302
Exhibit 5 - Green
PLN2022-004 Packet Pg. 138
1.f
N
Q
N
Q
Ln
0
U
0
LL1
0
L�
/
N
N
N
N
00
O
W
Q
O
J
n
77'—(1" 1 R'—(1" 1 d'—R"
NORTH
BASEMENT FLOOR PLAN
793 SF SCALE: 1 /8"= 1'-0"
O
Im
U
QcQ
u�
z
O
CL
c
LLJ
C
C� O
U
s
L Z
C
CV m
u U) .
Z J
O2
�w
© GREENWALK DESIGNS LLC.
3954 REGISTERED
AR CT
STEVEN A. BARNES STATE CF WAS! ING 1 CN
�
aN
0
Go
�p3
�
�
p
Cl)Co
ZO
o
9M0
Z
w
Z
O
Q
Lo
O
O
O
z
O
�
�
u
w
0
z
ry
�
In
w
cn
Q
m
N
W
N
J
Cn
z
N
°O
_0
W
U)
w
w
>
LU
U)
C)
0J
Exhibit 5 -
Packet Pg. 139
1.f
N
N
Q
V)
N
Q
0
Cn
0
m
0
N
N
N
O
O
O
U
U
QcQ
u�
z
O
CL
c
LLJ
C
C� O
U
s
z
C
CV m
u U) .
Z J
O2
�w
© GREENWALK DESIGNS LLC.
3954 REGISTERED
AR CT
STEVEN A. BARNES STATE CF WAS! ING 1 CN
�
aN
0
Go
�3
�
O
Cl)
w�
�
o
gO
`7'
w
FIRST FLOOR PLAN
SCALE: 1 /4"= 1'—O"
FIRST FLOOR 1,244 sf
O
SECOND FLOOR 1,640 sf
O
TOTAL FINISHED AREA OF HOUSE 2,884 sf
Lo
O
GARAGE 482 sf
Z
COVERED PORCH 90 sf
Q
0
COVERED DECK 193 sf
J
z
u
Elf
W
AVERAGE GRADE:
0
40.42X287+62.83X284+40.42X282+62.83X288=58,938/206.5=285.4
ry
Li
I
Iry
Li
N
W
N
J
Cn
z
N
°O
_0
W
U)
w
w
>
�
U)
o
W
Q
O
a_
Exhibit 5 -
Packet Pg. 140
1.f
N
Q
cn
N
Q
cn
0
/
cn
0
L
0
m
N
N
N
00
O
NORTH
SECOND FLOOR PLAN
1,640 SF SCALE: 1 /800= 1$-0"
2
0
U
U
c
Q
w
Z
O
LU
01 c
N 0
C� U
S
Lo
z
c
CV m
u .
Z J
OQ
�Lu
© GREENWALK DESIGNS LLC.
3054 REGISTERED I
AR CT
STEVEN A. BARN ES
STATE CF WASHING l CN
�
o
0
co
W
�p
�
0
90LU
O
O
Z
Ln
O
J
O
z
r
O
0
w
Li
0
0
n
Z
0
U
W
()
N
6i
N
z
N
O
06
w
U)
w
w
>
�
U)
o
Exhibit 5 - Green
PLN2022-004 Packet Pg. 141
1.f
I
Q
w
w
Q
Q)
U)
0
/
US
0
N
N
0
0
------------- i=------------- -----�
-------------------------------
FRONT ELEVATION
F,,; SCALE: 1/8"= 1'-0"
00
■
Fm]
310.'
- —91-4 fs
r
Hl
J
II
II I I �i
I
�L_______________---------------_______�' -- -- --
SIDE ELEVATION
ELEV SCALE: 1 /8"= 1'-0"
310.4�
, s7-- WON Nals
C
O
U
U
QcQ
u�
z
O
CL
c
ui
N C
C�
U
L Z
c
CV m
u U) .
Z J
O2
�w
MEM
© GREENWALK DESIGNS LLC.
3954 REGISTERED
AR CT
STEVEN A. BARN ES
STN
ATE OF WASHI G I CN,
5�z
>-
N
0
3::Go
�p3
�
wi)
p
Co
C
ZO
090
Zw
W
Cho
O
o
Q
O
>
z
LLB
J
u
L. J
w
o
�
N
6i
N
J
Cn
z
N
06
_O
W
Co
w
w
>
i-
U)
o
A3ml
Exhibit 5 - Greens-u-O-L,-
Packet Pg. 142
1.f
e,
REAR ELEVATION
--ESCALE: 1 /8"= 1'-0"
L
SIDE ELEVATION
ELEV SCALE: 1 /8"= 1'-0"
I
I
I
I
--Z-
I I I I
I I I I
310.,
285.4'
I
I
I
I
— 310.,
m
of- o r
285.4' AL
—9'-4�
2
O
U
U
QcQ
u�
z
O
z
CN 0
J
QU)
Ln w
c
Il
0
m
"'
Uu
u .
o
O <
�w
zw
w
W
Z N
LJJ
�
N
Q
i=
O-
co ui
co Q
I
N uJ
N
© GREENWALK DESIGNS LLC.
3954 REGISTERED
AR CT
STEVEN A. BARN ES
STATE OF WAS! INC I UN,
.z
>-
N
0
3::
Go
�p3
�
wi)
p
Co
C
ZO
090
Z
W
U/
O
z
Lo
O
o
Q
O
>
z
w
J
u
w
w
r
O
n
L�J
N
W
N
J
Cn
z
N
_O
LU
U)
LU
w
>
�
U)
o
A302
Exhibit 5 - Greens—u-O—L,—
Packet Pg. 143
1.f
N
I
0
0
I
(D
N
Q
/
Cn
UO
Q
/
0
/
V)
0
LLI
CD
Ln
.21
/
0
z
Q
0
0
0
/
0
/
0
/
Lol
N
N
O
N
W
Q
O
J
n
O'_Q" 17'—r," on'_n" in,-C."
17'-0"
21'-6"
22'-6"
BASEMENT FLOOR PLAN
875 SF SCALE: 1 /4"= 1'-0"
O
U
U
QcQ
u�
z
O
(n
c
LLJ
C
C� O
U
Lf? Z
C c
CV m
u U) .
Z J
O2
a-w
© GREENWALK DESIGNS LLC.
3954 REGISTERED
AR CT
�STEVEN A. BARN ES
`STATE OF WAS! INC �N,
Z
Q
J
0
0
1
w
z
w
w
cn
Q
m
w
J
w
LU
Cn
O
O
LO
O
O
Z
u
w
0
w
In
N
N
N Cn
z
N 0
Cn
w >
Q w
C) 0�
Exhibit 5 -
Packet Pg. 144
1.f
co
O
E
LLJ
O
O
N
O
N
O
O
Z
Q
O
co
N
/
O
cn
/
cn
/
L�
75
Q
z
z
Q
n,
0
N
N
\
O
N
c
c
of—O" 1 7'—C" Zr)'—C" Zl—R"
NORTH
FIRST FLOOR PLAN
1,431 SF SCALE: 1 /4"= 1'-0"
BASEMENT 875 sf
FIRST FLOOR 1,343 sf
SECOND FLOOR 1,383 sf
TOTAL LIVING AREA 3,601 sf
GARAGE
748 sf
AVERAGE GRADE:
49.83X263+66.09X268+49.83X270+66.09X268=61,984/231.8=267.4
49.83X276+66.09X274+49.83X284+66.09X282=63, 726/231.8=274.9
2
O
U
U
c
Q
w
Z
O
LU
01 c
N O
C� U
S
Lo
z
c
CV m
u .
Z J
OQ
�Lu
'REENWALK DESIGNS LLC.
REGISTERED
1 AR CT
7
STEVEN A. BARNES
MTE OFWASHING i Gm
a_
Of
0
0
LL
V)
Li
w
J
F-
w
w
U)
••
�
30
co
co
0
�
Wz
�0
�
0
C)
0
L0
C)
r
O
z
U
w
0
ry
0-
N
N
i
N
N
w
Q
0
z
O_
Cn
Exhibit 5 - Green
PLN2022-004 Packet Pg. 145
1.f
co
O
E
LLJ
O
O
O
O
N
O
O
Z
Q
O
co
O
/
O
cn
/
cn
/
L�
75
Q
z
c�
z
Q
n,
0
0
N
N
O
N
NORTH
SECOND FLOOR PLAN
1,383 SF SCALE: 1 /8"= 1'-0"
2
O
U
U
c
Q
LU
Z
O
LU
01 c
N O
C� U
S
z
c
CV m
u .
Z J
OQ
�Lu
© GREENWALK DESIGNS LLC.
3054 REGISTERED I
AR CT
STEVEN A. BARN ES
STATE OF WASHING l CN
O
0
J
LL-
Z
0
U
W
J
w
w
2
U)
••
Cfl
>-
N
cl)
Go
co
0
�
LU
Wz
0
�0
�
0
C)
0
L0
C)
r
O
Z
LU
0
n
Z
0
Cn
w
W
Q
O
a_
Exhibit 5 - Green
PLN2022-004 Packet Pg. 146
1.f
I
Q
/
W
W
Q
0
U)
0
0
0
E
w
0
0
0
0
0
0
0
z
Q
0
0
0
cn
/
cn
co
/
L�
75
Q
z
z
Q
n,
0
0
N
N
CD
292.4'
DI
I I I I
I I I I
I I I I
I I I I
I I I I
I I I I
I I I I
I I I I
1----- — — — — — — — — �— -- — — — �—
FRONT ELEVATION
ELEV SCALE: 1 /8"= 1'-0"
— — — — — — — — — — — — — — — — — — — — — — — — -- — I — — — — — — — — — — ----- )
SIDE ELEVATION
ELEV SCALE: 1 /8"= 1'-0"
267.4 F
292.4' OIL
J
Q U)
rZ
V J
zw
0
w
LJ
V
© GREENWALK DESIGNS LLC.
0
U
Im
QcQ
u�
z
O
ui
rl
N 0
O� �
U
LLU
Z
8 c
CV m
u N
J
C
Lu
Z N
u �
Q
Q
i=
O-
C� LLJ
J
CY) Q
N uJ
Cn
3954 REGISTERED
AR CT
STEVEN A. BARN'ES
STATE OF WASHI NG I CN,
••
N
�
�3
J
(000
M
CO
gO
w
0
W
U/
O
Z
Lf 7
O
o
Q
O
�>
Z
w
J
u
w
w
ry
O
w
ry
I
N
W
N
N
_O
w
U)
w
w
>
�
U)
o
A3ml
Exhibit 5 - Greens—u-O—L,—
Packet Pg. 147
1.f
REAR ELEVATION
ELEV SCALE: 1 /8"= 1'-0"
�0
m
L�
75
Q
z
z
Q
n,
0
N
N
O
O
0
297.0'
op vp
272.0�
U
J
z
0
(1)
LLJ
0
u
© GREENWALK DESIGNS LLC.
0
U
Im
QcQ
u�
z
O
c
N 0
o,
U
L Z
c
CV m
u N
.
Z J
O2
�w
3954 REGISTERED
AR CT
STEVEN A. BARN ES
STN
ATE OF WASHI G l CN
r
+ C>
r >- N
Q �
4o
F— ca
0 oQ
z�
J 0
M CO
CV3 0Q
0
LJJ w 0
297.0� 0
w
0
A302
Exhibit 5 - Greens—u-0-1—
W
Q
O
a_
Packet Pg. 148
1.f
N
N
N
uo
O
W
Q
O
J
n
FIRST FLOOR PLAN
SCALE: 1 /4"= 1'-0"
AREA:
FIRST FLOOR 1,158 sf
SECOND FLOOR 1,601 sf
TOTAL LIVING AREA 2,759 sf
GARAGE 416 sf
COVERED PORCH 85 sf
COVERED DECK 164 sf
2
O
U
U
c
Q
w
Z
O
LU
01 c
N O
C� U
S
Lo
z
c
CV m
u .
Z J
OQ
�Lu
© GREENWALK DESIGNS LLC.
3054 REGISTERED I
AR CT
STEVEN A. BARN ES
STATE OF WASHING l CN
Q
J
a
IElf
0
0
LL-
Li.i
J
w
U)
C1�
H
0
J
r%�
O
Go
3 Gj
03
0z
w0
0 9
w
C)
0
L0
0
r
z
U
LU
°ry
n
N
N
Cfl �
z
0
U)
LLi �
Q W
o 0�
Exhibit 5 - Green
PLN2022-004 Packet Pg. 149
1.f
C
r
N
N
Q
cn
N
Q
O
cn
O
/
T
O
cn
O
W
0
Ln
m
L�
75
Q
z
c�
z
Q
n,
0
N
N
N
CO
O
ol
27'-11"
6'-91P
8'-4"
7'-01p
ol
15'-8"
3'-10" ol
4'-10" 7'-0"
ol
O
CV
I
0
a
O
O
co
o BATH
O
N
I
0
0
�
I
sz
.4-
MASTER
CLOSET
BEDROOM
17'0"x18'8"
co
3'-8"
co
W
D
N
F
O
I
BEDROOM 2
11'0"x14'8"
N 0
--q-
LAUNDRY
10'-6"
I N
I
D N
CO
cV
O
I
04
o
co
N
O
�,
3'-4
ol
10'-8"
0�
°O 8'-0"
N
cv
BEDROOM 1
11'8"x12'4"
t
I
OPEN TO
BELOW
BATH
BEDROOM 3
12'0"x12'0"
L7
v n L
O
I
N
a O
O
C
J
12'-10"
2'-10"
8'-0"
12'-6"
15'-8"
20'-6"
13'-10"
SECOND FLOOR PLAN
1,601 SF SCALE: 1/4"= 1'-O"
� U
J
J
Q U)
(z�
V
U)
zw
0
uu
LU
V
© GREENWALK DESIGNS LLC.
2
O
U
U
c
Q
w
Z
O
LU
01 c
N 0
C� U
S
z
c
CV m
u .
Z J
OQ
a-Lu
3054 REGISTERED I
AR CT
STEVEN A. BARNES
STATE OF WAS! ING 1 ON
ME
No
O
co
3
co
0
ca
J
�Q
Wz
gO
"�
w
�
0
C)
'0
V J
Z
O
Q
O
Zz
�a_
LJ—
r
U
0LU
0
L.LM
0
Z
0
U
Ld
�
N
W
N
O
w
U)
L1J
w
>
�
U)
o
W
Q
0
a_
Exhibit 5 - Green
PLN2022-004 Packet Pg. 150
1.f
I
I
I
I
I
I
I
I
FRONT ELEVATION
ELEV SCALE: 1 /8"= 1'-0"
I I
I I
I I
I I
i
i
i
---------------------
---------------------
I I I I I I I
I I I I I I I
I I I I I I I
I -L I - I
SIDE ELEVATION
ELEV SCALE: 1 /8"= 1'-0"
_ 297' �
Y
10.0,
272.0
297' �
{
10.0'
272.0
O
U
U
QcQ
u�
z
O
ui
-00
J
QU)
Ln w
c
Il
0
m
"'
Uu
u .
o
O <
a-w
zw
w
W
Z N
�
N
Q
i=
O-
co ui
co Q
I
N uJ
N
© GREENWALK DESIGNS LLC.
3954 REGISTERED
AR CT
STEVEN A. BARN ES
STATE OF WASHING �N,
\i
N
>-N
CA
�
O
Co
o�
J
�
�
w�
gO
w
0
U�
Lo
O
o
Q
O
>
z
w
J
u
w
W
ry
O
w
ry
I
n
L�J
J
N
�
z
~
TL
T-
_O
W
U)
W
w
>
�
U)
o
A3ml
Exhibit 5 - Greens—u-O—L,—
Packet Pg. 151
1.f
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
L
I
I
REAR ELEVATION
C-E'' SCALE: 1 /8"= 1'-0"
77)
i
Q
Q
0
0
U)
0
F
w
0
LO
LL-
L�
75
Q
z
c�
z
Q
n,
0
N
N
N
\
0
C\ ,, SCALE: 1 /8"= 1'-0"
Q
0
0
a_
I]-
297' h
10.,6
Y
297 1
10.0'
_272.0'�
U
z
0
U)
LLJ
0
u
© GREENWALK DESIGNS LLC.
0
U
c
z
O
CL
c
ui
C
O� 0
U
z
C
CV m
u N
.
Z J
O2
�w
3954 REGISTERED
AR CT
STEVEN A. BARNES
`` STATE OF WAS! INC T CN
C1)
0
J
r%*-.,
CIO
O
Q
w
w
ry
O
ry
x
W
0
LO
0
O
z
u
w
O
w
In
W N
N
~ TL _O
W T- U)
W w >
LU
Un C) 0�
A302
Exhibit 5 - Greenw'`--'--' `
Packet Pg. 152
1.f
Lc
r
c
W
Q
O
J
R,-11" 1 W-R" 1 C,'-(1"
F IK5 I F LUUK NLAN
SCALE: 1 /4"= 1'—O"
FIRST FLOOR 1,373 SF
SECOND FLOOR 1,850 SF
TOTAL FINISHED AREA OF HOUSE 3,223 SF
GARAGE
697 SF
AVERAGE GRADE:
61.5X276+51.17X275+61.5X277+51.17X276= 62, 204/225.3= 276.0
© GREENWALK DESIGNS LLC.
7REQ{STER r
AR CT
VEN A. BARNES
r:,TATF-E OF-WASHIfMTON
z
Q
a
()
rv"
FT
W
J
W
Lij
G)
C'7
•
a011
�
3
03
0z
w0
0 9
w
C)
C)
L0
C)
r
O
z
U
w
O
ry
Ill
N
N
N
z
N O
Q W
c) O�
Exhibit 5 - Green
PLN2022-004 Packet Pg. 153
1.f
co
O
E
LLJ
O
co
O
.01
N
O
O
Z
Q
O
N
/
O
cn
/
cn
cn
/
NORTH
SECOND FLOOR PLAN
1,850 SF SCALE: 1 /8"= 1'-0"
.z
N
N
O
N
2
O
U
U
c
Q
w
Z
O
LU
01 c
N O
C� U
S
z
c
N m
u .
Z J
OQ
�Lu
© GREENWALK DESIGNS LLC.
3054 REGISTERED I
AR CT
STEVEN A. BARNES STATE CF WASHING 1 CN
Z
Q
a_
LJ—
O
O
I
Li
O
U
Ld
C�?
W
J
I—
W
W
2
Cn
�
30
co
H
co
0
C)o
LU
Wz
�
gO
"�
w
0
C)
0
L0
C)
r
O
z
U
Lu
O
ry
0—
z
O
Cn
W
W
Q
0
a_
Exhibit 5 - Green
PLN2022-004 Packet Pg. 154
1.f
I
Q
/
W
w
Q
00
0
V)
0
0
0
E
w
0
0
0
0
0
0
0
z
Q
0
0
/
cn
/
cn
CO
/
N
N
N
O
N
I I I I I I
------------------------------------� —�
z---------------i-----------------------z--z�
FRONT ELEVATION
ELEV SCALE: 1 /8"= 1'-0"
I
--
I
I
L-------L-------L----
I
I
I
L
SIDE ELEVATION
ELEV SCALE: 1 /8"= 1'-0"
0
U
Im
c
z
O
(n
c
ui
rl
N 0
O� �
U
z
c
CV m
u U) .
Z J
O2
�w
Z N
u �
Q
Q
i=
O-
C� LLJ
J
Cl) Q
N uJ
Cn
© GREENWALK DESIGNS LLC.
3954 REGISTERED
AR CT
STEVEN A. BARN ES
STATE OF WAS! INC LAN,
M
0
CD
J
00
W
CA
0
CIO
z
O
Q
w
w
ry
O
ry
w
w
J
w
LU
U)
O
O
LO
O
O
z
u
w
0
w
In
N
N
N �
z
N 0
Cn
w >
Q w
o0�
A3ml
Exhibit 5 - Greens—u-O—L,—
W
Q
0
a_
Packet Pg. 155
1.f
i
Q
/
W
w
Q
00
0
U)
0
0
0
E
w
0
0
0
0
0
0
0
z
Q
0
0
/
cn
/
cn
co
/
N
N
N
O
N
_ — — — — 301.0,
I I I I I I
I I I I I I
REAR ELEVATION
SCALE: 1 /8"= 1'-0"
I I I I I
I I I I
_ __
SIDE ELEVATION
ELEV SCALE: 1 /8"= 1'-0"
_ 301.,
0
U
c
z
O
CL
c
ui
rl
N 0
C�
U
L Z
c
CV m
u U) .
Z J
O2
�w
Z N
u �
Q
Q
i=
O-
C� LLJ
J
Cl) Q
N uJ
Cn
© GREENWALK DESIGNS LLC.
3954 REGISTERED
AR CT
STEVEN A. BARN ES
STATE OF WAS! INC LAN,
M
0
CD
J
00
W
CA
0
CIO
z
O
Q
w
w
ry
O
ry
w
x
W
w
J
w
LU
U)
O
O
LO
O
O
z
u
w
O
w
N
N
N �
z
N 0
Cn
w;
Q w
o0�
A302
Exhibit 5 - Greens—u-O—L,—
W
Q
O
a_
Packet Pg. 156
1.f
so 89 30"CED � D��'`\�2�Q�, '�`\� �WW\,0,pN 88008'01 " W 51 1 ' O— 1 TREE PROTECTI I FENICE„CE ',\478'/4g LJ\,�_�4 22CED/�it 0
1 \ 14CE I / \\ '\ I /\ �\, �' �� 11 ,-497° 12"SPR -''j8B;PCUMI__`I 5 �° D� �- - - _ - / ,-''' / „ CED I �I//- - ''/IQ---- —i i'147~✓ 50 'CED I / -- - ,,°,/ I I\II►98 12 DE/ �148 „ICEDp
-_L AS
TO CREATE
-ION
Lw
Q
Co
0
LLJ
0
i
m
N
0
N
0
0
L�
Q
0
0
a_
/ 1' / »/\ I /r,� 39 C�FD / / 1496 �I \ / i I I�N /�' P 8, \E,� — — \ \ \ © GREENWALK DESIGNS LLC.
5 I I 50 16 DEC 1 D 10" � �J 8 - \ \ \ 417 8 P \\ ��/_\ I/ I \ 8 31 „CE,p\ I ���\\ I I I ° '
_ I ° °»\� \ \ \ \Ss W4 REWSTE
RED
I I ` ARCr
W sO \ \\\
95 41 "CED / �j -�---- ----T \ \ ♦� ' ,41 112' ALG ss \ \ eARhES
° _----- STATE OF iNASHINCTON,
;�4 4 I E r /1---- i I \ 514 \ 0 Y% i 1\ EVEN A.
/1 » �I�'H „ , �,
4/41 i8XNIJ I i 4M\8 APFL \ I �' \'\ I / i I I \\ i I / I I I--------- 1 i °\� , ° , 8 AL I _ 0=2'10'52"
�_- 1 \/ 1 1 I I I �� ---- I i _ 6 2 , 1 _ _
— — i T — — — �1 , , \ / i \ I — I 1 \ I I \ 4' 1'41 " I „ D - S� k-1004.94
I`u--- ��------ \L=38.26' O�%�
I I 51 1 __ �
I� 472 8 A LE I - - li I 1 1 I i I\\ \ \ I / /► I I I I 512,/8 H OL i I / \\ / \ /(, R\ ''-' V
�; / , \ , 1 , \ 1 150 6 M AP I / 403 18 C
, I /\\ 40 `' �• ooA
,L�---L-1---- /I ' \ ' 11 I / , / 404 1� I •22 •87.
i 1 \ \LI--------I-- I --- I I I \ ,� 1 I /��
", I ' / I '1 I 1 , --�93 6 M�PL-�-_ - __ I I i
/ � 8 ,FIG ,� - _ _ �-�- / h
L o 73 6 P // / � \ 10 1\2'iFl `� \ ' \ - I L _ I I�' I i 51 48 ED �\ i \ ,
N 63'02 07 W \
467 21 '� I \ \ /\ I it x 4" �18 U M I I \ I ; 4s�� ` 1 „ E � i \ \\\ ,\ I \\ � � - - -� ry I � j I 1 O `\ �, �, /I / \� , _ , I ; � \ 44.17' -
' I � 'r \I I L"r` \ \ / ` _ '�tJCY7_ I `»
47G\ ICE / .\ / I I h I \ _
1 \ \ / \ , I_ 412 5 42�
�I I p �� 1 EC \\ 1 \\ 502 5 13"MAP \ / \ _ / , \
'10 4��\�� P LE'/ /II I ; ��--------------�-- 1 ' // �/ 509 1i''�EQ
41 CED
I ,\ j ,/,7 24 D
8 28"D, 0�'� \ o \1
ECE Q O
---
I / Z N
R L SCR4O464o 0 L 90 6' I
CL
45P 2D '-/ /i \ - 414/ G4O
50 ,T5
56 8"CED
°' \\ /
i
`
;� -- -'�-I� ���4 3 4�� \ \ 'X / / \ \ \ \ .% TREE PROTECTION FENCE
480' 32 I I \ ?� `\-____-- I �,I- �`' ; ;�\ 4x5 4X"Ep\ I �/ ��11 /��/ ; \\\ / \/ \\ // / LL i1�
I / \ I I \ - - l- - - - - 1 / / , \ \ / \ 8 D C(CLUS ER) 0
4 4 CE k 4�S I 4 / / I l -�--�_ / \ / / \ \ / O Z
\1�/ , \ -- 4 4 6 MAP , 1 I I I \ \\ , / i— — — I/ / I �� i / \ / \ \ / Z L0
/ I\ �I 1 / 1 1 \ , / X �/ /� 1 /392 40" F w Ul 0
/ w - IS
I �� I , I \ I I \ I I /\ / / / 33 / \
� ---- ---- } - / // / �� \ r / \ \� / Co O /7 8 50"DF w + 0
Ln „ LU
O l i i 4Ff 8 "iC 2
I62
I\ \ II 1\ 3 �4 \2
,I ` I \�/ I 461 1) �/ \
/ //♦/
1`
96CH
° eo� I I\ I c/// 416CO 5i
�- -,
I`\ ��7'� ` -I �1 „ // 1/ 1 1 \ \ I / \\ \ I I aJ : i l i 417 //4�„ \ / I 39 16 P
I 4� 421 C D 1 I 1 / \ I II // \\\ \ I, �''' / �i' / /� / / 1 1 \ �� \ / �.
446/ 8 -E6 - % �I-_ .� - I / ♦ 6'\ _-- I \ ( V / \ \ I r_ -I
- / 11y� 5 6'�MAP � � �I I'"I�� �TqE` CT N FE-NC � -4fiD�� \_ ,I�kIL----- = J _ -''%' / �_\/ $' \ / 1 ,� I / o
I \\ - DEC K /40 -° 10 \I \ \
�0
;- // I I\ �,''_ �, MA/ 42 ' -J ----J / � - /i //� �° 4$FI \ O
44 12M �, ��, / / \,/ QI`2DF/
I
� \I �\ ��F��1 \ - � ►II I I�i I / / � � � /\/4
1� 36 Q SPI
39 I I < \70�\ (ICED� ,2 E--F 7
/ W
8_ I 026 I/ „ / �
/ //p 2E / Z Z
40 D 1\ I 8
/ /
-7 8/ FIR�GRAI�ip I,4'36/LL
3 ED, _tL6
I I �'� - - - - - _ ! Y 1142 „L L \ ;� - - ;i i'� , / / / �� / �;' \I I / / z Z
D � 435 / 6 'C ,'\�I� ---- I p I \ \ y� / I I / / / o r /� \ / / 74 38 DF \ I I W O
�� I� ; �� I it °I /�� �, „ / ♦ ' 1 / / / / TREE PROTECTION FENCE
\� - - - - - - 0 - - _ I \ I \ /: / I / , 420 4 C-ED �� / / ( /� 3�CEQ _ I I I/ L - _ _ _- / / U
„ 4�4'\ 0' E '° 430° 2"DF � '� - � � I \ \L , / t.---„---- �- --� L----- W
519 12 AMA E / / \ _\ �'� �, - / I- - - - 26 LRL 70 26 MAP 1 \ I / -�� -/
\/ / 43 27 40 CED 426 44 FIR(GF� ND - - - O / W
_ --�- _ \8�/ 129.59' W � z
_ 88 _ _ _ _
TREE PROTECTION FENCE- -' \ 8.61 ' — — — — — — _ _ _ - - _ _ J
TREE PROTECTION FENCE TREE PROTECTION FENCE - - - - - ~ W W
I J
N 00054' 15" E
4.75' w
w
0 20 40
NORTH
I TREE RETENTION PLAN
E SCALE: 1 "= 20'-0"
GRAPHIC SCALE
L
Exhibit 5 -
C)
O
O
Z
U
I U)
N
O
N U)
w >
Q w
o 0�
Packet Pg. 157
1.f
7)
w
cn
Q
C)
0
w
0
0
w
75
Q
z
c�
z
Q
n,
0
CROWN DRIP LINE OR CRITICAL ROOT ZONE AS DETERMINED
SEE TREE PROTECTION FENCE ALIGNMENT ON L1
�I o
In` / U
ev
o
c
ZLo
z
412 - 182 sf ��---- �/ �� c z
\ �_I LU oQ
- 392 - 51 sf 426 - 125 sf 427 - 118 sf 441 J - 36 sf 433J 112 sf 445 - 30 sf LU
tit Tree Protection fence: High 387 - 43 sf Li
8.5"x11 sign `� density polyethylene fencing w z N
laminated in plastic I with 3.5" x 1.5" openings; // i / - - - - - I > �
spaced every 50' Color- orange. Steel posts Q
along the fence. installed at 8' o.c. / /
2" x 6' steel posts / - C)
or approved equal. / ) 0 ^ Q
KEEP OUT 5 thick layer of mulch. /LU
o TREE Maintain existing grade with
PROTECTION the tree protection fence
Ln AREA Per ECDC 23.10.070
20 TREE = 314 SF X 30 TREE = 706 SF X 40 TREE = 1,256 SF X 30 TREE = 706 SF X 30 TREE = 706 SF X 20 TREE = 314 SF X 30 TREE = 706 SF X 20 TREE = 314 SF X
- _ - 0.2 = 62 SF 0.2 = 141 SF 0.2 = 251 SF 0.2 = 141 SF 0.2 = 141 SF 0.2 = 62 SF 0.2 = 141 SF 0.2 = 62 SF
387 14% 392 - 7% 412 - 14% 426 - 18% 427 - 17% 441 - 11 % 433 - 18% 445 - 10% © GREENMLK DESIGNS LLC.
3954 REGISTERED
SECTION VIEW
AR CT
S
CONTRACTOR TO BORE UNDER CROWN DRIPLINE OF TREE L - - - - -� � - - -7TEVEN A. BARNES
STATE OF ��NASE-SlRtGTu�;
Outside of the crown dripline /
TREE PROTECTION DETAIL of the tree contractor can � _ _ _ _ _
o en trench. � - - - - J �
_ A \
1 - SCALE: 1 4"= 1'-0" I ` -
136 sf
TREE PROTECTION NOTES: 478 - 88 sf �` I 516 -
1. Pruning shall be performed by approved arborist to remove deadwood. Do not 462 - 63 sf N 7
overprune. I I 501 - 90 sf
2. During the pre -construction phase of development the project arborist shall inspect 515 - 16 sf
tree protection fencing and the completion of pre -construction treatments. this V
inspection shall be clearly documented by the applicant and provided to the city - _ _ 484 \ 18 sf c J
prior to commencement of any construction activity. A preconstruction meeting will
be scheduled with city staff per ECDC 23.10.070.A. 485 - 14 sf 493 - 50 sf I I
3. Significant trees designated to be retained by these plans shall be protected from
damage per ECDC 23.10.070.
4. Tree protection barriers shall be installed 5 feet beyond the driplines of significant - -
trees identified for retention and completely encompass the trees prior to - - - - - -
commencing any construction. protection barriers shall consis of fencing at least _ J
four feet high, constructed of chain link or polyethylene laminar safety fencing or silt - - - - -0 - -
fence. trees designated for preservation that are damaged or removed shall be - - - - 0
considered noncompliant with ECDC 23.10, subject to violation, enforcement and N
penalties per ECDC 23.10.00. 590 SF 20" TREE = 314 SF X 20" TREE = 314 SF X 20" TREE = 314 SF X 30" TREE = 706 SF X 20" TREE = 314 SF X 40" TREE = 1,256 SF X CL CO C>
5. No equipment shall operate inside the protective fencing. Protective fencing shall 30" TREE = 706 SF X 45" TREE = 1,
remain in place for the duration of the project until the city authorizes it's removal 0.2 = 141 SF X 0.2 = 318 SF 0.2 = 62 SF 0.2 = 62 SF 0.2 = 62 SF 0.2 = 141 SF 0.2 = 62 SF 0.2 = 251 SF 0 CO
per ECDC 23.10.070.C.4. Z
6. Native understory trees, shrubs and other vegetation shall be protected within the 462 - 9 % 478 - 6 % 484 - 6 % 485 - 5 % 493 - 16 % 501 - 13 % 515 - 5 % 516 - 11 % Q
designated tree protection area. no storage of materials or equipment within the
dripline plus 5 feet of protected trees.
7. Project arborist shall observe the status of the trees during regular inspection site 0
visits. Tree damage at the project site, including overstressed, dying or dead trees, W ca
shall be reported to the project manager as soon as it is observed. the project manager will coordinate with the arborist to determine the cause of the damage, ENCROACHMENT INTO DRIP LINE � C11, Z
assess the value of loss based on the tree's cost shown in the project documents,
and direct any remedial action required to restore the tree. SCALE: 1 20'-0" w LL') O
8. Provide soil amendments and fertilize trees to encourage tree growth. M
9. Water trees that have been worked on to reduce stress. Q
ANY ENCROACHMENT INTO THE APPROVED TREE PROTECTION FENCE
BOUNDARY IS SUBJECT TO CITY REVIEW/APPROVAL 9 LL
10. For trees where it is required to work within the critical Root Zone that area shall
be determined by one of the method described below: WORKING WITHIN THE ROOT ZONE OF TREES: TREE RETENTION CALCULATIONS 0
A. The dbh of the tree. Each inch dbh equals to 1 foot root zone radius. Two thirds THERE ARE 121 SIGNIFICANT TREES ON THE SITE, 1 IS NOT VIABLE SO THERE ARE A
of this area is considered Critical Root Zone. 1. ROOTS OF SUBJECT TREES SHOULD BE HAND DUG AND EXPOSED JUST OUTSIDE OF THE PROPOSED TREE PROTECTION FENCING PRIOR TO ANY CONSTRUCTION TOTAL OF 120 VIABLE SIGNIFICANT TREES.
B. On -site CRZ establishment based on actual investigation with an airspade ACTIVITIES. THE EXPOSED ROOTS SHOULD BE CUT WITH A SHARP CLEAN SAW AND TREE PROTECTION FENCING SHOULD THEN BE INSTALLED. ROOTS SHOULD NEVER BE
discovering locations of the roots. Airspade exploration must be supervised by an SEVERED WITH SHOVELS OR EXCAVATION EQUIPMENT. TOTAL TREES BEING REMOVED = 84
arborist. 2. ANY NECESSARY PRUNING SHOULD BE PERFORMED BY A QUALIFIED ARBORIST AND SHALL CONFORM TO THE THECHNIQUES AND STANDARDS SPECIFIED IN THE CURRENT TOTAL TREES BEING RETAINED = 36
8. Any trees that require working within the drip line shall have 5" of wood chips EDITION OF ANSI A300. PERCENT OF TREES BEING RETAINED: 36/120 = 30% = 30% MINIMUM RETAINED ALLOWED
(mulch) placed around the tree to completely cover the root zone. 3. THE PROJECT ARBORIST SHALL BE AVAILABLE ON -SITE TO CONSULT, DOCUMENT AND PROVIDE PRUNING OF SIGNIFICANT ROOTS (GREATER THAN 3 INCHES), TO ENSURE
9. When large vehicles need to drive within the root zone contractor shall provide steel BEST PRACTICE IS BEING FOLLOWED.
plates over the root zone to protect the soil from compaction. Should the soil 4. ACTIVITIES TO AVOID IN THE CRITICAL ROOT ZONE: SIGNIFICANT TREE TYPES BEING REMOVED
become compacted contractor shall airate the soil within the root zone to the
satisfaction of the arborist. 0STOCKPILING CONSTRUCTION MATERIALS OR DEMOLITION DEBRIS. A 6"-10" 21
10. If roots are damaged during excavation, they must be recut with a sharp, 0 PARKING VEHICLES OR EQUIPMENT. B 10.1"-14" 5
disinfected saw blade, protected with a moist plastic or burlap and covered with soil • PILING SOIL AND/OR MULCH. C 14.1"-24" 17
as soon as possible.
• TRENCHING FOR UTILITIES INSTALLATION OR REPAIR, OR FOR IRRIGATION SYSTEM INSTALLATION. D 24:+ 41
• CHANGING SOIL GRADE BY CUTTING OR FILLING.
• DAMAGING ROOTS BY GRADING, TEARING OR GRUBBING. TREE 24" DBH REMOVAL FEE (n
• COMPACTING SOIL WITH EQUIPMENT, VEHICLES, MATERIAL STORAGE AND/OR FOOT TRAFFIC. TOTAL SITE AREA: 135,272 X 2 - $270,544 u O
• CONTAMINATING SOIL FROM WASHING OUT EQUIPMENT (EXPECIALLY CONCRETE) AND VEHICLE MAINTENANCE. J LO
• INSTALLING IMPERVIOUS PARKING LOTS, DRIVEWAYS AND WALKWAYS. u Q
• ATTACHING ANYTHING TO TREES USING NAILS, SCREWS OR SPIKES. T_
• WOUNDING TRUNKS WITH STRING WEED TRIMMERS AND LAWN MOWERS. 0 0
• CAUSING INJURY BY FIRE OR EXCESSIVE HEAT.
5. BEST PRACTICES FOR TRENCHING INCLUED THE FOLLOWING: I—
• PROTECT THE TRUNKS OF HIGH -VALUE TREES FROM SCRAPING AND GOUGING TO A HEIGHT OF AT LEAST EIGHT FEET. Z LLJ
0
• KEEP EQUIPMENT AND EXCAVATED BACKFILL ON THE SIDE FURTHEST FROM THE TREE, NOT AGAINST THE TRUNK. w
• PLACE EXCAVATED BACKFILL ON A PLASTIC OR CANVAS TARP OUTSIDE THE CRZ.
w Iy
• PRUNE AWAY JAGGED ROOTS BACK TO THE TRENCH WALL CLOSEST TO THE TREE. USE A HANDHELD PRUNER OR PRUNING SAW TO MAKE SHARP, CLEAN CUTS. ry CL
• REPLACE THE BACKFILL ON THE SAME DAY IF AT ALL POSSIBLE. COVER EXPOSED ROOTS WITH WET BURLAP TO PREVENT THEM FROM DRYING OUT: IN HOT DRY w
CONDITIONS, SMALL ROOTS MAY BE INJURED IN AS LITTLE AS 30 MINUTES. w
• DO NOT ALLOW CHEMICALS, TRASH, OR OTHER FOREIGN DEVRIS TO BECOME MIXED WITH THE BACKFILL. r/
• IF EARTHWORK SPECIFICATIONS ALLOW IT, FIRM THE BACKFILL TO THE SAME CPMPACTION AS THE SURROUNDING SOIL AND NO MORE.
• WATER THE BACKFILL TO PREVENT EXCESSIVE ROOT DRYING. .. C�
6. BEST PRACTICES FOR FILL OPERATIONS INCLUDE THE FOLLOWING: J N
Ln Z
• NEVER PLACE ANY FILL OR ORGANIC MATERIALS DIRECTLY AGAINST THE TREE. � N
• NEVER COMPACT THE SOIL WITHIN THE CRZ. i 0
• IF USING NO MORE THAN TWO TO FOUR INCHES OF FILL AROUND EXISTING TREES, SIGNIFICANT DAMAGE MAY BE AVOIDED IF THE FILL HAS A COARSER TEXTURE THAN W N Cf)
THE EXISTING SOIL.
W w
N
N � o �
N
N
Ln
0
L2
Q
0
0
Exhibit 5 -Green
PLN2022-004 Packet Pg. 158
1.f
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
w cD
• 00
LJ
Cn
\ w
1 F d• \d U\��/
\ !Y \
30 C \ "/O M►I CD
w o
---- 12 1
-------------------- ..: s ��S w
N 88°38'01_" W 251 �Q1' g'p " 23'1.09' °
1 D \s Q
16" 9,CE-D- �/ - -- 2 C`o --- ° F
/
28 ,---�, ° \ \
s
NEW
36" I \' I / 8" PL o 6' 8' 6o DE
------� „DEC
_ o '
r — S" . • y j �\ o �. \s 5/23/23
o \
---, . / \\� • r
l • :,.\�.:7C5� = I 6"DE OLL
/8„C ED
\
\ ' — \
- 7 ° I • ''LOT 4 I T 3 I I w�.�' v C3
S _ 1 I ,CED \� I I 8„ o D
50
_ '
L' "CED I / J _ V 1 Ewl L _ / 20
I , 284 0 "11111lvvv„ �a�g9' A D \ /Q\\\ ' STATE OF WASHINGTON
\ — / _ _ \ _o �%Q REGISTERED
° \\ o I I I Al I LOT 2 I \ 5t9\� LAN SCAPf CHITECT 0
�,
\ \
6' oM\
J „ AKEMI f6f SAKAIDA
ERTIF CATE 0 794 CEXPIRES 06/16/24
° \ \ /, .y .; f.. �, dM1, .Ir ld•� ' , 4 �..°�', •rj 'a .--;:T : •a ■ I I :'{d}? f - y - ^/, /,( 1 e' \ \ \ )f
s
I S P E 48 �•� •��� . �... N 0)07 W
IF C 0 N
_ — / I I \.\ "•�•::;I'• ;:. �.,11 .'•.d �' ,� ,1., •.d.i '•Y.. ,' °,\...y•• .•.�: - --- 58 \ I Y, •••}• .a 44.11
7
U I" � . %'.. ". Y) ... . . 00
ro
- -.` a , ., '..`.• ° eat .•je :' .,.�;` / co / - i g +. • : a.;:d" L \ \ / / i (� t.' \ i
o: y. a. .. • • . •' d I f —
. . \ • '.e %�•' •} d•a \ o�fA •• •.I.� :• 7 1 I 9 .. � La ''' d [ \' /('��`
I— — _ — — _ — _ — — •' I. .�. • ' « :;'d.•i a ,::• :.4 - h l !'aa 7• O ^. •. �. •�{:: •9, I . a
_ �.,. t :. b ..j': �r: ;/ . 24 � � : ` •: LOT 1 0 CN =
^ �\ - i /�/ r ✓. \\_. :4. a:.• °9.-. yt(L..,a�:•' ',•3'_.` eda
6 �O � � //W 0.1 0„L— — — — — o �,- rSTREET R 18„\C`ED
LRL LIGHT (TYP) m
S S � /L
I u)i
/ \ \/ •'-•
� y
LLJ
O / \ �\ / / \ / / y. '' Qr' ...• ,� ..•�.. •,r .y O .q..•.e..� ai1•. �.�. �• - >~ .'>4 +L d•a. •:. •/a.. :'.. /1 v'{ /Q :Q
CE�-_ _ / A �, - ♦ n v v - ' a�VA\ •• /♦ A ■
—-----�-32 CED`F -}j-7 \ 12 !� _ - • 4� I •+ '. r I S C
`��� �//
— 2 ^a•r. :%E• �+ I 1 a4.. r — v�'•;,4 f — — — — — — — / .,dad. / \ \ (CLU y
RACT B I I I �.—.:.:,: ♦ z� --� \I o• /',' "d:.� / \\� \ 0 z
ON SP I I =-- �, .;F�;:. 4 E Co DF o
�r.
Lo
lb
L� -7_--, C I I 28o C , 2jz % LOT 16 �� oa N
_ LOT 11 N
�n 40 CED -- 1 a
z , — — I\ \ \--/ './� �.,,f";. %•a ' \\' I n ' 9, 1 \\ y _`., ti^"• ' , d•.� r' 777\\\ 6 ° ,^/ ,f \ \\ / •\ / C1 I I �
414 CE 3d CIE[ E
/ \ \ :� • r.: • . ::.: -I-- I •'' \ u -- ��� Kai, \ / OG M - t
}\ \ C _Q _ • = 6 SP \ \ QED
\ 1\\\3�''�'E�D ,— — — — /' I I � � \I I r - -, I I I — — — — o � �/,- r�; /\ \ _,�, - ' �'�=r1••`:.�.::"� ''i /'' • ;° \ \ / �
° ------ N
�—_�'/T. I „ 2�6 / 1 ae�EC � 6" � /� I I 270 ' ''/y \�/ `y��� ;-��•_+� itiJ.•�' `/ t:'a '�.•• ..•'!r• \ Q
CDo
O
Lo
• .. \ ((���
L T 8 1.: �. :',.,:I I s :•.::.�. Y' j \ , `may\ -
o, � I
IT Cb
Qv
'' n ��, . � \\\ I :• ', rl .. :'; � ,� „ I I I LOT 1
\\ 14 ED / - / I U
Lu
E D
4
R( R D)IT
00
0 y 6�� — Z — — — —I-► �' v 38 CE �y \v - DF i °
112"MAP _, ' "CED /r - i' RL - '
► /;,' 2"CE x 6"MAP® vvv 88
Lu
_ — - _ _
3 " ----" 28.61' — — — J cY) z
TREE PLAN
0 10 20 40
N
1 inch = 20 ft.
X 1 0- N p
W UJ (n
Lu
N 00054'15" E _ Q w
4.75 U)
L301
PRELIMINARY DEVELOPMENT PLANS XPLLIN20 2r004 Packet Pg. 159
1.f
SET TREE STRAIGHT AND PLACE RO
ON SOLID GROUND OR ON COMPACT
BACKFILL.
BACKFILL PLANTING HOLE 1/2 FULL WITH NATIVE SOIL
REMOVED OF DEBRI. TAMP SOIL TO STABILIZE ROOTBALI
WATER THOROUGHLY. CUT AWAY AND REMOVE STRING /
BURLAP. IF IN WIRE BASKET REMOVE COMPLETELY. BE
CAREFUL NOT TO DAMAGE ROOTS. BACKFILL REMAINING
PLANTING HOLE WITH A MIXTURE OF APPROVED TOPS011
AND NATIVE SOIL. AMEND BACKFILL AS NOTED IN
LANDSCAPE NOTES.
3 TIMES
ROOT BALL DIAMETER
TREE PLANTING DETAIL
�.2SCALE: N.T.S.
0
2%6" WOOD STAKES, LOCATED OUTSIDE OF
ROOTBALL. FASTEN WITH CHAIN LOK TREE
TIES. STAKE MAY NOT TOUCH TREE
TRUNK. STAKE HEIGHT MUST BE AT LEAST
5' FROM FINISHED GRADE.
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
PLANT SCHEDULE
11.70W
SYMBOL
SCIENTIFIC NAME
COMMON NAME
EXISTING TREES TO REMAIN WITHIN CONSTRUCTION AREA
TREES: COUNTED AS TREE REPLACEMENT CREDITS
0 0
SIZE (MIN.) IS CALIPER AND HEIGHT
CALIPER IS MEASURED AT 4.5' HIGH
QUANTITY HEIGHT IS FROM TOP OF SOIL LEVEL SPACING (MAX.) NOTES
REFER TO ARBORIST REPORT
REFER TO SHEETS L1 AND L2
REFER TO ARBORIST REPORT, L1, L2, AND Al SHEETS FOR ADDITIONAL
INFORMATION ON THE TREES TO REMAIN AND BE PROTECTED AND TO BE
REMOVED. REFER TO OWNER OR OWNER REPRESENTATIVE FOR ANY
CLARIFICATIONS THAT ARE NEEDED. REPORT ANY CONFLICTS TO OWNER
REPRESENTATIVE.
MEDIUM TO LARGE CONIFERS: 15 6' HIGH
ABIES GRANDIS: GRAND FIR AS SHOWN FULL TO GROUND. NICE BRANCHING. STRONGLY UPRIGHT.
CALOCEDRUS DECURRENS: INCENSE CEDAR
THUJA PLICATA 'HOGAN': HOGAN CEDAR
®
MEDIUM TO COLUMNAR CONFIERS: 19
6' HIGH AS SHOWN
ABIES KOREANA: KOREAN FIR
FULL TO GROUND. NICE BRANCHING. STRONGLY UPRIGHT.
CHAMAECYPARIS OBTUSA GRACILIS: SLENDER HINOKI
CHAMAECYPARIS NOOTKATENSIS PENDULA: WEEPING ALASKA CEDAR
TAXUS MEDIA HICKSII: HICKS YEW
STREET TREE: DECIDUOUS 31
1 " CALIPER AS SHOWN
SINGLE TRUNK, MATCHING FORM, LOWEST BRANCHES AT 4' CLEARANCE,
DO NOT PRUNE TO ACHIEVE LOWEST BRANCHING HEIGHT.
PRUNUS CERASIFERA 'CRIPOIZAM': CRIMSON POINTE PLUM
GROUP TREES: 9
1" CALIPER AS SHOWN
SINGLE TRUNK, MATCHING FORM, LOWEST BRANCHES AT 4' CLEARANCE,
BETULUS PAPYRIFERA 'RENCI': RENAISSANCE REFLECTION BIRCH
DO NOT PRUNE TO ACHIEVE LOWEST BRANCHING HEIGHT.
NYSSA SYLVATICA 'HAYMANRED': RED RAGE TUPELO
O
MEDIUM TO LARGE DECIDUOUS TREES: 7 AS SHOWN SINGLE TRUNK, MATCHING FORM, LOWEST BRANCHES AT 4' CLEARANCE,
ACER RUBRUM 'AUTUMN FLAME': AUTUMN FLAME MAPLE
1 J" CALIPER DO NOT PRUNE TO ACHIEVE LOWEST BRANCHING HEIGHT.
CERCIDIPHYLLUM JAPONICUM: KATSURA TREE
CLADRASTIS: YELLOW WOOD
MEDIUM DECIDUOUS TREES: 10 1 1" CALIPER AS SHOWN SINGLE TRUNK TO 3' MINIMUM. STRONGLY UPRIGHT. MATCHING FORM.
AMELANCHIER: SERVICEBERRY
CORNUS KOUSA : KOUSA DOGWOOD
HALESIA: SILVERBELL
SMALL DECIDUOUS TREES: 16 1 J" CALIPER AS SHOWN SINGLE TRUNK AND MULTI - STEM ACCEPTABLE AFTER 18"
ACER CIRCINATUM: VINE MAPLE
CORYLUS CORNUTA: HAZELNUT
HAMAMELIS VIRGINIANA: WITCH HAZEL
MALUS "XX?": CRABAPPLE (VARIES)
NOTE:
- TREES LISTED SHOW DIFFERENT OPTIONS THAT CAN BE USED FOR THAT TYPE OF TREE (SYMBOL).
DECIDUOUS
SET TREE STRAIGHT AND PLACE
ROOTBALL ON SOLID GROUND
OR ON COMPACTED BACKFILL.
PLACE 3" OF BARK MULCH IN SAUCER TO BACKFILL PLANTING HOLE 1/2 FULL WITH NATIVE SOIL REMOVED OF
WITHIN 3" OF THE TRUNK. NO PLANTING DEBRI. TAMP SOIL TO STABILIZE ROOTBALL. WATER THOROUGHLY. CUT
3' DIAMETER MIN. AWAY AND REMOVE STRING AND BURLAP. IF IN WIRE BASKET
REMOVE COMPLETELY. BE CAREFUL NOT TO DAMAGE ROOTS. BACKFILL
REMOVE CONTAINER OR TOP j OF BURLAPS REMAINING PLANTING HOLE WITH A MIXTURE OF APPROVED TOPSOIL
FROM ROOTBALL PRIOR BACKFILL \ AND NATIVE SOIL. AMEND BACKFILL AS NOTED IN LANDSCAPE NOTES.
FORM 5" HT. WATER DAM
AROUND TREE WITH SOIL TO
HOLD WATER.
FINISH GRADE.
3"
NOTE:
ALL WEEDS ARE TO BE REMOVED WITH ROOT(S) IN PLANTS
f-a
DELIVERED, UPON ARRIVAL. DISPOSE OF WEEDS OFFSITE.
IF EXCESSIVE WEEDS OCCUR AROUND THE BASE OF PLANTS
WITHIN THE FIRST YEAR, THE CONTRACTOR SHALL BE
SCARIFY SIDES OF PLANTING
RESPONSIBLE FOR WEED REMOVAL BY MECHANICAL MEANS.
HOLE. MAKE SURE
GOOD DRAINAGE.
w
00
00
�
J
Q
Q
w
o
<
z�
cn
�o
Q
UJ
Z
Q
CD
W
N
o
J
Lo
c
5/23/23
STATE OF WASHINGTON E
REGISTERED c
LAN SCAP,PCHITECT u-
c -a
rm-
AKEMI 4f SAKAIDA
CERTIFICATE NO. 794 a
EXPIRES 06/16/24
d
E
Q.
0
d
d
m
N�
(n
0000 �
Q
c
V .E
Z
Qa
IL
R
O
C
c
a
�
vJ c
Lu
p °'
L
ZLo
O7
` 0)
oaq
O
W
r /
N
C
N
"
Z
Q J
W
0
"I(D
c
0
a
m
L
R
r
N
m
a
J
0
0Lo
t
O
Lu
Lu
z
m
�0
V
z
C)
a
�i
0
z
EXISTING NATIVE SOIL OR NEWLY
6i
uj
Co
N
PLACED TOPSOIL.
J
N
3 TIMES ROOT BARRIER ALONG SIDEWALKS AND CURBS:
J
N
O
ROOT BALL DIAMETER REFER TO CITY CODE OR PUBLIC WORKS REQUIREMENTS FOR EXACT
Lf')
_
SPECIFICATIONS.
Lli
(n
TYPICALLY 18"-24" DEEP CONTINUOUS ROOT BARRIER, 15' CENTERED
Lli
W
Lu
>
ON TREE AREA WHEN TREE IS WITHIN 5' OF A PUBLIC CURB AND OR
=
/
I—
Lli
SIDEWALK/PAVING/WALKWAY.
C/)
0
0�
L302
PRELIMINARY DEVELOPMENT PLANS XPLLhibIN20 2r004 Packet Pg. 160
1.g
CITY OF EDMONDS
ARCHITECTURAL DESIGN BOARD
Minutes of Regular Meeting
July 27, 2023
Vice Chair Brooks called the meeting of the Architectural Design Board to order at 6:00 p.m. in the Brackett
Room at City Hall, 121— 5th Avenue North, Edmonds, Washington.
Board Members Present
Alexa Brooks, Vice Chair
Joe Herr
Maurine Jeude
Corbitt Loch
Lauri Strauss
Board Members Absent
Kim Bayer, Chair (excused)
Steve Schmitz
APPROVAL OF AGENDA
The agenda was approved as presented.
AUDIENCE COMMENTS
None
APPROVAL OF MINUTES
Staff Present
Mike Clugston, Senior Planner
May 25, 2023 and June 15, 2023 ADB Meeting Minutes
MOTION MADE BY BOARD MEMBER STRAUSS, SECONDED BY BOARD MEMBER JEUDE,
TO APPROVE THE MINUTES AS PRESENTED. MOTION PASSED UNANIMOUSLY.
NEW BUSINESS
Site and Building Design Review of the Greenwalk Park Planned Residential Development
Senior Planner Mike Clugston made the presentation on the Greenwalk Park Planned Residential Development
(PRD). He explained what a PRD is and discussed the PRD review process. This is currently at the preliminary
review where the ADB reviews and makes a recommendation to the Hearing Examiner on design at a public
Architectural Design Board Meeting
Minutes of Regular Meeting Q
July 27, 2023
Page 1 of 5
Exhibit 6 - Green
PLN2022-004 Packet Pg. 161
1.g
meeting. He reviewed the location at 540 and 550 Edmonds Way, the preliminary site plan, and single-family
design standards for PRDs.
Site Desigzn Standards
Retain Significant Features: This site has rolling topography. The applicant intends to retain 36 significant trees
and the existing pond for open space.
Vehicular Access:
• Driveway widths 20' max — lots 6-8 seem to exceed 20 feet. May need to add verification as a
conditional approval.
• Shared driveways are encouraged — lots 14 & 15 share.
• Primary plat road 24' at SR 104 (Edmonds Way(, reduces to 18' with sidewalks on both sides.
• Secondary access drives are 12' wide
Garage Locations: Homes should have visually diminished garage fronts. The designs appear to meet the code,
but side -loaded or one -door tandem parked would further reduce the visual impact.
Landscaping and Buffering:
• 36 trees will be retained out of 119 existing trees.
• 31 street trees are proposed.
• Additional trees will be installed throughout the site.
One of the conditions will be to get a landscaping plan that shows landscaping for all the particular lots
in order to determine compliance with Type II/Type III buffer landscaping along north, west, and south
property lines. The Board will need to determine the appropriate type of buffer landscaping (Type II or
Type II1) for this site.
Building Entrances:
• Homes should have a dominant front porch with pedestrian access to main entrance.
• Front porch entries are identifiable; some are more dominant than others.
• Some designs have pedestrian connection to entry; some connect to driveway.
Open Space Requirements: 10% of the lot area is required for usable open space. 10.5% is proposed which
includes a play space and pond/seating. Both open space areas show guest parking over the areas, and there
were question about whether that was consistent with the open space requirements; the code is not clear on this.
Because of the street width reductions there is no parking allowed on the streets or access easements. There will
be a fair amount of parking for each unit. Staff asked several questions, including whether the proposal needs
more guest parking or if guest parking over open space areas is a reasonable use for a usable open space. A
condition is proposed.
Building Design Standards:
Characteristics of Single -Family Development: Demonstrate residential quality — pedestrian access, human
scale, sidewalks on plat road.
Architectural Design Board Meeting
Minutes of Regular Meeting Q
July 27, 2023
Page 2 of 5
Exhibit 6 - Green
PLN2022-004 Packet Pg. 162
1.g
Materials: Materials should be consistent on all four sides. Each of the house designs uses varied modern design
elements on all sides. Human scale — horizontal and vertical difference.
Staff has proposed two conditions before the project is ready to go before the Hearing Examiner. One is
verification that all curb cuts for driveways are a maximum of 20' wide. The other is an updated landscaping
plan consistent with ECDC 20.13 showing all retained trees and proposed trees and landscaping throughout the
development. It should also show any fencing being considered throughout the project.
Additional questions/conditions to address in the Hearing Examiner staff report:
1. Whether guest parking can be included in usable open space.
2. Whether Type II or Type 11 landscaping is appropriate for the north, west, and south sides of the
development.
Guest Parking in Open Space: Staff feels that guest parking is not consistent with usable open space. Open space
is to be used by people, not cars. However, the code is not clear on that.
Board Member Loch asked if they would still meet the 10% requirement for open space if the parking areas are
removed. Senior Planner Clugston did not think so.
The applicant explained the original plan for those parking spaces was to provide basketball hoops. At the public
hearing some of the neighbors were concerned that parking could overflow onto their neighboring streets. The
idea is that most of the time these will be basketball hoops, but every once in a while, somebody could park on
them. They would be paved but not necessarily striped. The developer is fine with removing the parking if
desired by the City. He also noted that all of the yards will be fenced with 6-foot-tall cedar fences, especially
the perimeter. The fences were important to neighbors because of the removal of trees and the proximity of
homes to the property lines. He noted that there are 16 lots with 8 different housing types. The housing types
were designed so that they will not necessarily have the same roofline and siding, and there will be variety.
Board Member Herr asked about the garages which appeared to be three -car garages with two doors. The
applicant explained that this was so the garage doors don't cover more than 50% of the front of the house. They
are large garages, but they are only two -car garages. People like to have the extra space. Board Member Herr
referred to Lot 6 and said it looks like it has a full -width driveway. The applicant said all the driveways should
be less than 20 feet. Mr. Clugston commented that when staff looked at this, it looked like 6, 7, and 8 were wider
than 20 feet. This should be verified.
Board Member Strauss asked about access to SR 104. The applicant explained that you have to turn right coming
out of the development but coming down the hill there is a left turn lane to turn into the development. This is a
limited access portion of 104. There was an easement on this property that limited the access to one access drive
per lot. The applicant had to work with WSDOT in order to get that to be a road instead of an entrance drive.
They are planning on putting a gate on it for added security and to prevent accidental public access.
The applicant explained they are required to plant a minimum of 80 trees, but they are planting 120 trees. He
added that the pond is actually a beautiful waterfall from the previous property owners.
Architectural Design Board Meeting
Minutes of Regular Meeting Q
July 27, 2023
Page 3 of 5
Exhibit 6 - Green
PLN2022-004 Packet Pg. 163
1.g
Board Member Strauss thought one of the houses looked very close to the sidewalk on 104. The applicant
explained it has the prescribed setback. Mr. Clugston said it was 25 feet. The applicant explained they have
larger setbacks around the perimeter per the PRD requirements.
Board Member Strauss referred to the basketball court/guest parking area and said she didn't have a problem
with the basketball court being used for guest parking occasionally. The houses have large driveways that can
accommodate four cars plus two in the garage. She wondered about just taking the word parking off it.
Board Member Jeude recommended doing away with the guest parking.
Board Member Herr noted these are nice large lots. It's a shame they have three car garages that can't be used
as three -car garages, but he understands why they did it. He likes the shared easements. There are only a few
people that live on the main street; everybody else lives down their own private little drive. He thinks the site
layout is really good. He said he was impressed with the plans.
Board Member Loch said he thinks there will be a need for extra parking, and there really isn't a place for
overflow parking in the neighborhood. He suggested keeping one of the two guest parking areas.
Board Member Jeude did not think guest parking should be included in open space.
There was consensus that guest parking cannot be included as part of the usable open space, the applicant should
change the wording to basketball hoops, leave the concrete where it is, and let the neighborhood figure out how
they want to use it.
MOTION MADE BY BOARD MEMBER STRAUSS, SECONDED BY BOARD MEMBER LOCH,
THAT THE GUEST PARKING CANNOT BE INCLUDED AS PART OF THE USABLE OPEN
SPACE. MOTION PASSED UNANIMOUSLY.
Mr. Clugston reviewed the difference between Type II and Type III landscape requirements.
Board Member Loch asked if perimeter landscaping would be required if this was a regular subdivision. Mr.
Clugston replied that it would not. Board Member Loch said, based on that and based on the fact that it is single-
family on the other side of the fence, he thinks it should be the lesser requirement (Type III). He thinks this is
adequate to screen from another single-family home.
Board Member Herr asked what the advantage was of doing a PRD instead of a subdivision. The applicant
explained it allows them to build the houses closer to the street. As long as they have a 20-foot-deep driveway,
the front porch can be within 10 feet of the back of the sidewalk. This makes a suburban area look more urban
because the houses appear to be closer to the street. It also gives modulation. They can also adjust the lot sizes
so some are smaller and some are larger. The PRD also allows modification of the access drive and allows them
to go a little above the 35% lot coverage.
Board Member Herr expressed frustration with the City of Edmonds requirement that the sidewalk has to come
up to the entry because nobody uses it. Everyone comes from the driveway to the front door. This creates issues
for builders because of the lot coverage area. Mr. Clugston acknowledged that the PRD code needs some
updates.
Architectural Design Board Meeting
Minutes of Regular Meeting Q
July 27, 2023
Page 4 of 5
Exhibit 6 - Green -
PLN2022-004 Packet Pg. 164
1.g
MOTION MADE BY BOARD MEMBER STRAUSS, SECONDED BY BOARD MEMBER LOCH,
TO ALLOW TYPE III LANDSCAPING WITH THE CONDITION THAT THEY DON'T TAKE OUT
ANY TREES THEY ALREADY SAID THEY ARE GOING TO PROVIDE. MOTION PASSED
UNANIMOUSLY.
MOTION MADE BY BOARD MEMBER HERR, SECONDED BY BOARD MEMBER STRAUSS,
THAT THE ADB RECOMMEND THAT THE HEARING EXAMINER APPROVE THE DESIGN
FOR THE PROPOSED GREENWALK PARK PROJECT IN PLN2022-0049, SUBJECT TO THE
RECOMMENDED CONDITIONS ON PAGE 34 AS AMENDED ABOVE. MOTION PASSED
UNANIMOUSLY.
Board Member Strauss commented that she was also impressed with the design.
PUBLIC HEARINGS
Request for continuance of public hearing for 627 Dayton Apartments
Mr. Clugston explained that the hearing had previously been continued to July 27, 2023. The applicant was not
able to resubmit during that window and is requesting additional time to prepare updated plans. The request is
to extend the public hearing until the Board's September 28 meeting, since a separate hearing is already
scheduled for the Board's August 24 meeting.
MOTION MADE BY VICE CHAIR BROOKS, SECONDED BY BOARD MEMBER JEUDE, TO
CONTINUE THE PUBLIC HEARING FOR 627 DAYTON APARTMENTS TO SEPTEMBER 28,
2023. MOTION PASSED UNANIMOUSLY.
BOARD REVIEWS ITEMS
None
BOARD DISCUSSION ITEMS
None
ARCHITECTURAL DESIGN BOARD MEMBER COMMENTS:
Board Member Strauss said she would be out of town for the September 28 meeting and on east coast time, but
she will try to join in remotely.
ADJOURNMENT:
The meeting was adjourned at 7:06 p.m.
Architectural Design Board Meeting
Minutes of Regular Meeting Q
July 27, 2023
Page 5 of 5
Exhibit 6 - Green
PLN2022-004 Packet Pg. 165
GREENWALK
1.h
DESIGNS LLC.
12733 39TH AVE. NE PHONE: 206.5W.9296
SEATTLE, WA 98125 EMAIL• WAt7NEs6C0M5RS10NEARCH.00M
September 7, 2023
City of Edmonds
Development Services Department —Planning Division
RE: GREENWALK PARK
RESPONSE TO DESIGN REVIEW MEETING (PERMIT# PLN2022-0049, 2022-0053)
Dear City of Edmonds
1. DRM requested that fencing be shown around the entire site. 6' cedar fencing has been shown
around the entire perimeter of the site and around back yards of individual houses. See new site plan
A1.0.
2. DRM requested that type III landscaping be applied around the entire perimeter of the site, not
between individual lots. See revised landscaping plans.
3. DRM requested that parking shown in play areas be removed. Overflow parking has been removed
as requested. See new site plan A1.0.
4. DRM requested that drives interfacing with access easements be no wider than are required for city
streets which is 20 feet wide. Paving has been removed to comply with this requirement. See new site
plan A1.0.
See attached responses to stormwater review.
Sincerely,
GREENWALK DESIGNS
Steve Barnes AIA
Exhibit 7 - Green
PLN2022-004 Packet Pg. 166
1.h
TERRAFORMA
DESIGN GROUP
August 23, 2023
Taylor Brown, PE
Blueline
Interim Stormwater Reviewer for City of Edmonds
RE: GREENWALK PARK
- Application# PLN2022-0049, PLN2022-0053
- Response to Stormwater Review
Dear Taylor,
Thank you for your review of the project. We have updated our TESC plans and SWPPP. The following are
your review comments with my responses in bold.
Review Comments L
1. Please note it is recommended that a response is written for every comment. a
L
2. Previous Comment: It appears the TESC sheet on the civil plan's submittal has the west basin at 1.75 a
acres and the east basin at 1.36 acres while the storm drainage report TESC plans have the west basin at '5
M
1.59 Acres and the east basin at 1.52 acres. Please reconcile. The TESC basin limits line and base area 3
c
notes have been revised to match the drainage report existing conditions map. West Basin = 1.59 ac.
East Basin = 1.52 ac. C7
Civil Plans
0
3. Previous Comment: Discharge from sediment traps must be routed to stabilized conveyance, an outlet,
or to a level spreader and must not create the potential for a point discharge from the site. The design is
0
still proposing to discharge runoff direct) on to the neighboring property without an easement for flow or
p p g g Y g gp p Y
m
an appropriate setback. Please revise the discharge location for the sediment trap. Both sediment traps
Q
have been redesigned to fully infiltrate the 100yr-24hr design storm. No outlet is proposed for either
0
pond. No easement is necessary to neighboring properties.
m
w
c
0
4. Please make the following revisions to the proposed details.
vCLi
1. Previous Comment: BMP 235: Wattles: i. Per Volume IV, Chapter 2 of the DOE Manual, stakes should be
driven through the middle of the wattle, leaving 2 to 3 inches of the stake protruding above the wattle.
CU
Please revise the provided detail to include stakes and anything else listed in the DOE section BMP C235:
Q
Wattles. The proposed straw wattle measure is limited to use within the Edmonds Way existing
a
Q
roadway. The straw wattle will be placed onto the existing pavement downstream of the proposed
roadway curb replacement and pavement restoration. A detail of the wattle on pavement is provided on
�-
Detail 5/C8. Is this situation, stakes through the wattle would not be appropriate.
s
2. Previous Comment: Please include a detail of BMP C154: Concrete Washout Area on the plans. See
W
added detail 6/C8.
m
E
c�
w
CIVIL ENGINEERING Q
& LANDSCAPE ARCHITECTURE
5027 515L Avenue SW Seattle WA 98136 phone 206.795.9023 website www.terraformadesieg¢rmup;com Green
PLN2022-004 Packet Pg. 167
1.h
GREENWALK PARK— RESPONSE TO CIVIL COMMENTS
August 23, 2023
Page 1 2
3. Previous Comment: BMP C209: Outlet Protection: Please include a minimum thickness in the detail per
the DOE design standards. Callout for 12" min. depth provided on detail 3/C8.
4. Previous Comment: Please include Edmonds standard detail SD-642: Post Construction Soil Quality and
Depth. Detail has been added to Sheet C7.
5. Previous Comment: Per BMP T5.10A: Downspout Full Infiltration: All infiltration systems should be at
least 10 feet from any structure, property line, or sensitive area. Please revise the drainage plans so the
drywells are at least 10 feet from all structures and property lines.
1. Please revise the locations of drywells on lots #2, #3, #4, #5, #11, #12, #14 and #16 and ensure that
the drywells are at least 10 feet away from any structure, property line, or sensitive area. Per Edmonds
SD-638, measure from the edge of the drywell to the closest property line or structure. Additionally,
please revise the drywell footprint to be representative of the size of the drywell. The reviewer needs
to determine the feasibility of drywells with Minimum Requirement 5 and the proposed house
footprints. We have revised our design to meet the City requirement. Standard detail SD-638 has
been added to the plans. According to the detail, our minimum setback to a property line or
easement is actually 5 feet. See the updated plan with added drywell location dimensions /
setbacks. We are still proposing a traditional drywell (48" dia perforated MH) per detail 1/C7 as this
type of drywell provides great holding volume during drawdown.
6. Please revise the design of the eastern sediment trap to ensure the overflow is discharged to stabilized
conveyance, outlet, or level spreader. The eastern sediment trap is designed to infiltrate up to the 100-yr
storm event. Infiltration is proposed since the existing topography merely sheet drains to the property
to the south with no viable deeper storm drain or ditch to connect to.
SWPPP
1. Previous Comment: Please provide full sizing calculations for the sediment traps for Element 4
2. Previous Comment: Element 8:
a. BMP C200: Inceptor Dike and Swale is not a method of stabilizing channels and outlets but rather c
protecting slopes. Please revise the SWPPP narrative to include BMP C200 in Element 6. BMP C200 has
been omitted from Element #8. It has been included in Element #6. c
0
3. The SWPPP Narrative is missing Elements 1 and 2. Please add these elements to the SWPPP Narrative. p
It is now provided in the SWPPP. Q
0
r
m
Thank you again for your review. Please let us know if you have any further questions or comments. The c
applicant is anxious to move forward with the project as soon as possible. y
d
L
rt+
_
CU
Sincerely, V
TERRAFORMA DESIGN GROUP, INC. a
Q
s
x
Pedro DeGuzman, PE w
m
E
t
c�
w
Q
TERRAFORMA DESIGN GROUP, INC. Exhibit 7 - Green
PLN2022-004 Packet Pg. 168
SUBDIVISION
1.i
Guarantee/Certificate Number:
Issued By:
500123504
CHICAGO TITLE INSURANCE COMPANY Amendment 1
CHICAGO TITLE INSURANCE COMPANY
a corporation, herein called the Company
GUARANTEES
Fernandez & Barnes, LLC, a Washington limited liability company
herein called the Assured, against actual loss not exceeding the liability amount stated in Schedule A which the Assured
shall sustain by reason of any incorrectness in the assurances set forth in Schedule A.
LIABILITY EXCLUSIONS AND LIMITATIONS
1. No guarantee is given nor liability assumed with respect to the identity of any party named or referred to in Schedule A
or with respect to the validity, legal effect or priority of any matter shown therein.
2. The Company's liability hereunder shall be limited to the amount of actual loss sustained by the Assured because of
reliance upon the assurance herein set forth, but in no event shall the Company's liability exceed the liability amount
set forth in Schedule A.
Please note carefully the liability exclusions and limitations and the specific assurances afforded by this guarantee. If you
wish additional liability, or assurances other than as contained herein, please contact the Company for further information
as to the availability and cost.
Chicago Title Company of Washington
3002 Colby Ave., Suite 200
Everett, WA 98201
Countersigned By:
&Wjo-"
i�
Eamonn Doherty
Authorized Officer or Agent
SEAT
•a0
Chicago Title Insurance Company
By:
Attest:
Michael J. Nolan, President
Marjorie Nemzura, Secretary
Subdivision Guarantee/Certificate Printed: 07.01.22 @ 06:54 AM
Page 1 WA-CT-FNRV-02150.624691-SPS-1-22-500123504
Exhibit 8 - Green
PLN2022-004 Packet Pg. 169
1.i
GUARANTEE/CERTIFICATE NO. 500123504
CHICAGO TITLE INSURANCE COMPANY
AMENDMENT 1
ISSUING OFFICE:
Title Officer: Builder Unit
Chicago Title Company of Washington
3002 Colby Ave., Suite 200
Everett, WA 98201
Fax: (866)827-8844
Main Phone: (425)259-8223
Email: evebuilder@ctt.com
SCHEDULE A
Liability
Premium
Tax
$1,000.00
$350.00
$34.30
Effective Date: June 27, 2022 at 08:00 AM
The assurances referred to on the face page are:
That, according to those public records which, under the recording laws, impart constructive notice of matter relative to
the following described property:
SEE EXHIBIT "A" ATTACHED HERETO AND MADE A PART HEREOF
Title to said real property is vested in:
Fernandez & Barnes, LLC, a Washington limited liability company
subject to the matters shown below under Exceptions, which Exceptions are not necessarily shown in the order of their
priority.
END OF SCHEDULE A
Subdivision Guarantee/Certificate Printed: 07.01.22 @ 06:54 AM
Page 2 WA-CT-FNRV-02150.624691-SPS-1-22-500123504
Exhibit 8 - Green
PLN2022-004 Packet Pg. 170
1.i
EXHIBIT "A"
Legal Description
For APN/Parcel ID(s): 270325-003-083-00
THAT PORTION OF THE NORTH HALF OF THE NORTHWEST QUARTER OF THE SOUTHWEST QUARTER OF THE
SOUTHWEST QUARTER OF SECTION 25, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M., IN SNOHOMISH
COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS:
BEGINNING AT THE NORTHWEST CORNER OF SAID NORTH HALF OF THE NORTHWEST QUARTER OF THE
SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER;
THENCE SOUTH, ALONG THE WEST LINE THEREOF, 321.83 FEET;
THENCE EAST, 300 FEET, MORE OR LESS, TO A POINT WHICH IS 300 FEET EAST AND 321.03 FEET SOUTH OF
THE NORTHWEST CORNER OF THE SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER;
THENCE NORTH 41°28'23" EAST, TO THE SOUTHERLY BOUNDARY OF TRACT CONVEYED TO STATE OF
WASHINGTON BY DEED RECORDED NOVEMBER 2, 1977 UNDER RECORDING NO. 2171113;
THENCE NORTHWESTERLY ALONG SOUTHERLY LINE OF TRACT, AS CONVEYED TO STATE OF WASHINGTON
TO THE NORTH LINE OF THE SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER;
THENCE WEST, ALONG SAID NORTH LINE TO A POINT OF BEGINNING.
EXCEPT THE NORTH 35 FEET THEREOF.
SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON.
a
Subdivision Guarantee/Certificate Printed: 07.01.22 @ 06:54 AM
Page 3 WA-CT-FNRV-02150.624691 -SPS-1 -22-500123504
Exhibit 8 - Green
PLN2022-004 Packet Pg. 171
1.i
GUARANTEE/CERTIFICATE NO. 500123504
CHICAGO TITLE INSURANCE COMPANY
SCHEDULE B
GENERAL EXCEPTIONS
AMENDMENT 1
A. Rights or claims of parties in possession, or claiming possession, not shown by the Public Records
B. Any encroachment, encumbrance, violation, variation, or adverse circumstance affecting the Title that would be
disclosed by an accurate and complete land survey of the Land.
C. Easements, prescriptive rights, rights -of -way, liens or encumbrances, or claims thereof, not shown by the
Public Records.
D. Any lien, or right to a lien, for contributions to employee benefit funds, or for state workers' compensation, or
for services, labor, or material heretofore or hereafter furnished, all as imposed by law, and not shown by the
Public Records.
E. Taxes or special assessments which are not yet payable or which are not shown as existing liens by the Public
Records.
F. Any lien for service, installation, connection, maintenance, tap, capacity, or construction or similar charges for
sewer, water, electricity, natural gas or other utilities, or for garbage collection and disposal not shown by the
Public Records.
G. Unpatented mining claims, and all rights relating thereto.
H. Reservations and exceptions in United States Patents or in Acts authorizing the issuance thereof.
I. Indian tribal codes or regulations, Indian treaty or aboriginal rights, including easements or equitable servitudes
J. Water rights, claims or title to water.
Subdivision Guarantee/Certificate Printed: 07.01.22 @ 06:54 AM
Page 4 WA-CT-FNRV-02150.624691 -SPS-1 -22-500123504
Exhibit 8 - Green
PLN2022-004 Packet Pg. 172
1.i
GUARANTEE/CERTIFICATE NO. 500123504
CHICAGO TITLE INSURANCE COMPANY
2
4
SCHEDULE B
(continued)
SPECIAL EXCEPTIONS
AMENDMENT 1
No search has been made as to property taxes and assessments. Property taxes and assessments will be
searched upon request.
Waiver of damages contained in deed:
In Favor Of: Snohomish County
Recorded: December 7, 1931
Recording No.: 510578
As Follows: Said grantor does hereby relinquish all claims of damage caused or arising by reason of the
laying out and establishing of a public road upon the property herein conveyed
Easement(s) for the purpose(s) shown below and rights incidental thereto as set forth in a document:
In favor of: Olympic View Water District
Purpose: Sanitary sewer line or lines, and appurtenances thereto
Recording Date: February 13, 1968
Recording No: 2013162
Affects: a portion of said premises
Relinquishment of access to State Highway Number 104 and of light, view and air by Deed:
Grantee: State of Washington
Recording Date: November 2, 1970
Recording No.: 2171113
Ordinance No. 3308, and the terms and conditions thereof:
Recording Date: June 19, 2000
Recording No.: 200006190107
A deed of trust to secure an indebtedness in the amount shown below,
Amount:
$1,875,000.00
m
Dated:
January 1, 1753
Trustor/Grantor:
Fernandez & Barnes, LLC, a Washington limited liability company
m
Trustee:
Trustee Services, Inc.
Beneficiary:
1st Security Bank of Washington
Loan No.:
5152045730
00
r
Recording Date:
December 16, 2021
Recording No.:
202112160114
w
Subdivision Guarantee/Certificate Printed: 07.01.22 @ 06:54 AM
Page 5 WA-CT-FNRV-02150.624691-SPS-1-22-500123504
Exhibit 8 - Green
PLN2022-004 Packet Pg. 173
1.i
GUARANTEE/CERTIFICATE NO. 500123504
CHICAGO TITLE INSURANCE COMPANY
SCHEDULE B
(continued)
Assignment of Rents and Leases
Assigned to: 1st Security Bank of Washington
Assigned by: Fernandez & Barnes, LLC, a Washington limited liability company
Recording Date: December 16, 2021
Recording No.: 202112160115
AMENDMENT 1
The Company's liability for this report is limited to $1,000.00. This report is based on the company's property
records, and no liability is assumed for items misindexed or not indexed in the public records, or for matters which
would be disclosed by an inquiry of the parties in possession or by an accurate survey or inspection of the
premises. This report and the legal description given herein are based upon information supplied by the applicant
as to the location and identification of the premises in question, and no liability is assumed for discrepancies
resulting therefrom. This report does not represent either a commitment to insure title, an examination of, or
opinion as to the sufficiency or effect of the matter shown, or an opinion as to the marketability of title to the
subject premises.
END OF SCHEDULE B
Subdivision Guarantee/Certificate Printed: 07.01.22 @ 06:54 AM
Page 6 WA-CT-FNRV-02150.624691-SPS-1-22-500123504
Exhibit 8 - Green
PLN2022-004 Packet Pg. 174
SUBDIVISION
1.i
Guarantee/Certificate Number:
Issued By:
500131227
CHICAGO TITLE INSURANCE COMPANY Amendment 1
CHICAGO TITLE INSURANCE COMPANY
a corporation, herein called the Company
GUARANTEES
Fernandez & Barnes, LLC, a Washington limited liability company
herein called the Assured, against actual loss not exceeding the liability amount stated in Schedule A which the Assured
shall sustain by reason of any incorrectness in the assurances set forth in Schedule A.
LIABILITY EXCLUSIONS AND LIMITATIONS
1. No guarantee is given nor liability assumed with respect to the identity of any party named or referred to in Schedule A
or with respect to the validity, legal effect or priority of any matter shown therein.
2. The Company's liability hereunder shall be limited to the amount of actual loss sustained by the Assured because of
reliance upon the assurance herein set forth, but in no event shall the Company's liability exceed the liability amount
set forth in Schedule A.
Please note carefully the liability exclusions and limitations and the specific assurances afforded by this guarantee. If you
wish additional liability, or assurances other than as contained herein, please contact the Company for further information
as to the availability and cost.
Chicago Title Company of Washington
3002 Colby Ave., Suite 200
Everett, WA 98201
Countersigned By:
Brent Aune
Authorized Officer or Agent
Chicago Title Insurance Company
By:
Attest:
Michael J. Nolan, President
��� )?&o —
Marjorie Nemzura, Secretary
Subdivision Guarantee/Certificate Printed: 07.01.22 @ 07:10 AM
Page 1 WA-CT-FNRV-02150.624691-SPS-1-22-500131227
Exhibit 8 - Green
PLN2022-004 Packet Pg. 175
1.i
GUARANTEE/CERTIFICATE NO. 500131227
CHICAGO TITLE INSURANCE COMPANY
AMENDMENT 1
ISSUING OFFICE:
Title Officer: Builder Unit
Chicago Title Company of Washington
3002 Colby Ave., Suite 200
Everett, WA 98201
Fax: (866)827-8844
Main Phone: (425)259-8223
Email: evebuilder@ctt.com
SCHEDULE A
Liability
Premium
Tax
$1,000.00
$350.00
$34.30
Effective Date: June 27, 2022 at 08:00 AM
The assurances referred to on the face page are:
That, according to those public records which, under the recording laws, impart constructive notice of matter relative to
the following described property:
SEE EXHIBIT "A" ATTACHED HERETO AND MADE A PART HEREOF
Title to said real property is vested in:
Fernandez & Barnes, LLC, a Washington limited liability company
subject to the matters shown below under Exceptions, which Exceptions are not necessarily shown in the order of their
priority.
END OF SCHEDULE A
Subdivision Guarantee/Certificate Printed: 07.01.22 @ 07:10 AM
Page 2 WA-CT-FNRV-02150.624691-SPS-1-22-500131227
Exhibit 8 - Green
PLN2022-004 Packet Pg. 176
1.i
EXHIBIT "A"
Legal Description
LOT 1, CITY OF EDMONDS BOUNDARY LINE AGREEMENT RECORDED UNDER AUDITOR'S FILE NO.
200808145058, BEING A PORTION OF THE NORTHWEST QUARTER OF THE SOUTHWEST QUARTER OF THE
SOUTHWEST QUARTER OF SECTION 25, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M., RECORDS OF
SNOHOMISH COUNTY.
SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON
a
Subdivision Guarantee/Certificate Printed: 07.01.22 @ 07:10 AM
Page 3 WA-CT-FNRV-02150.624691 -SPS-1 -22-500131227
Exhibit 8 - Green
PLN2022-004 Packet Pg. 177
1.i
GUARANTEE/CERTIFICATE NO. 500131227
CHICAGO TITLE INSURANCE COMPANY
SCHEDULE B
GENERAL EXCEPTIONS
AMENDMENT 1
A. Rights or claims of parties in possession, or claiming possession, not shown by the Public Records
B. Any encroachment, encumbrance, violation, variation, or adverse circumstance affecting the Title that would be
disclosed by an accurate and complete land survey of the Land.
C. Easements, prescriptive rights, rights -of -way, liens or encumbrances, or claims thereof, not shown by the
Public Records.
D. Any lien, or right to a lien, for contributions to employee benefit funds, or for state workers' compensation, or
for services, labor, or material heretofore or hereafter furnished, all as imposed by law, and not shown by the
Public Records.
E. Taxes or special assessments which are not yet payable or which are not shown as existing liens by the Public
Records.
F. Any lien for service, installation, connection, maintenance, tap, capacity, or construction or similar charges for
sewer, water, electricity, natural gas or other utilities, or for garbage collection and disposal not shown by the
Public Records.
G. Unpatented mining claims, and all rights relating thereto.
H. Reservations and exceptions in United States Patents or in Acts authorizing the issuance thereof.
I. Indian tribal codes or regulations, Indian treaty or aboriginal rights, including easements or equitable servitudes
J. Water rights, claims or title to water.
Subdivision Guarantee/Certificate Printed: 07.01.22 @ 07:10 AM
Page 4 WA-CT-FNRV-02150.624691 -SPS-1 -22-500131227
Exhibit 8 - Green
PLN2022-004 Packet Pg. 178
1.i
GUARANTEE/CERTIFICATE NO. 500131227
CHICAGO TITLE INSURANCE COMPANY
SCHEDULE B
(continued)
SPECIAL EXCEPTIONS
AMENDMENT 1
No search has been made as to property taxes and assessments. Property taxes and assessments will be
searched upon request.
2. Relinquishment of all claims of damage caused or arising by reason of the laying out and establishing of a public
road, over property conveyed to Snohomish County by Deed:
Recording Date: December 7, 1931
Recording No.: 510578
Matters set forth in Ordinance No. 3308
Recording Date: June 19, 2000
Recording No.: 20006190107
4. Covenants, conditions, restrictions, recitals, reservations, easements, easement provisions, dedications, building
setback lines, notes, statements, and other matters, if any, but omitting any covenants or restrictions, if any,
including but not limited to those based upon race, color, religion, sex, sexual orientation, familial status, marital
status, disability, handicap, national origin, ancestry, or source of income, as set forth in applicable state or federal
laws, except to the extent that said covenant or restriction is permitted by applicable law, as set forth on Record of
Survey for Boundary Line Agreement:
Recording No: 200808145058
A deed of trust to secure an indebtedness in the amount shown below,
Amount:
$825,000.00
Dated:
April 21, 2022
Trustor/Grantor:
Fernandez & Barnes, LLC, a Washington limited liability company
Trustee:
Trustee Services, Inc.
Beneficiary:
1st Security Bank of Washington
Loan No.:
5152143130
Recording Date:
May 20, 2022
Recording No.:
202205200058
Siad Deed of Trust is a Re-record of 202205050174.
Assignment of Rents and Leases
Assigned to: 1st Security Bank of Washington
Assigned by: Fernandez & Barnes, LLC, a Washington limited liability company
Recording Date: May 20, 2022
Recording No.: 202205200059
Subdivision Guarantee/Certificate Printed: 07.01.22 @ 07:10 AM
Page 5 WA-CT-FNRV-02150.624691-SPS-1-22-500131227
Exhibit 8 - Green
PLN2022-004 Packet Pg. 179
1.i
GUARANTEE/CERTIFICATE NO. 500131227
CHICAGO TITLE INSURANCE COMPANY
SCHEDULE B
(continued)
Hazardous Substance Agreement and the terms and conditions thereof:
Recording Date: May 20, 2022
Recording No.: 202205200060
AMENDMENT 1
The Company's liability for this report is limited to $1,000.00. This report is based on the company's property
records, and no liability is assumed for items misindexed or not indexed in the public records, or for matters which
would be disclosed by an inquiry of the parties in possession or by an accurate survey or inspection of the
premises. This report and the legal description given herein are based upon information supplied by the applicant
as to the location and identification of the premises in question, and no liability is assumed for discrepancies
resulting therefrom. This report does not represent either a commitment to insure title, an examination of, or
opinion as to the sufficiency or effect of the matter shown, or an opinion as to the marketability of title to the
subject premises.
END OF SCHEDULE B
Subdivision Guarantee/Certificate Printed: 07.01.22 @ 07:10 AM
Page 6 WA-CT-FNRV-02150.624691-SPS-1-22-500131227
Exhibit 8 - Green
PLN2022-004 Packet Pg. 180
1.j
EU cEdmonds Utilities Consortium
CUSTOMER - EUC
CONTACT
Form
A coordinated utility environment which maximizes joint utility opportunities to provide quality service for the citizens of Edmonds
YOU WILL BE GIVEN A CONFIRMATION NUMBER BY EACHUTILITY ONCE
YOU HAVE INFORMED THEM OF YOUR PROJECT.
SITE ADDRESS: 540 & 550 Edmonds Way, Edmonds, WA 98020
EMU
# P U D-0115-2022
Mary McAllister - 425-670-3216
You will need to provide PUD with a site plan and a completed New Service
MMMcAllister@SNOPUD.com
Questionnaire.
PUGET
SOUND
# 512540194
ENERGY
Call to verify gas availability and to coordinate service install. You will need to
New Customer Construction
provide PSE with the parcel number, contact phone number and mailing
Department - 1-888.321-7779
address.
ziply fi ber
# 22-008
You will need to provide Ziply with the location of your project, total line
Mike HaKahan - 425-949-0230
requirement, and the date in which service is required. A copy of your
Mike.HaKahan@ziply.com
development plan may be required.
COMCAST
91462
#
425-757-1794
You will need to provide Comcast with the location of the project, copy of the
John Warrick - 425-263-5328
development and site plan (digital copy if available), the date in which service is
John Warrick@cable.comcast.com
required and a list of contact names, phone numbers and mailing addresses.
OLYMPIC VIEW1
# 22-02
For customers in Olympic View Service Area:
You will need to provide OVWSD with the survey map of your site and
425-774-7769 or chriss@ovwater.com
complete a development information form.
THIS FORM MUST BE COMPLETED AND GIVEN TO DEVELOPMENT
SERVICES STAFF AT THE TIME OF PERMIT SUBMITTAL PLLIN2c 2VE)5NJ
Packet Pg. 181
lmi 2
City of Edmonds Zoning Map
FO
KU SHAN R11
G
1
15SN S'�-
226TH ST SW -J
22606Uj
LU
Q v v
LLJ ;24 10706 10624 22604 22615 c
UJI 226,
Lu�=226TH Pt SW
z Z o z262s ~ 1: 3,031 O r" �21621 22625
0 252.60 505.2 Feet 376.2 This ma is a user generated static output from an Internet mapping site and is 1
4,514 p B p PP B
reference only. Data layers that appear on this map may or may not be accura
WGS_1984_Web_Mercator_AuxiIiary_Sphere current, or otherwise reliab
© City of Edmonds THIS MAP IS NOT TO BE USED FOR DESIGN OR CONSTRUCTIC
Legend
0
ReZones
PRD
Ro W
Zoning
■
RS-6
RS-8
RS-10
RS-12
©
RSW-12
RS-20
RS-MP
RM-3
■
RM-2.4
■
RM-1.5
RM-EW
13131
BD2
BD3
BD4
BD5
OR
®
WMU
z
BP
■
BN
.
FVMU
BC
Notes
Greenwalk Park PRD/Plat
540 & 550 Edmonds Way
Packet Pg. 182
City of Edmonds Greenwalk Park
A.
ft
d
N
d
Legend
ArcSDE.GIS.STREET_CENTERLIN
— <all other values>
C
1
E
2
7@
L
s; 4
a
9;71;7;8
a
- Sections Boundary
Sections
tE
Edmonds Boundary =
.y •afy .r+ ��� r ArcSDE.GIS.PROPERTY _BUILDIP
ArcSDE.GIS.STREET_CENTERLIN
r. ' <all other values> N
j.".• - F �f Interstate 0
t .sy� � •° • ,� ��• %� ,� + �' '�`�� � e' � Principal Arterial CL
MW
t
Minor Arterial; Collector
' ' Mw
- - ' ' 4
7 -_• '� _-11r7�� f '".� Local Street 06
4%;' l ' State Highways ca
E
-�^ I ! �• ^��-- -.. -:��. yr' <all other values>
-A N ix ' C
County Boundary
cl
,"► t �T '' .±' ! �• Parks s
r '-
_ AreSDE.GIS.PROPERTY _WASHII W
r t ArcSDE.GIS.PROPERTY _CITIES r
�♦ ,, ► C
rif��l E
1: 1,516 O s
Notes
ry0 126.30 252.6 Feet c 540 and 550 Edmonds Way Q
2,257 188.1 This map is a user generated static output from an Internet mapping site and is for Preliminary PRD/Plat
reference only. Data layers that appear on this map may or may not be accurate, PLN2022-0049/PLN2022-0053
WGS_1984_Web_Mercator_Auxiliary_Sphere current, or otherwise reliable.
© City of Edmonds THIS MAP IS NOT TO BE USED FOR DESIGN OR CONSTRUCTION E hibit 10 - Green
Packet Pg. 183
1.k
F
TO
If �'
N
O
O
t
Q
d
.y
Q
E
0)
C
O
N
0
s
x
w
r
c
d
E
w
a
Exhibit 10 - Green
PLN2022-004 Packet Pg. 185
1.1
X k_"912 411 L [91U011
121 51h Avenue North, Edmonds WA 98020
Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.edmondswa.gov
DEVELOPMENT SERVICES DEPARTMENT • PLANNING DIVISION
`12C. 189\J
August 4, 2022
Steve Barnes
sbarnes@cornerstonearch.com
Subject: Letter of Incomplete Application
Preliminary Planned Residential Development and Formal Plat at 540 & 550 Edmonds
Way (Consolidated Permits PLN2022-0049 & PLN2022-0053)
Steve,
The City of Edmonds has reviewed the applications noted above. Pursuant to Sections
20.02.002, 20.35.070, and 20.75.060 of the Edmonds Community Development Code (ECDC),
the application has been found to be incomplete; please accept this letter as the City's
incompleteness notice in accordance with ECDC 20.02.003.
Please submit the following information to make the application complete:
1. PRD map. See ECDC 20.35.070.A.2.
2. PRD house drawings. Submit elevations and/or renderings for each side of each of
the proposed house styles. Call out what exterior materials are proposed to used.
See ECDC 20.35.060.
3. PRD draft CCRs. See ECDC 20.35.070.A.8.
4. PRD landscaping plan. Show existing trees that are proposed to be retained as well as
other landscaping to be planted in addition to street trees. Show the proposed open
spaces and indicate what features will be included areas and details for any equipment
or play structures in those areas.
5. Provide a letter from WSDOT confirming preliminary project feasibility or other
documentation that confirms the proposed number of lots is consistent with/allowed
per WSDOT limited access restrictions.
Please be aware that a complete response to this information request must be received
within 90 days or the application will lapse for lack of information (ECDC 20.02.003.D). No
extensions are allowed.
Exhibit 11 - Green
PLN2022-004 Packet Pg. 186
1.1
The following corrections have also been identified but additional corrections are possible in
the future after other reviewers are able to analyze the materials referenced above. Please
respond to each of the comments in a cover letter and by providing updated plans or other
materials as necessary:
6. Alternative standards. Update the project narrative to describe what elements in
ECDC 20.35.030 are being altered and the extent of those changes.
7. Preliminary plat. On the preliminary plat map, update the following:
• Update the owner's names on Sheet 1.
• Show the distances of the proposed setbacks on Sheet 5.
• The project boundaries on Sheets 4 and 5 do not match. Describe the status of
the 5' strip at the south edge of the project — the space labelled 'to be deeded to
the neighbor'. No lot line adjustment has been proposed for that location.
• Show the gross and net lot areas (exclusive of access easement area) for each lot
on Sheet 6. Note that structural lot coverage is calculated against net lot area
rather than gross lot area.
• Label the access road as private. If the access road will be gated, note that on
the preliminary plat and civils.
8. Site Plan and Prelim Civils. Clearly show and label limits of Access Utility Easement
serving Lots 14-16.
9. Technical Comments. Current comments from project reviewers are attached.
If you have any questions, please let me know either at 425-771-0220 or
michael.clugston@edmondswa.gov.
Sincerely,
� c
l G
Mike Clugston, AICP
Senior Planner
2
Exhibit 11 - Green
PLN2022-004 Packet Pg. 187
1.1
v
121 5`h Ave N Edmonds WA. 98020
12425 Meridian Ave, Everett, WA 98208
Serving the cities of Brier, Edmonds, Lynnwood and Mountlake Terrace
Department of Fire Prevention
FIRE COMMENTS
From: Fire Marshal Karl Fitterer
Date: July 18, 2022
Re: Greenwalk Park 540 Edmonds Way
1. Approved turnaround
2. Need a hydrant at the hammerhead intersection Lot #4 per Edmonds Municipal
Code19.25.055
3. Hydrant on Edmonds way will need a, UL approved, 4" Storz type fitting
4. All underground vaults or infiltration galleries, in drive isles will need to be built in excess
of HS20 for ladder truck operations.
5. All homes over 3,000 square feet will be required fire sprinklers. A 13D type is
recommended for cost and installation. A 1 inch meter is required unless it can be shown
that a smaller meter will be sufficient.
6. Lots #10, 13, 14, 15 and 16 will be required to have fire sprinklers because of driveway
access, no matter the square footage.
Exhibit 11 - Green
PLN2022-004 Packet Pg. 188
1.1
of Eo_a CITY OF EDMONDS
�° PLAN REVIEW COMMENTS
PLANNING DIVISION
Fsr, i $go
(425)771-0220
City Website: www.edmondswa.gov
DATE: August 2, 2022
TO: Mike Clugston
FROM: Deb Powers, Urban Forest Planner
RE: Tree Retention Plan Review — Preliminary Subdivision
540 & 550 Edmonds Way
Greenwalk Park 16-Lot Subdivision PLN2022-0053/PLN2022-0049
Pursuant to ECDC 23.10.060, the City of Edmonds requires approval of a tree retention and
protection plan in conjunction with subdivision development (ECDC 23.10.060). The City's
objective is to retain as many viable trees as possible on a developing site while still allowing
the development proposal to move forward in a timely manner. The applicant's preliminary
Tree Retention Plan is incomplete. In order for the City to continue its review and provide
approval of the proposed subdivision, the information, corrections, or clarifications shown in
bold text below need to be addressed with responses summarized in a cover letter with the
resubmittal of preliminary subdivision permit application PLN2022-0053 and PLN2022-0049.
1. Tree retention/protection site plan. A tree retention/protection site plan needs to clearly
identify trees proposed for removal and show proposed improvements and tree protection
fence locations per ECDC 253.10.060.B.2.b. Sheet L1 and the inset in the arborist report
show existing significant trees by number, but do not show proposed improvements. On
these site plans, the solid and dashed symbols, presumably to indicate which trees are
proposed for removal versus retention, are not very distinguishable from another. Sheet Al
shows proposed improvements and existing significant trees without ID numbers, while
Sheets C1 and C2 show proposed retained trees. Tree protection fence locations are not
shown on any of the site plans.
Please submit a full-size site plan that clearly shows proposed improvements, trees
identified by number corresponding to the arborist report, proposed tree removals
indicated with an `x' and proposed tree protection fence locations. Sheet C2 may suffice if
improvements were "ghosted out" and the required tree information was shown.
2. Offsite trees. The arborist report and Sheet L1 show 8 offsite trees potentially impacted by
the proposed improvements. However, aerial imagery indicates there may be additional
offsite significant trees along adjacent property lines with overhanging canopies or critical
root zones (CRZs) than what is shown. Note that proposed tree protection fence locations
for all potentially impacted offsite significant trees must be clearly shown on the
preliminary site plans.
Exhibit 11 - Green
PLN2022-0�4
a Packet Pg. 189
1.1
Please include offsite significant trees with overhanging canopies or CRZs and indicate
tree protection fence locations on site plans, based on limits of disturbance information
provided in the arborist report per ECDC 23.10.060.B.2.b.
3. Tree retention calculations. 30% of existing viable significant trees must be retained with
subdivision development per ECDC 23.10.060.C, or mitigation requirements per ECDC
23.10.060.F.4.b and 23.10.080 apply. The proposed calculation shown on Sheet L1 does not
appear to distinguish viable from non -viable trees and indicates there are a total of 130
significant trees on site, while the total number of on -site significant trees shown in the
inventory is 125. It is unclear which trees may have been mistakenly included in the
calculation, as the inventory does not distinguish which trees are proposed for removal or
retention and the site plans do not clearly indicate tree removals in a manner that can be
easily checked.
Please indicate in the inventory which trees are proposed for removal, as required per
ECDC 23.10.060.B.2.a. Show updated tree retention and replacement calculations on the
site plan (or in the arborist report) that are consistent with the information provided in
the inventory, as shown in the chart under Comment 4 below.
4. Tree replacement requirements. If the 30% tree retention threshold cannot be met, the
applicant is required to make up the deficiency through tree planting or with payment of
fees in lieu per ECDC 23.10.060.F.4, in that order per ECDC 23.10.060.C-F. Fee in lieu
requirements are covered below under Comment 5.
In addition to meeting the 30% tree retention threshold, every viable significant tree that is
removed must be replaced, depending on the size of the removed tree, per ECDC
23.10.080. The chart shown below may assist the applicant in calculating whether retention
thresholds have been met and how many replacement trees are required. Existing tree
information in the first section is based on the applicant's preliminary tree inventory.
Please submit updated proposed tree replacement calculations on Sheet C4, using the x
chart shown below. Depending on the outcome of the calculations, please submit a w
planting plan per ECDC 23.10.060.B.2.b.vii, or submit documentation demonstrating the
a�
infeasibility of tree retention and replanting per ECDC 23.10.060.C-F with the submittal of E
the formal subdivision.
r
a
Exhibit 11 - Green
PLN2022-01,a Packet Pg. 190
1.1
Significant trees
125
Non -viable = dead or "poor" condition, subject
Existing Trees
-1
to review. Location is not a viability factor.
Non -viable trees
on Site
TOTAL # VIABLE TREES
124
Tree #421.
Retained viable trees
Qty?
Trees #_,
within critical areas
_...
Retained viable trees
Proposed Tree
outside critical areas
+Qty?
Trees #_,
Retention
(in "developable site")
_...
TOTAL # RETAINED
Viable = assessed in at least Fair condition,
_Qty?
VIABLE
subject to review.
# REMOVED
TOTAL
VIABLE TREES
REPLACEMENT
REQ'D
DBH
RATIO
NEW
QTY.
RANGETREES
Removed viable trees
6-10"
?
x1 = ?
Proposed Tree
Qty?
Trees #
10.1-
Removals
_, _...
?
x2 = ?
14„
?
?
x3 = ?
Replacements
11
241
>24"
?
Appraised Value
Total*
Removed non -viable
+Qty?
Note: mitigation (planting/fees in lieu) is not
trees
required for removed, non -viable trees.
TOTAL #REMOVALS
=Qty?
30%, not including
Qty?Does
applicant meet/exceed minimum 30%
critical areas
x.3
tree retention threshold?
Tree Retention
Thresholds
Qty?
*50%
50% site -wide, to
o
Does applicant meet/exceed minimum 50%
waive all fees in lieu
x.7
5=
tree retention threshold?
5. Fees in lieu of replanting. Fees in lieu are assessed if a) the 30% tree retention threshold
cannot be met, b) if replanting on site is not feasible and c) to mitigate the removal of viable
trees greater than 24 inches DBH through the payment of their appraised values. Note that
the code states appraised values are assessed by the City; however they are submitted by
the applicant's arborist and are subject to review. The applicant may also opt to use the $2
per square feet of lot area "cap" allowed by ECDC 23.10.080.E.4.
If the applicant can meet a 50% tree retention threshold, all fees in lieu are waived. The
50% tree retention threshold can be met using the flexibility in subdivision design allowed
by ECDC 20.75.048, described in Comment 6 below.
Please indicate the cost of fees in lieu associated with the 30% tree retention threshold,
infeasible on -site tree planting, removed trees >24 inches DBH through payment of
appraised values or with the maximum square foot lot area fee in lieu.
Thank you.
Exhibit 11 - Green
PLN2022r0 4
a Packet Pg. 191
1.1
Applicable codes, handouts, the City's GIS, and other permit assistance is available at:
https://www.edmondswa.gov
w
a
Exhibit 11 - Green
PLN2022 OQ4 Packet Pg. 192
a
1.1
of EDo CITY OF EDMONDS
STORMWATER REVIEW COMMENTS
ENGINEERING DIVISION
�s. iggo (425) 771-0220
City Website: www.edmondswa.gov
DATE: July 15, 2022
TO: Permit Coordinator
FROM: Taylor Brown, PE, Blueline, Interim Stormwater Reviewer
RE: Application #: PLN2022-0049 & PLN2022-0053
Project: Greenwalk Park Preliminary Plat
Address: 540 & 550 Edmonds Way
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Please submit revised plans/documents with a written
response to each of the items below.
City of Edmonds handouts, standard details and development code can be referenced on the City
website.
Civil Plans
Per Edmonds Stormwater Addendum, Checklist 2: Drawing Requirements, please include
overall dimensions and measurements of all drainage facilities.
2. Please show existing vegetation (trees and other vegetation) to be retained on the Site Plan
as proposed in the Stormwater Site Plan Report under Minimum Requirement #5.
3. Please show proposed location and sizing of infiltration facilities including typical
trench/drywall detail(s) and/or cross -sections for determining feasibility of on -site
stormwater management of roof areas. Ensure the location of infiltration facilities comply
with required setbacks.
4. Please show flow arrows for all driveways in addition to spot elevations (FG) to support
that surface water runoff from the driveway areas flow and drain to the proposed
stormwater system located within the roadway as proposed in the Stormwater Site Plan
Report.
Exhibit 11 -Green
PLN2022-004 Packet Pg. 193
1.1
5. Please provide proposed roof areas and driveway dimensions for each lot to verify
impervious surfaces proposed on the Civil Plans match impervious surfaces proposed in the
Stormwater Site Plan Report.
Stormwater Site Plan Report
1. Land Cover Data (page 6):
a. The value shown in the acreage column is miscalculated for landscape area in Step
1 (Site Data), Section 2 (Existing onsite characteristics). Please revise and check
other calculations to ensure other listed information is accurate.
b. Proposed landscaped area.
2. Minimum Requirement #1: The provided Stormwater Site Plan (Report and Civil Plan set)
doesn't appear to address the construction phase of the project. Please provide a
Stormwater Site Plan that provides for source control and management of runoff during
construction in accordance with the DOE Manual and Edmonds Stormwater Code and
Addendum.
3. Minimum Requirement #2: Per Edmonds Stormwater Addendum, A Construction SWPPP
(narrative and drawings) is required for the proposed project.
4. Minimum Requirement #3: Please note: All single-family residential projects shall
incorporate required applicable source control BMPs from SWMMWW Volume IV.
5. Minimum Requirement #5: Please provide calculations and/or qualitative analysis for
proposed on -site stormwater management BMPs for roof areas in accordance with
Edmonds Stormwater Code and the DOE Manual.
6. The included Soils Report indicates that a Small -Scale PIT was the method used for i6
infiltration testing. The total project area is 3.15 acres, but this testing method is only
0
applicable to drainage areas less than 1 acre per Edmonds Stormwater Addendum, E
0
Appendix B. Please provide infiltration testing using an approved method as required for
the Soils Report, per Edmonds Stormwater Addendum, Appendix C: Checklist 2, Line 110.
Revise Civil Plans, Stormwater Site Plan Report, and WWHM modeling calculations as
necessary. x
w
c
d
E
0
r
a
Page 2 of 2
Exhibit 11 - Green
PLN2022-004 Packet Pg. 194
1.1
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA PROPERTY INFO LEGEND LIJ00r) EXISTING PROPOSED qtj
l� \ J U ivi n PROPERTY LINE � U �
STORMWATER PER 2019 DOE SWMMWW (LRG. SITE CRITERIA). -9 �
REFER TO MAIN ACCESS DRIVE \`o \ c� �-\S IM=266.00' PARCEL NO: - - - - EASEMENT I►j
FULL INFILTRATION PROPOSED. 27032500308300
INFILTRATION GALLERIES FOR ROADWAY &DRIVEWAYS. ROADWAY PROFILE ON SHEET C3 `�\ ��� o \ \\ IE W)=250.46 48, 27032500308400 0 A.C. PAVING �j �� Q
o \ I E 250.80 48 CONCRETE Q U N
DRYWELLS FOR INDIVIDUAL ROOF / LANDSCAPE INFILTRATION. `.\ �6��ti `� s �\ IE(S 26 08' 8"CO C VERTICAL DATUM --9C--- sAwcuT LINE Q Q co
N AVD88 � RETAINING WALL
SITE AREA 100 -100 - GRADING CONTOUR
540 EDMONDS WAY: 2.55 AC +90.00 90.00
SPOT ELEVATION wLO
SMH 550 EDMONDS WAY: 0.55 AC 8» W w
Driveways difficult to loca on lots. 1 "D 6 26A6 90� �1� `\ =266. 5' 8 S WATER MAIN w C)
- \ 1 EARTHWORK QUANTITIES s SEWER MAIN
Verify end lots have ea way to do " 1 F O 26�1 TOTAL CUT - 3569 BCY 12 ° 120 W
get out (or add hamm head layQu \ � = STORM DRAIN Q
ED D � / \ TOTAL FILL 1990 BCY
considering turning D �6 \ 0 I 7 * FOR PERMIT USE ONLY
g � .7 �f a ��'� � \ L� i� )10' FIRE HYDRANT
7 1 2"CED o O I \ 'Garb ition RI 68.4 ' B3 Ia WATER METER
- - - 16"CED 4 "CED - 1 � � � �`O t e IE SE =259. N N GATE VALVE Now
"
?g„ ED --------- --� :� 0 / 1 \\ \\c �ro1 26 ( ) Q SEWER MANHOLE
o I i A 0 d rive access
�\
10 "CED °F o \ 26t Ide st
S ❑ ■ STORM CB C
I 8„PL�2
s STORM MANHOLE
_ Q 1 0 1 D 5� �$. AQ- of wAsy,
277.55 - - - - i - - - - - - EC ;� 8 0 6 \ 0 a d ded, �%to limit 's , °� �' ' • "`'z�
I LOT v7.s5 i D F 6 269.4 t d ist4fte 4 Ot 2s9.87 ^�' S\ .S �H c
I I 2so I \ 16"DE ' " 8 ED \ RIMa272.26' 3564s ��
213 S.F. I 1 O ?� ,�
7' I \ \ O o3S 69.7 0 70.51 0.79 IE(NW)=259.58 12 FS GISTS
(0.17 ACRES) i U 1 i i V / ° „ \ 2 midis 2 S IE(SW)=259.6�'`1.2" S/ONAL E� 3 �_ -- s
LOT >< I I _ _�__� io s ree I i s o ''S q �� �° ,.33
1271.3 27
X I (( I I LOT --- �' I 0 \ s 7/4/22
8,695 S.F.
" o ° 2 ce hhe c to re \
----, 8 C 12 A D o c\ o LL
(0.20 ACRES) 8,801 S.F. E M i_,
- - - - ' (0.20 ACRES) --- I -�------'-- N 21'41' I o 72.28 ca
- - - - I i I I LOWER \ 284 ° „ 23J9 3 i ^�o 272.00 , 84 0
2% I I GRADE D Q 272
I ' I � I T0280.0 \\ .1:.1., 282 � ��9 �'\\�\ a
I LOT \ . , .�. I �N P INFILTRATION GALLERY #2 �� \ Q o �Mob�-arnp clo 0 _'1 o
p 2723p 2° / v
x Ga ! ! i BOTTOM EL= 267.00 26 \ y
I� I I 8,685 S.F. .,I STORMTECH SC-740 CHAMBERS / ��6>> I�f7ltCi S in
- - - - - - I 1 I (0.20 ACRES) !:`. I 278 / / C 1 .2 99 2> J ide � plan .7 274.35 �1� o
14' L
x
°12
0"
x
"LI
0 10" I
1 L Lx
0 10"
x
w
0
in
0
0
x
z c
x
a
m
O
4
0
N
N
O
N
0
0
3
U
i
0
3
cj
[V
O
N
LT-
00 1-� U I --w
CD
co
rn1� 6,909 S.F. II III % 1 O (0.16 ACRES) iI I I 'T LOT-=i1-,5
C)SOT o LOT L�LI7187 S.F. 6,684 S.F. �/ �i
(0.16 ACRES)/ 6939 S.F. LOT ® (0.15 ACRES) STORM PIPE SCHEDULE
�' / PIPE DIA TYPE LENGTH FT SLOPE > O
04 (.) ,024 S.F.
(0.16 ACRES) ° \V// A 8" CPE 10 2.00% V
a
B 8" CPE 15 1.33%
I I o I S� n
/ ' �� R _
/ u LiL��}I� - -- -J / / ---- r E 2 C 8" CPE 20 1.50%
II
X I o 0 0 8 D 8" CPE 8 2.50%
---------0 ------ ' i a ° v/� �' / D / I I I // \V
„ L - - k z - 6 I �L_ -� ,- / �ii STORM STRUCTURE / CLEANOUT SCHEDULE
12 MAP x X ��" / - - - - -26'TM AP - - - - '� --- -- - __-- - �; 76 c0 TYPE RIM IE LIJ CV
X �- X + O 1 TY. 2- 54", SL 276.20 273.50 (8"N) J N
k X X �� „
X - - - ' / _ 16 P. 0 - - 271.85 (24"E) Z
2 CB STORMFILTER 276.00 273.70 (8"S) 0
O N 88'38 2 W 300.00 - --------- -- -----------------------' �_
TO BE DEEDED TO NEIGHBOR - - - - 3 TY. 2- 54", SL 272.50 269.50 (8"E) LU
30"CED SMH INFILTRATION GALLERY#3 267.85 (24"SW) L1J L--
1,151 S.F. KIM=271.15' x BOTTOM EL= 264.75 = LLI
NE =260.59' 12" STORMTECH SC-740 CHAMBERS 4 CB STORMFILTER 272.00 269.70 (8"E) Q
IE(SW)=260.73' 12" 5 TY. 1, GR 272.30 270.00 (8"W)
6 TY. 2- 54", SL 270.00 266.80 (8"NW)
265.60 (24"NE)
7 CB STORMFILTER 269.30 267.00 (8"S)
0 10 20 40
1 inch = 20 ft.
I C
Exhibit 11 - Green
PLN2022-004 Packet Pg. 195
1.1
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
w
LEGEND V
� w
SDMH EXISTING PROPOSED
- - PROPERTY LINE w
IM=266.00
IE W)=250.46' 48 - - - - - EASEMENT O ^� cn
I E 250.80' 48" - - -so- - - SAWCUT LINE 0 Q
IE(S 26 08' 8"CO C RETAINING WALL
\` \ z
100 100 GRADING CONTOUR �% �
z
90.00
+ SPOT ELEVATION N V z
w CD
8° 4 - - 8 wW WATER MAIN w `�
\ �� s SMH
1 ' D 6 0 \ =266. 5' -- 8-- 8 s S SEWER MAIN Q
12 - - - STORM DRAIN
30"CED
1 \ �\ ` I�
N 8°38'01 " W 2� D FIRE HYDRANT 09' I ' \ � \ Now
�w
1qD
O - \ \\ \ RI 68.4 ' ® WATER METER
16 4 CED SSCO 1 / o \ / IE(NE)= .04' 12RIM= 275. r � SI na a\IESE)=259. D4 H GATE VALVE C
�8-------- --� IE=272.5U('� A 9 9 y ° X \ \ \ �• SEWER MANHOLE�
s w I �,r \� \ ❑ ■ STORM CB
F ° \ �� Q
o
8 P L LW4 > o o \
- - - - I - - ° A 1 ° 0 1 " D \ \ \ ` \ s \ Q STORM MANHOLE
� o
I- -- -
- "DEC
7,213 S.F. I I 28o I 16 D E 1 0' 8 ED 27 0 \ , RIM=272.26'
I I \ 0 G \ IE(NW)=259.58' 12"
(0.17 ACRES) I I IIE(SW)=259.6�' 2"
LOT 4
I I LOT �d ° O '
x I \\ I 8,695 S.F. I C o ��\ \
8,801 S.F. EMI ;� - i----, / 8 C 8 A D 12 A D I \\ o\\ o
(0.20 ACRES) s _ I
-(0.2o ACRES) --- I ------- :, .:. rl N 21'41'
I; l 284 ° 23.79
282 N,
44� I I LOT . , .�. o ,� ° \ \
X a 1 I I 4 I 8,685 S.F. II�r..1� I HP / 1 \`
(0.20 ACRES) I! / / INP 1 „CE
- - I 278 / \ \
I I I ��U I \
-
1 4 ' I = _ TRACT A / / / / I/ ---
X I ® ------j- I / \
012 I cn i it I a : I I--_ = _ P .1 I - COMMON SPACE_ / f / f � \ o cCIO
\ \
CD Al
z I I I 4 I' J I L .'! 6,910 S.F. , /f
----- I.- -
cv c� cN cv cv p I II I I I L I - ti a I1 a 'A
ESS S E �'T--(0.16 ACRES_)
I 2767LOT 6
011 7,338 S.F. X
\ D
\
. \
O ° \
(0.17 ACRES) 2 4„ D F \ \ \
2 D F
IG.
° \
„L �,' / FH � P w / / f i /, LOOT 1 10" I�IE
----
iE.
�� 4 W I \
° 10 L I LL I i ------ w w 8 W / f ` / 8 650 S.F. o\
X 0 • / w X e/ N
1 L ° I-- - - - - - + ----I i a/ � 0 / oo ♦ �/ o�J / (0.20 ACRES) \ \
0 10 "
F I N SSMH#3 38 D
--- ---- ---- -� I 3 �' c� f ��� / / „
S SS / cV
X
TRACT p E ,_ I S`3 �fc5
COMMON SPACE S
-- - - - - 274o 8,298 S.F. - :'`,i�/
278 290s.s 01.00x[PRIVATE] 206S 0 A15/
(0.19 ACRES) ------ [PRIVATE] \
\ \ i
o=
8„
D E C L U S E R )27---------
280
CD
CO
aa I I ❑\ T `'\ ' C \ 1` \ ` rr/i ,/♦ 50 DF
1� �GO
LOT 16
00�
LOT �
LOT 11 8,066 S.F. r (019 ACRES) I 7,289 S.F. 60S 5,604 S.F. LOT (0.19 ACRES) 8,489 S.F.
(0.17 ACRES) (0.13 ACRES) 5,384 S.F. ,� �0
I I ❑ \\a // j S ,♦� \ 4 r'�� IJ� 6"CH 2
/ (0.12 ACRES) I I ❑ \\� / / / K ♦
GM
/ \ \
I------- - J �CL' c - - -- - y / / \1 I \ ♦ ♦ \�/ / o�i �� 0 20"CED
X
-� - - - - - 3 1 0
--- - - - - - - ---- - - -IUD o - - F1t`T, - + /� I I ,,,♦ SEWER MANHOLES
---7- > "-�\ F.N. 2013162
o r ----- --I� - ---------- ---- / \ SSMH#1
3 c /
Z � / \ \ '\ . I \:�� \ TY. 1-48" - SADDLE MH
1 Q \ I \ ,�- - / \ LOT 14 I /� /� \ .. i RIM= 273.30
o \ .' II I I - _ -, i / / / 6,909 S.F. �' `�.� I E= 261.37 8 W
LOT I 1\_, I f I \ham' \\ \\ i i I I / 0 (0.16 ACRES) I I LOT 15 /\ i IE= 260.04± EX. 12" CTR
7,187 S.F. I I �.' L®T \ \\\ I a I / / 34 CE I I 6,684 S.F. ( )
(0.16 ACRES) - I I I 6,939 S.F. o \\ LOT 10 i i . .� / f / / I I I (0.15 ACRES) i / / it SSMH #2
00 I (0.16 ACRES) i . \ 7,024 S.F. I / f _ � / � �
,(0.16 ACRES) /f -J__ j/ / iir TY. 1 48" PRIVATE MH
o C.7
/ j // i ' 1c� � �/ RIM= 274.00
O i u u LpI�_ I I -_j f / 2 IE= 267.00 (81)
----- o 0 o i i a pj.� ff /� +// I I I� �i'' SSMH#3
------------
r, - -
--- \
� L PRIVATE MH
X--- -----� O
12"MAP X------- ' .' _ _ _ _ - -
\ it TY 1 48"
X -_-' f 5/�) - - - - - - - -26' MAP - --- -� ,___�� �' i' RIM 276.90
N X _ X "X Y, - �- X 41 „ O --__ IE= 270.10 (6"N,S)
N X - - - - / - 16 M AP o IE= 270.00 (8"E)
R co#2s1.00 N 88°38' 2" W 300.00'
o O IE= 276.50 (6°) - -
0 30"CED TO BE DEEDED TO NEIGHBOR SMH
01 1,151 S.F. c0=271.15' X
-ENE)=260.59' 12"
Y IE(SW)=260.73' 12" o io 1 ao
0
3
c
C7
I
[V
O
1 inch = 20 ft.
� o
.y
35646 (vim
'n GISTER�
'SS7(NAL ECG 3
7/4/22 0
LL
c
c,s
IL
CL
d
c
2
N
N
0 � d
�^ 0 _
v!
0 a
Z IJ � E
0 a`
0 a
W Q
3
O
Z O v CD
W � L
0 m
W0
�} d
V LLJ E
n O
L ' C�
d
Ul
o
CL
V)
L
1
1
Q
C
C:)
u
Q
1
W
z
W
e
F�LU
VJ
0
elf
LLB
Q
W
~
N
N
~
Z
O
~
G7
Lu
Lu
2
ul
Q
>
LU
C/)
m
0�
C2
Exhibit 11 - Green
PLN2022-004 Packet Pg. 196
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
285
�-
.......
/ /./.........................
_--
'-_
EX. GRADE
...
280
............................................
.......................................
..........................
...............................................................................
...................-.�'............
..............................................................................
....\.\.\�..�.........................................................................................................................................
....
........ ......... ......... .........
..................
........ ......... .........
......... ......... ......... ......... ....., �'
�...... ......... ......... ......... .........
.........
................. ... DE...........
PROPOSED GRADE
.................................................... .......................
I AT ROAD C/L
\
�.:
........ ......... ......... .........
.................
.,
.........1..
.....
1
......... ......... ......... .........
�\\
.....
-'--��
..... .... .... ....
.... .... .... .... ....
....
.... ..
.... .... .... .... ....
....
275
---
---
/�
+--------- —
-- -----------
... .... ....
V
i
................
.... ... ..
.... ..... .....
'�
LTRATION #1 i i
`.
�.�........
f
SC-740 CHAMBERS---- .
-----------
------------
NEW 4 WATERMAIN
- - - - - - - - - - - - - - - -- J
DESIGN INFILTRATION RATE = 4.0 IN/HR
270
SSMH3 .....
.........
.........................
......... ......... ......... ......... ......... ......
......... ......... ...... ....
TY:.. 1-48 _... PRIVATE ..MH
...........................................................................................................................................................................................................................................................................................................
RIM=. 276.90 ....
....
.... .... .... .... .... ..
...................................
.....................................................
....................
....
IE=270.10 (6 N S)...
NEW 8" SEWERMAI........
IE= 270.00 (8"E)
..... .....
..... ..... ..... .....
..... ..... ..... ..... ..... .....
..... ..... ..... ..... .....
.....
[PRIVATE]
265
........ ......... ......... .........
......... .........
......... ......... ......... .........
......... ......... ......... ......... .........
......... ......... ......... ......... .........
.........
......... ......... ......... ......... ......... .......
......... ......... .......
M
........ ......... ......... .........
......... .........
......... ......... ......... .........
......... ......... ......... ......... .........
......... ......... ......... ......... .........
.........
......... ......... ......... ......... ......... .......
.. TY48 ........PRIVATE. MH... .......
1 . ........
....
RIM= 274.00
........ ......... ......... .........
......... .........
......... .........
..
......... ......... ......... ......... ......... .......
ILL- 26710 (8"W
........ ......... ......... .........
......... .........
......... ......... ......... .........
.........
..
......... ......... ......... ......... ......... .......
- ......................
IE�
260
20+00
21+00
22+00
3+00
PROFILE: ROAD STA 19+88 - 24+00
SCALE: 1" = 20' HORIZ., 1" = 5' VERT.
.......................................
NEW 8" WATERMAIN
TY. 1-48" - SADDLE MH
RIM= 273.30
IE= 261.37 (8"W)
IE= 260.04f (EX. 12" CTR)
o 10 20 40
1 inch = 20 ft.
26' ACCESS ESMT.
�ICi
13.0' 13.0'
2%
2%
ASPHALT ROAD
SECTION
5.0'
SIDEWALK
SOUTH SIDE
4" HIGH CONC. L-4" HIGH CONC.
ROLLED CURB ROLLED CURB
SECTION - ACCESS ROAD
SCALE: 1 " - 5'
285
275
270
265
260
w
Co
�
w
Q
Q
�
w
�
o
O �
Q
U
Cn
V)
z
Q
it
w
w
CD
Z
w
N
O
WrrH^^
vJ
J
�
loom
qw
c
c
_2
� j.y
.n Qs'(vac/
�SS/ONAL ECG\
Cn
ru
7/4/22 E-
0
LL
c
Cu
0
IL
c
d
w
0
a�
d
0
c
m
N
0�
U^
�J J
m
M c
vV �
0
a
0
J
Z
O
< c
E
�
a`
0
a
L
0 3
Z
0
m
Z 0
,,L^^
O v
W
L
�
C
ui
O
d
ui
Lo
o
v
ai
Ul
C
O
CL
N
L
C
C)
O
J
O
Q
�
H
'
OZ
L
U
LLJ
J_
O
L.L
�
O
ry
n
L
J
~
N
N
�
Z
O
L
U
Lu
/2
V)
LJJ
Q
c)
\\
/
/LU
L L
N
N
LT-
C3
Exhibit 11 - Green
PLN2022-004 Packet Pg. 197
GREENWALK
1.1
DESIGNS LLC.
12733 39TH AVE. NE PHONE: 206.550.9296
SEATTLE, WA 98125 EMAIL: SBARNESOCORNERSTONEARCH.COM
August 18, 2022
City of Edmonds
Development Services Department — Planning Division
RE: GREENWALK PARK
- RESPONSE TO CITY REVIEW COMMENTS (PERMIT# PLN2022-0049, 2022-0053)
Dear City of Edmonds
Thank you for your review of the Greenwalk Park development Preliminary Plat submittal. The following
is a list of the review comments from the Letter of Incomplete Application dated August 4, 2022 with
our responses provided in bold.
PLANNING DEPARTMENT REVIEW by Mike Clugston, AICP, Planner
Please submit the following information to make the application complete:
1. PRD map. See ECDC 20.35.070.A.2. See "Map with Zoning within 300"'
2. PRD house drawings. Submit elevations and/or renderings for each side of each of the proposed
house styles. Call out what exterior materials are proposed to used. See ECDC 20.35.060. House
elevations are included with our resubmittal.
3. PRD draft CCRs. See ECDC 20.35.070.A.8. Draft CC&R's are included in submittal.
4. PRD landscaping plan. Show existing trees that are proposed to be retained as well as other
landscaping to be planted in addition to street trees. Show the proposed open spaces and indicate what
features will be included areas and details for any equipment or play structures in those areas. See
attached L3.1— Landscape Planting Plan.
5. Provide a letter from WSDOT confirming preliminary project feasibility or other documentation that
confirms the proposed number of lots is consistent with/allowed per W5DOT limited access
restrictions. See attached letter from WSDOT confirming they will allow us to have access to SR 104.
They will take the lead in designing the intersecion.
Exhibit 11 -Green
PLN2022-004 Packet Pg. 198
1.1
GREENWALK PARK— RESPONSE TO PLAN REVIEW COMMENTS
September 18, 2022
Page 1 2
The following corrections have also been identified but additional corrections are possible in the future
after other reviewers are able to analyze the materials referenced above. Please respond to each of the
comments in a cover letter and by providing updated plans or other materials as necessary:
6. Alternative standards. Update the project narrative to describe what elements in ECDC 20.35.030 are
being altered and the extent of those changes. See attached updated narrative. Project narrative has
been revised to specifically address the elements included in ECDC 20.35.030.
7. Preliminary plat. On the preliminary plat map, update the following:
• Update the owner's names on Sheet 1. Names have been corrected.
• Show the distances of the proposed setbacks on Sheet 5. Distances to setbacks are noted
along the setback line.
• The project boundaries on Sheets 4 and 5 do not match. Describe the status of the 5' strip at
the south edge of the project — the space labelled 'to be deeded to the neighbor'. No lot line
adjustment has been proposed for that location. 5' strip has been removed.
• Show the gross and net lot areas (exclusive of access easement area) for each lot on Sheet 6
Note that structural lot coverage is calculated against net lot area rather than gross lot area.
Net lot areas have been added to sheet 6.
• Label the access road as private. If the access road will be gated, note that on the preliminary
plat and civils. BBA?
8. Site Plan and Prelim Civils. Clearly show and label limits of Access Utility Easement serving Lots 14-16
Access Utility Easement has been added to the Site and Civil plans.
9. Technical Comments. Current comments from project reviewers are attached. See below.
FIRE DEPARTMENT REVIEW by Karl Fitterer. Fire Marshall
1. Approved turnaround. Our design plans reflect a hammerhead turnaround at Lot 6.
2. Need a hydrant at the hammerhead intersection Lot #4 per Edmonds Municipal Code19.25.055
Per previous discussion, a fire hydrant near Lot #4 was not necessary. We show a fire hydrant at Tract
A. This is allowed because all the houses are fire sprinklered per pre -application meeting.
3. Hydrant on Edmonds way will need a UL approved, 4" Storz type fitting. Note added to the plan.
Exhibit 11 -Green
PLN2022-004 Packet Pg. 199
1.1
GREENWALK PARK— RESPONSE TO PLAN REVIEW COMMENTS
September 18, 2022
Page 1 3
4. All underground vaults or infiltration galleries, in drive isles will need to be built in excess of HS20 for
ladder truck operations. The underground infiltration gallery within the access drive near Lot 4 will be
manufactured by Stormtech (or equal) and be designed to accommodate HS20 vehicle loads.
5. All homes over 3,000 square feet will be required fire sprinklers. A 13D type is recommended for
cost and installation. A 1 inch meter is required unless it can be shown that a smaller meter will be
sufficient. Each lot will include a 1" domestic meter designed to provide fire sprinkler service.
6. Lots #10, 13, 14, 15 and 16 will be required to have fire sprinklers because of driveway access, no
matter the square footage. All houses will be fire sprinklered.
TREE RETENTION REVIEW by Deb Powers, Urban Forest Planner
Pursuant to ECDC 23.10.060, the City of Edmonds requires approval of a tree retention and protection
plan in conjunction with subdivision development (ECDC 23.10.060). The City's objective is to retain as
many viable trees as possible on a developing site while still allowing the development proposal to
move forward in a timely manner. The applicant's preliminary Tree Retention Plan is incomplete. In
order for the City to continue its review and provide approval of the proposed subdivision, the
information, corrections, or clarifications shown in bold text below need to be addressed with
responses summarized in a cover letter with the resubmittal of preliminary subdivision permit
application PLN2022-0053 and PLN2022-0049.
1. Tree retention/protection site plan. A tree retention/protection site plan needs to clearly identify
trees proposed for removal and show proposed improvements and tree protection fence locations per
ECDC 253.10.060.B.2.b. Sheet Li and the inset in the arborist report show existing significant trees by
number, but do not show proposed improvements. On these site plans, the solid and dashed symbols,
presumably to indicate which trees are proposed for removal versus retention, are not very
distinguishable from another. Sheet Al shows proposed improvements and existing significant trees
without ID numbers, while Sheets Cl and C2 show proposed retained trees. Tree protection fence
locations are not shown on any of the site plans. Tree protection fence is now shown on sheets Al, L1
and civil.
Please submit a full-size site plan that clearly shows proposed improvements, trees identified by number
corresponding to the arborist report, proposed tree removals indicated with an 'x' and proposed tree
protection fence locations. Sheet C2 may suffice if improvements were "ghosted out" and the required
tree information was shown. See sheet L1 with all trees identified by number and Y on trees being
removed.
2. Offsite trees. The arborist report and Sheet Li show 8 offsite trees potentially impacted by the
proposed improvements. However, aerial imagery indicates there may be additional offsite significant
Exhibit 11 -Green
PLN2022-004 Packet Pg. 200
1.1
GREENWALK PARK — RESPONSE TO PLAN REVIEW COMMENTS
September 18, 2022
Page 14 0
trees along adjacent property lines with overhanging canopies or critical root zones (CRZs) than what is
shown. Note that proposed tree protection fence locations for all potentially impacted offsite significant
trees must be clearly shown on the preliminary site plans. We have reviewed the site again and
although we don't see off site trees that will be affected by our work we have placed the tree
protection fence to stay well off the property lines in areas you have suggested.
Please include offsite significant trees with overhanging canopies or CRZs and indicate tree protection
fence locations on site plans, based on limits of disturbance information provided in the arborist report
per ECDC 23.10.060.6.2.b. Tree protection fencing has been added to the plans. There is also a detail
showing how to work around trees where we will have to work within the drip line. This will be
supervised by Tree Frog our arborist. Per our arborist this is preferred over cutting down trees that
won't be damaged by working around them.
3. Tree retention calculations. 30% of existing viable significant trees must be retained with subdivision
development per ECDC 23.10.060.C, or mitigation requirements per ECDC 23.10.060.F.4.b and
23.10.080 apply. The proposed calculation shown on Sheet L1 does not appear to distinguish viable
from non -viable trees and indicates there are a total of 130 significant trees on site, while the total
number of on -site significant trees shown in the inventory is 125. It is unclear which trees may have
been mistakenly included in the calculation, as the inventory does not distinguish which trees are
proposed for removal or retention and the site plans do not clearly indicate tree removals in a manner
that can be easily checked. See tree removal matrix added to sheel L2. This shows we are complying
with the 30% tree retention requirement and addresses the additional trees that need to be planted.
We still need to calculate the value of the significant trees that are over 24" dbh per the matrix. We
are proposing planting more trees than are required to be planted for the other significant trees being
removed. Arborist report has been corrected showing which trees are off site (this was not properly
noted on original copy) and calls out which trees are being removed as shown on sheet L1 Tree
Retention Plan.
Please indicate in the inventory which trees are proposed for removal, as required per ECDC
23.10.060.B.2.a. Show updated tree retention and replacement calculations on the site plan (or in the
arborist report) that are consistent with the information provided in the inventory, as shown in the chart
under Comment 4 below.
4. Tree replacement requirements. If the 30% tree retention threshold cannot be met, the applicant is E
0
required to make up the deficiency through tree planting or with payment of fees in lieu per ECDC
23.10.060.F.4, in that order per ECDC 23.10.060.C-F. Fee in lieu requirements are covered below under
Comment 5. Tree retention threshold is being met.
In addition to meeting the 30% tree retention threshold, every viable significant tree that is removed w
must be replaced, depending on the size of the removed tree, per ECDC 23.10.080. The chart shown
E
0
r
a
Exhibit 11 - Green
PLN2022-004 Packet Pg. 201
1.1
GREENWALK PARK— RESPONSE TO PLAN REVIEW COMMENTS
September 18, 2022
Page 1 5
below may assist the applicant in calculating whether retention thresholds have been met and how
many replacement trees are required. Existing tree information in the first section is based on the
applicant's preliminary tree inventory. Chart has been added to sheet L2 and is included below.
Please submit updated proposed tree replacement calculations on Sheet C4, using the chart shown
below. Depending on the outcome of the calculations, please submit a planting plan per ECDC
23.10.060.6.2.b.vii, or submit documentation demonstrating the infeasibility of tree retention and
replanting per ECDC 23.10.060.C-F with the submittal of the formal subdivision. See Landscaping and
Tree Retention plans added to plan set. Planting plans for replacement trees is included on sheet L3.1
This information is shown on the landscape plans not sheet C4 but the trees being saved along with
tree protection fence are shown.
Significant trees
120
Non -viable = dead or "poor" condition, subject
Existing Trees
-1
to review. Location is not a viability factor.
Non -viable trees
on Site
TOTAL fi VIABLE TREES
119
Tree #421.
Retained viable trees
0
Trees # N/A nor critical areas on site
within critical areas
Retained viable trees
Proposed Tree
outside critical areas
41
Trees # See attached tree inventory
Retention
(in "developable site")
TOTAL # RETAINED
Viable = assessed in at least Fair condition,
VIABLE
41
subject to review.
# REMOVED
TOTAL
VIABLE TREES
REPLACEMENT
REQ'D
DBH
RATIO
NEW
RANGE
Qom'
TREES
Removed viable trees
6-10"
18
xl = 18
Proposed Tree
Trees # See attached
78
Removals
tree inventory
10- .1
6
x2 =12
1
81
8`
14- .1
17
x3 = 51
Replacements
2
>24"
37
i Appraised Value Total'
Removed non -viable
1
Note: mitigation (planting/fees in lieu) is not
trees
required for removed, non -viable trees.
TOTAL # REMOVALS
= 79
30%, not including
119 xDoes
applicant meet/exceed minimum 30%
critical areas
36
tree retention threshold?
Tree Retention
'50% site -wide, to
120 x
Does applicant meet/exceed minimum 50%
Thresholds
waive all fees in lieu
.5
tree retention threshold?
60
Exhibit 11 -Green
PLN2022-004 Packet Pg. 202
1.1
GREENWALK PARK — RESPONSE TO PLAN REVIEW COMMENTS
September 18, 2022
Page 1 6
5. Fees in lieu of replanting. Fees in lieu are assessed if a) the 30% tree retention threshold cannot be
met, b) if replanting on site is not feasible and c) to mitigate the removal of viable trees greater than 24
inches DBH through the payment of their appraised values. Note that the code states appraised values
are assessed by the City; however they are submitted by the applicant's arborist and are subject to
review. The applicant may also opt to use the $2 per square feet of lot area "cap" allowed by ECDC
23.10.080.E.4. 30% tree retention threshold is being met.
If the applicant can meet a 50% tree retention threshold, all fees in lieu are waived. The 50% tree
retention threshold can be met using the flexibility in subdivision design allowed by ECDC 20.75.048,
described in Comment 6 below.
Please indicate the cost of fees in lieu associated with the 30% tree retention threshold, infeasible on -
site tree planting, removed trees >24 inches DBH through payment of appraised values or with the
maximum square foot lot area fee in lieu. As shown in chart we are removing 37 trees that exceed the
24" threshold which require an appraisal to determine value. As noted, this cost will ultimately be
determined by the city or the $2 per square foot fee needs to be paid. There are a number of
questions for how these amounts should be determined before we can calculate this cost. What area
of the site does the square foot cost include, such as is it the net buildable area of each lot, does it
include the access and utility easements, does it include common spaces, etc. Once we have all the
information needed to do these calculations we will be happy to comply. When you ask us for an
appraisal this would be the value that we can sell the timber to a mill, is this how you expect the
appraisal to be performed, the trees are far larger than any tree that can be purchased.
Civil Plan Review by Tavlor Brown. PE. Interim Stormwater Reviewer
CIVIL PLAN REVIEW:
1. Per Edmonds Stormwater Addendum, Checklist 2: Drawing Requirements, please include overall
dimensions and measurements of all drainage facilities. See infiltration gallery details and dimensions
on added sheet C5.
2. Please show existing vegetation (trees and other vegetation) to be retained on the Site Plan as
proposed in the Stormwater Site Plan Report under Minimum Requirement 45. Existing trees to remain
are identified on the site and civil plans. The civil plans have been updated to show trees to be
retained and tree protection fence.
3. Please show proposed location and sizing of infiltration facilities including typical trench/drywell
detail(s) and/or cross -sections for determining feasibility of on -site stormwater management of roof
areas. Ensure the location of infiltration facilities comply with required setbacks. Sizing and
dimensioning added for the infiltration galleries. Drywell locations have been added to the plans.
Exhibit 11 - Green
PLN2022-004 Packet Pg. 203
1.1
GREENWALK PARK — RESPONSE TO PLAN REVIEW COMMENTS
September 18, 2022
Page 1 7
4. Please show flow arrows for all driveways in addition to spot elevations (FG) to support that surface
water runoff from the driveway areas flow and drain to the proposed stormwater system located within
the roadway as proposed in the Stormwater Site Plan Report. Flow arrows and slopes added to the
driveways. After further review, the driveways for Lots 10 & 13 will retain drainage onsite via a
drywell in the driveway area.
5. Please provide proposed roof areas and driveway dimensions for each lot to verify impervious
surfaces proposed on the Civil Plans match impervious surfaces proposed in the Stormwater Site Plan
Report. Roof areas have been added to Sheet C1. Driveway areas and dimensions have been added
to Sheet C1.
6. Sheet C1 has markups on it. Plan questions the C curb, curb and sidewalk location and street lighting.
There are also questions regarding hammer head design of access easement at west end of site along
with extent of sidewalk shown in this location. Lighting has been added along main access easement
shown on sheet Al and all work within right of way on SR 104 will be designed by WSDOT. We will
comply with all WSDOT requirements since we will not be allowed the intersection if we don't.
STORMWATER SITE PLAN REPORT REVIEW:
1. Land Cover Data (page 6): The storm drainage report has been updated based on the current plan.
a. The value shown in the acreage column is miscalculated for landscape area in Step 1 (Site Data),
Section 2 (Existing onsite characteristics). Please revise and check other calculations to ensure
other listed information is accurate.
b. Proposed landscaped area.
2. Minimum Requirement #1: The provided Stormwater Site Plan (Report and Civil Plan set) doesn't
appear to address the construction phase of the project. Please provide a Stormwater Site Plan that
provides for source control and management of runoff during construction in accordance with the DOE
Manual and Edmonds Stormwater Code and Addendum. TESC Plan provide on Sheet C1. Civil sheets
have been renumbered.
3. Minimum Requirement #2: Per Edmonds Stormwater Addendum, A Construction SWPPP (narrative
and drawings) is required for the proposed project. See attached SWPPP.
4. Minimum Requirement #3: Please note: All single-family residential projects shall incorporate
required applicable source control BMPs from SWMMWW Volume IV. See attached Source Control
Plan.
Exhibit 11 - Green
PLN2022-004 Packet Pg. 204
1.1
GREENWALK PARK — RESPONSE TO PLAN REVIEW COMMENTS
September 18, 2022
Page 1 8
5. Minimum Requirement #5: Please provide calculations and/or qualitative analysis for proposed on -
site stormwater management BMPs for roof areas in accordance with Edmonds Stormwater Code and
the DOE Manual. A drywell sizing calculation is included that will be sufficient for all circumstances.
6. The included Soils Report indicates that a Small -Scale PIT was the method used for infiltration testing.
The total project area is 3.15 acres, but this testing method is only applicable to drainage areas less than
1 acre per Edmonds Stormwater Addendum, Appendix B. Please provide infiltration testing using an
approved method as required for the Soils Report, per Edmonds Stormwater Addendum, Appendix C:
Checklist 2, Line 110. Revise Civil Plans, Stormwater Site Plan Report, and WWHM modeling calculations
as necessary. An explanation of infiltration methods by Associated Earth Sciences, Inc. is included
with our resubmittal. AESI will be onsite during storm facility installation to verify the infiltration bed
soil meets the facility design parameters.
5. Please provide proposed roof areas and driveway dimensions for each lot to verify
impervious surfaces proposed on the Civil Plans match impervious surfaces proposed in the
Stormwater Site Plan Report. Roof and driveway areas have been added to the plans. Additional sub -
basin area information has been added to the storm report. The proposed total landcover areas
match up with the updated storm drainage report.
Sincerely,
GREEWALK DESIGNS LLC
Steve Barnes
Architect
Exhibit 11 - Green
PLN2022-004 Packet Pg. 205
1.1
CITY OF EDMONDS
121 5t" Avenue North, Edmonds WA 98020
Phone: 425.771.0220 • Fax: 425.771.0221 • Web: www.edmondswa.gov
DEVELOPMENT SERVICES DEPARTMENT • PLANNING DIVISION
,nC. t 89\-)
October 3, 2022
Steve Barnes
sbarnes@cornerstonearch.com
Subject: Letter of Application for Greenwalk Park
Preliminary Planned Residential Development and Formal Plat at 540 & 550 Edmonds
Way (Consolidated Permits PLN2022-0049 & PLN2022-0053)
Steve,
The City of Edmonds has reviewed the applications noted above. Pursuant to Sections
20.02.002, 20.35.070, and 20.75.060 of the Edmonds Community Development Code (ECDC),
the applications have been determined to meet the procedural submission requirements and
are therefore complete; please accept this letter as the City's completeness notice in
accordance with ECDC 20.02.003.
As required by Chapter 20.03 ECDC, the City will issue a notice of application about the project
within two weeks. It should be noted that while the applications are complete, additional
clarification or corrections to the submitted materials may be required by reviewing staff.
If you have any questions, please let me know either at 425-771-0220 or
michael.clugston@edmondswa.gov.
Sincerely,
1?6wkv
Mike Clugston, AICP
Senior Planner
x
w
c
d
E
r
a
Exhibit 11 - Green
PLN2022-004 Packet Pg. 206
1.m
CITY OF EDMONDS
NOTICE OF APPLICATION
'12C. 1 gy1J
PROJECT DESCRIPTION: The proposal is for a preliminary formal subdivision of a 2.88-acre site into 16 single
family residential lots using the planned residential development (PRD) process. All
existing improvements would be removed, and a new plat road constructed to serve
the new lots with access to Edmonds Way (SR-104). The site is zoned Single Family
Residential — Master Plan (RS-MP). A master plan like a planned residential
development allows development at the site to achieve an RS-8 zoning density (5.5
du/acre) while being able to modify some of the RS-12 development standards that
apply to the site (excluding height). A PRD first requires review of home designs and
site layout, including usable open space, by the Architectural Design Board (ADB). The
ADB makes a recommendation on project design to the Hearing Examiner, who makes
the final decision on the preliminary PRD and preliminary formal subdivision after a
public hearing.
PROJECT LOCATION: 540 & 550 Edmonds Way (Tax ID #s: 27032500308300 & 27032500308400)
NAME OF APPLICANT: Fernandez Barnes LLC (Steve Barnes)
FILE NO.:
PLN2022-0049 & PLN2022-0053
DATE OF APPLICATION: June 24, July 7, and September 19, 2022
DATE OF COMPLETENESS: October 3, 2022
DATE OF NOTICE: October 17, 2022
REQUESTED PERMITS: Consolidated preliminary planned residential development and preliminary formal
subdivision (Type III -A process with a decision by the Hearing Examiner after a public
hearing. The public hearing will be scheduled, and separate notice provided, at a
future date.)
OTHER REQUIRED City Building and Engineering permits, WSDOT approval for access to SR-104
PERMITS:
REQUIRED STUDIES: None at this time
EXISTING ENVIRONMENTAL
DOCUMENTS: Stormwater report, SEPA checklist, geotech report, arborist report and tree retention
plan
COMMENTS ON
PROPOSAL DUE: October 31, 2022
Any person has the right to comment on this application during public comment period, receive notice and
participate in any hearings, and request a copy of the decision on the application. The City may accept public
comments at any time prior to the closing of the record of an open record predecision hearing, if any, or, if no open
record predecision hearing is provided, prior to the decision on the project permit. Only parties of record as defined
in ECDC 20.06.020 have standing to initiate an administrative appeal.
Information on this development application can be obtained online at
https://www.edmondswa.gov/services/public involvement/public notices/development notices under the
Exhibit 12 - Green
PLN2022-004 Packet Pg. 207
1.m
development notice for application number PLN20212-0049 & PLN2022-0053, by emailing the City contact listed
below, or by calling the City of Edmonds at 425-771-0220. Please refer to the application number for all inquiries.
All comments submitted are public records subject to disclosure per RCW 42.56.
CITY CONTACT: Mike Clugston, AICP, Senior Planner
michael.clugston@edmondswa.gov
425-771-0220
,RNERSTONE
� ARCHITECTURAL GROUP
Exhibit 12 - Green
PLN2022-004 Packet Pg. 208
Cityof Edmonds ureenwaiK ram AUjaceni rroperty
monRA.%ll
ALGOfVQU/N RD
1219
7
3 12k1 1291� • o0
12�
�Q PgRgQ/ 3� 13 6
KULSH� RD
s/
1351
41) /
'Os, 0iq�s 12
�^ s
-i4 10708 10624 22f
O.'
W
W
z
.fl Ab
226TH ST SW
v
2A 2261` o
I 2222 A
22621P 2�
229
;t v
o
22is 227�
2� 1: 3,031 O
zz
I 1.m I
E
O
Y
Legend °
Sections Boundary
Sections s
Edmonds Boundary i
C
ArcSDE.GIS.PROPERTY_BUILDIP
ArcSDE.GIS.STREET_CENTERLIN i
<all other values> +
C
C
Interstate
Principal Arterial •�
S
Minor Arterial; Collector
S
Local Street; On Ramp °
C
State Highways <
<all other values> Z
S
0 r
1
2 r
t
County Boundary t
Parks
i
ArcSDE.GIS.PROPERTY_WASHII
ArcSDE.GIS.PROPERTY CITIES
ArcSDE.GIS.PROPERTY_CITIES 2
City of Edmonds C
City of Lynnwood
r
City of Mountlake Terrace i
S
Unincorporated King Co; Unincor LJ
City of Woodway +
S
Citv of Arlinaton: Citv of Bothell:
S
Notes
0
0 252.60 505.2 Feet
Parcels within 300' of 540 & 550 <
376.2 This ma is a user generated static output from an Internet mapping site and is for Edmonds Wa
4,514 p B p Pp B Y
reference only. Data layers that appear on this map may or may not be accurate, Files: PLN2022-0049 & -0053
WGS_1984_Web-Mercator _Auxiliary -Sphere current, or otherwise reliable.
© City of Edmonds THIS MAP IS NOT TO BE USED FOR DESIGN OR CONSTRUCTION ibit 12 - Green
Packet Pg. 209
1.m
PARCEL_ID
OWNERNAME
OWNERLINEI
OWNERCITY
OWNERSTATE
OWNERZIP
00384700500200
ECONOMOU CHRIS & MARLA
10828 KULSHAN RD
WOODWAY
WA
98020
27032500307100
HALE LINDSAY K & GARY KENDALL K
619 PARADISE LN
EDMONDS
WA
98020-4651
cS
27032500308100
OWENS OWEN L 401K TRUST
PO BOX 12922
MILL CREEK
WA
98082
00539100000100
PENA MICHAEL G & TERRI L
1370 6TH PL S
EDMONDS
WA
98020
—
00539100004100
CIVARRA JAMES & MARTHA
1371 6TH PL S
EDMONDS
WA
98020
d
27032500302600
PARADISE HEIGHTS HLD LLC
190 W DAYTON ST STE 103
EDMONDS
WA
98020
27032500303200
REEDY PATRICK L
541 EDMONDS WAY
EDMONDS
WA
98020-4638
a
27032500303300
OWENS OWEN L & JACQUELINE L
PO BOX 12922
LYNNWOOD
WA
98082
X
27032500303400
NEWKIRK DARALEE LOUISE & SCOTT
13404 N ECHO LAKE RD
SNOHOMISH
WA
98296-6193
3
00384700500100
LECKY LIVING TRUST
10820 KULSHAN RD
WOODWAY
WA
98020-6127
d
27032500302900
KIM BYUNG H & IM HEE-SUNG
10826 KULSHAN RD
WOODWAY
WA
98020-6127
27032500308300
FERNANDEZ & BARNES LLC
10529 NE 58TH ST
KIRKLAND
WA
98033
27032500308400
MOLNAR BUILDING LLC
PO BOX 55576
SHORELINE
WA
98155
27032500308500
BONN DALE W
PO BOX 72
EDMONDS
WA
98020
+r
O
27032500307300
1ST SECURITY BANK
6920 220TH ST SW STE 208
MOUNTLAKE TERRACE
WA
98043
00384700501100
ZEVENBERGEN JOHN & JACLYN
10901 ALGONQUIN RD
WOODWAY
WA
98020-6108
v
27032500308900
EDMONDS WESTGATE LLC
606 EDMONDS WAY
EDMONDS
WA
98020
s
27032500310000
GEORGE LORI J
10605 226TH ST SW
EDMONDS
WA
98020
Q
27032500308800
LEWIS SCOTT F & MARGARITA 0
612 EDMONDS WAY
EDMONDS
WA
98020-4641
m
00384700501200
MILLER GLENN R & CATHERINE A
5916 STANDREWS DR
MUKILTEO
WA
98275-4847
Q
27032500309900
NELSON MICHAEL LEE
10607 226TH ST SW
EDMONDS
WA
98020-6100
C
27032500310400
KOFLER RALPH R & IRENE M
10611 226TH ST SW
EDMONDS
WA
98020
ca
27032500308700
REDELFS RICHARD HENRY & LIU XIAO WEI
606 EDMONDS WAY
EDMONDS
WA
98020-4641
O
0
27032500310100
MARTINELLI MICHAEL
10615 226TH SW
EDMONDS
WA
98020
27032500309800
LEMAS MITCHEL J & ALICE
10609 226TH ST SW
EDMONDS
WA
98020-6100
v
27032500316200
MAHMOUD MOHAMMED & MAHMOUD-HOWELL BETH
10705 226TH ST SW
EDMONDS
WA
98020-6132
Q
27032500316400
BAYER KIM/AUGUSTAVO ED
10707 226TH STREET SW
EDMONDS
WA
98020
4-
27032500316300
WILSON JAMES R & SHARON
10703 226TH ST SW
EDMONDS
WA
98020-6132
O
27032500310700
PETERS MARVIN T & LLYNDA F
10525 226TH ST SW
EDMONDS
WA
98020-5123
V
r
27032500311000
KIMMELMAN LEE/SHU HUI HOU TTEE
1054 9TH AVENUE S
EDMONDS
WA
98020
O
Z
27032500310800
SHEPSIS VLADIMIR & ANETA TRUST
8034 CYRUS PL
EDMONDS
WA
98026
'
27032500316500
HELLEREN LEIF T & KIMBERLY J
2522 192ND ST
SHORELINE
WA
98177
r
27032500316700
JOHANNESSEN JOHN M CREDIT TRUST
10727 226TH ST SW
EDMONDS
WA
98020-6132
27032500308400
MOLNAR BUILDING LLC
1240 NE 175TH ST STE A
SHORELINE
WA
98155
t
Exhibit 12 - Green
PLN2022-004 Packet Pg. 210
1.m
FILE NO.: PLN2022-0049 & PLN2022-0053
Applicant: Fernandez and Barnes LLC
DECLARATION OF MAILING
On the 171h day of October 2022, the attached Notice of Application was mailed by the City of
Edmonds to property owners within 300 feet of the property that is the subject of the above -
referenced application.
I, Michelle Martin, hereby declare under penalty of perjury under the laws of the State of
Washington that the foregoing is true and correct this 17th day of October 2022, at Edmonds,
Washington.
Signed: U:a4& W 4"&a
1BFP747887.DOC;1\00006.900000\ }
Exhibit 12 - Green
PLN2022-004 Packet Pg. 211
1.m
File No.: PLN2022-0049 & PLN2022-0053
Applicant: Fernandez and Barnes LLC
DECLARATION OF POSTING
On the 17th day of October, 2022, the attached Notice of Application and
Public Comment Period was posted as prescribed by Ordinance and in any
event where applicable on or near the subject property. It was not posted at
the Edmonds Library since it is being renovated following the 2022 water leak.
I, Mike Clugston, hereby declare under penalty of perjury under the laws of the
State of Washington that the foregoing is true and correct this 17th day of
October, 2022, at Edmonds, Washington.
c,
Signed:
Exhibit 12 - Green
PLN2022-004 Packet Pg. 212
1.m
CITY OF EDMONDS
NOTICE OF PUBLIC MEETING
'12C. 1 gy1J
PROJECT DESCRIPTION: The proposal is for a preliminary formal subdivision of a 2.88-acre site into 16 single
family residential lots using the planned residential development (PRD) process. All
existing improvements would be removed, and a new plat road constructed to serve
the new lots with access to Edmonds Way (SR-104). The site is zoned Single Family
Residential — Master Plan (RS-MP). A master plan like a planned residential
development allows development at the site to achieve an RS-8 zoning density (5.5
du/acre) while being able to modify some of the RS-12 development standards that
apply to the site (excluding height). A PRD first requires review of home designs and
site layout, including usable open space, by the Architectural Design Board (ADB). The
ADB makes a recommendation on project design to the Hearing Examiner, who makes
the final decision on the preliminary PRD and preliminary formal subdivision after a
public hearing.
PROJECT LOCATION: 540 & 550 Edmonds Way (Tax ID #s: 27032500308300 & 27032500308400)
NAME OF APPLICANT: Fernandez Barnes LLC (Steve Barnes)
FILE NO.:
PLN2022-0049 & PLN2022-0053
DATE OF APPLICATION: June 24, July 7, and September 19, 2022
DATE OF COMPLETENESS: October 3, 2022
DATE OF NOTICE: July 13, 2023
REQUESTED PERMITS: Consolidated preliminary planned residential development and preliminary formal
subdivision (Type III -A process with a decision by the Hearing Examiner after a public
hearing. The public hearing will be scheduled, and separate notice provided, at a
future date.)
OTHER REQUIRED City Building and Engineering permits, WSDOT approval for access to SR-104
PERMITS:
REQUIRED STUDIES: None at this time
EXISTING ENVIRONMENTAL
DOCUMENTS: Stormwater report, SEPA checklist, geotech report, arborist report and tree retention
plan
COMMENTS ON
PROPOSAL DUE: N/A
PUBLIC MEETING
INFORMATION: A hybrid public meeting will be held by the Architectural Design Board on Thursday, July
27, 2023 at 6:00 p.m. The physical location is Edmonds City Hall, 121 5th Avenue N, 3rd
Floor, Brackett Room.
Or join the Zoom meeting at:
Exhibit 12 - Green
PLN2022-004 Packet Pg. 213
1.m
https://edmondswa-
gov.zoom.us/I/88959586932?pwd=RzdPWUlwM09PZ1k1M HN2eWM1YXPhZz09
Or via phone by dialing 253-205-0468
Meeting ID: 8895 9586 932
Password: 591531
Per ECDC 20.35.080, no public comment will be taken at the Architectural Design Board
meeting; the Hearing Examiner will take testimony during a public hearing which will be
noticed separately once a date has been determined.
Information on this development application is available at the City of Edmonds
Planning & Development Department, 121 5ch Ave North, Edmonds, WA 98020 between
the hours of 10:00 A.M. and 2:00 P.M. Monday — Friday or through the City's website
(https://www.edmondswa.gov/services/public involvement/public notices/developme
nt notices) and search for permit PLN2022-0049 & -0053. A copy of the staff report will
be available at least seven days prior to the meeting date.
CITY CONTACT: Mike Clugston, AICP, Senior Planner
michael.clugston@edmondswa.gov
425-771-0220
,RNERSTONE
� ARCHITECTURAL GROUP
Exhibit 12 - Green
PLN2022-004 Packet Pg. 214
1.m
File No.: PLN2022-0049
Applicant: Fernandez and Barnes LLC
DECLARATION OF POSTING
On the 13rd day of July, 2023, the attached Notice of Public Meeting was posted
as prescribed by Ordinance and in any event where applicable on or near the
subject property. It was not posted at the Edmonds Library since it is being
renovated following the 2022 water leak.
I, Mike Clugston, hereby declare under penalty of perjury under the laws of the
State of Washington that the foregoing is true and correct this 13th day of July
2023, at Edmonds, Washington.
Signed:
Exhibit 12 - Green
PLN2022-004 Packet Pg. 215
Click2Mail MOL Pro Tracing Data Page 1 of 2 1.m
For Click2Mail Order #20721338
Tracking Number
Mailing Address Scan Status Scan Date
Scan
Address/Standard Type
Location
Address (ZipCode)
00270200802186710319
LECKY LIVING TRUST 10820 Kulshan Rd Woodway WA 98020-6127 UNITED STATES
00270200802186710319
Standard USPS Indicated Delivered 07/17/23 17:59 EDT
98020
00270200802186710318
NEWKIRK DARALEE LOUISE & SCOTT 13404 N Echo Lake Rd Snohomish WA 98296-6193 UNITED STATES
00270200802186710318
Standard USPS Indicated Delivered 07/17/23 13:33 EDT
98296
00270200802186710320
00270200802186710320
00270200802186710342
00270200802186710342
00270200802186710341
00270200802186710341
00270200802186710340
00270200802186710340
00270200802186710328
00270200802186710328
00270200802186710327
00270200802186710327
00270200802186710326
00270200802186710326
00270200802186710325
00270200802186710325
00270200802186710324
00270200802186710324
00270200802186710323
00270200802186710323
00270200802186710322
00270200802186710322
00270200802186710321
00270200802186710321
00270200802186710343
00270200802186710343
00270200802186710329
00270200802186710329
00270200802186710331
00270200802186710331
00270200802186710330
00270200802186710330
KIM BYUNG H & IM HEE-SUNG 10826 Kulshan Rd Woodway WA 98020-6127 UNITED STATES
Standard USPS Indicated Delivered 07/17/23 17:59 EDT 98020
JOHANNESSEN JOHN M CREDIT TRUST 10727 226th St SW Edmonds WA 98020-6132 UNITED STATES
Standard USPS Indicated Delivered 07/17/23 19:12 EDT 98020
HELLEREN LEIF T & KIMBERLY J 2522 NW 192nd PI Shoreline WA 98177-2920 UNITED STATES
Standard 07/14/23 21:50 EDT 48233
SHEPSIS VLADIMIR & ANETA TRUST 8034 Cyrus PI Edmonds WA 98026-5028 UNITED STATES
Standard USPS Indicated Delivered 07/17/23 16:40 EDT 98026
LEWIS SCOTT F & MARGARITA O 612 Edmonds Way Edmonds WA 98020-4641 UNITED STATES
Standard USPS Indicated Delivered 07/17/23 17:35 EDT 98020
GEORGE LORI J 10605 226th St SW Edmonds WA 98020-6100 UNITED STATES
Standard USPS Indicated Delivered 07/17/23 19:12 EDT 98020
EDMONDS WESTGATE LLC 606 Edmonds Way Edmonds WA 98020-4641 UNITED STATES
Standard USPS Indicated Delivered 07/17/23 17:35 EDT 98020
ZEVENBERGEN JOHN & JACLYN 10901 Algonquin Rd Woodway WA 98020-6108 UNITED STATES
Standard USPS Indicated Delivered 07/17/23 19:24 EDT 98020
1 ST SECURITY BANK 6920 220th St SW Ste 208 Mountlake Terrace WA 98043 UNITED STATES
USPS Indicated Delivered 07/17/23 11:18 EDT 98043
BONN DALE W PO Box 72 Edmonds WA 98020-0072 UNITED STATES
Standard USPS Indicated Delivered 07/17/23 08:21 EDT 98020
MOLNAR BUILDING LLC PO Box 55576 Shoreline WA 98155-0576 UNITED STATES
Standard Arrived at Recipient PO 07/17/23 01:13 EDT 98168
FERNANDEZ & BARNES LLC 10529 NE 58th St Kirkland WA 98033-7417 UNITED STATES
Standard USPS Indicated Delivered 07/17/23 12:26 EDT 98033
MOLNAR BUILDING LLC 1240 NE 175th St Ste A Shoreline WA 98155-5145 UNITED STATES
Standard USPS Indicated Delivered 07/17/23 09:18 EDT 98155
MILLER GLENN R & CATHERINE A 5916 St Andrews Dr Mukilteo WA 98275-4847 UNITED STATES
Standard USPS Indicated Delivered 07/17/23 11:01 EDT 98275
KOFLER RALPH R & IRENE M 10611 226th St SW Edmonds WA 98020 UNITED STATES
En Route 07/17/23 07:05 EDT 98168
NELSON MICHAEL LEE 10607 226th St SW Edmonds WA 98020-6100 UNITED STATES
Standard USPS Indicated Delivered 07/17/23 19:12 EDT 98020
Exhibit 12 - Greenwalk Park
PLN2022-0049 & -0053
Page 2 of 2
Tracking Number
Mailing Address Scan Status Scan Date Scan
Address/Standard Type Location
Address (ZipCode)
00270200802186710317
OWENS OWEN L & JACQUELINE L PO Box 12922 Mill Creek WA 98082-0922 UNITED STATES
00270200802186710317
Standard Arrived at Recipient PO 07/16/23 18:13 EDT 98052
00270200802186710339
KIMMELMAN LEE/SHU HUI HOU TTEE 1054 9th Ave S Edmonds WA 98020-3909 UNITED STATES
00270200802186710339
Standard USPS Indicated Delivered 07/17/23 11:38 EDT 98020
00270200802186710316
REEDY PATRICK L 541 Edmonds Way Edmonds WA 98020-4694 UNITED STATES
00270200802186710316
Standard USPS Indicated Delivered 07/17/23 12:06 EDT 98020
00270200802186710338
PETERS MARVIN T & LLYNDA F 10525 226th St SW Edmonds WA 98020-5123 UNITED STATES
00270200802186710338
Standard USPS Indicated Delivered 07/17/23 18:49 EDT 98020
00270200802186710315
PARADISE HEIGHTS HLD LLC 190 W Dayton St Ste 103 Edmonds WA 98020-4182 UNITED STATES
00270200802186710315
Standard USPS Indicated Delivered 07/17/23 11:56 EDT 98020
00270200802186710337
WILSON JAMES R & SHARON 10703 226th St SW Edmonds WA 98020-6132 UNITED STATES
00270200802186710337
Standard USPS Indicated Delivered 07/17/23 19:12 EDT 98020
00270200802186710314
CIVARRA JAMES & MARTHA 1371 6th PI S Edmonds WA 98020-4616 UNITED STATES
00270200802186710314
Standard USPS Indicated Delivered 07/17/23 12:06 EDT 98020
00270200802186710336
BAYER KIM/AUGUSTAVO ED 10707 226th St SW Edmonds WA 98020-6132 UNITED STATES
00270200802186710336
Standard USPS Indicated Delivered 07/17/23 19:12 EDT 98020
00270200802186710313
PENA MICHAEL G & TERRI L 1370 6th PI S Edmonds WA 98020-4616 UNITED STATES
00270200802186710313
Standard USPS Indicated Delivered 07/17/23 12:06 EDT 98020
00270200802186710335
MAHMOUD MOHAMMED & MAHMOUD-HOWELL BETH 10705 226th St SW Edmonds WA 98020-6132 UNITED
STATES
00270200802186710335
Standard USPS Indicated Delivered 07/17/23 19:12 EDT 98020
00270200802186710312
OWENS OWEN L 401 K TRUST PO Box 12922 Mill Creek WA 98082-0922 UNITED STATES
00270200802186710312
Standard Arrived at Recipient PO 07/16/23 18:13 EDT 98052
00270200802186710334
LEMAS MITCHEL J & ALICE 10609 226th St SW Edmonds WA 98020-6100 UNITED STATES
00270200802186710334
Standard USPS Indicated Delivered 07/17/23 19:12 EDT 98020
00270200802186710311
HALE LINDSAY K & GARY KENDALL K 619 Paradise Ln Edmonds WA 98020-4651 UNITED STATES
00270200802186710311
Standard USPS Indicated Delivered 07/17/23 12:06 EDT 98020
00270200802186710333
MARTINELLI MICHAEL 10615 226th St SW Edmonds WA 98020-6100 UNITED STATES
00270200802186710333
Standard USPS Indicated Delivered 07/17/23 19:12 EDT 98020
00270200802186710310
ECONOMOU CHRIS & MARLA 10828 Kulshan Rd Woodway WA 98020-6127 UNITED STATES
00270200802186710310
Standard USPS Indicated Delivered 07/17/23 17:59 EDT 98020
00270200802186710332
REDELFS RICHARD HENRY & LIU XIAO WEI 606 Edmonds Way Edmonds WA 98020-4641 UNITED STATES
00270200802186710332
Standard USPS Indicated Delivered 07/17/23 17:35 EDT 98020
Report Generated on : July 18, 2023
Exhibit 12 - Greenwalk Park
PLN2022-0049 & -0053
1.n
From: Clugston, Michael
Sent: Monday, October 31, 2022 1:58 PM
To: Dale Bonn
Subject: RE: Comments on 540 & 550 Edmonds Way PLN2022-0049 and PLN2022-
0053
Attachments: PLN2022-0049 Neighborhood Meeting Information.pdf; RESUB 1
PLN2022-0049+WSDOT Letter+9.19.2022_9.38.07_AM+3115443.pdf
Hi Dale,
Thank you for your comments. You are now considered a party of record to permits PLN2022-0049 & -
0053. You will receive additional notice of the eventual SEPA determination and public hearing by the
Hearing Examiner, receive a copy of his eventual decision, and have the right to appeal should you find
that necessary. Your comments from early September 2022 were received but not acted on at that time
since the project had not yet been determined to be complete. Once the application was found to be
complete in early October 2022, the required noticing processes began.
Regarding your September comments, you were on the list as a recipient for the pre -application
meeting notice required to be held by the developer (see attached). I'm not sure what happened but
you have received subsequent notice and are included in the process.
With respect to the construction process, I don't know how that will play out this time. Off -site impacts
caused during the project must be repaired at the developer's expense. I can say that sound from
temporary construction sites is limited to 7AM-6PM on weekdays, 10AM-6PM on Saturdays. Additional
property performance standards in ECDC 17.60 apply.
Regarding access from SR-104, WSDOT controls on that and so will have to approve any eventual access
and may add conditions to that (for example, right turn only going out). WSDOT is aware of the project
(see attached) and will be consulted throughout the process.
Tree retention and replacement must be managed in accordance with the adopted tree code in ECDC
23.10. The City's urban forest planner will be reviewing the project to ensure compliance with the code
Likewise, compliance with stormwater codes will be evaluated by the City's stormwater engineer.
Engineering staff will also review sewer requirements but water in that area is provided by Olympic
View.
I hope that helps. If you have any other questions, please let me know.
Mike Clugston AICP I Senior Planner
City of Edmonds
425-771-0220, ext. 1330
michael.clugston@edmondswa.gov
The Planning & Development Department Permit Center is open M-F Sam to 4:30pm for Telephone and
Digital/Remote access.
In -Person walk-in service is currently available Wednesdays 10:00am to 2:00pm; appointments are
encouraged.
Exhibit 13 - Green
PLN2022-004 Packet Pg. 218
1.n
Appointments are also available M, T, Th, F, from 10am to 2pm. Please call ahead to arrange an in -
person or remote (Zoom) appointment to assure the appropriate staff member is available.
For general service:
Phone 425.771.0220
Email devserv.admin@edmondswa.gov
-----Original Message -----
From: Dale Bonn <dalepatience@icloud.com>
Sent: Monday, October 31, 2022 11:23 AM
To: Clugston, Michael <Michael.Clugston@edmondswa.gov>
Subject: Comments on 540 & 550 Edmonds Way PLN2022-0049 and PLN2022-0053
Dear Mr. Clugston:
Please consider these my comments on the above proposal that are due October 31, 2022. My
comments include those in the attached letter dated August 30, 2022, which incidentally, I have not yet
receive a response to from the City of Edmonds.
In addition, due to the uncertainly as to how much disruption my tenants at the adjacent property, 600
Edmonds Way, will be forced to endure as a result of noise, air pollution, disruption of utilities,
increased traffic, etc., I would like to make sure that they, or I, are adequately compensated for this
disruption. If my tenants find it necessary to vacate the property, either temporarily or permanently,
they, or I, must be compensated for lost rents and loss of the peaceful enjoyment of their home. I
would like to be included in the discussion of what measures will be taken to mitigate the negative
effects of these projects.
Please make sure that I receive all notices of hearings and meetings.
Sincerely,
Dale W. Bonn
PO Box 72
Edmonds, WA. 98020
Exhibit 13 - Green
PLN2022-004 Packet Pg. 219
1.n
August 30, 2022
Brad Shipley, Long Range Planner
City of Edmonds
121-5thAvN
Edmonds, WA. 98020
RE: Development at 540 and 550 Edmonds Way
Dear Mr. Shipley:
About two weeks ago I learned of a proposed development at 540 & 550 Edmonds Way from
another neighbor. Apparently there was a public meeting promoted by the developer on May
10, 2022. As the adjacent property owner at 600 Edmonds Way, I am surprised that I was not
informed of or invited to the meeting by the developer, Fernande Barnes, LLC. My mailing
address is easily located in the Snohomish County public records.
In their notice, Fernandez Barnes states, "The city of Edmonds requires that a public meeting
must be conducted and all parties within 300 feet of the site shall be invoked prior to
submitting for permitting to the city of Edmonds." One of the purposes of this letter is to
inform the City that this requirement has not been met in as far as notification to me has not yet
been made.
The other purpose is to outline some of my concerns regarding a planned development of 16
residences on what is currently 2 homes covered with a tree canopy.
My property at 600 Edmonds Way has a sewer easement through and under 540. 1
want to make sure that this is not damaged or rendered unusable for any period of time
during construction.
2. 1 have what I consider to be very good renters in the house and am extremely
concerned about disruptions to their quiet enjoyment of the property. This is a concern
both during construction and afterwards. If there is to be construction on the scale
proposed, there needs to be mitigation efforts to reduce noise, dust and unsightliness
from construction crews and heavy equipment. This may be, but is not limited to,
monetary compensation to the tenants and other adjacent homeowners who may find
their homes uninhabitable during a portion of the construction period. At completion,
there needs to be a substantial barrier between the properties.
3. Ingress and egress from SR 104 is a concern. The developer states that The State
Department of Transportation has given approval for a single drive that will access 104
to minimize traffic hazards. After personally living at 600 Edmonds Way for more than
35 years, I can give personal testimony that I don't think there is anything that a can be
done to sufficiently mitigate traffic from what was two houses becoming 16 houses. I
Exhibit 13 - Green
PLN2022-004 Packet Pg. 220
1.n
have waited in traffic for more that 5 minutes to either exit or enter my driveway when
ferry traffic is coming up the hill. This summer there is less traffic than normal due to
WSDOT being unable to maintain a normal two boat schedule, but that is only
temporary. There will be increased traffic accidents if there are 16 house with 32 or
more vehicles trying to get in and out during busy commute times. The speed limit on
that stretch of highway is poorly enforced. I have witnessed numerous incidents of
road rage on this section of the highway over the years.
4. 1 am concerned with climate change and the impact of clearing the tree canopy from lot
550. The developer states that they will "maintain as many trees around the perimeter
of the site as possible". Many of the trees on the perimeter have already been tagged,
assume for cutting. Is this in compliance with code? In last week's Beacon, August 25,
there is an article about the Edmonds Climate Action Plan. One recommended action
plan is adopting a canopy coverage target, a tree survey and a possible requirement to
plant a minimum number of trees at construction sites. I hope the developer is not
rushing, and the city does not allow, discriminate tree cutting to circumvent proposed
tighter regulation. These trees have been there a very long time and clearcutting will
impact wind patterns on my lot making my trees more susceptible to falling during wind
storms. Any mitigation efforts made by planting trees elsewhere will do nothing to
clear our air of the gasoline fumes and other pollutants from SR 104.
5. 1 notice that there is play area very close to SR 104. It seems to be a bad location to
have children play that close to a major highway next to the single ingress/egress. I
was always concerned that a speeding or drunk driver was going to miss the curve and
wind up in our house or the house at 540. Studies by the University of Washington and
other universities show that there is a direct correlation between the proximity of high
density roads and respiratory diseases, especially in children.
In conclusion, I have serious concerns about a development of this size and density on 540 &
550 Edmonds Way. I ask that the City of Edmonds take a very careful look at the entire
proposal before considering permits and require the appropriate mitigation. I would especially
like to see the analysis from WSDOT on the single access driveway and their thoughts behind
the safety to residents and the public of more than 30 additional vehicles entering/exiting the
highway with oncoming ferry traffic, especially on Friday evenings when downhill ferry traffic
can be back up to the Westgate Chapel.
Sincerely,
Dale Bonn
PO Box 72
Edmonds, WA. 98020
C: Grenwalk Designs, LLC
Exhibit 13 - Green
PLN2022-004 Packet Pg. 221
1.n
From: Clugston, Michael
Sent: Wednesday, January 18, 2023 8:57 AM
To: Mitch Lemas
Cc: McConnell, Jeanie
Subject: RE: PLN2022-0049 & PLN2022-0053 public comment
Hi Mitch,
Thanks for the info. I've copied Jeanie McConnell from the Engineering Division so the concept is on her
radar as well. I'm not sure if this is something that can be achieved through the adjacent platting
project that is occurring but we'll take a look.
Have a good day.
Mike Clugston AICP I Senior Planner
City of Edmonds
425-771-0220, ext. 1330
michael.clugston@edmondswa.gov
The Planning & Development Department Permit Center is open M-F 8am to 4:30pm for Telephone and
Digital/Remote access.
In -Person walk-in service is currently available Wednesdays 10:00am to 2:OOam: aaoointments are
encouraged.
Appointments are also available M, T, Th, F, from 10am to 2pm. Please call ahead to arrange an in
person or remote (Zoom) appointment to assure the appropriate staff member is available.
For general service:
Phone 425.771.0220
Email devserv.admin@edmondswa.gov
From: Mitch Lemas <mitch@pacificrepworks.com>
Sent: Wednesday, January 18, 2023 8:51 AM
To: Clugston, Michael<michael.clugston@edmondswa.gov>
Subject: PLN2022-0049 & PLN2022-0053 public comment
Mr. Clugston,
I appreciate the time on the phone last month regarding the proposed development project located at
540 & 550 Edmonds Way and our residential access to City of Edmonds sewer infrastructure.
I'd like to ask that this project include a hookup site and access to City of Edmonds sewer lines for the
2 adjoining properties located at 10615 & 10609 226th St SW. These properties are currently utilizing
septic tank systems for their waste water.
Exhibit 13 - Green
PLN2022-004 Packet Pg. 222
1.n
Please note, both properties are more than 200 feet from any sewer main (both City of Edmonds &
Olympic View) which perpetuates the use of a septic system when a repair of replacement becomes
necessary.
We understand migrating homes within city limits from septic systems to the city sewer system is a
priority for the City of Edmonds. Including this small provision is consistent with this civic objective and
would seemingly be of minor marginal cost to the developer for a project of this size.
Thank you for considering our request.
Kindest regards,
Mitch Lemas and Kathy Martinelli
10609 & 10615 226th St SW, Edmonds
Mitch cell: 425-772-6764
Exhibit 13 - Green
PLN2022-004 Packet Pg. 223
1.n
Clugston, Michael
From: Clugston, Michael
Sent: Tuesday, February 28, 2023 3:29 PM
To: L.M. Lecky
Cc: Lien, Kernen; John H Lecky M.D.
Subject: RE: Party of Record Concerns re: PRD 540/550 Edmonds Way
Hi Lisa,
Thank you for your comment. Kernen's email probably bounced back to you — he left Edmonds last fall for
greener pastures in the Olympia area but I'm still working on this project. You are considered a party of
record to permits PLN2022-0049 & -0053, will receive a copy of the eventual decision, and have the right to
appeal should you find that necessary.
Regarding stormwater, all stormwater must be managed on the project site and that is something that the
Engineering Division will look at as part of their review. As for trees, those along the property line between
your parcel and the development site are shown to be retained and enhanced in a couple locations — the top
(or left) snip below shows existing conditions and the bottom (right) snip shows conditions after the proposed
replanting. The exact location of the replacements hasn't been determined but it looks like the intent is to
provide additional screening for the houses - that is something you could talk to Steve Barnes about.
If you have any other questions, please let me know.
Mike Clugston AICP I Senior Planner
City of Edmonds
425-771-0220, ext 1330
michael.clugston@edmondswa.gov
The Permit Center is open M-F 8am to 4:30pm for Telephone and Digital/Remote access.
In -Person walk-in service is currently available Wednesdays 10:OOam to 2:OOom: aaoointments are encouraaed.
Appointments are also available M, T, Th, F, from 10am to 2pm. Please call ahead to arrange an in -person or remote
(Zoom) appointment to assure the appropriate staff member is available.
For general service:
Phone / 425.771.0220
Email / devserv.admin@edmondswa.gov
Exhibit 13 - Green
PLN2022-004 Packet Pg. 224
1.n
U
Q
N
D
0
rl
E
I
I
I
RS—MP
_ 1 _ N 888'01 " 489 30'CED
2 .1' O_
478 22
0 T 4
I I . ► 1 /
I I �\ 4 CED /1 1/ E 4 S.F.
4 / 1 i 1 \ i----- f—�I 4 1
�'\ � ♦ 1 � 8' 14P 1 I t ' I / ___��' Ill�jj I
LYT
��� ' 7,2 616 S.F�472 6
4936
. / 443 65fr' ! i / // ;21F1'6V ✓I
21 . .� A"w �rw
`I 1 *) I DEC
L I
0, � U L ILJ
u i i VLJ
TREE F,
/ o 7�339—
t 1111 /Yk!
J. !_
N i-17-- i— 4 32r}�+L E 4 31 r_ 1 '�CO MOIV,SPA,'-: •a.'I 4
Y° / 4 iij� �iT`
" CEO -c- r I AP -A 7, 246 c
w ! � ,1 r/ � IAA ��AY AKA
to
1 i, —4 40 D ,, 2�
6"EsfL' O 1 <
f1 1
1� 6T y1�1 42I {� Imo` -
90 F��Jlr11 7 6"5 ---
T 8 ��/ \� ��—: i 1112 BI
QIC
-7 F-- r � r
j /y �, \
1 I- ' �I 1 / I I
i 1 l 42 f �CfC9 i LJ
20 I 1 \429 14',�ED
�`�---i ,
FIR(()kA1 Y 436-
- n- ,
12 MAPLE _L 143 /� t2 - 1 i 7 -40 GED 426 R
88'3 —r w 3—
�`� xhibit 13 - Green
TREE PROTECTION FENCE PLN2022-004 Packet Pg. 225
I
467
464•
1.n
From: L.M. Lecky <Imlecky@yahoo.com>
Sent: Tuesday, February 28, 2023 2:48 PM
To: Clugston, Michael <michael.clugston@edmondswa.gov>
Cc: Lien, Kernen <kernen.lien@edmondswa.gov>; John H Lecky M.D. <Lecky@u.washington.edu>; Lisa Lecky
<Imlecky@yahoo.com>
Subject: Party of Record Concerns re: PRD 540/550 Edmonds Way
Re: Concerns re PRD 540/550 Edmonds Way - Fernandez Barnes, LLC (Steve Barnes)
Hi Mike,
In your reply to my email dated October 18, 2022, you explained that, to become a "party of record"
should send you a list of concerns. To formally document these concerns, please add this email to
your files for PRD 540/550 Edmonds Way.
1. Stormwater Runoff:
According to Steve Barnes, four flag houses will be built 10 feet away from my property line. To build
these houses, significant, native evergreen trees will be removed. I am concerned that removal of
these trees, and the attendant change in drainage patterns, will create stormwater runoff onto my
property.
2. Request for Developer to Install Fence Before Construction Begins:
During the Zoom meeting on May 10, 2022, Steve Barnes agreed to build a six-foot, wood fence (the
maximum height allowed) along the property lines. According to Steve Barnes, we will hear
"significant construction noise" for six months or longer (Monday through Saturday). Having the fence
completed before any construction begins would help to mitigate construction noise.
3. Request to Meet With Developer re Planting Trees Along Property Lines:
If development is approved, the top floors and roofs of the four flag houses will be visible from the
main windows of my home. I would like the developer to plant Leyland cypress or other appropriate
trees along the property lines. This would help to hide the PRD houses from view and decrease
construction noise. A meeting with you and/or Steve Barnes would help determine exactly where the
trees might be planted to achieve the desired effect. Please let me know how to schedule this
meeting.
Going forward, I am open to your recommendations and advice. Thank you for your ongoing help,
Mike.
Sincerely,
Lisa
Lisa M. Lecky and John H. Lecky
10820 Kulshan RD
Woodway, WA 98020
Phone: 425-640-8797
Exhibit 13 - Green
PLN2022-004 Packet Pg. 226
1.n
M
MULLAVEY, PROUT, GREINLEY & FOE, LLP
LAW OFFICES I A LIMITED LIABILITY PARTNERSHIP I ALL ADMITTED IN WASHINGTON
4,
CHARLES N. MULLAVEY (1929-2015)
RICHARD L. PROUT, P.C. (Of Counsel)
HENRY W.GRENLEY
ALAN K. FOE, P.S. (RERRED PARTNER)
JOHN S. WMASTERS, P.S.
TREN WICKSTROM
SARAH E. SMITH
DIANE L. WIES
DANIEL A.S. FOE
SCOTT M. ELLERBY
March 27, 2023
Justin Barnes
Fernandez & Barnes LLC
10529 NE 58 h St.
Kirkland, WA 98033
2401 NW SIXTY-FIFTH
PO BOX 70567
SEATTLE, WASHINGTON 98127
(206) 789-2511
FAX: (206) 789-4484
www.ballardlawyers.com
John S. McMasters
jmcmasters@ballardlawyers.com
Via Regular and Certified Mail
Re: 540 Edmonds Way, Edmonds, WA; Tax Parcel Number #27032500308300
Dear Mr. Barnes:
I represent Kari Johannessen, who owns the property located at 10727 226th Street SW,
Edmonds, Washington, and the property's tax parcel number is 202012045001. I understand that your
company purchased the property at 540 Edmonds Way from Alexander Molnar and Theresa Molnar in
December of 2021, and that you are in the process of short platting the property for development. I
presume that you already have a survey of your property and are aware of the boundary lines and
encroachments.
The purpose of this letter is to ascertain that you are aware that Kari Johnanessen asserts that the
property which is located south of Kari Johannessen's existing fence line belongs to Kari Johannessen,
and has been exclusively maintained and used by her and her family for more than thirty years. In that
you are in the process of planning your development, Kari Johannessen wished to confirm that you had
adequate notice, such that an adjustment to your plan was not required at a later point in time.
If you wished to have the boundary line adjusted to the existing fence line at this time, please
contact me, and we can discuss the most effective way to do so.
Very truly yours,
MULLAVEY. PROUT, GRENLEY & FOE, LLP
In
JSM:kf
Enclosure - Survey
Our file no. 22123.08803
cc: Kari Johannessen
l o i i i i S. McMasters
MAwpdocs\Johannessen, Kari12021 Boundaryll-Justin Barnes 01 v3.docx
Exhibit 13 - Green
PLN2022-004 Packet Pg. 227
1.n
20 25
(sp) Pos
25 0 25 50 /
1 INCH = 50 FT
I mfflp�Alr Car
P)l4G #29 02 o0 00 00 1
(SUBJECT PROPERTY, EXHIBIT A) �
4 o s s EXISTING FENCE (rYP (2W,235 .F.)Ea
L L3 4... L9! .tl
N88' f 9'48'W 328.57
o�ROPERTY LINE '
- ,, -- —
0 0 ; l do4 -'owi
o Line. Table , a
I
o
i EX 10' OLYMPVC VIEW—/ \
way OlsiMT SEWER
Q EASEM � MUSE IF93173
( J
I
---� i
i----------- �----
i
LINE aEa3rNc. DISTANCE
L f
S8 f'05' 18'E
19.5 f'
l2
N88'50:49'� :
42.57'
L3
589'44'19'i °
6Z.0 f '
L4
fY82' 10'431�
30.60'
L5
58976'2B E
27.89'
L6
N88'31'18'�
20.81'
L7
S59 32'03'�
6.34'
Le
Nsr s2'o2'�
B.oa�
L9
586f0'04'L
4047'
L r0
S8227 56�
7.58'
L f f
S82'29'491�
22.49'
L12
SOi'1201iY
505'
Exhibit 13 -Green
PLN2022-004 Packet Pg. 228
1.0
a s s o c i a t e d
earth sciences
i n c o r p o r a t e d
January 11, 2022
Project No. 20200451H001
Fernandez & Barnes LLC
28720 SE 63rd Street
Issaquah, Washington 98027
Attention: Mr. Justin Barnes
Subject: Limited Subsurface Exploration and Infiltration Feasibility Assessment
Molnar Short Plat
540 and 550 Edmonds Way
Edmonds, Washington
Dear Mr. Barnes:
Associated Earth Sciences, Inc. (AESI) is pleased to present our findings and stormwater
infiltration feasibility assessment and recommendations for the above -referenced project. Our
general understanding of the project is based on discussions with you, our experience working
in the project vicinity, and review of conceptual project documents.
Based on the results of our subsurface explorations, we consider infiltration to be feasible for
this project based on the presence of permeable Vashon advance outwash sands at a depth of
about 10 feet beneath surficial fill and glacial till, as discussed in this letter -report.
This letter -report has been prepared for the exclusive use of Fernandez & Barnes LLC, for
specific application to this project. Within the limitations of scope and schedule, our services
have been performed in accordance with generally accepted local geotechnical engineering
practices in effect at the time our letter -report was prepared. No other warranty, express or
implied, is made. Our work was performed in general accordance with our proposal, dated
September 21, 2021.
SITE AND PROJECT DESCRIPTION
The subject site includes the existing single-family residential properties located at 540 and 550
Edmonds Way in Edmonds, Washington (Snohomish County Parcel Nos. 27032500308300 and
27032500308400), as shown on Figure 1 "Vicinity Map." The parcels are irregularly shaped and
have a total area of approximately 2.88 acres. Each parcel contains a single-family residence
with detached garage, landscaping, and associated access and utility improvements.
The project area gently slopes down toward the northwest and southeast. Site slopes are
generally inclined at 10% or less with one moderate slope approximately 8 feet tall and inclined
at 20 to 25% next to the northern detached garage. Vegetation consists of maintained grass
lawn and landscaping, and mature trees are scattered throughout both parcels. A large,
Kirkland I Tacoma I Mount Vernon
425-827-7701 I www.aesgeo.com Exhibit 14 - Green
PLN2022-004 Packet Pg. 229
1.0
Molnar Short Plat Limited Subsurface Exploration and
Edmonds, Washington Infiltration Feasibility Assessment
decorative, water feature is situated near the center of the 540 Edmonds Way parcel. It consists
of multiple waterfalls and streams traveling over and around large boulders, and empties into a
maintained decorative pond approximately 25 feet wide and 50 feet long.
We understand that the current plan includes the subdivision of the existing parcels into
sixteen lots for the purposes of constructing new single-family residences, with associated
access and utilities at the resulting lots. We understand that infiltration is being considered as a
means of stormwater disposal, and we have been requested to complete an infiltration
feasibility assessment for the subject project.
SUBSURFACE EXPLORATION
Our field studies were conducted for this project in October 2021 and included excavating two
exploration pits. The site location is shown on the "Vicinity Map," Figure 1, and approximate
locations of the explorations completed for this study are presented on the "Site and
Exploration Plan," Figure 2. The various types of sediments, as well as the depths where the
characteristics of the sediments changed, are indicated on the exploration logs presented in
Appendix A. The depths indicated on the logs where conditions changed may represent
gradational variations between sediment types. If changes occurred between sample intervals
in our exploration pits, they were interpreted. Our explorations were approximately located in
the field by measuring from known site features.
The conclusions and recommendations presented in this letter -report are based, in part, on the
explorations completed for this study. The number, locations, and depths of the explorations
were completed within site and budgetary constraints. Because of the nature of exploratory
work below ground, extrapolation of subsurface conditions between field explorations is
necessary. It should be noted that differing subsurface conditions may be present due to the
random nature of deposition and the alteration of topography by past grading and/or filling.
The nature and extent of variations between the field explorations may not become fully
evident until construction. If variations are observed at that time, it may be necessary to
re-evaluate specific recommendations in this letter -report and make appropriate changes.
Exploration Pits
One exploration pit and one Pilot Infiltration Test (PIT) were excavated with a steel -tracked
excavator under subcontract to AESI. These pits permitted direct, visual observation of
subsurface conditions. Materials encountered in the exploration pits were studied and
classified in the field by a geologist from our firm. All exploration pits were backfilled
immediately after examination and logging. Samples were then transported to our laboratory
for further visual classification and testing, as necessary.
January 11, 2022 ASSOCIATED EARTH SCIENCES, INC.
JG11d - 20200451 H001 -002
Exhibit 14 - Gree
PLN2022-004 Packet Pg. 230
1.0
Molnar Short Plat Limited Subsurface Exploration and
Edmonds, Washington Infiltration Feasibility Assessment
SUBSURFACE CONDITIONS
The feasibility of stormwater infiltration depends upon the presence of a suitable native
receptor soil of sufficient thickness, extent, permeability, and vertical separation from
groundwater. All explorations completed for this study generally encountered fill over a series
of glacially derived sediments.
Stratigraphy
Grass/Topsoil
A surficial layer of organic -rich, grass sod over dark brown topsoil was encountered at all
explorations. The encountered thickness of the topsoil was generally 8 inches. Organic topsoil is
not a suitable stormwater infiltration receptor.
Fill
Underlying the surficial topsoil horizon, our explorations encountered approximately 4 feet of
loose, gray to dark brown, fine to medium sand, with variable silt and gravel content and trace
organics and debris. These materials are interpreted as fill soils placed during previous site
development. Fill is expected to be found around existing structures, buried utilities,
foundation/wall backfill areas, and beneath landscape improvements. Due to their variable silt
content, highly variable composition, and lack of lateral continuity, fill soils are not a suitable
stormwater infiltration receptor.
Vashon Recessional Outwash
Sediments encountered beneath the fill soils in our explorations generally consisted of loose to
medium dense, bedded, orangish brown, fine to medium sand with variable silt and gravel
content. We interpret these sediments to be representative of Vashon recessional outwash.
The recessional outwash was only about 3 to 3.5 feet in thickness, and was underlain by glacial
till at a depth of about 7 to 8 feet. The Vashon recessional outwash was deposited by meltwater
streams flowing from the retreating glacial ice during the latter portion of the Vashon Stade of
the Fraser Glaciation, approximately 12,500 to 15,000 years ago. Vashon recessional outwash is
often a suitable stormwater infiltration receptor, but at this location it does not have sufficient
thickness or permeability. Therefore, it is not a suitable stormwater infiltration receptor.
Vashon Lodgement Till
Underlying the recessional outwash, our explorations encountered dense to very dense,
non -stratified, gray, silty, fine sand with some gravel, interpreted as Vashon lodgement till. The
till layer ranged from 2 to 3 feet in thickness, and was underlain by Vashon advance outwash at
a depth of about 10 feet. The Vashon lodgement till was deposited directly from basal,
debris -laden glacial ice during the Vashon Stade of the Fraser Glaciation, approximately 12,500
January 11, 2022 ASSOCIATED EARTH SCIENCES, INC.
JG11d - 20200451 H001 -002 Pa e 3
Exhibit 14 - Green
PLN2022-004 Packet Pg. 231
1.0
Molnar Short Plat Limited Subsurface Exploration and
Edmonds, Washington Infiltration Feasibility Assessment
to 15,000 years ago. The high relative density characteristic of the Vashon lodgement till is due
to its consolidation by the massive weight of the glacial ice from which it was deposited. Due to
a significant amount of fines and consolidation by the massive weight of the glacial ice from
which it was deposited resulting in a very low permeability, lodgement till is not a suitable
stormwater infiltration receptor.
Vashon Advance Outwash
Underlying the lodgement till, our explorations encountered dense, gray, fine sand, with trace
silt and trace gravel. The bedding was primarily massive with only occasional thin (%-inch-thick)
silty sand interbeds. We interpret these sediments to be representative of Vashon advance
outwash. The Vashon advance outwash was deposited by meltwater streams flowing from the
advancing glacial ice during the early portion of the Vashon Stade of the Fraser Glaciation,
approximately 12,500 to 15,000 years ago. Unsaturated Vashon advance outwash is a suitable
stormwater infiltration receptor when present in sufficient vertical and lateral extent, and
provided the recommendations contained in this letter -report are followed.
Published Geologic Mapping Review
Review of the regional geologic map titled Geologic Map of the Edmonds East and part of the
Edmonds West Quadrangles, by J.P. Minard (1983) indicates that the subject site is underlain by
Vashon advance outwash with Vashon lodgement till mapped nearby. Our interpretation of
subsurface conditions is in general agreement with the published geologic map of the area.
Published Soils Mapping Review
Review of the U.S. Department of Agriculture (USDA) Soils Conservation Service (SCS), now
referred to as Natural Resources Conservation Service (NRCS), Web Soil Survey indicates that
the subject site is underlain by Everett very gravelly sandy loam, 0 to 8 percent slopes. Everett
Series soils have a parent material of glacial outwash. Our interpretations of the soils
encountered in our explorations is in general agreement with the regional soils mapping.
Hydrology
Regional Groundwater
Based on regional groundwater mapping (R.C. Newcomb, 1952, Ground -water Resources of
Snohomish County, Washington: U.S. Geological Survey, Water -Supply Paper 1135, scale
1:62,500), we estimate the depth to deeper groundwater within the advance outwash to be on
the order of elevation 220 to 240 feet, or about 35 to 55 feet below the current ground surface.
While AESI was onsite for our field study, the property owner, Mr. Molnar, directed AESI to use
the on -site domestic water well as the water supply for the PIT. Mr. Molnar estimated the
groundwater level within the well to be approximately 35 feet below existing ground surface.
January 11, 2022 ASSOCIATED EARTH SCIENCES, INC.
JG/Id-20200451HO01-002 Pa e 4
Exhibit 14 - Green
PLN2022-004 Packet Pg. 232
1.0
Molnar Short Plat Limited Subsurface Exploration and
Edmonds, Washington Infiltration Feasibility Assessment
We did not place any instruments within the well or open the well cap to determine the
groundwater level inside. Review of the Washington State Department of Ecology Water Well
Log for Mr. Molnar's water well (DOE Well Tag ALA-149) indicates that the static water level
was 34.5 feet below the top of the well on May 23, 2005. This reported depth to water is
consistent with the regional mapping of the groundwater table within the Vashon advance
outwash underlying the site at depth.
Local Groundwater
No seepage was present at the time of digging in the exploration pits. We observed increased
moisture content at the contact between the recessional outwash sediments in both EP-1 and
IT-1 and the underlying low -permeability Vashon lodgement till. The infiltration test pit was left
open for several hours to facility infiltration testing. Very slow groundwater seepage was
observed at IT-1 at a depth of 7 feet below ground surface after being left open for
approximately 7 hours for the PIT. We interpret this very slow groundwater seepage as being
perched on top of the underlying Vashon lodgement till. In areas underlain by lodgement till,
it is common for shallow perched seepage to accumulate seasonally at the base of
more -permeable fill or recessional outwash deposits, or for groundwater to be present within
the weathered till horizon during the wetter winter months. Groundwater perched within the
weathered till sediments is known as "interflow," and is perched atop the underlying, dense,
low -permeability, unweathered till. This water may travel laterally and typically will follow the
ground surface topography.
During excavation immediately after infiltration testing at IT-1 was complete, one discontinuous
seepage on a sidewall was encountered within the Vashon advance outwash at a depth of
approximately 14 feet. We interpret this seepage to be water from our infiltration test perched
on a thin, natural, less -permeable layer within the advance outwash.
It should be noted that the depth or occurrence of groundwater seepage below the site may
vary in response to such factors as changes in season, precipitation, and on- and off -site use.
Explorations for this study were conducted in October 2021.
Laboratory Testing
AESI performed a grain -size analysis (sieve) on a representative sample of the Vashon advance
outwash sediments. This grain -size analysis test result is included in Appendix B and is
summarized below in Table 1 with soil descriptions based on ASTM International
(ASTM) D-2487 Unified Soil Classification System (USCS).
January 11, 2022 ASSOCIATED EARTH SCIENCES, INC.
J611d - 20200451 H001 -002 Pa 5
Exhibit 14 - Green
PLN2022-004 Packet Pg. 233
1.0
Molnar Short Plat Limited Subsurface Exploration and
Edmonds, Washington Infiltration Feasibility Assessm en t
Table 1
Summary of Grain -Size Analysis
Exploration
Number
Depth
(feet)
I Geologic Unit
USCS Soil Description
Fines
Content (%)
IT-1
11
Vashon Advance Outwash
SAND, trace gravel, trace silt
2.0
USCS = Unified Soil Classification System
% = percent of total weight passing the U.S. No. 200 Sieve
INFILTRATION
Infiltration Testing Procedures
Infiltration testing was conducted in order to obtain a representative infiltration rate for the
proposed project using a method generally corresponding to the procedure described for the
Small -Scale PIT in the 2017 City of Edmonds Stormwater Addendum. One low -head Small -Scale
PIT was completed in the central portion of the site near the proposed infiltration facility
location.
Water for the testing was obtained from an on -site domestic water well with an integrated
pumping system. Water for the test was then conveyed through an electronic flow meter
assembly with instantaneous flow rate and total flow volume readouts into the infiltration test
pit. Every 10 to 15 minutes, flow rates were recorded and water levels were measured with a
staff gauge marked in 0.01-foot increments that was placed in the test pit prior to testing.
Infiltration data and details of testing are included in Appendix C. Analyses of infiltration testing
data are discussed in the "Infiltration Testing Results" section of this letter -report.
AESI generally conducted infiltration testing as follows: during the initial portion of infiltration
testing, water was discharged onto the pit base through a diffuser for a "soaking period" of
6 hours to allow the receptor soils in the immediate vicinity of the pit to become saturated.
After completion of the soaking period, the water level in the pit was maintained at a constant
low head with constant inflow rates for an additional hour. After 7 hours, the inflow was
disconnected and the falling water level was monitored and recorded for at least 1 hour, or
until water level was too low to measure.
Infiltration Testing Results
One Small -Scale PIT (IT-1) was conducted on October 18, 2021 at the approximate location of
the proposed infiltration system, as shown on Figure 2, to obtain a representative infiltration
rate. Field-testing data sheets are included in Appendix C. Details regarding the infiltration test
are provided below in Table 2, "Small -Scale Pilot Infiltration Test Summary."
January 11, 2022 ASSOCIATED EARTH SCIENCES, INC.
JG/Id - 20200451 H001-002 P a
Exhibit 14 - Green
PLN2022-004 Packet Pg. 234
1.0
Molnar Short Plat Limited Subsurface Exploration and
Edmonds, Washington Infiltration Feasibility Assessment
Table 2
Small -Scale Pilot Infiltration Test Summary
Average Flow
Field
Rate during Final
Field (Unfactored)
(Unfactored)
Test
Test Area
Hour of Testing
Constant -Head
Falling -Head
Test
Depth
(square
(gallons per
Infiltration Rate
Infiltration Rate
Number
(feet)
feet)
minute)
(inches/hour)
(inches/hour)
IT-1
11
12
1A
11.1
11.7
Upon completion of the infiltration test, infiltration pit IT-1 was deepened to: 1) document the
types of soils the water infiltrated through, and 2) identify any soil layers that would restrict the
downward flow of infiltrating water. The material beneath the test surface consisted of
generally similar coarse -grained Vashon advance outwash sediments, extending beyond the
maximum explored depth of 19 feet. AESI observed increased moisture content below the
infiltration test depth, indicating that the test water infiltrated downward to at least the total
depth explored. One discontinuous seepage was observed on a sidewall at approximately
14 feet below ground surface.
Design Infiltration Rate Determination
The field -based infiltration rates presented in Table 2 are unfactored field infiltration rates and
are therefore non -conservative for design purposes. The 2017 City of Edmonds Stormwater
Addendum requires that the field -measured infiltration rate must then have various correction
factors applied to account for site variability, number of tests conducted, type of field test, and
the potential for long-term clogging due to siltation and bio-buildup. The correction factors
used in the calculation and the resulting Ksat Design rate are described below.
Ksatdesign = Ksatinitial * CFv * CFT * CFM
Ksat, design: Represents the long-term design infiltration rate.
Ksat, initial: Represents the uncorrected field -measured infiltration rate.
Site variability and number of locations tested (CFy): Based on the relatively uniform
subsurface conditions observed in our explorations in the proposed infiltration area, we
consider the uncertainty at the site to be low and a partial correction factor of 0.8 was
selected.
Uncertainty of test method (CFT): Based on the use of 1 Small -Scale PIT, a partial
correction factor of 0.5 is defined.
Dejzree of influent control to prevent siltation and bio-buildup (CFm): A partial correction
factor of 0.9 is defined.
January 11, 2022 ASSOCIATED EARTH SCIENCES, INC.
JG11d-20200451H001-001 Pa e 7
Exhibit 14 - Green
PLN2022-004 Packet Pg. 235
1.0
Molnar Short Plat Limited Subsurface Exploration and
Edmonds, Washington Infiltration Feasibility Assessment
We elected to use the constant -head infiltration rate as it was the lower of the two calculated
field infiltration rates and would provide a more conservative design infiltration rate. Therefore,
Design Infiltration Rate = 11.1 inches per hour x 0.8 x 0.5 x 0.9 = 4 inches per hour.
The correction factors and resulting design infiltration rate apply only to the proposed
infiltration facility near IT-1 where unsaturated advance outwash consistent with the tested
material is present at the base of any proposed infiltration best management practice (BMP).
General Infiltration BMP Subgrade Recommendations
From our subsurface exploration, our laboratory testing results, and our Small -Scale PIT results,
stormwater infiltration is feasible at this site. It should be noted that the Vashon advance
outwash receptor was encountered at a depth of approximately 10 feet below existing ground
surface.
The base of the infiltration BMP should be situated at least 2 feet into the Vashon advance
outwash deposits. AESI should confirm the required embedment into the infiltration receptor
horizon at the time of construction.
Due to natural variability of the subsurface conditions, the potential for field adjustments
should be anticipated based on actual conditions encountered during construction. The
infiltration subgrade will need to be protected from siltation and sand by proper temporary
erosion and sediment control (TESC) practices and management of the imported materials
stockpile. Turbid stormwater or silt must not be allowed into the infiltration system because it
will clog the receptor soil.
The BMP-specific design infiltration rate is based upon the field infiltration testing, grain -size
distribution testing, subsurface exploration, groundwater level data, and AESI's experience on
projects with similar site conditions.
The design infiltration rate given above requires that a representative of AESI is present during;
the excavation of the infiltration BMP to observe the subgrade. In addition, the infiltration
system must remain off-line during construction to avoid siltation. Stormwater runoff must not
be routed to the infiltration BMP until the site is stabilized and runoff is clear.
The recommended design infiltration rates assume that permeable advance outwash deposits
similar to that tested in IT-1 will be encountered at the subgrade of the proposed infiltration
BMP.
We recommend an overflow path be specified such that runoff above the BMP's design
capacity does not cause flooding of a building or emergency access, erosion, or downstream
sedimentation, or slope failure.
January 11, 2022 ASSOCIATED EARTH SCIENCES, INC.
lG/Id - 20200451HO01-002 P a 8
Exhibit 14 - Green
PLN2022-004 Packet Pg. 236
1.0
Molnar Short Plat Limited Subsurface Exploration and
Edmonds, Washington Infiltration Feasibility Assessment
Critical Aquifer Recharge Areas and Groundwater Protection
The Edmonds City Code (ECC 23.60.010) defines Critical Aquifer Recharge Areas as the
following:
Critical aquifer recharge areas (CARAs) are those areas with a critical recharging effect
on aquifers used for potable water as defined by WAC 365-190-030(2). CARAs have
prevailing geologic conditions associated with infiltration rates that create a high
potential for contamination of ground water resources or contribute significantly to the
replenishment of ground water. CARAs are protected as critical areas under the
Washington State Growth Management Act. However, no areas meeting criteria for
CARAs exist in the vicinity of the city of Edmonds. Thus, additional specific provisions for
protection of this critical area type are not provided within this title.
The ECC specifies that no CARAs are present within the vicinity of the City of Edmonds.
Review of the Washington State Department of Health Source Water Assessment Program
(SWAP) Online Mapping Application indicates that the Olympic View Water & Sewer District
maintains a surface water source at Deer Creek in Woodway, approximately 0.5 miles
southwest of the site. The 1-, 5-, and 10-year time of travel zones for this source extend
southeast from Deer Creek and are more than 1,000 feet away from the site.
Recommendations for Future Infiltration -Related Study
Additional study of the fate of the infiltrated water such as depth to seasonal high
groundwater, groundwater flow direction, and a mounding analysis may be necessary
depending on the areas and volumes of stormwater to be infiltrated and any applicable City of
Edmonds requirements.
PLAN REVIEW AND CONSTRUCTION MONITORING
We are available to provide additional geotechnical/hydrogeologic consultation as the project
design develops and possibly changes from that upon which this letter -report is based.
We recommend that AESI perform a review of the plans prior to final design completion. In this
way, our infiltration recommendations may be properly interpreted and implemented in the
design.
We are also available to provide geotechnical engineering and hydrogeologic monitoring
services during construction of the infiltration BMP. The infiltration performance depends on
verification of anticipated subsurface conditions, proper site preparation, backfill quality, and
construction procedures. In addition, engineering decisions may have to be made in the field in
the event that variations in subsurface conditions become apparent. Construction monitoring
services are not part of the current scope of work. If these services are desired, please let us
know and we will prepare a cost proposal.
January 11, 2022 ASSOCIATED EARTH SCIENCES, INC.
JG11d - 20200451 H001 -002 Pa e 9
Exhibit 14 - Green
PLN2022-004 Packet Pg. 237
1.0
Molnar Short Plat Limited Subsurface Exploration and
Edmonds, Washington Infiltration Feasibility Assessment
CLOSURE
We appreciate the opportunity to be of service to you on this project. Should you have any
questions regarding this letter -report or other geotechnical aspects of the project, please call us
at your earliest convenience.
Sincerely,
ASSOCIATED EARTH SCIENCES, INC.
Kirkland, Washington
Joshua S. P. Greer, G.I.T.
Senior Staff Geologist
Jeffrey P. Laub, P.E., L.G., L.E.G.
Associate Engineer/Geologist
Attachments: Figure 1:
Figure 2:
Appendix A:
Appendix B:
Appendix C:
Digitally signed by
Kurt D. Kurt D. Merriman, P.E.
MevJP�i�mN
bD
20220113
Kurt D. Merriman, P.E.
Senior Principal Geotechnical Engineer
Vicinity Map
Site and Exploration Plan
Exploration Logs
Laboratory Test Results
Infiltration Test Data
January 11, 2022
JG11d - 20200451HO01-002
ASSOCIATED EARTH SCIENCES, INC.
Page 10
Exhibit 14 - Green
PLN2022-004 Packet Pg. 238
1.0
Lol. NIF
/. •� . • C
2
. 4.
U)
E
w ED ONO
• ♦ u-
O
� � `;•,. f • _ try w s;� �
Ir . >
• SITE . j I •O :D.
13
a
�-7 C
Al E
ot; ' • ✓�: Gen ,1'^• - � � �• �' lC
O ( - 99 G>
Lu
O'ti'O Y SNOHOMISH CcUN I Y
scyQ — -- 1---- - - — — ---- — IN u0misil tt. c
CL
Y KING GQUNTY --- _-
0
T.
i-, a s S O C i a t e d
earth s c 1 9 n c 9 s X
I n c o r p o r a t a Cl w
a 2Vu
VICINITY MAP E
s
FEET V
I �
r
DATA SOURCES I REFERENCES. MOLNAR SHORT PLAT Q
USGS 7.5' SERIES TOPOGRAPHIC ►/APS, ESRULCUBEDINRTIONkL NOTE BLACK AND WHIT£
GEOGRAPHIERIEST POGR REPRODUC71ONOFTHIS COLOR EDMONDS, WASHINGTON
ORIGINAL MAY RE4M1)CF ITS
SNOHOMISH CO: STREETS, CITY LIMITS, PARCELS. 3121 EFFECT► INESSANDLEADTO [PROJ NO. DATE i IGVRF_
LOCATIONS AND DISTANCES SHOWN ARE APPROXIMATE INCORRECT 6NTERPR£TATION 20200451 EO01 10121 1
PLN2022-004 Packet Pg. 239
1.0
LEGEND
SITE
ExPLORATION PIT
MvRLTRATION TEST
CITY BOUNDARY
PARCEL
CONTOUR 1 D FT
CONTOUR 2 FT
0XIA SCCRCES P RETEREAICES
WAST96 t" PCOTAL: NCDM IN MAI T $09W 2010
ACGU RED M10- - SEPT Mi. GRD CELL SME IS Y
O.IMTOURS FROM LICAR
SNCIWYSN Wr STREETS. PARCELS -R•
9198 CO EAGi FAEM TECNMCLODIEa dL AER V12019
LOCATIM 01D C-TANCES SHOM ARE AIFT43tTT0.TE 'L^
V
L
ft I N O
FEET
0
V
ERFGTIxFFMrw7lFAC T4,�jA,VAECTINTEMTT�rC 4v 4
r
:a(
t e d
earth science s �
Incorporated
X
EXISTING SITE AND W
EXPLORATION PLAN
MOLNAIR SHORT PtA- d
EDMONDS WASHINGTON t
PRW NO D4TE %lu'u FE. ()
20200451H001 M21 tC
r-r
Q
Exhibit 14 - Green
PLN2022-004 Packet Pg. 240
1.0
APPENDIX A
Exploration Logs
IF
0
y
.>
CO
m
E
L
0
um
_
s
a
m
E
a
0
4)
0
c
�a
d
d
d
C
C
a
�a
E
L
a
L
a
�o
3
a�
,L^
V.+
L
Q.
0
L
(i
0
,4)
V
Exhibit 14 - Green
PLN2022-004 Packet Pg. 241
0
0
° 0
Well -graded gravel and
Terms Describing Relative Density and Consistency
oa0
GW
gravel with sand, little to
Density SPT(Z)blows/foot
N
o
no fines
Coarse Very Loose 0 to 4
CD
>
�
m >
o a)
v in
geO0°0°
to
W
0000
o°0°0
GP
Poorly-graded gravel
Loose 4to10
Grained Soils
Medium Dense 10 to 30 Test Symbols
y
U)
o 6
00000
and gravel with sand,
Dense 30 to 50
0
0
°000°
00000
little to no fines
Very Dense >50 G =Grain Size
N
e Z
2000°
(2) M = Moisture Content
° 0
0 0
Silty gravel and silty
Z
� o
Consistency SPT blows/foot A = Atterberg Limits
o
� a
°
°
GM
gravel with sand
Very Soft 0 to 2 C = Chemical
Fine
`
m
, 0
, 0
Soft 2 to 4 DID = Dry Density
Grained Soils
E
0
LL
Medium Stiff 4 to 8 K =Permeability
Stiff 8 to 15
N
Clayey gravel and
Very Stiff 15 to 30
N�
GC
clayey gravel with sand
Hard >30
o
m
Component Definitions
L
o
Well -graded sand and
L
Descri tive Term Size Ranee and Sieve Number
SW
sand with gravel, little
Boulders Larger than 12"
o
;
:
to no fines
Cobbles 3" to 12"
2
c
..........
NlL
` a1
a
Gravel 3" to No. 4 (4.75 mm)
Poorly -graded raded sand
y-g
0
cn
o i
2 T
LO
SP
and sand with gravel,
Coarse Gravel 3" to 3/4"
Fine Gravel 3/4" to No. 4 (4.75 mm)
a)
o v
little to no fines
Sand No. 4 (4.75 mm) to No. 200 (0.075 mm)
o
0 Z
Coarse Sand No. 4 (4.75 mm) to No. 10 (2.00 mm)
Ch
�y
SM
Silty sand and
Medium Sand No. 10 (2.00 mm) to No. 40 (0.425 mm)
silty sand with
Fine Sand No. 40 (0.425 mm) to No. 200 (0.075 mm)
o a
C
.
gravel
Silt and Clay Smaller than No. 200 (0.075 mm)
Lo
N
SC
Clayey sand and
t3) Estimated Percentage
Moisture Content
CU
NI
clayey sand with gravel
Component Percentage by Weight
Dry Absence of moisture,
Trace <5
dusty, dry to the touch
Slightly Moist - Perceptible
Silt, sandy silt, gravelly silt,
0
ML
silt with sand or gravel
Some 5 to <12
moisture
>�
Moist - Damp but no visible
y
Modifier 12 to <30
water
Clay of low to medium
0
oN
N
(silly, sandy, gravelly)
Very Moist - Water visible but
U m
° J
CL
Plasticity; silty, sandy, or
not free draining
Z
M `
gravelly clay, lean Clay
Very modifier 30 to <50
Wet - Visible free water, usually
Nw
J
(silty, sandy, gravelly)
from below water table
MU)
==
Organic clay or silt of low
Symbols
a1
or
=
OL
plasticity
Blows/6" or
0
_—
Sampler portion of 6"
Cement grout
°
—
Type /
I
surface seal
Elastic silt, clayey silt, silt
2.0" OD Sampler Type
o
MH
with micaceous or
Split -Spoon Description
(4i
Bentonite
seal
L
o
diatomaceous fine sand or
"
Sampler 3.0" OD Split -Spoon Sampler
:.: Filter pack with
o
Ln o
silt
(SPT) 3.25" OD Split -Spoon Ring Sampler (4)
:. blank casing
::
Clay of high plasticity,
U)
v o
:
CH
sandy or gravelly Clay, fat
Bulk sample 3.0" OD Thin -Wall Tube Sampler
section
Screened casing
N .E
..
clay with sand or gravel
(including Shelby tube)
: or Hydrotip
with filter pack
(7
—
Grab Sample
: End cap
i
Cr
Organic clay or silt of
O Portion not recoveredLL
-'
OH
medium to high
(1) (4)
Percentage by dry weight Depth of ground water
plasticity
(2) (SPT) Standard Penetration Test
(ASTM D-1586) T ATD = At time of drilling
(3) Q Static water level (date)
In General Accordance with
Peat, muck and other
g,
_
c
M 0n
PT
highly organic soils
Standard Practice for Description (5) Combined USCS symbols used for
O
and Identification of Soils (ASTM D-2488) fines between 5% and 12%
Classifications of soils in this report are based on visual field and/or laboratory observations, which include density/consistency, moisture condition, grain size, and
plasticity estimates and should not be construed to imply field or laboratory testing unless presented herein. Visual -manual and/or laboratory classification
methods of ASTM D-2487 and D-2488 were used as an identification guide for the Unified Soil Classification System.
a s s o c i a t e d Q
e a r t h s c i e n c e s EXPLORATION LOG KEY FIGURE Al
i r
Exhibit 14 - Green
PLN2022-004 Packet Pg. 242
EXPLORATION PIT NO. EP-1
w
This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
read together with that report for complete interpretation. This summary applies only to the location of this trench at the
m
time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are
❑
a simplification of actual conditions encountered.
DESCRIPTION Elevation (ft). 276
Topsoil - 3 inches
1
Fill
Loose, moist, gray to dark brown, fine to medium SAND, some silt, trace gravel; frequent fine
2
organics (SP-SM).
3
4
5
Vashon Recessional Outwash
Loose to medium dense, very moist at top to moist, orangish brown, silty, fine to coarse SAND,
6
some gravel; bedded (SM/SP-SM).
7
8
Vashon Lodgement Till
9
Dense, moist, gray, silty, fine SAND, some gravel; unsorted; excavates in clasts (SM).
10
Vashon Advance Outwash
11
Dense, moist, gray, fine SAND, trace silt, trace gravel; massive (SP).
12
13
Two very thin silty beds (0.25 inches thick).
14
15
16
17
Becomes some silt (SP-SM).
18
Bottom of exploration pit at depth 17 feet
No seepage. Slight caving 3 to 6 feet.
19
20
21
O
m
C9
r
X
22 W
y LL
E r
m C
z Molnar Short Plat E
Edmonds, WA
a
a s s o c i a t e c Project No. 20200451 H001
N Logged by: JG
N earth sciences
i Approved by: JHS i n c o r p o r a t e c 10/18/21
Y Exhibit 14 - Green
Packet Pg. 243
EXPLORATION PIT NO. IT-1
L
This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
read together with that report for comrlete interpretation. This summary applies only to the location of this trench at the
o
time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are
a simplification of actual conditions encountered.
DESCRIPTION Elevation (ft): 276
Topsoil - 4 inches
1
Fill
Loose, moist, gray, fine SAND, trace silt, trace gravel, trace organics (SP).
2
Layer 1 foot thick of buried topsoil (SM).
Loose, moist, dark brown, silty, fine SAND, trace gravel, trace organics and debris; metal irrigation
3
running east to west; drain pipe running west to south destroyed (SM).
4
Vashon Recessional Outwash
Loose to medium dense, moist, orangish brown, silty, fine to medium SAND, some gravel; bedded
5
(SM).
6
7
Becomes very moist; slight seepage after 4 hours open.
Vashon Lodgement Till
8
Dense to very dense, moist, gray, silty, fine SAND, some gray; unsorted diamict; excavates in
clasts; difficult excavation (SM).
9
10
Vashon Advance Outwash
11
Dense, moist gray, fine SAND, trace silt; massive (SP).
12
Becomes very moist from infiltration test water; continues to bottom.
13
14
15
16
17
18
19
20
Bottom of exploration pit at depth 19 feet
Slight seepage 14 to 14.5 feet at northeast corner. No caving. Infiltration test performed at 11 feet.
21
o u
N
22 W
N
E +j
W
z Molnar Short Plat E
o
Edmonds, WA
o w
a s s o c i a t e c Q
Logged by: JG Project No. 20200451 H001
earth sciences
Approved by: JHS i n c o r p o r a t e s 10/18/21
a
Y Exhibit 14-;Green
Packet Pg. 244
1.0
APPENDIX B
Laboratory Test Results
c
0
N
CO
m
E
L
0
U-
m
0
s
a
.r
C
0
E
a
0
m
a�
0
r
c
m
a�
d
C
C
a
C
E
L
a
L
(L
3
C
m
m
/L^
V
0
Q
a)
L
V
r
0
,0
V
r
r
t
K
LU
C
0
E
t
V
r
a�
Q
Exhibit 14 - Green
PLN2022-004 Packet Pg. 245
1.0
0Y
w
Z
I-L
I-
Z
w
U
w
0-
100
90
80
70
60
50
40
30
20
10
0
Particle Size Distribution Report
aaa
ZZ
c c c c 5 00 a N can a m v N
I
I
I
1
1
I
I
I
I
I 1
I I
1
I
I
I
1
I
I I
I I
1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I I
I I
I I
I I
I
I
I
I
I
I
1
I
I
1
I
I
I
I
I
I
I
I
I
I
I
I
I I
I I
I I
I I
I
I
I
1
I
1
1
I
1
1
I
1
I
I
I
I
I
I
I
I
I I
I I
I 1
I I
I
I
1
I
I
I
I
1
I
1
I
I
I
I
I
I
I I
I I
I I
I I
I
1
I
1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I I
I I
I I
I 1
I
I
I
I
1
I
I
1
I
I
I
I
I I
I I
I I
I 1
I I
I I
I I
I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I I
I I
I
I
1
I
I
I
I I
I I
I I
I I
I
I
I
I
I
I
1
I
I
I
I
1
I
I
I
I
I
I
I
I I
I I
I I
I I
I
I
I
I
I
I
I
I
I
I
1
I
I I
I I
I 1
I 1
I I
I I
I I
I I
I
1
I
1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I I
I
I i
1 I
I
I
I
I
I
I
I
I
I
I
I
I
I I
I I
I
I I
I I
I I
I I
I I
I
I
I
I
I
I
I
I
I
1
I
I
I
I
I I
I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I 1
I I
I I
I
I
I
I
1
I
I
I
I
I
I
I
I
I
I
I
I
I
I I
I 1
I I
I
I
1
I
I
I
I
1
I
I
I
I
I
1 I
1 1
I I
I I
I I
I I
I I
I I
1
1
I
I
I
I
I
I
I
I
I
I
I I
I 1
1
I
1
I
I
I
I
I I
I I
1
1
I
1
GRAIN SIZE - mm.
% +3„ % Gravel % Sand % Fines
Coarse Fine Coarse Medium Fine Silt Clay
0.0 1.7 1.1 0.4 17.2 77.6 2.0 --
TEST RESULTS
Opening
Percent
Spec.*
Pass?
Size
Finer
(Percent)
(X=Fail)
V
100.0
3/4"
98.3
5/8"
98.0
1/2"
97.8
3/8"
97.6
#4
97.2
#8
96.9
#10
96.8
#20
95.0
#40
79.6
#60
23.9
#100
5.1
#200
2.0
#270
1.4
Material Description
SAND, trace gravel, trace silt
Atterberg Limits (ASTM D 4318)
PL= NP LL- NV PI=
Classification
USCS (D 2487)= SP AASHTO (M 145)= A-3
Coefficients
D90= 0.6326 D85= 0.5123 D60= 0.3497
D50= 0.3208 D30= 0.2675 D15= 0.2191
1310= 0.1945 Cu= 1.80 Cc= 1.05
Remarks
Date Received: 10/22/2021 Date Tested: 10/28/2021
Tested By: CI
Checked By: JG/JPL
Title:
(no specification provided)
Location: Onsite - Advance Outwash
Sample Number: IT-1 Depth: 11'
a S S o C i a t e d Client: Fernandez and Barnes LLC
e a r t h 5 c i e n C e S Project: Molnar Short Plat
i n c o r p o r a t e d
Prniect Nn- 2(12(1045I ROM
1=
0
a
m
t
v
d
0
m
C9
r
t
Date Sampled: 10/18/2021 t j
c
d
t
c.�
Fissure f°
r
- - Q
Exhibit 14 - Green
PLN2022-004 Packet Pg. 246
1.0
APPENDIX C
Infiltration Test Data
Exhibit 14 - Green
PLN2022-004 Packet Pg. 247
1.0
Project Name:
Molnar Short Plat
Water Source:
Well
Project Number:
20200451H001
Meter:
FM-10
Date:
10/18/2021
Pit Area (sq. feet):
12
Weather:
P. Cloudy, 50's
Ring Area (sq. feet):
N/A
Test No.:
I IT-1
Test Depth (feet):
11
Performed By:
1G
Receptor Soils:
jAdvance Outwash
Time
(24-hr)
Flow Rate (gpm)
Stage (feet)
Totalizer (gallons)
Comments
9:20
0
0
0
Flow on
9:24
3.30
0.24
0.0
FM not reading flow, switch FM
9:30
3.31
0.40
21.1
9:40
3.34
0.58
54.2
10:00
1.97
0.64
94.0
10:15
1.60
0.67
118.3
10:30
1.60
0.68
142.5
10:45
1.61
0.70
167.0
11:00
1.45
0.70
188.4
11:15
1.43
0.70
210.1
11:30
1.42
0.70
231.3
11:45
1.40
0.70
252.1
12:00
1.40
0.70
273.0
12:15
1.38
0.70
293.9
12:30
1.38
0.70
314.7
12:45
1.38
0.70
335.7
13:00
1.38
0.70
356.5
13:15
1.38
0.70
377.4
13:30
1.43
0.70
398.4
13:45
1.38
0.71
419.3
Slight caving caused stage increase
14:00
1.39
0.71
440.0
14:15
1.36
0.71
460.8
14:30
1.36
0.71
481.4
14:45
1.37
0.71
501.9
15:00
1.37
0.71
522.5
15:15
1.37
0.71
543.2
15:20
1.37
0.71
550.0
15:30
1.38
0.71
563.8
15:40
1.37
0.71
577.7
15:50
1.37
0.71
591.3
16:00
1.37
0.71
605.1
16:10
1.37
0.71
618.9
16:20
1.37
0.71
632.7
Flow off
16:22
0
0.68
632.7
16:24
0
0.66
632.7
16:26
0
0.62
632.7
16:28
0
0.58
632.7
16:30
0
0.55
632.7
16:32
0
0.52
632.7
16:34
0
0.50
632.7
16:36
0
0.48
632.7
16:38
0
0.45
632.7
16:40
0
0.42
632.7
16:42
0
0.39
632.7
16:44
0
0.36
632.7
16:46
0
0.32
632.7
16:48
0
0.28
632.7
16:49
0
0.24
632.7
Bottom of exposed staff gauge
Average Infiltration Rate (in/hr) during last hour of inflow: 11.1
Average Infiltration Rate (in/hr) during falling head: 13.3
Exhibit 14 - Green
PLN2022-004 Packet Pg. 248
Page 1 of 42
Arborist Report - Cornerstone — Greenwalk Park
To: Cornerstone Architectural Group
Job Site: 540 EDMONDS WAY, 550 EDMONDS WAY
Parcel: 27032500308300 (540), 27032500308400 (550)
Subject: Arborist Report
Date: 1/23/2022,5/3/2023
TREE
FROG
LLC
CONSULTING ARBORIST _
From: Andy Crossett, ISA Certified Arborist #PN-7375A, Qualified Tree Risk Assessor, WSNLA
Certified Professional Horticulturist #2537
Assignment
On Monday, August 2"d, 2021, Steve Barnes, from Cornerstone Architectural Group, contacted me with a request
for a tree inventory report for an Edmond's property. On Tuesday, January 11", 1 walked the site to inspect the
trees and document my findings.
5/3/2023 — Updated following corrections from the City of Edmonds Urban Forester.
A site map can be found below under sections 3 and 4.
Where applicable, I have categorized risk based on the methodologies presented in the International Society of
Arboriculture's Tree Risk Assessment (Best Management Practices).
My responsibilities were to provide the following:
A tree plan that includes a tree inventory, site map, replanting information (if necessary), tree protection measures
for on -site and off -site trees (where CRZ extends on -site) (if requested), and recommendations that will meet the
minimum city of Edmond's tree code requirements.
Site Description
27032500308300 —This 2.33-acre lot is located south-east of Edmonds Way. The lot is heavily forested with a mix
of Puget sound lowland evergreen trees as well as a variety of non-native ornamental small trees, shrubs, and
ground cover plants. The dominant tree on this property is the western redcedar. The majority of trees are in good
condition, and I saw no signs of serious pests or diseases. According to the City of Edmonds GIS data, there are no
steep slopes or wetlands on this site.
27032500308400 —This .55-acre lot is also located south-east of Edmonds way. It shares its north-west property
line with the parcel above. This lot is also heavily forested, but with a mix of native Puget sound lowland evergreen
TREE FROG LLC
https://www.treefrogI lc.com/
PO Box 307, Duvall, WA 98019
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 249
1.p
Page 2 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
and deciduous trees. Much like the above property, the trees are in good condition with no signs of pests or
diseases. The topography of the site is flat, and there are no steep slopes or wetlands, per GIS data.
1. Summary
Significant trees
121
Non -viable = dead or "poor" condition, subject
Existing Trees
-1
to review. Location is not a viability factor.
Non -viable trees
on Site
TOTAL # VIABLE TREES
120
Tree #421.
Retained viable trees
0
Trees # N/A nor critical areas on site
within critical areas
Retained viable trees
Proposed Tree
outside critical areas
36
Trees # See attached tree inventory
Retention
(in "developable site")
TOTAL # RETAINED
Viable = assessed in at least Fair condition,
VIABLE
36
subject to review.
# REMOVED
TOTAL
VIABLE TREES
REPLACEMENT
REQ'D
DBH
RATIO
NEW
QTY.
RANGE
TREES
Removed viable trees
6-10"
21
x1 = 21
Proposed Tree
Trees # See attached
84
Removals
tree inventory
10- .1
5
x2 = 10
82
1
.1
17
x3 = 51
Replacements
2
>24"
41
Appraised Value
Total*
Removed non -viable
1
Note: mitigation (planting/fees in lieu) is not
trees
required for removed, non -viable trees.
TOTAL #REMOVALS
=
30%, not including
120 x
Does applicant meet/exceed minimum 30%
critical areas
36
tree retention threshold?
Tree Retention
Thresholds
*50% site -wide, to
120 x
Does applicant meet/exceed minimum 50%
waive all fees in lieu
.5
tree retention threshold?
60
Retained on -site and off -site trees (with driplines extending on -site) will require protection measures to ensure
they are not significantly impacted by construction. Edmonds tree protection measures, fencing details, and ISA
recommended tree protection guidelines can be found below under sections 7 — 9.
TREE FROG LLC
https://www.treefrogI lc.com/
PO Box 307, Duvall, WA 98019
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 250
1.p
Page 3 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Tree Replacement Requirements
23.10.080 Tree replacement.
A. Replacement Required. Tree replacement is required for tree cutting permits
required by this chapter and/or for tree removal associated with the development types
identified in ECDC 23.10.060(A). Each significant tree to be removed shall be replaced as
follows:
1. For each significant tree between six inches and 10 inches DBH removed, one
replacement tree is required.
2. For each significant tree between 10.1 inches and 14 inches in DBH removed,
two replacement trees are required.
3. For each significant tree greater than 14 inches and less the 24 inches in DBH
removed, three replacement trees are required.
TREE FROG LLC w
https://www.treefrogI Ic.co m/
Q
PO Box 307, Duvall, WA 98019
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 251
1.p
Page 4 of 42
Arborist Report - Cornerstone — Greenwalk Park
2. Tree Inventory
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Western Hemlock
Evergreen
401
27032500308300
18
15'
8'
Good
Low
Yes
Remove C
Tsugo heterophylla
conifer
Recommendation
402
27032500308300
Western Redcedar
Evergreen
14
15'
8'
Good
Low
Yes
Remove B
Thujo plicato
conifer
Recommendation
Western Redcedar
Evergreen
403
27032500308300
18
15'
8'
Good
Low
Yes
Remove C
Thujo plicato
conifer
Recommendation
Red Alder
404
27032500308300
Deciduous
14
15'
8'
Good
Low
Yes
Remove B
Alnus rubra
Recommendation
Western Redcedar
Evergreen
405
27032500308300
32
30'
15'
Good
Low
Yes
Remove D
Thujo plicato
conifer
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t1
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 252
1.p
Page 5 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Western Redcedar
Evergreen
406
27032500308300
20
30'
15'
Good
Low
Yes
Remove C
Thuja plicata
conifer
Recommendation
407
27032500308300
Western Redcedar
Evergreen
34
35'
18'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
Western Redcedar
Evergreen
408
27032500308300
24
20'
10'
Good
Low
Yes
Remove C
Thuja plicata
conifer
Recommendation
Red Alder
409
ROW
Deciduous
9
15'
8'
Good
Low
Yes
Retain
ROW tree.
Alnus rubra
Recommendation
Red Alder
410
ROW
Deciduous
12
20'
10,
Good
Low
Yes
Retain
ROW tree.
Alnus rubra
Recommendation
Red Alder
411
ROW
Deciduous
8
15'
8'
Good
Low
Yes
Retain
ROW tree.
Alnus rubra
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t1
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 253
1.p
Page 6 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Western Redcedar
Evergreen
412
27032500308300
58
40'
20'
Good
Low
Yes
Retain
Thuja plicata
conifer
Recommendation
413
27032500308300
Western Redcedar
Evergreen
34
30'
15'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
Western Redcedar
Evergreen
414
27032500308300
24
20'
10'
Good
Low
Yes
Remove C
Thuja plicata
conifer
Recommendation
415
27032500308300
Western Redcedar
Evergreen
42
40'
20'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
416
27032500308300
Western Redcedar
Evergreen
24
30'
15'
Good
Low
Yes
Remove C
Thuja plicata
conifer
Recommendation
Western Redcedar
Evergreen
417
27032500308300
40
20'
10'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t1
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 254
1.p
Page 7 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Western Redcedar
Evergreen
418
27032500308300
36
30'
15'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
419
27032500308300
Western Redcedar
Evergreen
28
30'
15'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
Western Redcedar
Evergreen
420
27032500308300
42
30'
15'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
Multi-trunked tree. Heavily tipped and topped. Added
421
27032500308300
English Laurel
Broadleaf
18
20'
10,
Poor
Low
No
Remove
5/3/2023. WA State and/or Snohomish County Noxious
Prunus laurocerasus
Evergreen
Weed.
Recommendation
Amur Maple
422
27032500308300
Deciduous
8
15'
8'
Good
Low
Yes
Remove A
Acer japonicum
Recommendation
Blue Spruce
Evergreen
423
27032500308300
6
10,
5'
Good
Low
Yes
Remove A
Picea pungens
conifer
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t1
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 255
1.p
Page 8 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Amur Maple
424
27032500308300
Deciduous
6
20'
10,
Good
Low
Yes
Remove A
Acer japonicum
Recommendation
425
27032500308300
Deciduous
10
15'
8'
Good
Low
Yes
Retain
Recommendation
Grand fir
Evergreen
426
27032500308300
44
30'
15'
Good
Low
Yes
Retain
Abies grandis
conifer
Recommendation
427
27032500308300
Western Redcedar
Evergreen
40
30'
15'
Good
Low
Yes
Retain
Thujo plicato
conifer
Recommendation
428
27032500308300
Western Redcedar
Evergreen
20
30'
15'
Good
Low
Yes
Remove C
Thujo plicato
conifer
Recommendation
Western Redcedar
Evergreen
429
27032500308300
18
30'
15'
Good
Low
Yes
Remove C
Codominant tree.
Thujo plicato
conifer
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t1
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 256
1.p
Page 9 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Douglas fir
430
27032500308300
Pseudotsugo
Evergreen
12
15'
8'
Good
Low
Yes
Retain
conifer
menziesii
Recommendation
Douglas fir
431
27032500308300
Pseudotsugo
Evergreen
12
15'
8'
Good
Low
Yes
Retain
conifer
menziesii
Recommendation
Douglas fir
432
27032500308300
Pseudotsugo
Evergreen
12
15'
8'
Good
Low
Yes
Retain
conifer
menziesii
Recommendation
433
27032500308300
Western Redcedar
Evergreen
26
30'
15'
Good
Low
Yes
Retain
Thuja plicato
conifer
Recommendation
434
27032500308300
Western Redcedar
Evergreen
30
30'
15'
Good
Low
Yes
Remove D
Thujo plicato
conifer
Recommendation
Western Redcedar
Evergreen
435
27032500308300
36
40'
20'
Good
Low
Yes
Remove D
Thujo plicato
conifer
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t1
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 257
1.p
Page 10 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Western Redcedar
Evergreen
436
27032500308300
30
30
15'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
437
27032500308300
Grand fir
Evergreen
8
15'
8'
Good
Low
Yes
Remove A
Abies grandis
conifer
Recommendation
Giant Redwood
438
27032500308300
Sequoia
Evergreen
26
20'
10,
Good
Low
Yes
Remove D
conifer
sempervirens
Recommendation
439
27032500308300
Western Redcedar
Evergreen
26
30'
15'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
440
27032500308300
Western Redcedar
Evergreen
20
20'
10'
Good
Low
Yes
Remove C
Thuja plicata
conifer
Recommendation
Silver Birch
441
27032500308300
Deciduous
12
20'
10,
Good
Low
Yes
Retain
Very large burl on the trunk.
Betula pendula
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t1
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 258
1.p
Page 11 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Amur Maple
442
27032500308300
Deciduous
12
20'
10,
Good
Low
Yes
Remove B
Acer japonicum
Recommendation
443
27032500308300
Western Redcedar
Evergreen
42
40'
20'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
Western Redcedar
Evergreen
444
27032500308300
26
30
15'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
Amur Maple
445
27032500308300
Deciduous
6
20'
10,
Good
Low
Yes
Retain
Acer japonicum
Recommendation
446
27032500308300
Western Redcedar
Evergreen
38
40'
20'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
Western Redcedar
Evergreen
447
27032500308300
38
40'
20'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t1
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 259
1.p
Page 12 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Western Redcedar
Evergreen
448
27032500308300
40
30'
15'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
449
27032500308300
Western Redcedar
Evergreen
46
30'
15'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
Western Redcedar
Evergreen
450
27032500308300
32
30'
15'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
451
27032500308300
Western Redcedar
Evergreen
30
30'
15'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
452
27032500308300
Western Redcedar
Evergreen
34
30'
15'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
Western Redcedar
Evergreen
453
27032500308300
34
30'
15'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t1
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 260
1.p
Page 13 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Amur Maple
454
27032500308300
Deciduous
6
30'
15'
Good
Low
Yes
Remove A
Acer japonicum
Recommendation
Silver Birch
455
27032500308300
Deciduous
23
30'
15'
Good
Low
Yes
Remove C
Multi-trunked tree.
Betula pendula
Recommendation
Serbian Spruce
Evergreen
456
27032500308300
6
10'
S'
Good
Low
Yes
Retain
Picea omorika
conifer
Recommendation
457
27032500308300
Serbian Spruce
Evergreen
6
10'
S'
Good
Low
Yes
Retain
Picea omorika
conifer
Recommendation
458
27032500308300
Serbian Spruce
Evergreen
6
10'
S'
Good
Low
Yes
Retain
Picea omorika
conifer
Recommendation
Serbian Spruce
Evergreen
459
27032500308300
6
10'
S'
Good
Low
Yes
Retain
Picea omorika
conifer
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t1
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 261
1.p
Page 14 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Western Redcedar
Evergreen
460
27032500308300
66
50'
25'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
461
27032500308300
Western Redcedar
Evergreen
62
50'
25'
Good
Low
Yes
Remove D
Multi-trunked tree.
Thuja plicata
conifer
Recommendation
Mountain Ash
Added 5/3/2023. WA State and/or Snohomish County
462
27032500308300
Deciduous
14
30'
15'
Good
Low
Yes
Retain
Sorbus aucuparia
Noxious Weed.
Recommendation
27032500302900
English Laurel
Broadleaf
Off -site tree. Added 5/3/2023. WA State and/or Snohomish
463
10
20'
10,
Fair
Low
Yes
Retain
(off -site)
Prunus laurocerasus
evergreen
County Noxious Weed.
Recommendation
27032500302900
English Laurel
Broadleaf
Off -site tree. Added 5/3/2023. WA State and/or Snohomish
464
10
20'
10,
Fair
Low
Yes
Retain
(off -site)
Prunus laurocerasus
evergreen
County Noxious Weed.
Recommendation
27032500302900
English Laurel
Broadleaf
Off -site tree. Added 5/3/2023. WA State and/or Snohomish
465
10
20'
10,
Fair
Low
Yes
Retain
(off -site)
Prunus laurocerasus
evergreen
County Noxious Weed.
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t!
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 262
1.p
Page 15 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
English Laurel
Broadleaf
466
27032500308300
10
20'
10,
Fair
Low
Yes
Retain
Prunus laurocerasus
evergreen
Recommendation
English Laurel
Broadleaf
Multi-trunked tree. Added 5/3/2023. WA State and/or
467
27032500308300
21
20'
10,
Fair
Low
Yes
Retain
Prunus laurocerasus
evergreen
Snohomish County Noxious Weed.
Recommendation
European Plum
468
27032500308300
Deciduous
8
20'
10,
Good
Low
Yes
Remove A
Prunus domestica
Recommendation
Malussp.
469
27032500308300
Deciduous
8
20'
10,
Good
Low
Yes
Remove
Apple
Recommendation
MApplep.
470
27032500308300
Deciduous
8
20'
10,
Good
Low
Yes
Remove A
Recommendation
471
27032500308300
Ficus sp.
Evergreen
10
20'
10'
Good
Low
Yes
Remove A
Fig Tree
conifer
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t1
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 263
1.p
Page 16 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
MApplep.
472
27032500308300
Deciduous
8
20'
10,
Good
Low
Yes
Remove A
Recommendation
Malussp.
473
27032500308300
Deciduous
8
20'
10,
Good
Low
Yes
Remove
Apple
Recommendation
474
27032500308300
Pyrus sp.
Deciduous
8
20'
10,
Good
Low
Yes
Remove A
Pear
Recommendation
Malussp.
475
27032500308300
Deciduous
8
20'
10,
Good
Low
Yes
Remove
Apple
Recommendation
MApplep'
476
27032500308300
Deciduous
8
20'
10,
Good
Low
Yes
Remove A
Recommendation
Western Redcedar
Evergreen
477
27032500308300
50
45'
23'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t1
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 264
1.p
Page 17 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Western Redcedar
Evergreen
478
27032500308300
42
45'
23'
Good
Low
Yes
Retain
Thuja plicata
conifer
Recommendation
00384700500100
Western Redcedar
Evergreen
479
12
20'
10'
Good
Low
Yes
Retain
Off -site tree.
(off -site)
Thuja plicata
conifer
Recommendation
00384700500100
Western Redcedar
Evergreen
480
16
30'
15'
Good
Low
Yes
Retain
Off -site tree.
(off -site)
Thuja plicata
conifer
Recommendation
481
00384700500100
Western Redcedar
Evergreen
28
30'
15'
Good
Low
Yes
Retain
Off -site tree.
(off -site)
Thuja plicata
conifer
Recommendation
00384700500100
Western Redcedar
Evergreen
482
10
20'
10'
Good
Low
Yes
Retain
Off -site tree.
(off -site)
Thuja plicata
conifer
Recommendation
Western Redcedar
Evergreen
483
27032500308300
38
45'
23'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t1
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 265
1.p
Page 18 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Western Redcedar
Evergreen
484
27032500308300
14
20'
10'
Good
Low
Yes
Retain
Thuja plicata
conifer
Recommendation
485
27032500308300
Western Redcedar
Evergreen
42
20'
10'
Good
Low
Yes
Retain
Thuja plicata
conifer
Recommendation
Western Redcedar
Evergreen
486
27032500308300
22
20'
10'
Good
Low
Yes
Retain
Thuja plicata
conifer
Recommendation
487
27032500308300
Western Redcedar
Evergreen
39
30'
15'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
488
27032500308300
Western Redcedar
Evergreen
36
45'
23'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
27032500302900
Western Redcedar
Evergreen
489
30
45'
23'
Good
Low
Yes
Retain
Off -site tree.
(off -site)
Thuja plicata
conifer
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t1
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 266
1.p
Page 19 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
490
27032500308300
Fig Tree
Deciduous
12
20'
10,
Good
Low
Yes
Remove B
Ficus sp.
Recommendation
Japanese Stewartia
491
27032500308300
Stewortio
Deciduous
12
20'
10,
Good
Low
Yes
Remove A
pseudocamellia
Recommendation
Japanese Maple
5/3/2023. Incorrectly Identified as a western redcedar.
493
27032500308300
Deciduous
6
20'
10,
Good
Low
Yes
Remove C
Acer palmatum
Corrected ID error.
Recommendation
494
27032500308300
Western Redcedar
Evergreen
42
45'
23'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
495
27032500308300
Western Redcedar
Evergreen
46
45'
23'
Good
Low
Yes
Remove D
Thujo plicata
conifer
Recommendation
English Holly
Broadleaf
Added 5/3/2023. WA State and/or Snohomish County
496
27032500308300
6
10,
5'
Good
Low
Yes
Remove A
Ilex aquifolium
evergreen
Noxious Weed.
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t1
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 267
1.p
Page 20 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
497
27032500308300
Spruce
Evergreen
12
10'
S'
Good
Low
Yes
Retain
Picea sp.
conifer
Recommendation
Pacific Dogwood
498
27032500308300
Deciduous
12
20'
10,
Good
Low
Yes
Retain
Cornus nuttallii
Recommendation
Plum
499
ROW
Deciduous
8
20'
10,
Good
Low
Yes
Retain
ROW tree.
Prunus sp.
Recommendation
Black Walnut
500
ROW
Deciduous
16
30'
15'
Good
Low
Yes
Retain
ROW tree.
luglans Nigro
Recommendation
Amur Maple
501
27032500308300
Deciduous
6
30'
15'
Good
Low
Yes
Retain
Acer japonicum
Recommendation
Amur Maple
502
27032500308300
Deciduous
13
30'
15'
Good
Low
Yes
Remove B
Multi-trunked tree.
Acer japonicum
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t1
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 268
1.p
Page 21 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
503
27032500308300
Spruce
Evergreen
8
10'
S'
Good
Low
Yes
Remove A
Picea sp.
conifer
Recommendation
504
27032500308300
Spruce
Evergreen
8
10,
5'
Good
Low
Yes
Remove A
Picea sp.
conifer
Recommendation
505
27032500308300
Spruce
EvergreenPicea
12
10'
S'
Good
Low
Yes
Remove B
sp.
conifer
Recommendation
507
27032500308300
Western Redcedar
Evergreen
48
45'
23'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
508
27032500308300
Western Redcedar
Evergreen
48
45'
23'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
Western Redcedar
Evergreen
509
27032500308300
18
30'
15'
Good
Low
Yes
Remove C
Thuja plicata
conifer
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t1
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 269
1.p
Page 22 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Western Redcedar
Evergreen
510
27032500308300
28
30'
15'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
Golden Chain Tree
511
27032500308300
Deciduous
6
15'
8'
Good
Low
Yes
Remove A
Laburnum x watereri
Recommendation
English Holly
Broadleaf
Added 5/3/2023. WA State and/or Snohomish County
512
27032500308300
8
10,
5'
Good
Low
Yes
Retain
Ilex aquafolium
evergreen
Noxious Weed.
Recommendation
English Holly
Broadleaf
ROW tree. Added 5/3/2023. WA State and/or Snohomish
513
ROW
8
15'
8'
Good
Low
Yes
Retain
Ilex aquafolium
evergreen
County Noxious Weed.
Recommendation
English Holly
Broadleaf
ROW tree. Added 5/3/2023. WA State and/or Snohomish
514
ROW
10
15'
8'
Good
Low
Yes
Retain
Ilex aquafolium
evergreen
County Noxious Weed.
Recommendation
Western Redcedar
Evergreen
515
27032500308300
14
20'
10'
Good
Low
Yes
Retain
Thuja plicata
conifer
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t1
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 270
1.p
Page 23 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Douglas fir
516
ROW
Pseudotsugo
Evergreen
24
40'
20'
Good
Low
Yes
Retain
ROW tree.
conifer
menziesii
Recommendation
517
ROW
Western Redcedar
Evergreen
12
20'
10'
Good
Low
Yes
Retain
ROW tree.
Thujo plicato
conifer
Recommendation
Douglas fir
387
27032500308400
Pseudotsugo
Evergreen
24
20'
10,
Good
Low
Yes
Retain
conifer
menziesii
Recommendation
Douglas fir
388
27032500308400
Pseudotsugo
Evergreen
28
20'
10,
Good
Low
Yes
Retain
conifer
menziesii
Recommendation
389
27032500308400
Lodgepole Pine
Evergreen
10
10'
S'
Good
Low
Yes
Retain
Pinus contorta
conifer
Recommendation
Lodgepole Pine
Evergreen
390
27032500308400
6
10'
S'
Good
Low
Yes
Retain
Pinus contorta
conifer
--TRecommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
tw
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 271
1.p
Page 24 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Douglas fir
391
ROW
Pseudotsugo
Evergreen
34
30'
15'
Good
Low
Yes
Retain
ROW tree.
conifer
menziesii
Recommendation
Douglas fir
392
27032500308400
Pseudotsugo
Evergreen
40
30'
15'
Good
Low
Yes
Retain
conifer
menziesii
Recommendation
Douglas fir
393
27032500308400
Pseudotsugo
Evergreen
34
30'
15'
Good
Low
Yes
Remove D
conifer
menziesii
Recommendation
Douglas fir
394
27032500308400
Pseudotsugo
Evergreen
28
30'
15'
Good
Low
Yes
Remove D
conifer
menziesii
Recommendation
395
27032500308400
Lodgepole Pine
Evergreen
16
20'
10'
Good
Low
Yes
Remove C
Pinus contorta
conifer
Recommendation
Douglas fir
396
27032500308400
Pseudotsugo
Evergreen
32
30'
15'
Good
Low
Yes
Remove D
conifer
menziesii
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
tw
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 272
1.p
Page 25 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Western Redcedar
Evergreen
397
27032500308300
8
20'
10'
Good
Low
Yes
Remove A
Thuja plicata
conifer
Recommendation
398
27032500308400
Western Hemlock
Evergreen
21
30'
15'
Good
Low
Yes
Remove C
Tsugo heterophylla
conifer
Recommendation
Douglas fir
399
27032500308400
Pseudotsuga
Evergreen
24
30'
15'
Good
Low
Yes
Remove C
conifer
menziesii
Recommendation
Douglas fir
400
27032500308400
Pseudotsuga
Evergreen
36
30'
15'
Good
Low
Yes
Remove D
conifer
menziesii
Recommendation
Douglas fir
701
27032500308400
Pseudotsuga
Evergreen
24
30'
15'
Good
Low
Yes
Remove C
conifer
menziesii
Recommendation
Western Redcedar
Evergreen
702
27032500308400
22
30'
15'
Good
Low
Yes
Remove C
Thuja plicata
conifer
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
tw
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 273
1.p
Page 26 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Western Redcedar
Evergreen
703
27032500308400
34
30'
15'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
704
27032500308400
Western Redcedar
Evergreen
38
30'
15'
Good
Low
Yes
Retain
Thuja plicata
conifer
Recommendation
Bigleaf Maple
705
27032500308400
Deciduous
26
30'
15'
Good
Low
Yes
Retain
Acer mocrophyllum
Recommendation
Douglas fir
706
27032500308400
Pseudotsugo
Evergreen
38
30'
15'
Good
Low
Yes
Remove D
conifer
menziesii
Recommendation
707
27032500308400
Western Redcedar
Evergreen
40
40'
20'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
27032500308500
Western Redcedar
Evergreen
708
22
30'
15'
Good
Low
Yes
Retain
Off -site tree.
(off -site)
Thuja plicata
conifer
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
tw
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 274
1.p
Page 27 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Douglas fir
709
27032500308500
Pseudotsugo
Evergreen
50
40'
20'
Good
Low
Yes
Retain
Off -site tree.
(off -site)
conifer
menziesii
Recommendation
27032500308500
Bitter Cherry
710
Deciduous
6
15'
8'
Good
Low
Yes
Retain
Off -site tree.
(off -site)
Prunus emarginato
Recommendation
27032500308500
Western Redcedar
Evergreen
711
20
30'
15'
Good
Low
Yes
Retain
Off -site tree.
(off -site)
Thujo plicata
conifer
Recommendation
518
27032500308300
Western Redcedar
Evergreen
48
40'
20'
Good
Low
Yes
Remove D
Thuja plicata
conifer
Recommendation
519
27032500308300
Bigleaf Maple
Deciduous
12
25'
12.5'
Good
Low
Yes
Retain
Added 5/3/2023. Missing from inventory, but on -site map.
Acer mocrophyllum
Recommendation
492
27032500308300
Crepe Myrtle
Deciduous
10
20'
10'
Good
Low
Yes
Remove A
Added 5/3/2023. Missing from inventory, but on -site map.
Lagerstroemia sp.
__TRecommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
t1
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 275
1.p
Page 28 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Average
Critical
Overall
Tree
DBH
Overall
Viable for
Proposed
Parcel
Species
Type
Dripline
Root Zone
Risk
Comments
ID
(Inches)
Condition
Retention?
Action
(diameter)
(radius)
Rating
Added 5/3/2023. Multi-trunked — 10, 12, 13, 16". Added
Cherry Laurel
Broadleaf
520
27032500308300
26
30'
15'
Good
Low
Yes
Retain
5/3/2023. WA State and/or Snohomish County Noxious
Prunus laurocerasus
evergreen
Weed.
Recommendation
TREE FROG LLC
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 276
Page 29 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
3. Site Map - Snipped from a provided tree plan.
--- W
--- - -- - --
--- --- --- :�-�--- ° --- - --
'\ _ N 88538'01 " . W 1. 1• w•ccD `
/ - �-,- jj}-�� - —� _ _ _ °_ _ mEE RRo_recnoN FEra4E ' .a
41111
.� i------ ® /I `I ' �e �i2• �T� " •� ,a w �` s d
,# 1
r.
I i e•_ `1��-- �\Ii �,i�4 -��� �,i �I' J `.` /�'-'-- i j i` '- It � _ \� i �.
i 12
4i♦. I ,} ' j 1 i �'----�:♦ �I ls51es
` / IPAD
47 e� r-� -—-( \\I''1 `� y i I I ` I I e wAn i 51 s .- _ _ -�� ? `\ \ �O�'D C
I /
`%------- _
---- ---- t' I_ 1' I -� % f� E
I � 1 :�_=�--� ('� , r l -' I, j .�.
��.//�� 'lac I / - —
. AS I7V1 ``! I f� CI 1 I 502 r15)ly'f1/'i `'
CREA 309 , T �♦ / \` \ \ '
'i -'d iR I _. 1-_--------
f` 1 d
DN q - o
46t 0 k: /L
50
f _ �Y�� I tin '?,'♦ 'y __ --f---- __ - \ l__ 1 ' Si1C♦D-�
i0 i / ♦,♦i♦ / // _>t L'---------- FECT
\ f /
I ] I r- - I - �r 1 / 1 ♦ \ �i 4'-�' `1`� `�/ / ' ) C
1 I 1 l Cw R
/Sa2 y
f � T ii I � 1 T� I �- � `�•/ �'/ ,i / � .� � � ' 0 // SO•DF L
o. 1 ♦\
1
I/ ' I I I \ I I ` I I ; \ 1 {10/14• II / / 0
II i �.1 4C I`LI i_/{nisrcm
o>Q!ls'
Z ,If r- ♦ e' y s• 1 \ I ,I I 1 I I I i / , f \ 2`dF`j f �`/ r•�`r d
I X }yam _ �I�l71(�
I % � , 1 ' •�/!Y♦`iltlW� i I ```•�� �''
n- ` 1�
�\ -j \ .'/ ♦ _``, Xi.t-`-•--�-,J1 ''�35• ��Ix 'DF it i I `/ 1 'ICY.
7 ♦ / r I I
l �r DI ` = I
za CE
it ( ♦ /
.J/ �•=y8 /%I _ \'i 31�./E , \12Y ♦CED / / I 1� I / I I7 O �L- ` �/� �' i I 1 I / /
j L {�1 i -, G �'y- x Qom♦ t' 120'^QV I ` 'Y•CELL` `f b'OiTREE RROiECnON FENCE_
7 10•CfD 4 �'il J'' � - �I - - , 1'/ 211% ' p 7 0•rIA'r -"! I �,,% L__--_=
y-- - f 88. r„'e°e fy- c2•- ��8'21 129.59
3 DIED REE RRoiECTIaN FENCi .81 - - - - - - - - - - - �— _ k
mEE RROTECT,ON FENCE TREE PROTECTION FENCE - - - W
I_
TREE FROG LLC
to
ca
https://www.treefrogllc.com/ r
PO Box 307, Duvall, WA 98019 Q
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 277
1.p
Page 30 of 42
Arborist Report - Cornerstone — Greenwalk Park
4. Details of Risk Assessment
Level 2: Basic Assessment
A level 2 basic assessment is the standard assessment performed for tree risk. The assessment includes a detailed
visual inspection of a tree and its surrounding site, and a synthesis of the information collected. The basic
assessment involves walking completely around the tree — looking at the site, buttress roots, trunk, and branches.
The tree is viewed from a distance, as well as close up, to consider crown shape and surroundings.
Methodology —When identifying potential hazard trees, I must consider a variety of factors that could contribute
to failure. This can include the following: previous history of site failures, topography, site changes, prevailing wind
direction and exposure, tree size and species, growth habit, overall vigor, the density and health of the foliage and
crown, examination of root and root collar health, dead wood, hanging or broken branches, and evidence of
disease -causing bacteria, fungi, or virus.
Tools Utilized: Binoculars, compass, hammer, diameter tape, clinometer
Timeline — This assessment covers a five-year period and is based on conditions present at the time of the
assessment.
5. Definitions:
DBH - Tree size is measured in Diameter at Breast Height (DBH) — standard forestry methodology for measuring
tree size.
Significant Tree Edmonds - A tree that is at least six (6) inches in diameter at breast height (DBH) as measured at
4.5 feet from the ground. For trees with multiple leaders at four and one-half (4.5) feet height, the DBH shall be
the combined cumulative total of branches greater than six (6) inches diameter at four and one-half (4.5) feet
above the average grade. If a tree has been removed and only the stump remains that is below four and one-half
(4.5) feet tall, the size of the tree shall be the diameter of the top of the stump.
Calculating DBH of Multi -Stemmed Trees — Multi -stemmed trunk combined DBH determined by the square root of
the sum of all squared trunk stems DBH.
Driplines — Most trees in groves do not have symmetrical driplines. Therefore, drip line radius was measured in the
quadrant assumed to be most affected by future disturbance or where most significant.
Limits of Disturbance — Limits of disturbance shall relate to either Critical Root Zone (CRZ) or Dripline Radius, due
to exceedingly wide drip line radii on some trees being out of proportion to actual tree size. CRZ is measured at 1
foot of distance from center of trunk for every inch diameter at 4.5 feet above grade.
Risk —The combination of the likelihood of an event and the severity of the potential consequences. In the context
of trees, risk is the likelihood of a conflict or a tree failure occurring and affecting a target, and the severity of the
associated consequences — personal injury, property damage, or disruption of activities.
TREE FROG LLC
https://www.treefrogI lc.com/
PO Box 307, Duvall, WA 98019
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 278
1.p
Page 31 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
How people perceive risk and their need for personal safety is inherently subjective; therefore, risk tolerance and
action thresholds vary. What is within the tolerance of one person may be unacceptable to another. It is
impossible to maintain trees completely free of risk —some level of risk must be accepted to experience the
benefits that trees provide.
Referenced Municipal Code:
Chapter 23.10 Tree Related Regulations
https://www.codepublishing.com/WA/Edmonds/#!/Edmonds23/Edmonds2310.html#23.10.060
Explanation of Tree Conditions
Poor — A tree described with a poor condition would have a combination of the following features: low vigor,
sparse crown density, and few interior branches. The crown could be unbalanced or contain many dead
twigs/branches. It may also have been topped, tipped, or mal pruned. The trunk could have cracks,
cavities, conks/mushrooms, and evidence of decay within the tree.
Fair — A fair description would describe a tree with normal vigor and crown density. The tree may possess one or
possibly two of the above listed qualities but overall is in decent health. Improvements of site conditions
could improve the trees health.
Good — Trees listed in good condition will have high vigor with a thick crown density. It would have few, if any
defects, and would be a good example of that specific tree.
Explanation of Risk Ratings
Low— The low -risk category applies when consequences are negligible, and likelihood is unlikely; or
consequences are minor, and likelihood is somewhat likely.
Moderate — Moderate -risk situations are those for which consequences are minor and likelihood is very likely or
likely; or likelihood is somewhat likely, and consequences are significant or severe.
High — High -risk situations are those for which consequences are significant and likelihood is very likely or likely,
or consequences are severe, and likelihood is likely.
Extreme —The extreme -risk category applies in situations in which failure is imminent, there is a high likelihood of
impacting the target, and the consequences of the failure are severe.
TREE FROG LLC
https://www.treefrogI lc.com/
PO Box 307, Duvall, WA 98019
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 279
1.p
Page 32 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
6. 23.10.070 Tree protection measures during development.
Prior to development activity or initiating tree removal on the site, vegetated areas, individual trees and soil to
be preserved in accordance with ECDC 23.10.060(B) shall be protected from potentially damaging activities
pursuant to the following standards:
A. Preconstruction Meeting Required. Prior to the commencement of any permitted clearing and grading
activity, a preconstruction meeting shall be held on site with the permittee and appropriate city staff. The
project site shall be marked in the field as follows:
1. The extent of clearing and grading to occur;
2. Delineation and protection of any critical areas and critical area buffers with clearing limit fencing;
3. Flagging of trees to be removed and tags on trees to be retained; and
4. Property lines.
B. Placing Materials Near Trees. No person may conduct any activity within the protected area of any tree
designated to remain, including, but not limited to, operating or parking equipment, placing solvents,
storing building material or stockpiling any materials, or dumping concrete washout or other chemicals
During construction, no person shall attach any object to any tree designated for protection.
C. Protective Barrier. Before development, land clearing, grading, filling or any land alteration, the applicant
shall:
1. Erect and maintain readily visible temporary protective tree fencing along the limits of disturbance
which completely surrounds the protected area of all retained trees, groups of trees, vegetation and
native soil. Tree protective fencing shall be a minimum height of three feet, visible and of durable
construction; orange polyethylene laminar fencing is acceptable.
2. Install highly visible signs spaced no further than 15 feet apart along the entirety of the protective
tree fencing. Said sign must be approved by the director and shall state, at a minimum, "Tree and Soil
Protection Area, Entrance Prohibited," and provide the city phone number for code enforcement to
report violations.
3. Prohibit excavation or compaction of soil or other potentially damaging activities within the barriers;
provided, that the director may allow such activities approved by a qualified professional and under
the supervision of a qualified professional retained and paid for by the applicant.
4. Maintain the protective barriers in place for the duration of the project until the director authorizes
their removal.
5. Ensure that any approved landscaping done in the protected zone subsequent to the removal of the
barriers shall be accomplished with machinery from outside the protected zone or by hand.
6. Limit the time period that the critical root zone is covered by mulch, plywood, steel plates or similar
materials, or by light soils, to protect the tree's critical root zone.
TREE FROG LLC
https://www.treefrogI lc.com/
PO Box 307, Duvall, WA 98019
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 280
1.p
Page 33 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
7. In addition to the above, the director may require the following:
a. If equipment is authorized to operate within the protected zone, the soil and critical root
zone of a tree must be covered with mulch to a depth of at least six inches or with plywood,
steel plates or similar material in order to protect roots and soil from damage caused by
heavy equipment.
b. Minimize root damage by hand -excavating a two -foot -deep trench, at edge of critical root
zone, to cleanly sever the roots of trees to be retained. Never rip or shred roots with heavy
equipment.
c. Corrective pruning performed on protected trees in order to avoid damage from machinery
or building activity.
d. Maintenance of trees throughout construction period by watering and fertilizing.
D. Grade.
1. The grade shall not be elevated or reduced within the critical root zone of trees to be preserved
without the director's authorization based on recommendations from a qualified professional. The
director may allow coverage of up to one-half of the area of the tree's critical root zone with light
soils (no clay) to the minimum depth necessary to carry out grading or landscaping plans, if it will not
imperil the survival of the tree. Aeration devices may be required to ensure the tree's survival.
2. If the grade adjacent to a preserved tree is raised such that it could slough or erode into the tree's
critical root zone, it shall be permanently stabilized to prevent soil erosion and suffocation of the
roots.
3. The applicant shall not install an impervious surface within the critical root zone of any tree to be
retained without the authorization of the director. The director may require specific construction
methods and/or use of aeration devices to ensure the tree's survival and to minimize the potential
for root -induced damage to the impervious surface.
4. To the greatest extent practical, utility trenches shall be located outside of the critical root zone of
trees to be retained. The director may require that utilities be tunneled under the roots of trees to be
retained if the director determines that trenching would significantly reduce the chances of the tree's
survival.
5. Trees and other vegetation to be retained shall be protected from erosion and sedimentation.
Clearing operations shall be conducted so as to expose the smallest practical area of soil to erosion
for the least possible time. To control erosion, it is encouraged that shrubs, ground cover and stumps
be maintained on the individual lots, where feasible.
6. The director may approve the use of alternative tree protection techniques if those techniques
provide an equal or greater degree of protection than the techniques listed in this subsection.
E. Directional Felling. Directional felling of trees shall be used to avoid damage to trees designated for
retention.
TREE FROG LLC
https://www.treefrogI lc.com/
PO Box 307, Duvall, WA 98019
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 281
1.p
Page 34 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
F. Additional Requirements. The director may require additional tree protection measures that are
consistent with accepted urban forestry industry practices. [Ord. 4227 § 1 (Att. A), 2021; Ord. 4220 § 1
(Att. A), 2021; Ord. 4218 § 1 (Att. A), 2021].
7. ISA Recommended Tree Protection Detail
Croton drip line or other limit of Tree Protection area. See Notes:
tree preservation plan for fence alignment. 1- See specifications for additional tree
protection requirements-
2- If there is no existing irrigation, see
specifications for watering requirements-
3- No pruning shall be performed except
by approved arborist.
4- No equipment shall operate inside the
protective fencing including during fence
installation and removal.
5- See site preparation plan for any
qqqq, modifications with the Tree Protection
(- area.
Tree Protection
fence: High density
polyethylene fencing
with 3.5" x 1.5"
0 r openings; Color -
orange. Steel posts
installed at 8' o.c.
sign
laminated in i 2" x 6' steel posts
plastic spaced or approved equal.
every 50' 5"thick
along the KEEP OUT layer of mulch.
fence. TREE
q PROTECTION
'v AREA �t Maintain existing
I''' grade with the tree
protection fence
unless otherwise
� indicated on the
plans.
SECTION VIEW
14
TREE PROTECTION URRANTREOURCEF FREE
USE
OPEN SOURCE FREE TO USE
V
r*-
0
Q
0
w+
to
L
0
L
Q
r
X
LU
d
E
i
%i
TREE FROG LLC Q
https://www.treefrogI Ic.com/
PO Box 307, Duvall, WA 98019
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 282
1.p
Page 35 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
8. ISA Recommended Tree Protection Information
The Pacific Northwest Chapter of the ISA Recommends the following for protecting trees from damage during
construction.
https://pnwisa.org/tree-care/damage/protecting-trees-from-damage/
Critical Root Zone Protection
A critical step in retaining healthy trees is the protection of tree roots from disturbance. Each tree has a critical
root zone (CRZ) that varies by species and site conditions. The International Society of Arboriculture defines CRZ as
an area equal to a 1-foot radius from the base of the tree's trunk for each 1 inch of the tree's diameter at 4.5 feet
above grade (referred to as diameter at breast height).
Another common rule of thumb is to use a tree's drip line to estimate the CRZ (see figure). Evaluate both of these
and choose whichever provides the larger CRZ.
Under certain circumstances, disturbing or cutting roots in a CRZ may be unavoidable. In such cases, the work
should be done only under the on -site supervision of an ISA Certified Arborist.
Cutting or disturbing a large percentage of a tree's roots increases the likelihood of the tree's failure or death.
Never cut tree roots that are more than four inches wide; roots that large are usually structural. Cutting them can
destroy the stability of the tree, causing it to fall over!
If you must cut tree roots, do so cleanly with sharp tools. Never tear with a backhoe or other dull instrument. A
clean cut encourages good wound closure and confines the spread of decay. If damage is severe,
consider removing the tree because its stability may have been compromised.
Activities to Avoid in the Critical Root Zone
The CRZ that should be protected from negative interactions. Avoid the following activities:
• Stockpiling construction materials or demolition debris
• Parking vehicles or equipment
• Piling soil and/or mulch
• Trenching for utilities installation or repair, or for irrigation system installation
• Changing soil grade by cutting or filling
• Damaging roots by grading, tearing, or grubbing
• Compacting soil with equipment, vehicles, material storage, and/or foot traffic
TREE FROG LLC
https://www.treefrogI lc.com/
PO Box 307, Duvall, WA 98019
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 283
1.p
Page 36 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
• Contaminating soil from washing out equipment (especially concrete) and vehicle maintenance
• Installing impervious parking lots, driveways, and walkways
• Attaching anything to trees using nails, screws, or spikes
• Wounding or breaking tree trunks or branches through contact with vehicles and heavy equipment
• Wounding trunks with string weed trimmers and lawn mowers
• Causing injury by fire or excessive heat
During Construction
Monitor compliance with tree protection requirements and the impacts of construction activities on tree health
regularly during construction. If there are incursions into the root zone, ensure roots have been severed cleanly,
enforce penalties, and reestablish the protection zone. Confer with your contractors to make sure
that construction offices, vehicular parking, worker break sites, concrete washout areas or other pollutants, and
material storage will remain outside of protected areas. Diligence in maintaining barriers and in enforcing your
protection plan will pay great dividends at the end of the project when the tree is still healthy.
Following the guidelines laid out above will serve in most situations, but occasionally construction plans will
require impingement on the CRZ.
Trenching
Trenching is a standard way to install utilities. It is best to entirely avoid trenching through the CRZ (see figure);
such practice could severely destabilize a tree, as well as adversely affect its health through loss of roots. Workers
performing such operations should understand that 85% of the mass of a tree's root system is located within the
CRZ and that most of a tree's roots are within the top 18 inches of soil. Alter routes of underground infrastructure
or use alternate methods such as pipe boring. Tunneling at least 18 inches beneath the root zone will prevent loss
of critical root mass if underground utilities must unavoidably be placed within the CRZ.
A decision must be made as to where best to locate utility trenches. Planners and designers must be made aware
that trenches may not cross a CRZ and design alternate alignments accordingly; such realignments are not the
responsibility of the construction crew.
Best practices for trenching include the following:
• Protect the trunks of high -value trees from scraping and gouging to a height of at least eight feet.
• Keep equipment and excavated backfill on the side furthest from the tree, not against the trunk.
TREE FROG LLC
https://www.treefrogI lc.com/
PO Box 307, Duvall, WA 98019
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 284
1.p
Page 37 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
• Place excavated backfill on a plastic or canvas tarp outside the CRZ.
• Prune away jagged roots back to the trench wall closest to the tree. Use a handheld pruner or pruning
saw to make sharp, clean cuts.
• Replace the backfill on the same day if at all possible. Cover exposed roots with wet burlap to prevent
them from drying out; in hot dry conditions, small roots may be injured in as little as 30 minutes.
• Do not allow chemicals, trash, or other foreign debris to become mixed with the backfill.
• If earthwork specifications allow it, firm the backfill to the same compaction as the surrounding soil and
no more.
• Water the backfill to prevent excessive root drying.
Grade or Ground Level Changes
Grade changes should be avoided in order to prevent serious damage or death to a tree. Fill that is added over
existing soils can smother and kill roots, or invite disease if piled around the trunk. Even temporary fills such as
stockpiling mulch or soil in the CRZ of a tree for as little as several days during the construction process can have
severe, long-term negative effects, though symptoms may not appear for several years.
The extent of injury from adding soil around a tree varies with the kind, age, and condition of the tree; the depth
and type of fill; drainage; and several other factors. Maple, oak and evergreens are most susceptible, while elm,
ash, willow, sycamore, and locust are least affected.
Little can be done to save trees that have been suffering from soil added over an extended period of time. It is
prudent to consider possible damage that may occur to a tree and take alternative action before the fill is made;
prevention is less expensive and more effective than attempting to correct the situation after damage has been
done.
Best practices for fill operations include the following:
• Never place any fill or organic materials directly against the tree.
• Never compact the soil within the CRZ.
• If using no more than two to four inches of fill around existing trees, significant damage may be avoided if
the fill has a coarser texture than the existing soil.
Less damage to a tree's roots is likely with a lowered grade than when it is raised, unless exposing or removing a
great deal of the root mass. A general rule -of -thumb used by landscape architects is to remove no more than six
inches of soil from the existing grade in the CRZ; however, this is dependent on the soils in which the tree is
growing. A tree's roots may all exist in the top foot of a shallow soil; removing the top six inches would have
tremendous negative impact in that case.
TREE FROG LLC
https://www.treefrogI lc.com/
PO Box 307, Duvall, WA 98019
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 285
1.p
Page 38 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Best practices for removing soil include the following:
• Consider removal and replacement if the tree is young, in poor condition, an undesirable species, or very
susceptible to insects and disease.
• Plan grade changes well in advance of construction using the appropriate method to prevent injury to
desirable trees.
• Use retaining walls or terraces to avoid excessive soil loss in the area of greatest root growth.
• Spread mulch over the exposed root area when possible, to help prevent soil erosion, reduce moisture
loss, and keep soil temperatures lower.
• Provide supplementary water when rainfall is less than one inch per week.
• Prune roots to prepare the tree for root loss due to grade lowering. Root pruning is best left to an ISA
Certified Arborist, who can take into account the variables necessary to reduce the stress of the pruning
to the tree.
TREE FROG LLC
https://www.treefrogI lc.com/
PO Box 307, Duvall, WA 98019
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 286
1.p
Page 39 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
9. Certificate of Performance
I, Andy Crossett, certify that:
• 1 have personally inspected the trees and the property referred to in this report and have stated my
findings accurately.
• 1 have no current or prospective interest in the vegetation or the property that is the subject of this report
and have no personal interest or bias with respect to the parties involved.
• The analysis, opinion, and conclusions stated herein are my own and are based on current industry
standards, scientific procedures and facts.
• My analysis, opinion, and conclusions were developed and this report has been prepared according to
commonly accepted arboriculture practices.
• No one provided significant professional assistance to me, except as indicated within the report.
• My compensation is not contingent upon the reporting of predetermined conclusion that favors the cause
of the client or any other party nor upon the results of the assessment, the attainment of stipulated
results, or the occurrence of any subsequent events.
I further certify that I am a member in good standing of the International Society of Arboriculture (ISA) and an ISA
Certified Arborist (#PN-7375A) and Tree Risk Assessment Qualified. I also am a Certified Professional Horticulturist
through the Washington State Nursery and Landscape Association.
If you have any questions about this report, please contact me at 206-310-8254 or andycrossett@hotmail.com.
Andy Crossett
References:
Dirr, Michael A. Manual of Woody Landscape Plants Their Identification, Ornamental Characteristics, Culture,
Propagation, and Use. Stripes Publishing L.L.C., 2009
Smiley, E. Thomas, Nelda Matheny, and Sharon Lilly. Tree Risk Assessment (Best Management
Practices, Second Edition). Champaign: International Society of Arboriculture, 2017.
Dunster, Julian A., E. Thomas Smiley, Nelda Matheny, and Sharon Lilly. Tree Risk Assessment Manual. Champaign,
Illinois: International Society of Arboriculture, 2013.
Shigo, Alex L. A New Tree Biology: Facts, Photos, and Philosophies on Trees and Their Problems and Proper Care
Shigo and Trees, Associates, 1986.
TREE FROG LLC
https://www.treefrogI lc.com/
PO Box 307, Duvall, WA 98019
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 287
1.p
Page 40 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
10. Credentials & Experience
History
I first began working in the horticulture industry in 2002 at a landscaping company located locally in Bellevue, WA.
After working in the field for a few years, as a laborer and a supervisor, I decided to pursue a formal education at
Lake Washington Institute of Technology. I graduated in 2011 with a degree in Environmental Horticulture and
immediately took the ISA and CPH exams to be become a Certified Arborist and a Certified Horticulturist,
respectively. I moved onto to work as a member of the Street Tree and Irrigation Department for the City of
Bellevue. Tree Frog LLC started in 2013, when I began consulting part time in addition to working as head gardener
at a seven -acre estate in Medina, WA. Tree Frog LLC has grown, and I have been consulting full time since 2017.
In my spare time, I enjoy spending time with my family and the animals on my small hobby farm.
Education
Lake Washington Institute ofTechnology—Associates Degree, Environmental Horticulture
My education from Lake Washington Institute of Technology's horticulture program focused on the following areas
of study: botany, plant propagation, greenhouse management, soils, pruning, pest and disease management,
landscape design, turf grass management, and plant identification.
Credentials
Certified Professional Horticulturist through the Washington State Nursery & Landscape Association #2537
In 1978, WSNLA created a two -pronged professional certification program that was known as the Washington
Certified Nurseryman or Washington Certified Landscaper. In 2005, WSNLA revamped and upgraded the
certification program and renamed the designation as Certified Horticultural Professional. With nearly 400
Certified Professional Horticulturists, the CPH program is the largest community of state certifications serving
professional horticulturists in Washington State.
To earn a WSNLA Certified Professional Horticulturist credential, you must pass a written exam that tests your
skills and knowledge as a horticultural professional based on study materials and practical applications.
You must provide the equivalent of one year of work experience (2000 hours) with a licensed nursery, landscape
contractor or WSNLA-approved business or institution.
Certified Arborist and Qualified Tree Risk Assessor, through the International Society of Arboriculture #PN-7375A.
To earn an ISA Certified Arborist° credential, you must be trained and knowledgeable in all aspects of
arboriculture. ISA Certified Arborist® have met all requirements to be eligible for the exam, which includes three or
more years of full-time, eligible, practical work experience in arboriculture and/or a degree in the field of
arboriculture, horticulture, landscape architecture, or forestry from a regionally accredited educational institute.
This certification covers a large number of topics giving the candidates flexibility in the arboricultural profession. A
code of ethics for ISA Certified Arborists° strengthens the credibility and reliability of the work force. This
certification is accredited by the American National Standards Institute, meeting, and exceeding ISO 17024.
TREE FROG LLC
https://www.treefrogI lc.com/
PO Box 307, Duvall, WA 98019
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 288
1.p
Page 41 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
Continued Education
Trees and the Law I Report Writing for Arborists I Defensible Tree Appraisal I Developing Field Assessment Skills
for Common PNW Tree Diseases I Climbing Safety Case Studies I WSNLA PROseries seminar Pest & Disease Tree
Disorder Diagnosis Online Workshop & Live Discussion I Why Trees Fail Online Workshop & Live Discussion Arbor
Chat: A Deep Dive Into the ISA Certified Arborist® Code of Ethics I Diagnosis & Disorder: General Diagnosis Tree
Biology: Anatomy I Arbor Chat - Coronet cuts: The simulation of natural fractures I Tree root physiology and urban
soils — can't we just all get along? I Arboricultural Zombies - Myths That Will Not Die I Forged in Fire: Arborist
Options Before & After the Fire I Forest Health Watch — working together to monitor, study and understand tree
health issues in Pacific Northwest I Tree insect pest diagnosis and management I Homeowner knowledge and
perceptions of tree care and preservation on residential properties I Managing the Trees Where People Live for
Resiliency I Regenerative Pruning: Research on Overextended Trees, Practice on Hollow Trees I Machine
Generated Report Writing I Tools We Use I Putting the MD Back in Tree Doctor I Building a Resilient Arboriculture
and Urban Forestry Program in Rural Municipalities I Ethical Tree Care in the Urban Interface I What's pesky in the
PNW... And what could be on its way? I Coping with heat: Community urban forest perspectives and experiences
in Vancouver, Canada I Advancing Urban Forestry in the Pacific Northwest I Root Pruning The Influence of
Abiotic Factors on Street Tree Condition and Mortality in a Commercial -Retail Streetscape Arborists and Wildlife:
Retaining Trees for Wildlife Habitat I Tree Inventories I Biology and Identification of Fungi Wood Decay Fungi
Identification and Management I Container Type Affects Root Development I Tree Lightning Protection Systems
Advanced Tree Identification I Wood Chips and Compost Improve Soil Quality and Increase Growth of Acer rubrum
and Betula nigra in Compacted Urban Soil I A Review of Spatial Variation of Allergenic Tree Pollen I The Cost of
Not Maintaining the Urban Forest I Impacts of Wire Basket Retention and Removal I Effects of Root Severance by
Excavation on Two Urban Tree Species
Volunteering
Dog Mountain Farm, CSA
Dog Mountain Farm serves the Snoqualmie Valley community and Seattle area by providing Certified Naturally
Grown farm -fresh vegetables, fruit, eggs, herbs, and flowers. They also offer educational tours for schools and
groups.
TREE FROG LLC
https://www.treefrogI lc.com/
PO Box 307, Duvall, WA 98019
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 289
1.p
Page 42 of 42
Arborist Report - Cornerstone - FERNANDEZ SHORT PLAT
11. Assumptions & Limiting Conditions
a) A field examination of the site was made on 1/11/2022. My observations and conclusions are as of
that date.
b) Care has been taken to obtain all information from reliable sources. All data has been verified insofar
as possible; however, the consultant/arborist can neither guarantee nor be responsible for accuracy
of information provided by others.
c) Unless stated otherwise: 1) information contained in this report covers only those trees that were
examined and reflects the conditions of those trees at the time of inspection; and 2) the inspection is
limited to visual examination of the subject trees without dissection, excavation, probing, or coring.
There is no warranty or guarantee, expressed or implied that problems or deficiencies of the subject
tree may not arise in the future.
d) All trees possess the risk of failure. Trees can fail at any time, with or without obvious defects, and
with or without applied stress. A complete evaluation of the potential for this (a) tree to fail requires
excavation and examination of the base of the subject tree. Permission of the current property owner
must be obtained before this work can be undertaken and the hazard evaluation completed.
e) Other trees with similar defects are standing in the neighborhood and have been so for some time.
Trees are living biological organisms, and I cannot predict nor guarantee their stability or failure.
f) Sketches, drawings and photographs in this report, being intended as visual aids, are not necessarily
to scale and should not be construed as engineering or architectural report of surveys unless
expressed otherwise. The reproduction of any information generated by architects, engineers, or
other consultants on any sketches, drawings, or photographs is for the express purpose of
coordination and ease of reference only. Inclusion of said information on any drawings or other
documents does not constitute a representation by Tree Frog LLC as to the sufficiency or accuracy of
said information.
g) The consultant/appraiser shall not be required to give testimony or attend court because of this
report unless subsequent contractual arrangements are made.
h) Loss or alteration of any part of this report invalidates the entire report.
i) Unless required by law otherwise, possession of this report or a copy thereof does not imply right of
publication or use for any purpose by any other than the person to whom it is addressed, without the
prior expressed written or verbal consent of the consultant/appraiser.
TREE FROG LLC
https://www.treefrogI lc.com/
PO Box 307, Duvall, WA 98019
[P] 206-310-8254 [E] andycrossett@hotmail.com
Exhibit 15 - Green
PLN2022-004 Packet Pg. 290
1.q
SW1/4 OF SW1/4 OF SEC. 25, T27N, RK, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
w cO E
F
U
�\ \e) O
\ V \ W
CO
En
\\ O J N 3
mod\ Z Q
\\ \ 3
TYPE 3 LSC: \ \ ` F \`r \ \ z - 2
TREES NO MORE THAN 30' O.C. WITH A MIN. OF 50% EVERGREEN. \ �\ �\ OA _� ` �/ ,� o
3C -9 TREES REQUIRED WITH 5 BEING EVERGREENLo
.PROPOSE:6 EVERGREEN (4 EXISTING) & 4 DECIDUOUS. \ /�✓ !^� �C►�I w o oN 88°38'01" 251Qrn
v
1 D \
°
28
° PR F of 6 �\ �` OEM
o � Q
'-� 36"\\ e 8"PL �� ���� ' DE
o
�— ---0 �;"� i // I---------� "DEC ��� �`d \� \Q\ 8123/23
L_OT � �. �
f E
-a
/- — LE „
- \
---7 ,��-1 V s s
7 T 3
Cn Ld X "� — o I i LOT 4 I ;QED I I — �° g" y 2 ��� v��
8„ ° D 2 D 12-A \� \�,
��� "
»w L---� 50 �_ED I V I V L_� ,A D
- I I L 284 __ „ 7
~ o z o � �- O I I °° � STATE OF WASHINGTON ,
� ° — O I I ' I ♦ I I LOT 2 _--- REGISTERED =
CD �r, CD --- I w' I ' I �.�� \ �9/A' �`\ LA SCAP C�ljITECTLA
x //
_ Cn
uj o w ® /0 I L- - — — — - ® L_ — J I !/ �\ — / `� AKEMI SAKAIDA y
- — "
♦ ® - — CERTIFICATE N0. 794
z - i VL — — — \ — — — — - _ \ A C �� ��/v� ����� EXPIRES 06/16/24 E
o N C -RL Y \ 1 IK I) — — — — — — I L- \i SP E 48 ' D ` / \ I ki / j '\`� �\\ N 63°02'07" VV LL
- p I - \ - �9S O `� •o
� ---� _ _ 8 P��M I, 2j� I -- -- ° 58\ -/ ✓ir �� 4417'
z \
_T ,, x
D - o
i o I u L- 6` `` I I I o o I �278
II _-
E o
/ A _
U
I i t o N - 1 4 `\ '
QED - - T / '> E
�� >- C
�— O d
LLJLLJ
! C I I- ,a n, l- Lj
_ LOT 1 0 `V
as R E — — — / - ^ w w \ n w— / // - I1 \\ `^� / \\ -/ / -- / , ` O +•
o I- — — — — — — — — — O '_ --, �.�� `� STREET R ii 1 8"\ED �� ,� w �' ' ` 4 // ��� /
ERE LIGHT (TYP)
„ 0 m
C14
ui-T�--
�y �" o - -
w �o o �— , I , /
- _ - - ! /
--�CE -f �� O �._f / V\� / �♦ c
o y' 3 "CED`, ,- - . - - 0 E
I
��--A-7 2�� o
46 C ' `� �� ,--- I --- ---- / ♦ W Q
/ - a
ACT
� ♦ r 4EZ DE o OL-
ON S
w �
LC)L I I I C 2, // LOT T 16
o I LOT T 11 280 2 , p
2 �, _
' ` � I I / / �� Q P' GJO
/ ca + Q
_ /' 40 CED ,- �� 0 I- o � c?
I 01
2I4 �''- \���y L_ T 12 _ OT 3 _ — °� -„� o� Lu a
CD O
/\a V OVA I 414"CED/ I " I\ // /' /
I 2 7 E / / i �` / N
3 CE
r I v r
i / /-- �'
X \O� i I ED 6 S I \\ \ \EDI I I /, - �T r -_ l 2 D F /
i
-----
�3� ��'— — — I - O �' -�_ �' /
\� -r O _
-�---� � 2� � 1 „D170
EC ��6"G€� ,' � �,v' �� 'HEM
/ o ♦ X
, // LU
"B I R ♦
12tip°
� 3� DE I —
® _ L 24'iDEr 4 DIE -- °E
� `�i; - i r „v, I-� — — � O E
CD
/� C r
O O
_ � ti
Y� T 9 I , / I
15
I
26, /� 1 I I / 22 C Z
6„� V I aV /� 0 ED� I I LOT 10
I '/ / 36"CE�-/I ''VV /�
11 4'kED I I /�, i I I u1
I
CE -
- - - — --- I I D <�
0
I f�
— —
12"MAP CED k ; ' 1 AP \,
N 98°5 2
o ,_ 2„CE � � 6' x 6"MAP® ,
o ,
M
J\\�00.0-- - — — W Z N
3" — — — \
TYPE 3 LSC: 28.61' Q (� z
TREES NO MORE THAN 30' O.C. WITH A MIN. OF 50% EVERGREEN. X I CV O
-10 TREES REQUIRED WITH 5 BEING EVERGREEN.
PROPOSE:9 EVERGREEN(4 EXISTING) AND 6 DECIDUOUS (2 EXISTING). I I w w 00 U)
N 00-54'15 E _ w
TREE PLAN 4.75'
I
0 10 20 40
N
1 inch = 20 ft.
LOm
PRELIMINAFFY)M ft)jP&Nf0 *walk Packet Pg. 291
PI n17n77-nnaa Z -nnti,i
SET TREE STRAIGHT AND PLACE RO
ON SOLID GROUND OR ON COMPACT
BACKFILL.
BACKFILL PLANTING HOLE 1/2 FULL WITH NATIVE SOIL
REMOVED OF DEBRI. TAMP SOIL TO STABILIZE ROOTBALI
WATER THOROUGHLY. CUT AWAY AND REMOVE STRING /
BURLAP. IF IN WIRE BASKET REMOVE COMPLETELY. BE
CAREFUL NOT TO DAMAGE ROOTS. BACKFILL REMAINING
PLANTING HOLE WITH A MIXTURE OF APPROVED TOPS011
AND NATIVE SOIL. AMEND BACKFILL AS NOTED IN
LANDSCAPE NOTES.
3 TIMES
ROOT BALL DIAMETER
TREE PLANTING DETAIL
L3.2 SCALE: N.T.S.
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
PLANT SCHEDULE
11.040
SYMBOL
SCIENTIFIC NAME
COMMON NAME
EXISTING TREES TO REMAIN WITHIN CONSTRUCTION AREA
TREES: COUNTED AS TREE REPLACEMENT CREDITS
0 0
2%6" WOOD STAKES, LOCATED OUTSIDE OF
ROOTBALL. FASTEN WITH CHAIN LOK TREE
TIES. STAKE MAY NOT TOUCH TREE
TRUNK. STAKE HEIGHT MUST BE AT LEAST
5' FROM FINISHED GRADE.
0 0
SIZE (MIN.) IS CALIPER AND HEIGHT
CALIPER IS MEASURED AT 4.5' HIGH
QUANTITY HEIGHT IS FROM TOP OF SOIL LEVEL SPACING (MAX.) NOTES
REFER TO ARBORIST REPORT
REFER TO SHEETS L1 AND L2
REFER TO ARBORIST REPORT, L1, L2, AND Al SHEETS FOR ADDITIONAL
INFORMATION ON THE TREES TO REMAIN AND BE PROTECTED AND TO BE
REMOVED. REFER TO OWNER OR OWNER REPRESENTATIVE FOR ANY
CLARIFICATIONS THAT ARE NEEDED. REPORT ANY CONFLICTS TO OWNER
REPRESENTATIVE.
MEDIUM TO LARGE CONIFERS: 13 6' HIGH
ABIES GRANDIS: GRAND FIR AS SHOWN FULL TO GROUND. NICE BRANCHING. STRONGLY UPRIGHT.
CALOCEDRUS DECURRENS: INCENSE CEDAR
THUJA PLICATA 'HOGAN': HOGAN CEDAR
®
MEDIUM TO COLUMNAR CONFIERS: 19
6' HIGH AS SHOWN
ABIES KOREANA: KOREAN FIR
FULL TO GROUND. NICE BRANCHING. STRONGLY UPRIGHT.
CHAMAECYPARIS OBTUSA GRACILIS: SLENDER HINOKI
CHAMAECYPARIS NOOTKATENSIS PENDULA: WEEPING ALASKA CEDAR
TAXUS MEDIA HICKSII: HICKS YEW
STREET TREE: DECIDUOUS 31
1 " CALIPER AS SHOWN
SINGLE TRUNK, MATCHING FORM, LOWEST BRANCHES AT 4' CLEARANCE,
DO NOT PRUNE TO ACHIEVE LOWEST BRANCHING HEIGHT.
PRUNUS CERASIFERA 'CRIPOIZAM': CRIMSON POINTE PLUM
GROUP TREES: 9
1" CALIPER AS SHOWN
SINGLE TRUNK, MATCHING FORM, LOWEST BRANCHES AT 4' CLEARANCE,
BETULUS PAPYRIFERA 'RENCI': RENAISSANCE REFLECTION BIRCH
DO NOT PRUNE TO ACHIEVE LOWEST BRANCHING HEIGHT.
NYSSA SYLVATICA 'HAYMANRED': RED RAGE TUPELO
O
MEDIUM TO LARGE DECIDUOUS TREES: 7 AS SHOWN SINGLE TRUNK, MATCHING FORM, LOWEST BRANCHES AT 4' CLEARANCE,
ACER RUBRUM 'AUTUMN FLAME': AUTUMN FLAME MAPLE
1 J" CALIPER DO NOT PRUNE TO ACHIEVE LOWEST BRANCHING HEIGHT.
CERCIDIPHYLLUM JAPONICUM: KATSURA TREE
CLADRASTIS: YELLOW WOOD
MEDIUM DECIDUOUS TREES: 10 1 1" CALIPER AS SHOWN SINGLE TRUNK TO 3' MINIMUM. STRONGLY UPRIGHT. MATCHING FORM.
AMELANCHIER: SERVICEBERRY
CORNUS KOUSA : KOUSA DOGWOOD
HALESIA: SILVERBELL
SMALL DECIDUOUS TREES: 16 1 J" CALIPER AS SHOWN SINGLE TRUNK AND MULTI - STEM ACCEPTABLE AFTER 18"
ACER CIRCINATUM: VINE MAPLE
CORYLUS CORNUTA: HAZELNUT
HAMAMELIS VIRGINIANA: WITCH HAZEL
MALUS "XX?": CRABAPPLE (VARIES)
NOTE:
- TREES LISTED SHOW DIFFERENT OPTIONS THAT CAN BE USED FOR THAT TYPE OF TREE (SYMBOL).
DECIDUOUS
SET TREE STRAIGHT AND PLACE
ROOTBALL ON SOLID GROUND
OR ON COMPACTED BACKFILL.
PLACE 3" OF BARK MULCH IN SAUCER TO BACKFILL PLANTING HOLE 1/2 FULL WITH NATIVE SOIL REMOVED OF
WITHIN 3" OF THE TRUNK. NO PLANTING DEBRI. TAMP SOIL TO STABILIZE ROOTBALL. WATER THOROUGHLY. CUT
3' DIAMETER MIN. AWAY AND REMOVE STRING AND BURLAP. IF IN WIRE BASKET
REMOVE COMPLETELY. BE CAREFUL NOT TO DAMAGE ROOTS. BACKFILL
REMOVE CONTAINER OR TOP j OF BURLAPS REMAINING PLANTING HOLE WITH A MIXTURE OF APPROVED TOPSOIL
FROM ROOTBALL PRIOR BACKFILL \ AND NATIVE SOIL. AMEND BACKFILL AS NOTED IN LANDSCAPE NOTES.
FORM 5" HT. WATER DAM
AROUND TREE WITH SOIL TO
HOLD WATER.
FINISH GRADE.
3"
NOTE:
ALL WEEDS ARE TO BE REMOVED WITH ROOT(S) IN PLANTS
f-
DELIVERED, UPON ARRIVAL. DISPOSE OF WEEDS OFFSITE.
•
IF EXCESSIVE WEEDS OCCUR AROUND THE BASE OF PLANTS
WITHIN THE FIRST YEAR, THE CONTRACTOR SHALL BE
SCARIFY SIDES OF PLANTING
RESPONSIBLE FOR WEED REMOVAL BY MECHANICAL MEANS.
HOLE. MAKE SURE
GOOD DRAINAGE.
1.q
W
cD E
U
�
w
o
W
W
O E
O
U
O
(n o
N
�o
Q
3
J
N 3
r h
�
>
v
CD
Z
N
Q �
w
3
o
z
r- ca
o
w
N r7
CA
J
�
Lo C)
w
j
cp
o
N
00
0-
lmlkh4
Immo
1111w
8/23/23
STATE OF WASHINGTON
REGISTERED c
LA SCAP C ITECT y
=a
AKEMI kf SAKAIDA N
CERTIFICATE NO. 794
EXPIRES 06/16/24 c
c
R
IL
C
as
2
O
d
N�
VC ^ MJ w a
Q T N
vJ �
Z
OIL
C
0 � E
LLB Q a`
0 Z
Z Looa
Y
W +
3
L
WLu
R
L a
L
r
c
d
0
J 0
Lo
Q o a
LLJ O
0 z
V F---
Z_ U
LLJ
Z O
Q
J �
�i
0
z
EXISTING NATIVE SOIL OR NEWLY
6i
uj
Co
N
PLACED TOPSOIL.
J
N
3 TIMES ROOT BARRIER ALONG SIDEWALKS AND CURBS:
J
N
O
ROOT BALL DIAMETER REFER TO CITY CODE OR PUBLIC WORKS REQUIREMENTS FOR EXACT
00
_
SPECIFICATIONS.
W
LLJ
( n
TYPICALLY 18"-24" DEEP CONTINUOUS ROOT BARRIER, 15' CENTERED
Lli
W
Lu
>
ON TREE AREA WHEN TREE IS WITHIN 5' OF A PUBLIC CURB AND OR
=
/
I—
Ll.l
SIDEWALK/PAVING/WALKWAY.
C/)
0
0�
L302
PRELIMINAR 14, j"%�t)glu: JT\DIr� walk Packet Pg. 292
PI n17n77_nndQ Z _nnti,i
1.r
Q
w
cn
Q
0
w
0
Ln
J
Q
z
w
0
cn
W
0
w
Q
z
z
Q
n,
0
I \
HOUSE DATA GREENWALK \
LOT CNERAGE \ \\ \ \ \
LOT 1: f,030 SF/6,757 SF=30% LOT 9: 2,030 SF/7,337 SF=27% HOUSE 1: (2) 3,686 SF 5 BEDROOM, 3 j BATHS, REC ROOM, 3 CARS ARAGE \ \ LEGEND 0
LOT 2: 1,862 SF/7,627 SF=24% LOT 10: 1,693 SF/6,545 SF=26% HOUSE 2: (3) 2,561 SF 5 BEDROOM, 3 BATH, 2 CAR GARAGE \ \ \ \
LOT 3: 2,346 SF/7,889 SF=30% LOT 11: 1,884 SF/5,124 SF=37% HOUSE 3: (3) 2,907 SF 5 BEDROOM, 3 BATHS, 2 CAR GARAGE \ \ \ ev
LOT 4: 2,346 SF/7 701 SF=30% / 022 SF=38% OFFICE 31 BATH REC ROOM, 3 CAR GARAGE \ \ \ v CONCRETE PAVING o
, LOT 12: 1,884 SF 5, ° HOUSE 4: (2) 3,336 SF 4 BEDROOM, ,
LOT 5: 2,262 SF/7,213 SF=31% LOT 13: 1,693 SF/5,752 SF=29% HOUSE 5: (1) 3,719 SF 5 BEDROOM, 4 BATHS, REC ROOM, 2 CAR GARAGE \ \ SDMH \ a a o w
LOT 6: 2,284 SF/6,437 SF=35% LOT 14: 1,862 SF/6,909 SF=27% HOUSE 6: (2) 3,601 SF 5 BEDROOM, 34 BATHS, REC ROOM, 3 CAR GARAGE \ \ - \ J N 0
\ \ RIM-266.00 C o
LOT 7: 2,262 SF 6,396 SF=35%' LOT 15: 1,844 SF 6,626 SF=28% \ ASPHALT PAVING
/ / HOUSE 7: (2) 2,753 SF 4 BEDROOM, 21 BATH, 2 CAR GARAGE \ \ \\ \ I E(N W) = 250.46' 48"
LOT 8: 12,284 SF/6,700 SF=34% LOT 16: 2,030 SF/6,757 SF=30% HOUSE 8: (2) 3,223 SF 5 BEDROOM, 3 BATH, 3 CAR GARAGE \\ \\ \ `:--_--_--\ --- \ \ \ IE(SE)=250.80' 48" < z Q
IE(S)=262.08' 8"CONC PAVERS z
- ='\ \ \ 6' CEDAR FENCE
\
SMH °p
RIM=266.25' Q Q
W
RS-MP 3:
SMH LLi
»`\ ` _____---26�----- \ ( IM=268.42' ^ Q
\ -.: ` \ c\� Lw
\ N 88138 01 W 51 11 'I _ -- IE E)=259.04 12 \
97.83' o /� y� \ <,-Frp- \ ) �,� \\�\ \ \ IE(SE 59.18' 12" \
° 1 - - - - \+ - ' L I / O 70.0 70. 13. ,\\ MAINTAIN TEES IN ROW \ \ \
� \ \ / , » / / y' ice' \ � O \ �.; \
\ \
C) \ I LOT _I , p OI O / °
° / / - �\ , \\ - -I`, \\ - GARAG I i/i �;° ° ' II /» ' - / N ,�'i ♦' I � \ •--- SMH
ZT�- �_ N EXI G TWO W
, TURNIN ANE TAPE RIM = 272.26'
\ © GREENWALK DESIGNS LLC.
' \ WEST OFHER
o IE W)=259.58' 12„
1 03954REGISTERE
DIE(SW 59.65 12
CT
/ i. I °. , 4 / �' I I EXISTIN SPHALT \ \ \ \ AR
o" w \ t I / 6 � WALK
_ STEVEN A. BARNES
i O a \ \
° FOG LINE \ \ \ STATE OF �'VASHING i ON
. � i HOT } ' HOUSE 8 1I -- DECK / I W
1'-0» '7 SF' 10'-0
o\ `y e
\..::
ti� / �� o r r I - _ - \ \ \ A=2' 10'52"� �\\
- - ��1 ». \ in I i -0" 0» \ I I I N 4� 1'41" r ..'.'.'.'.'.'.'.... \1004�94 �O \
1 0 SITE WALKWAY
I o T 5 O \ cV _ I I �i\ 3. 1 / .......... . r L=3R6 \
! ! I \ I , '\J 1 P o ONNECTED TO EXISTING \ \
S. F O \ ARAGE CAR,gGE I • I \ I I w -� - I i / OW WALKWAY \
/ • - oo HOUSE 7 Lo
- \ \
3 I ......... -��
......\. I 1 - � � � �' i I r SIGN �� .'.�.......•
O
..... i1 I I 1 ENT Y \ I I to I �' l PLAYA<.700 \ \
! O , I I \ I co I /
EN RY I ! I ,? ALIGN WITH EXI
r,
I I GARAGE.:....... I \
1\ O„ 26ry _ 'CURB LINE
1 ► :..: - - �- - I- - '- " �'� O N / PAGE
AEMEN \a I'10 " \ \
o , CK ENR2- N 63 02 07 W \
„NO•
•
E ` � �
I b ARKI
:,� NG FIRE T O
\ I I 1 / TRH
! LCI E' SIGNS 50' O.C. I TREES
a
\ � r
r.. �� o c" °O I r a /."�.'.'...' AIROW N n2 \
r p � / r\ M \
,J
ul 0 ........ ..0..... \ ,>\ Q
i
L ..'.. o ....... O
{ x I y< C>
�°
I \
•
b.. .'..'...'. ........ O I J °
E �..... + ........................ ....... ............ ...... ♦ O
I:. / o
1 n
n F- ........ �' ....... F J o 0
S E6
\ / I. R H la ♦ \
x d \
_..... 70:0. a ............ .....
o 16.83 % a ♦ % . +''.. ...
i�i N 70.Q li Z
o .................... .... .. - \'. .......
/ / _ M .Q oci , / S
/ 10 0 �.'................... ...... ----�,�.'. ..............................................',.......... , .................. ;...=�-- �. ♦_
:. %i". \
1 R L / o ,��'.'................... ................. ......................40:75 . /.......... gY........ O Q
o _ I a......... 8, ......... \
---,L --- LOT 6 ..............: o.................. -. T...
J \'.. .............\'............'.�Q.................... r'.. ................---�-.'. - �........... �a -9 \
1.2: • '�9 c
�-.................................17.'.. ,'................. \
�' .'... y. �° c LOT
/ I .! _ ................... i..... / \
/ / /.�'. \ r............. i...... ... 1C \
0 0 / lGHT l 7`L/F? ; �\ 8 6 6 0 A W
00 / , 9 \ CA al �......... O
o \ n ,. /.
/
�. o ?
\ S
/ \ T /
C/ / - - _- - - - - :• •• ate. O / O / o "� ....f.. \ \ / °
-SPA I _ _ ' UJ +
N , ------ ' I • \ / /
E
- /
/ / I SEIvJENI . P A AREA T » I I I I /� ,/ /
W / HO 1 .15'.- " ' -- 6 . I I \ ! I , / :; / %�� \ S C O /
I I T I O SE
i i r - - : • \� r GARAGE I I DE'Gl�
i I POND I
LO I1A 0 o
z 0CARA E � HOUSs.
o MA / .... / / . E2 .. ...
4 '' .''O ::
0 -0»ID DECK HOUSE 2 ..
\
�
SITE DATA
34 �
oSITE AREA 540:111,275 SF 2.55 ACRES
- I 4 \ I Q p \ i e �` I� \ �• SITE AREA 550: 24,043 SF 0.56 ACRES
\ - - - - - - - - V.___' , , PQ \ I \ \ , MINUS AREA DEDICATED TO NEIGHBOR 135,272-1,151 =
F b� ` --► � ,,.. S� 134121 (3.08 ACRES)
o ♦--------- J \ -
, � \ - -� � COMMON SPACE REQUIRED 134,121 X .10 = 13,412 SF
- / �� 0 14,096 SF OF COMMON SPACE PROVIDED
....... � _ \ LOT 11 LO 1 - -- - c� �'.'.
:j: - - I \ \ 59 '6 156 I , - - ___- _ al ,7; 7 S �.��: / / I '� \ 8, S. ZONING: RS-MP
10' �» T �- ' - '- .75 ,? ��;� _ _ '� +•�'•:. • I I ' \ TAX ACCOUNT 540: 27032500308300
10
7 T92 S. '�- - I ^I o / / �AT,rAGE F TR ,� TAX ACCOUNT # 550: 270325003084001
/' / '-a"' • '1' 0» - -� - - - 2C - \ b i LOT 1 0 ! ro / - r r \ \ NUMBER OF LOTS 3.08 X 5.5/acre = 17 LOTS O
/ _ _ ti �-\ 1
o /' EGk / ..i ..,.,..., • �� ./ \ - � - .... .... ...'." �:• 'y RY I I �I h RS-MP 16 LOTS PROPOSED � O
_ e \� I �--�/ ` '' / I RS-8 LOT WIDTH 70 (VARIES)
GARAGE / . 34 I ' ��' HOU� 5 \ F - - �: T ........'.:.:.:.:.:.:.:.'../.:.:.:.:.:.:... / / / I I GARAGES �6, 6 8 W
/ > ,--' I J� I \ I' �' ...... o / / I / SETBACKS: FRONT YARD 25', 7.5' SIDE 15' REAR, 357. LOT �_ 0
COVERAGE - 10' all SIDES AT LOTS ON EASEMENTS z
(/)
N I / SUGGESTED MODIFIED SETBACKS: FRONT YARD 10' (20' AT I-
_``� 10® 10t-0» SE 4, I ! I / O\ \ I GARAGE), 7.5' SIDE, 15' REAR w V
_ I \ ECK !
EN I : E��. / Oc
� I w Q w
GARAGE � LOT 1
E BUILDING HT: 25'
o I
HO E 6 I I n �\ I \ CO \ "� - I - - - 7 �, 0 �'h �.� HOUSE 2 / O z 0
121-
D♦ 1 l _ _ _ -! -\\ - - - - - /� -/- - _ _ ♦ I DECK I
o r - ,' - 1 �- _ - - - 1- w
i
l I I p o - - I / _ r / , / - - - T - �o O LL
/ \ o i _ �.'' ,,n� 134.25' ,� I , r / i o-�- - - - - - 0 0 0 \ o
7. l I �"�" I ' ° ; / o �' 72.17 - - --�--- - _-���___ o ��'� °59'5 " 1 9. ' ' v w
° 55.1
W/ - ° -
/N 8 8° 301 0' O E E D /' 5' - --- - ---- j -- _ - - - _ - - - - - - - _ _ _ - N to
8.61 - - - _ _ _ _ _ _ - _ _ _ o z
ITEM3-10' ~ M O
w
00
SEWER ESM Tui
I
RS-MP SMH A.F.N. 2013162 N 00054' 15" E = I- w
I RIM=271.15 4.75'
IE(NE)=260.59' 12"
IE(SW)=260.73' 12"
NORTH 0 20 40
GRAPHIC SCALE
PRELIMINARY SITE PLAN_
E SCALE: 1 "= 20'-0"
Exhibit 17 -Green alk ar
PLN2022-0049 & -0
Packet Pg. 293
1.s
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
w cO E
U
�\ \e) O \ n \ ¢ a� o
\ V \ W y-- C
CEn 3i
\\ O J N 3
mod\ Z Q
\\ \ 3
TYPE 3 LSC: \ \ ` F \`r \ \ z - 2
TREES NO MORE THAN 30' O.C. WITH A MIN. OF 50% EVERGREEN. \ �\ �\ OA _\ ` �/ ,� o
3C -9 TREES REQUIRED WITH 5 BEING EVERGREENLo
!-' ` ^� �C►�I w o rn
PROPOSE:6 EVERGREEN (4 EXISTING) & 4 DECIDUOUS. \ 12 s^ O,(1 `\\ w o
N 88°38'01" W 251�Q1' g 0 2��.�� o /�✓ v
1 0 \
°
28
\ PR F of 6 �\ �` OEM
o Q
36" \\\ e 8"PL �� ���� ' DE
o
�— -- - - -�- �;"� i // I---------� "DEC ��� \ `d \� \Q\ 8123/23
LOT � �.\\ l
f E v
-a
---7 ,��-1 V s s
7 T 3
Ln Ld X "� — O I i LOT 4 I ;QED I 1— �° 8„ 1' 2 ��� v��
8„ 0 0 2 D 12-A \ A� \�,
� "
»w L---� 50 �_ED I V I V L_� ,A D _
__ „ 7 O
o z o �- O I °� STATE OF WASHINGTON p
°' ° — I I ' I ♦ I I LOT 2 _ --- REGISTERED ;�,
w
u- ¢ ' \ '` \ ♦ EC >
-
�Ln. -- I \I / I low - �\�a A9TAT :a
LA SCAP C I
L_ /
Cn
w — — — _ �\ —
x ® I L- — - ® — — — J ♦ 1 \ v / — / `� AKEMI SAKAIDA R
® A / CERTIFICATE N0. 794
- I�.,� c q �v I� ��� -? EXPIRES 06/16/24 w
UD RL jl 12 IK I----- --- I L i'- - \ SP E 48" D r / k' / / / ° f 7\ c
�w ° p u \ ' — \ Irk ♦ L I \ - �Q �' \ O �� `\ 02 07 W ca N 63
— — — -- ---- ✓ir
z � 44.17
QO — A I r� \ L
/ ED � \
Ioo
I I I / 278
o
C) 0- I I I L / E
UCL
> o _ O
O
Li C I I o a DF o
2 4 (, LOT 1 0'
p -- —
as PL y ^ w W \n yy—T / /
,a - ,� - \ - w�— w \ , I Q 6
10 I-- --- ----- �'-- `� STREET v R ii 18"\ED w ' v ` 4 O�� / v � 00
ERE _ _ LIGHT (TYP) ,\ -r - — q _ 4 \ / \ , \ 'D
7— \
00
I\ SSte— Q
T�-— -
C14
\1 \ o \ - — \ 3 \ O
- I �o
O
(IL
-
I \ \ r ♦ — — — / \ ♦ CLUSTER ^ W F- — --46 C /i Y
V
- .
X I ---- I I = ACT B I I I v 27 -� I o fr //, �1 4', �/ \\ 4 „DE ° O Z
w I I ON SP I 00
o
o I L- -7 I I I 280 C 2j2 / / LOT 16
LOT 11
Ln
,----� 40 CED 2 -.� f L I I ° I � �' � \ \ Q \���
. -- - /
2�4 \--- �''- \\, y L T 12 L_ O T 3 ° - , 6„C o w
r
414 CED, ,v 3 CIIE I I 2 o,/Eu,/ ��'� ° � v v v // --
�v
/ v
v I 6
ED 6 S I \\ \ \EDI I I �T r -_ l\ 2 D F \\ E
T- O I \
1 'DEC
o
12 �B I R — — • tip° / / �/ 3 �\ F `� I —
-- ® I N w
r� 24'iDF
E r � 4 a1F �
®� „ ------ o�
O / ��V ' r ---- C) v
- l % o
---- — 21I,
g
\L4T 9 I
I
26, /� 1 I I / 22 C Z
� rd I I I � � x /
6„C I \ I aV /� 0 E�/ I I LOT 10
I // / 136"CE�—/I '' A /�
y I 1 14'� ED I I /�, i I I u1
I
CE -
- D <Ll
13
30"
` \ — \ -
� j
\. ---- �4 R( D) ,—L-----
— —
it 0
12"MAP CED AP \\ \,
° ° N �8°5 2
° 2"CE 6' x 6"MAP® 114151
o
M
J -- - — — W Z N
300.0
3" — — — \
TYPE 3 LSC. 28.61' t o
Q M z
TREES NO MORE THAN 30' O.C. WITH A MIN. OF 50% EVERGREEN. X N O
-10 TREES REQUIRED WITH 5 BEING EVERGREEN.
00
PROPOSE:9 EVERGREEN(4 EXISTING) AND 6 DECIDUOUS (2 EXISTING). I I w w �
N 00-54'1572 E _ ui Lu w
� �
I
TREE PLAN 4.75' U) 0
0 10 20 40
N
1 inch = 20 ft.
Exhibit 18 - Greenwal
kF)Am
9 & PRELIMINARY DE EL P L Packet Pg. 294
SET TREE STRAIGHT AND PLACE RO
ON SOLID GROUND OR ON COMPACT
BACKFILL.
BACKFILL PLANTING HOLE 1/2 FULL WITH NATIVE SOIL
REMOVED OF DEBRI. TAMP SOIL TO STABILIZE ROOTBALI
WATER THOROUGHLY. CUT AWAY AND REMOVE STRING /
BURLAP. IF IN WIRE BASKET REMOVE COMPLETELY. BE
CAREFUL NOT TO DAMAGE ROOTS. BACKFILL REMAINING
PLANTING HOLE WITH A MIXTURE OF APPROVED TOPS011
AND NATIVE SOIL. AMEND BACKFILL AS NOTED IN
LANDSCAPE NOTES.
3 TIMES
ROOT BALL DIAMETER
TREE PLANTING DETAIL
L3.2 SCALE: N.T.S.
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
PLANT SCHEDULE
11.040
SYMBOL
SCIENTIFIC NAME
COMMON NAME
EXISTING TREES TO REMAIN WITHIN CONSTRUCTION AREA
TREES: COUNTED AS TREE REPLACEMENT CREDITS
0 0
2%6" WOOD STAKES, LOCATED OUTSIDE OF
ROOTBALL. FASTEN WITH CHAIN LOK TREE
TIES. STAKE MAY NOT TOUCH TREE
TRUNK. STAKE HEIGHT MUST BE AT LEAST
5' FROM FINISHED GRADE.
0 0
SIZE (MIN.) IS CALIPER AND HEIGHT
CALIPER IS MEASURED AT 4.5' HIGH
QUANTITY HEIGHT IS FROM TOP OF SOIL LEVEL SPACING (MAX.) NOTES
REFER TO ARBORIST REPORT
REFER TO SHEETS L1 AND L2
REFER TO ARBORIST REPORT, L1, L2, AND Al SHEETS FOR ADDITIONAL
INFORMATION ON THE TREES TO REMAIN AND BE PROTECTED AND TO BE
REMOVED. REFER TO OWNER OR OWNER REPRESENTATIVE FOR ANY
CLARIFICATIONS THAT ARE NEEDED. REPORT ANY CONFLICTS TO OWNER
REPRESENTATIVE.
MEDIUM TO LARGE CONIFERS: 13 6' HIGH
ABIES GRANDIS: GRAND FIR AS SHOWN FULL TO GROUND. NICE BRANCHING. STRONGLY UPRIGHT.
CALOCEDRUS DECURRENS: INCENSE CEDAR
THUJA PLICATA 'HOGAN': HOGAN CEDAR
®
MEDIUM TO COLUMNAR CONFIERS: 19
6' HIGH AS SHOWN
ABIES KOREANA: KOREAN FIR
FULL TO GROUND. NICE BRANCHING. STRONGLY UPRIGHT.
CHAMAECYPARIS OBTUSA GRACILIS: SLENDER HINOKI
CHAMAECYPARIS NOOTKATENSIS PENDULA: WEEPING ALASKA CEDAR
TAXUS MEDIA HICKSII: HICKS YEW
STREET TREE: DECIDUOUS 31
1 " CALIPER AS SHOWN
SINGLE TRUNK, MATCHING FORM, LOWEST BRANCHES AT 4' CLEARANCE,
DO NOT PRUNE TO ACHIEVE LOWEST BRANCHING HEIGHT.
PRUNUS CERASIFERA 'CRIPOIZAM': CRIMSON POINTE PLUM
GROUP TREES: 9
1" CALIPER AS SHOWN
SINGLE TRUNK, MATCHING FORM, LOWEST BRANCHES AT 4' CLEARANCE,
BETULUS PAPYRIFERA 'RENCI': RENAISSANCE REFLECTION BIRCH
DO NOT PRUNE TO ACHIEVE LOWEST BRANCHING HEIGHT.
NYSSA SYLVATICA 'HAYMANRED': RED RAGE TUPELO
O
MEDIUM TO LARGE DECIDUOUS TREES: 7 AS SHOWN SINGLE TRUNK, MATCHING FORM, LOWEST BRANCHES AT 4' CLEARANCE,
ACER RUBRUM 'AUTUMN FLAME': AUTUMN FLAME MAPLE
1 J" CALIPER DO NOT PRUNE TO ACHIEVE LOWEST BRANCHING HEIGHT.
CERCIDIPHYLLUM JAPONICUM: KATSURA TREE
CLADRASTIS: YELLOW WOOD
MEDIUM DECIDUOUS TREES: 10 1 1" CALIPER AS SHOWN SINGLE TRUNK TO 3' MINIMUM. STRONGLY UPRIGHT. MATCHING FORM.
AMELANCHIER: SERVICEBERRY
CORNUS KOUSA : KOUSA DOGWOOD
HALESIA: SILVERBELL
SMALL DECIDUOUS TREES: 16 1 J" CALIPER AS SHOWN SINGLE TRUNK AND MULTI - STEM ACCEPTABLE AFTER 18"
ACER CIRCINATUM: VINE MAPLE
CORYLUS CORNUTA: HAZELNUT
HAMAMELIS VIRGINIANA: WITCH HAZEL
MALUS "XX?": CRABAPPLE (VARIES)
NOTE:
- TREES LISTED SHOW DIFFERENT OPTIONS THAT CAN BE USED FOR THAT TYPE OF TREE (SYMBOL).
DECIDUOUS
SET TREE STRAIGHT AND PLACE
ROOTBALL ON SOLID GROUND
OR ON COMPACTED BACKFILL.
PLACE 3" OF BARK MULCH IN SAUCER TO BACKFILL PLANTING HOLE 1/2 FULL WITH NATIVE SOIL REMOVED OF
WITHIN 3" OF THE TRUNK. NO PLANTING DEBRI. TAMP SOIL TO STABILIZE ROOTBALL. WATER THOROUGHLY. CUT
3' DIAMETER MIN. AWAY AND REMOVE STRING AND BURLAP. IF IN WIRE BASKET
REMOVE COMPLETELY. BE CAREFUL NOT TO DAMAGE ROOTS. BACKFILL
REMOVE CONTAINER OR TOP j OF BURLAPS REMAINING PLANTING HOLE WITH A MIXTURE OF APPROVED TOPSOIL
FROM ROOTBALL PRIOR BACKFIL A I f AND NATIVE SOIL. AMEND BACKFILL AS NOTED IN LANDSCAPE NOTES.
1.s
W
(D E
U
�
w
o
Ld
W
W
�
O �
O
�
Q
U
0),2
(n o
N
�o
Q
3
J
N 3
r h
�
>
v
C�
Z
N
Q �
w
3
� o
z
r- Ca
o
w
N r7
CA
J
�
Lo C)
w
j
cp
o
N
00
0-
14111111h4
Immo
qw
8/23/23
STATE OF WASHINGTON c
REGISTERED w
LA SCAP C ITECT
C� U)
N RAE
AKEMI SAKAIDA �
CERTIFICATE NO. , — 0
EXPIRES 06/16/24 u-
c
R
G
IL
c
m
0
NC
�^
VJ
M y
�
TWT
m
Z0
O
Ia
IL
R
Q
`
�E
v J a`
W
O
QIL
7 L
`'o
Z`o
O
W
L /
C
��
[L�
Q v
Wow`
CL
L0
cc
0
N
c
0.
t
x
W
J
0
0
Lo
c
d
t
Q
C
r
Q
Lu
O
z
FORM 5" HT. WATER DAM
r�
v
AROUND TREE WITH SOIL TO
HOLD WATER.
Z
U
L li
FINISH GRADE. 3"
NOTE:
ALL WEEDS ARE TO BE REMOVED WITH ROOT(S) IN PLANTS
z
Q
O
f-
DELIVERED, UPON ARRIVAL. DISPOSE OF WEEDS OFFSITE.
IF EXCESSIVE WEEDS OCCUR AROUND THE BASE OF PLANTS
J
WITHIN THE FIRST YEAR, THE CONTRACTOR SHALL BE
SCARIFY SIDES OF PLANTING
RESPONSIBLE FOR WEED REMOVAL BY MECHANICAL MEANS.
HOLE. MAKE SURE HOLE HAS
06
GOOD DRAINAGE.
Q
z
EXISTING NATIVE SOIL OR NEWLY
L]Ij
LLI
CY)N
PLACED TOPSOIL.
J
V
U)
LuN
3 TIMES
ROOT BARRIER ALONG SIDEWALKS AND CURBS:
O
ROOT BALL DIAMETER
REFER TO CITY CODE OR PUBLIC WORKS REQUIREMENTS FOR EXACT
00
_
SPECIFICATIONS.
W
LLJ
( n
TYPICALLY 18"-24" DEEP CONTINUOUS ROOT BARRIER, 15' CENTERED
L1i
W
Lu
>
ON TREE AREA WHEN TREE IS WITHIN 5' OF A PUBLIC CURB AND OR
=
/
I—
LJi
SIDEWALK/PAVING/WALKWAY.
U
0
0�
Exhibit 18 - Greenwalk,a• 2
Pi N=9 r%/"%A-0 1.5-11
PRELIMINARY DE EL P L 9 & Packet Pg. 295
Planning &
Development 1.t
Received
09/07/202Tf E R R A F O R M A _
DESIGN GROUP E
L
0
U_
PRELIMIMINARY STORMWATER SITE PLAN REPORT
0
re
GREENWALK PARK
LOCATION:
540 + 550 Edmonds Way
Edmonds, WA 98020
ISSUE DATE:
August 23, 2023
PREPARED FOR:
Fernandez & Barnes LLC
10529 NE 58t' Street
Kirkland, WA 98033
Contact: Steve Barnes
Phone: (206) 550-9296
PREPARED BY:
Terraforma Design Group, Inc.
5027 515t Avenue SW
Seattle, WA 98136
Contact: Pedro DeGuzman, PE
Phone: (206) 795-9023
Email: pedro@terraformadesigngroup.com
COMPLIES WITH APPLICABLE O
CITY STORMWATER CODE of WAsy
% 2
10/11 /2023
35646 <
CONDITIONALLY APPROVED FOR PRELIMINARY �� �F�isrO�°
DESIGN. SEE PRELIM APVD_STM_PLN2022-0053
FOR CONDITIONS rT�
8/23/23
All plans and specifications, calculations, certifications, as -built drawings, and all other
submittals which will become part of the permanent record of the project are dated and
bear the project engineer's official seal and signature. Project engineer is a
professional engineer licensed in the State of Washington in civil engineering.
0 CIVIL ENGINEERING
& LANDSCAPE ARCHITECTURE
5027 51" Avenue SW Seattle WA 98136 phone 206.795.9023 website www.terraformadesi�Zngroup.com
Exhibit 19 - Green
PLN2022-004 Packet Pg. 296
Planning &
Development
Received
09/07/2023GREENWALK PARK
STORMWATER SITE PLAN REPORT
If_13I=Ee]YK67►kI=1►k%I
1.
PROJECT OVERVIEW & MAPS
1
2.
EXISTING CONDITIONS SUMMARY
7
3.
OFF -SITE ANALYSIS REPORT
9
4.
SUMMARY OF MINIMUM REQUIREMENTS
12
5.
PERMANENT STORMWATER CONTROL PLAN
16
6.
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN
22
7.
SPECIAL REPORTS & STUDIES
22
8.
OTHER PERMITS
22
9.
OPERATION MAINTENANCE MANUAL, SOURCE CONTROL
22
10.
BOND QUANTITIES WORKSHEET
22
APPENDIX A —
WWHM CALCULATIONS
APPENDIX B —
GEOTECHNICAL REPORT
APPENDIX C
— STORMWATER OPERATION AND MAINTENANCE MANUAL
ADDENDIX D
— SOURCE CONTROL PLAN
APPENDIX E —
DRAINAGE PLANS
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 297
Planning &
Development
Received
09/07/2023GREENWALK PARK
STORMWATER SITE PLAN REPORT
SECTION 1 - PROJECT OVERVIEW AND MAPS
This Preliminary Stormwater Site Plan Report for the Greenwalk Park project has been submitted to
the City of Edmonds as part of a Preliminary Plat Review.
Project Proponent: Fernandez & Barnes LLC
Property Area: 3.11 acres
Total Project Area: 3.15 acres
Site Location: 540 & 550 Edmonds Way, Edmonds, WA 98020
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E
W.M. Snohomish County
Parcel ID: 27032500308300,27032500308400
Required Permits: Preliminary Plan, Building Permit, Sitework Permit
Dept. of Ecology Construction Stormwater Permit
The proposed project involves the development of two existing single-family properties for
construction of a new 16 parcel single-family plat. The existing structures, pavement and much of
the existing conifer trees will be cleared for the development. Work will include clearing, grading,
drainage, utilities, landscaping and roadway frontage improvements. New drainage improvements
will include runoff treatment and infiltration for the access roads and drive aisle and drywells for
each lots roof and planter areas. No stormwater surface discharge is proposed. The site is
tributary to both Willow Creek, Deer Creek and Puget Sound.
The project will require compliance with the City of Edmonds drainage standards and the
Department of Ecology 2019 Stormwater Management Manual for Western Washington.
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 298
Planning &
Development
Received
09/07/2023GREENWALK PARK
STORMWATER SITE PLAN REPORT
k
Wn9
Scratch istiUlry
.09
1.t
a ID
Hut Edmonds
www 9 r•
onEUmcnd'
m
Edmonds y a s
city Park. wry
Doir
X PINE PARK
NEIGHBORHOOD
220th 9 SW 220th St S'.,
1V = • � 3
ISm40 Edmonds Wayy. 5
'donds. WA 98020 <
. SITES \; �
S 226TH ST. SW 8
f
Edmonds 6_ -
WESTGATE 228TH ST. SW
© 22" St SYi 728in i •..
D � 1
Noun PCC Carrr,nrtY _ _ _ O
Markets Edmonds
,3y
5
SHERWOOD
FOREST
Madrona K-8 Scholl p
2
S �
Aquarlum Coop O
zaam st sw
Kruckeb-
Qernr Ger t*
VICINITY MAP
SCALE: N T S.
540 & 550 Edmonds Way, Edmonds, WA 98020
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E
W.M. Snohomish County
TJ Ma■x�
23tnn St SW
r'
Fanna 6nr
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 299
Planning &
Development
Received
09/07/2023GREENWALK PARK
STORMWATER SITE PLAN REPORT
-01
IN
540 Edmonds Way
►s
3.a
550 Edmonds Way /.
Ir-
M
SITE AERIAL ♦'
EXISTING SITE AERIAL
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 300
Planning &
Development
Rec
09/07 2023
30"CED \�
1 ` i
12"CED u
N 83$' 1" W 2$D.09' '
1 "CED 4 °SEB �\ / --\ / \22"YD
)8' D// /14"CED o
ly\ / 1 SPR \ o„
° ��
D
` [
I ; \I I 1
0"CED I \I j 1 36" EDP
1 J II 142"CEI —Y 9CED "\ I "1 1 '
\ 40'CED / 1 \ I r �V 3\
\ 6DEC � 8
6"APPL \I / \ \ I �' 1 / I �r \�
4 "CED' \
` /J I 6„C D \
/ I \ 42'CED n
8"PEAR \ 50"CED /` / I f� ' I 8"C 8 A D12'A D
SHEET DRAIN' ` / 1\ __� ° D ° N z1'41' w 23.79'
6..APPL ,I GRASS ; \ ROOF
\ / 6„IMAP .—+� 6„MAP I E o 26+
8I °FIG
1 L°1 \ 6"AP\P2"II I6 —D 48\1�IE
LUM 10"DEC 58ED
PARCE NO. WAX ED
AFFVL / 27032500 08300
011
\'—\
o
WM \
L
APPL I °.4 1 // I / 04„ ED\ \I / \ \ 4"CE f /s 8 D \ TINIA I p
T B SIN (2.55f AC ES) --° 9`�_�_\�\ C D /`J28 E \/ I/ // \ 0„CED` 10" EQ(Rpih\ IA)� 24 DF DO" IN
111,275t F. 4 1 �— \ v -- I
/I 24 CEDII I \�
1o°L L _ 1.59A i /'� yr \'' i -__ ' I1�
1 L ° 0" '' l /%i u�\, R j/ %8" `�D 1 \y `� / ' / 24"CED` \ y %f /
\ (r BIR 10"BII,�I j ( 4o�EDy _, — — —I�— ` \\ // PAVING 38"D c
' GRASS
BIR/A 'P \\�� 18"CED
\/
/ \32CE\�\x \ 34' I 1 i 16 MAP \\ PAVING 1\ 42"CED / / \\ i' 8"DE CLU
o / \ ` /
50"DF
POND
40"6Eo `\ <�_2s"cE�' I WALK \� RASS _ \
I / 1 /'/ ,-�,� ROOF \--< ~-r��?spF/ <( ROOF
/ 38\CE9 \J / \ \ , ( 30"C�dl \ V� c 24°EEC— _1 / h\2X--\ J 1 V L
\I I o2 a\16"PINIE
/ f 12 �� ��\ I 6„may. GRASS/'/ \ \ 1\ 3 »QED/ I \� Sti // 40'/CED / \ \ I L� 1 _ \ L
/\I \ 42"CED / /��`� / _ \\�\\� / / �� SS> _32"DF I /
38"CED / / \ �— p I 66"CED //� _` ' X\— /y\ �' 1 /27032 0308400 ° C
1 —� � �\ 6„ AP / ° 16 IEc ` 1 t' L<\ PARC L N0. WALK 20»G
\ I / I L
12"BIR\ \ BASIN , \ \ \
I ° I OND \ G 6� AP _ F \ 4,043t S.F.
1.52AC 124'�DF 24 dIF I 0.56t ACRES)
6"SPR B,.M P\ 1 y
GRASS / /' /� 12� A)'
\ r _
/12"CED$ \ I ° `1. /� \ 34�'CE 1 22TED / \ ASS
1— 1 � /20"CED I 2 EDI / 1 36"CE4 I \ \\
14,CED 28"CED
30'C
` EDI/26"C�Fp�r�r
/ { P �< \ / \ / o 0 14"LL \ / \ 1 \ �? �� / I �k 40"CED I I ROOF L
I 11 3 'CED / I\I2' p
/ 6RAN QI Lh 1 f 38 DF j 1 V
0 40
'MAR �\ 30CED 26"MAP
/ — 42"CED / F\LRL 16"M PO 30
1 inch = 40 ft. L
a
GREENWALK PARK DRAINAGE BASIN MAP
540 + 550 EDMONDS WAY, EDMONDS — EXISTING CONDITIONS
by: Pedro DeGuzman, PE Terraforma Design Group, Inc. DATE: 6/23/22
Exhibit 19 - Green,
PLN2022-004 Packet Pg. 301
Planning &
Development
Received
09/07/202PREENWALK PARK
STORMWATER SITE PLAN REPORT
LANDCOVER DATA
Project Name: GREENWALK PARK
Project Number: '21027
DRAINAGE CRITERIA: CITY OF EDMONDS, 2019 SWMMWW
1.t
Step 1) Site Data
1) General characteristics:
Basin ALL Soil type Vashon Outwash / Vashon Till
Developm ent type single family Soil Group A/C
Size (ac.) 3.11 Existing surface roof, pavement, grass, trees
Detention/Retention Retention Predev Cover Forested
2) E)asting onsite characteristics
Landscape
Roof
Pond
Paving
111703
sf= 2.56 acres
sf = 0.25 acres
sf = 0.03 acres
sf= 0.27 acres
10702
1258
11655
Total 135318 sf= 3.11 acres
3) Developed onsite characteristics
Landscape
Roof
Pond
Walks
Paving
66777
sf= 1.53 acres
sf = 0.89 acres
sf = 0.02 acres
sf= 0.02 acres
sf= 0.64 acres
38762
798
999
27912
Total 135248 sf= 3.10 acres
4) Pollution Generating Hard/Impervious Surface:
5) Pollution Generating Pervious Surface:
6) Existing Unmanaged Hard Surface:
7) Average Slope:
8) Estimated Ultimate Infiltration Rate:
27,912 sf
66,777 sf
0.00 sf
4 %
4 in/hr
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 303
Planning &
Development
Received
09/07/202PREENWALK PARK
STORMWATER SITE PLAN REPORT
SECTION 2 - EXISTING CONDITIONS SUMMARY
The subject site includes the existing single-family residential properties located at 540 and 550
Edmonds Way in Edmonds, Washington (Snohomish County Parcel Nos. 27032500308300 and
27032500308400). The parcels are irregularly shaped and have a total area of approximately 3.11
acres. Each parcel contains a single-family residence with detached garage, landscaping, and
associated access and utility improvements. Landscover consists of roofs, driveways, patios, grass
and significant trees including cedar, douglas fir, spruce and maple.
The property generally sheet drains towards the neighboring properties to the west and south. Site
slopes are generally inclined at 10% or less with one moderate slope approximately 8 feet tall and
inclined at 20 to 25% next to the northern detached garage. Vegetation consists of maintained
grass lawn and landscaping, and mature trees are scattered throughout both parcels. A large,
decorative, water feature is situated near the center of the 540 Edmonds Way parcel. It consists of
multiple waterfalls and streams traveling over and around large boulders, and empties into a
maintained decorative pond approximately 25 feet wide and 50 feet long.
There is no area of contributing runoff from adjacent properties. There are no onsite stormwater
treatment or flow control facilities. A manmade pond exists within the western portion of the site
and will be preserved.
There are no onsite wetlands or sensitive areas onsite or in the immediate vicinity.
The property is not within a 100-yr floodplain.
A geotechnical study and infiltration tests were performed by Associated Earth Sciences, Inc. in
January of 2022. See Appendix B for the full report.
Geology
Grass/Topsoil
A surficial layer of organic -rich, grass sod over dark brown topsoil was encountered at all
explorations. The encountered thickness of the topsoil was generally 8 inches. Organic topsoil is
not a suitable stormwater infiltration receptor.
Fill
Underlying the surficial topsoil horizon, the explorations encountered approximately 4 feet of
loose, gray to dark brown, fine to medium sand, with variable silt and gravel content and trace
organics and debris. These materials are interpreted as fill soils placed during previous site
development. Fill is expected to be found around existing structures, buried utilities,
foundation/wall backfill areas, and beneath landscape improvements. Due to their variable silt
content, highly variable composition, and lack of lateral continuity, fill soils are not a suitable
stormwater infiltration receptor.
Vashon Recessional Outwash
Sediments encountered beneath the fill soils in our explorations generally consisted of loose to
medium dense, bedded, orangish brown, fine to medium sand with variable silt and gravel
content. We interpret these sediments to be representative of Vashon recessional outwash.
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 304
Planning &
Development
Received
09/07/202PREENWALK PARK
STORMWATER SITE PLAN REPORT
The recessional outwash was only about 3 to 3.5 feet in thickness, and was underlain by glacial
till at a depth of about 7 to 8 feet. Vashon recessional outwash is often a suitable stormwater
infiltration receptor, but at this location it does not have sufficient thickness or permeability.
Therefore, it is not a suitable stormwater infiltration receptor.
Vashon Lodgement Till
Underlying the recessional outwash, the explorations encountered dense to very dense,
non -stratified, gray, silty, fine sand with some gravel, interpreted as Vashon lodgement till. The
till layer ranged from 2 to 3 feet in thickness, and was underlain by Vashon advance outwash at
a depth of about 10 feet. Due to a significant amount of fines and consolidation by the massive
weight of the glacial ice from which it was deposited resulting in a very low permeability, lodgement
till is not a suitable stormwater infiltration receptor.
Vashon Advance Outwash
Underlying the lodgement till, the explorations encountered dense, gray, fine sand, with trace
silt and trace gravel. The bedding was primarily massive with only occasional thin ('/4-inch-thick)
silty sand interbeds. We interpret these sediments to be representative of Vashon advance
outwash. Unsaturated Vashon advance outwash is a suitable stormwater infiltration receptor when
present in sufficient vertical and lateral extent, and provided the recommendations contained in this
letter -report are followed.
Groundwater was not found during the excavation to 17 feet below grade. Based on groundwater
mapping and documentation of the existing onsite well, groundwater is approximately 35 feet below
grade.
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 305
Planning &
Development
Received
09/07/202PREENWALK PARK
STORMWATER SITE PLAN REPORT
SECTION 3 - OFFSITE ANALYSIS REPORT
The existing 3.1 acre parcel consists of 2 subbasins.
Basin #1 (west subbasin) sheet drains westerly to the west property line. Drainage continues to
sheet drain through the existing single family residential properties in a northerly direction until it
reaches Willow Creek. Willow Creek continues westerly and then northerly until it reaches
Edmonds Marsh and the Puget Sound.
Basin #2 (east subbasin) sheet drains to the south property line. Drainage continues to sheet
drain through the existing single family residential properties until it reaches 226th Street SW. A
ditch along the north side of 226th Street SW intercepts runoff and routes runoff into an existing
12" storm drain within 226th Street SW. This system turns southward along North Deer Avenue
before outfalling into Deer Creek. Deer Creek continues westerly until it reaches the Puget
Sound.
There is no area of contributing runoff from adjacent properties.
We do not expect any impacts to the off -storm stormwater system since the development will
fully infiltrate runoff onsite.
See attached Downstream DrainageMap and Off -Site Analysis Drainage Table.
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 306
Planning &
Development
Received
09/07/202PREENWALK PARK
STORMWATER SITE PLAN REPORT
Aa - c
�1
O 1
i/low Creek 1C is O a� �70
�o
108.
00 b
SITE, Y
2A ,
- o
zap
2D zos,-0., °� ditch 226th St. SW
I
2C 2B C
O o f�--
m
Z
AEI 228th St. SW
I o mob?
240•-0- -- ♦ ♦ 1 ��
1t
i%N ! 2F
Deer Creek
D aq y
fir~ J� r2G I
4� 0 30
0 60on r,
DOWNSTREAM DRAINAGE MAP
1.t
Ll
t
#iw
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 307
Planning &
Development
Received
09/07/202PREENWALK PARK
STORMWATER SITE PLAN REPORT
OFF -SITE ANALYSIS DRAINAGE TABLE
SITE ADDRESS: 540 + 550 Edmonds Way
BASIN: 1 1 - North SUBBASIN NAME: N/A I SUBBASIN #: N/A DATE: 12/17/2021
DRAINAGE
DRAINAGE
DISTANCE
OBSERVATIONS OF FIELD
COMPONENT TYPE,
COMPONENT
FROM SITE
EXISTING
POTENTIAL
INSPECTOR, RESOURCE
SYMBOL
NAME AND SIZE
DESCRIPTION
SLOPE
DISCHARGE
PROBLEMS
PROBLEMS
REVIEWER OR RESIDENT
see map
Type: sheet flow,
drainage basin,
%
1/4 mi = 1320 ft
constrictions, under capacity,
tributary area, likelihood of
swale, stream,
vegetation,
ponding, overtopping, flooding,
problem,
channel, pipe, pond,
cover, depth, type of
habitat or organism
overflow pathways, potential
flow control/wq BMP;
sensitive
destruction, scouring, bank
impacts
Size: diameter,
area, volume
sloughing, sedimentation,
surface area
incision, other erosion
1A
west p/I outlet
0
1B
sheet flow
residential
9%
1212
none
none
none
1C
Willow Creek
creek
8%
1320
none
none
none
NO DOWNSTREAM DRAINAGE CONCERNS FOUND
SITE ADDRESS: 540 + 550 Edmonds Way
BASIN: 1 2 -South I SUBBASIN NAME: N/A SUBBASIN #: N/A DATE: 12/17/2021
DRAINAGE
DRAINAGE
DISTANCE
OBSERVATIONS OF FIELD
COMPONENT TYPE,
COMPONENT
FROM SITE
EXISTING
POTENTIAL
INSPECTOR, RESOURCE
SYMBOL
NAME AND SIZE
DESCRIPTION
SLOPE
DISCHARGE
PROBLEMS
PROBLEMS
REVIEWER OR RESIDENT
see map
Type: sheet flow,
drainage basin,
%
1/4 mi = 1320 ft
constrictions, under capacity,
tributary area, likelihood of
swale, stream,
vegetation,
ponding, overtopping, flooding,
problem,
channel, pipe, pond,
cover, depth, type of
habitat or organism
overflow pathways, potential
flow control/wq BMP;
sensitive
destruction, scouring, bank
impacts
Size: diameter,
area, volume
sloughing, sedimentation,
surface area
incision, other erosion
2A
south p/I outlet
0
2B
sheet flow
residential
0.7%
310
none
none
none
2C
ditch
226th St SW storm
0.5%
360
none
none
none
2D
12" storm drain
226th St SW storm
0.5%
566
none
none
none
2E
12" storm drain
N Deer Dr storm
1.3%
1241
none
none
none
2F
36" CMP
culvert
1.0%
1441
none
none
none
2G
Deer Creek
creek
5%
1575
none
none
none
NO DOWNSTREAM DRAINAGE CONCERNS FOUND
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 308
Planning &
Development
Received
09/07/202PREENWALK PARK
STORMWATER SITE PLAN REPORT
SECTION 4 - SUMMARY OF MINUMUM REQUIREMENTS
Since the project will result in 5000 sf or greater in new plus replaced hard surface area, the
project is classified as a Category 2 Project Site. Applicable requirements include the City of
Edmonds Municipal Code 18.30.060.0 and the Department of Ecology 2019 Stormwater
Management Manual for Western Washington.
The flowcharts are provided to determined the required drainage criteria.
Figure 1-3.1: Flow Chart for Determining Requirements for New
Development
Start Here
Does the Site have 35% Yes See Redevelopment Project
or more of existing hard Thresholds and the Figure "Flow
surface coverage? Chart for Determining
Requirements for Redevelopment".
Does the Project convert YA
acres or more of vegetation to
Does the Project result in lawn or landscaped areas, or
5,000 square feet, or No convert 2.5 acres or more of
greater, of new plus native vegetation to pasture?
replaced hard surface
area?
No
Yes
Yes Does the Project result in 2,000
square feet, or greater, of new plus
All Minimum Requirements replaced hard surface area?
apply to the new and replaced
hard surfaces and converted Yes JINO
vegetation areas.
Does the Project have land
Minimum Requirements #1 disturbing activities of 7,000
through #5 apply to the new Y� square feet or greater?
and replaced hard surfaces
and the land disturbed. iNo
Minimum Requirement #2
applies.
Flow Chart for Determining Requirements for
New Development
DEPARTMENT � Revised March 2019
ECOLOGYplease see http:Owww.ecy.wa.gov/copyright.html for copyright notice including permissions,
State of Washington limitation of liability, and disclaimer.
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 309
Planning &
Development
Received
09/07/202PREENWALK PARK
STORMWATER SITE PLAN REPORT
9 Minimum Requirements as provided within Vol. I, Chapter 3 of the 2019 SWMMWW. The
following summarizes the applicable requirements for the proposed project.
Minimum Requirement #1 — Preparation of Stormwater Site Plan
This Stormwater Site Plan Report and the Civil Plans address the temporary and permanent
drainage impacts of the project.
Minimum Requirement #2 — Construction Stormwater Pollution Prevention Plan
A Construction Stormwater Pollution Prevention Plan will be provided with our permit submittal
documents.
Minimum Requirement #3 - Source Control of Pollution
The proposed single family development will be a relatively low pollution generator. Applicable
Source Control measure requirements will be included with our Stormwater Operation and
Maintenance Manual.
Minimum Reauirement #4 — Preservation of Natural Drainaae Svstems and Outfalls
The existing topography indicates there are two (2) sub -basins. Basin #1 (west basin) sheet
drains to the west property line. Basin #2 (east basin) sheet drains to the south property line
The proposed development will include three (3) underground infiltration facilities to meet
stormwater flow control requirements. We expect the infiltrated stormwater to generally follow
the existing drainage path via subsurface flows.
Minimum Reauirement #5 — On -Site Stormwater Manaaement
Onsite Stormwater Management is required of the project since our project requires compliance
with MR1 — MR9; see Figure 1-2.5.1 of the 2019 SWMMWW.
Existing site vegetation will be cleared with the exception of a few significant conifers and deciduous
trees. The project include infiltration galleries for the access road and driveway and drywells for the
roof and yard areas in order to meet the LID Performance Standard. All onsite hard surfaces will
drain to stormwater management facilities.
Post -Construction Soil Quality and Depth will also be installed for all post -construction pervious
surfaces.
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 310
Planning &
Development
Received
09/07/2023GREENWALK PARK
STORMWATER SITE PLAN REPORT
Figure 1-3.3: Flow Chart for Determining MR #5 Requirements
Does the entire project qualify as Flow Control exempt (per MR #7)?
Yes
Did the project developer choose to meet
the LID Performance Standard?
Ni
Yes REQUIRED: For each
surface, consider the BMPs
in the order listed in List #3
for that type of surface. Use
the first BMP that Is
considered feasible.
NOT REQUIRED:
Achievement of the LID
Performance Standard.
REQUIRED: For each
surface, consider the
BMPs in the order
listed in List #1 for that
type of surface. Use
the first BMP that is
considered feasible.
NOT REQUIRED:
Achievement of the LID
Performance Standard.
No
Does the project trigger
only MRs #1 - #5? (Per
the Project Thresholds in
Applicability of the
Minimum Requirements
Section).
No
REQUIRED: Meet the LID Performance
Standard through the use of any Flow Control
BMP(s) in this manual.
REQUIRED: Apply BMP T5.13 Post
Construction Soil Quality and Depth.
NOT REQUIRED: Applying the BMPs in Lists
#1, #2, or #3.
somb f�
DEPARTMENT OF
ECOLOGY
State of Washington
No
(the project triggers Is the project outside
MRs #1 - #9) the UGA on a parcel
10 that is 5 acres or larger?
Yes
Did the project
developer choose to
meet the LID
Performance
Standard?
Yes/ Yes
REQUIRED: For each
surface, consider the BMPs
in the order listed in List #2
for that type of surface. Use
the first BMP that is
considered feasible.
NOT REQUIRED:
Achievement of the LID
Performance Standard -
IF
No
Yes
Did the project
developer choose to
meet the LID
Performance
Standard?
/NO
REQUIRED: Meet the LID
Performance Standard through
the use of any Flow Control
BMP(s) in this manual.
REQUIRED: Apply BMP T5.13
Post -Construction Soil Quality
and Depth.
NOT REQUIRED: Applying the
BMPs in Lists #1, #2, or #3.
Flow Chart for Determining MR #5
Requirements
Revised March 2019
Please see http.//www.ecy.wa.gov/copyright.html for copyright notice including permissions,
limitation of liability, and disclaimer.
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 311
Planning &
Development
Received
09/07/202PREENWALK PARK
STORMWATER SITE PLAN REPORT
Minimum Requirement #6 — Runoff Treatment
Runoff Treatment will be required for the pollution generating impervious surfaces. The treatment
facility shall be designed to accommodate pollution generating hard surface and pervious surfaces.
Since the project involves only single family residential development, only Basic Treatment is
required. Streamfilter catch basins will be proposed and sized for the 91 % storm event. Three (3)
treatment units will be proposed based on the three (3) separate onsite roadway sub -basins.
Minimum Reauirement #7 — Flow Control
Flow control is required of the development and shall meet the following criteria:
Stormwater discharges shall match developed discharge durations to predeveloped durations
for the range of pre -developed discharge rates from 50% of the 2-year peak flow up to the full
50-year peak flow. The pre -developed condition to be matched shall be a forested land cover.
Stormwater infiltration will be proposed for the development using three (3) storm infiltration
galleries. Each of the facilities will be designed to penetrate into the underlying Vashon
Outwash soils.
For the proposed roof areas, infiltration drywells will be proposed.
Minimum Requirement #8 — Wetlands Protection
There are no onsite wetlands or sensitive areas onsite or in the immediate vicinity.
Minimum Reauirement #9 — Operation and Maintenance
A Stormwater Operation and Maintenance Manual will be provided with the formal sitework
permit submittal.
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 312
Planning &
Development
Received
09/07/2023GREENWALK PARK
STORMWATER SITE PLAN REPORT
SECTION 5 - PERMANENT STORMWATER CONTROL PLAN
The proposed project involves the development of two existing single-family properties for
construction of a new 16 parcel single-family plat. The existing structures, pavement and much of
the existing conifer trees will be cleared for the development. Work will include clearing, grading,
drainage, utilities, landscaping and roadway frontage improvements. New drainage improvements
will include runoff treatment and infiltration for the access roads and drive aisles and drywells for
each lots roof and planter areas. No stormwater surface discharge is proposed. The site is
tributary to both Willow Creek, Deer Creek and Puget Sound.
Applicable requirements include the City of Edmonds Municipal Code 18.30.060.0 and the
Department of Ecology 2019 Stormwater Management Manual for Western Washington.
The project triggers Flow Control, Runoff Treatment and Stormwater Management.
Minimum Requirement #5 — Onsite Stormwater Management
The proposed infiltration trench galleries will be design to meet the LID Performance Standard. The
Proposed roof areas will drain to infiltration trenches or drywells. Post Construction Soil Quality and
Depth will be proposed for the landscape planter areas.
Minimum Reauirement #6 — Runoff Treatment
Runoff Treatment will be required for the pollution generating impervious surfaces. The treatment
facility shall be designed to accommodate pollution generating hard surface and pervious surfaces.
Since the project involves only single family residential development, only Basic Treatment is
required. Bayfilter Treatment Manholes will be proposed and sized for the 91 % storm event. Three
(3) treatment units will be proposed based on the three (3) separate onsite roadway sub -basins.
See attached treatment calculations.
Minimum Requirement #7 — Flow Control
Stormwater flow control for the proposed roadways and open space tracts will be addressed
using three (3) storm infiltration galleries. These systems will also accommodate the residential
driveways, unless noted otherwise. Each of the facilities will be designed to penetrate into the
underlying Vashon Outwash soils.
For the proposed landscape and roof areas of individual lots, infiltration drywells are proposed
See attached basin data and calculations. WWHM calculations and output are provided
within Appendix A of this report.
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 313
Planning &
Development
Received
09/07/2023
1.t
LOT /TRACT LANDCOVER DATA
Project Name:
Project Number:
GREENWALK PARK
21027
DRAINAGE CRITERIA:
SUBBASIN
Alawn
(sf)
Aroof
(sf)
CITY OF EDMONDS, 2019 SWMMWW
Awalk Apaving2 Atotal' Alawn
(sf) (sf) (sf) (ac)
Aroof
(ac)
Awalk
(ac)
Apaving
(ac)
Atotal'
(ac)
1
4537
2189
105
565
7396
0.10
0.05
0.00
0.01
0.17
2
4786
2124
127
427
7464
0.11
0.05
0.00
0.01
0.17
3
4383
2794
100
480
7757
0.10
0.06
0.00
0.01
0.18
4
3952
2734
102
561
7349
0.09
0.06
0.00
0.01
0.17
5
3517
2700
56
476
6749
0.08
0.06
0.00
0.01
0.15
6
3011
2808
36
510
6365
0.07
0.06
0.00
0.01
0.15
7
3128
2828
27
391
6374
0.07
0.06
0.00
0.01
0.15
8
3487
2808
79
489
6863
0.08
0.06
0.00
0.01
0.16
9
4288
2409
132
456
7285
0.10
0.06
0.00
0.01
0.17
10 3
3414
2106
132
829
6481
0.08
0.05
0.00
0.02
0.15
11
2588
2183
43
311
5125
0.06
0.05
0.00
0.01
0.12
12
2499
2186
46
288
5019
0.06
0.05
0.00
0.01
0.12
13 3
2955
2061
83
342
5441
0.07
0.05
0.00
0.01
0.12
14
2943
2228
0
311
5482
0.07
0.05
0.00
0.01
0.13
15
3341
2184
58
1012
6595
0.08
0.05
0.00
0.02
0.15
16
4026
2420
53
510
7009
0.09
0.06
0.00
0.01
0.16
A
4201
0
0
476
4677
0.10
0.00
0.00
0.01
0.11
B7
3423
0
618
1385
5426
0.08
0.00
0.01
0.03
0.12
ROAD WEST
(BASIN #1)
0
0
0
8050
8050
0.00
0.00
0.00
0.18
0.18
ROAD EAST
(BASIN #2)
0
0
0
7679
7679
0.00
0.00
0.00
0.18
0.18
ROAD SOUTH
(BASIN #3)
2298
0
0
2364
4662
0.05
0.00
0.00
0.05
0.11
TOTAL 66777 38762 1797 27912 135248
NOTES
1. Subbasin residence lot areas exclude the roadway access easement
2. Apaving drains to roadway storm facilities, unless noted otherwise
3. Lot 10 & 13 driveway areas drain to individual lot drywell
4. Road West & Tract B drain to Infiltration Gallery #1
5. Road East & Tract A drain to Infiltration Gallery #2
6. Road South drains to Infiltration Gallery #3
7. Existing pond (798 sf) documented as paving for this table.
1.53 0.89 0.04 0.64 3.10
Exhibit 19 - Green
PLN2022-004 Packet Pg. 314
Planning &
Development
Received
09/07/202PREENWALK PARK
STORMWATER SITE PLAN REPORT
TREATMENT & FLOW CONTROL CALCULATIONS
Project Name: GREENWALK PARK
Project Number: '21027
DRAINAGE CRITERIA: CITY OF EDMONDS, 2019 SWMMWW
Step 1) Site Data
1) BASIN # 1
2) Developed sub -basin characteristics
Grass
3423
sf=
Roadway/Sidewalk
8050
sf=
Driveway
5059
sf=
Walk
571
sf=
Pond
798
sf=
* Includes Tract B & driveways of Lots 3-9,11
0.08 acres
0.18 acres
0.12 acres
0.01 acres
0.02 acres
Total 17901 sf= 0.41 acres
3) Water Quality Flowrate: 0.0243 cfs
Step 2) Calculate Number of Cartridges
Use Bayfilter treatment cartridges, Model: 522
Invert Drop (in) = 2.3 Treatment Rate (gpm / cart)= 22.5
N = Num ber of Cartridges
Qwq * 449 gpm / cfs / (treatment rate)
0.5 ==> USE BAYFILTER CB WITH 1 — BAYFILTER 522
4) Infiltration Facility Design:
# of SC-740 Stormtech Chambers 15
Design infiltration Rate= 4.0 in/hr
Percent Infiltration= 100%
a
Facility Name
JStormTech 1
Outlet 1 Outlet 2 Outlet 3
Downstream Connection
0 0 F
Auto Chamber I Quick Chamber I
Chamber Model t
740
Rowl.enpth(0)
115 Outlet Structure Data I
Nurba of Chanbas
15 Riser Height 00 r— J
Number of Endcaps
0 Riser Dwrieta fnl 12 J
Top Stone Depth (n)
12 Riser Type J
Bottom Stone Depth fin)
© Notch Type
Infiltration --.&A
Orifice Diameter Height
Measured Infiltration Rate (iJh)
1t.7 - J
Number (in) (ft)
Redact onFada(ntifact«I
0.312
}}yy
1 II T 1%;
Use WettedSufaceArea(sidewds)
NO -1
2 [0--- --i FO--.--1
TotalvolumeInfiltrated (acitl
43.031
3 F0___ 1 Fo---.fl
TotalVokin Though Rim (ac-fl)
0
Total Volume Though FacilMac•tt)
031
St«mTech VoYane at Rita Head (ac•Al .028
Percent Infiltrated
ShowStormTech Open Table =1
Initial Volume F—
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 315
Planning &
Development
Received
09/07/202PREENWALK PARK
STORMWATER SITE PLAN REPORT
TREATMENT & FLOW CONTROL CALCULATIONS
Project Name: GREENWALK PARK
Project Number: '21027
DRAINAGE CRITERIA: CITY OF EDMONDS, 2019 SWMMWW
Step 1) Site Data
1) BASIN # 2
2) Developed sub -basin characteristics:
Grass 4296 sf=
Roadway/Sidewalk 7679 sf=
Driveway 1756 sf=
Walk 0 sf=
. Includes TractA&driveways of Lots 1,2,12
0.10 acres
0.18 acres
0.04 acres
0.00 acres
Total 13731 sf= 0.32 acres
3) Water Quality Flowrate: 0.0165 cfs
Step 2) Calculate Number of Cartridges
Use Bayfilter treatment cartridges, Model: 522
Invert Drop (in) = 2.3 Treatment Rate (gpm / cart)= 22.5
N = Num ber of Cartridges
Qwq ' 449 gpm / cfs / (treatment rate)
0.3 ==> USE BAYFILTER CB WITH 1 — BAYFILTER 522
4) Infiltration Facility Design
# of SC-740 Stormtech Chambers
9
Design infiltration Rate=
4.0
in/hr
Percent Infiltration=
100%
0
Facility Name
IStomiTech 2
Outlet 1
Outlet 2
Outlet 3
Downstream Connection
0
0
I°
Auto Chamber Quick Chamber
Chamber Model t
740
Row Lergth (it)
r72 I
Outlet Structure Data
Nunber of Chambers
0
Riser Height (ft) r4- J
Number o1 Endcaps
Riser Diameter (n) 12 J
Top Stone Depth (n)
12
Riser Type Fyt J
Bottom Stone Depth (in)
©
Notch Type
Infiltration !es
Meastsed Infiltration Rate (rift]
Reduction Factor linfilt'facta)
Use Wetted Surface Area (sidewelt)
Total Voltme Infiltrated (ac4t)
Total Vokww Through Riser (acft)
Total VaYme Through Facity(aclt)
Percent Infiltrated
Orifice Diameter Height
11.7 J Number (in) (ft)
0.342 ={ 1 �J �J Thirsty s`
NO --.1 2 � J � J T
30.973 3 F0_ J F0_ J
0
30973 StamTechVokmeatRiser Head (ac•11) 017
100
Show StormTech ope.Table
Initial Volume F_
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 316
Planning &
Development
Received
09/07/202PREENWALK PARK
STORMWATER SITE PLAN REPORT
TREATMENT & FLOW CONTROL CALCULATIONS
Project Name: GREENWALK PARK
Project Number: '21027
DRAINAGE CRITERIA: CITY OF EDMONDS, 2019 SWMMWW
Step 1) Site Data
1) BASIN # 3 Includes driveways of Lots 14-16
2) Developed sub -basin characteristics
Grass 2140 sf= 0.05 acres
Roadway/Sidewalk 2364 sf= 0.05 acres
Driveway 1831 sf= 0.04 acres
Total 6335 sf= 0.15 acres
3) Water Quality Flowrate: 0.0064 cfs
Step 2) Calculate Number of Cartridges
Use Bayfilter treatment cartridges, Model: 522
Invert Drop (in) = 2.3 Treatment Rate (gpm / cart)= 22.5
N = Number of Cartridges
Qwq * 449 gpm / cfs / (treatment rate)
0.1 ==> USE BAYFILTER CB WITH 1 — BAYFILTER 522
4) Infiltration Facility Design
# of SC-740 Stormtech Chambers=
5
Design infiltration Rate=
4.0
in/hr
Percent Infiltration=
100%
a
Facility Name
StamTech 3
Outlet 1
Outlet 2
Outlet 3
Downstream Connection
10
Auto Chamber I Quick Chamber I
Chamber Model #
740
Row Length (it)
L�
Outlet Structure Data I
Number of Chambers
0
Riser Height 00 Id —�
Number of Endcaps
0
Riser Diameter (a) 12 -1
Top Stone Depth (in)
12
Riser Type Flat J
Bottom Stone Depth (n)
©
Notch Type
Infiltration Yes J
Orifice Diameter Height
Measured Infiltration Rate (n/Fr)
11.7 J
Number (in) (lt)
Reduction Factor (nfdrfactor)
0.3 22
1 F0___ -J F0___ J
Thirsty
Use Wetted Surface Area (sidewals)
ND J
2 F0_ J F0 J
Total Volume Infiltrated (ac-ft)
12.967
3
Taal Volume Though Riser (ack)
0
Total volume Though Facity(acdt)
12.967
StamTech Vol me at Riser Head (acft)
.009
Percent Ir&rated
100
Show StormTech Open Table
Initial Volume F_
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 317
Planning &
Development
Received
09/07/2023GREENWALK PARK
STORMWATER SITE PLAN REPORT
DRYWELL SIZING
Project Name: GREENWALK PARK
Project Number: '21027
DRAINAGE CRITERIA: CITY OF EDMONDS, 2019 SWMMWW
Drywells are proposed for each residential lot for infiltration of roof, walkway & planter areas.
For Lots 10 & 13, the drywell will also infiltrate the driveway (could not gravity to roadway)
A single drywell design is proposed for all residential lots. The sizing will be based on the
most conservative of situations (Lot 3).
Design Landcover Data
Grass 4495 sf= 0.10 acres
Roof 2777 sf = 0.06 acres
Walk/Driveway 100 sf = 0.00 acres
Total 7372 sf = 0.17 acres
The design drywell is based on the Dept. of Ecology 2019 SWMMWW, Typ. 2 Infiltration Drywell.
Design Data
Manhole dia.=
Drywell dia.=
Design infiltration Rate=
Design Depth=
Max. Infiltration Sidewall Depth=
Percent Infiltrated=
4.0 ft
8.0 ft
4.0 in/hr
4.0 ft (max)
3.0 ft
100%
FacilityName SSD Table 2
Flows To. F— j
i PrecodationAp*d F—
i Evapo(alionAppbed Facility TyperSSDTABLE
Iv Manual lnf Atation
Load File: Browse F ll-Terreforma\l-Projects121027-GR
r Stn a Computed
Stage (ft)
Area
Manual
Manual
Not Used
PJot Used
Not Used A
es)
atorage
1
0000000
0001200
0000000
0000000 0 004800
2
1.000000
0001800
0-000300
0000000 0 007300
3
2000000
0003000
0.000900
0000000 0 012100
4
3 000000
0-004200
0-001500
0000000 0 022600
5
4000000
0004200
0004200
0000000 0022600
6
7
�a
9
10
11
12
olume
Infiltrated (ac-ft)
8.26
Total Volume (ac-ft) 8.26
dolume
Through Riser (ac-ft)
0.00
Percent Infiltrated 100
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 318
Planning &
Development
Received
09/07/2023GREENWALK PARK
STORMWATER SITE PLAN REPORT
SECTION 6 - CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN
A Construction Stormwater Pollution Prevention Plan has been prepared and submitted to the
City.
SECTION 7 - SPECIAL REPORTS & STUDIES
A geotechnical study and infiltration testing was performed onsite. Appendix B includes the
Limited Subsurface Exploration and Infiltration Feasibility Assessment as prepared by
Associated Earth Sciences, Inc. dated January 11, 2022.
SECTION 8 - OTHER PERMITS
A Department of Ecology Construction Stormwater Permit will be obtained with the Department
of Ecology since the site disturbance exceeds one (1) acre.
SECTION 9 - OPERATION MAINTENANCE MANUAL, SOURCE CONTROL
A Stormwater Operation and Maintenance Manual and Pollution Source Control Plan will be
included with our formal sitework permit submittal.
SECTION 10 -BOND QUANTITIES WORKSHEET
A Bond Quantities Worksheet will be prepared and submitted upon request.
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 319
Planning &
Development
Received
09/07/2023GREENWALK PARK
STORMWATER SITE PLAN REPORT
APPENDIX A — WWHM CALCULATIONS
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 320
Planning &
Development
Received
09/07/2023—
1.t
WWHM2012
PROJECT REPORT
BASINS #1- 3 - WWHM OUTPUT
Exhibit 19 - Green
PLN2022-004 Packet Pg. 321
Planning &
Development
1.t
Receiv d
09/071 neral Model Information
Project Name: 21027-GREENWALK
F5
Site Name: Greenwalk Park
0
0
Site Address: 540 Edmonds Way
U_
City: Edmonds
Report Date: 3/1 /2023
0
a
Gage: Everett
Data Start: 1948/10/01
E
a
Data End: 2009/09/30
Timestep: 15 Minute
o
Precip Scale: 0.800
Version Date: 2019/09/13
.y
Version: 4.2.17
POC Thresholds
Low Flow Threshold for POC1: 50 Percent of the 2 Year
High Flow Threshold for POC1: 50 Year
Low Flow Threshold for POC2: 50 Percent of the 2 Year
High Flow Threshold for POC2: 50 Year
Low Flow Threshold for POC3: 50 Percent of the 2 Year
High Flow Threshold for POC3: 50 Year
21027-GREENWALK 3/1/2023 12:20:56 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 322
Planning &
Development
Received
09107i1oapduse Basin
Data
Predeveloped Land Use
E
L
Basin 1
-
Bypass:
No
_
GroundWater:
No
a
Pervious Land Use
acre
A B, Forest, Mod
0.41
Pervious Total
0.41
a
Impervious Land Use
acre
a�
Impervious Total
0
Basin Total
0.41
Element Flows To:
Surface
Interflow Groundwater
a
21027-GREENWALK 3/1/2023 12:20:56 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 323
Planning &
Development
1.t
Received
09/07/Sin 2
Bypass:
No
E
GroundWater:
No
0
U-
Pervious Land Use
acre
A B, Forest, Mod
0.32
0
Pervious Total
0.32
a
Impervious Land Use
acre
E
0-
0
Impervious Total
0
Basin Total
0.32
a�
Element Flows To:
Surface
Interflow Groundwater
21027-GREENWALK 3/1/2023 12:20:56 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 324
Planning &
Development
1.t
Received
09/07/�ftSin 3
Bypass:
No
E
GroundWater:
No
0
U-
Pervious Land Use
acre
A B, Forest, Mod
0.14
0
a_
Pervious Total
0.14
a
Impervious Land Use
acre
E
a
0
Impervious Total
0
Basin Total
0.14
a�
a�
Element Flows To:
Surface
Interflow Groundwater
W
21027-GREENWALK 3/1/2023 12:20:56 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 325
Planning &
Development
Received
09107/:Mf'ated Land Use
Basin 2
Bypass:
No
GroundWater:
No
Pervious Land Use
acre
C, Lawn, Flat
0.1
Pervious Total
0.1
Impervious Land Use
acre
ROADS MOD
0.18
DRIVEWAYS FLAT
0.04
Impervious Total
0.22
Basin Total
0.32
Element Flows To:
Surface
StormTech 2
Interflow Groundwater
StormTech 2
1.t
21027-GREENWALK
3/1/2023 12:20:56 PM
Exhibit 19 - Green
PLN2022-004 Packet Pg. 326
Planning &
Development
1.t
Received
09/07/�ftSin 3
Bypass:
No
E
GroundWater:
No
0
U-
Pervious Land Use
acre
C, Lawn, Flat
0.05
0
Pervious Total
0.05
a
Impervious Land Use
acre
E
ROADS MOD
0.05
0
DRIVEWAYS FLAT
0.04
a�
Impervious Total
0.09
Basin Total
0.14
.y
d
Element Flows To:
Surface
Interflow Groundwater
=
StormTech 3
StormTech 3
Cu
21027-GREENWALK 3/1/2023 12:20:56 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 327
Planning &
Development
1.t
Received
09/07/Sin 1
Bypass:
No
E
GroundWater:
No
0
U-
Pervious Land Use
acre
C, Lawn, Flat
0.08
0
a_
Pervious Total
0.08
a
Impervious Land Use
acre
_
E
ROADS MOD
0.18
0
DRIVEWAYS FLAT
0.12
SIDEWALKS FLAT
0.01
0
POND
0.02
Impervious Total
0.33
_
.y
Basin Total
0.41
Element Flows To:
Cu
Surface
Interflow Groundwater
a
StormTech 1
StormTech 1
21027-GREENWALK 3/1/2023 12:20:56 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 328
Planning &
Development
Received
1.t
091071uting Elements
Predeveloped Routing
21027-GREENWALK 3/1/2023 12:20:56 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 329
Planning &
Development
Received
09107/:Mf'ated Routing
1.t
StormTech 2
Chamber Model: 740
Dimensions
Max Row Length: 72
Number of Chambers: 9
Number of Endcaps: 2
Top Stone Depth: 12
Bottom Stone Depth: 6
Infiltration On
Infiltration rate: 11.7
Infiltration safety factor: 0.342
Total Volume Infiltrated (ac-ft.):
Total Volume Through Riser (ac-ft.):
Total Volume Through Facility (ac-ft.):
Percent Infiltrated:
Total Precip Applied to Facility:
Total Evap From Facility:
Discharge Structure
Riser Height: 4 ft.
Riser Diameter: 12 in.
Element Flows To:
Outlet 1 Outlet 2
30.973
0
30.973
100
0
0
StormTech Hydraulic Table
Stage(feet)
Area(ac.)
Volume(ac-ft.)
Discharge(cfs)
Infilt(cfs)
0.0000
0.007
0.000
0.000
0.000
0.0833
0.007
0.000
0.000
0.028
0.1667
0.007
0.000
0.000
0.028
0.2500
0.007
0.000
0.000
0.028
0.3333
0.007
0.000
0.000
0.028
0.4167
0.007
0.001
0.000
0.028
0.5000
0.007
0.001
0.000
0.028
0.5833
0.007
0.001
0.000
0.028
0.6667
0.007
0.002
0.000
0.028
0.7500
0.007
0.002
0.000
0.028
0.8333
0.007
0.003
0.000
0.028
0.9167
0.007
0.003
0.000
0.028
1.0000
0.007
0.004
0.000
0.028
1.0833
0.007
0.004
0.000
0.028
1.1667
0.007
0.005
0.000
0.028
1.2500
0.007
0.005
0.000
0.028
1.3333
0.007
0.006
0.000
0.028
1.4167
0.007
0.006
0.000
0.028
1.5000
0.007
0.007
0.000
0.028
1.5833
0.007
0.007
0.000
0.028
1.6667
0.007
0.008
0.000
0.028
1.7500
0.007
0.008
0.000
0.028
1.8333
0.007
0.009
0.000
0.028
1.9167
0.007
0.009
0.000
0.028
2.0000
0.007
0.010
0.000
0.028
2.0833
0.007
0.010
0.000
0.028
2.1667
0.007
0.010
0.000
0.028
2.2500
0.007
0.011
0.000
0.028
21027-GREENWALK
3/1 /2023 12:20:56 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 330
Planning &
Development
1.t
Received
09/07/=333
0.007
0.011
0.000
0.028
2.4167
0.007
0.012
0.000
0.028
2.5000
0.007
0.012
0.000
0.028
E
2.5833
0.007
0.012
0.000
0.028
0
2.6667
0.007
0.013
0.000
0.028
U-
2.7500
0.007
0.013
0.000
0.028
2.8333
0.007
0.013
0.000
0.028
2.9167
0.007
0.013
0.000
0.028
3.0000
0.007
0.014
0.000
0.028
a
3.0833
0.007
0.014
0.000
0.028
3.1667
0.007
0.014
0.000
0.028
E
3.2500
0.007
0.014
0.000
0.028
C
3.3333
0.007
0.015
0.000
0.028
3.4167
0.007
0.015
0.000
0.028
0
3.5000
0.007
0.015
0.000
0.028
3.5833
0.007
0.015
0.000
0.028
3.6667
0.007
0.015
0.000
0.028
3.7500
0.007
0.016
0.000
0.028
y
3.8333
0.007
0.016
0.000
0.028
3.9167
0.007
0.016
0.000
0.028
4.0000
0.007
0.016
0.000
0.028
=
21027-GREENWALK 3/1/2023 12:20:56 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 331
Planning &
Development
Received
09/07/mTech 3
Chamber Model: 740
Dimensions
Max Row Length: 43
Number of Chambers: 5
Number of Endcaps: 2
Top Stone Depth: 12
Bottom Stone Depth: 6
Infiltration On
Infiltration rate: 11.7
Infiltration safety factor: 0.342
Total Volume Infiltrated (ac-ft.):
Total Volume Through Riser (ac-ft.):
Total Volume Through Facility (ac-ft.):
Percent Infiltrated:
Total Precip Applied to Facility:
Total Evap From Facility:
Discharge Structure
Riser Height: 4 ft.
Riser Diameter: 12 in.
Element Flows To:
Outlet 1 Outlet 2
12.967
0
12.967
100
0
0
StormTech Hydraulic Table
Stage(feet)
Area(ac.)
Volume(ac-ft.)
Discharge(cfs)
Infilt(cfs)
0.0000
0.003
0.000
0.000
0.000
0.0833
0.003
0.000
0.000
0.015
0.1667
0.003
0.000
0.000
0.015
0.2500
0.003
0.000
0.000
0.015
0.3333
0.003
0.000
0.000
0.015
0.4167
0.003
0.000
0.000
0.015
0.5000
0.003
0.000
0.000
0.015
0.5833
0.003
0.001
0.000
0.015
0.6667
0.003
0.001
0.000
0.015
0.7500
0.003
0.001
0.000
0.015
0.8333
0.003
0.001
0.000
0.015
0.9167
0.003
0.002
0.000
0.015
1.0000
0.003
0.002
0.000
0.015
1.0833
0.003
0.002
0.000
0.015
1.1667
0.003
0.003
0.000
0.015
1.2500
0.003
0.003
0.000
0.015
1.3333
0.003
0.003
0.000
0.015
1.4167
0.003
0.003
0.000
0.015
1.5000
0.003
0.004
0.000
0.015
1.5833
0.003
0.004
0.000
0.015
1.6667
0.003
0.004
0.000
0.015
1.7500
0.003
0.004
0.000
0.015
1.8333
0.003
0.005
0.000
0.015
1.9167
0.003
0.005
0.000
0.015
2.0000
0.003
0.005
0.000
0.015
2.0833
0.003
0.005
0.000
0.015
2.1667
0.003
0.006
0.000
0.015
2.2500
0.003
0.006
0.000
0.015
2.3333
0.003
0.006
0.000
0.015
2.4167
0.003
0.006
0.000
0.015
1.t
21027-GREENWALK 3/1/2023 12:20:56 PM Exhibit 19 - Green10
PLN2022-004 Packet Pg. 332
Planning &
Development
1.t
Received
09/07/=00
0.003
0.006
0.000
0.015
2.5833
0.003
0.007
0.000
0.015
2.6667
0.003
0.007
0.000
0.015
E
2.7500
0.003
0.007
0.000
0.015
0
2.8333
0.003
0.007
0.000
0.015
U-
2.9167
0.003
0.007
0.000
0.015
3.0000
0.003
0.007
0.000
0.015
3.0833
0.003
0.008
0.000
0.015
3.1667
0.003
0.008
0.000
0.015
a
3.2500
0.003
0.008
0.000
0.015
3.3333
0.003
0.008
0.000
0.015
E
3.4167
0.003
0.008
0.000
0.015
0
3.5000
0.003
0.008
0.000
0.015
3.5833
0.003
0.008
0.000
0.015
0
3.6667
0.003
0.008
0.000
0.015
3.7500
0.003
0.009
0.000
0.015
3.8333
0.003
0.009
0.000
0.015
3.9167
0.003
0.009
0.000
0.015
y
4.0000
0.003
0.009
0.000
0.015
21027-GREENWALK 3/1/2023 12:20:56 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 333
Planning &
Development
Received
09/07/mTech 1
Chamber Model: 740
Dimensions
Max Row Length: 115
Number of Chambers: 15
Number of Endcaps: 2
Top Stone Depth: 12
Bottom Stone Depth: 6
Infiltration On
Infiltration rate: 11.7
Infiltration safety factor: 0.342
Total Volume Infiltrated (ac-ft.):
Total Volume Through Riser (ac-ft.):
Total Volume Through Facility (ac-ft.):
Percent Infiltrated:
Total Precip Applied to Facility:
Total Evap From Facility:
Discharge Structure
Riser Height: 4 ft.
Riser Diameter: 12 in.
Element Flows To:
Outlet 1 Outlet 2
43.031
0
43.031
100
0
0
StormTech Hydraulic Table
Stage(feet)
Area(ac.)
Volume(ac-ft.)
Discharge(cfs)
Infilt(cfs)
0.0000
0.011
0.000
0.000
0.000
0.0833
0.011
0.000
0.000
0.047
0.1667
0.011
0.000
0.000
0.047
0.2500
0.011
0.001
0.000
0.047
0.3333
0.011
0.001
0.000
0.047
0.4167
0.011
0.001
0.000
0.047
0.5000
0.011
0.002
0.000
0.047
0.5833
0.011
0.003
0.000
0.047
0.6667
0.011
0.004
0.000
0.047
0.7500
0.011
0.004
0.000
0.047
0.8333
0.011
0.005
0.000
0.047
0.9167
0.011
0.006
0.000
0.047
1.0000
0.011
0.007
0.000
0.047
1.0833
0.011
0.008
0.000
0.047
1.1667
0.011
0.009
0.000
0.047
1.2500
0.011
0.009
0.000
0.047
1.3333
0.011
0.010
0.000
0.047
1.4167
0.011
0.011
0.000
0.047
1.5000
0.011
0.012
0.000
0.047
1.5833
0.011
0.012
0.000
0.047
1.6667
0.011
0.013
0.000
0.047
1.7500
0.011
0.014
0.000
0.047
1.8333
0.011
0.015
0.000
0.047
1.9167
0.011
0.015
0.000
0.047
2.0000
0.011
0.016
0.000
0.047
2.0833
0.011
0.017
0.000
0.047
2.1667
0.011
0.018
0.000
0.047
2.2500
0.011
0.018
0.000
0.047
2.3333
0.011
0.019
0.000
0.047
2.4167
0.011
0.019
0.000
0.047
1.t
21027-GREENWALK 3/1/2023 12:20:56 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 334
Planning &
Development
1.t
Received
09/07/=00
0.011
0.020
0.000
0.047
2.5833
0.011
0.021
0.000
0.047
2.6667
0.011
0.021
0.000
0.047
E
2.7500
0.011
0.022
0.000
0.047
0
2.8333
0.011
0.022
0.000
0.047
U-
2.9167
0.011
0.023
0.000
0.047
3.0000
0.011
0.023
0.000
0.047
3.0833
0.011
0.023
0.000
0.047
3.1667
0.011
0.024
0.000
0.047
a
3.2500
0.011
0.024
0.000
0.047
3.3333
0.011
0.025
0.000
0.047
E
3.4167
0.011
0.025
0.000
0.047
C
3.5000
0.011
0.025
0.000
0.047
3.5833
0.011
0.026
0.000
0.047
0
3.6667
0.011
0.026
0.000
0.047
3.7500
0.011
0.027
0.000
0.047
3.8333
0.011
0.027
0.000
0.047
3.9167
0.011
0.027
0.000
0.047
y
4.0000
0.011
0.028
0.000
0.047
21027-GREENWALK 3/1/2023 12:20:56 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 335
Planning &
Development
Receivp,d
091071ARalysis Results
POC 1
N
2�
l
U
Ub
PBrCont Tfm• Exo�odinp
+ Predeveloped
Predeveloped Landuse Totals for POC #1
Total Pervious Area: 0.41
Total Impervious Area: 0
Mitigated Landuse Totals for POC #1
Total Pervious Area: 0.08
Total Impervious Area: 0.33
CumWh•ro pro�aEd�y
e aaa� oaoo�
30 3Q 50 M N 90 95 BB 99 BB.S 1bo
x Mitigated
Flow Frequency Method: Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period
Flow(cfs)
2 year
0.000289
5 year
0.000335
10 year
0.000355
25 year
0.000373
50 year
0.000384
100 year
0.000392
Flow Frequency Return Periods for Mitigated. POC #1
Return Period
Flow(cfs)
2 year
0
5 year
0
10 year
0
25 year
0
50 year
0
100 year
0
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year
Predeveloped
Mitigated
1949
0.000
0.000
1950
0.000
0.000
1951
0.000
0.000
1952
0.000
0.000
1953
0.000
0.000
1954
0.000
0.000
1955
0.000
0.000
1956
0.000
0.000
1957
0.000
0.000
1958
0.000
0.000
1.t
21027-GREENWALK 3/1/2023 12:20:56 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 336
Planning &
Development
Received
09/07/MM
0.000
0.000
1960
0.000
0.000
1961
0.000
0.000
1962
0.000
0.000
1963
0.000
0.000
1964
0.000
0.000
1965
0.000
0.000
1966
0.000
0.000
1967
0.000
0.000
1968
0.000
0.000
1969
0.000
0.000
1970
0.000
0.000
1971
0.000
0.000
1972
0.000
0.000
1973
0.000
0.000
1974
0.000
0.000
1975
0.000
0.000
1976
0.000
0.000
1977
0.000
0.000
1978
0.000
0.000
1979
0.000
0.000
1980
0.000
0.000
1981
0.000
0.000
1982
0.000
0.000
1983
0.000
0.000
1984
0.000
0.000
1985
0.000
0.000
1986
0.000
0.000
1987
0.000
0.000
1988
0.000
0.000
1989
0.000
0.000
1990
0.000
0.000
1991
0.000
0.000
1992
0.000
0.000
1993
0.000
0.000
1994
0.000
0.000
1995
0.000
0.000
1996
0.000
0.000
1997
0.000
0.000
1998
0.000
0.000
1999
0.000
0.000
2000
0.000
0.000
2001
0.000
0.000
2002
0.000
0.000
2003
0.000
0.000
2004
0.000
0.000
2005
0.000
0.000
2006
0.000
0.000
2007
0.000
0.000
2008
0.000
0.000
2009
0.000
0.000
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and
Rank
Predeveloped
Mitigated
1
0.0003
0.0000
2
0.0003
0.0000
3
0.0003
0.0000
Mitigated. POC #1
1.t
21027-GREENWALK 3/1/2023 12:25:36 PM Exhibit 19 - Green 17
PLN2022-004 Packet Pg. 337
Planning &
Development
Received
09/07/21023
0.0003
0.0000
5
0.0003
0.0000
6
0.0003
0.0000
7
0.0003
0.0000
8
0.0003
0.0000
9
0.0003
0.0000
10
0.0003
0.0000
11
0.0003
0.0000
12
0.0003
0.0000
13
0.0003
0.0000
14
0.0003
0.0000
15
0.0003
0.0000
16
0.0003
0.0000
17
0.0003
0.0000
18
0.0003
0.0000
19
0.0003
0.0000
20
0.0003
0.0000
21
0.0003
0.0000
22
0.0003
0.0000
23
0.0003
0.0000
24
0.0003
0.0000
25
0.0003
0.0000
26
0.0003
0.0000
27
0.0003
0.0000
28
0.0003
0.0000
29
0.0003
0.0000
30
0.0003
0.0000
31
0.0003
0.0000
32
0.0003
0.0000
33
0.0003
0.0000
34
0.0003
0.0000
35
0.0003
0.0000
36
0.0003
0.0000
37
0.0003
0.0000
38
0.0003
0.0000
39
0.0003
0.0000
40
0.0003
0.0000
41
0.0003
0.0000
42
0.0003
0.0000
43
0.0003
0.0000
44
0.0003
0.0000
45
0.0003
0.0000
46
0.0003
0.0000
47
0.0003
0.0000
48
0.0002
0.0000
49
0.0002
0.0000
50
0.0002
0.0000
51
0.0002
0.0000
52
0.0002
0.0000
53
0.0002
0.0000
54
0.0002
0.0000
55
0.0002
0.0000
56
0.0002
0.0000
57
0.0002
0.0000
58
0.0002
0.0000
59
0.0002
0.0000
60
0.0002
0.0000
61
0.0001
0.0000
1.t
21027-GREENWALK 3/1/2023 12:25:36 PM Exhibit 19 - GreenIQ
PLN2022-004 Packet Pg. 338
Planning &
Development
Received
09/07/2023
1.t
21027-GREENWALK 3/1/2023 12:25:36 PM Exhibit 19 - Greencl
PLN2022-004 Packet Pg. 339
Duration Flows
The Facility PASSED
Flow(cfs)
Predev
Mit
Percentage
Pass/Fail
0.0001
885
0
0
Pass
0.0001
873
0
0
Pass
0.0001
838
0
0
Pass
0.0002
814
0
0
Pass
0.0002
776
0
0
Pass
0.0002
759
0
0
Pass
0.0002
728
0
0
Pass
0.0002
707
0
0
Pass
0.0002
684
0
0
Pass
0.0002
653
0
0
Pass
0.0002
634
0
0
Pass
0.0002
601
0
0
Pass
0.0002
584
0
0
Pass
0.0002
574
0
0
Pass
0.0002
547
0
0
Pass
0.0002
526
0
0
Pass
0.0002
501
0
0
Pass
0.0002
486
0
0
Pass
0.0002
461
0
0
Pass
0.0002
447
0
0
Pass
0.0002
430
0
0
Pass
0.0002
405
0
0
Pass
0.0002
393
0
0
Pass
0.0002
378
0
0
Pass
0.0002
365
0
0
Pass
0.0002
354
0
0
Pass
0.0002
344
0
0
Pass
0.0002
336
0
0
Pass
0.0002
317
0
0
Pass
0.0002
308
0
0
Pass
0.0002
294
0
0
Pass
0.0002
284
0
0
Pass
0.0002
276
0
0
Pass
0.0002
259
0
0
Pass
0.0002
248
0
0
Pass
0.0002
239
0
0
Pass
0.0002
230
0
0
Pass
0.0002
219
0
0
Pass
0.0002
213
0
0
Pass
0.0002
211
0
0
Pass
0.0002
199
0
0
Pass
0.0002
195
0
0
Pass
0.0002
185
0
0
Pass
0.0002
183
0
0
Pass
0.0003
177
0
0
Pass
0.0003
171
0
0
Pass
0.0003
163
0
0
Pass
0.0003
154
0
0
Pass
0.0003
151
0
0
21027-GREENWALK 3/1/2023 12:25:36 PM Page 20
Planning &
Development
1.t
Received
09/07/=03
119
0
0
Pass
0.0003
111
0
0
Pass
0.0003
106
0
0
Pass
E
0.0003
101
0
0
Pass
o
0.0003
96
0
0
Pass
U-
0.0003
89
0
0
Pass
0.0003
85
0
0
Pass
0.0003
79
0
0
Pass
a_
0.0003
71
0
0
Pass
a
0.0003
65
0
0
Pass
0.0003
61
0
0
Pass
E
0.0003
57
0
0
Pass
o
0.0003
52
0
0
Pass
0.0003
47
0
0
Pass
o
0.0003
42
0
0
Pass
0.0003
39
0
0
Pass
0.0003
35
0
0
Pass
0.0003
31
0
0
Pass
y
0.0003
29
0
0
Pass
0.0003
21
0
0
Pass
0.0003
14
0
0
Pass
0.0003
14
0
0
Pass
Cu
0.0003
10
0
0
Pass
a
0.0003
1
0
0
Pass
0.0003
0
0
0
Pass
0.0003
0
0
0
Pass
-
0.0003
0
0
0
Pass
a
0.0003
0
0
0
Pass
Y
0.0003
0
0
0
Pass
a
0.0003
0
0
0
Pass
Y
0.0003
0
0
0
Pass
0.0003
0
0
0
Pass
3
0.0004
0
0
0
Pass
L
0.0004
0
0
0
Pass
0
0.0004
0
0
0
Pass
a
0.0004
0
0
0
Pass
a
0.0004
0
0
0
Pass
0.0004
0
0
0
Pass
Cn
0.0004
0
0
0
Pass
V
0.0004
0
0
0
Pass
a
0.0004
0
0
0
Pass
2
0.0004
0
0
0
Pass
0.0004
0
0
0
Pass
3
0.0004
0
0
0
Pass
E
0.0004
0
0
0
Pass
o
0.0004
0
0
0
Pass
N
0.0004
0
0
0
Pass
E
21027-GREENWALK 3/1/2023 12:25:36 PM Exhibit 19 - Green 01
PLN2022-004 Packet Pg. 341
Planning &
Development
Received
09/07/der Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:
0.0278 acre-feet
On-line facility target flow:
0.0429 cfs.
Adjusted for 15 min:
0.0429 cfs.
Off-line facility target flow:
0.0243 cfs.
Adjusted for 15 min:
0.0243 cfs.
1.t
21027-GREENWALK 3/1/2023 12:25:36 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 342
Planning &
Development
Received
09/07/idD Report
1.t
LID Technique
Used for
Total Volume
Volume
Infiltration
Cumulative
Percent
Water Quality
Percent
Comment
Treatment?
Needs
Through
Volume
Volume
volume
Water Quality
Treatment
Facility
(ac-ft)
Infiltration
Infiltrated
Treated
iac-ft)
(ac-ft)
Credit
StormTech 1 POC
❑
39.16
❑
100.00
Total Volume Infiltrated
39.16
0.00
0.00
100.00
0.00
0%
No Treat.
Credit
Duration
Compliance with LID
Analysis
Standard 8% of 2-yr to 50% of
Result=
2-yr
Passed
21027-GREENWALK
3/1/2023 12:25:36 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 343
Planning &
Development
Received
09/07/290iC� 2
1.t
0
0
Po.-or�t Timms Exo��dinp
+ Predeveloped
Predeveloped Landuse Totals for POC #2
Total Pervious Area: 0.32
Total Impervious Area: 0
Mitigated Landuse Totals for POC #2
Total Pervious Area: 0.1
Total Impervious Area: 0.22
10 1 i -
x Mitigated
Flow Frequency Method: Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #2
Return Period
Flow(cfs)
2 year
0.000226
5 year
0.000261
10 year
0.000277
25 year
0.000291
50 year
0.000299
100 year
0.000306
Flow Frequency Return Periods for Mitigated. POC #2
Return Period
Flow(cfs)
2 year
0
5 year
0
10 year
0
25 year
0
50 year
0
100 year
0
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #2
Year
Predeveloped
Mitigated
1949
0.000
0.000
1950
0.000
0.000
1951
0.000
0.000
1952
0.000
0.000
1953
0.000
0.000
1954
0.000
0.000
1955
0.000
0.000
1956
0.000
0.000
1957
0.000
0.000
1958
0.000
0.000
1959
0.000
0.000
O GEOf
+c _. M so ro m so n w " w.s �
21027-GREENWALK 3/1/2023 12:26:41 PM Exhibit 19 - Green OA
PLN2022-004 Packet Pg. 344
Planning &
Development
1.t
Received
09/07/2M
0.000
0.000
1961
0.000
0.000
1962
0.000
0.000
E
1963
0.000
0.000
0
1964
0.000
0.000
U-
1965
0.000
0.000
1966
0.000
0.000
1967
0.000
0.000
1968
0.000
0.000
a
1969
0.000
0.000
1970
0.000
0.000
E
1971
0.000
0.000
C
1972
0.000
0.000
1973
0.000
0.000
0
1974
0.000
0.000
1975
0.000
0.000
1976
0.000
0.000
1977
0.000
0.000
y
1978
0.000
0.000
1979
0.000
0.000
1980
0.000
0.000
1981
0.000
0.000
CU
1982
0.000
0.000
a
1983
0.000
0.000
1984
0.000
0.000
1985
0.000
0.000
-
1986
0.000
0.000
Z
1987
0.000
0.000
Y
1988
0.000
0.000
a
1989
0.000
0.000
Y
1990
0.000
0.000
1991
0.000
0.000
3
1992
0.000
0.000
L
1993
0.000
0.000
0
1994
0.000
0.000
a
1995
0.000
0.000
a
1996
0.000
0.000
1997
0.000
0.000
Cn
1998
0.000
0.000
06
1999
0.000
0.000
a
2000
0.000
0.000
2
2001
0.000
0.000
2002
0.000
0.000
3
2003
0.000
0.000
E
2004
0.000
0.000
0
2005
0.000
0.000
N
2006
0.000
0.000
E
2007
0.000
0.000
L
2008
0.000
0.000
a
2009
0.000
0.000
C
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #2
Rank Predeveloped Mitigated
1 0.0003 0.0000
2 0.0003 0.0000
3 0.0003 0.0000
4 0.0003 0.0000
21027-GREENWALK 3/1/2023 12:28:53 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 345
Planning &
Development
Received
09/07/1023
0.0003
0.0000
6
0.0003
0.0000
7
0.0003
0.0000
8
0.0003
0.0000
9
0.0003
0.0000
10
0.0003
0.0000
11
0.0003
0.0000
12
0.0003
0.0000
13
0.0002
0.0000
14
0.0002
0.0000
15
0.0002
0.0000
16
0.0002
0.0000
17
0.0002
0.0000
18
0.0002
0.0000
19
0.0002
0.0000
20
0.0002
0.0000
21
0.0002
0.0000
22
0.0002
0.0000
23
0.0002
0.0000
24
0.0002
0.0000
25
0.0002
0.0000
26
0.0002
0.0000
27
0.0002
0.0000
28
0.0002
0.0000
29
0.0002
0.0000
30
0.0002
0.0000
31
0.0002
0.0000
32
0.0002
0.0000
33
0.0002
0.0000
34
0.0002
0.0000
35
0.0002
0.0000
36
0.0002
0.0000
37
0.0002
0.0000
38
0.0002
0.0000
39
0.0002
0.0000
40
0.0002
0.0000
41
0.0002
0.0000
42
0.0002
0.0000
43
0.0002
0.0000
44
0.0002
0.0000
45
0.0002
0.0000
46
0.0002
0.0000
47
0.0002
0.0000
48
0.0002
0.0000
49
0.0002
0.0000
50
0.0002
0.0000
51
0.0002
0.0000
52
0.0002
0.0000
53
0.0002
0.0000
54
0.0002
0.0000
55
0.0002
0.0000
56
0.0002
0.0000
57
0.0002
0.0000
58
0.0002
0.0000
59
0.0002
0.0000
60
0.0002
0.0000
61
0.0001
0.0000
1.t
21027-GREENWALK 3/1/2023 12:28:53 PM Exhibit 19 - Green on
PLN2022-004 Packet Pg. 346
Planning &
Development
Received
09/07/2023
1.t
21027-GREENWALK 3/1/2023 12:28:53 PM Exhibit 19 - Green 07
PLN2022-004 Packet Pg. 347
Duration Flows
The Facility PASSED
Flow(cfs)
Predev
Mit
Percentage
Pass/Fail
0.0001
880
0
0
Pass
0.0001
873
0
0
Pass
0.0001
843
0
0
Pass
0.0001
811
0
0
Pass
0.0001
779
0
0
Pass
0.0001
757
0
0
Pass
0.0001
729
0
0
Pass
0.0001
694
0
0
Pass
0.0001
679
0
0
Pass
0.0001
666
0
0
Pass
0.0001
634
0
0
Pass
0.0001
610
0
0
Pass
0.0001
584
0
0
Pass
0.0001
567
0
0
Pass
0.0001
547
0
0
Pass
0.0001
523
0
0
Pass
0.0001
499
0
0
Pass
0.0001
491
0
0
Pass
0.0001
468
0
0
Pass
0.0001
451
0
0
Pass
0.0002
430
0
0
Pass
0.0002
406
0
0
Pass
0.0002
392
0
0
Pass
0.0002
378
0
0
Pass
0.0002
362
0
0
Pass
0.0002
355
0
0
Pass
0.0002
348
0
0
Pass
0.0002
337
0
0
Pass
0.0002
317
0
0
Pass
0.0002
308
0
0
Pass
0.0002
298
0
0
Pass
0.0002
283
0
0
Pass
0.0002
270
0
0
Pass
0.0002
257
0
0
Pass
0.0002
251
0
0
Pass
0.0002
242
0
0
Pass
0.0002
233
0
0
Pass
0.0002
223
0
0
Pass
0.0002
214
0
0
Pass
0.0002
208
0
0
Pass
0.0002
200
0
0
Pass
0.0002
192
0
0
Pass
0.0002
187
0
0
Pass
0.0002
183
0
0
Pass
0.0002
178
0
0
Pass
0.0002
172
0
0
Pass
0.0002
163
0
0
Pass
0.0002
156
0
0
Pass
0.0002
151
0
0
21027-GREENWALK 3/1/2023 12:28:53 PM Page 28
Planning &
Development
1.t
Received
09/07/=02
120
0
0
Pass
0.0002
113
0
0
Pass
0.0002
107
0
0
Pass
E
0.0002
101
0
0
Pass
o
0.0002
98
0
0
Pass
U-
0.0002
91
0
0
Pass
0.0002
88
0
0
Pass
0.0002
81
0
0
Pass
a_
0.0002
72
0
0
Pass
a
0.0002
66
0
0
Pass
0.0002
61
0
0
Pass
E
0.0002
57
0
0
Pass
o
0.0002
52
0
0
Pass
0.0002
48
0
0
Pass
o
0.0002
45
0
0
Pass
0.0002
39
0
0
Pass
0.0002
36
0
0
Pass
0.0002
34
0
0
Pass
y
0.0002
29
0
0
Pass
0.0002
24
0
0
Pass
0.0003
15
0
0
Pass
0.0003
14
0
0
Pass
Cu
0.0003
11
0
0
Pass
a
0.0003
6
0
0
Pass
0.0003
1
0
0
Pass
0.0003
0
0
0
Pass
-
0.0003
0
0
0
Pass
a
0.0003
0
0
0
Pass
Y
0.0003
0
0
0
Pass
a
0.0003
0
0
0
Pass
Y
0.0003
0
0
0
Pass
0.0003
0
0
0
Pass
3
0.0003
0
0
0
Pass
L
0.0003
0
0
0
Pass
�?
0.0003
0
0
0
Pass
a
0.0003
0
0
0
Pass
a
0.0003
0
0
0
Pass
0.0003
0
0
0
Pass
Cn
0.0003
0
0
0
Pass
V
0.0003
0
0
0
Pass
a
0.0003
0
0
0
Pass
2
0.0003
0
0
0
Pass
0.0003
0
0
0
Pass
3
0.0003
0
0
0
Pass
E
0.0003
0
0
0
Pass
o
0.0003
0
0
0
Pass
N
0.0003
0
0
0
Pass
E
21027-GREENWALK 3/1/2023 12:28:53 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 349
Planning &
Development
Received
09/07/der Quality
Water Quality BMP Flow and Volume for POC #2
On-line facility volume:
0.0193 acre-feet
On-line facility target flow:
0.0293 cfs.
Adjusted for 15 min:
0.0293 cfs.
Off-line facility target flow:
0.0165 cfs.
Adjusted for 15 min:
0.0165 cfs.
1.t
21027-GREENWALK 3/1/2023 12:28:53 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 350
Planning &
Development
Received
09/07/idD Report
1.t
LID Technique
Used for
Total Volume
'Volume
Infiltration
Cumulative
Percent
1^Vater Quality
Percent
Comment
Treatment?
Needs
Through
Volume
Volume
Volume
NlaterQuality
Treatment
Facility
(ac-ft)
Infiltration
Infiltrated
Treated
ac-ft)
aCA)
Credit
StormTech 2 POC
❑
28.19
❑
100.00
Total Volume Infiltrated
28.19
0.00
0.00
100.00
0.00
0%
No Treat.
Credit
Duration
Compliance with LID
Analysis
Standard 8% of 2-yr to 50% of
Result=
2-yr
Passed
21027-GREENWALK
3/1 /2023 12:28:53 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 351
Planning &
Development
Received
09/07/2180iC� 3
1.t
M
0
.� c,.,iutwreoirer�, eae,
c ae
P•ro.ar.t Tim• 97— dine i ,s , 5 ,C _. M so ro m so 95 BB 99 BB.s ,
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #3
Total Pervious Area-
0.14
Total Impervious Area-
0
Mitigated Landuse Totals for POC #3
Total Pervious Area-
0.05
Total Impervious Area-
0.09
Flow Frequency Method-
Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #3
Return Period
Flow(cfs)
2 year
0.000099
5 year
0.000114
10 year
0.000121
25 year
0.000128
50 year
0.000131
100 year
0.000134
Flow Frequency Return Periods for Mitigated. POC #3
Return Period
Flow(cfs)
2 year
0
5 year
0
10 year
0
25 year
0
50 year
0
100 year
0
Annual Peaks
Annual Peaks for Predeveloped
and Mitigated. POC #3
Year Predeveloped Mitigated
1949 0.000
0.000
1950 0.000
0.000
1951 0.000
0.000
1952 0.000
0.000
1953 0.000
0.000
1954 0.000
0.000
1955 0.000
0.000
1956 0.000
0.000
1957 0.000
0.000
1958 0.000
0.000
1959 0.000
0.000
21027-GREENWALK
3/1/2023 12:28:53 PM
Exhibit 19 - Green
PLN2022-004 Packet Pg. 352
Planning &
Development
1.t
Received
09/07/2M
0.000
0.000
1961
0.000
0.000
1962
0.000
0.000
E
1963
0.000
0.000
0
1964
0.000
0.000
U-
1965
0.000
0.000
1966
0.000
0.000
1967
0.000
0.000
1968
0.000
0.000
a
1969
0.000
0.000
1970
0.000
0.000
E
1971
0.000
0.000
C
1972
0.000
0.000
1973
0.000
0.000
0
1974
0.000
0.000
1975
0.000
0.000
1976
0.000
0.000
1977
0.000
0.000
y
1978
0.000
0.000
1979
0.000
0.000
1980
0.000
0.000
1981
0.000
0.000
CU
1982
0.000
0.000
a
1983
0.000
0.000
1984
0.000
0.000
1985
0.000
0.000
-
1986
0.000
0.000
Z
1987
0.000
0.000
Y
1988
0.000
0.000
a
1989
0.000
0.000
Y
1990
0.000
0.000
1991
0.000
0.000
3
1992
0.000
0.000
L
1993
0.000
0.000
0
1994
0.000
0.000
a
1995
0.000
0.000
a
1996
0.000
0.000
1997
0.000
0.000
Cn
1998
0.000
0.000
06
1999
0.000
0.000
a
2000
0.000
0.000
2
2001
0.000
0.000
2002
0.000
0.000
3
2003
0.000
0.000
E
2004
0.000
0.000
0
2005
0.000
0.000
N
2006
0.000
0.000
E
2007
0.000
0.000
L
2008
0.000
0.000
a
2009
0.000
0.000
C
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #3
Rank Predeveloped Mitigated
1 0.0001 0.0000
2 0.0001 0.0000
3 0.0001 0.0000
4 0.0001 0.0000
21027-GREENWALK 3/1/2023 12:29:31 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 353
Planning &
Development
Received
09/07/1023
0.0001
0.0000
6
0.0001
0.0000
7
0.0001
0.0000
8
0.0001
0.0000
9
0.0001
0.0000
10
0.0001
0.0000
11
0.0001
0.0000
12
0.0001
0.0000
13
0.0001
0.0000
14
0.0001
0.0000
15
0.0001
0.0000
16
0.0001
0.0000
17
0.0001
0.0000
18
0.0001
0.0000
19
0.0001
0.0000
20
0.0001
0.0000
21
0.0001
0.0000
22
0.0001
0.0000
23
0.0001
0.0000
24
0.0001
0.0000
25
0.0001
0.0000
26
0.0001
0.0000
27
0.0001
0.0000
28
0.0001
0.0000
29
0.0001
0.0000
30
0.0001
0.0000
31
0.0001
0.0000
32
0.0001
0.0000
33
0.0001
0.0000
34
0.0001
0.0000
35
0.0001
0.0000
36
0.0001
0.0000
37
0.0001
0.0000
38
0.0001
0.0000
39
0.0001
0.0000
40
0.0001
0.0000
41
0.0001
0.0000
42
0.0001
0.0000
43
0.0001
0.0000
44
0.0001
0.0000
45
0.0001
0.0000
46
0.0001
0.0000
47
0.0001
0.0000
48
0.0001
0.0000
49
0.0001
0.0000
50
0.0001
0.0000
51
0.0001
0.0000
52
0.0001
0.0000
53
0.0001
0.0000
54
0.0001
0.0000
55
0.0001
0.0000
56
0.0001
0.0000
57
0.0001
0.0000
58
0.0001
0.0000
59
0.0001
0.0000
60
0.0001
0.0000
61
0.0000
0.0000
1.t
21027-GREENWALK 3/1/2023 12:29:31 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 354
Planning &
Development
Received
09/07/2023
1.t
21027-GREENWALK 3/1/2023 12:29:31 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 355
Duration Flows
The Facility PASSED
Flow(cfs)
Predev
Mit
Percentage
Pass/Fail
0.0000
880
0
0
Pass
0.0001
858
0
0
Pass
0.0001
829
0
0
Pass
0.0001
796
0
0
Pass
0.0001
773
0
0
Pass
0.0001
752
0
0
Pass
0.0001
724
0
0
Pass
0.0001
692
0
0
Pass
0.0001
679
0
0
Pass
0.0001
649
0
0
Pass
0.0001
622
0
0
Pass
0.0001
598
0
0
Pass
0.0001
578
0
0
Pass
0.0001
564
0
0
Pass
0.0001
542
0
0
Pass
0.0001
522
0
0
Pass
0.0001
499
0
0
Pass
0.0001
478
0
0
Pass
0.0001
460
0
0
Pass
0.0001
441
0
0
Pass
0.0001
426
0
0
Pass
0.0001
404
0
0
Pass
0.0001
388
0
0
Pass
0.0001
375
0
0
Pass
0.0001
362
0
0
Pass
0.0001
353
0
0
Pass
0.0001
344
0
0
Pass
0.0001
327
0
0
Pass
0.0001
316
0
0
Pass
0.0001
305
0
0
Pass
0.0001
294
0
0
Pass
0.0001
281
0
0
Pass
0.0001
269
0
0
Pass
0.0001
257
0
0
Pass
0.0001
246
0
0
Pass
0.0001
238
0
0
Pass
0.0001
228
0
0
Pass
0.0001
219
0
0
Pass
0.0001
212
0
0
Pass
0.0001
206
0
0
Pass
0.0001
198
0
0
Pass
0.0001
192
0
0
Pass
0.0001
185
0
0
Pass
0.0001
182
0
0
Pass
0.0001
173
0
0
Pass
0.0001
170
0
0
Pass
0.0001
159
0
0
Pass
0.0001
154
0
0
Pass
0.0001
147
0
0
21027-GREENWALK 3/1/2023 12:29:31 PM Page 36
Planning &
Development
1.t
Received
09/07/=01
118
0
0
Pass
0.0001
111
0
0
Pass
0.0001
105
0
0
Pass
E
0.0001
99
0
0
Pass
o
0.0001
95
0
0
Pass
U-
0.0001
88
0
0
Pass
0.0001
85
0
0
Pass
0.0001
76
0
0
Pass
a_
0.0001
71
0
0
Pass
a
0.0001
65
0
0
Pass
0.0001
60
0
0
Pass
E
0.0001
57
0
0
Pass
o
0.0001
51
0
0
Pass
0.0001
47
0
0
Pass
o
0.0001
40
0
0
Pass
0.0001
39
0
0
Pass
0.0001
35
0
0
Pass
0.0001
31
0
0
Pass
y
0.0001
29
0
0
Pass
0.0001
21
0
0
Pass
0.0001
15
0
0
Pass
0.0001
13
0
0
Pass
Cu
0.0001
8
0
0
Pass
a
0.0001
1
0
0
Pass
0.0001
0
0
0
Pass
0.0001
0
0
0
Pass
-
0.0001
0
0
0
Pass
a
0.0001
0
0
0
Pass
Y
0.0001
0
0
0
Pass
a
0.0001
0
0
0
Pass
Y
0.0001
0
0
0
Pass
0.0001
0
0
0
Pass
3
0.0001
0
0
0
Pass
L
0.0001
0
0
0
Pass
0
0.0001
0
0
0
Pass
a
0.0001
0
0
0
Pass
a
0.0001
0
0
0
Pass
0.0001
0
0
0
Pass
Cn
0.0001
0
0
0
Pass
V
0.0001
0
0
0
Pass
a
0.0001
0
0
0
Pass
2
0.0001
0
0
0
Pass
0.0001
0
0
0
Pass
3
0.0001
0
0
0
Pass
E
0.0001
0
0
0
Pass
o
0.0001
0
0
0
Pass
N
0.0001
0
0
0
Pass
E
21027-GREENWALK 3/1/2023 12:29:31 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 357
Planning &
Development
Received
09/07/der Quality
Water Quality BMP Flow and Volume for POC #3
On-line facility volume:
0.008 acre-feet
On-line facility target flow:
0.0114 cfs.
Adjusted for 15 min:
0.0114 cfs.
Off-line facility target flow:
0.0064 cfs.
Adjusted for 15 min:
0.0064 cfs.
1.t
21027-GREENWALK 3/1/2023 12:29:31 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 358
Planning &
Development
Received
09/07/idD Report
1.t
LID Technique
Used for
Total Volume
Volume
Infiltration
Cumulative
Percent
Water Quality
Percent
Comment
Treatment?
Needs
Through
Volume
Volume
volume
Water Quality
Treatment
Facility
(ac-ft)
Infiltration
Infiltrated
Treated
iac-ft)
ac-ft)
Credit
StormTech 3 POC
❑
11 20
❑
100.00
Total Volume Infiltrated
11 80
0.00
0.00
100.00
0.00
0%
No Treat.
Credit
Duration
Compliance with LID
Analysis
Standard 8% of 2-yr to 50% of
Result=
2-yr
Passed
21027-GREENWALK
3/1/2023 12:29:31 PM Exhibit 19 - Greencl
PLN2022-004 Packet Pg. 359
Planning &
Development
Received
09/07/del Default Modifications
1.t
Total of 0 changes have been made.
PERLND Changes
No PERLND changes have been made.
IMPLND Changes
No IMPLND changes have been made.
21027-GREENWALK 3/1/2023 12:29:31 PM Exhibit 19 - Green An
PLN2022-004 Packet Pg. 360
Planning &
Development
Receiv d
o9io7i2ppendix
1.t
Predeveloped Schematic
IBasin 3
i.1 2 _ �3 0.14ac
21027-GREENWALK 3/1/2023 12:29:31 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 361
Planning &
Development
Received
09/07/,Vf'ated Schematic
1.t
A Basin Basin Basin 3
0.41aCE0.32a .- 0.14ac
SI SI SI
Storm ech 1 Storm StormTech
2 3
Q
21027-GREENWALK 3/1/2023 12:29:32 PM Exhibit 19 - Green AO
PLN2022-004 Packet Pg. 362
Planning &
Development
Received
09/07/29radeveloped UCI File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1
END GLOBAL
FILES
<File>
<Un#>
END FILES
OPN SEQUENCE
2009 09 30
UNIT SYSTEM 1
<----------- File Name--
---------------------------->***
***
INGRP INDELT 00:15
PERLND 2
COPY 501
COPY 502
COPY 503
DISPLY 1
DISPLY 2
DISPLY 3
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<---------- Title ----------- >***TRAN PIVL DIG1 FIL1
1 Basin 1 MAX
2 Basin 2 MAX
3 Basin 3 MAX
END DISPLY-INF01
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
502 1 1
503 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
PYR DIG2 FIL2 YRND
1 2 30 9
1 2 31 9
1 2 32 9
<PLS ><------- Name ------- >NBLKS Unit -systems Printer ***
# - # User t-series Engl Metr ***
in out ***
2 A/B, Forest, Mod 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
1.t
ACTIVITY ip
<PLS > ************* Active Sections ***************************** Q
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 363
<PLS ><------- Name ------- >NBLKS Unit -systems Printer ***
# - # User t-series Engl Metr ***
in out ***
2 A/B, Forest, Mod 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
1.t
ACTIVITY ip
<PLS > ************* Active Sections ***************************** Q
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 363
Planning &
Development
Received
09/07/2023# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
2 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT -INFO
<PLS > ***************** Print -flags ***************************** PIVL PYR
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
2 0 0 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT -INFO
PWAT-PARM1
<PLS > PWATER variable monthly parameter value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ***
2 0 0 0 0 0 0 0 0 0 0 0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2 ***
# - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC
2 0 5 2 400 0.1 0.3 0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER
input info:
Part 3
***
# - # ***PETMAX
PETMIN
INFEXP
INFILD
DEEPFR
BASETP AGWETP
2 0
0
2
2
0
0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER
input info:
Part 4
***
# - # CEPSC
UZSN
NSUR
INTFW
IRC
LZETP ***
2 0.2
0.5
0.35
0
0.7
0.7
END PWAT-PARM4
PWAT-STATEl
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# - # *** CEPS SURS UZS IFWS LZS AGWS GWVS
2 0 0 0 0 3 1 0
END PWAT-STATEI
END PERLND
IMPLND
GEN-INFO
<PLS ><------- Name ------- >
END GEN-INFO
*** Section IWATER***
Unit -systems Printer ***
User t-series Engl Metr ***
in out ***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
END ACTIVITY
PRINT -INFO
<ILS > ******** Print -flags ******** PIVL PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
END PRINT -INFO
IWAT-PARM1
<PLS > IWATER variable monthly parameter value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
END IWAT-PARM1
1.t
IWAT-PARM2 d
<PLS > IWATER input info: Part 2 ***
# - # *** LSUR SLSUR NSUR RETSC v
END IWAT-PARM2
Q
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 364
Planning &
Development
Received
09/07/2023AT-PARM3
<PLS > IWATER input info: Part 3 ***
# - # ***PETMAX PETMIN
END IWAT-PARM3
IWAT-STATEI
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
END IWAT-STATEI
END IMPLND
SCHEMATIC
<-Source->
<Name> #
Basin 1***
PERLND 2
PERLND 2
Basin 2***
PERLND 2
PERLND 2
Basin 3***
PERLND 2
PERLND 2
******Routing******
END SCHEMATIC
<--Area-->
<-Target->
MBLK
<-factor->
<Name>
#
Tbl#
0.41
COPY
501
12
0.41
COPY
501
13
0.32
COPY
502
12
0.32
COPY
502
13
0.14
COPY
503
12
0.14
COPY
503
13
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
COPY 502 OUTPUT MEAN 1 1 48.4 DISPLY 2 INPUT TIMSER 1
COPY 503 OUTPUT MEAN 1 1 48.4 DISPLY 3 INPUT TIMSER 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------ >< --- > User T-series Engl Metr LKFG ***
in out ***
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
END ACTIVITY
PRINT -INFO
<PLS > ***************** Print -flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
END PRINT -INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC Al A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
END HYDR-PARM1
1.t
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
<------ ><-------- ><-------- ><-------- ><-------- ><-------- ><-------- > ***
END HYDR—PARM2 Q
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 365
Planning &
Development
Received
09/07/2O23DR-INIT
RCHRES Initial
# - # *** VOL
*** ac-ft
<------ ><-------- >
END HYDR-INIT
END RCHRES
SPEC -ACTIONS
END SPEC -ACTIONS
FTABLES
END FTABLES
conditions for each HYDR section ***
Initial value of COLIND Initial value of OUTDGT
for each possible exit for each possible exit
<--- ><--- ><--- ><--- >< --- > *** <--- ><--- ><--- ><--- >< --- >
EXT
SOURCES
<-Volume->
<Member>
SsysSgap<--Mult-->Tran
<-Target
vols>
<-Grp>
<-Member-> ***
<Name> #
<Name> #
tem
strg<-factor->strg
<Name>
#
#
<Name> # # ***
WDM
2
PREC
ENGL
0.8
PERLND
1
999
EXTNL
PREC
WDM
2
PREC
ENGL
0.8
IMPLND
1
999
EXTNL
PREC
WDM
1
EVAP
ENGL
0.76
PERLND
1
999
EXTNL
PETINP
WDM
1
EVAP
ENGL
0.76
IMPLND
1
999
EXTNL
PETINP
END EXT SOURCES
EXT TARGETS
<-Volume->
<-Grp>
<-Member-><--Mult-->Tran
<-Volume->
<Member>
Tsys
Tgap Amd ***
<Name> #
<Name>
#
#<-factor->strg
<Name>
#
<Name>
tem
strg strg***
COPY 501
OUTPUT
MEAN
1
1 48.4
WDM
501
FLOW
ENGL
REPL
COPY 502
OUTPUT
MEAN
1
1 48.4
WDM
502
FLOW
ENGL
REPL
COPY 503
OUTPUT
MEAN
1
1 48.4
WDM
503
FLOW
ENGL
REPL
END EXT TARGETS
MASS -LINK
<Volume> <-Grp> <-Member-><--Mult-->
<Name> <Name> # #<-factor->
MASS -LINK 12
PERLND PWATER SURO 0.083333
END MASS -LINK 12
MASS -LINK 13
PERLND PWATER IFWO
END MASS -LINK 13
END MASS -LINK
END RUN
0.083333
<Target> <-Grp> <-Member->***
<Name> <Name> # #***
COPY INPUT MEAN
COPY INPUT MEAN
1.t
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 366
Planning &
Development
Received
09/07IMftated UC/ File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1
END GLOBAL
FILES
<File>
<Un#>
END FILES
OPN SEQUENCE
2009 09 30
UNIT SYSTEM 1
1.t
<----------- File Name--
---------------------------->***
***
INGRP INDELT 00:15
PERLND 16
IMPLND 2
IMPLND 5
IMPLND 8
IMPLND 14
RCHRES 1
RCHRES 2
RCHRES 3
COPY 2
COPY 502
COPY 3
COPY 503
COPY 1
COPY 501
DISPLY 2
DISPLY 3
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<---------- Title ----------- >***TRAN PIVL DIG1 FIL1
2 StormTech 2 MAX
3 StormTech 3 MAX
1 StormTech 1 MAX
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
2 1 1
502 1 1
3 1 1
503 1 1
501 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
PYR DIG2 FIL2 YRND
1 2 31 9
1 2 32 9
1 2 30 9
21027-GREENWALK 3/1/2023 12:29:33 PM
Exhibit 19 -Green
PLN2022-004 Packet Pg. 367
Planning &
Development
Received
09/07/ 3GENER
PERLND
GEN-INFO
<PLS ><------- Name ------- >NBLKS
16 C, Lawn, Flat 1
END GEN-INFO
*** Section PWATER***
Unit -systems Printer ***
User t-series Engl Metr ***
in out ***
1 1 1 27 0
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
16 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT -INFO
<PLS > ***************** Print -flags ***************************** PIVL PYR
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
16 0 0 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT -INFO
PWAT-PARM1
<PLS > PWATER variable monthly parameter value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ***
16 0 0 0 0 0 0 0 0 0 0 0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2 ***
# - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC
16 0 4.5 0.03 400 0.05 0.5 0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER
input info:
Part 3
***
# - # ***PETMAX
PETMIN
INFEXP
INFILD
DEEPFR
BASETP AGWETP
16 0
0
2
2
0
0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER
input info:
Part 4
***
# - # CEPSC
UZSN
NSUR
INTFW
IRC
LZETP ***
16 0.1
0.25
0.25
6
0.5
0.25
END PWAT-PARM4
PWAT-STATEI
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# - # *** CEPS SURS UZS IFWS LZS AGWS GWVS
16 0 0 0 0 2.5 1 0
END PWAT-STATEI
END PERLND
IMPLND
GEN-INFO
<PLS ><------- Name ------- >
2 ROADS/MOD
5 DRIVEWAYS/FLAT
8 SIDEWALKS/FLAT
14 POND
END GEN-INFO
*** Section IWATER***
Unit -systems Printer ***
User t-series Engl Metr ***
in out ***
1 1 1 27 0
1 1 1 27 0
1 1 1 27 0
1 1 1 27 0
1.t
ACTIVITY
************* *****************************
<PLS > Active Sections �
# - # ATMP SNOW IWAT SLD IWG IQAL ***
2 0 0 1 0 0 0 Q
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 368
Planning &
Development
Received
09/07/20235 0
0
1
0
0 0
8 0
0
1
0
0 0
14 0
0
1
0
0 0
END ACTIVITY
PRINT -INFO
<ILS > ********
Print
-flags ********
PIVL PYR
# - # ATMP
SNOW IWAT
SLD IWG IQAL
*********
2 0
0
4
0
0 0
1 9
5 0
0
4
0
0 0
1 9
8 0
0
4
0
0 0
1 9
14 0
0
4
0
0 0
1 9
END PRINT -INFO
IWAT-PARM1
<PLS > IWATER
variable
monthly
parameter value
flags
***
# - # CSNO
RTOP VRS
VNN RTLI
***
2 0
0
0
0
0
5 0
0
0
0
0
8 0
0
0
0
0
14 0
0
0
0
0
END IWAT-PARM1
IWAT-PARM2
<PLS >
IWATER
input info:
Part 2
***
# - # ***
LSUR
SLSUR
NSUR
RETSC
2
400
0.05
0.1
0.08
5
400
0.01
0.1
0.1
8
400
0.01
0.1
0.1
14
400
0.01
0.1
0.1
END IWAT-PARM2
IWAT-PARM3
<PLS >
IWATER
input info:
Part 3
***
# - # ***PETMAX
PETMIN
2
0
0
5
0
0
8
0
0
14
0
0
END IWAT-PARM3
IWAT-STATEI
<PLS > *** Initial
conditions
at start
of simulation
# - # ***
RETS
SURS
2
0
0
5
0
0
8
0
0
14
0
0
END IWAT-STATEI
END IMPLND
SCHEMATIC
<-Source->
<--Area-->
<-Target->
MBLK ***
<Name> #
<-factor->
<Name>
#
Tbl# ***
Basin 2***
PERLND 16
0.1
RCHRES
1
2
PERLND 16
0.1
RCHRES
1
3
IMPLND 2
0.18
RCHRES
1
5
IMPLND 5
0.04
RCHRES
1
5
Basin 3***
PERLND 16
0.05
RCHRES
2
2
PERLND 16
0.05
RCHRES
2
3
IMPLND 2
0.05
RCHRES
2
5
IMPLND 5
0.04
RCHRES
2
5
Basin 1***
PERLND 16
0.08
RCHRES
3
2
PERLND 16
0.08
RCHRES
3
3
IMPLND 2
0.18
RCHRES
3
5
IMPLND 5
0.12
RCHRES
3
5
1.t
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green An
PLN2022-004 Packet Pg. 369
Planning &
Development
Received
09/07/2023ND 8 0.01 RCHRES 3 5
IMPLND 14 0.02 RCHRES 3 5
******Routing******
PERLND
16
0.1
COPY
2
12
IMPLND
2
0.18
COPY
2
15
IMPLND
5
0.04
COPY
2
15
PERLND
16
0.1
COPY
2
13
PERLND
16
0.05
COPY
3
12
IMPLND
2
0.05
COPY
3
15
IMPLND
5
0.04
COPY
3
15
PERLND
16
0.05
COPY
3
13
PERLND
16
0.08
COPY
1
12
IMPLND
2
0.18
COPY
1
15
IMPLND
5
0.12
COPY
1
15
IMPLND
8
0.01
COPY
1
15
IMPLND
14
0.02
COPY
1
15
PERLND
16
0.08
COPY
1
13
RCHRES
1
1
COPY
502
17
RCHRES
2
1
COPY
503
17
RCHRES
3
1
COPY
501
17
END SCHEMATIC
NETWORK
<-Volume->
<-Grp>
<-Member-><--Mult-->Tran
<-Target vols>
<-Grp>
<-Member-> ***
<Name>
#
<Name>
#
#<-factor->strg
<Name>
# #
<Name>
# # ***
COPY
502
OUTPUT
MEAN
1
1 48.4
DISPLY
2
INPUT
TIMSER
1
COPY
503
OUTPUT
MEAN
1
1 48.4
DISPLY
3
INPUT
TIMSER
1
COPY
501
OUTPUT
MEAN
1
1 48.4
DISPLY
1
INPUT
TIMSER
1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
1.t
<Name> # <Name>
# #<-factor->strg <Name>
#
#
<Name> # #
***
L
END NETWORK
d
RCHRES
3
GEN-INFO
C
RCHRES Name
Nexits
Unit
Systems
Printer
***
# - #<------------------
>< --- >
User
T-series
Engl
Metr
LKFG
***
in out
***
--
1 StormTech 2
2
1
1 1
28
0
1
a
2 StormTech 3
2
1
1 1
28
0
1
a
a
3 StormTech 1
2
1
1 1
28
0
1
END GEN-INFO
fn
*** Section RCHRES***
06
t
ACTIVITY
0
CL
<PLS > *************
Active Sections
*****************************
L
# - # HYFG ADFG CNFG
HTFG SDFG
GQFG
OXFG NUFG
PKFG
PHFG
1 1 0
0 0 0
0
0 0
0
0
2 1 0
0 0 0
0
0 0
0
0
3
3 1 0
0 0 0
0
0 0
0
0
E
END ACTIVITY
O
N
PRINT -INFO
E
<PLS > *****************
Print -flags
*******************
PIVL PYR
d
# - # HYDR ADCA CONS
HEAT SED
GQL
OXRX NUTR
PLNK
PHCB
PIVL PYR *********
d
1 4 0
0 0 0
0
0 0
0
0
1 9
2 4 0
0 0 0
0
0 0
0
0
1 9
3 4 0
0 0 0
0
0 0
0
0
1 9
+r
END PRINT -INFO
t
X
HYDR-PARM1
W
RCHRES Flags for each
HYDR Section
***
# - # VC Al A2 A3
ODFVFG for
each
*** ODGTFG
for
each
FUNCT for
each
4)
FG FG FG FG
possible
exit
*** possible
exit
possible
exit
t
1 0 1 0 0
4 5 0
0 0
0 0
0
0 0
2 2 2
2 2
2 0 1 0 0
4 5 0
0 0
0 0
0
0 0
2 2 2
2 2
Q
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 370
Planning &
Development
Received
09/07/20233 0 1 0
0 4 5
0 0 0
0 0 0
0 0
2 2
2 2 2
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO
LEN
DELTH
STCOR
KS
DB50
***
<------ ><-------- ><
-------- ><
-------- ><
-------- ><--------
><--------
>
***
1 1
0.01
0.0
2.0
0.5
0.0
2 2
0.01
0.0
2.0
0.5
0.0
3 3
0.02
0.0
2.0
0.5
0.0
END HYDR-PARM2
HYDR-INIT
RCHRES Initial
conditions
for each HYDR
section
***
# - # *** VOL
Initial
value
of COLIND
Initial
value
of OUTDGT
*** ac-ft
for each
possible
exit
for each
possible
exit
<------ ><-------- >
<--- ><
--- ><--- ><
--- >< --- > ***
<--- ><---
><--- ><
--- >< --- >
1 0
4.0
5.0 0.0
0.0 0.0
0.0
0.0 0.0
0.0 0.0
2 0
4.0
5.0 0.0
0.0 0.0
0.0
0.0 0.0
0.0 0.0
3 0
4.0
5.0 0.0
0.0 0.0
0.0
0.0 0.0
0.0 0.0
END HYDR-INIT
END RCHRES
SPEC -ACTIONS
END SPEC -ACTIONS
FTABLES
FTABLE 1
48 5
Depth Area Volume Outflowl Outflow2
(ft) (acres) (acre-ft) (cfs) (cfs)
0.000000 0.006984 0.000000 0.000000 0.000000
0.083333 0.006984 0.000233 0.000000 0.028180
0.166667 0.006984 0.000466 0.000000 0.028180
0.250000 0.006984 0.000700 0.000000 0.028180
0.333333 0.006984 0.000933 0.000000 0.028180
0.416667 0.006984 0.001167 0.000000 0.028180
0.500000 0.006984 0.001400 0.000000 0.028180
0.583333 0.006984 0.001907 0.000000 0.028180
0.666667 0.006984 0.002412 0.000000 0.028180
0.750000 0.006984 0.002915 0.000000 0.028180
0.833333 0.006984 0.003414 0.000000 0.028180
0.916667 0.006984 0.003912 0.000000 0.028180
1.000000 0.006984 0.004405 0.000000 0.028180
1.083333 0.006984 0.004895 0.000000 0.028180
1.166667 0.006984 0.005382 0.000000 0.028180
1.250000 0.006984 0.005864 0.000000 0.028180
1.333333 0.006984 0.006341 0.000000 0.028180
1.416667 0.006984 0.006814 0.000000 0.028180
1.500000 0.006984 0.007281 0.000000 0.028180
1.583333 0.006984 0.007744 0.000000 0.028180
1.666667 0.006984 0.008200 0.000000 0.028180
1.750000 0.006984 0.008651 0.000000 0.028180
1.833333 0.006984 0.009094 0.000000 0.028180
1.916667 0.006984 0.009530 0.000000 0.028180
2.000000 0.006984 0.009959 0.000000 0.028180
2.083333 0.006984 0.010381 0.000000 0.028180
2.166667 0.006984 0.010794 0.000000 0.028180
2.250000 0.006984 0.011195 0.000000 0.028180
2.333333 0.006984 0.011585 0.000000 0.028180
2.416667 0.006984 0.011964 0.000000 0.028180
2.500000 0.006984 0.012330 0.000000 0.028180
2.583333 0.006984 0.012681 0.000000 0.028180
2.666667 0.006984 0.013013 0.000000 0.028180
2.750000 0.006984 0.013320 0.000000 0.028180
2.833333 0.006984 0.013588 0.000000 0.028180
2.916667 0.006984 0.013841 0.000000 0.028180
3.000000 0.006984 0.014081 0.000000 0.028180
3.083333 0.006984 0.014314 0.000000 0.028180
3.166667 0.006984 0.014547 0.000000 0.028180
3.250000 0.006984 0.014781 0.000000 0.028180
3.333333 0.006984 0.015014 0.000000 0.028180
3.416667 0.006984 0.015248 0.000000 0.028180
Velocity Travel Time***
(ft/sec) (Minutes)***
1.t
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 371
Planning &
Development
Received
09/07/2023500000
0.006984
0.015481
0.000000
0.028180
3.583333
0.006984
0.015715
0.000000
0.028180
3.666667
0.006984
0.015948
0.000000
0.028180
Fa
3.750000
0.006984
0.016181
0.000000
0.028180
E
3.833333
0.006984
0.016415
0.000000
0.028180
0
3.916667
0.006984
0.016648
0.000000
0.028180
LL
END FTABLE
1
c
FTABLE
2
48 5
Depth
Area
Volume
Outflowl
Outflow2
Velocity Travel Time***
a
(ft)
(acres)
(acre-ft)
(cfs)
(cfs)
(ft/sec) (Minutes)***
0.000000
0.003880
0.000000
0.000000
0.000000
0.083333
0.003880
0.000130
0.000000
0.015656
E
0.166667
0.003880
0.000259
0.000000
0.015656
0-
0.250000
0.003880
0.000389
0.000000
0.015656
0
0.333333
0.003880
0.000518
0.000000
0.015656
>
0.416667
0.003880
0.000648
0.000000
0.015656
p
0.500000
0.003880
0.000778
0.000000
0.015656
0.583333
0.003880
0.001059
0.000000
0.015656
r
0.666667
0.003880
0.001340
0.000000
0.015656
0.750000
0.003880
0.001619
0.000000
0.015656
°
0.833333
0.003880
0.001897
0.000000
0.015656
0.916667
0.003880
0.002173
0.000000
0.015656
1.000000
0.003880
0.002447
0.000000
0.015656
a�
1.083333
0.003880
0.002720
0.000000
0.015656
1.166667
0.003880
0.002990
0.000000
0.015656
M
1.250000
0.003880
0.003258
0.000000
0.015656
a
1.333333
0.003880
0.003523
0.000000
0.015656
�+
1.416667
0.003880
0.003785
0.000000
0.015656
1.500000
0.003880
0.004045
0.000000
0.015656
E
1.583333
0.003880
0.004302
0.000000
0.015656
-
1.666667
0.003880
0.004556
0.000000
0.015656
2!
1.750000
0.003880
0.004806
0.000000
0.015656
a
1.833333
0.003880
0.005052
0.000000
0.015656
L
1.916667
0.003880
0.005295
0.000000
0.015656
a
2.000000
0.003880
0.005533
0.000000
0.015656
�e
2.083333
0.003880
0.005767
0.000000
0.015656
3
2.166667
0.003880
0.005997
0.000000
0.015656
C
2.250000
0.003880
0.006219
0.000000
0.015656
4)
2.333333
0.003880
0.006436
0.000000
0.015656
2.416667
0.003880
0.006647
0.000000
0.015656
--
2.500000
0.003880
0.006850
0.000000
0.015656
a
2.583333
0.003880
0.007045
0.000000
0.015656
a
a
2.666667
0.003880
0.007229
0.000000
0.015656
2.750000
0.003880
0.007400
0.000000
0.015656
U)
2.833333
0.003880
0.007549
0.000000
0.015656
06
2.916667
0.003880
0.007690
0.000000
0.015656
C
3.000000
0.003880
0.007823
0.000000
0.015656
a
3.083333
0.003880
0.007952
0.000000
0.015656
L
3.166667
0.003880
0.008082
0.000000
0.015656
3.250000
0.003880
0.008212
0.000000
0.015656
3.333333
0.003880
0.008341
0.000000
0.015656
3
3.416667
0.003880
0.008471
0.000000
0.015656
E
3.500000
0.003880
0.008601
0.000000
0.015656
0
3.583333
0.003880
0.008730
0.000000
0.015656
N
3.666667
0.003880
0.008860
0.000000
0.015656
E
3.750000
0.003880
0.008990
0.000000
0.015656
3.833333
0.003880
0.009119
0.000000
0.015656
a
3.916667
0.003880
0.009249
0.000000
0.015656
END FTABLE
2
FTABLE
3
48 5
Depth
Area
Volume
Outflowl
Outflow2
Velocity Travel Time***
K
(ft)
(acres)
(acre-ft)
(cfs)
(cfs)
(ft/sec) (Minutes)***
W
0.000000
0.011641
0.000000
0.000000
0.000000
0.083333
0.011641
0.000389
0.000000
0.046967
0.166667
0.011641
0.000777
0.000000
0.046967
E
E
0.250000
0.011641
0.001167
0.000000
0.046967
0
0.333333
0.011641
0.001555
0.000000
0.046967
0.416667
0.011641
0.001944
0.000000
0.046967
Q
21027-GREENWALK
3/1/2023 12:29:33
PM Exhibit 19 - Green
PLN2022-004
Packet Pg. 372
Planning &
Development
Received
1.t
09/07/2023500000
0.011641
0.002334
0.000000
0.046967
0.583333
0.011641
0.003178
0.000000
0.046967
0.666667
0.011641
0.004020
0.000000
0.046967
0.750000
0.011641
0.004858
0.000000
0.046967
0.833333
0.011641
0.005691
0.000000
0.046967
0.916667
0.011641
0.006519
0.000000
0.046967
1.000000
0.011641
0.007342
0.000000
0.046967
1.083333
0.011641
0.008159
0.000000
0.046967
1.166667
0.011641
0.008969
0.000000
0.046967
1.250000
0.011641
0.009773
0.000000
0.046967
1.333333
0.011641
0.010569
0.000000
0.046967
1.416667
0.011641
0.011356
0.000000
0.046967
1.500000
0.011641
0.012136
0.000000
0.046967
1.583333
0.011641
0.012907
0.000000
0.046967
1.666667
0.011641
0.013667
0.000000
0.046967
1.750000
0.011641
0.014418
0.000000
0.046967
1.833333
0.011641
0.015157
0.000000
0.046967
1.916667
0.011641
0.015884
0.000000
0.046967
2.000000
0.011641
0.016599
0.000000
0.046967
2.083333
0.011641
0.017302
0.000000
0.046967
2.166667
0.011641
0.017990
0.000000
0.046967
2.250000
0.011641
0.018658
0.000000
0.046967
2.333333
0.011641
0.019308
0.000000
0.046967
2.416667
0.011641
0.019940
0.000000
0.046967
2.500000
0.011641
0.020550
0.000000
0.046967
2.583333
0.011641
0.021134
0.000000
0.046967
2.666667
0.011641
0.021688
0.000000
0.046967
2.750000
0.011641
0.022201
0.000000
0.046967
2.833333
0.011641
0.022647
0.000000
0.046967
2.916667
0.011641
0.023069
0.000000
0.046967
3.000000
0.011641
0.023468
0.000000
0.046967
3.083333
0.011641
0.023857
0.000000
0.046967
3.166667
0.011641
0.024245
0.000000
0.046967
3.250000
0.011641
0.024635
0.000000
0.046967
3.333333
0.011641
0.025024
0.000000
0.046967
3.416667
0.011641
0.025413
0.000000
0.046967
3.500000
0.011641
0.025802
0.000000
0.046967
3.583333
0.011641
0.026191
0.000000
0.046967
3.666667
0.011641
0.026580
0.000000
0.046967
3.750000
0.011641
0.026969
0.000000
0.046967
3.833333
0.011641
0.027358
0.000000
0.046967
3.916667
0.011641
0.027747
0.000000
0.046967
END FTABLE 3
END FTABLES
EXT SOURCES
<-Volume->
<Member>
SsysSgap<--Mult-->Tran
<-Target
vols> <-Grp> <-Member-> ***
<Name> #
<Name> #
tem strg<-factor->strg
<Name>
# # <Name> # # ***
WDM 2
PREC
ENGL 0.8
PERLND
1 999 EXTNL PREC
WDM 2
PREC
ENGL 0.8
IMPLND
1 999 EXTNL PREC
WDM 1
EVAP
ENGL 0.76
PERLND
1 999 EXTNL PETINP
WDM 1
EVAP
ENGL 0.76
IMPLND
1 999 EXTNL PETINP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd ***
<Name>
#
<Name>
#
#<-factor->strg
<Name>
#
<Name>
tem
strg strg***
RCHRES
1
HYDR
RO
1
1
1
WDM
1022
FLOW
ENGL
REPL
RCHRES
1
HYDR
0
1
1
1
WDM
1023
FLOW
ENGL
REPL
RCHRES
1
HYDR
0
2
1
1
WDM
1024
FLOW
ENGL
REPL
RCHRES
1
HYDR
STAGE
1
1
1
WDM
1025
STAG
ENGL
REPL
COPY
2
OUTPUT
MEAN
1
1
48.4
WDM
702
FLOW
ENGL
REPL
COPY
502
OUTPUT
MEAN
1
1
48.4
WDM
802
FLOW
ENGL
REPL
RCHRES
2
HYDR
RO
1
1
1
WDM
1026
FLOW
ENGL
REPL
RCHRES
2
HYDR
0
1
1
1
WDM
1027
FLOW
ENGL
REPL
RCHRES
2
HYDR
0
2
1
1
WDM
1028
FLOW
ENGL
REPL
RCHRES
2
HYDR
STAGE
1
1
1
WDM
1029
STAG
ENGL
REPL
COPY
3
OUTPUT
MEAN
1
1
48.4
WDM
703
FLOW
ENGL
REPL
COPY
503
OUTPUT
MEAN
1
1
48.4
WDM
803
FLOW
ENGL
REPL
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 373
Planning &
Development
Received
09/07/20$3ES 3 HYDR RO 1 1 1
RCHRES 3 HYDR 0 1 1 1
RCHRES 3 HYDR 0 2 1 1
RCHRES 3 HYDR STAGE 1 1 1
COPY 1 OUTPUT MEAN 1 1 48.4
COPY 501 OUTPUT MEAN 1 1 48.4
END EXT TARGETS
MASS -LINK
<Volume> <-Grp> <-Member-><--Mult-->
<Name> <Name> # #<-factor->
MASS -LINK 2
PERLND PWATER SURD 0.083333
END MASS -LINK 2
MASS -LINK 3
PERLND PWATER IFWO 0.083333
END MASS -LINK 3
MASS -LINK 5
IMPLND IWATER SURO 0.083333
END MASS -LINK 5
MASS -LINK 12
PERLND PWATER SURO 0.083333
END MASS -LINK 12
MASS -LINK 13
PERLND PWATER IFWO 0.083333
END MASS -LINK 13
MASS -LINK 15
IMPLND IWATER SURO 0.083333
END MASS -LINK 15
MASS -LINK 17
RCHRES OFLOW OVOL 1
END MASS -LINK 17
END MASS -LINK
END RUN
WDM
1030
FLOW
ENGL
REPL
WDM
1031
FLOW
ENGL
REPL
WDM
1032
FLOW
ENGL
REPL
WDM
1033
STAG
ENGL
REPL
WDM
701
FLOW
ENGL
REPL
WDM
801
FLOW
ENGL
REPL
<Target> <-Grp> <-Member->***
<Name> <Name> # #***
RCHRES INFLOW IVOL
RCHRES INFLOW IVOL
RCHRES
INFLOW
IVOL
COPY
INPUT
MEAN
COPY
INPUT
MEAN
COPY
INPUT
MEAN
COPY
INPUT
MEAN
1.t
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 374
Planning &
Development
Received
09/07/29r,eJeveloped
HSPF Message File
1.t
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 375
Planning &
Development
Received
09/07/Mf'ated HSPF Message File
1.t
ERROR/WARNING ID: 341 6
DATE/TIME: 2007/12/ 3 12:45
RCHRES: 1
The volume of water in this reach/mixed reservoir is greater than the value
in the "volume" column of the last row of RCHTAB(). To continue the
simulation the table has been extrapolated, based on information contained
in the last two rows. This will usually result in some loss of accuracy.
If depth is being calculated it will also cause an error condition.
Relevant data are:
NROWS V1 V2 VOL
48 715.04 725.19 731.76
ERROR/WARNING ID: 341 5
DATE/TIME: 2007/12/ 3 12:45
RCHRES: 1
Calculation of relative depth, using Newton's method of successive
approximations, converged to an invalid value (not in range 0.0 to 1.0).
Probably ftable was extrapolated. If extrapolation was small, no problem.
Remedy; extend ftable. Relevant data are:
A B C RDEP1 RDEP2 COUNT
0.0000E+00 608.45 -1.002E+03 1.6474 1.6474E+00 2
ERROR/WARNING ID: 341 6
DATE/TIME: 2007/12/ 3 13: 0
RCHRES: 1
The volume of water in this reach/mixed reservoir is greater than the value
in the "volume" column of the last row of RCHTAB(). To continue the
simulation the table has been extrapolated, based on information contained
in the last two rows. This will usually result in some loss of accuracy.
If depth is being calculated it will also cause an error condition.
Relevant data are:
NROWS V1 V2 VOL
48 7.1504E+02 725.19 748.12
ERROR/WARNING ID: 341 5
DATE/TIME: 2007/12/ 3 13: 0
RCHRES: 1
Calculation of relative depth, using Newton's method of successive
approximations, converged to an invalid value (not in range 0.0 to 1.0).
Probably ftable was extrapolated. If extrapolation was small, no problem.
Remedy; extend ftable. Relevant data are:
A B C RDEP1 RDEP2 COUNT
0.0000E+00 608.45 -1.983E+03 3.2599 3.2599E+00 2
ERROR/WARNING ID: 341 6
DATE/TIME: 2007/12/ 3 13:15
RCHRES: 1
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 376
Planning &
Development
Received
09/07/2U3volume of water in
this reach/mixed reservoir is
greater than the value
in the "volume" column
of the last row of RCHTAB().
To continue the
simulation the table has
been extrapolated, based on
information contained
Fa
in the last two rows.
This will usually result in some loss of accuracy.
E
If depth is being calculated
it will also cause an error condition.
Relevant data are:
io
LL
NROWS V1
V2 VOL
M
48 7.1504E+02 725.19
756.03
a
ERROR/WARNING ID: 341
5
c
d
DATE/TIME: 2007/12/ 3
13:15
E
RCHRES: 1
Calculation of relative depth, using Newton's method of successive
approximations, converged to an invalid value (not in range 0.0 to 1.0).
Probably ftable was extrapolated. If extrapolation was small, no problem.
Remedy; extend ftable. Relevant data are:
A B C RDEP1 RDEP2 COUNT
0.0000E+00 608.45 -2.457E+03 4.0385 4.0385E+00 2
ERROR/WARNING ID: 341 6
DATE/TIME: 2007/12/ 3 13:30
RCHRES: 1
The volume of water in this reach/mixed reservoir is greater than the value
in the "volume" column of the last row of RCHTAB(). To continue the
simulation the table has been extrapolated, based on information contained
in the last two rows. This will usually result in some loss of accuracy.
If depth is being calculated it will also cause an error condition.
Relevant data are:
NROWS V1 V2 VOL
48 7.1504E+02 725.19 754.78
ERROR/WARNING ID: 341 5
DATE/TIME: 2007/12/ 3 13:30
RCHRES: 1
Calculation of relative depth, using Newton's method of successive
approximations, converged to an invalid value (not in range 0.0 to 1.0).
Probably ftable was extrapolated. If extrapolation was small, no problem.
Remedy; extend ftable. Relevant data are:
A B C RDEP1 RDEP2 COUNT
0.0000E+00 608.45 -2.383E+03 3.9162 3.9161E+00 2
ERROR/WARNING ID: 341 6
DATE/TIME: 2007/12/ 3 13:45
RCHRES: 1
The volume of water in this reach/mixed reservoir is greater than the value
in the "volume" column of the last row of RCHTAB(). To continue the
simulation the table has been extrapolated, based on information contained
in the last two rows. This will usually result in some loss of accuracy.
If depth is being calculated it will also cause an error condition.
Relevant data are:
NROWS V1 V2 VOL
48 7.1504E+02 725.19 751.15
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 377
Planning &
Development
Received
09/07/2023
ERROR/WARNING ID: 341 5
DATE/TIME: 2007/12/ 3 13:45 E
0
LL
RCHRES: 1 -a
c
Calculation of relative depth, using Newton's method of successive
approximations, converged to an invalid value (not in range 0.0 to 1.0).
Probably ftable was extrapolated. If extrapolation was small, no problem. a
Remedy; extend ftable. Relevant data are:
c
m
A B C RDEP1 RDEP2 COUNT E
0.0000E+00 608.45 -2.165E+03 3.5581 3.5581 2 Q-
ERROR/WARNING ID: 341 6
DATE/TIME: 2007/12/ 3 14: 0
RCHRES: 1
The volume of water in this reach/mixed reservoir is greater than the value
in the "volume" column of the last row of RCHTAB(). To continue the
simulation the table has been extrapolated, based on information contained
in the last two rows. This will usually result in some loss of accuracy.
If depth is being calculated it will also cause an error condition.
Relevant data are:
NROWS V1 V2 VOL
48 715.04 725.19 743.70
ERROR/WARNING ID: 341 5
DATE/TIME: 2007/12/ 3 14: 0
RCHRES: 1
Calculation of relative depth, using Newton's method of successive
approximations, converged to an invalid value (not in range 0.0 to 1.0).
Probably ftable was extrapolated. If extrapolation was small, no problem.
Remedy; extend ftable. Relevant data are:
A B C RDEP1 RDEP2 COUNT
0.0000E+00 608.45 -1.718E+03 2.8244 2.8244E+00 2
ERROR/WARNING ID: 341 6
DATE/TIME: 2007/12/ 3 14:15
RCHRES: 1
The volume of water in this reach/mixed reservoir is greater than the value
in the "volume" column of the last row of RCHTAB(). To continue the
simulation the table has been extrapolated, based on information contained
in the last two rows. This will usually result in some loss of accuracy.
If depth is being calculated it will also cause an error condition.
Relevant data are:
NROWS V1 V2 VOL
48 7.1504E+02 725.19 742.74
ERROR/WARNING ID: 341 5 K
W
DATE/TIME: 2007/12/ 3 14:15
as
RCHRES: 1 E
t
t�
Calculation of relative depth, using Newton's method of successive
approximations, converged to an invalid value (not in range 0.0 to 1.0). Q
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 378
Planning &
Development
Received
09/07/223ably ftable was extrapolated. If extrapolation was small, no problem.
Remedy; extend ftable. Relevant data are:
A B C RDEP1 RDEP2 COUNT E
0.0000E+00 608.45 -1.661E+03 2.7294 2.7294E+00 2 0
LL
ERROR/WARNING ID: 341 6 =
0
DATE/TIME: 2007/12/ 3 14:30
a
RCHRES: 1
The volume of water in this reach/mixed reservoir is greater than the value
in the "volume" column of the last row of RCHTAB(). To continue the
simulation the table has been extrapolated, based on information contained
in the last two rows. This will usually result in some loss of accuracy.
If depth is being calculated it will also cause an error condition.
Relevant data are:
NROWS V1 V2 VOL
48 7.1504E+02 725.19 750.28
ERROR/WARNING ID: 341 5
DATE/TIME: 2007/12/ 3 14:30
RCHRES: 1
Calculation of relative depth, using Newton's method of successive
approximations, converged to an invalid value (not in range 0.0 to 1.0).
Probably ftable was extrapolated. If extrapolation was small, no problem.
Remedy; extend ftable. Relevant data are:
A B C RDEP1 RDEP2 COUNT
0.0000E+00 608.45 -2.112E+03 3.4720 3.4720E+00 2
ERROR/WARNING ID: 341 6
DATE/TIME: 2007/12/ 3 14:45
RCHRES: 1
The volume of water in this reach/mixed reservoir is greater than the value
in the "volume" column of the last row of RCHTAB(). To continue the
simulation the table has been extrapolated, based on information contained
in the last two rows. This will usually result in some loss of accuracy.
If depth is being calculated it will also cause an error condition.
Relevant data are:
NROWS V1 V2 VOL
48 7.1504E+02 725.19 760.16
ERROR/WARNING ID: 341 5
DATE/TIME: 2007/12/ 3 14:45
RCHRES: 1
Calculation of relative depth, using Newton's method of successive
approximations, converged to an invalid value (not in range 0.0 to 1.0).
Probably ftable was extrapolated. If extrapolation was small, no problem.
Remedy; extend ftable. Relevant data are:
A B C RDEP1 RDEP2 COUNT
0.0000E+00 608.45 -2.705E+03 4.4461 4.4461E+00 2
ERROR/WARNING ID: 341 6
DATE/TIME: 2007/12/ 3 15: 0
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 379
Planning &
Development
Received
09/07/2023
RCHRES: 1
The volume of water in
this reach/mixed reservoir is
greater than the value
E
in the "volume" column
of the last row of RCHTAB().
To continue the
0
simulation the table has been extrapolated, based on
information contained
LL
in the last two rows.
This will usually result in some loss of accuracy.
c
If depth is being calculated it will also cause an error condition.
Relevant data are:
a
NROWS V1
V2 VOL
48 7.1504E+02 725.19
768.85
ERROR/WARNING ID: 341 5
DATE/TIME: 2007/12/ 3 15: 0
RCHRES: 1
Calculation of relative depth, using Newton's method of successive
approximations, converged to an invalid value (not in range 0.0 to 1.0).
Probably ftable was extrapolated. If extrapolation was small, no problem.
Remedy; extend ftable. Relevant data are:
A B C RDEP1 RDEP2 COUNT
0.0000E+00 608.45 -3.226E+03 5.3018 5.3018E+00 2
ERROR/WARNING ID: 341 6
DATE/TIME: 2007/12/ 3 15:15
RCHRES: 1
The volume of water in this reach/mixed reservoir is greater than the value
in the "volume" column of the last row of RCHTAB(). To continue the
simulation the table has been extrapolated, based on information contained
in the last two rows. This will usually result in some loss of accuracy.
If depth is being calculated it will also cause an error condition.
Relevant data are:
NROWS V1 V2 VOL
48 7.1504E+02 725.19 770.66
ERROR/WARNING ID: 341 5
DATE/TIME: 2007/12/ 3 15:15
RCHRES: 1
Calculation of relative depth, using Newton's method of successive
approximations, converged to an invalid value (not in range 0.0 to 1.0).
Probably ftable was extrapolated. If extrapolation was small, no problem.
Remedy; extend ftable. Relevant data are:
A B C RDEP1 RDEP2 COUNT
0.0000E+00 608.45 -3.334E+03 5.4800 5.4800E+00 2
ERROR/WARNING ID: 341 6
DATE/TIME: 2007/12/ 3 15:30
B
RCHRES: 1
x
w
The volume of water in this reach/mixed reservoir is greater than the value
in the "volume" column of the last row of RCHTAB(). To continue the d
simulation the table has been extrapolated, based on information contained t
in the last two rows. This will usually result in some loss of accuracy.
If depth is being calculated it will also cause an error condition.
Relevant data are: Q
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 380
Planning &
Development
Received
09/07/2023
NROWS V1 V2 VOL
48 7.1504E+02 725.19 766.27
ERROR/WARNING ID: 341 5
DATE/TIME: 2007/12/ 3 15:30
RCHRES: 1
Calculation of relative depth, using Newton's method of successive
approximations, converged to an invalid value (not in range 0.0 to 1.0).
Probably ftable was extrapolated. If extrapolation was small, no problem.
Remedy; extend ftable. Relevant data are:
A B C RDEP1 RDEP2 COUNT
0.0000E+00 608.45 -3.071E+03 5.0481 5.0481E+00 2
ERROR/WARNING ID: 341 6
DATE/TIME: 2007/12/ 3 15:45
RCHRES: 1
The volume of water in this reach/mixed reservoir is greater than the value
in the "volume" column of the last row of RCHTAB(). To continue the
simulation the table has been extrapolated, based on information contained
in the last two rows. This will usually result in some loss of accuracy.
If depth is being calculated it will also cause an error condition.
Relevant data are:
NROWS V1 V2 VOL
48 7.1504E+02 725.19 758.51
ERROR/WARNING ID: 341 5
DATE/TIME: 2007/12/ 3 15:45
RCHRES: 1
Calculation of relative depth, using Newton's method of successive
approximations, converged to an invalid value (not in range 0.0 to 1.0).
Probably ftable was extrapolated. If extrapolation was small, no problem.
Remedy; extend ftable. Relevant data are:
A B C RDEP1 RDEP2 COUNT
0.0000E+00 608.45 -2.606E+03 4.2832 4.2832E+00 2
ERROR/WARNING ID: 341 6
DATE/TIME: 2007/12/ 3 16: 0
RCHRES: 1
The volume of water in this reach/mixed reservoir is greater than the value
in the "volume" column of the last row of RCHTAB(). To continue the
simulation the table has been extrapolated, based on information contained
in the last two rows. This will usually result in some loss of accuracy.
If depth is being calculated it will also cause an error condition.
Relevant data are:
NROWS V1 V2 VOL
48 7.1504E+02 725.19 746.52
ERROR/WARNING ID: 341 5
DATE/TIME: 2007/12/ 3 16: 0
RCHRES: 1
1.t
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 381
Planning &
Development
Received
09/07/2023
Calculation of relative depth, using Newton's method of successive
approximations, converged to an invalid value (not in range 0.0 to 1.0). Fa
Probably ftable was extrapolated. If extrapolation was small, no problem. E
Remedy; extend ftable. Relevant data are: 0
A B C RDEP1 RDEP2 COUNT c
0.0000E+00 608.45 -1.887E+03 3.1018 3.1018 2 M
ERROR/WARNING ID: 341 6 a
DATE/TIME: 2007/12/ 3 16:15 ell
RCHRES: 1
The volume of water in this reach/mixed reservoir is greater than the value
in the "volume" column of the last row of RCHTAB(). To continue the
simulation the table has been extrapolated, based on information contained
in the last two rows. This will usually result in some loss of accuracy.
If depth is being calculated it will also cause an error condition.
Relevant data are:
NROWS V1 V2 VOL
48 715.04 725.19 732.06
ERROR/WARNING ID: 341 5
DATE/TIME: 2007/12/ 3 16:15
RCHRES: 1
Calculation of relative depth, using Newton's method of successive
approximations, converged to an invalid value (not in range 0.0 to 1.0).
Probably ftable was extrapolated. If extrapolation was small, no problem.
Remedy; extend ftable. Relevant data are:
A B C RDEP1 RDEP2 COUNT
0.0000E+00 608.45 -1.021E+03 1.6774 1.6774E+00 2
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 382
Planning &
Development
Recei d
0910711JISclaimer
1.t
Legal Notice
This program and accompanying documentation are provided 'as -is' without warranty of any kind. T
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by: Clear Creek Solutions, Inc. 2005-2023; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
21027-GREENWALK 3/1/2023 12:29:33 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 383
Planning &
Development
Received
09/07/2023—
1.t
WWHM2012
PROJECT REPORT
DRYWELL - WWHM OUTPUT
Exhibit 19 - Green
PLN2022-004 Packet Pg. 384
Planning &
Development
1.t
Receiv d
09/071 neral Model Information
Project Name: 21027-Drywell
F5
Site Name: Greenwalk - Drywell
L
o
Site Address: 540 Edmonds Way
U_
City: Edmonds
Report Date: 12/7/2022
0
a
Gage: Everett
Data Start: 1948/10/01
E
a
Data End: 2009/09/30
Timestep: 15 Minute
o
Precip Scale: 0.800
Version Date: 2019/09/13
.y
Version: 4.2.17
POC Thresholds
Low Flow Threshold for POC1: 50 Percent of the 2 Year
High Flow Threshold for POC1: 50 Year
21027-Drywell 12/7/2022 3:45:12 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 385
Planning &
Development
Received
0si07i1oapduse Basin
Data
Predeveloped Land Use
E
L
Basin 1
-
Bypass:
No
_
GroundWater:
No
a
Pervious Land Use
acre
A B, Forest, Flat
0.07
Pervious Total
0.07
a
Impervious Land Use
acre
a�
Impervious Total
0
Basin Total
0.07
Element Flows To:
C
Surface
Interflow Groundwater
a
21027-Drywell 12/7/2022 3:45:12 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 386
Planning &
Development
Received
09107/:Mf'ated Land Use
Basin 1
Bypass:
No
GroundWater:
No
Pervious Land Use
acre
A B, Lawn, Flat
0.1
Pervious Total
0.1
Impervious Land Use
acre
ROOF TOPS FLAT
0.06
DRIVEWAYS FLAT
0.01
Impervious Total
0.07
Basin Total
0.17
Element Flows To:
Surface
SSD Table 2
Interflow Groundwater
SSD Table 2
1.t
21027-Drywell
12/7/2022 3:45:12 PM
Exhibit 19 - Green
PLN2022-004 Packet Pg. 387
Planning &
Development
Received
1.t
091071uting Elements
Predeveloped Routing
21027-Drywell 12/7/2022 3:45:12 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 388
Planning &
Development
Received
09107/:Mf'ated Routing
1.t
SSD Table 2
Depth:
Element Flows To:
Outlet 1
5 ft.
Outlet 2
SSD Table Hydraulic Table
Stage
Area
Volume
(feet)
(ac.)
(ac-ft.)
Manual
Manual
NotUsed
NotUsed
0.000
0.001
0.000
0.000
0.005
0.000
0.000
1.000
0.002
0.000
0.000
0.007
0.000
0.000
2.000
0.003
0.001
0.000
0.012
0.000
0.000
3.000
0.004
0.002
0.000
0.023
0.000
0.000
4.000
0.004
0.004
0.000
0.023
0.000
0.000
NotUsed
0.000
0.000
0.000
0.000
0.000
21027-Drywell 12/7/2022 3:45:12 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 389
Planning &
Development
Receivp,d
091071ARalysis Results
POC 1
n
M
U
J
oc
Peroont Tfm• Exo�odinp
+ Predeveloped
Predeveloped Landuse Totals for POC #1
Total Pervious Area: 0.07
Total Impervious Area: 0
Mitigated Landuse Totals for POC #1
Total Pervious Area: 0.1
Total Impervious Area: 0.07
CumWh•ro pro�aEdey
1�
c oe
x Mitigated
Flow Frequency Method: Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period
Flow(cfs)
2 year
0.000049
5 year
0.000057
10 year
0.000061
25 year
0.000064
50 year
0.000066
100 year
0.000067
Flow Frequency Return Periods for Mitigated. POC #1
Return Period
Flow(cfs)
2 year
0
5 year
0
10 year
0
25 year
0
50 year
0
100 year
0
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year
Predeveloped
Mitigated
1949
0.000
0.000
1950
0.000
0.000
1951
0.000
0.000
1952
0.000
0.000
1953
0.000
0.000
1954
0.000
0.000
1955
0.000
0.000
1956
0.000
0.000
1957
0.000
0.000
1958
0.000
0.000
1.t
21027-Drywell 12/7/2022 3:45:12 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 390
Planning &
Development
Received
09/07/MM
0.000
0.000
1960
0.000
0.000
1961
0.000
0.000
1962
0.000
0.000
1963
0.000
0.000
1964
0.000
0.000
1965
0.000
0.000
1966
0.000
0.000
1967
0.000
0.000
1968
0.000
0.000
1969
0.000
0.000
1970
0.000
0.000
1971
0.000
0.000
1972
0.000
0.000
1973
0.000
0.000
1974
0.000
0.000
1975
0.000
0.000
1976
0.000
0.000
1977
0.000
0.000
1978
0.000
0.000
1979
0.000
0.000
1980
0.000
0.000
1981
0.000
0.000
1982
0.000
0.000
1983
0.000
0.000
1984
0.000
0.000
1985
0.000
0.000
1986
0.000
0.000
1987
0.000
0.000
1988
0.000
0.000
1989
0.000
0.000
1990
0.000
0.000
1991
0.000
0.000
1992
0.000
0.000
1993
0.000
0.000
1994
0.000
0.000
1995
0.000
0.000
1996
0.000
0.000
1997
0.000
0.000
1998
0.000
0.000
1999
0.000
0.000
2000
0.000
0.000
2001
0.000
0.000
2002
0.000
0.000
2003
0.000
0.000
2004
0.000
0.000
2005
0.000
0.000
2006
0.000
0.000
2007
0.000
0.000
2008
0.000
0.000
2009
0.000
0.000
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and
Rank
Predeveloped
Mitigated
1
0.0001
0.0000
2
0.0001
0.0000
3
0.0001
0.0000
Mitigated. POC #1
1.t
21027-Drywell 12/7/2022 3:45:45 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 391
Planning &
Development
Received
09/07/21023
0.0001
0.0000
5
0.0001
0.0000
6
0.0001
0.0000
7
0.0001
0.0000
8
0.0001
0.0000
9
0.0001
0.0000
10
0.0001
0.0000
11
0.0001
0.0000
12
0.0001
0.0000
13
0.0001
0.0000
14
0.0001
0.0000
15
0.0001
0.0000
16
0.0001
0.0000
17
0.0001
0.0000
18
0.0001
0.0000
19
0.0001
0.0000
20
0.0001
0.0000
21
0.0001
0.0000
22
0.0001
0.0000
23
0.0001
0.0000
24
0.0001
0.0000
25
0.0001
0.0000
26
0.0001
0.0000
27
0.0001
0.0000
28
0.0001
0.0000
29
0.0001
0.0000
30
0.0001
0.0000
31
0.0001
0.0000
32
0.0001
0.0000
33
0.0001
0.0000
34
0.0000
0.0000
35
0.0000
0.0000
36
0.0000
0.0000
37
0.0000
0.0000
38
0.0000
0.0000
39
0.0000
0.0000
40
0.0000
0.0000
41
0.0000
0.0000
42
0.0000
0.0000
43
0.0000
0.0000
44
0.0000
0.0000
45
0.0000
0.0000
46
0.0000
0.0000
47
0.0000
0.0000
48
0.0000
0.0000
49
0.0000
0.0000
50
0.0000
0.0000
51
0.0000
0.0000
52
0.0000
0.0000
53
0.0000
0.0000
54
0.0000
0.0000
55
0.0000
0.0000
56
0.0000
0.0000
57
0.0000
0.0000
58
0.0000
0.0000
59
0.0000
0.0000
60
0.0000
0.0000
61
0.0000
0.0000
1.t
21027-Drywell 12/7/2022 3:45:45 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 392
Planning &
Development
Received
09/07/2023
1.t
21027-Drywell 12/7/2022 3:45:45 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 393
Duration Flows
The Facility PASSED
Flow(cfs)
Predev
Mit
Percentage
Pass/Fail
0.0000
890
0
0
Pass
0.0000
873
0
0
Pass
0.0000
848
0
0
Pass
0.0000
820
0
0
Pass
0.0000
785
0
0
Pass
0.0000
768
0
0
Pass
0.0000
740
0
0
Pass
0.0000
711
0
0
Pass
0.0000
684
0
0
Pass
0.0000
667
0
0
Pass
0.0000
636
0
0
Pass
0.0000
609
0
0
Pass
0.0000
586
0
0
Pass
0.0000
572
0
0
Pass
0.0000
553
0
0
Pass
0.0000
526
0
0
Pass
0.0000
504
0
0
Pass
0.0000
485
0
0
Pass
0.0000
466
0
0
Pass
0.0000
449
0
0
Pass
0.0000
430
0
0
Pass
0.0000
405
0
0
Pass
0.0000
390
0
0
Pass
0.0000
379
0
0
Pass
0.0000
364
0
0
Pass
0.0000
354
0
0
Pass
0.0000
344
0
0
Pass
0.0000
331
0
0
Pass
0.0000
317
0
0
Pass
0.0000
306
0
0
Pass
0.0000
298
0
0
Pass
0.0000
283
0
0
Pass
0.0000
269
0
0
Pass
0.0000
257
0
0
Pass
0.0000
246
0
0
Pass
0.0000
239
0
0
Pass
0.0000
229
0
0
Pass
0.0000
219
0
0
Pass
0.0000
212
0
0
Pass
0.0000
206
0
0
Pass
0.0000
198
0
0
Pass
0.0000
192
0
0
Pass
0.0000
184
0
0
Pass
0.0000
179
0
0
Pass
0.0000
173
0
0
Pass
0.0000
169
0
0
Pass
0.0000
159
0
0
Pass
0.0000
152
0
0
Pass
0.0000
147
0
0
21027-Drywell 12/7/2022 3:45:45 PM Page 11
Planning &
Development
1.t
Received
09/07/=00
113
0
0
Pass
0.0000
109
0
0
Pass
0.0000
102
0
0
Pass
E
0.0000
99
0
0
Pass
o
0.0000
91
0
0
Pass
U-
0.0000
88
0
0
Pass
0.0000
81
0
0
Pass
0.0000
73
0
0
Pass
a_
0.0001
67
0
0
Pass
a
0.0001
64
0
0
Pass
0.0001
59
0
0
Pass
E
0.0001
54
0
0
Pass
o
0.0001
50
0
0
Pass
0.0001
44
0
0
Pass
o
0.0001
39
0
0
Pass
0.0001
35
0
0
Pass
0.0001
34
0
0
Pass
0.0001
29
0
0
Pass
y
0.0001
24
0
0
Pass
0.0001
16
0
0
Pass
0.0001
14
0
0
Pass
0.0001
10
0
0
Pass
Cu
0.0001
2
0
0
Pass
a
0.0001
0
0
0
Pass
0.0001
0
0
0
Pass
0.0001
0
0
0
Pass
-
0.0001
0
0
0
Pass
a
0.0001
0
0
0
Pass
Y
0.0001
0
0
0
Pass
a
0.0001
0
0
0
Pass
Y
0.0001
0
0
0
Pass
0.0001
0
0
0
Pass
3
0.0001
0
0
0
Pass
L
0.0001
0
0
0
Pass
0
0.0001
0
0
0
Pass
a
0.0001
0
0
0
Pass
a
0.0001
0
0
0
Pass
0.0001
0
0
0
Pass
Cn
0.0001
0
0
0
Pass
V
0.0001
0
0
0
Pass
a
0.0001
0
0
0
Pass
2
0.0001
0
0
0
Pass
0.0001
0
0
0
Pass
3
0.0001
0
0
0
Pass
E
0.0001
0
0
0
Pass
o
0.0001
0
0
0
Pass
N
0.0001
0
0
0
Pass
E
21027-Drywell 12/7/2022 3:45:45 PM Exhibit 19 - Green10
PLN2022-004 Packet Pg. 395
Planning &
Development
Received
09/07/der Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:
0 acre-feet
On-line facility target flow:
0 cfs.
Adjusted for 15 min:
0 cfs.
Off-line facility target flow:
0 cfs.
Adjusted for 15 min:
0 cfs.
1.t
21027-Drywell 12/7/2022 3:45:45 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 396
Planning &
Development
Received
09/07/idD Report
1.t
LID Technique
Used for
Total Volume
'Volume
Infiltration
Cumulative
Percent
1^Vater Quality
Percent
Comment
Treatment?
Needs
Through
Volume
Volume
Volume
water Quality
Treatment
Facility
(ac-ft)
Infiltration
Infiltrated
Treated
ac-ft)
aCA)
Credit
SSD Taole 2 POC
❑
7.52
❑
100.00
Total Volume Infiltrated
752
0.00
0.00
100.00
0.00
0%
No Treat.
Credit
Duration
Compliance with LID
Analysis
Standard 8% of 2-yr to 50% of
Result=
2-yr
Passed
21027-Drywell
12/7/2022 3:45:45 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 397
Planning &
Development
Received
09/07/del Default Modifications
1.t
Total of 0 changes have been made.
PERLND Changes
No PERLND changes have been made.
IMPLND Changes
No IMPLND changes have been made.
21027-Drywell 12/7/2022 3:46:07 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 398
Planning &
Development
Receiv d
o9io7i2ppendix
1.t
Predeveloped Schematic
�a Basin 1
0.07ac
21027-Drywell 12/7/2022 3:46:07 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 399
Planning &
Development
Received
09/07/,Vf'ated Schematic
Basin 1
0.17ac
SI
--- SSD Table 2
=�A 1�
1.t
21027-Drywell 12/7/2022 3:46:08 PM Exhibit 19 - Green 17
PLN2022-004 Packet Pg. 400
Planning &
Development
Received
09/07/29radeveloped UCI File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1
END GLOBAL
FILES
<File>
<Un#>
OPN SEQUENCE
2009 09 30
UNIT SYSTEM 1
<----------- File Name
------------------------------>***
***
INGRP INDELT 00:15
PERLND 1
COPY 501
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<---------- Title ----------- >***TRAN PIVL DIG1 FIL1
1 Basin 1 MAX
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
PYR DIG2 FIL2 YRND
1 2 30 9
<PLS ><------- Name ------- >NBLKS Unit -systems Printer ***
# - # User t-series Engl Metr ***
in out ***
1 A/B, Forest, Flat 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
1 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
1.t
PRINT -INFO
<PLS > ***************** Print -flags ***************************** PIVL PYR
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
1 0 0 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT -INFO ip
r
Q
21027-Drywell 12/7/2022 3:46:08 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 401
Planning &
Development
Received
09/07/2023AT-PARM1
<PLS > PWATER variable monthly parameter value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ***
1 0 0 0 0 0 0 0 0 0 0 0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER
input info:
Part 2
***
# - # ***FOREST
LZSN
INFILT
LSUR
SLSUR
KVARY
AGWRC
1 0
5
2
400
0.05
0.3
0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER
input info:
Part 3
***
# - # ***PETMAX
PETMIN
INFEXP
INFILD
DEEPFR
BASETP
AGWETP
1 0
0
2
2
0
0
0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER
input info:
Part 4
***
# - # CEPSC
UZSN
NSUR
INTFW
IRC
LZETP
***
1 0.2
0.5
0.35
0
0.7
0.7
END PWAT-PARM4
PWAT-STATEI
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# - # *** CEPS SURS UZS IFWS LZS AGWS GWVS
1 0 0 0 0 3 1 0
END PWAT-STATEI
END PERLND
IMPLND
GEN-INFO
<PLS ><------- Name ------- >
END GEN-INFO
*** Section IWATER***
Unit -systems Printer ***
User t-series Engl Metr ***
in out ***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
END ACTIVITY
PRINT -INFO
<ILS > ******** Print -flags ******** PIVL PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
END PRINT -INFO
IWAT-PARM1
<PLS > IWATER variable monthly parameter value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
END IWAT-PARM1
IWAT-PARM2
<PLS > IWATER input info: Part 2 ***
# - # *** LSUR SLSUR NSUR RETSC
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3 ***
# - # ***PETMAX PETMIN
END IWAT-PARM3
IWAT-STATEI
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
END IWAT-STATEI
1.t
21027-Drywell 12/7/2022 3:46:08 PM Exhibit 19 - Green In
PLN2022-004 Packet Pg. 402
Planning &
Development
Received
09/07/31MPLND
1.t
SCHEMATIC
<-Source->
<Name> #
Basin 1***
PERLND 1
PERLND 1
******Routing******
END SCHEMATIC
<--Area--> <-Target-> MBLK
<-factor-> <Name> # Tbl#
0.07 COPY 501 12
0.07 COPY 501 13
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------ >< --- > User T-series Engl Metr LKFG ***
in out ***
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
END ACTIVITY
PRINT -INFO
<PLS > ***************** Print -flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
END PRINT -INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC Al A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
<------ ><-------- ><-------- ><-------- ><-------- ><-------- ><-------- > ***
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section ***
# - # *** VOL Initial value of COLIND Initial value of OUTDGT
*** ac-ft for each possible exit for each possible exit
<------ ><-------- > <--- ><--- ><--- ><--- >< --- > *** <--- ><--- ><--- ><--- >< --- >
END HYDR-INIT
END RCHRES
SPEC -ACTIONS
END SPEC -ACTIONS
FTABLES
END FTABLES
EXT SOURCES
<-Volume->
<Member>
SsysSgap<--Mult-->Tran
<-Target
vols>
<-Grp> <-Member->
*** E
4)
<Name> #
<Name> #
tem strg<-factor->strg
<Name>
# #
<Name> # #
*** 0
WDM 2
PREC
ENGL 0.8
PERLND
1 999
EXTNL PREC
WDM 2
PREC
ENGL 0.8
IMPLND
1 999
EXTNL PREC
Q
21027-Drywell
12/7/2022 3:46:08 PM
Exhibit 19 - Green
PLN2022-004
Packet Pg. 403
Planning &
Development
Received
09/07/2023 1 EVAP
ENGL
0.76
PERLND 1
999 EXTNL PETINP
WDM 1 EVAP
ENGL
0.76
IMPLND 1
999 EXTNL PETINP
END EXT SOURCES
E
O
EXT TARGETS
LL
<-Volume-> <-Grp>
<-Member-><--Mult-->Tran
<-Volume->
<Member> Tsys Tgap
Amd ***
c
<Name> #
<Name>
# #<-factor->strg
<Name> #
<Name> tem strg
strg***
COPY 501 OUTPUT
MEAN
1 1 48.4
WDM 501
FLOW ENGL
REPL
END EXT TARGETS
d
MASS -LINK
<Volume> <-Grp>
<-Member-><--Mult-->
<Target>
<-Grp> <-Member->***
E
<Name>
<Name>
# #<-factor->
<Name>
<Name>
# #***
A-
MASS -LINK
12
O
PERLND PWATER
SURD
0.083333
COPY
INPUT MEAN
>
END MASS -LINK
12
MASS -LINK
13
+r
PERLND PWATER
IFWO
0.083333
COPY
INPUT MEAN
y
END MASS -LINK
13
a
END MASS -LINK
END RUN
21027-Drywel I
12/7/2022 3:46:08 PM
Exhibit 19 - Green
PLN2022-004 Packet Pg. 404
Planning &
Development
Received
09/07IMftated UC/ File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1
END GLOBAL
FILES
<File>
<Un#>
OPN SEQUENCE
2009 09 30
UNIT SYSTEM 1
<----------- File Name
------------------------------>***
***
INGRP INDELT 00:15
PERLND 7
IMPLND 4
IMPLND 5
RCHRES 1
COPY 1
COPY 501
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<---------- Title ----------- >***TRAN PIVL DIG1 FIL1
1 SSD Table 2 MAX
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
PYR DIG2 FIL2 YRND
1 2 30 9
<PLS ><------- Name ------- >NBLKS Unit -systems Printer ***
# - # User t-series Engl Metr ***
in out ***
7 A/B, Lawn, Flat 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
7 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
1.t
PRINT -INFO ip
<PLS > ***************** Print -flags ***************************** PIVL PYR Q
21027-Drywell 12/7/2022 3:46:08 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 405
Planning &
Development
Received
09/07/2023# - # ATMP SNOW
PWAT SED PST PWG PQAL
MSTL
PEST NITR
PHOS TRAC
*********
7 0 0
4 0
0 0 0
0
0 0
0 0
1 9
END PRINT -INFO
io
E
PWAT-PARM1
L
O
<PLS > PWATER variable
monthly
parameter
value
flags ***
LL
# - # CSNO RTOP
UZFG VCS VUZ VNN VIFW
VIRC
VLE INFC
HWT ***
c
7 0 0
0 0
0 0 0
0
0 0
0
END PWAT-PARM1
a
PWAT -PARM2
<PLS > PWATER
input info:
Part 2
***
# - # ***FOREST
LZSN
INFILT
LSUR
SLSUR
KVARY
AGWRC
m
E
7 0
5
0.8
400
0.05
0.3
0.996
Q-
END PWAT-PARM2
O
d
PWAT-PARM3
d
<PLS > PWATER
input info:
Part 3
***
# - # ***PETMAX
PETMIN
INFEXP INFILD
DEEPFR
BASETP
AGWETP
+r
7 0
0
2
2
0
0
0
d
END PWAT-PARM3
a
PWAT-PARM4
<PLS > PWATER
input info:
Part 4
***
# - # CEPSC
UZSN
NSUR
INTFW
IRC
LZETP
***
a>
7 0.1
0.5
0.25
0
0.7
0.25
END PWAT-PARM4
c=o
PWAT-STATEl
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# - # *** CEPS SURS UZS IFWS LZS AGWS GWVS
7 0 0 0 0 3 1 0
END PWAT-STATEI
END PERLND
IMPLND
GEN-INFO
<PLS ><------- Name ------- >
4 ROOF TOPS/FLAT
5 DRIVEWAYS/FLAT
END GEN-INFO
*** Section IWATER***
Unit -systems Printer ***
User t-series Engl Metr ***
in out ***
1 1 1 27 0
1 1 1 27 0
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
4 0 0 1 0 0 0
5 0 0 1 0 0 0
END ACTIVITY
PRINT -INFO
<ILS > ******** Print -flags ******** PIVL PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
4 0 0 4 0 0 0 1 9
5 0 0 4 0 0 0 1 9
END PRINT -INFO
IWAT-PARM1
<PLS > IWATER variable monthly parameter value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
4 0 0 0 0 0
5 0 0 0 0 0
END IWAT-PARM1
IWAT-PARM2
<PLS > IWATER input info: Part 2 ***
# - # *** LSUR SLSUR NSUR RETSC
21027-Drywell 12/7/2022 3:46:08 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 406
Planning &
Development
Received
09/07/20234 400 0.01 0.1 0.1
5 400 0.01 0.1 0.1
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3 ***
# - # ***PETMAX PETMIN
4 0 0
5 0 0
END IWAT-PARM3
IWAT-STATEI
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
4 0 0
5 0 0
END IWAT-STATEI
END IMPLND
SCHEMATIC
<-Source->
<--Area-->
<-Target->
MBLK
<Name> #
<-factor->
<Name>
#
Tbl#
Basin 1***
PERLND 7
0.1
RCHRES
1
2
PERLND 7
0.1
RCHRES
1
3
IMPLND 4
0.06
RCHRES
1
5
IMPLND 5
0.01
RCHRES
1
5
******Routing******
PERLND 7
0.1
COPY
1
12
IMPLND 4
0.06
COPY
1
15
IMPLND 5
0.01
COPY
1
15
PERLND 7
0.1
COPY
1
13
RCHRES 1
1
COPY
501
17
END SCHEMATIC
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------ >< --- > User T-series Engl Metr LKFG ***
in out ***
1 SSD Table 2 2 1 1 1 28 0 1
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
1 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT -INFO
<PLS > ***************** Print -flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
1 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT -INFO
HYDR-PARM1
1.t
21027-Drywell 12/7/2022 3:46:08 PM Exhibit 19 - Green OA
PLN2022-004 Packet Pg. 407
Planning &
Development
Received
1.t
09/07/2023RCHRES Flags for
each HYDR Section
***
# - # VC Al A2
A3 ODFVFG for each
*** ODGTFG for
each
FUNCT for each
FG FG FG
FG possible exit
*** possible
exit
possible exit
* * *
* * * * * *
* * *
* *
***
1 0 1 0
0 4 5 0 0 0
0 0 0
0 0
2 2 2 2 2
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO
LEN DELTH
STCOR
KS
DB50 ***
<------ ><-------- ><
-------- ><-------- ><
-------- ><--------
><--------
> ***
1 1
0.01 0.0
0.0
0.5
0.0
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions
for each HYDR
section
***
# - # *** VOL
Initial value
of COLIND
Initial
value of OUTDGT
*** ac-ft
for each possible
exit
for each
possible exit
<------ ><-------- >
<--- ><--- ><--- ><
--- >< --- > ***
<--- ><---
><--- ><--- >< --- >
1 0
4.0 5.0 0.0
0.0 0.0
0.0
0.0 0.0 0.0 0.0
END HYDR-INIT
END RCHRES
SPEC -ACTIONS
END SPEC -ACTIONS
FTABLES
FTABLE 1
5 5
Depth Area
(ft) (acres)
0.000000 0.001200
1.000000 0.001800
2.000000 0.003000
3.000000 0.004200
4.000000 0.004200
END FTABLE 1
END FTABLES
Volume Outflowl
(acre-ft) (cfs)
0.000000 0.000000
0.000300 0.000000
0.000900 0.000000
0.001500 0.000000
0.004200 0.000000
Outflow2 Velocity Travel Time***
(cfs) (ft/sec) (Minutes)***
0.000000
0.007300
0.012100
0.022600
0.022600
EXT SOURCES
<-Volume->
<Member>
SsysSgap<--Mult-->Tran
<-Target
vols>
<-Grp>
<-Member-> ***
<Name>
#
<Name> #
tem
strg<-factor->strg
<Name>
#
#
<Name> # # ***
WDM
2
PREC
ENGL
0.8
PERLND
1
999
EXTNL
PREC
WDM
2
PREC
ENGL
0.8
IMPLND
1
999
EXTNL
PREC
WDM
1
EVAP
ENGL
0.76
PERLND
1
999
EXTNL
PETINP
WDM
1
EVAP
ENGL
0.76
IMPLND
1
999
EXTNL
PETINP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume->
<Name> #
<Name>
#
#<-factor->strg
<Name> #
RCHRES 1 HYDR
RO
1
1 1
WDM 1004
RCHRES 1 HYDR
0
1
1 1
WDM 1005
RCHRES 1 HYDR
0
2
1 1
WDM 1006
RCHRES 1 HYDR
STAGE
1
1 1
WDM 1007
COPY 1 OUTPUT
MEAN
1
1 48.4
WDM 701
COPY 501 OUTPUT
MEAN
1
1 48.4
WDM 801
END EXT TARGETS
MASS -LINK
<Volume> <-Grp>
<-Member-><--Mult-->
<Target>
<Name>
<Name>
#
#<-factor->
<Name>
MASS -LINK
2
PERLND PWATER
SURO
0.083333
RCHRES
END MASS -LINK
2
MASS -LINK
3
PERLND PWATER
IFWO
0.083333
RCHRES
END MASS -LINK
3
MASS -LINK
5
IMPLND IWATER
SURO
0.083333
RCHRES
<Member> Tsys Tgap Amd ***
<Name>
tem strg
strg***
FLOW
ENGL
REPL
FLOW
ENGL
REPL
FLOW
ENGL
REPL
STAG
ENGL
REPL
FLOW
ENGL
REPL
FLOW
ENGL
REPL
<-Grp> <-Member->***
<Name>
# #***
INFLOW IVOL
INFLOW IVOL
INFLOW IVOL
21027-Drywell 12/7/2022 3:46:08 PM
Exhibit 19 - Green
PLN2022-004 Packet Pg. 408
Planning &
Development
Received
09/07/2023D MASS —LINK 5
MASS —LINK 12
PERLND PWATER SURD
END MASS —LINK 12
MASS —LINK 13
PERLND PWATER IFWO
END MASS —LINK 13
MASS —LINK 15
IMPLND IWATER SURO
END MASS —LINK 15
MASS —LINK 17
RCHRES OFLOW OVOL 1
END MASS —LINK 17
END MASS —LINK
END RUN
0.083333 COPY
INPUT
MEAN
0.083333 COPY
INPUT
MEAN
0.083333 COPY
INPUT
MEAN
COPY
INPUT
MEAN
1.t
21027-Drywell 12/7/2022 3:46:08 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 409
Planning &
Development
Received
09/07/29r,eJeveloped
HSPF Message File
1.t
21027-Drywell 12/7/2022 3:46:08 PM Exhibit 19 - Green 07
PLN2022-004 Packet Pg. 410
Planning &
Development
Received
091071:Mf'ated
HSPF Message File
1.t
21027-Drywell 12/7/2022 3:46:08 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 411
Planning &
Development
Recei d
0910711JISclaimer
1.t
Legal Notice
This program and accompanying documentation are provided 'as -is' without warranty of any kind. T
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by: Clear Creek Solutions, Inc. 2005-2022; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
21027-Drywell 12/7/2022 3:46:08 PM Exhibit 19 - Green
PLN2022-004 Packet Pg. 412
Planning &
Development
Received
09/07/2023GREENWALK PARK
STORMWATER SITE PLAN REPORT
APPENDIX B — GEOTECHNICAL REPORT
Limited Subsurface Exploration and Infiltration Feasibility Assessment
as prepared by Associated Earth Sciences, Inc. dated January 11, 2022.
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 413
Planning &
Development
Received
09/07/2023 a s s o c i a t e d
earth sciences
"a i n c o r p o r a t e d
August 18, 2022
Project No. 20200451H001
Fernandez & Barnes LLC
28720 SE 6316 Street
Issaquah, Washington 98027
Subject: Response to City Comment
Molnar Short Plat
540 and 550 Edmonds Way
Edmonds, Washington
Reference: "Limited Subsurface Exploration and Infiltration Feasibility Assessment, Molnar
Short Plat," prepared by Associated Earth Sciences, Inc. for Fernandez & Barnes
LLC, dated January 11, 2022.
Dear Mr. Barnes:
This letter has been prepared in response to an email that you addressed to us containing a
review comment from the City of Edmonds regarding the subject project. We were not
provided with a complete copy of the City comment letter. The provided comment is listed
below in bold, followed by our response.
rf%mmcnt•
The included Soils Report indicates that a Small -Scale PIT was the method used for infiltration
testing. The total project area is 3.15 acres, but this testing method is only applicable to
drainage areas less than 1 acre per Edmonds Stormwater Addendum, Appendix B. Please
provide infiltration testing using an approved method as required for the Soils Report, per
Edmonds Stormwater Addendum, Appendix C: Checklist 2, Line 110. Revise Civil Plans,
Stormwater Site Plan Report, and WWHM modeling calculations as necessary.
onse to Comment:
We chose the Small -Scale Pilot Infiltration Test (PIT) testing method for the following reasons
• Practical restraints. Our Small -Scale PIT was conducted at a depth of 11 feet. A
Large -Scale PIT requires a testing area of at least 100 square feet. An excavation that
large and deep would have been challenging and difficult to manage.
Kirkland I Tacoma I Mount Vernon
425-827-7701 1 www.aesgeo.com
1.t
Exhibit 19 - Green
PLN2022-004 Packet Pg. 414
Planning &
Development
Received
09/07/2023
1.t
• Limited water supply. During infiltration testing, we recorded the maximum flow from
the on -site hose bib at 3.3 gallons per minute. If we had attempted a Large -Scale PIT,
this water source would not be able to supply enough water for the test.
• Drainage area size. At the time, we understood that the drainage area to the infiltration
facility was less than 1 acre because other areas of the site were to be managed by
drywells. Although the total site is 3.15 acres, only a portion of that total area is directed
to the facility.
Other Infiltration Considerations:
The recommendations in our above cited limited infiltration feasibility assessment include that
infiltration BMPs be embedded 2 feet in the advance outwash and that AESI be on site to
observe construction and confirm embedment. Our limited exploration shows that the advance
outwash is present at approximately 10 feet below the surface, but depths will likely vary across
the site. Drywells on the order of 12 feet deep are not standard and their performance requires
proper embedment in the receptor horizon. We also recommend that AESI review the plans
relative to our infiltration recommendations and that the depth of infiltration BMPs is clearly
indicated or shown on the plans.
If you have any questions regarding this letter, please contact us at your earliest convenience
Sincerely,
ASSOCIATED EARTH SCEINCES, INC.
Kirkland, Washington
i
J shua S. P. Greer, L.G.
Project Geologist
4
Jeffrey P. Laub, P.E. L.G., L.E.G.
Associate Engineer/Geologist
JG/jh - 20200451H001-003
2
Jennifer H. Saltonstall, L.G., L.Hg.
Principal Geologist/Hydrogeologist
Exhibit 19 - Green
PLN2022-004 Packet Pg. 415
Planning &
Development
Received
09/07/2023 a s s o c i a t e d
earth sciences
i n c o r p o r a t e d
January 11, 2022
Project No. 20200451H001
Fernandez & Barnes LLC
28720 SE 63rd Street
Issaquah, Washington 98027
Attention: Mr. Justin Barnes
Subject: Limited Subsurface Exploration and Infiltration Feasibility Assessment
Molnar Short Plat
540 and 550 Edmonds Way
Edmonds, Washington
Dear Mr. Barnes:
Associated Earth Sciences, Inc. (AESI) is pleased to present our findings and stormwater
infiltration feasibility assessment and recommendations for the above -referenced project. Our
general understanding of the project is based on discussions with you, our experience working
in the project vicinity, and review of conceptual project documents.
Based on the results of our subsurface explorations, we consider infiltration to be feasible for
this project based on the presence of permeable Vashon advance outwash sands at a depth of
about 10 feet beneath surficial fill and glacial till, as discussed in this letter -report.
This letter -report has been prepared for the exclusive use of Fernandez & Barnes LLC, for
specific application to this project. Within the limitations of scope and schedule, our services
have been performed in accordance with generally accepted local geotechnical engineering
practices in effect at the time our letter -report was prepared. No other warranty, express or
implied, is made. Our work was performed in general accordance with our proposal, dated
September 21, 2021.
SITE AND PROJECT DESCRIPTION
The subject site includes the existing single-family residential properties located at 540 and 550
Edmonds Way in Edmonds, Washington (Snohomish County Parcel Nos. 27032500308300 and
27032500308400), as shown on Figure 1 "Vicinity Map." The parcels are irregularly shaped and
have a total area of approximately 2.88 acres. Each parcel contains a single-family residence
with detached garage, landscaping, and associated access and utility improvements.
The project area gently slopes down toward the northwest and southeast. Site slopes are
generally inclined at 10% or less with one moderate slope approximately 8 feet tall and inclined
at 20 to 25% next to the northern detached garage. Vegetation consists of maintained grass
lawn and landscaping, and mature trees are scattered throughout both parcels. A large,
1.t
Kirkland I Tacoma I Mount Vernon
425-827-7701 1 www.aesgeo.com Exhibit 19 - Green
PLN2022-004 Packet Pg. 416
Planning &
Development
Received
09107/2023gvlolnar short Plat
Edmonds, Washington
Limited Subsurface Exploration and
Infiltration Feasibility Assessment
decorative, water feature is situated near the center of the 540 Edmonds Way parcel. It consists
of multiple waterfalls and streams traveling over and around large boulders, and empties into a
maintained decorative pond approximately 25 feet wide and 50 feet long.
We understand that the current plan includes the subdivision of the existing parcels into
sixteen lots for the purposes of constructing new single-family residences, with associated
access and utilities at the resulting lots. We understand that infiltration is being considered as a
means of stormwater disposal, and we have been requested to complete an infiltration
feasibility assessment for the subject project.
SUBSURFACE EXPLORATION
Our field studies were conducted for this project in October 2021 and included excavating two
exploration pits. The site location is shown on the "Vicinity Map," Figure 1, and approximate
locations of the explorations completed for this study are presented on the "Site and
Exploration Plan," Figure 2. The various types of sediments, as well as the depths where the
characteristics of the sediments changed, are indicated on the exploration logs presented in
Appendix A. The depths indicated on the logs where conditions changed may represent
gradational variations between sediment types. If changes occurred between sample intervals
in our exploration pits, they were interpreted. Our explorations were approximately located in
the field by measuring from known site features.
The conclusions and recommendations presented in this letter -report are based, in part, on the
explorations completed for this study. The number, locations, and depths of the explorations
were completed within site and budgetary constraints. Because of the nature of exploratory
work below ground, extrapolation of subsurface conditions between field explorations is
necessary. It should be noted that differing subsurface conditions may be present due to the
random nature of deposition and the alteration of topography by past grading and/or filling.
The nature and extent of variations between the field explorations may not become fully
evident until construction. If variations are observed at that time, it may be necessary to
re-evaluate specific recommendations in this letter -report and make appropriate changes.
Exploration Pits
One exploration pit and one Pilot Infiltration Test (PIT) were excavated with a steel -tracked
excavator under subcontract to AESI. These pits permitted direct, visual observation of
subsurface conditions. Materials encountered in the exploration pits were studied and
classified in the field by a geologist from our firm. All exploration pits were backfilled
immediately after examination and logging. Samples were then transported to our laboratory
for further visual classification and testing, as necessary.
1.t
January 11, 2022 ASSOCIATED EARTH SCIENCES, INC.
JG/Id-20200451HO01-002 Exhibit 19 - Green
PLN2022-004 Packet Pg. 417
Planning &
Development
Received
09107/2023gvlolnar short Plat
Edmonds, Washington
SUBSURFACE CONDITIONS
Limited Subsurface Exploration and
Infiltration Feasibility Assessment
The feasibility of stormwater infiltration depends upon the presence of a suitable native
receptor soil of sufficient thickness, extent, permeability, and vertical separation from
groundwater. All explorations completed for this study generally encountered fill over a series
of glacially derived sediments.
Stratigraphy
Grass/Topsoil
A surficial layer of organic -rich, grass sod over dark brown topsoil was encountered at all
explorations. The encountered thickness of the topsoil was generally 8 inches. Organic topsoil is
not a suitable stormwater infiltration receptor.
Fill
Underlying the surficial topsoil horizon, our explorations encountered approximately 4 feet of
loose, gray to dark brown, fine to medium sand, with variable silt and gravel content and trace
organics and debris. These materials are interpreted as fill soils placed during previous site
development. Fill is expected to be found around existing structures, buried utilities,
foundation/wall backfill areas, and beneath landscape improvements. Due to their variable silt
content, highly variable composition, and lack of lateral continuity, fill soils are not a suitable
stormwater infiltration receptor.
Vashon Recessional Outwash
Sediments encountered beneath the fill soils in our explorations generally consisted of loose to
medium dense, bedded, orangish brown, fine to medium sand with variable silt and gravel
content. We interpret these sediments to be representative of Vashon recessional outwash.
The recessional outwash was only about 3 to 3.5 feet in thickness, and was underlain by glacial
till at a depth of about 7 to 8 feet. The Vashon recessional outwash was deposited by meltwater
streams flowing from the retreating glacial ice during the latter portion of the Vashon Stade of
the Fraser Glaciation, approximately 12,500 to 15,000 years ago. Vashon recessional outwash is
often a suitable stormwater infiltration receptor, but at this location it does not have sufficient
thickness or permeability. Therefore, it is not a suitable stormwater infiltration receptor.
Vashon Lodgement Till
1.t
Underlying the recessional outwash, our explorations encountered dense to very dense, wo
non -stratified, gray, silty, fine sand with some gravel, interpreted as Vashon lodgement till. The X
w
till layer ranged from 2 to 3 feet in thickness, and was underlain by Vashon advance outwash at
a depth of about 10 feet. The Vashon lodgement till was deposited directly from basal, E
debris -laden glacial ice during the Vashon Stade of the Fraser Glaciation, approximately 12,500
�a
Q
January 11, 2022 ASSOCIATED EARTH SCIENCES, INC.
JG/Id-20200451HO01-002 Exhibit 19 - Green
PLN2022-004 Packet Pg. 418
Planning &
Development
Received
09107/2023gvlolnar short Plat
Edmonds, Washington
Limited Subsurface Exploration and
Infiltration Feasibility Assessment
to 15,000 years ago. The high relative density characteristic of the Vashon lodgement till is due
to its consolidation by the massive weight of the glacial ice from which it was deposited. Due to
a significant amount of fines and consolidation by the massive weight of the glacial ice from
which it was deposited resulting in a very low permeability, lodgement till is not a suitable
stormwater infiltration receptor.
Vashon Advance Outwash
Underlying the lodgement till, our explorations encountered dense, gray, fine sand, with trace
silt and trace gravel. The bedding was primarily massive with only occasional thin (%-inch-thick)
silty sand interbeds. We interpret these sediments to be representative of Vashon advance
outwash. The Vashon advance outwash was deposited by meltwater streams flowing from the
advancing glacial ice during the early portion of the Vashon Stade of the Fraser Glaciation,
approximately 12,500 to 15,000 years ago. Unsaturated Vashon advance outwash is a suitable
stormwater infiltration receptor when present in sufficient vertical and lateral extent, and
provided the recommendations contained in this letter -report are followed.
Published Geologic Mapping Review
Review of the regional geologic map titled Geologic Map of the Edmonds East and part of the
Edmonds West Quadrangles, by J.P. Minard (1983) indicates that the subject site is underlain by
Vashon advance outwash with Vashon lodgement till mapped nearby. Our interpretation of
subsurface conditions is in general agreement with the published geologic map of the area.
Published Soils Mapping Review
Review of the U.S. Department of Agriculture (USDA) Soils Conservation Service (SCS), now
referred to as Natural Resources Conservation Service (NRCS), Web Soil Survey indicates that
the subject site is underlain by Everett very gravelly sandy loam, 0 to 8 percent slopes. Everett
Series soils have a parent material of glacial outwash. Our interpretations of the soils
encountered in our explorations is in general agreement with the regional soils mapping.
Hydrology
Regional Groundwater
Based on regional groundwater mapping (R.C. Newcomb, 1952, Ground -water Resources of
Snohomish County, Washington: U.S. Geological Survey, Water -Supply Paper 1135, scale
1:62,500), we estimate the depth to deeper groundwater within the advance outwash to be on
the order of elevation 220 to 240 feet, or about 35 to 55 feet below the current ground surface.
1.t
While AESI was onsite for our field study, the property owner, Mr. Molnar, directed AESI to use
the on -site domestic water well as the water supply for the PIT. Mr. Molnar estimated the E
groundwater level within the well to be approximately 35 feet below existing ground surface.
�a
Q
January 11, 2022 ASSOCIATED EARTH SCIENCES, INC.
JG/Id-20200451HO01-002 Exhibit 19 - Green
PLN2022-004 Packet Pg. 419
Planning &
Development
Received
09/07/2023Molnor short Plat
Edmonds, Washington
Limited Subsurface Exploration and
Infiltration Feasibility Assessment
We did not place any instruments within the well or open the well cap to determine the
groundwater level inside. Review of the Washington State Department of Ecology Water Well
Log for Mr. Molnar's water well (DOE Well Tag ALA-149) indicates that the static water level
was 34.5 feet below the top of the well on May 23, 2005. This reported depth to water is
consistent with the regional mapping of the groundwater table within the Vashon advance
outwash underlying the site at depth.
Local Groundwater
No seepage was present at the time of digging in the exploration pits. We observed increased
moisture content at the contact between the recessional outwash sediments in both EP-1 and
IT-1 and the underlying low -permeability Vashon lodgement till. The infiltration test pit was left
open for several hours to facility infiltration testing. Very slow groundwater seepage was
observed at IT-1 at a depth of 7 feet below ground surface after being left open for
approximately 7 hours for the PIT. We interpret this very slow groundwater seepage as being
perched on top of the underlying Vashon lodgement till. In areas underlain by lodgement till,
it is common for shallow perched seepage to accumulate seasonally at the base of
more -permeable fill or recessional outwash deposits, or for groundwater to be present within
the weathered till horizon during the wetter winter months. Groundwater perched within the
weathered till sediments is known as "interflow," and is perched atop the underlying, dense,
low -permeability, unweathered till. This water may travel laterally and typically will follow the
ground surface topography.
During excavation immediately after infiltration testing at IT-1 was complete, one discontinuous
seepage on a sidewall was encountered within the Vashon advance outwash at a depth of
approximately 14 feet. We interpret this seepage to be water from our infiltration test perched
on a thin, natural, less -permeable layer within the advance outwash.
It should be noted that the depth or occurrence of groundwater seepage below the site may
vary in response to such factors as changes in season, precipitation, and on- and off -site use.
Explorations for this study were conducted in October 2021.
Laboratory Testing
AESI performed a grain -size analysis (sieve) on a representative sample of the Vashon advance
outwash sediments. This grain -size analysis test result is included in Appendix B and is
summarized below in Table 1 with soil descriptions based on ASTM International
(ASTM) D-2487 Unified Soil Classification System (USCS).
1.t
January 11, 2022 ASSOCIATED EARTH SCIENCES, INC.
JG11d - 20200451HO01-002 Exhibit 19 - Green
PLN2022-004 Packet Pg. 420
Planning &
Development
Received
09107/2023gvlolnar short Plat
Edmonds, Washington
Table 1
Summary of Grain -Size Analysis
Limited Subsurface Exploration and
Infiltration Feasibility Assessment
Exploration
Number
Depth
(feet)
I Geologic Unit
USCS Soil Description
Fines
Content (%)
IT-1
11
1 Vashon Advance Outwash
SAND, trace gravel, trace silt
2.0
USCS = Unified Soil Classification System
% = percent of total weight passing the U.S. No. 200 Sieve
INFILTRATION
Infiltration Testing Procedures
Infiltration testing was conducted in order to obtain a representative infiltration rate for the
proposed project using a method generally corresponding to the procedure described for the
Small -Scale PIT in the 2017 City of Edmonds Stormwater Addendum. One low -head Small -Scale
PIT was completed in the central portion of the site near the proposed infiltration facility
location.
Water for the testing was obtained from an on -site domestic water well with an integrated
pumping system. Water for the test was then conveyed through an electronic flow meter
assembly with instantaneous flow rate and total flow volume readouts into the infiltration test
pit. Every 10 to 15 minutes, flow rates were recorded and water levels were measured with a
staff gauge marked in 0.01-foot increments that was placed in the test pit prior to testing.
Infiltration data and details of testing are included in Appendix C. Analyses of infiltration testing
data are discussed in the "Infiltration Testing Results" section of this letter -report.
AESI generally conducted infiltration testing as follows: during the initial portion of infiltration
testing, water was discharged onto the pit base through a diffuser for a "soaking period" of
6 hours to allow the receptor soils in the immediate vicinity of the pit to become saturated.
After completion of the soaking period, the water level in the pit was maintained at a constant
low head with constant inflow rates for an additional hour. After 7 hours, the inflow was
disconnected and the falling water level was monitored and recorded for at least 1 hour, or
until water level was too low to measure.
Infiltration Testing Results
1.t
One Small -Scale PIT (IT-1) was conducted on October 18, 2021 at the approximate location of
the proposed infiltration system, as shown on Figure 2, to obtain a representative infiltration M
rate. Field-testing data sheets are included in Appendix C. Details regarding the infiltration test w
are provided below in Table 2, "Small -Scale Pilot Infiltration Test Summary."
a�
E
s
�a
Q
January 11, 2022 ASSOCIATED EARTH SCIENCES, INC.
JG/Id-20200451HO01-002 Exhibit 19 - Green
PLN2022-004 Packet Pg. 421
Planning &
Development
Received
09107/2023gvlolnar short Plat
Edmonds, Washington
Limited Subsurface Exploration and
Infiltration Feasibility Assessment
Table 2
Small -Scale Pilot Infiltration Test Summary
Average Flow
Field
Rate during Final
Field (Unfactored)
(Unfactored)
Test
Test Area
Hour of Testing
Constant -Head
Falling -Head
Test
Depth
(square
(gallons per
Infiltration Rate
Infiltration Rate
Number
(feet)
feet)
minute)
(inches/hour)
(inches/hour)
IT-1
11
12
1.4
11.1
11.7
Upon completion of the infiltration test, infiltration pit IT-1 was deepened to: 1) document the
types of soils the water infiltrated through, and 2) identify any soil layers that would restrict the
downward flow of infiltrating water. The material beneath the test surface consisted of
generally similar coarse -grained Vashon advance outwash sediments, extending beyond the
maximum explored depth of 19 feet. AESI observed increased moisture content below the
infiltration test depth, indicating that the test water infiltrated downward to at least the total
depth explored. One discontinuous seepage was observed on a sidewall at approximately
14 feet below ground surface.
Design Infiltration Rate Determination
The field -based infiltration rates presented in Table 2 are unfactored field infiltration rates and
are therefore non -conservative for design purposes. The 2017 City of Edmonds Stormwater
Addendum requires that the field -measured infiltration rate must then have various correction
factors applied to account for site variability, number of tests conducted, type of field test, and
the potential for long-term clogging due to siltation and bio-buildup. The correction factors
used in the calculation and the resulting Ksat Design rate are described below.
Ksatdesign = Ksatinitial * CFv * CFT * CFM
Ksat, design: Represents the long-term design infiltration rate.
Ksat, initial: Represents the uncorrected field -measured infiltration rate.
Site variability and number of locations tested Ov): Based on the relatively uniform
subsurface conditions observed in our explorations in the proposed infiltration area, we
consider the uncertainty at the site to be low and a partial correction factor of 0.8 was
selected.
Uncertainty of test method (CFT): Based on the use of 1 Small -Scale PIT, a partial
correction factor of 0.5 is defined.
1.t
Degree of influent control to prevent siltation and bio-buildup (CFM): A partial correction c
factor of 0.9 is defined. E
s
�a
Q
January 11, 2022 ASSOCIATED EARTH SCIENCES, INC.
JG/Id-20200451HO01-002 Exhibit 19 - Green
PLN2022-004 Packet Pg. 422
Planning &
Development
Received
09107/2023gvlolnar short Plat
Edmonds, Washington
Limited Subsurface Exploration and
Infiltration Feasibility Assessment
We elected to use the constant -head infiltration rate as it was the lower of the two calculated
field infiltration rates and would provide a more conservative design infiltration rate. Therefore,
Design Infiltration Rate = 11.1 inches per hour x 0.8 x 0.5 x 0.9 = 4 inches per hour.
The correction factors and resulting design infiltration rate apply only to the proposed
infiltration facility near IT-1 where unsaturated advance outwash consistent with the tested
material is Dresent at the base of anv Droaosed infiltration best manaeement Dractice (BMP).
General Infiltration BMP Subgrade Recommendations
From our subsurface exploration, our laboratory testing results, and our Small -Scale PIT results,
stormwater infiltration is feasible at this site. It should be noted that the Vashon advance
outwash receptor was encountered at a depth of approximately 10 feet below existing ground
surface.
The base of the infiltration BMP should be situated at least 2 feet into the Vashon advance
outwash deposits. AESI should confirm the required embedment into the infiltration receptor
horizon at the time of construction.
Due to natural variability of the subsurface conditions, the potential for field adjustments
should be anticipated based on actual conditions encountered during construction. The
infiltration Subgrade will need to be protected from siltation and sand by proper temporary
erosion and sediment control (TESC) practices and management of the imported materials
stockpile. Turbid stormwater or silt must not be allowed into the infiltration system because it
will clog the receptor soil.
The BMP-specific design infiltration rate is based upon the field infiltration testing, grain -size
distribution testing, subsurface exploration, groundwater level data, and AESI's experience on
projects with similar site conditions.
The design infiltration rate given above requires that a representative of AESI is present during
the excavation of the infiltration BMP to observe the Subgrade. In addition, the infiltration
system must remain off-line during construction to avoid siltation. Stormwater runoff must not
be routed to the infiltration BMP until the site is stabilized and runoff is clear.
The recommended design infiltration rates assume that permeable advance outwash deposits
similar to that tested in IT-1 will be encountered at the subgrade of the proposed infiltration
BMP.
1.t
We recommend an overflow path be specified such that runoff above the BMP's design X
w
capacity does not cause flooding of a building or emergency access, erosion, or downstream
sedimentation, or slope failure.
s
�a
Q
January 11, 2022 ASSOCIATED EARTH SCIENCES, INC.
JG/Id-20200451HO01-002 Exhibit 19 - Green
PLN2022-004 Packet Pg. 423
Planning &
Development
Received
09/07/2023MoInarShort Plat Limited Subsurface Exploration and
Edmonds, Washington Infiltration Feasibility Assessment
Critical Aquifer Recharge Areas and Groundwater Protection
The Edmonds City Code (ECC 23.60.010) defines Critical Aquifer Recharge Areas as the
following:
Critical aquifer recharge areas (CARAs) are those areas with a critical recharging effect
on aquifers used for potable water as defined by WAC 365-190-030(2). CARAs have
prevailing geologic conditions associated with infiltration rates that create a high
potential for contamination of ground water resources or contribute significantly to the
replenishment of ground water. CARAs are protected as critical areas under the
Washington State Growth Management Act. However, no areas meeting criteria for
CARAs exist in the vicinity of the city of Edmonds. Thus, additional specific provisions for
protection of this critical area type are not provided within this title.
The ECC specifies that no CARAs are present within the vicinity of the City of Edmonds.
Review of the Washington State Department of Health Source Water Assessment Program
(SWAP) Online Mapping Application indicates that the Olympic View Water & Sewer District
maintains a surface water source at Deer Creek in Woodway, approximately 0.5 miles
southwest of the site. The 1-, 5-, and 10-year time of travel zones for this source extend
southeast from Deer Creek and are more than 1,000 feet away from the site.
Recommendations for Future Infiltration -Related Study
Additional study of the fate of the infiltrated water such as depth to seasonal high
groundwater, groundwater flow direction, and a mounding analysis may be necessary
depending on the areas and volumes of stormwater to be infiltrated and any applicable City of
Edmonds requirements.
PLAN REVIEW AND CONSTRUCTION MONITORING
We are available to provide additional geotechnical/hydrogeologic consultation as the project
design develops and possibly changes from that upon which this letter -report is based.
We recommend that AESI perform a review of the plans prior to final design completion. In this
way, our infiltration recommendations may be properly interpreted and implemented in the
design.
We are also available to provide geotechnical engineering and hydrogeologic monitoring
services during construction of the infiltration BMP. The infiltration performance depends on
verification of anticipated subsurface conditions, proper site preparation, backfill quality, and
construction procedures. In addition, engineering decisions may have to be made in the field in
the event that variations in subsurface conditions become apparent. Construction monitoring
services are not part of the current scope of work. If these services are desired, please let us
know and we will prepare a cost proposal.
1.t
January 11, 2022 ASSOCIATED EARTH SCIENCES, INC.
JG11d - 20200451HO01-002 Exhibit 19 - Green
PLN2022-004 Packet Pg. 424
Planning &
Development
Received
09107/2023gvlolnar short Plat
Edmonds, Washington
CLOSURE
1.t
Limited Subsurface Exploration and
Infiltration Feasibility Assessment
We appreciate the opportunity to be of service to you on this project. Should you have any
questions regarding this letter -report or other geotechnical aspects of the project, please call us
at your earliest convenience.
Sincerely,
ASSOCIATED EARTH SCIENCES, INC.
Kirkland, Washington
Joshua S. P. Greer, G.I.T.
Senior Staff Geologist
Jeffrey P. Laub, P.E., L.G., L.E.G.
Associate Engineer/Geologist
Attachments: Figure 1:
Figure 2:
Appendix A:
Appendix B:
Appendix C:
Kurt D. Merriman, P.E.
Senior Principal Geotechnical Engineer
Vicinity Map
Site and Exploration Plan
Exploration Logs
Laboratory Test Results
Infiltration Test Data
January 11, 2022
JG11d - 20200451 HO01-002
ASSOCIATED EARTH SCIENCES, INC.
Exhibit 19 - Gree
PLN2022-004 Packet Pg. 425
Planning &
Development 1.t
Receiv rN,
09/07/2 23 / i - .�• I �_
524 1 i
Jilo' us
wa rq s PQiC
SITE ., i (;;r�ae
j a j Luke '
i G
_JDA 104 C
j W.00DW
------------
l` Olt Tan S -. � < •, ' .....' .-_` ' C
99
— SNOHOMISM' COUNT\ �iN(SSH•
__ _ _ y
I
• KING COUNTY t\.1•;(; n) - —
N
A
0 2000
FEET
a s s o c i a t e d
earth sciences
i n c o r p o r a t e d
VICINITY MAP
DATA SOURCES/REFERENCES: MOLNAR SHORT PLAT
USGS:7.5'SERIES TOPOGRAPHIC MAPS, ESRIII-CUBED/NATIONAL NOTE: BLACK AND WHITE
REPRODUCTION OFTHIS COLOR EDMONDS, WASHINGTON
GEOGRAPHIC SOCIETY 2013 ORIGINAL MAY REDUCE ITS
SNOHOMISH CO: STREETS, CITY LIMITS, PARCELS, 3/21 EFFECTIVENESS AND LEAD TO PROJ NO. DATE: FIGURE:
LOCATIONS AND DISTANCES SHOWN ARE APPROXIMATE INCORRECT INTERPRETATION 2020045�,qQ I _Green
PLN2022-0041 Packet Pg. 426
Planning &
Development
ReceivFd-
09/07/2$23.
1VE f'
!1 EagleView Technologies,
LEGEND
I--1 SITE
❑ EXPLORATION PIT
0 INFILTRATION TEST
CITY BOUNDARY
PARCEL
CONTOUR 10 FT
CONTOUR 2 FT
DATA SOURCES / REFERENCES:
WA STATE LIDAR PORTAL: NORTH PUGET SOUND 2016
ACQUIRED MARCH - SEPT 2016, GRID CELL SIZE IS 3'
CONTOURS FROM LIDAR
SNOHOMISH CO: STREETS, PARCELS 3/21
KING CO: EAGLEVIEW TECHNOLOGIES, INC., AERIAL 2019
LOCATIONS AND DISTANCES SHOWN ARE APPROXIMATE
N
0 60
FEET
King C
BLACK AND WHITE REPRODUCTION OF THIS COLOR ORIGINAL MAY REDUCE ITS
EFFECTIVENESS AND LEAD TO INCORRECT INTERPRETATION
C
a s s o c i a t e d
"i earth sciences
i n c o r p o r a t e d
EXISTING SITE AND
EXPLORATION PLAN
MOLNAR SHORT PLAT
EDMONDS, WASHINGTON
PROJ NO. DATE: FIGURE:
2020045�hgQi - Gr
PLN2022-0041 Packet Pg. 427
Planning &
Development
Received
09/07/2023
1.t
APPENDIX A
Exploration Logs
Exhibit 19 - Green
PLN2022-004 Packet Pg. 428
Planning &
Develo
pment
1.t
02
° 0 0
Well -graded gravel and
Terms Describing Relative Density and Consistency
L
�y
o°o°
0
GW
gravel with sand, little to
Density SPT(2)blows/foot
ii
° 0
no fines
Very Loose 0 to 4
Coarse
E
>
fn a)
f° >
v
o
��
Loose 4 to 10
Grained Soils
Medium Dense 10 to 30 Test Symbols
L
o
ILL
0 0 0
o o o o o
GP
Poorly -graded gravel
o v
and ravel with sand,
g
Dense 30 to 50
0
0
d
0 0 0 0 0
00000
little to no fines
Very Dense >50 G =Grain Size
N
o z
0 0 0 0 0
(z) M= Moisture Content
° 0
° 0
Silty gravel and silty
6
o
Consistent SPT blows/foot A = Atterberg Limits
y
C
C a
GM
gravel with sand
Very Soft 0 to 2 C = Chemical
Fine
a
Soft 2 to 4 DID = Dry Density
Grained Soils
Medium Stiff 4 to 8 K = Permeability
a
N
Stiff 8 to 15
Clayey gravel and
Very Stiff 15 to 30
a
N
Al
Gc
clayey gravel with sand
Hard >30
0
o
�
m
Component Definitions
m
Descriptive Term Size Range and Sieve Number
Well -graded sand and
SW
sand with gravel, little
Boulders Larger than 12"
y
O
LL
N
a�
°`°e°;°e°;°
.
to no fines
Cobbles 3" to 12"
W
Cl)
°v;
Gravel 3" to No. 4 (4.75 mm)
0
a)
0 >
: -: -
Poorly -graded
Poor) raded sand
Coarse Gravel 3" to 3/4"
w
to
U .(D
A`-
SP
and sand with gravel,
Fine Gravel 3/4" to No. 4 (4.75 mm)
a
c
a
2
little to no fines
Sand No. 4 (4.75 mm) to No. 200 (0.075 mm)
'a
a�
2
0
0 Z
2
Coarse Sand No. 4 (4.75 mm) to No. 10 (2.00 mm)
c
m
Silty sand and
Medium Sand No. 10 (2.00 mm) to No. 40 (0.425 mm)
f6
m
�N
SM
silty sand with
Fine Sand No. 40 (0.425 mm) to No. 200 (0.075 mm)
a
v
o a
iL
gravel
Silt and Clay Smaller than No. 200 0.075 mm
Y ( )
LO
(3) Estimated Percentage
Moisture Content
N
.-- -
sc
Clayey sand and
clayey sand with gravel
Component Percentage by Weight
D Absence of moisture,
Dry -
m
�
Trace <5
dusty, dry to the touch
Slightly Moist - Perceptible
a
Silt, sandy silt, gravelly silt,
moisture
ca
a,
o
ML
silt with sand or gravel
Some 5 to <12
a
Moist - Damp but no visible
Ie
i)
'n w
Modifier 12 to <30
water
3
of low to medium
CD
cc
(silty, sandy, gravelly)
Very Moist - Water visible but
N
d
v En
a a�
CL
plasticity; silty, sandy, or
not free draining
d
`
z
m w
E
gravelly clay, lean clay
Very modifier 30 to <50
Wet - Visible free water, usually
Y
C9
w
(silty, sandy, gravelly)
from below water table
a
�
IL
a
Organic clay or silt of low
Symbols
2
OL
plasticity
Blows/6" or
0
Sampler portion of 6"
Cement grout
o
Type \ 1
surface seal
U)
Elastic silt, Clayey silt, silt
2 0" OID O Sampler Type
o
a,
MH
with micaceous or
Split SpJon Description c4)
Bentonite
seal
Q.
0
o
gP
diatomaceous fine sand or
Sampler3.0" OD Split -Spoon Sam ler -
Filter pack with
i
o
y
$
silt
(SPT)3.25" OD Split -Spoon Ring Sampler (4)
:
blank casingL.
Clay of high plasticity,
U)
a
v o
a LO
c =
CH
sand or ravel) clay, fat
y gravelly y
Bulk sa-
3.0" OD Thin -Wall Tube Sampler
section
= Screened casing
v
3
w E
clay with sand or gravel
(including Shelby tube)
. ` or Hydrotip
with filter pack
E
i
—
Grab Sa
. • End ca p
0
+r
i
c
�%
Organic clay or silt of
Portion not recovered
rn
J
; ��
OH
medium to high
E
(1) (4)
plasticity
Percentage by dry weight Depth of ground water
(z)
(SPT) Standard Penetration Test 1 ATD = At time of drilling
(ASTM D-1586)
(s) Q Static water level (date)
In General Accordance with
L
d
,
>,
�
Peat, muck and other
rn
=
c
o, 0
PT
highly organic soils
Standard Practice for Description (5) Combined USCS symbols used for
O
and Identification of Soils (ASTM D-2488) fines between 5% and 12%
Z
Received
09/07
Classifications of soils in this report are based on visual field and/or laboratory observations, which include density/consistency, moisture condition, grain size, and
plasticity estimates and should not be construed to imply field or laboratory testing unless presented herein. Visual -manual and/or laboratory classification
methods of ASTM D-2487 and D-2488 were used as an identification guide for the Unified Soil Classification System.
t
x
W
;.7
C
d
E
i
a s s o c i a t e d
ea
earth sciences EXPLORATION LOG KEY FIGURE Al a
incorporated
PLN2022-004 Packet Pg. 429
Planning &
Development
Received
09/07/2023
EXPLORATION PIT NO. EP-1
w
This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
read together with that report for complete interpretation. This summary applies only to the location of this trench at the
m
time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are
a simplification of actual conditions encountered.
DESCRIPTION Elevation (ft - 276
Topsoil - 3 inches
1
Fill
Loose, moist, gray to dark brown, fine to medium SAND, some silt, trace gravel; frequent fine
2
organics (SP-SM).
3
4
5
Vashon Recessional Outwash
Loose to medium dense, very moist at top to moist, orangish brown, silty, fine to coarse SAND,
6
some gravel; bedded (SM/SP-SM).
7
8
Vashon Lodgement Till
9
Dense, moist, gray, silty, fine SAND, some gravel; unsorted; excavates in clasts (SM).
10
Vashon Advance Outwash
11
Dense, moist, gray, fine SAND, trace silt, trace gravel; massive (SP).
12
13
Two very thin silty beds (0.25 inches thick).
14
15
16
17
Becomes some silt (SP-SM).
18
Bottom of exploration pit at depth 17 feet
No seepage. Slight caving 3 to 6 feet.
19
20
21
Logged by: JG
Approved by: JHS
Molnar Short Plat
Edmonds, WA
a s s o c i a t e c
earth sciences
i n c o r p o r a t e s
Project No. 20200451 H001
10/18/21
Exhibit 19 - Green
Packet Pg. 430
Planning &
Development
Received
09/07/2023
EXPLORATION PIT NO. IT-1
w
This log is part of the report prepared by Associated Earth Sciences, Inc. (AESI) for the named project and should be
read together with that report for complete interpretation. This summary applies only to the location of this trench at the
m
time of excavation. Subsurface conditions may change at this location with the passage of time. The data presented are
a simplification of actual conditions encountered.
DESCRIPTION Elevation (ft - 276
Topsoil - 4 inches
1
Fill
Loose, moist, gray, fine SAND, trace silt, trace gravel, trace organics (SP).
2
Layer 1 foot thick of buried topsoil (SM).
Loose, moist, dark brown, silty, fine SAND, trace gravel, trace organics and debris; metal irrigation
3
running east to west; drain pipe running west to south destroyed (SM).
4
Vashon Recessional Outwash
Loose to medium dense, moist, orangish brown, silty, fine to medium SAND, some gravel; bedded
5
(SM).
6
7
Becomes very moist; slight seepage after 4 hours open.
Vashon Lodgement Till
8
Dense to very dense, moist, gray, silty, fine SAND, some gray; unsorted diamict; excavates in
clasts; difficult excavation (SM).
9
10
Vashon Advance Outwash
11
Dense, moist gray, fine SAND, trace silt; massive (SP).
12
Becomes very moist from infiltration test water; continues to bottom.
13
14
15
16
17
18
19
20
Bottom of exploration pit at depth 19 feet
Slight seepage 14 to 14.5 feet at northeast corner. No caving. Infiltration test performed at 11 feet.
21
Logged by: JG
Approved by: JHS
Molnar Short Plat
Edmonds, WA
a s s o c i a t e c
earth sciences
i n c o r p o r a t e s
Project No. 20200451 H001
10/18/21
Exhibit 19 - Green
Packet Pg. 431
Planning &
Development
Received
09/07/2023
1.t
APPENDIX 6
Laboratory Test Results
Exhibit 19 - Green
PLN2022-004 Packet Pg. 432
Planning &
Development
Received
09/07/2023
1.t
n,
W
Z
LL
H
Z
W
U
W
IZ
100
90
80
70
60
50
40
30
20
10
0
Particle Size Distribution Report
100 10 1 0.1 0.01 0.0(
GRAIN SIZE - mm. I
% ±3„ % Gravel % Sand % Fines
Coarse Fine Coarse Medium Fine Silt Clay
0.0 1.7 1.1 0.4 17.2 77.6 2.0
c
TEST RESULTS
Opening
Percent
Spec."
Pass?
Size
Finer
(Percent)
(X=Fail)
V
100.0
3/4"
98.3
5/8"
98.0
1/2"
97.8
3/8"
97.6
#4
97.2
#8
96.9
#10
96.8
#20
95.0
#40
79.6
#60
23.9
#100
5.1
#200
2.0
#270
1.4
Material Description
SAND, trace gravel, trace silt
Atterberg Limits (ASTM D 4318)
PL=
NP
LL= NV
PI=
Classification
USCS (D 2487)=
SP AASHTO (M 145)= A-3
Coefficients
D90=
0.6326
D85= 0.5123
D60= 0.3497
D50=
0.3208
D30= 0.2675
D15= 0.2191
D10=
0.1945
Cu= 1.80
Cc= 1.05
Remarks
Date Received: 10/22/2021 Date Tested: 10/28/2021
Tested By: CI
Checked By: JG/JPL
Title:
(no specification provided)
r
Location: Onsite - Advance Outwash Date Sampled: 10/18/2021
Sample Number: IT-1 Depth: IV
a s S o C i a t e d Client: Fernandez and Barnes LLC L
B a r t h s c i e n c e S Project: Molnar Short Plat i
i
i n c o r p o r a t e d i
Prniac4 Nn• 'J(YJOOAI;1 T-TO01 Finiira �
Exhibit 19 - Green
PLN2022-004 Packet Pg. 433
Planning &
Development
Received
09/07/2023
1.t
APPENDIX C
Infiltration Test Data
Exhibit 19 - Green
PLN2022-004 Packet Pg. 434
1.t
Planning &
Development
Received
09/07/
O23 Project Name:
Molnar Short Plat
Water Source:
Well
Project Number:
20200451H001
Meter:
FM-10
Date:
10/18/2021
Pit Area (sq. feet):
12
Weather:
P. Cloudy, 50's
Ring Area (sq. feet):
N/A
Test No.:
I IT-1
Test Depth (feet):
11
Performed By:
JJG
Receptor Soils:
Advance Outwash
Time
(24-hr)
Flow Rate (gpm)
Stage (feet)
Totalizer (gallons)
Comments
9:20
0
0
0
Flow on
9:24
3.30
0.24
0.0
FM not reading flow, switch FM
9:30
3.31
0.40
21.1
9:40
3.34
0.58
54.2
10:00
1.97
0.64
94.0
10:15
1.60
0.67
118.3
10:30
1.60
0.68
142.5
10:45
1.61
0.70
167.0
11:00
1.45
0.70
188.4
11:15
1.43
0.70
210.1
11:30
1.42
0.70
231.3
11:45
1.40
0.70
252.1
12:00
1.40
0.70
273.0
12:15
1.38
0.70
293.9
12:30
1.38
0.70
314.7
12:45
1.38
0.70
335.7
13:00
1.38
0.70
356.5
13:15
1.38
0.70
377.4
13:30
1.43
0.70
398.4
13:45
1.38
0.71
419.3
Slight caving caused stage increase
14:00
1.39
0.71
440.0
14:15
1.36
0.71
460.8
14:30
1.36
0.71
481.4
14:45
1.37
0.71
501.9
15:00
1.37
0.71
522.5
15:15
1.37
0.71
543.2
15:20
1.37
0.71
550.0
15:30
1.38
0.71
563.8
15:40
1.37
0.71
577.7
15:50
1.37
0.71
591.3
16:00
1.37
0.71
605.1
16:10
1.37
0.71
618.9
16:20
1.37
0.71
632.7
Flow off
16:22
0
0.68
632.7
16:24
0
0.66
632.7
16:26
0
0.62
632.7
16:28
0
0.58
632.7
16:30
0
0.55
632.7
16:32
0
0.52
632.7
16:34
0
0.50
632.7
16:36
0
0.48
632.7
16:38
0
0.45
632.7
16:40
0
0.42
632.7
16:42
0
0.39
632.7
16:44
0
0.36
632.7
16:46
0
0.32
632.7
16:48
0
0.28
632.7
16:49
0
0.24
632.7
Bottom of exposed staff gauge
Average Infiltration Rate (in/hr) during last hour of inflow: 11.1
Average Infiltration Rate (in/hr) durine falline head: 13.3
Exhibit 19 - Green
PLN2022-004 Packet Pg. 435
Planning &
Development
Received
09/07/2023GREENWALK PARK
STORMWATER SITE PLAN REPORT
APPENDIX C — STORMWATER OPERATION AND MAINTENANCE MANUAL
Stormwater O&M will be submitted with the formal sitework permit application.
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 436
Planning &
Development
Received
09/07/2023GREENWALK PARK
STORMWATER SITE PLAN REPORT
APPENDIX D — POLLUTION SOURCE CONTROL PLAN
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 437
Planning &
Development
Received
09/07/2023 T E R R A F O R M A
DESIGN GROUP E
O
LL
POLLUTION SOURCE CONTROL BMP's
s
GREENWALK PARK
LOCATION:
540 & 550 Edmonds Way
Edmonds, WA 98020
PREPARED FOR:
Fernandez & Barnes LLC
10529 NE 58th Street
Kirkland, WA 98033
Contact: Steve Barnes
Phone: (206) 550-9296
PREPARED BY:
Terraforma Design Group, Inc.
5027 51st Avenue SW
Seattle, WA 98136
Contact: Pedro DeGuzman, PE
Phone: (206) 795-9023
Email: pedro@terraformadesigngroup.com
Issue Date: 8/19/22
41F CIVIL ENGINEERING
& LANDSCAPE ARCHITECTURE
5027 51st Avenue SW Seattle WA 98136 phone 206.923.0590 fax 206.923.3507 website www.terraformadesign rrooup.com
Exhibit 19 - Green
PLN2022-004 Packet Pg. 438
Planning &
Development
Received
09/07/2023 GREENWALK PARK POLLUTION SOURCE CONTROL PROGRAM
TABLE OF CONTENTS
1. Project Description
2. Responsible Parties
3. Pollution Source Control 3
Exhibit 19 - Green
PLN2022-004 Packet Pg. 439
1.t
Planning &
Development
Received
09/07/2023
GREENWALK PARK POLLUTION SOURCE CONTROL PROGRAM
1. Project Description
The proposed development consists of a new 16-lot, single-family housing development.
The two existing single family parcels at 540 and 550 Edmonds Way, Edmonds, will be
removed. Work will include building demolition, site clearing, grading, drainage, utilities and
roadway improvements. The project will require private roadway improvements with shared
access agreements.
Drainage improvements will be required in accordance with City of Edmonds standards and
the 2019 Stormwater Manual for Western Washington (2019 SWMMWW). Proposed
facilities will include media filter vaults for runoff treatment and underground infiltration
galleries and drywells for runoff flow control and management.
This manual outlines the require Pollution Source Control requirements for the proposed
single-family development in accordance with Volume IV of the 2019 SWMMWW.
2. Responsible Parties
Fernandez & Barnes LLC
10529 NE 58t" Street
Kirkland, WA 98033
Contact: Steve Barnes
Phone: (206) 550-9296
Email: sbarnes@cornerstonearch.com
Responsible for all onsite drainage and pollution prevention practices. A copy of this
manual shall be retained onsite or within reasonable access to the site. It shall also be
retained by the property owners and shall be transferred with the properties to any
successors.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 440
1.t
Planning &
Development
Received
09/07/2023
GREENWALK PARK POLLUTION SOURCE CONTROL PROGRAM
© IT
Scratch DistO+e"
104
a
Nosauna W..
k k
N
1�
<
PINE PARK
'
NEIGHBORHOOD
zzaa, a Iry
.mon540 Edds Way, w
's
Edmonds. WA 98020
SITES ' =� 8
226TH ST. Sw r
776tM 51 SW v_
Edmonds G odw`II� WESTGATE 2287H ST. Sw
h
228th st Sw
19
l
4 \
ao••
PCC Community �' 1
Markets ECni�rids=
r SHERWOOD
FOREST
11
f 11
l�
TJ MaxxQ
Maorona K•B Sct-o_ P
73Mh51 SW
� • L
� `� •
roi
- - Aquarium i..- Y
>Imh 19W
y
Kruckeberq
Botanic Garder
VICINITY MAP
SCALE: N.T.S.
540 8r 550 Edmonds Way, Edmonds, WA 98020
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E
W.M. Snohomish County
Exhibit 19 - Green
PLN2022-004 Packet Pg. 441
Planning &
Development 1.t
Received
09/07/2023 GREENWALK PARK POLLUTION SOURCE CONTROL PROGRAM
3. Pollution Source Control
Pollution source control is the application of pollution prevention practices on a
developed site to reduce contamination of stormwater runoff at its source. BMPs and
resource management systems are designed to reduce the amount of contaminants used
and potentially discharged to the environment. This section contains language regarding
pollution source controls that are specifically applicable to the site.
The following is an outline of the required applicable Source Control Measures related to
this single family housing development:
S410 BMPs for Correcting Illicit Discharges to Storm Drains
S453 BMPs for Formation of a Pollution Prevention Team
S454 BMPs for Preventive Maintenance / Good Housekeeping
S455 BMPs for Spill Prevention and Cleanup
S457 BMPS for Inspections
S458 BMPs for Record Keeping
S417 BMPs for Maintenance of Stormwater Drainage and Treatment Systems
S430 BMPs for Urban Streets
S411 BMPs for Landscaping and Lawn / Vegetation Management
S450 BMPs for Irrigation
S438 BMPs for Construction Demolition
S440 BMPs for Pet Waste
S442 BMPs for Labeling Storm Drain Inlets On Your Property
S443 BMPs for Fertilizer Application
S451 BMPs for Building, Repair, Remodeling, Painting, and Construction
Exhibit 19 - Green
PLN2022-004 Packet Pg. 442
Planning &
Development
Received
09/07/2023
1.t
S410 BMPs for Correcting Illicit Discharges to
Storm Drains
Description of Pollutant Sources: Illicit discharges are unpermitted sanitary or process wastewa-
ter discharges to a storm sewer or to surface water, rather than to a sanitary sewer, industrial pro-
cess wastewater, or other appropriate treatment. They can also include swimming pool water, filter
backwash, cleaning solutions/washwaters, cooling water, etc. Experience has shown that illicit dis-
charges are common, particularly in older buildings.
Pollutant Control Approach: Identify and eliminate unpermitted discharges or obtain an N PDES
permit, where necessary, particularly at industrial and commercial facilities.
Applicable Operational BMPs:
For all real properties, responsible parties must examine their plumbing systems to identify
any potential illicit discharges. Review site plans, engineering drawings, or other sources of
information for the plumbing systems on the property.
. If an illicit discharge is suspected, trace the source using an appropriate method such as visual
reconnaissance, smoke test, flow test, dye test with a nontoxic dye, or closed circuit television
(CCTV) inspection. These tests are to be performed by qualified personnel such as a plumb-
ing contractor. Note: Contact Ecology prior to performing a dye test which may result in a dis-
charge to a receiving water.
. If illicit connections are found, permanently plug or disconnect the connections.
. Eliminate prohibited discharges to storm sewer, groundwater, or surface water.
. Convey unpermitted discharges to a sanitary sewer if allowed by the local sewer authority, or
to other approved treatment.
Obtain all necessary permits for altering or repairing side sewers and plumbing fixtures.
Restrictions on certain types of discharges, particularly industrial process waters, may require
pretreatment of discharges before they enter the sanitary sewer. It is the responsibility of the
property owner or business operator to obtain the necessary permits and to replace the con-
nection.
. Obtain appropriate state and local permits for these discharges.
Recommended Additional Operational BMPs:
At commercial and industrial facilities, conduct a survey of wastewater discharge connections to
storm drains and to surface water as follows:
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume /V - Chapter 1- Page 497 PLN2022-004 Packet Pg. 443
Planning &
Development
Received
09/07/2023
1.t
Conduct a field survey of buildings, particularly older buildings, and other industrial areas to
locate storm drains from buildings and paved surfaces. Note where these discharge.
During non-stormwater conditions, inspect each storm drain for non-stormwater discharges.
Record the locations of all non-stormwater discharges. Include all permitted discharges.
If useful, prepare a map of each area. Show on the map the known location of storm sewers,
sanitary sewers, and permitted and unpermitted discharges. Aerial photos may be useful.
Check records such as piping schematics to identify known side sewer connections and show
these on the map. Consider using smoke, dye, or chemical analysis tests to detect con-
nections between two conveyance systems (e.g., process water and stormwater). If desir-
able, conduct TV inspections of the storm drains and record the footage on videotape.
Compare the observed locations of connections with the information on the map and revise
the map accordingly. Note suspect connections that are inconsistent with the field survey.
Identify all connections to storm sewers or to surface water and take the actions specified
above as applicable BMPs.
S453 BMPs for Formation of a Pollution Prevention
Team
The pollution prevention team should be responsible for implementing and maintaining all BMPs and
treatment for the site. This team should be able to address any corrective actions needed on site to
mitigate potential stormwater contamination. The team members should:
• Consist of those people who are familiar with the facility and its operations.
• Possess the knowledge and skills to assess conditions and activities that could impact storm -
water quality at your facility, and who can evaluate the effectiveness of control measures.
. Assign pollution prevention team staff to be on duty on a daily basis to cover applicable per-
mittee facilities when those facilities are in operation.
• Have the primary responsibility for developing and overseeing facility activities necessary to
comply with stormwater requirements.
• Have access to all applicable permit, monitoring, SWPPP, and other records.
• Be trained in the operation, maintenance and inspections of all BMPs and reporting pro-
cedures.
• Establish responsibilities for inspections, operation, maintenance, and emergencies.
• Regularly meet to review overall facility operations and BMP effectiveness.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 1- Page 498 PLN2022-004 Packet Pg. 444
Planning &
Development
Received
09/07/2023
1.t
S454 BMPs for Preventive Maintenance / Good
Housekeeping
Preventative maintenance and good housekeeping practices reduce the potential for stormwater to
come into contact with pollutants and can reduce maintenance intervals for the drainage system and
sewer system.
Applicable BMPs:
Prevent the discharge of unpermitted liquid or solid wastes, process wastewater, and sewage
to ground or surface water, or to storm drains that discharge to surface water, or to the
ground. Conduct all oily parts cleaning, steam cleaning, or pressure washing of equipment or
containers inside a building, or on an impervious contained area, such as a concrete pad. Dir-
ect contaminated stormwater from such an area to a sanitary sewer where allowed by local
sewer authority, or to other approved treatment.
Promptly contain and cleanup solid and liquid pollutant leaks and spills including oils, solvents,
fuels, and dust from manufacturing operations on an exposed soil, vegetation, or paved area.
. If a contaminated surface must be pressure washed, collect the resulting washwater for
proper disposal (usually involves plugging storm drains, or otherwise preventing discharge
and pumping or vactoring up washwater, for discharge to sanitary sewer or for vactor truck
transport to a waste water treatment plant for disposal).
Do not hose down pollutants from any area to the ground, storm drains, conveyance ditches,
or receiving water. Convey pollutants before discharge to a treatment system approved by the
local jurisdiction.
. Sweep all appropriate surfaces with vacuum sweepers quarterly, or more frequently as
needed, for the collection and disposal of dust and debris that could contaminate stormwater
Use mechanical sweepers, and manual sweeping as necessary to access areas that a
vacuum sweeper can't reach to ensure that all surface contaminants are routinely removed.
Do not pave over contaminated soil unless it has been determined that groundwater has not
been and will not be contaminated by the soil. Call Ecology for assistance.
. Construct impervious areas that are compatible with the materials handled. Portland cement
concrete, asphalt, or equivalent material may be considered.
Use drip pans to collect leaks and spills from industrial/commercial equipment such as cranes
at ship/boat building and repair facilities, log stackers, industrial parts, trucks and other
vehicles stored outside.
. At industrial and commercial facilities, drain oil and fuel filters before disposal. Discard empty
oil and fuel filters, oily rags, and other oily solid waste into appropriately closed and properly
labeled containers, and in compliance with the Uniform Fire Code or International Building
Code.
For the storage of liquids use containers, such as steel and plastic drums, that are rigid and
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 1- Page 499 PLN2022-004 Packet Pg. 445
Planning &
Development
Received
09/07/2023
1.t
durable, corrosion resistant to the weather and fluid content, non -absorbent, water tight,
rodent -proof, and equipped with a close fitting cover.
For the temporary storage of solid wastes contaminated with liquids or other potential polluted
materials use dumpsters, garbage cans, drums, and comparable containers, which are dur-
able, corrosion resistant, non -absorbent, non -leaking, and equipped with either a solid cover
or screen cover to prevent littering. If covered with a screen, the container must be stored
under a roof or other form of adequate cover.
Where exposed to stormwater, use containers, piping, tubing, pumps, fittings, and valves that
are appropriate for their intended use and for the contained liquid.
. Clean oils, debris, sludge, etc. from all stormwater facilities regularly, including catch basins,
settling/detention basins, oil/water separators, boomed areas, and conveyance systems to
prevent the contamination of stormwater. Refer to Ecology Requirements for Generators of
Dangerous Wastes in 1-2.15 Other Requirements for references to assist in handling poten-
tially dangerous waste.
Promptly repair or replace all substantially cracked or otherwise damaged paved secondary
containment, high -intensity parking, and any other drainage areas, subjected to pollutant
material leaks or spills. Promptly repair or replace all leaking connections, pipes, hoses,
valves, etc., which can contaminate stormwater.
Do not connect floor drains in potential pollutant source areas to storm drains, surface water,
or to the ground.
Recommended BMPs:
Where feasible, store potential stormwater pollutant materials inside a building or under a
cover and/or containment.
Minimize use of toxic cleaning solvents, such as chlorinated solvents, and other toxic chem-
icals.
Use environmentally safe raw materials, products, additives, etc. such as substitutes for zinc
used in rubber production.
• Recycle waste materials such as solvents, coolants, oils, degreasers, and batteries to the max-
imum extent feasible. Contact Ecology's Hazardous Waste & Toxics Reduction Program at
https://ecology.wa.gov/About-us/Get-to-know-us/Our-Programs/H azardous-Waste-Toxics-
Reduction for recommendations on recycling or disposal of vehicle waste liquids and other
waste materials.
• Empty drip pans immediately after a spill or leak is collected in an uncovered area.
. Stencil warning signs at stormwater catch basins and drains, e.g., "Dump no waste — Drains
to waterbody".
• Use solid absorbents, e.g., clay and peat absorbents and rags for cleanup of liquid spills/leaks,
where practicable.
Promptly repair/replace/reseal damaged paved areas at industrial facilities.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 1- Page 500 PLN2022-004 Packet Pg. 446
Planning &
Development
Received
09/07/2023
1.t
Recycle materials, such as oils, solvents, and wood waste, to the maximum extent prac-
ticable.
Note: Evidence of stormwater contamination by oils and grease can include the presence of visible
sheen, color, or turbidity in the runoff, or present or historical operational problems at the facility.
Operators can use simple pH tests, for example with litmus or pH paper. These tests can screen for
high or low pH levels (anything outside a 6.5-8.5 range) due to contamination in stormwater.
S455 BMPs for Spill Prevention and Cleanup
Description of Pollutant Sources: Spills and leaks can damage public infrastructure, interfere
with sewage treatment, and cause a threat to human health or the environment. Spills are often pre-
ventable if appropriate chemical and waste handling techniques are practiced effectively and the spill
response plan is immediately implemented. Additional spill control requirements may be required
based on the specific activity occurring on site.
Applicable BMPs:
Spill Prevention
. Clearly label or mark all containers that contain potential pollutants.
• Store and transport liquid materials in appropriate containers with tight -fitting lids.
• Place drip pans underneath all containers, fittings, valves, and where materials are likely to
spill or leak.
• Use tarpaulins, ground cloths, or drip pans in areas where materials are mixed, carried, and
applied to capture any spilled materials.
. Train employees on the safe techniques for handling materials used on the site and to check
for leaks and spills.
Spill Plan
Develop and implement a spill plan and update it annually or whenever there is a change in
activities or staff responsible for spill cleanup. Post a written summary of the plan at areas with
a high potential for spills, such as loading docks, product storage areas, waste storage areas,
and near a phone. The spill plan may need to be posted at multiple locations. Describe the
facility, including the owner's name, address, and telephone number; the nature of the facility
activity; and the general types of chemicals used at the facility.
Designate spill response employees to be on -site during business activities. Provide a current
list of the names and telephone numbers (home and office) of designated spill response
employees who are responsible for implementing the spill plan.
Provide a site plan showing the locations of storage areas for chemicals, inlets/catch basins,
spill kits and other relevant infrastructure or materials information.
Describe the emergency cleanup and disposal procedures. Note the location of all spill kits in
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 1- Page 501 PLN2022-004 Packet Pg. 447
Planning &
Development
Received
09/07/2023
1.t
the spill plan.
List the names and telephone numbers of public agencies to contact in the event of a spill
Spill Cleanup Kits
. Store all cleanup kits near areas with a high potential for spills so that they are easily access-
ible in the event of a spill. The contents of the spill kit must be appropriate to the types and
quantities of materials stored or otherwise used at the facility, and refilled when the materials
are used. Spill kits must be located within 25 feet of all fueling/fuel transfer areas, including on-
board mobile fuel trucks.
Note: Ecology recommends that the kit(s) include salvage drums or containers, such as high
density polyethylene, polypropylene or polyethylene sheet -lined steel; polyethylene or equi-
valent disposal bags; an emergency response guidebook; safety gloves/clothes/equipment;
shovels or other soil removal equipment; and oil containment booms and absorbent pads; all
stored in an impervious container.
Spill Cleanup and Proper Disposal of Waste
• Stop, contain, and clean up all spills immediately upon discovery.
. Implement the spill plan immediately.
. Contact the designated spill response employees.
• Block off and seal nearby inlets/catch basins to prevent materials from entering the drainage
system or combined sewer.
. Use the appropriate material to cleanup the spill.
Do not use emulsifiers or dispersants such as liquid detergents or degreasers unless disposed
of proplerly. Emulsifiers and dispersants are not allowed to be used on surface water, or in a
place where they may enter storm drains, surface waters, treatments systems, or sanitary
sewers.
. Immediately notify Ecology and the local jurisdiction if a spill has reached or may reach a san-
itary or storm sewer, ground water, or surface water. Notification must comply with state and
federal spill reporting requirements.
Do not wash absorbent material into interior floor drains or inlets/catch basins.
. Place used spill control materials inappropriate containers and dispose of according to reg-
ulations.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 1- Page 502 PLN2022-004 Packet Pg. 448
Planning &
Development
Received
09/07/2023
1.t
S457 BMPS for Inspections
Qualified personnel shall conduct inspections monthly. Make and maintain a record of each inspec-
tion on -site. The following requirements apply to inspections:
Be conducted by someone familiar with the facility's site, operations, and BMPs.
. Verify the accuracy of the pollutant source descriptions in the SWPPP.
. Assess all BMPs that have been implemented for effectiveness and needed maintenance and
locate areas where additional BMPs are needed.
Reflect current conditions on the site.
. Include written observations of the presence of floating materials, suspended solids, oil and
grease, discoloration, turbidity and odor in the stormwater discharges; in outside vehicle main-
tenance/repair; and liquid handling, and storage areas. In areas where acid or alkaline mater-
ials are handled or stored use a simple litmus or pH paper to identify those types of
stormwater contaminants where needed.
Eliminate or obtain a permit for unpermitted non-stormwater discharges to storm drains or
receiving waters, such as process wastewater and vehicle/equipment washwater.
. Identify actions to address inspection deficiencies.
S458 BMPs for Record Keeping
See the applicable permit for specific record -keeping requirements and retention schedules for the
following reports. At a minimum, retain the following reports for five years:
. Inspection reports which should include:
Time and date of the inspection
Locations inspected
Statement on status of compliance with the permit
Summary report of any remediation activities required
Name, title, and signature of person conducting the inspection
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 1- Page 503 PLN2022-004 Packet Pg. 449
Planning &
Development
Received
09/07/2023
1.t
Reports on spills of oil or hazardous substances in greater than Reportable Quantities (Code
of Federal Regulations Title 40 Parts 302.4 and 117). Report spills of the following: antifreeze,
oil, gasoline, or diesel fuel, that cause:
o A violation of the State of Washington's Water Quality Standards.
A film or sheen upon or discoloration of the waters of the State or adjoining shorelines.
A sludge or emulsion to be deposited beneath the surface of the water or upon adjoin-
ing shorelines.
To report a spill or to determine if a spill is a substance of a Reportable Quantity, call the Eco-
logy regional office and ask for an oil spill operations or a dangerous waste specialist:
• Northwest Region (425)649-7000
• Southwest Region (360)407-6300
• Eastern Region (509)329-3400
• Central Region (509) 575-2490
In addition, call the Washington Emergency Management Division at 1-800-258-5990 or 1-
800-OILS-911 AND the National Response Center at 1-800-424-8802.
Also, refer to Focus on Emergency Spill Response (Ecology, 2009).
The following is additional recommended record keeping:
Maintain records of all related pollutant control and pollutant generating activities such as training,
materials purchased, material use and disposal, maintenance performed, etc.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 1- Page 504 PLN2022-004 Packet Pg. 450
Planning &
Development
Received
09/07/2023
1.t
S417 BMPs for Maintenance of Stormwater
Drainage and Treatment Systems
Description of Pollutant Sources: Facilities include roadside catch basins on arterials and within
residential areas, conveyance systems, detention facilities such as ponds and vaults, oil/water sep-
arators, biofilters, settling basins, infiltration systems, and all other types of stormwater treatment sys-
tems presented in Volume V. Oil and grease, hydrocarbons, debris, heavy metals, sediments and
contaminated water are found in catch basins, oil and water separators, settling basins, etc.
Pollutant Control Approach: Provide maintenance and cleaning of debris, sediments, and other
pollutants from stormwater collection, conveyance, and treatment systems to maintain proper oper-
ation.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 3 - Page 516 PLN2022-004 Packet Pg. 451
Planning &
Development
Received
09/07/2023
1.t
Applicable Operational BMPs:
Maintain stormwater treatment facilities per the operations and maintenance (O&M) procedures
presented in Appendix V-A: BMP Maintenance Tables in addition to the following BMPs:
. Inspect and clean treatment BMPs, conveyance systems, and catch basins as needed, and
determine necessary O&M improvements.
Promptly repair any deterioration threatening the structural integrity of stormwater facilities.
These include replacement of clean -out gates, catch basin lids, and rock in emergency spill-
ways.
Ensure adequacy of storm sewer capacities and prevent heavy sediment discharges to the
sewer system.
Regularly remove debris and sludge from BMPs used for peak -rate control, treatment, etc.
and discharge to a sanitary sewer if approved by the sewer authority, or truck to an appro-
priate local or state government approved disposal site.
Clean catch basins when the depth of deposits reaches 60 percent of the sump depth as
measured from the bottom of basin to the invert of the lowest pipe into or out of the basin.
However, in no case should there be less than six inches clearance from the debris surface to
the invert of the lowest pipe. Some catch basins (for example, WSDOT's Catch Basin Type 1L
W( SDOT, 2011)) may have as little as 12 inches sediment storage below the invert. These
catch basins need frequent inspection and cleaning to prevent scouring. Where these catch
basins are part of a stormwater collection and treatment system, the system owner/operator
may choose to concentrate maintenance efforts on downstream control devices as part of a
systems approach.
Properly dispose of all solids, polluted material, and stagnant water collected through system
cleaning. Do not decant water back into the drainage system from eductor trucks or vacuum
equipment since there may be residual contaminants in the cleaning equipment. Do not jet
material downstream into the public drainage system.
. Clean woody debris in a catch basin as frequently as needed to ensure proper operation of
the catch basin.
Post warning signs; "Dump No Waste -Drains to Ground Water," "Streams," "Lakes," or
emboss on or adjacent to all storm drain inlets where possible.
. Disposal of sediments and liquids from the catch basins must comply with Appendix IV-B:
Manaaement of Street Waste Solids and Liquids.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 3 - Page 517 PLN2022-004 Packet Pg. 452
Planning &
Development
Received
09/07/2023
1.t
S430 BMPs for Urban Streets
Description of Pollutant Sources: Urban streets can be the source of vegetative debris, paper,
fine dust, vehicle liquids, tire and brake wear residues, heavy metals (lead and zinc), soil particles,
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 3 - Page 518 PLN2022-004 Packet Pg. 453
Planning &
Development
Received
09/07/2023
1.t
ice control salts, domestic wastes, lawn chemicals, and vehicle combustion products. Street surface
contaminants contain significant concentrations of particle sizes less than 250 microns (Sartor and
Boyd, 1972).
Pollutant Control Approach: Conduct efficient street sweeping where and when appropriate to
minimize the contamination of stormwater. Do not wash street debris into storm drains.
Facilities not covered under the Industrial Stormwater General Permit may consider a minimum
amount of water washing of streets. All facilities must comply with their local stormwater require-
ments for discharging to storm sewers. Municipal NPDES permittees are required to limit street
wash water discharges and may have special conditions or treatment requirements.
Recommended BMPs:
For maximum stormwater pollutant reductions on curbed streets and high volume parking
lots, use efficient vacuum sweepers.
Note: High -efficiency street sweepers utilize strong vacuums and the mechanical action of
main and gutter brooms combined with an air filtration system that only returns clean air to the
atmosphere (i. e., filters very fine particulates). They sweep dry and use no water since they do
not emit any dust.
High -efficiency vacuum sweepers have the capability of removing 80 percent or more of the
accumulated street dirt particles whose diameters are less than 250 microns (Sutherland et
al., 1998). This assumes pavements under good condition and reasonably expected accu-
mulation conditions.
For moderate stormwater pollutant reductions on curbed streets use regenerative air sweep-
ers or tandem sweeping operations.
Note: A tandem sweeping operation involves a single pass of a mechanical sweeper followed
immediately by a single pass of a vacuum sweeper or regenerative air sweeper.
A regenerative air sweeper blows air down on the pavement to entrain particles and
uses a return vacuum to transport the material to the hopper.
These operations usually use water to control dust. This reduces their ability to pick up
fine particulates.
These types of sweepers have the capability of removing approximately 25 to 50 percent of
the accumulated street dirt particles whose diameters are less than 250 microns. (Sutherland
et a/., 1998). This assumes pavements under good conditions and typical accumulation con-
ditions.
For minimal stormwater pollutant reductions on curbed streets use mechanical sweepers
Note: The industry refers to mechanical sweepers as broom sweepers and uses the
mechanical action of main and gutter brooms to throw material on a conveyor belt that
transports it to the hopper.
These sweepers usually use water to control dust. This reduces their ability to pick up
fine particulates.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 3 - Page 519 PLN2022-004 Packet Pg. 454
Planning &
Development
Received
09/07/2023
1.t
Mechanical sweepers have the capability of removing only 10 to 20 percent of the accu-
mulated street dirt particles whose diameters are less than 250 microns (Sutherland et al.,
1998). This assumes pavements under good condition and the most favorable accumulation
conditions.
Conduct vacuum sweeping at optimal frequencies. Optimal frequencies are those scheduled
sweeping intervals that produce the most cost-effective annual reduction of pollutants nor-
mally found in stormwater and can vary depending on land use, traffic volume, receiving
water, and rainfall patterns.
. Train operators in those factors that result in optimal pollutant removal. These factors include
sweeper speed, brush adjustment and rotation rate, sweeping pattern, maneuvering around
parked vehicles, and interim storage and disposal methods.
. Consider the use of periodic parking restrictions in low to medium density single-family res-
idential areas to ensure the sweeper's ability to sweep along the curb.
. Establish programs for prompt vacuum sweeping, removal, and disposal of debris from spe-
cial events that will generate higher than normal loadings.
. Disposal of street sweeping solids must comply with Appendix IV-B: Management of Street
Waste Solids and Liquids.
. Consider developing ordinances that prohibit citizens from putting yard debris in the street gut-
ters, or doing vehicle maintenance on the street.
. Provide incentives to property owners for installing permeable pavement parking areas and
driveways.
. Consider installing catch basin inserts in high use areas to remove trash and yard debris
before it enters the system.
. Implement a storm drain stenciling program to label and educate the public not to dump mater-
ials into storm drains or onto sidewalks, streets, parking lots, and gutters.
. Provide household hazardous waste collection and used oil recycling for citizens to avoid
illegal dumping.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 3 - Page 520 PLN2022-004 Packet Pg. 455
Planning &
Development
Received
09/07/2023
1.t
S411 BMPs for Landscaping and Lawn / Vegetation
Management
Description of Pollutant Sources: Landscaping can include grading, soil transfer, vegetation
planting, and vegetation removal. Examples include weed control on golf course lawns, access
roads, and utility corridors and during landscaping; and residential lawn/plant care. Proper man-
agement of vegetation can minimize excess nutrients and pesticides.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 4 - Page 523 PLN2022-004 Packet Pg. 456
Planning &
Development
Received
09/07/2023
1.t
Pollutant Control Approach: Maintain appropriate vegetation to control erosion and the dis-
charge of stormwater pollutants. Prevent debris contamination of stormwater. Where practicable,
grow plant species appropriate for the site, or adjust the soil properties of the site to grow desired
plant species.
Applicable BMPs:
. Install engineered soil/landscape systems to improve the infiltration and regulation of storm -
water in landscaped areas.
• Select the right plants for the planting location based on proposed use, available main-
tenance,soil conditions, sun exposure, water availability, height, sight factors, and space avail-
able.
• Ensure that plants selected for planting are not on the noxious weed list. For example, but-
terfly bush often gets planted as an ornamental but is actually on the noxious weed list.
The Washington State Noxious Weed List can be found at the following webpage:
https://www.nwcb.wa.gov/printable-noxious-weed-list
• Do not dispose of collected vegetation into waterways or storm sewer systems.
• Do not blow vegetation or other debris into the drainage system.
• Dispose of collected vegetation such as grass clippings, leaves, sticks by composting or recyc-
ling.
• Remove, bag, and dispose of class A & B noxious weeds in the garbage immediately.
• Do not compost noxious weeds as it may lead to spreading through seed or fragment if the
composting process is not hot enough.
Use manual and/or mechanical methods of vegetation removal (pincer -type weeding tools,
flame weeders, or hot water weeders as appropriate) rather than applying herbicides, where
practical.
Use at least an eight -inch "topsoil" layer with at least 8 percent organic matter to provide a suf-
ficient vegetation -growing medium.
Organic matter is the least water-soluble form of nutrients that can be added to the soil.
Composted organic matter generally releases only between 2 and 10 percent of its total
nitrogen annually, and this release corresponds closely to the plant growth cycle.
Return natural plant debris and mulch to the soil, to continue recycling nutrients indef-
initely.
. Select the appropriate turfgrass mixture for the climate and soil type.
Certain tall fescues and rye grasses resist insect attack because the symbiotic endo-
phytic fungi found naturally in their tissues repel or kill common leaf and stem -eating
lawn insects.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 4 - Page 524 PLN2022-004 Packet Pg. 457
Planning &
Development
Received
09/07/2023
1.t
■ The fungus causes no known adverse effects to the host plant or to humans
Tall fescues and rye grasses do not repel root -feeding lawn pests such as Crane
Fly larvae.
■ Tall fescues and rye grasses are toxic to ruminants such as cattle and sheep
Endophytic grasses are commercially available; use them in areas such as parks or golf
courses where grazing does not occur.
Local agricultural or gardening resources such as Washington State University Exten-
sion office can offer advice on which types of grass are best suited to the area and soil
type.
Use the following seeding and planting BMPs, or equivalent BMPs, to obtain information on
grass mixtures, temporary and permanent seeding procedures, maintenance of a recently
planted area, and fertilizer application rates: BMP C120: Temporary and Permanent Seedil
BMP C121: Mulching, BMP C123: Plastic Covering, and BMP C124: Sodding.
. Adjusting the soil properties of the subject site can assist in selection of desired plant species
Consult a soil restoration specialist for site -specific conditions.
Recommended Additional BMPs:
. Conduct mulch -mowing whenever practicable.
. Use native plants in landscaping. Native plants do not require extensive fertilizer or pesticide
applications. Native plants may also require less watering.
Use mulch or other erosion control measures on soils exposed for more than one week during
the dry season (May 1 to September 30) or two days during the rainy season (October 1 to
April 30).
. Till a topsoil mix or composted organic material into the soil to create a well -mixed transition
layer that encourages deeper root systems and drought -resistant plants.
. Apply an annual topdressing application of 3/8" compost. Amending existing landscapes and
turf systems by increasing the percent organic matter and depth of topsoil can:
Substantially improve the permeability of the soil.
Increase the disease and drought resistance of the vegetation.
Reduces the demand for fertilizers and pesticides.
. Disinfect gardening tools after pruning diseased plants to prevent the spread of disease.
. Prune trees and shrubs in a manner appropriate for each species.
. If specific plants have a high mortality rate, assess the cause and replace with another more
appropriate species.
. When working around and below mature trees, follow the most current American National
Standards Institute (ANSI) ANSI A300 standards (see
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume /V - Chapter 4 - Page 525 PLN2022-004 Packet Pg. 458
Planning &
Development
Received
09/07/2023
1.t
://www.tcia.orci/TCIA/BUSINESS/ANSI A300 Standards /TCIA/BUSINESS/A300
Standards/A300 Standards. aspx?h key= 202ff566-4364-4686-b7cl -2a365af59669) and
International Society of Arboriculture BMPs to the extent practicable (e.g., take care to min-
imize any damage to tree roots and avoid compaction of soil).
. Monitor tree support systems (stakes, guys, etc.).
Repair and adjust as needed to provide support and prevent tree damage.
Remove tree supports after one growing season or maximum of 1 year.
Backfill stake holes after removal.
. When continued, regular pruning (more than one time during the growing season) is required
to maintain visual sight lines for safety or clearance along a walk or drive, consider relocating
the plant to a more appropriate location.
. Make reasonable attempts to remove and dispose of class C noxious weeds.
. Re -seed bare turf areas until the vegetation fully covers the ground surface.
Watch for and respond to new occurrences of especially aggressive weeds such as Him-
alayan blackberry, Japanese knotweed, morning glory, English ivy, and reed canary grass to
avoid invasions.
. Plant and protect trees per BMP T5.16: Tree Retention and Tree Planting.
. Aerate lawns regularly in areas of heavy use where the soil tends to become compacted. Con-
duct aeration while the grasses in the lawn are growing most vigorously. Remove layers of
thatch greater than 3/4-inch deep.
. Set the mowing height at the highest acceptable level and mow at times and intervals
designed to minimize stress on the turf. Generally mowing only 1/3 of the grass blade height
will prevent stressing the turf.
O Mowing is a stress -creating activity for turfgrass.
Grass decreases its productivity when mowed too short and there is less growth of
roots and rhizomes. The turf becomes less tolerant of environmental stresses, more dis-
ease prone and more reliant on outside means such as pesticides, fertilizers, and irrig-
ation to remain healthy.
Additional BMP Information:
King County's Best Management Practices for Golf Course Development and Operation
(King County, 1993) has additional BMPs for Turfgrass Maintenance and Operation.
King County, Seattle Public Utilities, and the Saving Water Partnership have created the fol-
lowing natural lawn and garden care resources that include guidance on building healthy soil
with compost and mulch, selecting appropriate plants, watering, using alternatives to pesti-
cides, and implementing natural lawn care techniques.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 4 - Page 526 PLN2022-004 Packet Pg. 459
Planning &
Development
Received
09/07/2023
1.t
■ Natural Yard Care -Five steps to make your piece of the planet a healthier place to live
(King County and SPU, 2008)
■ The Natural Lawn & Garden Series: Smart Watering (Saving Water Partnership, 2006)
■ Natural Lawn Care for Western Washington (Saving Water Partnership, 2007)
■ The Natural Lawn & Garden Series: Growing Healthy Soil; Choosing the Right Plants;
and Natural Pest, Weed and Disease Control (Saving Water Partnership, 2012)
The International Society of Arboriculture (ISA) is a group that promotes the professional prac-
tice of arboriculture and fosters a greater worldwide awareness of the benefits of trees
through research, technology, and education. ISA standards used for managing trees,
shrubs, and other woody plants are the American National Standards Institute (ANSI) A300
standards. The ANSI A300 standards are voluntary industry consensus standards developed
by the Tree Care Industry Association (TC IA) and written by the Accredited Standards Com-
mittee (ASC). The ANSI standards can be found on the ISA website: www.isa-arbor.-
com/education/publications/index.aspx
Washington State University's Gardening in Washington State website at http://garden-
ing.wsu.edu contains Washington State specific information about vegetation management
based on the type of landscape.
See the Pacific Northwest Plant Disease Management Handbook (Pscheidt and Ocamb
2016) for information on disease recognition and for additional resources.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 4 - Page 527 PLN2022-004 Packet Pg. 460
Planning &
Development
Received
09/07/2023
1.t
S450 BMPs for Irrigation
Description of Pollutant Sources: Irrigation consists of discharges from irrigation water lines,
landscape irrigation, and lawn or garden watering. Excessive watering can lead to discharges of
chlorinated potable water runoff into drainage systems; it can also cause erosion; and negatively
affect plant health. Improper irrigation can encourage pest problems, leach nutrients, and make a
lawn completely dependent on artificial watering. Mosquito breeding habitats may form through
excessive watering.
Pollutant Control Approach: Limit the amount and location of watering to prevent runoff and dis-
charges to drainage systems.
Applicable Operational BMPs:
. Irrigate with the minimum amount of water needed. Never water at rates that exceed the infilt-
ration rate of the soil.
. Maintain all irrigation systems so that irrigation water is applied evenly and where it is needed
. Ensure sprinkler systems do not overspray vegetated areas resulting in excess water dis-
charging into the drainage system.
. Inspect irrigated areas for excess watering. Adjust watering times and schedules to ensure
that the appropriate amount of water is being used to minimize runoff. Consider factors such
as soil structure, grade, time of year, and type of plant material in determining the proper
amounts of water for a specific area.
. Inspect irrigated areas regularly for signs of erosion and/or discharge.
. Place sprinkler systems appropriately so that water is not being sprayed on impervious sur-
faces instead of vegetation.
. Repair broken or leaking sprinkler nozzles as soon as possible.
. Appropriately irrigate lawns based on the species planted, the available water holding capa-
city of the soil, and the efficiency of the irrigation system.
The depth from which a plant normally extracts water depends on the rooting depth of
the plant. Appropriately irrigated lawn grasses normally root in the top 6 to 12 inches of
soil; lawns irrigated on a daily basis often root only in the top 1 inch of soil.
Do not irrigate plants during or immediately after fertilizer application. The longer the period
between fertilizer application and irrigation, the less fertilizer runoff occurs.
Do not irrigate plants during or immediately after pesticide application (unless the pesticide
label directs such timing).
Reduce frequency and / or intensity of watering as appropriate for the wet season (October 1
to April 30).
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume /V - Chapter 4 - Page 535 PLN2022-004 Packet Pg. 461
Planning &
Development
Received
09/07/2023
1.t
Place irrigation systems to ensure that plants receive water where they need it. For example,
do not place irrigation systems downgradient of plant's root zones on hillsides.
Recommended Operational BMPs:
. Add a tree bag or slow -release watering device (e.g., bucket with a perforated bottom) for
watering newly installed trees when irrigation system is not present.
Water deeply, but infrequently, so that the top 6 to 12 inches of the root zone is moist.
Use soaker hoses or spot water with a shower type wand when an irrigation system is not
present.
O Pulse water to enhance soil absorption, when feasible.
Pre -moisten soil to break surface tension of dry or hydrophobic soils/mulch, followed by
several more passes. With this method, each pass increases soil absorption and allows
more water to infiltrate prior to runoff.
. Identify trigger mechanisms for drought -stress (e.g., leaf wilt, leaf senescence, etc.) of dif-
ferent species and water immediately after initial signs of stress appear.
• Water during drought conditions or more often if necessary to maintain plant cover.
. Adjust irrigation frequency / intensity as appropriate after plant establishment.
• Annually inspect irrigation systems to ensure:
o That there are no blockages of sprayer nozzles.
Sprayer nozzles are rotating as appropriate.
Sprayer systems are still aligned with the plant locations and root zones.
Consult with the local water utility, Conservation District, or Cooperative Extension office to
help determine optimum irrigation practices.
Do not use chemigation and fertigation in irrigation systems. This will help avoid over applic-
ation of pesticides and fertilizers.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 4 - Page 536 PLN2022-004 Packet Pg. 462
Planning &
Development
Received
09/07/2023
1.t
S438 BMPs for Construction Demolition
Description of Pollutant Sources: This activity applies to removal of existing buildings and other
structures by controlled explosions, wrecking balls, or manual methods, and subsequent clearing of
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 7 - Page 599 PLN2022-004 Packet Pg. 463
Planning &
Development
Received
09/07/2023
1.t
the rubble. The loose debris may contaminate stormwater.
Pollutants of concern include toxic organic compounds, hazardous wastes, high pH, heavy metals,
and suspended solids.
Pollutant Control Approach: Do not expose hazardous materials to stormwater. Regularly clean
up debris that can contaminate stormwater. Protect the drainage system from dirty runoff and loose
particles. Sweep paved surfaces daily. Educate employees about the need to control site activities.
Applicable Operational BMPs:
. Identify, remove, and properly dispose of hazardous substances from the building before
beginning construction demolition activities that could expose them to stormwater. Such sub-
stances could include PCBs, asbestos, lead paint, mercury switches, and electronic waste.
Educate employees about the need to control site activities to prevent stormwater pollution,
and also train them in spill cleanup procedures.
Keep debris containers, dumpsters, and debris piles covered.
Place storm drain covers, or a similarly effective containment device, on all nearby drains to
prevent dirty runoff and loose particles from entering the drainage system.
Place the covers (or devices) at the beginning of the workday.
Collect and properly dispose of the accumulated materials before removing the covers
(or devices) at the end of the workday.
Use dikes, berms, or other methods to protect overland discharge paths from runoff if
stormwater drains are not present.
Sweep street gutters, sidewalks, driveways, and other paved surfaces in the immediate area
of the demolition at the end of each workday. Collect and properly dispose of loose debris and
garbage.
Lightly spray water (such as from a hydrant or water truck) throughout the site to help control
windblown fine materials such as soil, concrete dust, and paint chips. Control the amount of
dust control water so that runoff from the site does not occur, yet dust control is achieved. Do
not use oils for dust control.
Suggested Operational BMPs:
Construct a screen to prevent stray building materials and dust from escaping the area during
demolition. Size and orient the screen to capture wind-blown materials and contain them
onsite.
Schedule demolition to take place at a dry time of the year to prevent stormwater runoff from
the demolition site.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 7 - Page 600 PLN2022-004 Packet Pg. 464
Planning &
Development
Received
09/07/2023
1.t
S440 BMPs for Pet Waste
Description of Pollutant Sources: Pets and pet -care can generate pollutants from waste, animal
washing, and cage or kennel cleaning. Pet waste that washes into lakes, streams or Puget Sound
begins to decay, using up oxygen and releasing ammonia. Low oxygen levels and ammonia com-
bined with warm water can kill fish. Pet waste also contains nutrients that encourage weed and
algae growth, and contribute to low oxygen and high pH in waters we use for swimming, boating and
fishing. Most importantly, pet waste can carry viruses and bacteria that could cause disease and lead
to beach or shellfish harvesting closures.
Pollutant Control Approach: Use a plastic bag or pooper scooper to clean up after pets. Properly
dispose of pet waste.
Recommended Operational BMPs for Pet Owners
. Regularly pickup and dispose of pet waste deposited on walks and at home.
Put pet waste in a securely closed bag and deposit it in the trash. Do not place pet waste in
yard waste containers because pet waste may carry diseases, and composting may not kill dis-
ease -causing organisms.
Do not compost or use pet waste as fertilizer. Harmful bacteria, worms, and parasites that can
transmit disease can live in the soil for years even after the solid portion of the pet waste has
dissolved.
Do not dispose of unused pet pharmaceuticals in a storm drain, in a toilet, or down a sink.
Check with your local refuse collector for proper disposal locations of pet medications.
When cleaning out cages and kennels, dispose of wash water down the toilet or a mop sink.
Otherwise, wash directly over lawn areas or make sure the wash water drains to a vegetated
area.
. Bathe pets indoors or in a manner that wash water won't be discharged to storm drains,
ditches, or surface waters of the state.
Rcommended Operational BMPs for Recreation Areas and Multi -Family
Properties
. Post signs at recreation areas and multi -family properties (that allow pets) reminding res-
idents and visitors to pick up after their pets.
Carefully consider the placement of pet waste stations at recreation sites and near multi -fam-
ily properties that allow pets. Choose locations convenient for dog walkers to pick up a bag at
the start of their walk and locations for them to dispose of it at mid -walk or at the end of their
walk.
Check pet waste stations on a regular basis to keep pet waste bags stocked and disposal sta-
tions empty. Consider signage to keep regular trash out of pet waste disposal stations to avoid
filling them too quickly. Make sure pet waste disposal stations have a cover to keep out water.
. At multi -family properties with roof -top dog runs, ensure that stormwater from the dog run is
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 7 - Page 601 PLN2022-004 Packet Pg. 465
Planning &
Development
Received
09/07/2023
1.t
not discharged to the stormwater system. Check with the local jurisdiction regarding roof -top
dog run connections to sanitary sewer.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 7 - Page 602 PLN2022-004 Packet Pg. 466
Planning &
Development
Received
09/07/2023
1.t
Figure IV-7.5: Example of a Pet Waste Station
DEPARTMENT OF
ECOLOGY
State of Washington
Example of a Pet Waste Station
Revised May 2019
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 7 - Page 603 PLN2022-004 Packet Pg. 467
Planning &
Development
Received
09/07/2023
1.t
S442 BMPs for Labeling Storm Drain Inlets On Your
Property
Description of Pollutant Sources: Waste materials dumped into storm drain inlets can have
severe impacts on receiving waters. Posting notices regarding discharge prohibitions at storm drain
inlets can prevent waste dumping. Storm drain signs and stencils are highly visible source controls
that are typically placed directly adjacent to storm drain inlets.
Pollutant Control Approach: The stencil, affixed sign, or metal grate contains a brief statement
that prohibits dumping of improper materials into the urban runoff conveyance system. Storm drain
messages have become a popular method of alerting the public about the effects of and the pro-
hibitions against waste disposal.
Applicable Operational BMPs:
Label storm drain inlets in residential, commercial, industrial areas, and any other areas
where contributions or dumping to storm drains is likely.
. Stencil or apply storm drain markers adjacent to storm drain inlets to help prevent the
improper disposal of pollutants. Or, use a storm drain grate stamped with warnings against pol-
luting.
. Place the marker in clear sight facing toward anyone approaching the inlet from either side.
Use a brief statement and/or graphical icons to discourage illegal dumping. Examples
include:
• "No Dumping — Drains to Stream"
• "No Pollutants — Drains to Puget Sound"
• "Dump No Waste — Drains to Lake"
• "No Dumping — Puget Sound Starts Here"
Check with your local government agency to find out if they have approved specific signage
and / or storm drain message placards for use. Consult the local agency stormwater staff to
determine specific requirements for placard types and methods of application.
Maintain the legibility of markers and signs. Signage on top of curbs tends to weather and
fade. Signage on face of curbs tends to be worn by contact with vehicle tires and sweeper
brooms.
When painting stencils or installing markers, temporarily block the storm drain inlet so that no
pollutants are discharged from the labeling activities.
Optional Operational BMPs:
Use a stencil in addition to a storm drain marker or grate to increase visibility of the message.
Reference for this BMP: (CASQA, 2003
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 7 - Page 604 PLN2022-004 Packet Pg. 468
Planning &
Development
Received
09/07/2023
1.t
DEPARTMENT OF
ECOLOGY
State of Washington
Figure IV-7.6: Storm Drain Inlet Labels
� If, kkk)
. _ . 1.?.A. .. �Sr �.. ►fir .-rrar.��
1
Storm Drain Inlet Labels
Revised October 2017
Please see http:IAvww.ecy.wa.gov/copyright.html for copyright notice including permissions,
limitation of liability, and disclaimer.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 7 - Page 605 PLN2022-004 Packet Pg. 469
Planning &
Development
Received
09/07/2023
1.t
S443 BMPs for Fertilizer Application
Description of Pollutant Sources: Poor application of fertilizers can cause appreciable storm -
water contamination. Fertilizers can leach phosphorous, nitrogen, and coliform bacteria. Fertilizers
can contribute to algae blooms, increase nutrient concentrations, and deplete oxygen in receiving
waters.
Pollutant Control Approach: Minimize the amount of fertilizer necessary to maintain vegetation
Control the application of fertilizer to prevent the discharge of stormwater pollution.
Applicable Operational BMPs:
. Apply the minimum amount of slow -release fertilizer necessary to achieve successful plant
establishment.
• Do not fertilize when the soil is dry or during a drought.
. Never apply fertilizers if it is raining or about to rain.
• Do not apply fertilizers within three days prior to predicted rainfall. The longer the period
between fertilizer application and either rainfall or irrigation, the less fertilizer runoff occurs.
• Determine the proper fertilizer application for the types of soil and vegetation involved.
• Follow manufacturers' recommendations and label directions.
. Train employees on the proper use and application of fertilizers.
• Keep fertilizer granules off impervious surfaces. Clean up any spills immediately. Do not hose
down to a storm drain, conveyance ditch, or water body.
. If possible, do not fertilize areas within 100 feet of water bodies including wetlands, ponds,
and streams.
. Avoid fertilizer applications in stormwater ditches, stormwater facilities, and drainage sys-
tems.
. In areas that drain to sensitive water bodies, apply no fertilizer at commercial and industrial
facilities, to grass swales, filter strips, or buffer areas unless approved by the local jurisdiction.
• Use slow release fertilizers such as methylene urea, isobutylidene, or resin coated fertilizers
when appropriate, generally in the spring. Use of slow release fertilizers is especially import-
ant in areas with sandy or gravelly soils.
. Apply fertilizers in amounts appropriate for the target vegetation and at the time of year that
minimizes losses to surface and ground waters.
Time the fertilizer application to periods of maximum plant uptake. Ecology generally recom-
mends application in the fall and spring, although Washington State University turf specialists
recommend four fertilizer applications per year.
Do not use turf fertilizers containing phosphorous unless a soil sample analysis taken within
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 7 - Page 606 PLN2022-004 Packet Pg. 470
Planning &
Development
Received
09/07/2023
1.t
the past 36 months indicates the soil of the established lawn is deficient in phosphorus. For
more information about restrictions on turf fertilizers containing phosphorus, see the following
website:
https:Hagr.wa.gov/departments/pesticides-and-fertilizers/fertilizers/fertilizers-containing-phos-
hp orus
Recommended Operational BMPs:
Test soils to determine the correct fertilizer application rates.
• Evaluation of soil nutrient levels through regular testing ensures the best possible efficiency
and economy of fertilization.
• Fertilization needs vary by site depending on plant, soil, and climatic conditions.
. Choose organic fertilizers when possible.
• For details on soils testing, contact the local Conservation District, a soils testing professional,
or a Washington State University Extension office.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 7 - Page 607 PLN2022-004 Packet Pg. 471
Planning &
Development
Received
09/07/2023
1.t
S451 BMPs for Building, Repair, Remodeling,
Painting, and Construction
Description of Pollutant Sources: This activity refers to:
. The construction of buildings and other structures.
. Remodeling of existing buildings and houses.
. General exterior building repair work.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 7 - Page 609 PLN2022-004 Packet Pg. 472
Planning &
Development
Received
09/07/2023
1.t
Pollutants of concern include toxic hydrocarbons, hazardous wastes, toxic organics, suspended
solids, heavy metals, pH, oils, and greases.
Pollutant Control Approach: Educate employees about the need to control site activities. Control
leaks, spills, and loose material. Utilize good housekeeping practices. Regularly clean up debris that
can contaminate stormwater. Protect the drainage system from dirty runoff and loose particles.
Applicable Operational BMPs:
. Identify, remove, and properly dispose of hazardous substances from the building before
beginning repairing or remodeling activities that could expose them to stormwater. Such sub-
stances could include PCBs, asbestos, lead paint, mercury switches, and electronic waste.
Educate employees about the need to control site activities to prevent stormwater pollution,
and also train them in spill cleanup procedures.
. At all times, have available at the work site spill cleanup materials appropriate to the chemicals
used on site.
Cleanup the work site at the end of each workday. Put away materials (such as solvents)
indoors or cover and secure them, so that unauthorized personnal will not have access to
them.
. Sweep the area daily to collect loose litter, paint chips, grit, and dirt.
Do not dump any substance on pavement, on the ground, in the storm drain, or toward the
storm drain, regardless of its content, unless it is clean water only.
Place a drop cloth, where space and access permits, before beginning wood treating activ-
ities. Use drip pans in areas where drips are likely to occur if the area cannot be protected with
a drop cloth.
Use ground or drop cloths underneath scraping and sandblasting work. Use ground cloths,
buckets, or tubs anywhere that work materials are laid down.
Clean paintbrushes and other tools covered with water -based paints in sinks connected to
sanitary sewers or in portable containers that can subsequently be dumped into a sanitary
sewer drain.
Clean brushes and tools covered with non -water -based finishes or other materials in a man-
ner that enables collection of used solvents for recycling or proper disposal. Do not discharge
non -water -based finishes or paints or used solvents into the sanitary sewer, or any other
drain.
Use storm drain covers, or similarly effective devices, to prevent dust, grit, washwater, or
other pollutants from escaping the work area. Place the cover or containment device over the
storm drain at the beginning of the work day. Collect and properly dispose of accumulated
dirty runoff and solids before removing the cover or device at the end of each work day.
Refer to S431 BMPs for Washing and Steam Cleaning Vehicles / Equipment / Building Struc-
tures for best management practices associated with power washing buildings.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 7 - Page 610 PLN2022-004 Packet Pg. 473
Planning &
Development
Received
09/07/2023
1.t
Suggested Operational BMPs:
• Lightly spray water on the work site to control dust and grit that could blow away. Do not use
oils for dust control. Never spray to the point of water runoff from the site.
• Clean tools over a ground cloth or within a containment device such as a tub.
• Consider using filtered vacuuming to collect waste that may be hard to sweep, such as dust on
a drop cloth.
. If conducting work in wet weather conditions, consider setting up temporary cover when scrap-
ing or pressure -washing lead -based paint.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume IV - Chapter 7 - Page 611 PLN2022-004 Packet Pg. 474
Planning &
Development
Received
09/07/2023GREENWALK PARK
STORMWATER SITE PLAN REPORT
APPENDIX E — DRAINAGE PLANS
1.t
Terraforma Design Group, Inc.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 475
Planning &
Development
Received
09/07/2023
PROPERTY INFO
PARCEL NO:
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
27032500308300 GREENWALK PARK.
540 EDMONDS WAY
AREA= 2.55 AC 540 + 550 EDMONDS WAY
27032500308400EDMONDS, WA 98020
550 EDMONDSONDSWAAYY
AREA= 0.55 AC
ZONING: RS—MP
LEGAL DESCRIPTION
THAT PORTION OF THE NORTH HALF OF THE NORTHWEST QUARTER OF
THE SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER OF SECTION
25, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M., IN SNOHOMISH
COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS:
BEGINNING AT THE NORTHWEST CORNER OF SAID NORTH HALF OF
THE NORTHWEST QUARTER OF THE SOUTHWEST QUARTER OF THE
SOUTHWEST QUARTER; THENCE SOUTH, ALONG THE WEST LINE
THEREOF, 321.83 FEET; THENCE EAST, 300 FEET, MORE OR LESS, TO
A POINT WHICH IS 300 FEET EAST AND 321.03 FEET SOUTH OF THE
NORTHWEST CORNER OF THE SOUTHWEST QUARTER OF THE
SOUTHWEST QUARTER;
THENCE NORTH 41°28'23" EAST, TO THE SOUTHERLY BOUNDARY OF
TRACT CONVEYED TO STATE OF WASHINGTON BY DEED RECORDED
NOVEMBER 2, 1977 UNDER RECORDING NO. 2171113; THENCE
NORTHWESTERLY ALONG SOUTHERLY LINE OF TRACT, AS CONVEYED
TO STATE OF WASHINGTON TO THE NORTH LINE OF THE SOUTHWEST
QUARTER OF THE SOUTHWEST QUARTER; THENCE WEST, ALONG SAID
NORTH LINE TO A POINT OF BEGINNING. EXCEPT THE NORTH 35 FEET
THEREOF. SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF
WASHINGTON.
BASIS OF BEARING
WASHINGTON COORDINATE SYSTEM, NAD83(2011), NORTH ZONE,
DERIVED FROM WASHINGTON STATE REFERENCE NETWORK — ACCEPTED
THE BEARING OF N 88°38'03" W FOR THE NORTH LINE OF THE
SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER OF THE
SOUTHWEST QUARTER OF SECTION 25, TOWNSHIP 27 N., RANGE 3 E.,
W.M., BASED ON FOUND MONUMENTS IN CASE.
VERTICAL DATUM
NAVD88 PER GNSS OBSERVATIONS, DERIVED FROM WASHINGTON
STATE REFERENCE NETWORK
B(ackett's
ending North
'ry Terminal' uTeslas Drones - -
ECmr...�-r; Main 51
Scratch©st'y
i
a
dmands
Idmonds
OSauna Hut Edmonds
Marsh
Farina
--
each Park G'rty?ark
Walnut St
Main S1
�oQ
Q
PINE PARK
NEIGHBORHOOD
- 2201h sr S W
g
3�
•54C Edmonds Way,
Edmonds, WA 98020
SITES
g
221m St. SW T
f
i76ih S[ SW � o
EdmondsGood�will WESTGATE
Ngeeo
PCCCkmn-unity
Markets- Edmonds--
TOTAL DISTURBED AREA: 2.33 AC I
EX. IMPERVIOUS AREA: 22,357 SF
PROP. IMPERVIOUS AREA: 66,604 SF
NET CHANGE IMPERVIOUS AREA: +44,247 SF
EARTHWORK QUANTITIES
TOTAL CUT = 3569 BCY
TOTAL FILL = 1990 BCY
* FOR PERMIT USE ONLY
n
SHERWOOD ' £
FOREST
c
228TH ST. SW
2241h S1 SW
Madrona K-8 School 1P
cr w
3 s v
�L A
Aquarium Co-op 4
2491h Sl sW
Kruckeberg m
Botanic Carder n
VICINITY MAP
SCALE: N.T.S.
PROJECT TEAM
DEVELOPER
FERNANDEZ & BARNES LLC
10529 NE 58TH STREET
KIRKLAND, WA 98033
CONTACT: STEVE BARNES
PHONE: (206) 550-9296
EMAIL: sbarnes@cornerstonearch.com
ARCHITECT
GREENWALK DESIGNS LLC
CONTACT: STEVE BARNES
PHONE: (206) 550-9296
EMAIL: sbarnes@cornerstonearch.com
CIVIL ENGINEER
TERRAFORMA DESIGN GROUP, INC.
5027 51ST AVENUE SW
SEATTLE, WA 98136
CONTACT: PEDRO DEGUZMAN, PE
PHONE: (206) 795-9023
EMAIL: pedro@terraformadesigngroup.com
GOVERNING AGENCIES
w
co
M
UU
�
U
W
�
Q
o
m
0:f
\
<
v
o
^
!�{
w
d
v
� Edmonds
O
!��%i
U
(n
o
o
Q
(
3
n
3
_ J
D^/1
J
a>
3
z
a'
w
3
o
ZU-)
Lr)
O
z
N
N
22Pth SR SW
�
W
CD
�
�
>
U
O
N
r
1�
n
Esperance
3
i
2281h St SW
C
pg f
TJ- Maxx V j�
2381h St
\`}II& 49
Panera Bre
1M
PLANNING, GRADING, DRAINAGE
CITY OF EDMONDS
121 5TH AVENUE NORTH
EDMONDS, WA 98020
PLANNING: MIKE CLUGSTON, michael.clugston0edmondswa.gov
ENGINEERING: JEANIE MCDONNELL, jeanie.mcconnell0edmondswo.gov
WATER & SEWER
OLYMPIC VIEW WATER & SEWER
CONTACT: CHRIS SCOTT
EMAIL: chriss0ovwater.com
EDMONDS WAY (SR104) ACCESS
WASHINGTON STATE D.O.T.
CONTACT: PETER ALM
EMAIL: almp@wsdot.wo.gov
SHEET INDEX
C1
CIVIL COVER SHEET
C1.1
SITE PLAN
C2
DEMO & TESDC PLAN
C3
GRADING & DRAINAGE PLAN
C4
UTILITY PLAN
C5
PROFILES & SECTIONS
C6
STORM DETAILS
C7
STORM DETAILS
C8
TESC DETAILS
C9
CIVIL DETAILS
C10
CIVIL DETAILS
Au
lii
J
w
W
U)
0
.y
8/23/23
Cn
M
E
0
LL
0
a
c
a�
CL
0
tv
N=
2
�^CIO
0 �
d
c
Z Q`
O
Q G E
vJ a
w Q�
0
0 Z�
Z Lo 0
W
+ Q c?
LU 0
Wa
a
ly
a
m
a�
3
E
0
to
E
a�
a
r
O x
O w
L
O tv
E
0
z a
I —
ILL]
0
iy
a_
��
N •-
('7 U)
N z
0
00 U)
u.i
LU
o 0�
N
N
li
C1
PRELIMINARY DEVELOPMENT PLANS
hibit 19 -Green
PLN2022-004 Packet Pg. 476
Planning &
Development
Received
09/07/2023
co
12
N
0
M
CV
O
N
M
[V
Q
0
3
U
I
Y
O
3
c�
I
r,
N
O
CV
Jew
2a� 5 STOP SIGN (R1-1, 30"x30")
I I — — — — — ❑ I
j / / / \ \ \ \ I /
J
SIGN SUPPORT PER CITY DTL. TR-572
X,--- 1- I-----
- -----
IL
_L_ —_— — — — — — ,' / \\ rr I I 6 RIGHT TURN ONLY SIGN (R3-5R, 24 x30 )
/ SIGN SUPPORT PER CITY DTL. TR-572
-----------_j L — — — — — — —
o t --- 1 7 18" WHITE THERMOPLASTIC STOP BAR
+CD - / xo°` X
�O
`n N 88°38'02" W 300.00
8 WHITE, THERMOPLASTIC RIGHT TURN & ONLY — — — STENCILS
r---- — _._
G
x
0 10 20 40
1 inch = 20 ft.
Ago
9 SAWCUT & SEAL LINE
PATCH EX. ASPHALT PAVING
10 ONSITE CURBS & SIDEWALKS PER CITY STD. PLAN
TR-520, TR-531
11 ONSITE RAMPS PER CITY STD. DTL. T-540
12 HOT -MIX ASPHALT ROADWAY
di
J
W
W
U)
M z
N z
� _O
M
W r ^
w >
W
0 0�
C1.1
PRELIMINARY DEVELOPMENT PLANS
hibit 19 -Green
PLN2022-004 Packet Pg. 477
Planning &
Development
Received
09/07/2023
16
28
1 4"ER
10"E
00
N
w
Ln
0
Ln
0
0
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
`♦ `\ �� �� "vim/ \ 3uIVIF1
IM=266.00'
IE W)=250.46' 48
E 250.80' 48"
IE(S 26 08' 8"CO C
SMH
=266. 5'
__ 12
N 8'1" 2T.09'
\�` \ \ \
-2 — — -- - - - - \ I \� �PFED \ c \•,O �/� 1\' / RI 68.4 '
- --_ E �/ / IE(NE)= .04' 12„
F —r\ F F F ° 1 0 �\ �� \ / / IE(SE)=259.
4 \' SILT FENCE (BMP C233)
CITY STD. DTL. ER-900
6„ v_i vv '; -n 8„PE ��6'SI�v � \. o EX. DRIVEWAY TO
ti \ BE USED FOR
CONSTRUCTION ACCESS
2.0'40 ' D i \ ---1 _ C\\\ i' F J \`\ �` \ s \ AND THEN
6 DEC �'' °°, D \\� \ ° c "-RECONSTRUCTED FOR \
' `� �� , vy ' / \ 1 D `:. A PRIMARY ACCESS. v H
x I `\ y CI I V �` 16"DEC ° \\\�\ o�� 0� , RIM- 2.26'
04 r-...—.._.. 7
co SEDIMENTTRAP(WEST) %�- o�_ _-- _- o "CE 1 c IE(NW)=2 58' 12"
N SILT FENCE F R TREE c `\ o
m m (BMP C240) x \
o I F i I INFILTRATE INTO OUTWASH PROTECTION (TYP). „- ` \� \ W \ \ c s
� PER DTL. 11C8 (BMP C103, C233) E�D \\ \ \ �T \ 40
ADD TEMP CHAIN LINK AS r `\ `--------_-__�___a_
x co N `D (SIZED OR 10 YR S 0 M) -- -- / ._� 8 y 2 \
I I \... ' \ \ O \ \
rn I\� \ __ ------ E
N , NECESSARY. I I 1 ----- r--- \�`�.. 8 D 2 12 A I\\�\ � � \
LL-rt EAR_ --- I --IN\� s I- -- ° 0 "A D i0 w v v
OUTLE PRO CTION I _ - -- I CRAWL \ \ �' 41 WJ. �� IO O %
o
'/ •\1 4 - I -C-EY-D\- v- \ ; 0 -\ `---�_=- /L/I/E- D j`-8-_\9 �//_/Oy E� - -Oy--OOO I -O
9
��\\ �\ c
\ \�•
l0 O(BMP 9) SPACE ,
LOWER [DEMO] F 6
Fx OSE 6"MA L- `y 11 �LL p
IIyII O OBLO - O
� STRAW
WATTLE
oDURING
O ROADWAY IMPROVEMENT
n ------- LURK BMP C2 5)r
- — — — — — — ° I -----_ O O PER DTL. 51C8
r. CON
PLUM --°STEP -t4- ---- i 2„CED0 O
[DEMO _----- (5)6MAP O
WEST3ASIN O
1.59 ACRES EE APPLE '- ___ I14
\�
77
-�28" ED \ / O Q' -\.,' 1 / DE /
99 INTERCEPTORSWALE : : .� : .o� ;� �// ASPHALT Ii \ ��CrD /'i l \\I\\ ,... ':r,.. / /�� //`z. > ir.: y 0
9 �\
99 (BMP C200) PER DTL. 2/C8 --�\ ,� / / V A A ' ' / �i----,� \ I ,
/ CED /.' / .,
R PROPOSED STORMTECH INFILTRATION , / , ,� \ \ \ �\ -- / �, O �/1 ' ' 6
- / FOOTPRINT. AFTER REGRADING TO DESIGNED �/ �' "\\ ` ' /' ' ` \ EX. DRIVEWAY T'�
ROCK CHECK DAM / , \\ \ / / 18 CED , \ O l r .....
L / /' `` v 1 FINAL GRADE, AREA SHALL BE PROTECTED WITH ' �� q 2 O BE REMOVED. .y
(BMP C207) / // v I / V ' I CONSTRUCTION
PER DTL. 4/C8 B I R 10 B F� I / / 40 ���2 NOT A CO
\ /. HIGH VISIBILITY ORANGE FENCING. NO HEAVY I � \+---' � --O' ,. \.....�.. , �; f �..�/: ,,- ' ,:.� /./.. `' . ' ;:.:�.. -.... <... -. :
i EQUIPMENT OR STAGING OVER FACILITY. i\\ 20 x 100 \ O O O / / . j911 STABILIZED O O f, i, .. C S.
x / \\ \ \/ / 8 B R i - \ / / CONSTRUCTI O O / /.../y... z ��'`. �...: ' / CONCRETE WASHOUT �
\ I /
/ \ /\\ \�\\ /I \y\ i 18 CED �:.. .. / /...� . .
:_. :: ;
/ I y \ \ \ O 5.; ... ., ....._ ... i....:... If
. .:.-: o.: METAL BASIN
zENTRANCE ..:.. /.i..:
\ a
/,.. .
BMP C15 PER
(BMPC105) i•... )
„ I �` y!- - CITY STD. DTL. ER 900 / / / / r ' rr DTL. 6/C84 P
A D
46"CE \ /',R` \\ \\ / / / i�PARKING AREA
x ��_ \ \�\ // 6 MAP / MAINTAIN EX. POND, I ,% -\ \ DEM THE \ / , �� `/ A G
DECK &PATIO i m ' =' - \\1� ( \`\ / / `% \ 34" D /
STABILIZATION 4
11
INTERCEPTOR SWALE 1
_'''�� CRUSID SURF CIN�
h DEMO TREE (BMP ,° }L I'G'` ,` / / / ;/ / (BMP C200) PER BASE COURSE �\\
�( ) �- h \ \\� �' r-- DTL. 2/C8 (6" MIN. &FPTH)
/ TYP ' ' // I v vv vvvv / °� /
x
--- 40 CFD—r-'�- ° v� [DEMO]
V- GARAGE \\\\a / / /" ROCK CHECK [DEMO /
\ ' \ 414 D 30 CIED\I \ a� / ��,\ (BMP C207) /
OE D \ ,�� �\� 2 . /Eb / '� %''-�'
/ o PER DTL. 41C8 /
/ �\
\uLuK
_ - „ / Z OUTFALL PROTECTION � # A
1 /4' C'E-D " \\ \\ \ \ 3 CED [DEMO] \\ \\ \�' / 9 / ° //— �V rr J \ ' / %'42 CED \ \ \ \ ' / DEMO \ ��'Z ,�4 / 1j (BMP C209) �
\ \ \ BRIQGET- ` PER DTL.31C8 ��� � i . `
3� QED
�\\\\� - `\\ 66"CED ' \\�
1 EC 400D /
xl \\\\ 6 M AP -___ �' \ WALL �\ \ , ___-__--- / / ,�� SEDIMENT TRAP (EAST) /
/ \ o ��
\ � ----' ` ,� .ti`° (BMP C240) //� �� fu.: I
[DEMO] ��,' -*'I _ x / <h INFILTRATE INTO OUTWASH
/ \„ PROPOSED STORMTECH INFILTRATION / '1.
6`\MAP / PER DTL.1/C8 g
FOOTPRINT. AFTER REGRADING TO DESIGNED / , / / SIZED FOR 100YR STORM /
l I / ' ��\ FINAL GRADE, AREA SHALL BE PROTECTED" - J�( )
8"M / HIGH VISIBILITY ORANGE FENCING. NO HEAVY v
EQUIPMENT OR STAGING OVER FACILITY. / \\ / /�' <v�
EAST BASIN /r/
1.52 ACRES
l 26, Ii1 2"CEDI r M \ 'I
2� E�1 i `� I \�� ��\\\I // II p � �}' � r � �\ \\\II \`\�� �I ° 9 /% /i / � ` ••\. /• ��
20 C \\14 Z , it I I / �/
SILT FENCE FOR TREE
99 '/' „ " /' I/ �e----'' ,� /' _,�\ \ ,!� /, , I .. I F—t—\F PROTECTION TYP . /I
FiR(GRANN) 30 CED;` \ `� 6 \ --- - ��- \\ =--- F - \ ( ) I.
\ INTERCEPTOR SWAt / / r
vt BMP C200 PER / / v/ �� - �- `>' (BMP C103, C233) J\
36 CED --- / DTL. /' ADD TEMP CHAIN LINK AS /�'
CI
o 6" ! - J=====-{ ° -_�I / / 38 CIE
NECESSARY. �
9s \\ \~\ \ „ // ' ----- \ y /� , — /L_ __ — — 'R� -- it 99 AP
- �, `\ 30 CED /'/ 1 ----- -t- -__ -� �_ _ _, _ �% /
1 2 MAP �- x / 4fl CE �-.--r y- -7�-- - -L--- --- ' `�' F� F— ----
►------------�------- - - S T F CE (BM C233) \ F F F /
\-\ - f --- - CED / 6 6"MAPe `\ -�LIr� v
CITY STD. DTL. ER 900 X
N 8f8' 2" F- -F- - F -- -F--- - - -
F �-
W` 300.00 T _
3 " E EACH LOT WILL INCLUDE A PRIVATE DRYWELL FOR ROOF AND PLANTER SMH ^
DRAINAINAGE INFILTRATION. DRYWELLS SHALL NOT RECEIVED RIM=271.15' x
SEDIMENT LADEN RUNOFF. DRYWELLS SHALL BE STAKED, FLAGGED & IE(NE)=260.59' 12"
PROTECTED DURING CONSTURCTION. SEAL THE SURFACE GRATE AND IE(SW)=260.73' 12"
INLETS UNTIL THE UPSTREAM DRAINAGE AREA IS STABILIZED.
0 10 20 40
1 inch = 20 ft.
SEDIMENT TRAPS SHALL BE SHALL REMAIN IN PLACE UNTIL CIVIL
INFRASTRUCTURE IS INSTALLED, ACCESS ROADS PAVED AND SITE IS
STABILIZED. THEREON, TESC MEASURES SHALL BE THE
RESPONSIBILITY OF EACH LOT
i
DE 0 -
50"
6"C
LEGEND
E
CLUSTER)
1.t
w
W
E
VU
°
w
Q
o
w
�
E
Q
w
2
0
0
�
Q
3
z
Q
Ld
�
3
o
rl�
uj
z
LO
LO
M►j
,Z
N
'D
N
v J
W
J
�
a,
cD
o
SEEM
c
EXISTING
PROPOSED
PROPERTY LINE
— — -
— — — — —
EASEMENT
GRADING CONTOUR
90.00
+
SPOT ELEVATION
8 W
WATER MAIN
Z
8 S
SEWER MAIN
Q
12" D
STORM DRAIN
U
FIRE HYDRANT
®
WATER METER
U)
N
GATE VALVE
ui
O
SEWER MANHOLE
,�.,,,xx
W
❑
STORM CB
O
0
STORM MANHOLE
— — — E — —
ELECTRICAL LINE
ui
COMMUNICATION LINE
0
BASIN DIVIDER
'
F
FILTER FENCE
STRAW WATTLE
J
O
CB INLET PROTECTION
ROCK ENTRANCE
0
ROCK CHECK DAM
W
OUTLET PROTECTION
Lij
PROTECTIVE FENCING
0
FOR INFILTRATION AREA
EXISTING TREE
(TO REMAIN)
tl
EXISTING TREE
(REMOVE)
p,. DEG
WAsry/ C
v�F RFGISTER� �'
\ c
SS�ONAL ECG 0
.>
8/23/23
M
0
u-
c
G
IL
c
a
0
O�
N=
TT �
Q �
d
C
Z Q`
O
5 0
Q G E
0 vJ a
W 0
0
O Z
LO C c�
3
c
W L
W C:)Wa
a
0
E
a
O
W
Lid
c
O
O
r
a
Z
U
M z
CV z
� O
M
W r^
Lu >J
~ w
0
C2
PRELIMINARY DEVELOPMENT PLANS
hibit 19 -Green
PLN2022-004 Packet Pg. 478
Planning &
Development
Received
09/07/2023
I
o
0
x
z
STORMWATER PER 2019 DOE SWMMWW (LRG. SITE CRITERIA).
FULL INFILTRATION PROPOSED.
INFILTRATION GALLERIES FOR ROADWAY &DRIVEWAYS.
DRYWELLS FOR INDIVIDUAL ROOF /LANDSCAPE INFILTRATION.
"- ROOF AREA /180.00
= 2650 SF
A N L_
0 ( 12' M A P
N
o
N
O
N I
O
M
N
3
I
0
CD
1.t
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA LEGEND
w co
EXISTING PROPOSED 00
SDMH PROPERTY LINE
U
REFER TO MAIN ACCESS DRIVE tiq�� \` �J-� �\ IM=266.00' ----- EASEMENT g
ROADWAY PROFILE ON SHEET C5 �q�� \\.\ ��� \ o `\\ IE W)=250.46' 48� A.C. PAVING �� c- o
\ o \ I E 250.80 48 CONCRETE O N o
\ \ 0 \---sa--- SAWCUT LINE z cn 3
IE(S 26 08' 8"CO C � ¢ � 3
\77777777777, nssr-NEEF� RETAINING WALL h►j s :3 m
\ o \ 100 -100 - GRADING CONTOUR z_ a
ffi
+90.00 90.00 SPOT ELEVATION 4I�j w o
0,
a a \\ \ o \ \ S \ SMH 8„ W w- WATER MAIN v z N
1 \\ \ =266. 5' I
8" S r . 'IN" w Lo rn
\ s SEWER MAIN W J o
EX. TREE TO REMAIN (TYP) c \ \ 12" D 12" DD STORM DRAIN ^ v
30 C \ \\ O�/ FIRE HYDRANT �►I n
N R R'(111 " 7 �1 (1C�' 1 2 \ \ /C�� V\ c�� WATER METER ArW
177OLJ I > �3
v
78
ao W2 8.50 <TRACT B 28000 288 SF DF 279. F L�MON SPAC �4.
'
11 DRIVEWA LOT 160 ROOF
R280 430
2158SF 274.
I
571 SF � / 1 L 1 I �rT ��o / ',�� �'� i
v N I _ I C 8" CPE 15 1.67% 00
� I L 1 0 do 8 \ ROOF AREA n D 8" CPE 20 1.75%
00 ao I I / 1 2228 SF / I z
9% `� N I C2 E 10 • / I ROOF AREA I E 8" CPE 5 5.00%
9i Y I - - - I i ROOF AREA I / / <\ I = 2156 SF I 0
F 2061 SF ❑ I i /
/ � \ STORM STRUCTURE CLEANOUT SCHEDULE Q
- - ❑ J DR (TYP) \ / I I CB CO E TY RIM IE
D --- ----- / elf
PER DTL. 1/C7 \ (3
o f ��� DEPTH= 7-FT (TYP) \ \ / / I 1 TY. 2- 54", SL 271.60 266.60 (24"N,E) V
/ 38 I 2 TY. 2- 54 , SL 271.10 268.20 (8"W)co
-J ---- N
� / R L / o � A P " - 2ss.so (24"s) J
D / ' 6"MAP ® 3 STREAMFILTER CB 271.00 268.25 (8"E) (y) z
CD c PER DTL. 5/C6 CV
"' N 88*38 2 W 300.0 El El
- - - - - --- = 4 TY. 2- 54", SL 273.00 268.75 (8"N) W 00 U)
267.60 (24"W)
SMH INFILTRATION GALLERY #3 - LJJ Lu >
EX. TREE TO REMAIN (TYP) PER DTL. 3/C7 5 TY. 1, SL 272.10 269.00 (8"E,S) �
RIM=271.15' x I Q W
IE(NE)=260.59' 12" BOTTOM EL= 264.75 6 STREAMFILTER CB 272.00 269.25 (8"E) U)
IE(SW)=260.73' 12" I STORMTECH SC-740 CHAMBERS PER DTL. 5/C6 269.25 (8"W)
0 10 20 40
1 inch = 20 ft.
7 TY. 1, GR 272.30 269.60 (8"W)
8 TY. 2- 54", SL 270.30 266.50 (8-NW)
265.35 (24"SW)
9 STREAMFILTER CB 269.50 266.75 (8"SE)
PER DTL. 5/C6
I C3
PRELIMINARY DEVELOPMENT PLANS
hibit 19 -Green
PLN2022-004 Packet Pg. 479
Planning &
Development
Received
09/07/2023
CB #3 - STREAMFILTER CB
1-CARTRIDGE
RIM= 271.00
IE= 268.25 (81)
CB #1
TYPE 2 - 54"0
RIM= 271.60
IE- 266.60 (24"E,N)
d
co
0
N
O
N
M
01
Q
43
0
3
v
J
U
I
3
c
a>
(j
I
n
CV
0
Q
CB #2
TYPE 2 - 54"0
RIM= 271.10
IE= 268.20 (8"W)
IE= 266.60 (24"S)
FINISH GRADE
COMPACTED FILL EL= 271.1 MIN.
L= 269.50
EL= 269.0
DRAINAGE ROCK
EL= 266.50
Q = EL= 266.00
SECTION A -A GEOTEXTILE FABRIC
1"=5'
DESIGN INFILTRATION
RATE = 4 IN/HR
STORMTECH SC-740 CHAMBERS - 15 QTY.
-EDGE OF ROCK
GALLERY`
24" CPE @ 0.0% (TYP) A
DETAIL - INFILTRATION GALLERY #1
SCALE: 1 " = 10'
O
INSPECTION RISER
WITH CAST IRON
FRAME & LID
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
FINISH GRADE
EL= 273.0 MIN.
DESIGN INFILTRATION
RATE = 4 IN/HR !1
1 - � •-� � � •• itr 1 11
51
• 11
STORMTECH SC-740 CHAMBERS - 9
INSPECTION RISER A
rn O ---- --
A 72 0'
EDGE OF ROCK GALLERY
DETAIL - INFILTRATION GALLERY #2
SCALE: 1 " = 10'
NOTE: ALL INFILTRATION FACILITIES SHALL BE EXCAVATED
AND EMBED AT LEAST 2 FEET INTO THE NATIVE,
UNDERGROUND ADVANCE OUTWASH SOILS. GEOTECH
FIELD INSPECTION REQUIRED AT TIME OF INSTALLATION.
�o
32" 32"
I I ♦ JJ / /I
`I/!II/ I ! al\// / lI1I
BAYSAVER
\ \ \ \ \ \ fJJ
\ \ \ \ \ \ \ \ ff
J/,IJrf JI r/rrrJJlr
\\\ \ \\ \ \\,\\\\\\ \,,,
!/rJ IJrr rr Jr rrrl
♦\ \\\I\r\rff\ \ \\\\ \ \\ \t„�
�
r , l,/rrrr rrr ! r
•I J I. +m'v.Aay3rrcr.wm i I / I I
l,rlrr lrrrrr„ //rr,
., / / / ! J I- u'WFl88VSPYClA611F �/ / / s I / /
`// /r/r/r♦/`r JJJ
//r/lr/rr///Jrr/lJ/r
rff rrr Jrl rJrf rr
/ rrr/ J/rr lr,
u
BAYFILTER
III r r
�
�♦�
/
'��
rr
NLET
CB #6 - STORMFILTER
RIM= 272.00
IE= 269.25 (8"E,W)
CB 4
TYPE 2 - 54"0
RIM= 273.00
IE= 268.75 (8"N)
IE= 267.60 (24"W)
0 5 10 20
1 inch = 10 ft.
PLAN VIEW
OUTLET PIPE
AIR RELEASE VALVE
FLOW
CONTROL
ORIFICE
r- INLET
PLATE
FILTER
LEG
\NLET
STREAMFILTERT""
CBF-1
PROJECT
GREENWALK PARK
LOCATION
EDMONDS,WA
WATER QUALITY FLOW
VARIES, 0.023 CFS MAX
DRAINAGE AREA
VARIES
CARTRIDGE DESIGN FLOW RATE
22.5 GPM / CARTRIDGE
# BAYFILTER CARTRIDGES
1
TREATED SEDIMENT CAPACITY
175 LBS
THE BAYFILTER STORMWATER MANAGEMENT SYSTEM IS
A STORMWATER FILTRATION DEVICE DESIGNED TO
REMOVE FINE SEDIMENTS, HEAVY METALS, AND
PHOSPORUS. THE BAYFILTER SYSTEM RELIES ON A
SPIRAL WOUND MEDIA FILTER CARTRIDGE WITH
APPROXIMATELY 45 SQUARE FEET OF FILTRATION AREA -
THE FILTER CARTRIDGES REMOVE POLLUTANTS FROM
RUNOFF BY FILTRATION (INTERCEPTIONIATTACHMENT)
AND ADSORPTION.
4 STREAMFILTER CB
C6 SCALE: N.T.S.
SOLID COVER
DESIGN INFILTRATION
RATE = 4 IN/HR
CB #9 - STORMFILTER
RIM= 269.50
8" CPE
FINISH GRADE
EL= 270.0 MIN.
EL= 268.25
(- EL= 267.75
DRAINAGE ROCK
EL= 265.25
EL= 264.75
GEOTEXTILE FABRIC
STORMTECH SC-740
CHAMBERS - 5 QTY.
""'"r" N RISER
CB #8 43.0'
TYPE 2 - 54"0
RIM= 270.50 A LEDGE OF ROCK GALLERY
IE= 266.50 (8°NW�
IE= 265.35 (24"SW)
DETAIL - INFILTRATION GALLERY #3
SCALE: 1 " = 10'
SECTION A -A
33"
(MIN.)
30x30
SOLID COVER
RIM= PER PLAN
33"
(MIN-)
12"
51.1OUTLET
IE= PER PLAN
OPTIONAL 'DRAIN
INLET DOWN
STUBS
SECTION B-B
1.t
w cc E
0
U
U d
w
0
w � �
Q
2
CO
0
Q
J 3
CD >
z Q
3
Cn o
Ld z yS 0,
CD 2!:N r)
w o
Ln
J 0
o
N
a)
0
C3
a
of WAsy,'��
v� �F�ISTERE� �
�SS�ONAL ��G\ .0
8/23/23
Cn
M
E
0
U-
0
Q
a�
3
E
L
0
E
a
r
a+
O
x
O
w
L
U)
O
W
s
J
�
O
Q
W
I-
U
C�
G
LLJ
�
O
U)
LLI
M
N
(y)
N
Z
O
W
00
W
U)
LL.I
I-
5;
C6
PRELIMINARY DEVELOPMENT PLANS
hibit 19 -Greer
PLN2022-00 Packet Pg. 480
Planning &
Development
Received
09/07/2023
UNDISTURBED
NATIVE VEGETATION
UNDISTURBED NATIVE SOIL
2" ORGANIC MULCH
3" OF COMPOST
INCORPORATED INTO 5" OF
SITE SOIL (TOTAL AMENDED
DEPTH OF 9.5", FOR A
SETTLED DEPTH OF 8")
SUBSOIL SCARIFIED 4" BELOW
COMPOST AMENDED LAYER
(12" BELOW SOIL SURFACE)
2" ORGANIC
MULCH
6" IMPORTED
TOPSOIL MIX
(COMPACTED
DEPTH)
I SUBSO L IS
SCARIFIED 6"
BELOW
IMPORTED
TOPSOIL MIX
UNDISTURBED PLANTS UNDISTURBED TURF (LAWN)
(SEE NOTE 1) AREAS (SEE NOTE 1)
0"
OPTION 1 — NO DISTURBANCE
PLANTING BEDS TURF (LAWN) AREAS
r�
8,.
III, � �'llll'hICW�II�i
UNDISTURBED
TURF/LAWN/LANDSCAPE
UNDISTURBED NATIVE SOIL
STEEP SLOPE NOTE:
AMENDED SOILS SHOULD NOT BE
INSTALLED ON FINISHED SLOPES
EXCEEDING 33%. AREAS EXCEEDING
33% SHALL BE STABILIZED PER THE
ENGINEER/GEOTECH OF RECORD,
GRASS: SEED OR SOD
.75" OF COMPOST INCORPORATED
JTO 6.25" OF SITE SOIL (TOTAL
AMENDED DEPTH OF 9.5", FOR A
;ETTLED DEPTH OF 8")
SUBSOIL SCARIFIED 4" BELOW
COMPOST AMENDED LAYER
(12" BELOW SOIL SURFACE)
OPTION 2 — AMEND IN PLACE OR STOCKPILE AND AMEND
GENERAL NOTES:
PLANTING BEDS TURF (LAWN) AREAS
1- AREAS OF NO DISTURBANCE
SHALL BEAD
GRASS: SEED VEGETATIONFENCED AND SOIL SHALLTING BE
0" OR SOD PROTECTED FROM CONSTRUCTION
I I=1 I H 11—I I I-1 11=1 11=1 I 1=1 11-1 11=1 1-111-111-11 I IMPACTS.
I I —I �l I —
30
I I —III —I I —III —III —I I 1=1 1=1 I —I 1=1 I —I 11=1 I
III—IIL--III-III—III�I�I 1�111=111�1�111=III=III 2. TO MEASURE SETTLED DEPTH,
11=II IA1-111=III=II I-11 1-111=III=III=I II=II lEil I I= 6" IMPORTED WATER SOIL SUFFICIENTLY TO
TOPSOIL MIX FULLY SATURATE WITHOUT
I-T III— I I —I —II I—III—�—III=III—III-11I COMPACTED CAUSING EROSION.
�i-jjTfTTf=�i=
I -1 JIB-if-1Tl-1I-1T(-11I 1I1= =l I = I DEPTH)
II-I.11-11111-III-II_I=1 6" III-111=1 1=III-III=III=11 3. COMPOST SHALL MEET SPEC.
I— I' -1= =7 11= REQUIREMENTS IN THE 2017
, II II Lj- a EDMONDS STORMWATER
I� /�.I II SUBSOIL IS
ADDENDUM CHECKLIST 7).
I�a w�i� I' h��y II SCARIFIED 6" ( )
BELOW 4. COMPACTION OF TOPSOIL (WHERE
/\\//\\f/ \ IMPORTED REQUIRED) TO BE TO 85% (MAX)
12" / /�/�/\ TOPSOIL MIX OF THE MAXIMUM DRY DENSITY
OPTION 3 - IMPORT TOPSOIL PER MODIFIED PROCTOR TEST
(ASTM D1557).
CITY
I POST CONSTRUCTION SOIL
OF EDMONDS
QUALITY AND DEPTH
PUBLIC WORKS
DEPARTMENT
APPROVED BY: R. ENGLISH
REVISION DATE
APRIL 2021
STANDARD
DETAIL
SD-642
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
Manhole. frame, and cover
Slope a1 112 to 1
Filter fabric
314" to 2" washed river rock
Precast drywell base
Notes:
1. Backfill above filter fabric to base of asphalt with crushed
surfacing base course.
2. Size and spacing of drywells determined by drainage analysis.
Typical Infiltration Drywell
Type 2
DSPARTMFIdT C7F
ECOLOGY
Please see httpJAwtw,acywa.gavlcopyrfght.hW for copyright notice including permissions,
State of Washington limilaiion of liability, and disclaimer.
NOTE: DRYWELL SHALL BE EXCAVATED AND EMBED AT
LEAST 2 FEET INTO THE NATIVE, UNDERGROUND ADVANCE
OUTWASH SOILS. GEOTECH FIELD INSPECTION REQUIRED
AT TIME OF INSTALLATION.
DETAIL - DRYWELL
SCALE: N.T.S.
NOT TO SCALE
Revised ,tune 2018
REFER TO EDMONDS STD. DWG. SD-638 FOR
ADDITIONAL INFORMATION.
DRYWELL STRUCTURE TO BE A PEFORATED MH PER
DETAIL ABOVE.
DRYWELLS SHALL BE INSTALLED BY EACH LOT
CONTRACTOR / DEVELOPER.
SEE PLAN DIMENSIONS FOR DRYWELL LOCATIONS
AND CITY STD. PLAN FOR MIN. SETBACKS.
UPON COMPLETION OF DRYWELL, THE DRYWELL
SHALL BE STAKED AND FLAGGED TO AVOID DAMAGE
DURING CONSTRUCTION.
OBSERVATION PIPE MARKING
CENTER OF DRYWELL
48" DIA. (MIN) DRYWELL
4" (MIN) PERFORATED
PVC UNDERDRAIN PIPE
CLEANOUT
TYPE 1 OR 1—L CATCH
BASIN W/ SOLID LID PER
CITY STANDARD DETAIL
SD-303 OR SD-304
I
.......... . ..........
Uj
Z 5'
J,? (MIN) \� /
w
a
0
� (MIN)
4" (MIN) PVC DRAIN PIPE PER WSDOT
SPEC. 9-05.1(5), 1 % (MIN) SLOPE
TEST PLUG IN PLASTIC
BOX MARKED 'DRAIN"
CLEANOUT
12" (MIN)
TOPSOIL
GUTTER
u
5' (MIN)
10' (MIN)
PROPERTY LINE/EASEMENT
PLAN RooF
NTS
ROOF
DOWNSF
4" (MIN) PVC
DRAIN PIPE (TYP)
12" BUILDING
12" 4" (MIN) PVC DRAIN PIPE PER
MIN WSDOT SPEC. 9-05.1(5), POSITIVE
SLOPE
6" (MIN)
GENERAL NOTES:
n
Ol
12" (MIN)
z
COI
J��
4" (MIN)
1. REFER TO THE 2017 CITY OF
�O
PERFORATED PVC
UNDERDRAIN
REMOVABLE
EDMONDS STORMWATER ADDENDUM
FOR SETBACK (CHECKLIST 13) AND
�LJO
PUSH—OTEEN
INFEASIBILITY REQUIREMENTS.
PIPE PER WSDOT
SPEC. 9-05.1(6)
PVC
O
;=
2. MINIMUM COVER DEPTHS ASSUME NO
GEOTEXTILE, SEE NOTE 1
VEHICULAR LOADING. DESIGNER TO
SPECIFY COVER DEPTHS IF
VEHICULAR TRAFFIC ANTICIPATED.
WASHED DRAIN ROCK, 3. PROVIDE 10 FEET (MIN) SPACING
SEE NOTE 2 = BETWEEN DRY WELLS.
- NOTES:
UNCOMPACTED NATIVE
MATERIAL, SCARIFY 3" 1. PLACE GEOTEXTILE FABRIC ALONG WALLS AND TOP OF WASHED
(MIN) ROCK. GEOTEXTILE SHALL CONFORM TO WSDOT SPEC. 9-33.2(1),
1' (MIN) ABOVE SEASONAL GEOTEXTILE FOR SEPARATION, NON —WOVEN TYPE.
HIGH GROUNDWATER TABLE
OR HYDRAULICALLY 2. WASHED DRAIN ROCK SHALL CONFORM TO WSDOT SPEC.
RESTRICTIVE LAYER 9-03.12(5), GRAVEL BACKFILL FOR DRYWELLS.
PROFILE 3. OBSERVATION WELL SHALL CONFORM TO WSDOT SPEC.
NTS 9-05.2(6), PERFORATED PVC UNDERDRAIN PIPE.
"St. 189v
tEN
CITY OF EDMONDS TYPICAL DOWNSPOUT
INFILTRATION DRYWELL
PUBLIC WORKS DEPARTMENT APPROVED BY: R. ENGLISH
NOTE: PROPOSED DRYWELL STRUCTURE PER DTL. VC7
C
1.t
W c0 E
O
U
U d
w
U •�
Q � �
0
W E
Q
Q
J � 3
c7 >
z Q
CK 3
wCn o
z � �
CD o
z N �
W p C"j
J Ln p
O
N
a)
0
L
a
►' " P. ec
o�fi MWAsy,,,,
1 rnIr
Q
LU
0
75
ry
O
F_
cn
lii
__J
I—
W
W
U)
�F�ISTERE�
SS/0NAL ��G •v°-,
5
8/23/23
CO
ke
0
u-
c
ca
0
a.
c
m
CL
0
0
d
O co
N=
O
OD-0 d
-0
Z00
O
G E
0
W Q�
O Z
LO 0
LO
+ �?
O
Wa
a
0a
0
a
a�
w
CU
E
0
w
W
;_
a.
o x
o LU
L
0
E
O
z a
I—
U
w
O
N
� U)C'7 z
N O
00 (n
L L.i 5;
~
0 LU
0�
C7
PRELIMINARY DEVELOPMENT PLANS
hibit 19 -Greer
PLN2022-00 Packet Pg. 481
1.t
Stormwater Pollution Prevention Plan
(SWPPP)
for
GREENWALK PARK
Prepared for:
Fernandez and Barnes LLC
Perm ittee / Owner
Developer
Operator / Contractor
Fernandez & Barnes LLC
Fernandez & Barnes LLC
Fernandez & Barnes LLC
10529 NE 58th Street
10529 NE 58th Street
10529 NE 58th Street
Kirkland, WA 98033
Kirkland, WA 98033
Kirkland, WA 98033
Attn: Steve Barnes
Attn: Steve Barnes
Attn: Steve Barnes
sbarnes@cornerstonearch.com
sbarnes@cornerstonearch.com
sbarnes@cornerstonearch.com
540 + 550 Edmonds Way, Edmonds, WA 98020
Certified Erosion and Sediment Control Lead (CESCL)
Name Organization Contact Phone Number
Not Determined at this time
* Contractor to Complete prior to construction *
SWPPP Prepared By
Name
Organization
Contact Phone Number
Pedro DeGuzman, PE
Terraforma Design Group
(206) 795-9023
SWPPP Preparation Date
August 23, 2023
Project Construction Dates
Activity / Phase
Start Date
End Date
Demo & Construction
4/1 /2024
8/31 /2024
Exhibit 19 - Green
PLN2022-004 Packet Pg. 482
1.t
Table of Contents
Page
List of Acronyms and Abbreviations
1.0
Project Information
2
1.1
Existing Conditions
2
1.2
Proposed Construction Activities
2
2.0
Construction Stormwater Best Management Practices
4
2.1
The 12 Elements
4
2.1.1
Element 1: Preserve Vegetation / Mark Clearing Limits
4
2.1.2
Element 2: Establish Construction Access
4
2.1.3
Element 3: Control Flow Rates
5
2.1.4
Element 4: Install Sediment Controls
5
2.1.5
Element 5: Stabilize Soils
6
2.1.6
Element 6: Protect Slopes
6
2.1.7
Element 7: Protect Drain Inlets
7
2.1.8
Element 8: Stabilize Channels and Outlets
7
2.1.9
Element 9: Control Pollutants
8
2.1.10
Element 10: Control Dewatering
10
2.1.11
Element 11: Maintain BMPs
11
2.1.12
Element 12: Manage the Project
12
2.1.13
Element 13: Project Low Impact Development (LID) BMPs
14
3.0
Pollution Prevention Team
14
4.0
Monitoring and Sampling Requirements
15
4.1
Site Inspection
15
4.2
Stormwater Quality Sampling
15
4.2.1
Turbidity Sampling
15
4.2.2
pH Sampling
17
5.0
Discharge to 303(d) or TMDL Waterbodies (N/A)
18
6.0
Reporting and Record Keeping
19
6.1
Record Keeping
19
6.1.1
Site Log Book
19
6.1.2
Records Retention
19
6.1.3
Updating the SWPPP
19
6.2
Reporting
20
6.2.1
Discharge Monitoring Reports
20
6.2.2
Notification of Noncompliance
20
Appendix A - Site Maps (including TESC Plans)
Appendix B - BMP Details
Appendix C - Correspondence
Appendix D - Site Inspection Form
Appendix E - Construction Stormwater General Permit (CSWGP)
Appendix F - 303(d) List Waterbodies / TDML Waterbodies Info
Appendix G - Contaminated Site Information
Appendix H - Engineering Calculations
Exhibit 19 - Green
PLN2022-004 Packet Pg. 483
1.t
List of Acronyms and Abbreviations
Acronym / Abbreviation Explanation
303(d)
Section of the Clean Water Act pertaining to Impaired Waterbodies
BFO
Bellingham Field Office of the Department of Ecology
BMP(s)
Best Management Practice(s)
CESCL
Certified Erosion and Sediment Control Lead
CO2
Carbon Dioxide
CRO
Central Regional Office of the Department of Ecology
CSWGP
Construction Stormwater General Permit
CWA
Clean Water Act
DMR
Discharge Monitoring Report
DO
Dissolved Oxygen
Ecology
Washington State Department of Ecology
EPA
United States Environmental Protection Agency
ERO
Eastern Regional Office of the Department of Ecology
ERTS
Environmental Report Tracking System
ESC
Erosion and Sediment Control
GUILD
General Use Level Designation
NPDES
National Pollutant Discharge Elimination System
NTU
Nephelometric Turbidity Units
NWRO
Northwest Regional Office of the Department of Ecology
pH
Power of Hydrogen
RCW
Revised Code of Washington
SPCC
Spill Prevention, Control, and Countermeasure
sU
Standard Units
SWMMEW
Stormwater Management Manual for Eastern Washington
SWMMWW
Stormwater Management Manual for Western Washington
SWPPP
Stormwater Pollution Prevention Plan
TESC
Temporary Erosion and Sediment Control
SWRO
Southwest Regional Office of the Department of Ecology
TMDL
Total Maximum Daily Load
VFO
Vancouver Field Office of the Department of Ecology
WAC
Washington Administrative Code
WSDOT
Washington Department of Transportation
WWHM
Western Washington Hydrology Model
Exhibit 19 - Green
PLN2022-004 Packet Pg. 484
1.t
Project Information (1.0)
Project/Site Name: GREENWALK PARK
Street/Location: 540 + 550 Edmonds Way, Edmonds, WA 98020
Receiving waterbody: Groundwater
Existing Conditions (1.1)
Total acreage (including support activities such as off -site equipment staging yards, material
storage areas, borrow areas).
Total acreage: 3.2 ac (total clearing area)
Existing structures: Yes
Landscape topography: rolling
Drainage patterns: sheet drains to south, east and west
Existing Vegetation: 2nd growth forest, grass
Critical Areas (wetlands, streams, high erosion risk, steep or difficult to stabilize slopes)
None
List of known impairments for 303(d) listed or Total Maximum Daily Load (TMDL) for the
receiving waterbody: None
List of suspected and/or known contaminants associated with the construction activity. None
known.
Proposed Construction Activities (1.2)
Description of site development (example: subdivision):
New 16 parcel single family residential plat with associated access roads, drainage,
utilities and landscaping.
Description of construction activities (example: site preparation, demolition, excavation):
Tree removal, clearing, grading, drainage, utilities, road improvements and landscaping.
Individual home construction to be under separate building permits.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 485
1.t
Description of site drainage including flow from and onto adjacent properties. Must be consistent
with Site Map in Appendix A:
The site sheet drains offsite in both the west and south directions. Runoff entering the
site from adjacent properties is minimal.
Description of final stabilization (example: extent of revegetation, paving, landscaping):
Phase 1 — Plat Construction: new access roads, graded and hydroseeded building lots.
Phase 2 — Home Construction: new home construction, walkways, driveway and
landscaping on a lot -by -lot basis.
Contaminated Site Information:
Proposed activities regarding contaminated soils or groundwater (example: on -site treatment
system, authorized sanitary sewer discharge):
No known site contamination. Groundwater not founds at depths of at least 17 feet
(October 2021).
Exhibit 19 - Green
PLN2022-004 Packet Pg. 486
1.t
Construction Stormwater Best Management Practices (BMPs) (2.0)
The SWPPP is a living document reflecting current conditions and changes throughout the life
of the project. These changes may be informal (i.e. hand-written notes and deletions). Update
the SWPPP when the CESCL has noted a deficiency in BMPs or deviation from original design.
The 12 Elements (2.1)
Element 1: Preserve Vegetation / Mark Clearing Limits (2.1.1)
List and describe BMPs: Proposed removal of existing selected trees and ornamental
landscaping.
BMP C101 — Preserving Natural Vegetation
BMP C103 — High Visibility Plastic or Metal Entrance / Exit
Installation Schedules: Tree removal and site clearing at the start of the project.
Use for delineation of permanent infiltration areas (see
Element #13)
Inspection and Maintenance plan: Inspect daily.
Responsible Staff: CESCL
Element 2: Establish Construction Access (2.1.2)
List and describe BMPs: BMP C105 — Stabilized Construction Entrance / Exit
BMP C107 — Construction Road / Parking Area Stabilization
Installation Schedules: Install at start of construction.
Inspection and Maintenance plan: Inspect daily.
Responsible Staff: CESCL
Exhibit 19 - Green
PLN2022-004 Packet Pg. 487
1.t
Element 3: Control Flow Rates (2.1.3)
Will you construct stormwater retention and/or detention facilities?
Yes, three (3) infiltration galleries are proposed for the proposed access roads and
driveway areas. Drywells are proposed for invidual lot roof and landscape areas.
Two sediment traps will be used to infiltrate construction runoff until the site is
stabilized. The ponds will be designed to infiltrate the 100yr storm event based on SBUH
modeling. No outlet is proposed for either trap.
Will you use permanent infiltration ponds or other low impact development (example: rain
gardens, bio-retention, porous pavement) to control flow during construction?
No
List and describe BMPs: BMP 240 — Sediment Trap
Installation Schedules: Install at start of construction.
Inspection and Maintenance plan: Inspect daily.
Responsible Staff: CESCL
Element 4: Install Sediment Controls (2.1.4)
List and describe BMPs: BMP C233 — Silt Fence
BMP C235 — Wattles
BMP C240 — Sediment Trap
Installation Schedules: Install at start of construction.
Inspection and Maintenance plan: Inspect daily.
Responsible Staff: CESCL
Exhibit 19 - Green
PLN2022-004 Packet Pg. 488
1.t
Element 5: Stabilize Soils (2.1.5)
West of the Cascade Mountains Crest
Season
Dates
Number of Days Soils Can
be Left Exposed
During the Dry Season
May 1 — September 30
7 days
During the Wet Season
October 1 — April 30
2 days
Soils must be stabilized at the end of the shift before a holiday or weekend if needed based on
the weather forecast.
Anticipated project dates: Start date: 4/1/2024 End date: 8/31/2024
Will you construct during the wet season?
Yes
List and describe BMPs: BMP C120 — Temporary and Permanent Seeding
BMP C121 — Mulching
BMP C123 — Plastic Covering
BMP C140 — Dust Control
Installation Schedules: To be determined by contractor based on site operations
Inspection and Maintenance plan: Inspect daily.
Responsible Staff: CESCL
Element 6: Protect Slopes (2.1.6)
Will steep slopes be present at the site during construction?
Yes
List and describe BMPs: BMP C200 — Interceptor Swale
BMP C123 — Plastic Covering
Installation Schedules: Install if soil will not be reworked per the Stabilize Soils
exposure time limits as listed above.
Inspection and Maintenance plan: Inspect daily.
Responsible Staff: CESCL
Exhibit 19 - Green
PLN2022-004 Packet Pg. 489
1.t
Element 7: Protect Drain Inlets (2.1.7)
List and describe BMPs: BMP C220 — Inlet Protection
Installation Schedules: Install at start of construction.
Inspection and Maintenance plan: Inspect daily.
Responsible Staff: CESCL
Element 8: Stabilize Channels and Outlets (2.1.8)
Provide stabilization, including armoring material, adequate to prevent erosion of outlets,
adjacent stream banks, slopes, and downstream reaches, will be installed at the outlets of all
conveyance systems.
List and describe BMPs: BMP C207 — Check Dams
BMP C209 — Outlet Protection
Installation Schedules: Install at start of construction.
Inspection and Maintenance plan: Inspect daily
Responsible Staff: CESCL
Exhibit 19 - Green
PLN2022-004 Packet Pg. 490
1.t
Element 9: Control Pollutants (2.1.9)
The following pollutants are anticipated to be present on -site:
Table 2 — Pollutants
Pollutant (and source, if applicable)
Gasoline / diesel
Paint thinner
Cleaning Agents
Concrete placement, concrete cutting / demolition
List and describe BMPs: BMP C151 — Concrete Handling
BMP C152 — Sawcutting and Surface Pollution Prevention
BMP C153 — Material Delivery, Storage, and Containment
BMP C154 — Concrete Washout Area
Installation Schedules: Install at start of construction.
Inspection and Maintenance plan: Inspect daily.
Responsible Staff: CESCL
Will maintenance, fueling, and/or repair of heavy equipment and vehicles occur on -site?
Yes
Onsite maintenance, fueling or repair shall only occur over a contained matt or structure
to ensure any capture of contaiminants.
Will wheel wash or tire bath system BMPs be used during construction?
No
Will pH -modifying sources be present on -site?
Yes If yes, check the source(s).
Table 3 — pH -Modifying Sources
None
Exhibit 19 - Green
PLN2022-004 Packet Pg. 491
1.t
x
Bulk cement
Cement kiln dust
Fly ash
Other cementitious materials
New concrete washing or curing waters
Waste streams generated from concrete grinding and sawing
Exposed aggregate processes
x
Dewatering concrete vaults
x
Concrete pumping and mixer washout waters
Recycled concrete
Other (i.e. calcium lignosulfate) [please describe]
List and describe BMPs: BMP C154 — Concrete Washout Area
Installation Schedules: Implement when concrete poured
Inspection and Maintenance plan: Inspect Daily.
Responsible Staff: CESCL
Concrete trucks must not be washed out onto the ground, or into storm drains, open ditches,
streets, or streams. Excess concrete must not be dumped on -site, except in designated
concrete washout areas with appropriate BMPs installed.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 492
1.t
Element 10: Control Dewatering (2.1.10)
Water from foundations, vaults, and trenches with characteristics similar to stormwater runoff
shall be discharged into a controlled conveyance system before discharging to a sediment trap
or sediment pond. Clean dewatering water will not be routed through stormwater sediment
ponds.
Only clean, non -turbid dewatering water (such as well -point groundwater) may be discharged to
systems tributary to, or directly into, surface waters of the State, provided the dewatering flow
does not cause erosion or flooding of receiving waters.
Note: groundwater water not found to depths of at least 17 feet (Oct. 2021). We do not expect
any significant groundwater issues.
List and describe BMPs: Not applicable.
Installation Schedules: Not applicable.
Inspection and Maintenance plan: Not applicable.
Responsible Staff: Not applicable.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 493
1.t
Element 11: Maintain BMPs (2.1.11)
All temporary and permanent Erosion and Sediment Control (ESC) BMPs shall be maintained
and repaired as needed to ensure continued performance of their intended function.
Maintenance and repair shall be conducted in accordance with each particular BMP
specification (see Volume 11 of the 2019 SWMMWW).
Visual monitoring of all BMPs installed at the site will be conducted at least once every calendar
week and within 24 hours of any stormwater or non-stormwater discharge from the site. If the
site becomes inactive and is temporarily stabilized, the inspection frequency may be reduced to
once every calendar month.
All temporary ESC BMPs shall be removed within 30 days after final site stabilization is
achieved or after the temporary BMPs are no longer needed.
Trapped sediment shall be stabilized on -site or removed. Disturbed soil resulting from removal
of either BMPs or vegetation shall be permanently stabilized.
Additionally, protection must be provided for all BMPs installed for the permanent control of
stormwater from sediment and compaction. BMPs that are to remain in place following
completion of construction shall be examined and restored to full operating condition. If
sediment enters these BMPs during construction, the sediment shall be removed and the facility
shall be returned to conditions specified in the construction documents.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 494
1.t
Element 12: Manage the Project (2.1.12)
The project will be managed based on the following principles:
• Projects will be phased to the maximum extent practicable and seasonal work limitations
will be taken into account.
Inspection and monitoring:
o Inspection, maintenance and repair of all BMPs will occur as needed to ensure
performance of their intended function.
o Site inspections and monitoring will be conducted in accordance with Special
Condition S4 of the CSWGP. Sampling locations are indicated on the Site Map.
Sampling station(s) are located in accordance with applicable requirements of
the CSWGP.
• Maintain an updated SWPPP.
o The SWPPP will be updated, maintained, and implemented in accordance with
Special Conditions S3, S4, and S9 of the CSWGP.
As site work progresses the SWPPP will be modified routinely to reflect changing site
conditions. The SWPPP will be reviewed monthly to ensure the content is current.
Table 5 — Management
X
Design the project to fit the existing topography, soils, and drainage patterns
X
Emphasize erosion control rather than sediment control
X
Minimize the extent and duration of the area exposed
X
Keep runoff velocities low
X
Retain sediment on -site
X
Thoroughly monitor site and maintain all ESC measures
X
Schedule major earthwork during the dry season
Other (please describe)
Exhibit 19 - Green
PLN2022-004 Packet Pg. 495
1.t
Optional: Fill out Table 6 by listing the BMP associated with specific construction activities.
Identify the phase of the project (if applicable). To increase awareness of seasonal
requirements, indicate if the activity falls within the wet or dry season.
Table 6 — BMP Implementation Schedule
Phase of Construction
Project
Stormwater BMPs
Date
Wet/Dry
Season
[Insert construction
activity]
[Insert BMP]
[MM/DD/YYYY]
[Insert
Season]
Exhibit 19 - Green
PLN2022-004 Packet Pg. 496
1.t
Element 13: Protect Low Impact Development (LID) BMPs (2.1.13)
The proposed project includes the following Low Impact Development measures:
• Infiltration galleryies and drywell
• post construction soil amendment
Permittees must keep all heavy equipment off existing soils under LID facilities that have been
excavated to final grade to retain the infiltration rate of the soils.
Permittees must control erosion and avoid introducing sediment from the construction site into
the bioretention cells. All site runoff shall be diverted around the bioretention cells until the
bioretention facilities are fully constructed and plantings established.
Upon installation of Post -Construction Soil Amendment, the contractor shall ensure that such
areas are protected from machine compaction or construction sedimentation.
Pollution Prevention Team (3.0)
Table 7 — Team Information
Title
Names
Phone Number
Certified Erosion and
Sediment Control Lead
(CESCL)
Fernandez & Barnes LLC
(CESCL not chosen yet)
(206) 550-9296
Resident Engineer
Pedro DeGuzman, PE
(206) 795-9023
Emergency Ecology
Contact
Emergency Permittee/
Owner Contact
Steve Barnes
(206) 550-9296
Non -Emergency Owner
Contact
Steve Barnes
(206) 550-9296
Monitoring Personnel
Ecology Regional Office
Exhibit 19 - Green
PLN2022-004 Packet Pg. 497
1.t
Monitoring and Sampling Requirements (4.0)
Monitoring includes visual inspection, sampling for water quality parameters of concern, and
documentation of the inspection and sampling findings in a site log book. A site log book will be
maintained for all on -site construction activities and will include:
• A record of the implementation of the SWPPP and other permit requirements
• Site inspections
• Stormwater sampling data
Blank form filed under Appendix D.
The site log book must be maintained on -site within reasonable access to the site and be made
available upon request to Ecology or the local jurisdiction.
Site Inspection (4.1)
Site inspections will be conducted at least once every calendar week and within 24 hours
following any discharge from the site. For sites that are temporarily stabilized and inactive, the
required frequency is reduced to once per calendar month.
Stormwater Quality Sampling (4.2)
Turbidity Sampling (4.2.1)
Requirements include calibrated turbidity meter or transparency tube to sample site discharges
for compliance with the CSWGP. Sampling will be conducted at all discharge points at least
once per calendar week.
Not Applicable — no proposed stormwater discharge from the site. Construction runoff
shall infiltrate via infiltration sediment traps.
Method for sampling turbidity:
Table 8 — Turbidity Sampling Method
Turbidity Meter/Turbidimeter (required for disturbances 5 acres or greater in size)
X
Transparency Tube (option for disturbances less than 1 acre and up to 5 acres in size)
The benchmark for turbidity value is 25 nephelometric turbidity units (NTU) and a transparency
less than 33 centimeters.
If the discharge's turbidity is 26 to 249 NTU or the transparency is less than 33 cm but equal to
or greater than 6 cm, the following steps will be conducted:
Exhibit 19 - Green
PLN2022-004 Packet Pg. 498
1.t
1. Review the SWPPP for compliance with Special Condition S9. Make appropriate
revisions within 7 days of the date the discharge exceeded the benchmark.
2. Immediately begin the process to fully implement and maintain appropriate source
control and/or treatment BMPs as soon as possible. Address the problems within 10
days of the date the discharge exceeded the benchmark. If installation of necessary
treatment BMPs is not feasible within 10 days, Ecology may approve additional time
when the Permittee requests an extension within the initial 10-day response period.
3. Document BMP implementation and maintenance in the site log book.
If the turbidity exceeds 250 NTU or the transparency is 6 cm or less at any time, the following
steps will be conducted:
1. Telephone or submit an electronic report to the applicable Ecology Region's
Environmental Report Tracking System (ERTS) within 24 hours.
https://www.ecology.wa.gov/About-us/Get-involved/Report-an-environmental-issue
• Central Region (Benton, Chelan, Douglas, Kittitas, Klickitat, Okanogan, Yakima):
(509) 575-2490
• Eastern Region (Adams, Asotin, Columbia, Ferry, Franklin, Garfield, Grant,
Lincoln, Pend Oreille, Spokane, Stevens, Walla Walla, Whitman): (509) 329-3400
• Northwest Region (King, Kitsap, Island, San Juan, Skagit, Snohomish,
Whatcom): (425) 649-7000
• Southwest Region (Clallam, Clark, Cowlitz, Grays Harbor, Jefferson, Lewis,
Mason, Pacific, Pierce, Skamania, Thurston, Wahkiakum,): (360) 407-6300
2. Immediately begin the process to fully implement and maintain appropriate source
control and/or treatment BMPs as soon as possible. Address the problems within 10
days of the date the discharge exceeded the benchmark. If installation of necessary
treatment BMPs is not feasible within 10 days, Ecology may approve additional time
when the Permittee requests an extension within the initial 10-day response period
3. Document BMP implementation and maintenance in the site log book.
4. Continue to sample discharges daily until one of the following is true:
• Turbidity is 25 NTU (or lower).
• Transparency is 33 cm (or greater).
• Compliance with the water quality limit for turbidity is achieved.
0 1 - 5 NTU over background turbidity, if background is less than 50 NTU
0 1 % - 10% over background turbidity, if background is 50 NTU or greater
• The discharge stops or is eliminated.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 499
1.t
pH Sampling (4.2.2)
pH monitoring is required for "Significant concrete work" (i.e. greater than 1000 cubic yards
poured concrete or recycled concrete over the life of the project).The use of engineered soils
(soil amendments including but not limited to Portland cement -treated base [CTB], cement kiln
dust [CKD] or fly ash) also requires pH monitoring.
The project does not qualify as Significant Concrete Work.
For significant concrete work, pH sampling will start the first day concrete is poured and
continue until it is cured, typically three (3) weeks after the last pour.
For engineered soils and recycled concrete, pH sampling begins when engineered soils or
recycled concrete are first exposed to precipitation and continues until the area is fully
stabilized.
If the measured pH is 8.5 or greater, the following measures will be taken:
1. Prevent high pH water from entering storm sewer systems or surface water.
2. Adjust or neutralize the high pH water to the range of 6.5 to 8.5 su using appropriate
technology such as carbon dioxide (CO2) sparging (liquid or dry ice).
3. Written approval will be obtained from Ecology prior to the use of chemical treatment
other than CO2 sparging or dry ice.
Method for sampling pH:
Table 8 — pH Sampling Method
H meter
x
pH test kit
Wide range pH indicator paper
Exhibit 19 - Green
PLN2022-004 Packet Pg. 500
1.t
Discharges to 303(d) or Total Maximum Daily Load (TMDL)
Waterbodies (5.0)
Reporting and Record Keeping (6.0)
Record Keeping (6.1)
Site Log Book (6.1.1)
A site log book will be maintained for all on -site construction activities and will include:
• A record of the implementation of the SWPPP and other permit requirements
• Site inspections
• Sample logs
Records Retention (6.1.2)
Records will be retained during the life of the project and for a minimum of three (3) years
following the termination of permit coverage in accordance with Special Condition S5.0 of the
CSWGP.
Permit documentation to be retained on -site:
• CSWGP
• Permit Coverage Letter
• SWPPP
• Site Log Book
Permit documentation will be provided within 14 days of receipt of a written request from
Ecology. A copy of the SWPPP or access to the SWPPP will be provided to the public when
requested in writing in accordance with Special Condition S5.G.2.b of the CSWGP.
Updating the SWPPP (6.1.3)
The SWPPP will be modified if:
• Found ineffective in eliminating or significantly minimizing pollutants in stormwater
discharges from the site.
• There is a change in design, construction, operation, or maintenance at the construction
site that has, or could have, a significant effect on the discharge of pollutants to waters
of the State.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 501
1.t
The SWPPP will be modified within seven (7) days if inspection(s) or investigation(s) determine
additional or modified BMPs are necessary for compliance. An updated timeline for BMP
implementation will be prepared.
Reporting (6.2)
Discharge Monitoring Reports (6.2.1)
Per review with the Department of Ecology, since the site will fully retain all site construction
runoff, a Department of Ecology Construction Stormwater General Permit will not be required.
Disharge Monitoring Reports are not required unless a discharge occurs offsite; any discharge
shall be reported to the Engineer and the Pierce County inspector.
Notification of Noncompliance (6.2.2)
If any of the terms and conditions of the permit is not met, and the resulting noncompliance may
cause a threat to human health or the environment, the following actions will be taken:
1. Ecology will be notified within 24-hours of the failure to comply by calling the applicable
Regional office ERTS phone number (Regional office numbers listed below).
2. Immediate action will be taken to prevent the discharge/pollution or otherwise stop or
correct the noncompliance. If applicable, sampling and analysis of any noncompliance
will be repeated immediately and the results submitted to Ecology within five (5) days of
becoming aware of the violation.
3. A detailed written report describing the noncompliance will be submitted to Ecology
within five (5) days, unless requested earlier by Ecology.
Anytime turbidity sampling indicates turbidity is 250 NTUs or greater, or water transparency is 6
cm or less, the Ecology Regional office will be notified by phone within 24 hours of analysis as
required by Special Condition S5.A of the CSWGP.
• Central Region at (509) 575-2490 for Benton, Chelan, Douglas, Kittitas, Klickitat,
Okanogan, or Yakima County
• Eastern Region at (509) 329-3400 for Adams, Asotin, Columbia, Ferry, Franklin,
Garfield, Grant, Lincoln, Pend Oreille, Spokane, Stevens, Walla Walla, or Whitman
County
• Northwest Region at (425) 649-7000 for Island, King, Kitsap, San Juan, Skagit,
Snohomish, or Whatcom County
• Southwest Region at (360) 407-6300 for Clallam, Clark, Cowlitz, Grays Harbor,
Jefferson, Lewis, Mason, Pacific, Pierce, Skamania, Thurston, or Wahkiakum
Include the following information:
Exhibit 19 - Green
PLN2022-004 Packet Pg. 502
1.t
1. Your name and / Phone number
2. Permit number
3. City / County of project
4. Sample results
5. Date / Time of call
6. Date / Time of sample
7. Project name
In accordance with Special Condition S4.D.5.b of the CSWGP, the Ecology Regional office will
be notified if chemical treatment other than CO2 sparging is planned for adjustment of high pH
water.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 503
1.t
Appendix/Glossary
A. Site Maps & TESC Plans
Exhibit 19 - Green
PLN2022-004 Packet Pg. 504
1.t
E , cs Mein StF4%�,
atch
you
w OSauna Hut Edmonds wnwr .
Sc.Onda Match
EdmotWs
k City Park "
� N
N
1n_
s1C ^— es AA, 3y
�.o✓�hay �... .c_�l <
S a
2267H St. SW g r
2260 A sov e -
f
Edmc - Q ;.E T a-- 228TH ST. SW
v \.
a a' PCC Con munit
Markets ��m—'�
SHERWOOD
FOREST I
a
Madrona K"8 School
s
4
Aquarium Co cp O
Kruckeb
Botanic Garden
VICINITY MAP
SCALE: N.T.S.
540 & 550 Edmonds Way, Edmonds, WA 98020
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E
W.M. Snohomish County
TJ MaxxO
21411h Sr sw
".i
Exhibit 19 - Green
PLN2022-004 Packet Pg. 505
16
28
1 4"ER
Ln
0
1-0
0
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
IE W)=250.46' 48
I E 250.80' 48"
�J' s\ IE(S 26 08' 8"CO C
SMH
=266. 5'
'Co12 1 \
__ __ N 8'1" 2T.09'
\�` \ \ \
7, ,_---- _2 — — -- - - - - \ I \� �PFED \ � \•,O1\' / RI 68.4 '
CE--D - - --_ C E \ ..� `�/ / IE(NE)- .04' 12„
F -r \ F F F ° 10 �\ �� / / IE(SE)=259.
1 4 \' SILT FENCE (BMP C233)
/ PR CITY STD. DTL. ER-900
E7, v_i vv '; ..r.t 8„EE �����6'SI�v � \. o EX. DRIVEWAY TO
ti \ BE USED FOR
� FI F F F F F `� CONSTRUCTION ACCESS I \ /% �Q ' Q � 1 0 \ \`� "\ \ G �
2.0'40 ' D i \\ --- _ C\ \ 'i/ F „ J \`\ �` \ s \ AND THEN
6 DEC �'' °°, D \\� \ ° "-RECONSTRUCTED FOR
' `� , �`:. A PRIMARY ACCESS. H
x � I \\ \`\ y yl i \/ �` 16"DO ° \\\�\ o�� 0 �� , RIM- 2.26'
m Cq r...—.._.. 7
Um co SEDIMENT TRAP (WEST) %�- o�_ _-- ___- o "CE ? c IE(NW)=2 58' 1?
3:1 U-' N "' SILT FENCE F R TREE `\ o
m m (BMP C240) x
o I i I INFILTRATE INTO OUTWASH PROTECTION (TYP). - - „-
PER DTL. 11C8 (BMP C103, C233) E�,\ \\
ADD TEMP CHAIN LINK AS r � `\ `\---------_�___a_
x Co N `D (SIZED OR 10 YR S 0 M) -- -- / .-� 8 y 2 \
I I \... \ \ O \ \
N , NECESSARY. I I 1 ----- r--- \�`��.. 8 D 2 12 A
LL_rt EAR_ --- I --� s I- -- ° D "A D i0 w v v
o OUTLE PRO CTION I _ - i-- I CRAWLX
\ �' 41 W �� ly O %
(BMP 9) PE DTL.- C I v\ ,. I ..II D _ I O O /o
LOWER SPACE 9Q9
I I 1 [DEMO] \ i � \F
x ii i\ ACCESS l'I
I - - J
SE6"M A L� �\/ F // O 1 y �O " I° _`\7� �� �\
v it rt f III I� u / p G
BLO - O O OI O y
O STRAW WATTLE DURING
OOO'-011 O
o
�\c ROADW
AY
IMPROVEMENT
VEMENTL ��-
---------- -- I---c WORK C235)48"C12 -----_ PER DTL. 51C8
-1 LlO
_4 li ° PLUM CON
STEP +-- .4 O O 2„CED
OASIN EMO (5)6MAP ------ WES
\
99 E E
111 'APPLE P E� 59 ACRES
' 1.
\ r--- 1 4„ CED\ , LIED - - O y
---° - - - - \ - ' _�_ T`may I
/28 ED
INTERCEPTOR WALE L HALT I ^ Or / • 9 � � ;;�
(BMP C200) PER DTL. 21C8 /'/ / \\ i i /----\` CED
v / ��
R PROPOSED STORMTECH INFILTRATION , r , ,� \ \ \ - �, O / �� _ '. ' 6
- - / FOOTPRINT. AFTER REGRADING TO DESIGNED �' �' "\ ` ' /' ' ` \ / / is + : `/ .: EX. DRIVEWAY T�
ROCK CHECK DAM / / / 18 CED , \ O :. ,
FINAL GRADE, AREA SHALL BE PROTECTED WITH �_ ;; j vv /' 2 O BE REMOVED. .y
(BMP C207) / ,,r----,..:.�._ �.,, ... / r _ . .. ,
PER DTL. 41C8 i �' B R 10"B �` 1 /. r HIGH VISIBILITY ORANGE FENCING. NO HEAVY / 40 ��� I - O /.:`.;
NOT A CONSTRUCTION 8
/ EQUIPMENT OR STAGING OVER FACILITY. /20'O O O / ,...:: C S.
/ \ , STABILIZED -
/ 1 8 CED / i O/.. / CONCRETE WASHOUT
8 BI R /, CONSTRUCTI O l:." y :::.! .';_. i,.' .::::; f���\,..... �\: `
y _ y �/ �, z�j1 Z \ �/ / i ENTRANCE / �, .- r . `� /� METAL BASIN
3p CEC_ BMP C105 /f : / >.. i.' 1 (BMP C154) PER
�� , / -II m yam\ ( ) / / ��� / / / DTL.6/C8 ev
2„E '� .a i �' ---- CITY STD. DTL. ER-900 /
--n-7 D I I �o �t / / / ; /�� / /r / (CLUSTER)
46 C E v y �/ �� I �_ t DEM THE _v / / PARKING AREA k
x ,L /i �\\ ' T / . , MAINTAIN EX. POND, I Z t t \ i t
6 MAP I ,-t t / G---�
DECK &PATIO ( / / `/ ' \\
34"D / STABILIZATION o
40 DE 0 -
- INTERCEPTOR SWALE 1 "
CRUSID SURF CING 50 E
` DEMO TREE v ,� � / / / /' v / BMP C200 PER �J
�` � / ( ) y1 BASE COURSE
� I � I tv� vtat i o� � 1
( ) �- h t DTL. 2/C8 1
/ TYP � ;� / � , , \tt / r r/ G
' '-- - // — 6 MIN. B�PTH
x -- 40 C�Dt [DEMO] Ott ,/ /, „� r
1----x �- tt GARAGE \t / / . [DEMO r 6 C `L
-/ / v� v vv „ v `v t� ��� / /� / /� Cx�D //' ROCK CHECK
\ / t \ / \
414D 30 CED\I a \\�t / �, I //`/� / „O \ (BMP C207) /
38\�ED —I-- - 'tom 2 � El� / �'�-�_, / o - PER DTL.
\ ,\ r LEGEND
/ _ I / \ `'/ f. ate �/ T\\/ �/ /
/ \ \ OUTFALL PROTECTION # rr
r \ \ CAE _
\ / t-'
\ 1 CQ�i 42"CED \\ ` 3 QED/ [DEMO] tt t t �'��� '.�/ �`�� �T- BMPC209 \\\ ``
1 i , ` ` t t� - ; J' - ° / ( ) �1 /r ''I� EXISTING PROPOSED
\ / \ B R I Q G E , / �\� _ / / t y Z (l/°\ ` PER DTL. 31C8 PROPERTY LINE
\ \3u"
> \ EASEMENT
- 1 EC \ 66"CED 400D GRADING CONTOUR
\ 6 MAP --- �' ` WALL cC t-, - -_--- �- / D. ' 90.00
x v t �� t x / ,� SEDIMENT TRAP EAST / /��� r +
,� ( ) SPOT ELEVATION
`\ t [DEMO] y -n _ _ `� (BMPC240) �� `�,\ arY 8" W WATER MAIN
2'oB R ��� PROPOSED STORMTECH INFILTRATION / �/ / ��� INFILTRATE INTO OUTWASH /,�, a
6 `\MAP / PER DTL. 1/C8 g SEWER MAIN
FOOTPRINT. AFTER REGRADING TO DESIGNED / , / DJ F / SIZED FOR 100YR STORM
l I / ' ��\ FINAL GRADE, AREA SHALL BE PROTECTED WITH - ( ) 2 C STORM DRAIN
--7� �, A 8"M / HIGH VISIBILITY ORANGE FENCING. NO HEAVY v
\ / 5k Q -3 � U FIRE HYDRANT
`� � ---+, '- \ / `\ t � t / �4 ' ���� , EQUIPMENT OR STAGING OVER FACILITY. / / \ / /'�' <z�
/ 12 M _- „ ` `\. \� \ a\, ` EAST BASIN / / / ® WATER METER
1.52ACRES r' �'�VQ D4 GATE VALVE
cl
I/ 12 C E D I
`2� •'� /// I -�' _-_//� �`�O� � �\.
�
i
�O❑❑ SEWER MANHOLE
k STORM CB
L2E1 /1'0 ED2yC STORM MANHOLE14'i ED
1
i % ` / �` / \ i/ /' i i� SILT FENCE FOR TREE
---\ / � _ _ \ \ 1j ,� , , ELECTRICAL LINE
77 , I/ � i� \ �1 6 \"�;---'- --��-;' i � ' \ \ u ,, I ___- I F�F / - � PROTECTION (TYP). �
\ \ �- INTERCEPTOR SW / , r
EiR(CRAN�) 30 CED 1 o �/ / `,2 y BMPC103, C233 I I --- T -- COMMUNICATION LINE
F� F ' F o o�i`o 14 LFdL 1 /" (BMPC200)PER �/ / Co / v/ _ ( ) �4J
36 CED --- R N i° i /' (BMP C8 ADD TEMP CHAIN LINK ASliI /�/ _ _ = BASIN DIVIDER
DTL' / 1 D / \
"LfL 6" / - L-------� - / -� / % \ / NECESSARY. I� /� F FILTER FENCE
--- � / , 38 CE I __-__\ �'/
u \ �/' \ / °9 ice'-_ " _t- __- L-���- -f -/- _ -ti'- _ / / R - / \�-- `\ " A P - LY
12 MAP �,,; 30CED 1 --- 4fl CE __ -- -\_ -ti- _r y- --- - --- -L F� F --__ STRAW WATTLE
�\ _ 7 /
S T F CE (BM C233) \ F F F
- E D / E 6 M A P� `\ -� � I r� i n i i v 0 CB INLET PROTECTION
CITY STD. DTL. ER-900 _ _ _
�_ --------------- ROCK ENTRANCE
F- F- F I - F F
N 8 /38' 2,7 W� 300.00
\ T ROCK CHECK DAM
\ i _—_--
3 " E EACH LOT WILL INCLUDE A PRIVATE DRYWELL FOR ROOF AND PLANTER SMH '
DRAINAINAGE INFILTRATION. DRYWELLS SHALL NOT RECEIVED RIM=271.15' x OUTLET PROTECTION
SEDIMENT LADEN RUNOFF. DRYWELLS SHALL BE STAKED, FLAGGED & IE(NE)=260.59' 12"
PROTECTED DURING CONSTURCTION. SEAL THE SURFACE GRATE AND IE(SW)=260.73' 12"
INLETS UNTIL THE UPSTREAM DRAINAGE AREA IS STABILIZED.
0 10 20 40
1 inch = 20 ft.
SEDIMENT TRAPS SHALL BE SHALL REMAIN IN PLACE UNTIL CIVIL
INFRASTRUCTURE IS INSTALLED, ACCESS ROADS PAVED AND SITE IS
STABILIZED. THEREON, TESC MEASURES SHALL BE THE
RESPONSIBILITY OF EACH LOT
PROTECTIVE FENCING
FOR INFILTRATION AREA
1.t
wcO
CKr)a
E
V
~
erg_
°°
U
a
w
Q
o
w
<
O
2
o
0
0
�
Q
3
z
Q
Ld
C/)
3
o
rl�
LLJ
z
y3
�
M►j
,Z
N
o
N
W v J
J
L
a,
co
o
SEEM
qw
c
p,. DEG
2
v�F RF�ISTER� �'
\ c
SS�ONAL ECG 'N
>
8/23/23
m
0
U-
c
G
f�
E
a
O
w
Q
O
m
E
J
�
0
O
Z
r
a
w
W
OLu
G
�
0
W
N
�
CM
z
�
N
O
00
W
LLI
W
>
0
o EXISTING TREE
(TO REMAIN)
tl
EXISTING TREE
(REMOVE) C2
PRELIMINARY DEVELOPMENT PLANS
hibit 19 -Green
PLN2022-004 Packet Pg. 506
2" x 2" WOOD/STEEL
FILTER FABRIC SECURED
TO 2" x 2- 14 GA
WIRE FABRIC EQUAL
NATIVE BACKFILL MATERIAL
8"
FILTER FABRIC MATERIAL IN CONTINOUS ROLLS
USE STAPLES OR WIRE RINGS TO ATTACH
FABRIC TO WIRE
2" x 2" WOOD/STEEL POSTS--`
WIRE MESH FENCE
TO SUPPORT FILTER
FABRIC
BURY BOTTOM OF FILTER
MATERIAL 8" TO 12"
6' MAX
NOTES:
1. CONTRACTOR/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER
EROSION CONTROL THROUGHOUT PROJECT.
2. SILT FENCE TO BE PLACED DOWNSLrOPE OF CONSTRUCTION
ACTIVITY.
CITY OF EDMONDS
PUBLIC WORKS
DEPARTMENT
CITY INSPECTION REQUIRED ON
ALL EROSION CONTROL METHODS
BEFORE OTHER WORK CAN BEGIN
REVISION DATE
FILTER FABRIC FENCE JANUARY 2018
FILTRATION SYSTEMS
STANDARD
DETAIL
��
APPROVED BY: R. ENGLISH ER —
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
a
TH
IN
DE FULL WIDTH
DRESS/EGRESS
DETAIL NOTES:
THE MINIMUM LENGTH SHALL BE EXTENDED AS NECESSARY TO ENSURE MATERIAL IS NOT TRACKED OFF SITE
AND/OR INTO THE PUBLIC RIGHT-OF-WAY.
ATB DRIVEWAY RAMP AND/OR SITE ACCESS ROAD 15' WIDE MIN. SEE TABLE BELOW FOR REQUIRED LENGTH.
NOTES:
1. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED
ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 51 SLOPES WILL BE PERMITTED.
2. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING
Of SEDIMENT OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH
ADDITIONAL QUARRY SPALLS AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO
TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED OFF SITE AND/OR ONTO PUBLIC
RIGHT-OF-WAY MUST BE REMOVED IMMEDIATELY.
3. WHEELS SHALL 6E CLEANED TO REMOVE SEDIMENT PRIOR TO LEAVING, THE SfTE. WHEN WASHING IS USED. IT SHALL
BE DONE ON AN AREA STABILIZED WITH QUARRY SPALLS AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING
DEVICE,
4. INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN,
MAINTENANCE STANDARDS `-
1. THE KEY TO HAVING A FUNCTIONAL SEDIMENT TRAP IS CONTINUAL MONITORING AND REGULAR MAINTENANCE. THE SIZE OF
THE TRAP IS LESS IMPORTANT TO ITS EFFECTIVENESS THAN IS REGULAR SEDIMENT REMOVAL. SEDIMENT SHOULD BE REMOVED
FROM THE TRAP WHEN IT REACHES APPROXIMATELY ONE FOOT IN DEPTH (ASSUMING A 1 1/2 SEDIMENT ACCUMULATION DEPTH).
REGULAR INSPECTIONS SHOULD BE DONE AND ADDITIONAL INSPECTIONS MADE AFTER EACH LARGE RUNOFF -PRODUCING STORM.
2. ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED AND REPAIRED AS
NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL MAINTENANCE AND REPAIR SHALL BE
CONDUCTED IN ACCORDANCE WITH AN APPROVED MANUAL. REPAIR ANY DAMAGE OR EROSION WITHIN SIDESLOPES AS
NECESSARY.
3. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE
STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY BMPS ARE NO LONGER NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED
OR STABILIZED ON SITE. DISTURBED SOIL AREAS RESULTING FROM REMOVAL SHALL BE PERMANENTLY STABILIZED.
MAX. WATER SURFACE
2.1 MAX
ABOVE
FREEBOARD
OUTFALL PROTECTION
PER PLAN & DTL. 3/C8
(100YR STORM)
1.0' FREEBOARD[
TOP EL= PER PLAN
SWALE =I! I1 j 2.0' LIVE STORAGE
1.5' SEDIMENT STORAGE 3.1 -=I I
i=-
=1 -- 11=1 11=1 11=1 11=1 11=1 I I =1 i I—'
TRAP DESIGN TO INFILTRATE RUNOFF. DEPTH MARKER
DESIGN INFILTRATION RATE= 4.0 IN/HR
SEDIMENT TRAP (BMP C240)
PROJECT
SIZE
MIN LENGTH OF (FEET)
QUARRY SPALLS'
< 1/4 ACRE
30
< 1 ACRE
50
< 3 ACRE
1C0
> 3 ACRE
icc
*PROVIDE ATB OR ASPHALT
TRANSITION WHERE FRONTAGE
ROAD IS AN ARTERIAL.
LENGTH TO BE DETERMINED
BY CITY INSPECTOR. CITY INSPECTION REQUIRED ON
ALL EROSION CONTROL METHODS
BEFORE OTHER WORK CAN BEGIN
CATCH BASIN
GRATE
FILTER SOCK WITH
OVER FLOW HOLES
(T'P)
CATCH BASIN
NOTES:
1. CONTRACTOR/DEVELOPER SHALL MAINTAIN
THIS APPLICATION AT ALL TIME5 DURING
CONSTRUCTION PERIOD.
2. ANY SEDIMENT IN CATCH BASIN INSERT
SHALL BE REMOVED WHEN INSERT IS
ONE-THIRD FULL.
3. CITY INSPECTION REQUIRED ON ALL
EROSION CONTROL METHODS BEFORE
OTHER WORK CAN BEGIN.
I ='vi = ._,"ti CATC REVISION DATE
- ICITY DF EDMONDS STABILIZED CONSTRUCTION JANUARY 201a � CITY OF EDMONDS TEMPORARY JANUARY 2018
ENTRANCE SEDIMENT TRAP
PUBLIC WORKS STANDARD PUBLIC WORKS FOR CATCH BASINS STANDARD
DEPARTMENT lD7jETAIL DEPARTMENT
g 3 APPROVED 8Y; R_ ENGLISH E fl — 91 s.y APPROVED, BY: R. ENGLISH E R — 9 02
MAINTENANCE STANDARDS
1. DAMAGE RESULTING FROM RUNOFF OR CONSTRUCTION ACTIVITY SHALL BE REPAIRED IMMEDIATELY.
2. IF THE SWALES DO NOT REGULARLY RETAIN STORM RUNOFF, THE SIZE AND/OR FREQUENCY OF
THE SWALES SHALL BE INCREASED.
3. INSPECT ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE
FLOW AREA.
LEVEL BOTTOM
r', GRASS OR ROCK
Llo
1' IN.
2' MIN
TEMPORARY SWALE (BMP C200
SCALE: N.T.S.
TOP OF SEDIMENT TRAP
8' LONG (4'WIDE)
INTERCEPTOR SWALE �1
12" MIN.
ROCK GRADATION GEOTEXTILE UNDER ROCK LINING
(MIRAFI 50OX OR APPROVED
PASSING 8-IN SQUARE SIEVE: 100% EQUIVALENT)
PASSING 3-IN SQUARE SIEVE: 40-60% MAX.
PASSING 3/4-IN SQUARE SIEVE: 0-10% MAX.
3 OUTFALL PROTECTION BMP C209
C8 SCALE: N.T.S.
STRAW WATTLE ROLL
8"-10"DIA.
FLOW
j
STRAW WATTLE (BMP C235'
SCALE: N.T.S.
TEMPORARY HYDROSEED MIXTURE
HYDROSEED MEADOW MIX (TEMPORARY SOIL STABILIZATION AREAS)
RATIO, BY WEIGHT, OF 40% PERENNIAL RYEGRASS, 40% TALL FESCUE,
20% RED FESCUE.
APPLY AT 350 LB./ACRE
APPLY 10-20-20 FERTILIZER AT 435 LB./ACRE
APPLY WOOD FIBER MULCH AT 2000 LB./ACRE
SEED MIXTURE:
SEEDING ALONE IS ACCEPTABLE ONLY ON FLAT AREAS AND
LIMITED TO MARCH 1ST TO MAY 15TH AND AUGUST 15TH TO
OCTOBER 1ST. JUTE MATTING MAY BE REQUIRED ON STEEP
SLOPES.
SEED SHALL CONFORM TO THE STANDARDS FOR "CERTIFIED"
GRADE SEED OR BETTER, AS OUTLINED BY THE STATE OF WA.
DEPARTMENT OF AGRICULTURE'S "RULES FOR SEED CERTIFICATION"
LATEST EDITION. SEED SHALL BE FURNISHED IN UNOPENED
CONTAINERS WITH SEED MIXTURE CONTENT AND INERT MATERIAL
PLAINLY MARKED ON THE OUTSIDE OF CONTAINERS. FURNISH
DUPLICATE COPIES OF A STATEMENT SIGNED BY THE VENDOR
CERTIFYING THAT A CERTIFIED SEED -TESTING LAB HAS TESTED
EACH LOT OF SEED WITHIN 6 MONTHS OF DELIVERY TO THE
PROJECT SITE
View Looking Upstream
NOTE:
Key stone Into channel banks and
extend it beyond the abutments a
minimum of 18" (0.5m) to prevent
flow around dam.
Section A - A
F OVF
A
18" (0.5m)
12" (150mm)
Spacing Between Check Darns
'L' = the distance such that points `A' and
V are of equal elevation.
+Lr
"6 6.
POINT 'A'
ROCK CHECK DAM (BMP C207
SCALE: N.T.S.
�6� CONCRETE WASHOUT BASIN (BMP C154)
SCALE: N.T.S.
POINT V
NOT TO SCALE
UME
c
1.t
W c0 E
CK r1) O
U
� � d
w o
U •�
0
W � �
Q
2
0
Q En
J � 3
c7 >
= Q
CK 3
wO
CD O
z N �
W O Ln �
J c0
O
Q)
0
L
a
►' "
OVfi MWAsy/,��
1 rn Q11J1� z -
v�F �F�ISTERE� �
SS�ONAL ��G '2
8/23/23
E
0
U_
c
c
a
d
a
0
d
Q � 0
N=
CD
' A VCON /1 W �
0 a�
z
Q 0
O0.
Q G E
VJ a
3: W Q�
7 �
0 Z�
z LO o
L , _
d
+ Q 0
W0- 0
Wa
IL
'u^J �
0
a
m
m
3
E
L
0
E
0
a
r
r
O
x
O
w
LO
_
O
t
O
Q
Q
W
0
W
U
�
U)
Ii
LU
W
co
N
M
N
z
W
M
..
�O
Vl
W
LU
>
SCALE: N.T.S.
r�
PRELIMINARY DEVELOPMENT PLANS
habit 19 -Greer
PLN2022-00, Packet Pg. 507
1.t
B. BMP Details
E
0
LL
_
0
a
c
m
E
0_
0
0
0
0
c
d
.y
d
d
_
C
a
0
.@
L
a
L
a
3
_
d
m
/L^
V
a
a
a
06
V
0
0_
d
L
L
3
E
L
0
cn
E
L
a
r
Q
Exhibit 19 - Green
PLN2022-004 Packet Pg. 508
1.t
11-3 Construction Stormwater BMPs
II-3.1 A Summary of Construction Stormwater
►I-11UO
This chapter contains standards and specifications for temporary BMPs, used as appropriate during
the construction phase of a project. Often using BMPs in combination is the best method to meet
Construction Stormwater Pollution Prevention Plan (Construction SWPPP) requirements.
The standards and specifications in this chapter are not intended to limit innovative efforts to effect-
ively control erosion and sedimentation. Construction SWPPPs can contain experimental BMPs or
make minor modifications to standard BMPs. However, the permitting authority (state, local, or both)
must approve such practices before use. Experimental and modified BMPs must achieve the same
or better performance than the BMPs listed below.
None of the BMPs listed below will work successfully throughout the construction project without
inspection and maintenance. Regular inspections to identify problems with the operation of each
BMP, and the timely repair of any problems are essential to the continued operation of the BMPs. As
site conditions change, BMPs must change to remain in compliance.
Construction stormwater BMPs are divided into two categories: Construction Source Control BMPs
and Construction Runoff BMPs.
Table II-3.1: Construction Stormwater BMPs by SWPPP Element shows the relationship of the Con-
struction Stormwater BMPs to the Construction SWPPP Elements described in 1-3.4.2 MR2: Con-
struction Stormwater Pollution Prevention Plan (SWPPP).
Table II-3.1: Construction Stormwater BMPs by SWPPP Element
Construction Storm-
water BMP
Construction SWPPP Element #
#1
#2
#3
1 #4
#5
#6
#7
#8
#9
#10
#11
#12
#13
Construction Source Control BMPs
BMP C101: Preserving
Natural Vegetation
BMP C102: Buffer_
Zones
✓
✓
BMP C103: High-Vis-
✓
✓
ibility Fence
BMP C105: Stabilized
Construction Access
C106: Wheel Wash
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 267 PLN2022-004 Packet Pg. 509
1.t
Table 11-3.1: Construction Stormwater BMPs by SWPPP Element
(continued)
Construction Storm-
water BMP
Construction SWPPP Element #
#1
#2
#3
#4
#5
#6
#7
#8
#9
#10
#11
#12
#13
BMP C107: Con-
struction Road / Parking
Area Stabilization
BMP C120: Temporary
✓
✓
and Permanent Seeding
BMP C121: Mulching
BMP C122: Nets and
Blankets
✓
✓
✓
BMP C123: Plastic
Covering
✓
✓
BMP C124: Sodding
BMP C125: Topsoiling /
Composting
BMP C126: Poly-
acrylamide (PAM) for
Soil Erosion Protection
/
v
BMP C130: Surface
✓
✓
Roughening
BMP C131: Gradient
✓
✓
Terraces
BMP C140: Dust Con-
trol
BMP C150: Mater-
✓
ials on Hand
BMP C151: Concrete
Handling
✓
BMP C152: Sawcutting
and Surfacing Pollution
Prevention
BMP C153: Material
Delivery, Storage, and
Containment
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 268 PLN2022-004 Packet Pg. 510
1.t
Table 11-3.1: Construction Stormwater BMPs by SWPPP Element
(continued)
Construction Storm-
water BMP
Construction SWPPP Element #
#1
#2
#3
#4
#5
#6
#7
#8
#9
#10
#11
#12
#13
BMP C154: Concrete
✓
Washout Area
BMP C160: Certified
Erosion and Sediment
Control Lead
BMP C162: Scheduling
Construction Runoff BMPs
BMP C200: Interceptor
✓
✓
Dike and Swale
BMP C201: Grass-
Lined Channels
✓
✓
BMP C202: Riprap
Channel Lining
✓
BMP C203: Water Bars
BMP C204: Pipe Slope
✓
Drains
BMP C205: Subsurface
✓
Drains
BMP C206: Level
S rp Bader
✓
✓
BMP C207: Check
Dams
BMP C208: Triangular
✓
✓
Silt Dike J§D)
BMP C209: Outlet Pro-
✓
✓
tection
BMP C220: Inlet Pro-
tection
BMP C231: Brush Bar-
rier
m32: Gravel Fil-
BMter Be
✓
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 269 PLN2022-004 Packet Pg. 511
1.t
Table 11-3.1: Construction Stormwater BMPs by SWPPP Element
(continued)
Construction Storm-
Construction SWPPP Element #
water BMP
—;q
#2
#3
#4
#5
#6
#7
#8
#9
#10
#11
#12
#13
BMP C233: Silt Fence
V/
V/
BMP C234: Vegetated
✓
✓
Strip
BMP C235: Wattles
BMP C236: Vegetative
Filtration
BMP C240: Sediment
✓
✓
ILap
BMP C241: Sediment
✓
✓
Pond (Temporary)
BMP C250: Con-
struction Stormwater
Chemical Treatment
BMP C251: Con-
struction Stormwater
V/
Filtration
BMP C252: Treating
and Disposing of High
pH Water
Construction SWPPP Elements:
Element 1: Preserve Vegetation / Mark Clearing Limits
Element 2: Establish Construction Access
Element 3: Control Flow Rates
Element 4: Install Sediment Controls
Element 5: Stabilize Soils
Element 6: Protect Slopes
Element 7: Protect Drain Inlets
Element 8: Stabilize Channels and Outlets
Element 9: Control Pollutants
Element 10: Control Dewatering
Element 11: Maintain BMPs
Element 12: Manage the Project
Element 13: Protect Low Impact Development BMPs
II-3.2 Construction Source Control BMPs
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 270 PLN2022-004 Packet Pg. 512
1.t
BMP C101: Preserving Natural Vegetation
Purpose
The purpose of preserving natural vegetation is to reduce erosion wherever practicable. Limiting site
disturbance is the single most effective method for reducing erosion. For example, conifers can hold
up to about 50 percent of all rain that falls during a storm. Up to 20-30 percent of this rain may never
reach the ground but is taken up by the tree or evaporates. Another benefit is that the rain held in the
tree can be released slowly to the ground after the storm.
Conditions of Use
Natural vegetation should be preserved on steep slopes, near perennial and intermittent water-
courses or swales, and on building sites in wooded areas.
. As required by local governments.
Phase construction to preserve natural vegetation on the project site for as long as possible
during the construction period.
Design and Installation Specifications
Natural vegetation can be preserved in natural clumps or as individual trees, shrubs and vines.
The preservation of individual plants is more difficult because heavy equipment is generally used to
remove unwanted vegetation. The points to remember when attempting to save individual plants
are:
. Is the plant worth saving? Consider the location, species, size, age, vigor, and the work
involved. Local governments may also have ordinances to save natural vegetation and trees.
Fence or clearly mark areas around trees that are to be saved. It is preferable to keep ground
disturbance away from the trees at least as far out as the dripline.
Plants need protection from three kinds of injuries:
Construction Equipment- This injury can be above or below the ground level. Damage results
from scarring, cutting of roots, and compaction of the soil. Placing a fenced buffer zone around
plants to be saved prior to construction can prevent construction equipment injuries.
Grade Changes- Changing the natural ground level will alter grades, which affects the plant's
ability to obtain the necessary air, water, and minerals. Minor fills usually do not cause prob-
lems although sensitivity between species does vary and should be checked. Trees can typ-
ically tolerate fill of 6 inches or less. For shrubs and other plants, the fill should be less.
When there are major changes in grade, it may become necessary to supply air to the roots of
plants. This can be done by placing a layer of gravel and a tile system over the roots before the
fill is made. The tile system should be laid out on the original grade leading from a dry well
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 271 PLN2022-004 Packet Pg. 513
1.t
around the tree trunk. The system should then be covered with small stones to allow air to cir-
culate over the root area.
Lowering the natural ground level can seriously damage trees and shrubs. The highest per-
centage of the plant roots are in the upper 12 inches of the soil and cuts of only 2-3 inches can
cause serious injury. To protect the roots it may be necessary to terrace the immediate area
around the plants to be saved. If roots are exposed, construction of retaining walls may be
needed to keep the soil in place. Plants can also be preserved by leaving them on an undis-
turbed, gently sloping mound. To increase the chances for survival, it is best to limit grade
changes and other soil disturbances to areas outside the dripline of the plant.
Excavations - Protect trees and other plants when excavating for drainfields, power, water,
and sewer lines. Where possible, the trenches should be routed around trees and large
shrubs. When this is not possible, it is best to tunnel under them. This can be done with hand
tools or with power augers. If it is not possible to route the trench around plants to be saved,
then the following should be observed:
Cut as few roots as possible. When you have to cut, cut clean. Paint cut root ends with a
wood dressing like asphalt base paint if roots will be exposed for more than 24-hours.
Backfill the trench as soon as possible.
Tunnel beneath root systems as close to the center of the main trunk to preserve most
of the important feeder roots.
Some problems that can be encountered with a few specific trees are:
• Maple, Dogwood, Red alder, Western hemlock, Western red cedar, and Douglas fir do not
readily adjust to changes in environment and special care should be taken to protect these
trees.
. The windthrow hazard of Pacific silver fir and madrona is high, while that of Western hemlock
is moderate. The danger of windthrow increases where dense stands have been thinned.
Other species (unless they are on shallow, wet soils less than 20 inches deep) have a low
windthrow hazard.
. Cottonwoods, maples, and willows have water -seeking roots. These can cause trouble in
sewer lines and infiltration fields. On the other hand, they thrive in high moisture conditions
that other trees would not.
. Thinning operations in pure or mixed stands of Grand fir, Pacific silver fir, Noble fir, Sitka
spruce, Western red cedar, Western hemlock, Pacific dogwood, and Red alder can cause ser-
ious disease problems. Disease can become established through damaged limbs, trunks,
roots, and freshly cut stumps. Diseased and weakened trees are also susceptible to insect
attack.
Maintenance Standards
Inspect flagged and/or fenced areas regularly to make sure flagging or fencing has not been
removed or damaged. If the flagging or fencing has been damaged or visibility reduced, it shall be
repaired or replaced immediately and visibility restored.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 272 PLN2022-004 Packet Pg. 514
1.t
If tree roots have been exposed or injured, "prune" cleanly with an appropriate pruning saw or top-
pers directly above the damaged roots and recover with native soils. Treatment of sap flowing trees
(fir, hemlock, pine, soft maples) is not advised as sap forms a natural healing barrier.
BMP C102: Buffer Zones
Purpose
Creation of an undisturbed area or strip of natural vegetation or an established suitable planting that
will provide a living filter to reduce soil erosion and stormwater runoff velocities.
conditions of Use
Buffer zones are used along streams, wetlands and other bodies of water that need protection from
erosion and sedimentation. Contractors can use vegetative buffer zone BMPs to protect natural
swales and they can incorporate them into the natural landscaping of an area.
Do not use critical -areas buffer zones as sediment treatment areas. These areas shall remain com-
pletely undisturbed. The local permitting authority may expand the buffer widths temporarily to allow
the use of the expanded area for removal of sediment.
The types of buffer zones can change the level of protection required as shown below:
Designated Critical Area Buffers - buffers that protect Critical Areas, as defined by the Washington
State Growth Management Act, and are established and managed by the local permitting authority.
These should not be disturbed and must protected with sediment control BMPs to prevent impacts.
The local permitting authority may expand the buffer widths temporarily to allow the use of the expan
ded area for removal of sediment.
Vegetative Buffer Zones - areas that may be identified in undisturbed vegetation areas or managed
vegetation areas that are outside any Designated Critical Area Buffer. They may be utilized to
provide an additional sediment control area and/or reduce runoff velocities. If being used for pre-
servation of natural vegetation, they should be arranged in clumps or strips. They can be used to pro-
tect natural swales and incorporated into the natural landscaping area.
Design and Installation Specifications
• Preserving natural vegetation or plantings in clumps, blocks, or strips is generally the easiest
and most successful method.
• Leave all unstable steep slopes in natural vegetation.
• Mark clearing limits and keep all equipment and construction debris out of the natural areas
and buffer zones. Steel construction fencing is the most effective method to protect sensitive
areas and buffers. Alternatively, wire -backed silt fence on steel posts is marginally effective.
Flagging alone is typically not effective.
• Keep all excavations outside the dripline of trees and shrubs.
• Do not push debris or extra soil into the buffer zone area because it will cause damage by
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 273 PLN2022-004 Packet Pg. 515
1.t
burying and smothering vegetation.
. Vegetative buffer zones for streams, lakes or other waterways shall be established by the
local permitting authority or other state or federal permits or approvals.
Maintenance Standards
Inspect the area frequently to make sure flagging remains in place and the area remains undis-
turbed. Replace all damaged flagging immediately. Remove all materials located in the buffer area
that may impede the ability of the vegetation to act as a filter.
BMP C103: High -Visibility Fence
Purpose
High -visibility fencing is intended to:
. Restrict clearing to approved limits.
• Prevent disturbance of sensitive areas, their buffers, and other areas required to be left undis-
turbed.
. Limit construction traffic to designated construction entrances, exits, or internal roads.
• Protect areas where marking with survey tape may not provide adequate protection.
Conditions of Use
To establish clearing limits plastic, fabric, or metal fence may be used:
. At the boundary of sensitive areas, their buffers, and other areas required to be left uncleared.
. As necessary to control vehicle access to and on the site.
Design and Installation Specifications
High -visibility plastic fence shall be composed of a high -density polyethylene material and shall beat
least four feet in height. Posts for the fencing shall be steel or wood and placed every 6 feet on center
(maximum) or as needed to ensure rigidity. The fencing shall be fastened to the post every six inches
with a polyethylene tie. On long continuous lengths of fencing, a tension wire or rope shall be used as
a top stringer to prevent sagging between posts. The fence color shall be high -visibility orange. The
fence tensile strength shall be 360 Ibs/ft using the ASTM D4595 testing method.
If appropriate install fabric silt fence in accordance with BMP C233: Silt Fence to act as high -visibility
fence. Silt fence shall be at least 3 feet high and must be highly visible to meet the requirements of
this BMP.
Metal fences shall be designed and installed according to the manufacturer's specifications.
Metal fences shall be at least 3 feet high and must be highly visible.
Fences shall not be wired or stapled to trees.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 274 PLN2022-004 Packet Pg. 516
1.t
Maintenance Standards
If the fence has been damaged or visibility reduced, it shall be repaired or replaced immediately and
visibility restored.
BMP C105: Stabilized Construction Access
Purpose
Stabilized construction accesses are established to reduce the amount of sediment transported onto
paved roads outside the project site by vehicles or equipment. This is done by constructing a sta-
bilized pad of quarry spalls at entrances and exits for project sites.
Conditions of Use
Construction accesses shall be stabilized wherever traffic will be entering or leaving a construction
site if paved roads or other paved areas are within 1,000 feet of the site.
For residential subdivision construction sites, provide a stabilized construction access for each res-
idence, rather than only at the main subdivision entrance. Stabilized surfaces shall be of sufficient
length/width to provide vehicle access/parking, based on lot size and configuration.
On large commercial, highway, and road projects, the designer should include enough extra mater-
ials in the contract to allow for additional stabilized accesses not shown in the initial Construction
SWPPP. It is difficult to determine exactly where access to these projects will take place; additional
materials will enable the contractor to install them where needed.
Design and Installation Specifications
See Figure II-3.1: Stabilized Construction Access for details. Note: the 1 00'minimum length of the
access shall be reduced to the maximum practicable size when the size or configuration of the site
does not allow the full length (100').
Construct stabilized construction accesses with a 12-inch thick pad of 4-inch to 8-inch quarry spalls,
a 4-inch course of asphalt treated base (ATB), or use existing pavement. Do not use crushed con-
crete, cement, or calcium chloride for construction access stabilization because these products raise
pH levels in stormwater and concrete discharge to waters of the State is prohibited.
A separation geotextile shall be placed under the spalls to prevent fine sediment from pumping up
into the rock pad. The geotextile shall meet the standards listed in Table 11-3.2: Stabilized Con-
struction Access Geotextile Standards.
Table 11-3.2: Stabilized Construction Access
Geotextile Standards
Geotextile Property I Required Value
Grab Tensile Strength (ASTM D4751) 1 200 psi min.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 275 PLN2022-004 Packet Pg. 517
1.t
Table 11-3.2: Stabilized Construction Access
Geotextile Standards (continued)
Geotextile Property
Required Value
Grab Tensile Elongation (ASTM D4632)
30% max.
Mullen Burst Strength (ASTM D3786-80a)
400 psi min.
AOS (ASTM D4751)
20-45 (U.S. standard sieve size)
Consider early installation of the first lift of asphalt in areas that will be paved; this can be used
as a stabilized access. Also consider the installation of excess concrete as a stabilized access
During large concrete pours, excess concrete is often available for this purpose.
Fencing (see BMP C103: High -Visibility Fence) shall be installed as necessary to restrict
traffic to the construction access.
Whenever possible, the access shall be constructed on a firm, compacted subgrade. This can
substantially increase the effectiveness of the pad and reduce the need for maintenance.
Construction accesses should avoid crossing existing sidewalks and back of walk drains if at
all possible. If a construction access must cross a sidewalk or back of walk drain, the full length
of the sidewalk and back of walk drain must be covered and protected from sediment leaving
the site.
Alternative Material Specification
WSDOT has raised safety concerns about the Quarry Spall rock specified above. WSDOT observes
that the 4-inch to 8-inch rock sizes can become trapped between Dually truck tires, and then
released off -site at highway speeds. WSDOT has chosen to use a modified specification for the rock
while continuously verifying that the Stabilized Construction Access remains effective. To remain
effective, the BMP must prevent sediment from migrating off site. To date, there has been no per-
formance testing to verify operation of this new specification. Jurisdictions may use the alternative
specification, but must perform increased off -site inspection if they use, or allow others to use, it.
Stabilized Construction Accesses may use material that meets the requirements of WSDOT's Stand-
ard Specifications for Road, Bridge, and Municipal Construction Section 9-03.9(1) (WSDOT, 2016)
for ballast except for the following special requirements.
The grading and quality requirements are listed in Table II-3.3: Stabilized Construction Access
Alternative Material Requirements.
Table II-3.3: Stabilized
Construction Access
Alternative Material
Requirements
Sieve Size Percent Passing
2'/2" 99-100
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 276 PLN2022-004 Packet Pg. 518
1.t
Table II-3.3: Stabilized
Construction Access
Alternative Material
Requirements
(continued)
Sieve Size
Percent Passing
2"
65-100
3/4"
40-80
No. 4
5 max.
No. 100
0-2
% Fracture
75 min.
. All percentages are by weight.
. The sand equivalent value and dust ratio requirements do not apply.
The fracture requirement shall be at least one fractured face and will apply the combined
aggregate retained on the No. 4 sieve in accordance with FOP for AASHTO T 335.
Maintenance Standards
Quarry spalls shall be added if the pad is no longer in accordance with the specifications.
. If the access is not preventing sediment from being tracked onto pavement, then alternative
measures to keep the streets free of sediment shall be used. This may include replace-
ment/cleaning of the existing quarry spalls, street sweeping, an increase in the dimensions of
the access, or the installation of BMP C106: Wheel Wash.
Any sediment that is tracked onto pavement shall be removed by shoveling or street sweep-
ing. The sediment collected by sweeping shall be removed or stabilized on site. The pavement
shall not be cleaned by washing down the street, except when high efficiency sweeping is inef-
fective and there is a threat to public safety. If it is necessary to wash the streets, the con-
struction of a small sump to contain the wash water shall be considered. The sediment would
then be washed into the sump where it can be controlled.
Perform street sweeping by hand or with a high efficiency sweeper. Do not use a non -high effi-
ciency mechanical sweeper because this creates dust and throws soils into storm systems or
conveyance ditches.
Any quarry spalls that are loosened from the pad, which end up on the roadway shall be
removed immediately.
. If vehicles are entering or exiting the site at points other than the construction access(es),
BMP C103: High -Visibility Fence shall be installed to control traffic.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 277 PLN2022-004 Packet Pg. 519
1.t
Upon project completion and site stabilization, all construction accesses intended as per-
manent access for maintenance shall be permanently stabilized.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 278 PLN2022-004 Packet Pg. 520
1.t
Figure II-3.1: Stabilized Construction Access
cu
roadsi
Notes:
1. Driveway shall meet
the requirements of the
permitting agency.
2. It is recommended that
the access be crowned
so that runoff drains oft
the pad.
DEPARTMENT OF
ECOLOGY
State of Washington
NOT TO SCALE
15' min.
12' minimum thickness
Provide toll width
otingresslegress
area
..Stabilized Construction Access
Revised June 2018
Please see http.1Avww.ecy. wa.govfcopyright.html for copyright notice including permissions,
limitation of liability, and disclaimer.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 279 PLN2022-004 Packet Pg. 521
1.t
Approved as Functionally Equivalent
Ecology has approved products as able to meet the requirements of this BMP. The products did not
pass through the Technology Assessment Protocol — Ecology (TAPE) process. Local jurisdictions
may choose not to accept these products, or may require additional testing prior to consideration for
local use. Products that Ecology has approved as functionally equivalent are available for review on
Ecology's website at:
https:Hecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Stormwater-per-
mittee-guidance-resources/Emerging-stormwater-treatment-technologies
BMP C106: Wheel Wash
Purpose
Wheel washes reduce the amount of sediment transported onto paved roads by washing dirt from
the wheels of motor vehicles prior to the motor vehicles leaving the construction site.
Conditions of Use
Use a wheel wash when BMP C105: Stabilized Construction Access is not preventing sed-
iment from being tracked off site.
Wheel washing is generally an effective BMP when installed with careful attention to topo-
graphy. For example, a wheel wash can be detrimental if installed at the top of a slope abut-
ting a right-of-way where the water from the dripping truck can run unimpeded into the street
Pressure washing combined with an adequately sized and surfaced pad with direct drainage
to a large 10-foot x 10-foot sump can be very effective.
Wheel wash wastewater is not stormwater. It is commonly called process water, and must be
discharged to a separate on -site treatment system that prevents discharge to waters of the
State, or to the sanitary sewer with local sewer district approval.
Wheel washes may use closed -loop recirculation systems to conserve water use.
Wheel wash wastewater shall not include wastewater from concrete washout areas.
When practical, the wheel wash should be placed in sequence with BMP C105: Stabilized
Construction Access. Locate the wheel wash such that vehicles exiting the wheel wash will
enter directly onto BMP C105: Stabilized Construction Access. In order to achieve this, BMP
C105: Stabilized Construction Access may need to be extended beyond the standard install-
ation to meet the exit of the wheel wash.
Design and Installation Specifications
Suggested details are shown in Figure II-3.2: Wheel Wash. The Local Permitting Authority may
allow other designs. A minimum of 6 inches of asphalt treated base (ATB) over crushed base mater-
ial or 8 inches over a good subgrade is recommended to pave the wheel wash.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 280 PLN2022-004 Packet Pg. 522
1.t
BMP C107: Construction Road / Parking Area
Stabilization
Purpose
Stabilizing roads, parking areas, and other on -site vehicle transportation routes immediately after
grading reduces erosion caused by construction traffic or stormwater runoff.
Conditions of Use
Roads and parking areas shall be stabilized wherever they are constructed, whether permanent or
temporary, for use by construction traffic.
BMP C 103: High -Visibility Fence shall be installed, if necessary, to limit the access of vehicles to only
those roads and parking areas that are stabilized.
Design and Installation Specifications
. On areas that will receive asphalt as part of the project, install the first lift as soon as possible.
. A 6-inch depth of 2- to 4-inch crushed rock, gravel base, or crushed surfacing base course
shall be applied immediately after grading or utility installation. A 4-inch course of asphalt
treated base (ATB) may also be used, or the road/parking area may be paved. It may also be
possible to use cement or calcium chloride for soil stabilization. If cement or cement kiln dust is
used for roadbase stabilization, pH monitoring and BMP C252: Treating and Disposing of
High pH Water is necessary to evaluate and minimize the effects on stormwater. If the area
will not be used for permanent roads, parking areas, or structures, a 6-inch depth of hog fuel
may also be used, but this is likely to require more maintenance. Whenever possible, con-
struction roads and parking areas shall be placed on a firm, compacted subgrade.
. Temporary road gradients shall not exceed 15 percent. Roadways shall be carefully graded to
drain. Drainage ditches shall be provided on each side of the roadway in the case of a
crowned section, or on one side in the case of a super -elevated section. Drainage ditches
shall be directed to a sediment control BMP.
• Rather than relying on ditches, it may also be possible to grade the road so that runoff sheet -
flows into a heavily vegetated area with a well -developed topsoil. Landscaped areas are not
adequate. If this area has at least 50 feet of vegetation that water can flow through, then it is
generally preferable to use the vegetation to treat runoff, rather than a sediment pond or trap.
The 50 feet shall not include wetlands or their buffers. If runoff is allowed to sheetflow through
adjacent vegetated areas, it is vital to design the roadways and parking areas so that no con-
centrated runoff is created.
• Storm drain inlets shall be protected to prevent sediment -laden water entering the drainage
system (see BMP C220: Inlet Protection).
Maintenance Standards
Inspect stabilized areas regularly, especially after large storm events.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 283 PLN2022-004 Packet Pg. 523
1.t
Crushed rock, gravel base, etc., shall be added as required to maintain a stable driving surface and
to stabilize any areas that have eroded.
Following construction, these areas shall be restored to pre -construction condition or better to pre-
vent future erosion.
Perform street cleaning at the end of each day or more often if necessary.
BMP C120: Temporary and Permanent Seeding
Purpose
Seeding reduces erosion by stabilizing exposed soils. A well -established vegetative cover is one of
the most effective methods of reducing erosion.
Conditions of Use
Use seeding throughout the project on disturbed areas that have reached final grade or that will
remain unworked for more than 30 days.
The optimum seeding windows for western Washington are April 1 through June 30 and September
1 through October 1.
Between July 1 and August 30 seeding requires irrigation until 75 percent grass cover is established.
Between October 1 and March 30 seeding requires a cover of mulch or an erosion control blanket
until 75 percent grass cover is established.
Review all disturbed areas in late August to early September and complete all seeding by the end of
September. Otherwise, vegetation will not establish itself enough to provide more than average pro-
tection.
Mulch is required at all times for seeding because it protects seeds from heat, moisture loss, and
transport due to runoff. Mulch can be applied on top of the seed or simultaneously by hydroseeding.
See BMP C 121: Mulching for specifications.
Seed and mulch all disturbed areas not otherwise vegetated at final site stabilization. Final sta-
bilization means the completion of all soil disturbing activities at the site and the establishment of a
permanent vegetative cover, or equivalent permanent stabilization measures (such as pavement,
riprap, gabions, or geotextiles) which will prevent erosion. See BMP T5.13: Post -Construction Soil
Qualitv and Death.
Design and Installation Specifications
General
Install channels intended for vegetation before starting major earthwork and hydroseed with a
Bonded Fiber Matrix. For vegetated channels that will have high flows, install erosion control
blankets over the top of hydroseed. Before allowing water to flow in vegetated channels,
establish 75 percent vegetation cover. If vegetated channels cannot be established by seed
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 284 PLN2022-004 Packet Pg. 524
1.t
before water flow; install sod in the channel bottom — over top of hydromulch and erosion con-
trol blankets.
Confirm the installation of all required surface water control measures to prevent seed from
washing away.
Hydroseed applications shall include a minimum of 1,500 pounds per acre of mulch with 3 per-
cent tackifier. See BMP C121: Mulching for specifications.
. Areas that will have seeding only and not landscaping may need compost or meal -based
mulch included in the hydroseed in order to establish vegetation. Re -install native topsoil on
the disturbed soil surface before application. See BMP T5.13: Post -Construction Soil Quality
and Depth.
When installing seed via hydroseeding operations, only about 1/3 of the seed actually ends up
in contact with the soil surface. This reduces the ability to establish a good stand of grass
quickly. To overcome this, consider increasing seed quantities by up to 50 percent.
Enhance vegetation establishment by dividing the hydromulch operation into two phases
Phase 1- Install all seed and fertilizer with 25-30 percent mulch and tackifier onto soil in
the first lift.
Phase 2- Install the rest of the mulch and tackifier over the first lift.
Or, enhance vegetation by:
o Installing the mulch, seed, fertilizer, and tackifier in one lift.
o Spread or blow straw over the top of the hydromulch at a rate of 800-1000 pounds per
acre.
Hold straw in place with a standard tackifier.
Both of these approaches will increase cost moderately but will greatly improve and enhance
vegetative establishment. The increased cost may be offset by the reduced need for:
o Irrigation.
Reapplication of mulch.
Repair of failed slope surfaces.
This technique works with standard hydromulch (1,500 pounds per acre minimum) and Bon-
ded Fiber Matrix/ Mechanically Bonded Fiber Matrix (BFM/MBFMs) (3,000 pounds per acre
minimum).
. Seed may be installed by hand if:
o Temporary and covered by straw, mulch, or topsoil.
Permanent in small areas (usually less than 1 acre) and covered with mulch, topsoil, or
erosion blankets.
The seed mixes listed in Table II-3.4: Temporary and Permanent Seed Mixes include
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 285 PLN2022-004 Packet Pg. 525
1.t
recommended mixes for both temporary and permanent seeding.
. Apply these mixes, with the exception of the wet area seed mix, at a rate of 120 pounds per
acre. This rate can be reduced if soil amendments or slow -release fertilizers are used. Apply
the wet area seed mix at a rate of 60 pounds per acre.
Consult the local suppliers or the local conservation district for their recommendations. The
appropriate mix depends on a variety of factors, including location, exposure, soil type, slope,
and expected foot traffic. Alternative seed mixes approved by the local authority may be used,
depending on the soil type and hydrology of the area.
Table 11-3.4: Temporary and Permanent Seed Mixes
Common Name
Latin Name
% Weight
% Purity
% Germination
Temporary Erosion Control Seed Mix
A standard mix for areas requiring a temporary vegetative cover.
Chewings or
Festuca rubra var.
annual bluegrass
commutata or Poa
40
98
90
anna
Perennial rye
Lolium perenne
50
98
90
Redtop or colonial
Agrostis alba or
5
92
85
bentgrass
Agrostis tenuis
White dutch clover
Trifolium repens
5
98
90
Landscaping Seed Mix
A recommended mix for landscaping seed.
Perennial rye blend
Lolium perenne
70
98
90
Chewings and red
Festuca rubra var.
fescue blend
commutata or Fes-
30
98
90
tuca rubra
Low -Growing Turf Seed Mix
A turf seed mix for dry situations where there is no need for watering. This mix requires very little main-
tenance.
Dwarf tall fescue
Festuca arundin-
45
98
90
(several varieties)
acea var.
Dwarf perennial
Lolium perenne
30
98
90
rye (Barclay)
var. barclay
Red fescue
Festuca rubra
20
98
90
Colonial bentgrass
Agrostis tenuis
5
98
90
Bioswale Seed Mix
A seed mix for bioswales and other intermittently wet areas.
Tall or meadow fes-
Festuca arundin-
75-80
98
90
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 286 PLN2022-004 Packet Pg. 526
1.t
Table II-3.4: Temporary and Permanent Seed Mixes (continued)
Common Name
Latin Name
% Weight
% Purity
% Germination
acea or Festuca
cue
elatior
Seaside/Creeping
Agrostis palustris
10-15
92
85
bentgrass
Redtop bentgrass
Agrostis alba or
5-10
90
80
Agrostis gigantea
Wet Area Seed Mix
A low -growing, relatively non-invasive seed mix appropriate forvery wet areas that are not regulated wet-
lands. Consult Hydraulic Permit Authority (HPA) for seed mixes if applicable.
Tall or meadow fes-
Festuca arundin-
acea or Festuca
60-70
98
90
cue
elatior
Seaside/Creeping
Agrostis palustris
10-15
98
85
bentgrass
Meadow foxtail
Alepocurus praten-
10-15
90
80
sis
Alsike clover
Trifolium hybridum
1-6
98
90
Redtop bentgrass
Agrostis alba
1-6
92
85
Meadow Seed Mix
A recommended meadow seed mix for infrequently maintained areas or non -maintained areas where col-
onization by native plants is desirable. Likely applications include rural road and utility right-of-way. Seed-
ing should take place in September or very early October in order to obtain adequate establishment prior to
the winter months. Consider the appropriateness of clover, a fairly invasive species, in the mix. Amending
the soil can reduce the need for clover.
Redtop or Oregon
Agrostis alba or
bentgrass
Agrostis ore-
20
92
85
gonensis
Red fescue
Festuca rubra
70
98
90
White dutch clover
Trifolium repens
10
98
90
Roughening and Rototilling
The seedbed should be firm and rough. Roughen all soil no matter what the slope. Track walk
slopes before seeding if engineering purposes require compaction. Backblading or smoothing
of slopes greater than 4H:1 V is not allowed if they are to be seeded.
Restoration -based landscape practices require deeper incorporation than that provided by a
simple single -pass rototilling treatment. Wherever practical, initially rip the subgrade to
improve long-term permeability, infiltration, and water inflow qualities. At a minimum,
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 287 PLN2022-004 Packet Pg. 527
1.t
permanent areas shall use soil amendments to achieve organic matter and permeability per-
formance defined in engineered soil/landscape systems. For systems that are deeper than 8
inches complete the rototilling process in multiple lifts, or prepare the engineered soil system
per specifications and place to achieve the specified depth.
Fertilizers
• Conducting soil tests to determine the exact type and quantity of fertilizer is recommended.
This will prevent the over -application of fertilizer.
. Organic matter is the most appropriate form of fertilizer because it provides nutrients (includ-
ing nitrogen, phosphorus, and potassium) in the least water-soluble form.
. In general, use 10-4-6 N-P-K (nitrogen -phosphorus -potassium) fertilizer at a rate of 90
pounds per acre. Always use slow -release fertilizers because they are more efficient and
have fewer environmental impacts. Do not add fertilizer to the hydromulch machine, or agit-
ate, more than 20 minutes before use. Too much agitation destroys the slow -release coating.
. There are numerous products available that take the place of chemical fertilizers. These
include several with seaweed extracts that are beneficial to soil microbes and organisms. If
100 percent cottonseed meal is used as the mulch in hydroseed, chemical fertilizer may not be
necessary. Cottonseed meal provides a good source of long-term, slow -release, available
nitrogen.
Bonded Fiber Matrix and Mechanically Bonded Fiber Matrix
. On steep slopes use Bonded Fiber Matrix (BFM) or Mechanically Bonded Fiber Matrix
(MBFM) products. Apply BFM/MBFM products at a minimum rate of 3,000 pounds per acre
with approximately 10 percent tackifier. Achieve a minimum of 95 percent soil coverage during
application. Numerous products are available commercially. Most products require 24-36
hours to cure before rainfall and cannot be installed on wet or saturated soils. Generally,
products come in 40-50 pound bags and include all necessary ingredients except for seed and
fertilizer.
. Install products per manufacturer's instructions.
• BFMs and MBFMs provide good alternatives to blankets in most areas requiring vegetation
establishment. Advantages over blankets include:
• BFM and MBFMs do not require surface preparation.
• Helicopters can assist in installing BFM and MBFMs in remote areas.
• On slopes steeper than 2.5H:1 V, blanket installers may require ropes and harnesses
for safety.
• Installing BFM and MBFMs can save at least $1,000 per acre compared to blankets.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 288 PLN2022-004 Packet Pg. 528
1.t
Maintenance Standards
Reseed any seeded areas that fail to establish at least 75 percent cover (100 percent cover for areas
that receive sheet or concentrated flows). If reseeding is ineffective, use an alternate method such
as sodding, mulching, nets, or blankets.
Reseed and protect by mulch any areas that experience erosion after achieving adequate
cover. Reseed and protect by mulch any eroded area.
Supply seeded areas with adequate moisture, but do not water to the extent that it causes run-
off.
Approved as Functionally Equivalent
Ecology has approved products as able to meet the requirements of this BMP. The products did not
pass through the Technology Assessment Protocol — Ecology (TAPE) process. Local jurisdictions
may choose not to accept these products, or may require additional testing prior to consideration for
local use. Products that Ecology has approved as functionally equivalent are available for review on
Ecology's website at:
https://ecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Stormwater-per-
mittee-guidance-resources/Emerging-stormwater-treatment-technologies
BMP C121: Mulching
Purpose
Mulching soils provides immediate temporary protection from erosion. Mulch also enhances plant
establishment by conserving moisture, holding fertilizer, seed, and topsoil in place, and moderating
soil temperatures. There are a variety of mulches that can be used. This section discusses only the
most common types of mulch.
Conditions of Use
As a temporary cover measure, mulch should be used:
For less than 30 days on disturbed areas that require cover.
At all times for seeded areas, especially during the wet season and during the hot summer
months.
During the wet season on slopes steeper than 3H:1 V with more than 10 feet of vertical relief
Mulch may be applied at any time of the year and must be refreshed periodically.
For seeded areas, mulch may be made up of 100 percent:
. cottonseed meal;
. fibers made of wood, recycled cellulose, hemp, or kenaf;
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 289 PLN2022-004 Packet Pg. 529
1.t
. compost;
or blends of these.
Tackifier shall be plant -based, such as guar or alpha plantago, or chemical -based such as poly-
acrylamide or polymers.
Generally, mulches come in 40-50 pound bags. Seed and fertilizer are added at time of application.
Recycled cellulose may contain polychlorinated biphenyl (PCBs). Ecology recommends that
products should be evaluated for PCBs prior to use.
Refer to BMP C 126: Polyacrylamide (PAM) for Soil Erosion Protection for conditions of use. PAM
shall not be directly applied to water or allowed to enter a water body.
Any mulch or tackifier product used shall be installed per the manufacturer's instructions.
Design and Installation Specifications
For mulch materials, application rates, and specifications, see Table II-3.6: Mulch Standards and
Guidelines. Consult with the local supplier or the local conservation district for their recom-
mendations. Increase the application rate until the ground is 95% covered (i.e. not visible under the
mulch layer). Note: Thickness may be increased for disturbed areas in or near sensitive areas or
other areas highly susceptible to erosion.
Where the option of "Compost" is selected, it should be a coarse compost that meets the size grad-
ations listed in Table II-3.5: Size Gradations of Compost as Mulch Material when tested in accord-
ance with Test Method 02.02-13 found in Test Methods for the Examination of Composting and
Compost (Thompson, 2001).
Table 11-3.5: Size Gradations of Compost as Mulch Material
Sieve Size
Percent Passing
3"
100%
1"
90% -100%
3/4"
70% -100%
1/4"
40% -
100%
Mulch used within the ordinary high-water mark of surface waters should be selected to minimize
potential flotation of organic matter. Composted organic materials have higher specific gravities
(densities) than straw, wood, or chipped material. Consult the Hydraulic Permit Authority (H PA) for
mulch mixes if applicable.
Maintenance Standards
The thickness of the mulch cover must be maintained.
Any areas that experience erosion shall be remulched and/or protected with a net or blanket. If the
erosion problem is drainage related, then the problem shall be fixed and the eroded area remulched.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 290 PLN2022-004 Packet Pg. 530
1.t
Table II-3.6: Mulch Standards and Guidelines
Mulch Mater-
Guideline
Description
ial
Quality
Standards
Air-dried; free from undesirable seed and coarse material.
Application
2"-3" thick; 5 bales per 1,000 sf or 2-3 tons per acre
Rates
Cost-effective protection when applied with adequate thickness. Hand -
application generally requires greater thickness than blown straw. The
Straw
thickness of straw may be reduced by half when used in conjunction with
seeding. In windy areas straw must be held in place by crimping, using a
tackifier, or covering with netting. Blown straw always has to be held in
Remarks
place with a tackifier as even light winds will blow it away. Straw, however,
has several deficiencies that should be considered when selecting mulch
materials. It often introduces and/or encourages the propagation of weed
species and it has no significant long-term benefits It should also not be
used within the ordinary high-water elevation of surface waters (due to flot-
ation).
Quality
No growth inhibiting factors.
Standards
Application
Approx. 35-45 Ibs per 1,000 sf or 1,500 -2,000 Ibs per acre
Hydromulch
Rates
Shall be applied with hydromulcher. Shall not be used without seed and
Remarks
tackifier unless the application rate is at least doubled. Fibers longer than
about 3/4 -1 inch clog hydromulch equipment. Fibers should be kept to less
than 3/4 inch.
Quality
No visible water or dust during handling. Must be produced per WAC 173-
Standards
350, Solid Waste Handling Standards, but may have up to 35% biosolids.
Application
2 thick min.; approx. 100 tons per acre (approx. 750 Ibs per cubic yard)
Rates
More effective control can be obtained by increasing thickness to 3". Excel -
Compost
lent mulch for protecting final grades until landscaping because it can be dir-
ectly seeded or tilled into soil as an amendment. Compost used for mulch
Remarks
has a coarser size gradation than compost used for BMP C 125: Topsoiling
/ Composting or BMP T5.13: Post -Construction Soil Quality and Depth. It
is more stable and practical to use in wet areas and during rainy weather
conditions. Do not use near wetlands or near phosphorous impaired water
bodies.
Quality
Gradations from fines to 6 inches in length for texture, variation, and inter -
Chipped
Standards
locking properties. Include a mix of various sizes so that the average size
Site Veget-
is between 2- and 4- inches.
ation
Application
Rates
2" thick min.;
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 291 PLN2022-004 Packet Pg. 531
1.t
Table 11-3.6: Mulch Standards and Guidelines (continued)
Mulch Mater-
Guideline
Description
ial
This is a cost-effective way to dispose of debris from clearing and grub-
bing, and it eliminates the problems associated with burning. Generally, it
should not be used on slopes above approx. 10% because of its tendency
to be transported by runoff. It is not recommended within 200 feet of sur-
Remarks
face waters. If permanent seeding or planting is expected shortly after
mulch, the decomposition of the chipped vegetation may tie up nutrients
important to grass establishment.
Note: thick application of this material over existing grass, herbaceous spe-
cies, and some groundcovers could smother and kill vegetation.
Quality
No visible water or dust during handling. Must be purchased from a supplier
Standards
with a Solid Waste Handling Permit or one exempt from solid waste reg-
ulations.
Application
2 thick min.; approx. 100 tons per acre (approx. 750 lbs. per cubic yard)
Wood-
Rates
Based
This material is often called "wood straw" or "hog fuel". The use of mulch
Mulch
ultimately improves the organic matter in the soil. Special caution is
Remarks
advised regarding the source and composition of wood -based mulches. Its
preparation typically does not provide any weed seed control, so evidence
of residual vegetation in its composition or known inclusion of weed plants
or seeds should be monitored and prevented (or minimized).
Quality
A blend of loose, long, thin wood pieces derived from native conifer or
Standards
deciduous trees with high length -to -width ratio.
Application
2"thick min.
Rates
Wood
Cost-effective protection when applied with adequate thickness. A min -
Strand
imum of 95-percent of the wood strand shall have lengths between 2 and
Mulch
10-inches, with a width and thickness between 1/16 and 1/2-inches. The
Remarks
mulch shall not contain resin, tannin, or other compounds in quantities that
would be detrimental to plant life. Sawdust or wood shavings shall not be
used as mulch. [Specification 9-14.4(4) from the Standard Specifications
for Road, Bridge, and Municipal Construction (WSDOT, 2016)
BMP C122: Nets and Blankets
Purpose
Erosion control nets and blankets are intended to prevent erosion and hold seed and mulch in place
on steep slopes and in channels so that vegetation can become well established. In addition, some
nets and blankets can be used to permanently reinforce turf to protect drainage ways during high
flows.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 292 PLN2022-004 Packet Pg. 532
1.t
BMP C123: Plastic Covering
Purpose
Plastic covering provides immediate, short-term erosion protection to slopes and disturbed areas.
Conditions of Use
Plastic covering may be used on disturbed areas that require cover measures for less than 30 days,
except as stated below.
• Plastic is particularly useful for protecting cut and fill slopes and stockpiles. However, the rel-
atively rapid breakdown of most polyethylene sheeting makes it unsuitable for applications
greater than six months.
• Due to rapid runoff caused by plastic covering, do not use this method upslope of areas that
might be adversely impacted by concentrated runoff. Such areas include steep and/or
unstable slopes.
• Plastic sheeting may result in increased runoff volumes and velocities, requiring additional on -
site measures to counteract the increases. Creating a trough with wattles or other material
can convey clean water away from these areas.
. To prevent undercutting, trench and backfill rolled plastic covering products.
. Although the plastic material is inexpensive to purchase, the cost of installation, maintenance,
removal, and disposal add to the total costs of this BMP.
• Whenever plastic is used to protect slopes, install water collection measures at the base of the
slope. These measures include plastic -covered berms, channels, and pipes used to convey
clean rainwater away from bare soil and disturbed areas. Do not mix clean runoff from a
plastic covered slope with dirty runoff from a project.
. Other uses for plastic include:
• Temporary ditch liner.
• Pond liner in temporary sediment pond.
• Liner for bermed temporary fuel storage area if plastic is not reactive to the type of fuel
being stored.
• Emergency slope protection during heavy rains.
• Temporary drainpipe ("elephant trunk") used to direct water.
Design and Installation Specifications
Plastic slope cover must be installed as follows:
1. Run plastic up and down the slope, not across the slope.
2. Plastic maybe installed perpendicular to a slope if the slope length is less than 10 feet.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 298 PLN2022-004 Packet Pg. 533
1.t
3. Provide a minimum of 8-inch overlap at the seams.
4. On long or wide slopes, or slopes subject to wind, tape all seams.
5. Place plastic into a small (12-inch wide by 6-inch deep) slot trench at the top of the slope
and backfill with soil to keep water from flowing underneath.
6. Place sand filled burlap or geotextile bags every 3 to 6 feet along seams and tie them
together with twine to hold them in place.
7. Inspect plastic for rips, tears, and open seams regularly and repair immediately. This
prevents high velocity runoff from contacting bare soil, which causes extreme erosion.
8. Sandbags may be lowered into place tied to ropes. However, all sandbags must be
staked in place.
• Plastic sheeting shall have a minimum thickness of 0.06 millimeters.
. If erosion at the toe of a slope is likely, a gravel berm, riprap, or other suitable protection shall
be installed at the toe of the slope in order to reduce the velocity of runoff.
Maintenance Standards
. Torn sheets must be replaced and open seams repaired.
. Completely remove and replace the plastic if it begins to deteriorate due to ultraviolet radi-
ation.
• Completely remove plastic when no longer needed.
. Dispose of old tires used to weight down plastic sheeting appropriately.
Approved as Functionally Equivalent
Ecology has approved products as able to meet the requirements of this BMP. The products did not
pass through the Technology Assessment Protocol — Ecology (TAPE) process. Local jurisdictions
may choose not to accept these products, or may require additional testing prior to consideration for
local use. Products that Ecology has approved as functionally equivalent are available for review on
Ecology's website at:
https://ecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Stormwater-per-
mittee-guidance-resources/Emerging-stormwater-treatment-technologies
BMP C124: Sodding
Purpose
The purpose of sodding is to establish turf for immediate erosion protection and to stabilize drainage
paths where concentrated overland flow will occur.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 299 PLN2022-004 Packet Pg. 534
1.t
BMP C140: Dust Control
Purpose
Dust control prevents wind transport of dust from disturbed soil surfaces onto roadways, drainage
ways, and surface waters.
Conditions of Use
Use dust control in areas (including roadways) subject to surface and air movement of dust where
on -site or off -site impacts to roadways, drainage ways, or surface waters are likely.
Design and Installation Specifications
. Vegetate or mulch areas that will not receive vehicle traffic. In areas where planting, mulching,
or paving is impractical, apply gravel or landscaping rock.
• Limit dust generation by clearing only those areas where immediate activity will take place,
leaving the remaining area(s) in the original condition. Maintain the original ground cover as
long as practical.
. Construct natural or artificial windbreaks or windscreens. These may be designed as enclos-
ures for small dust sources.
• Sprinkle the site with water until the surface is wet. Repeat as needed. To prevent carryout of
mud onto the street, refer to BMP C105: Stabilized Construction Access and BMP C106:
Wheel Wash.
. Irrigation water can be used for dust control. Irrigation systems should be installed as a first
step on sites where dust control is a concern.
• Spray exposed soil areas with a dust palliative, following the manufacturer's instructions and
cautions regarding handling and application. Used oil is prohibited from use as a dust sup-
pressant. Local governments may approve other dust palliatives such as calcium chloride or
PAM.
• PAM (BMP C126: Polyacrylamide (PAM) for Soil Erosion Protection) added to water at a rate
of 0.5 pounds per 1,000 gallons of water per acre and applied from a water truck is more effect-
ive than water alone. This is due to increased infiltration of water into the soil and reduced
evaporation. In addition, small soil particles are bonded together and are not as easily trans-
ported by wind. Adding PAM may reduce the quantity of water needed for dust control. Note
that the application rate specified here applies to this BMP, and is not the same application
rate that is specified in BMP C 126: Polyacrylamide (PAM) for Soil Erosion Protection, but the
downstream protections still apply.
Refer to BMP C 126: Polyacrylamide (PAM) for Soil Erosion Protection for conditions of use.
PAM shall not be directly applied to water or allowed to enter a water body.
• Contact your local Air Pollution Control Authority for guidance and training on other dust con-
trol measures. Compliance with the local Air Pollution Control Authority constitutes
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 313 PLN2022-004 Packet Pg. 535
1.t
compliance with this BMP.
• Use vacuum street sweepers.
• Remove mud and other dirt promptly so it does not dry and then turn into dust.
• Techniques that can be used for unpaved roads and lots include:
• Lower speed limits. High vehicle speed increases the amount of dust stirred up from
unpaved roads and lots.
• Upgrade the road surface strength by improving particle size, shape, and mineral types
that make up the surface and base materials.
• Add surface gravel to reduce the source of dust emission. Limit the amount of fine
particles (those smaller than .075 mm) to 10 to 20 percent.
• Use geotextile fabrics to increase the strength of new roads or roads undergoing recon-
struction.
• Encourage the use of alternate, paved routes, if available.
• Apply chemical dust suppressants using the admix method, blending the product with
the top few inches of surface material. Suppressants may also be applied as surface
treatments.
• Limit dust -causing work on windy days.
• Pave unpaved permanent roads and other trafficked areas.
Maintenance Standards
Respray area as necessary to keep dust to a minimum.
BMP C150: Materials on Hand
Purpose
Keep quantities of erosion prevention and sediment control materials on the project site at all times
to be used for regular maintenance and emergency situations such as unexpected heavy rains. Hav-
ing these materials on -site reduces the time needed to replace existing or implement new BMPs
when inspections indicate that existing BMPs are not meeting the Construction SWPPP require-
ments. In addition, contractors can save money by buying some materials in bulk and storing them at
their office or yard.
Conditions of Use
. Construction projects of any size or type can benefit from having materials on hand. A small
commercial development project could have a roll of plastic and some gravel available for
immediate protection of bare soil and temporary berm construction. A large earthwork project,
such as highway construction, might have several tons of straw, several rolls of plastic, flexible
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 314 PLN2022-004 Packet Pg. 536
1.t
pipe, sandbags, geotextile fabric and steel "T" posts.
. Materials should be stockpiled and readily available before any site clearing, grubbing, or
earthwork begins. A large contractor or project proponent could keep a stockpile of materials
that are available for use on several projects.
. If storage space at the project site is at a premium, the contractor could maintain the materials
at their office or yard. The office or yard must be less than an hour from the project site.
Design and Installation Specifications
Depending on project type, size, complexity, and length, materials and quantities will vary. A good
minimum list of items that will cover numerous situations includes:
. Clear Plastic, 6 mil
• Drainpipe, 6 or 8 inch diameter
• Sandbags, filled
. Straw Bales for mulching
• Quarry Spalls
• Washed Gravel
. Geotextile Fabric
. Catch Basin Inserts
. Steel "T" Posts
. Silt fence material
• Straw Wattles
Maintenance Standards
. All materials with the exception of the quarry spalls, steel "T" posts, and gravel should be kept
covered and out of both sun and rain.
• Re -stock materials as needed.
BMP C151: Concrete Handling
Purpose
Concrete work can generate process water and slurry that contain fine particles and high pH, both of
which can violate water quality standards in the receiving water. Concrete spillage or concrete dis-
charge to waters of the State is prohibited. Use this BMP to minimize and eliminate concrete, con-
crete process water, and concrete slurry from entering waters of the State.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 315 PLN2022-004 Packet Pg. 537
1.t
Conditions of Use
Any time concrete is used, utilize these management practices. Concrete construction project com-
ponents include, but are not limited to:
• Curbs
. Sidewalks
• Roads
• Bridges
• Foundations
• Floors
• Runways
Disposal options for concrete, in order of preference are:
1. Off -site disposal
2. Concrete wash -out areas (see BMP C154: Concrete Washout Area)
3. De minimus washout to formed areas awaiting concrete
Design and Installation Specifications
Wash concrete truck drums at an approved off -site location or in designated concrete
washout areas only. Do not wash out concrete trucks onto the ground (including formed areas
awaiting concrete), or into storm drains, open ditches, streets, or streams. Refer to
C 154: Concrete Washout Area for information on concrete washout areas.
Return unused concrete remaining in the truck and pump to the originating batch plant
for recycling. Do not dump excess concrete on site, except in designated concrete
washout areas as allowed in BMP C154: Concrete Washout Area.
• Wash small concrete handling equipment (e.g. hand tools, screeds, shovels, rakes, floats,
trowels, and wheelbarrows) into designated concrete washout areas or into formed areas
awaiting concrete pour.
. At no time shall concrete be washed off into the footprint of an area where an infiltration fea-
ture will be installed.
• Wash equipment difficult to move, such as concrete paving machines, in areas that do not dir-
ectly drain to natural or constructed stormwater conveyance or potential infiltration areas.
• Do not allow washwater from areas, such as concrete aggregate driveways, to drain directly
(without detention or treatment) to natural or constructed stormwater conveyances.
• Contain washwater and leftover product in a lined container when no designated concrete
washout areas (or formed areas, allowed as described above) are available. Dispose of con-
tained concrete and concrete washwater (process water) properly.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 316 PLN2022-004 Packet Pg. 538
1.t
Always use forms or solid barriers for concrete pours, such as pilings, within 15-feet of surface
waters.
Refer to BMP C252: Treating and Disposing of High pH Water for pH adjustment require-
ments.
Refer to the Construction Stormwater General Permit (CSWGP) for pH monitoring require-
ments if the project involves one of the following activities:
Significant concrete work (as defined in the CSWGP)
The use of soils amended with (but not limited to) Portland cement -treated base,
cement kiln dust or fly ash.
Discharging stormwater to segments of water bodies on the 303(d) list (Category 5) for
high pH.
Maintenance Standard
Check containers for holes in the liner daily during concrete pours and repair the same day.
BMP C152: Sawcutting and Surfacing Pollution
Prevention
Purpose
Sawcutting and surfacing operations generate slurry and process water that contains fine particles
and high pH (concrete cutting), both of which can violate the water quality standards in the receiving
water. Concrete spillage or concrete discharge to waters of the State is prohibited. Use this BMP to
minimize and eliminate process water and slurry created through sawcutting or surfacing from enter-
ing waters of the State.
Conditions of Use
Utilize these management practices anytime sawcutting or surfacing operations take place. Saw -
cutting and surfacing operations include, but are not limited to:
• Sawing
• Coring
• Grinding
. Roughening
• Hydro -demolition
• Bridge and road surfacing
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 317 PLN2022-004 Packet Pg. 539
1.t
Design and Installation Specifications
. Vacuum slurry and cuttings during cutting and surfacing operations.
. Slurry and cuttings shall not remain on permanent concrete or asphalt pavement overnight.
• Slurry and cuttings shall not drain to any natural or constructed drainage conveyance includ-
ing stormwater systems. This may require temporarily blocking catch basins.
• Dispose of collected slurry and cuttings in a manner that does not violate ground water or sur-
face water quality standards.
• Do not allow process water generated during hydro -demolition, surface roughening or similar
operations to drain to any natural or constructed drainage conveyance including stormwater
systems. Dispose of process water in a manner that does not violate ground water or surface
water quality standards.
• Handle and dispose of cleaning waste material and demolition debris in a manner that does
not cause contamination of water. Dispose of sweeping material from a pick-up sweeper at an
appropriate disposal site.
Maintenance Standards
Continually monitor operations to determine whether slurry, cuttings, or process water could enter
waters of the state. If inspections show that a violation of water quality standards could occur, stop
operations and immediately implement preventive measures such as berms, barriers, secondary
containment, and/or vacuum trucks.
BMP C153: Material Delivery, Storage, and
Containment
Purpose
Prevent, reduce, or eliminate the discharge of pollutants to the stormwater system or watercourses
from material delivery and storage. Minimize the storage of hazardous materials on -site, store mater-
ials in a designated area, and install secondary containment.
Conditions of Use
Use at construction sites with delivery and storage of the following materials:
• Petroleum products such as fuel, oil and grease
. Soil stabilizers and binders (e.g., Polyacrylamide)
• Fertilizers, pesticides and herbicides
. Detergents
. Asphalt and concrete compounds
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 318 PLN2022-004 Packet Pg. 540
1.t
• Hazardous chemicals such as acids, lime, adhesives, paints, solvents, and curing compounds
. Any other material that maybe detrimental if released to the environment
Design and Installation Specifications
. The temporary storage area should be located away from vehicular traffic, near the con-
struction entrance(s), and away from waterways or storm drains.
. Safety Data Sheets (SDS) should be supplied for all materials stored. Chemicals should be
kept in their original labeled containers.
• Hazardous material storage on -site should be minimized.
• Hazardous materials should be handled as infrequently as possible.
• During the wet weather season (Oct 1 — April 30), consider storing materials in a covered
area.
• Materials should be stored in secondary containments, such as an earthen dike, horse trough,
or even a children's wading pool for non -reactive materials such as detergents, oil, grease,
and paints. Small amounts of material may be secondarily contained in "bus boy" trays or con-
crete mixing trays.
• Do not store chemicals, drums, or bagged materials directly on the ground. Place these items
on a pallet and, when possible, within secondary containment.
. If drums must be kept uncovered, store them at a slight angle to reduce ponding of rainwater
on the lids to reduce corrosion. Domed plastic covers are inexpensive and snap to the top of
drums, preventing water from collecting.
• Liquids, petroleum products, and substances listed in 40 CFR Parts 110, 117, or 302 shall be
stored in approved containers and drums and shall not be overfilled. Containers and drums
shall be stored in temporary secondary containment facilities.
. Temporary secondary containment facilities shall provide for a spill containment volume able
to contain 10% of the total enclosed container volume of all containers, or 110% of the capa-
city of the largest container within its boundary, whichever is greater.
• Secondary containment facilities shall be impervious to the materials stored therein for a min-
imum contact time of 72 hours.
• Sufficient separation should be provided between stored containers to allow for spill cleanup
and emergency response access.
• During the wet weather season (Oct 1 — April 30), each secondary containment facility shall
be covered during non -working days, prior to and during rain events.
. Keep material storage areas clean, organized and equipped with an ample supply of appro-
priate spill clean-up material (spill kit).
. The spill kit should include, at a minimum:
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 319 PLN2022-004 Packet Pg. 541
1.t
1-Water Resistant Nylon Bag
3-Oil Absorbent Socks Yx 4'
2-Oil Absorbent Socks 3" x 10'
O 12-Oil Absorbent Pads 17"xl9"
1-Pair Splash Resistant Goggles
o 3-Pair Nitrile Gloves
10-Disposable Bags with Ties
Instructions
Maintenance Standards
• Secondary containment facilities shall be maintained free of accumulated rainwater and spills
In the event of spills or leaks, accumulated rainwater and spills shall be collected and placed
into drums. These liquids shall be handled as hazardous waste unless testing determines
them to be non -hazardous.
• Re -stock spill kit materials as needed.
BMP C154: Concrete Washout Area
Purpose
Prevent or reduce the discharge of pollutants from concrete waste to stormwater by conducting
washout off -site, or performing on -site washout in a designated area.
Conditions of Use
Concrete washout areas are implemented on construction projects where:
• Concrete is used as a construction material
. It is not possible to dispose of all concrete wastewater and washout off -site (ready mix plant,
etc.).
• Concrete truck drums are washed on -site.
Note that auxiliary concrete truck components (e.g. chutes and hoses) and small concrete
handling equipment (e.g. hand tools, screeds, shovels, rakes, floats, trowels, and wheel-
barrows) may be washed into formed areas awaiting concrete pour.
At no time shall concrete be washed off into the footprint of an area where an infiltration feature will
be installed.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 320 PLN2022-004 Packet Pg. 542
1.t
Design and Installation Specifications
Implementation
• Perform washout of concrete truck drums at an approved off -site location or in designated con-
crete washout areas only.
• Do not wash out concrete onto non -formed areas, or into storm drains, open ditches, streets,
or streams.
• Wash equipment difficult to move, such as concrete paving machines, in areas that do not dir-
ectly drain to natural or constructed stormwater conveyance or potential infiltration areas.
• Do not allow excess concrete to be dumped on -site, except in designated concrete washout
areas as allowed above.
• Concrete washout areas may be prefabricated concrete washout containers, or self -installed
structures (above -grade or below -grade).
• Prefabricated containers are most resistant to damage and protect against spills and leaks.
Companies may offer delivery service and provide regular maintenance and disposal of solid
and liquid waste.
. If self -installed concrete washout areas are used, below -grade structures are preferred over
above -grade structures because they are less prone to spills and leaks.
. Self -installed above -grade structures should only be used if excavation is not practical.
• Concrete washout areas shall be constructed and maintained in sufficient quantity and size to
contain all liquid and concrete waste generated by washout operations.
Education
• Discuss the concrete management techniques described in this BMP with the ready -mix con-
crete supplier before any deliveries are made.
• Educate employees and subcontractors on the concrete waste management techniques
described in this BMP.
. Arrange for the contractor's superintendent or Certified Erosion and Sediment Control Lead
(CESCL) to oversee and enforce concrete waste management procedures.
. A sign should be installed adjacent to each concrete washout area to inform concrete equip-
ment operators to utilize the proper facilities.
Contracts
Incorporate requirements for concrete waste management into concrete supplier and subcontractor
agreements.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 321 PLN2022-004 Packet Pg. 543
1.t
Location and Placement
• Locate concrete washout areas at least 50 feet from sensitive areas such as storm drains,
open ditches, water bodies, or wetlands.
. Allow convenient access to the concrete washout area for concrete trucks, preferably near the
area where the concrete is being poured.
. If trucks need to leave a paved area to access the concrete washout area, prevent track -out
with a pad of rock or quarry spalls (see BMP C105: Stabilized Construction Access). These
areas should be far enough away from other construction traffic to reduce the likelihood of acci-
dental damage and spills.
. The number of concrete washout areas you install should depend on the expected demand
for storage capacity.
. On large sites with extensive concrete work, concrete washout areas should be placed in mul-
tiple locations for ease of use by concrete truck drivers.
Concrete Truck Washout Procedures
Washout of concrete truck drums shall be performed in designated concrete washout areas
only.
Concrete washout from concrete pumper bins can be washed into concrete pumper trucks
and discharged into designated concrete washout areas or properly disposed of off -site.
Concrete Washout Area Installation
• Concrete washout areas should be constructed as shown in the figures below, with a recom-
mended minimum length and minimum width of 10 ft, but with sufficient quantity and volume to
contain all liquid and concrete waste generated by washout operations.
• Plastic lining material should be a minimum of 10 mil polyethylene sheeting and should be free
of holes, tears, or other defects that compromise the impermeability of the material.
• Lath and flagging should be commercial type.
• Liner seams shall be installed in accordance with manufacturers' recommendations.
• Soil base shall be prepared free of rocks or other debris that may cause tears or holes in the
plastic lining material.
Maintenance Standards
Inspection and Maintenance
. Inspect and verify that concrete washout areas are in place prior to the commencement of con-
crete work.
. Once concrete wastes are washed into the designated washout area and allowed to harden,
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 322 PLN2022-004 Packet Pg. 544
1.t
the concrete should be broken up, removed, and disposed of per applicable solid waste reg-
ulations. Dispose of hardened concrete on a regular basis.
• During periods of concrete work, inspect the concrete washout areas daily to verify continued
performance.
• Check overall condition and performance.
• Check remaining capacity (% full).
• If using self -installed concrete washout areas, verify plastic liners are intact and side -
walls are not damaged.
• If using prefabricated containers, check for leaks.
• Maintain the concrete washout areas to provide adequate holding capacity with a minimum
freeboard of 12 inches.
• Concrete washout areas must be cleaned, or new concrete washout areas must be con-
structed and ready for use once the concrete washout area is 75% full.
If the concrete washout area is nearing capacity, vacuum and dispose of the waste material in
an approved manner.
• Do not discharge liquid or slurry to waterways, storm drains or directly onto ground.
• Do not discharge to the sanitary sewer without local approval.
• Place a secure, non -collapsing, non -water collecting cover over the concrete washout
area prior to predicted wet weather to prevent accumulation and overflow of pre-
cipitation.
• Remove and dispose of hardened concrete and return the structure to a functional con-
dition. Concrete may be reused on -site or hauled away for disposal or recycling.
When you remove materials from a self -installed concrete washout area, build a new struc-
ture; or, if the previous structure is still intact, inspect for signs of weakening or damage, and
make any necessary repairs. Re -line the structure with new plastic after each cleaning.
Removal of Concrete Washout Areas
• When concrete washout areas are no longer required for the work, the hardened concrete,
slurries and liquids shall be removed and properly disposed of.
• Materials used to construct concrete washout areas shall be removed from the site of the work
and disposed of or recycled.
Holes, depressions or other ground disturbance caused by the removal of the concrete
washout areas shall be backfilled, repaired, and stabilized to prevent erosion.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 323 PLN2022-004 Packet Pg. 545
1.t
Figure 11-3.7: Concrete Washout Area with Wood Planks
3m Minimum
Lath and flagging
n �1 on 3 sides
�J J Sandbag
Berm Sandbag
10 mil plastic lining
Varies �J A A
r, 1 m
U
Plan 10 mil plastic lining
Section A -A
Type "Below Grade"
Stake (typ.)
iil plastic lining
Berm
'1 Actual layout
determined in the field.
2. A concrete washout
sign shall be installed
within 10 m of the
temporary concrete
washout facility.
Wood frame
securely fastened
around entire
perimeter with two
stakes
10 mil
plastic lining
Section B-B
2x12 rough Plan
wood frame
Tvi3e "Above Grade" with Wood Planks
NOT TO SCALE
Concrete Washout Area with Wood Planks
Revised June 2016
DEPARTMENT OF
ECOLOGYPlease see http://www.ecy.wa.gov/copyright.html for copyright notice including permissions,
State of Washington limitation of liability, and disclaimer.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 324 PLN2022-004 Packet Pg. 546
1.t
Figure II-3.8: Concrete Washout Area with Straw Bales
Straw bale
Lmaterial
Staples (2 per bale)
Wood or
metal stakes
(2 per bale)
Section B-B
3m Minimum
Stake (typ)
B
Varies
■ ■
■ ■ R R ■ R ■
Straw bale
(tyF )
Plan
ohm
Binding wire
Plywood
1200 mm x 610 mm Wood post
painted white (89 mm x 89 mm
.....Lag screws x 2.4 m)
(12.5 mm)
1 CONCRETEI Black (otters
vvnsHouT 150 mm height
915 mm
915 mm
Concrete _Washout Sign
Detail (or equivalent)
i 50 mm
200 Trim 3.05 mm dia.
steel wire
Staple Oetail
'nil plastic lining Notes:
1. Actual layout
determined in the field
2. The concrete washout
sign shall be installed
within 10 m of the
temporary concrete
washout facility.
Type "Above Grade" with Straw Bales
NOT TO SCALE
Concrete Washout Area with Straw Bales
Revised June 2016
DEPARTMENT OF,
EC O L O G Y Please see http.11www.ecy. wa.govlcopyright.html for copyright notice including permissions,
State of Washington limitation of liability, and disclaimer.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 325 PLN2022-004 Packet Pg. 547
1.t
Figure II-3.9: Prefabricated Concrete Washout Container w/Ramp
vha�
DEPARTMENT OF
ECOLOGY
State of Washington
NOT TO SCALE
Prefabricated Concrete Washout Container
w/Ramp
Revised June 2016
Please see http:1Avww.ecy. wa gov/copyright html for copyright notice including permissions,
limitation of liability, and disclaimer.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume /I - Chapter 3 - Page 326 PLN2022-004 Packet Pg. 548
1.t
BMP C160: Certified Erosion and Sediment Control
Lead
Purpose
The project proponent designates at least one person as the responsible representative in charge of
erosion and sediment control (ESC), and water quality protection. The designated person shall be
responsible for ensuring compliance with all local, state, and federal erosion and sediment control
and water quality requirements. Construction sites one acre or larger that discharge to waters of the
State must designate a Certified Erosion and Sediment Control Lead (CESCL) as the responsible
representative.
Conditions of Use
A CESCL shall be made available on projects one acre or larger that discharge stormwater to sur-
face waters of the state. Sites less than one acre may have a person without CESCL certification
conduct inspections.
The CESCL shall:
Have a current certificate proving attendance in an erosion and sediment control training
course that meets the minimum ESC training and certification requirements established by
Ecology.
Ecology has provided the minimum requirements for CESCL course training, as well as a list
of ESC training and certification providers at:
https:Hecology.wa.gov/Regulations-Permits/Permits-certifications/Certified-erosion-sed-
iment-control
X7
Be a Certified Professional in Erosion and Sediment Control (CPESC). For additional inform-
ation go to:
http://www.envirocertintl.org/cpesc/
Specifications
. CESCL certification shall remain valid for three years.
. The CESCL shall have authority to act on behalf of the contractor or project proponent and
shall be available, or on -call, 24 hours per day throughout the period of construction.
. The Construction SWPPP shall include the name, telephone number, fax number, and
address of the designated CESCL. See II-2 Construction Stormwater Pollution Prevention
Plans (Construction SWPPPs
. A CESCL may provide inspection and compliance services for multiple construction projects
in the same geographic region, but must be on site whenever earthwork activities are
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 327 PLN2022-004 Packet Pg. 549
1.t
occurring that could generate release of turbid water.
Duties and responsibilities of the CESCL shall include, but are not limited to the following:
• Maintaining a permit file on site at all times which includes the Construction SWPPP
and any associated permits and plans.
• Directing BMP installation, inspection, maintenance, modification, and removal.
• Updating all project drawings and the Construction SWPPP with changes made.
• Completing any sampling requirements including reporting results using electronic Dis-
charge Monitoring Reports (WebDMR).
• Facilitate, participate in, and take corrective actions resulting from inspections per-
formed by outside agencies or the owner.
• Keeping daily logs, and inspection reports. Inspection reports should include:
■ Inspection date/time.
■ Weather information; general conditions during inspection and approximate
amount of precipitation since the last inspection.
■ Visual monitoring results, including a description of discharged stormwater. The
presence of suspended sediment, turbid water, discoloration, and oil sheen shall
be noted, as applicable.
■ Any water quality monitoring performed during inspection.
■ General comments and notes, including a brief description of any BMP repairs,
maintenance or installations made as a result of the inspection.
■ A summary or list of all BMPs implemented, including observations of all
erosion/sediment control structures or practices. The following shall be noted:
1. Locations of BMPs inspected.
2. Locations of BMPs that need maintenance.
3. Locations of BMPs that failed to operate as designed or intended.
4. Locations of where additional or different BMPs are required.
BMP C162: Scheduling
Purpose
Sequencing a construction project reduces the amount and duration of soil exposed to erosion by
wind, rain, runoff, and vehicle tracking.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 328 PLN2022-004 Packet Pg. 550
1.t
Conditions of Use
The construction sequence schedule is an orderly listing of all major land -disturbing activities
together with the necessary erosion and sedimentation control measures planned for the project.
This type of schedule guides the contractor on work to be done before other work is started so that
serious erosion and sedimentation problems can be avoided.
Following a specified work schedule that coordinates the timing of land -disturbing activities and the
installation of control measures is perhaps the most cost-effective way of controlling erosion during
construction. The removal of ground cover leaves a site vulnerable to erosion. Construction sequen-
cing that limits land clearing, provides timely installation of erosion and sedimentation controls, and
restores protective cover quickly can significantly reduce the erosion potential of a site.
Design Considerations
. Minimize construction during rainy periods.
Schedule projects to disturb only small portions of the site at any one time. Complete grading
as soon as possible. Immediately stabilize the disturbed portion before grading the next por-
tion. Practice staged seeding in order to revegetate cut and fill slopes as the work progresses
II-3.3 Construction Runoff BMPs
BMP C200: Interceptor Dike and Swale
Purpose
Provide a dike of compacted soil or a swale at the top or base of a disturbed slope or along the peri-
meter of a disturbed construction area to convey stormwater. Use the dike and/or swale to intercept
the runoff from unprotected areas and direct it to areas where erosion can be controlled. This can
prevent storm runoff from entering the work area or sediment -laden runoff from leaving the con-
struction site.
Conditions of Use
Use an interceptor dike or swale where runoff from an exposed site or disturbed slope must be con-
veyed to an erosion control BMP which can safely convey the stormwater.
Locate upslope of a construction site to prevent runoff from entering the disturbed area.
When placed horizontally across a disturbed slope, it reduces the amount and velocity of run-
off flowing down the slope.
Locate downslope to collect runoff from a disturbed area and direct it to a sediment BMP (e.g.
BMP C240: Sediment Trap or BMP C241: Sediment Pond (Temporary)).
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 329 PLN2022-004 Packet Pg. 551
1.t
Design and Installation Specifications
• Dike and/or swale and channel must be stabilized with temporary or permanent vegetation or
other channel protection during construction.
• Steep grades require channel protection and check dams.
. Review construction for areas where overtopping may occur.
. Can be used at the top of new fill before vegetation is established.
• May be used as a permanent diversion channel to carry the runoff.
. Contributing area for an individual dike or swale should be one acre or less.
• Design the dike and/or swale to contain flows calculated by one of the following methods:
Single Event Hydrograph Method: The peak volumetric flow rate calculated using a 10-
minute time step from a Type 1A, 10-year, 24-hour frequency storm for the worst -case
land cover condition.
OR
Continuous Simulation Method: The 10-year peak flow rate, as determined by an
approved continuous runoff model with a 15-minute time step for the worst -case land
cover condition.
Worst -case land cover conditions (i.e., producing the most runoff) should be used for analysis
(in most cases, this would be the land cover conditions just prior to final landscaping).
Interceptor Dikes
Interceptor dikes shall meet the following criteria:
. Top Width: 2 feet minimum.
• Height: 1.5 feet minimum on berm.
• Side Slope: 2H:1V or flatter.
• Grade: Depends on topography, however, dike system minimum is 0.5%, and maximum is
1%.
. Compaction: Minimum of 90 percent ASTM D698 standard proctor.
. Stabilization: Depends on velocity and reach. Inspect regularly to ensure stability.
• Ground Slopes <5%: Seed and mulch applied within 5 days of dike construction (see BMP
C121: Mulching).
• Ground Slopes 5 - 40%: Dependent on runoff velocities and dike materials. Stabilization
should be done immediately using either sod or riprap, or other measures to avoid erosion.
. The upslope side of the dike shall provide positive drainage to the dike outlet. No erosion shall
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 330 PLN2022-004 Packet Pg. 552
1.t
occur at the outlet. Provide energy dissipation measures as necessary. Sediment -laden runoff
must be released through a sediment trapping facility.
. Minimize construction traffic over temporary dikes. Use temporary cross culverts for channel
crossing.
. See Table II-3.8: Horizontal Spacing of Interceptor Dikes Along Ground Slope for recom-
mended horizontal spacing between dikes.
Table II-3.8: Horizontal Spacing of
Interceptor Dikes Along Ground
Slope
Average Slope
Slope Percent
Flowpath Length
20H:1V or less
3-5%
300 feet
(10 to 20)H:1V
5-10%
200 feet
(4 to 1Oft 1V
10-25%
100 feet
(2 to 4)H:1V
25-50%
50 feet
Interceptor Swales
Interceptor swales shall meet the following criteria:
Bottom Width: 2 feet minimum; the cross-section bottom shall be level.
. Depth: 1-foot minimum.
Side Slope: 2H:1V or flatter.
. Grade: Maximum 5 percent, with positive drainage to a suitable outlet (such as BMP C241
Sediment Pond (Temporary)).
. Stabilization: Seed as per BMP C120: Temporary and Permanent Seeding, or BMP C202:
Riprap Channel Lining, 12 inches thick riprap pressed into the bank and extending at least 8
inches vertical from the bottom.
Maintenance Standards
. Inspect diversion dikes and interceptor swales once a week and after every rainfall. Imme-
diately remove sediment from the flow area.
Damage caused by construction traffic or other activity must be repaired before the end of
each working day.
. Check outlets and make timely repairs as needed to avoid gully formation. When the area
below the temporary diversion dike is permanently stabilized, remove the dike and fill and sta-
bilize the channel to blend with the natural surface.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 331 PLN2022-004 Packet Pg. 553
1.t
BMP C207: Check Dams
Purpose
Construction of check dams across a swale or ditch reduces the velocity of concentrated flow and dis-
sipates energy at the check dam.
Conditions of Use
Use check dams where temporary or permanent channels are not yet vegetated, channel lining is
infeasible, and/or velocity checks are required.
. Check dams may not be placed in streams unless approved by the State Department of Fish
and Wildlife.
. Check dams may not be placed in wetlands without approval from a permitting agency.
• Do not place check dams below the expected backwater from any salmonid bearing water
between October 1 and May 31 to ensure that there is no loss of high flow refuge habitat for
overwintering juvenile salmonids and emergent salmonid fry.
Design and Installation Specifications
• Construct rock check dams from appropriately sized rock. The rock used must be large
enough to stay in place given the expected design flow through the channel. The rock must be
placed by hand or by mechanical means (do not dump the rock to form the dam) to achieve
complete coverage of the ditch or swale and to ensure that the center of the dam is lower than
the edges.
. Check dams may also be constructed of either rock or pea -gravel filled bags. Numerous new
products are also available for this purpose. They tend to be re -usable, quick and easy to
install, effective, and cost efficient.
• Place check dams perpendicular to the flow of water.
. The check dam should form a triangle when viewed from the side. This prevents undercutting
as water flows over the face of the check dam rather than falling directly onto the ditch bottom.
• Before installing check dams, impound and bypass upstream water flow away from the work
area. Options for bypassing include pumps, siphons, or temporary channels.
. Check dams combined with sumps work more effectively at slowing flow and retaining sed-
iment than a check dam alone. A deep sump should be provided immediately upstream of the
check dam.
. In some cases, if carefully located and designed, check dams can remain as permanent install-
ations with very minor regrading. They may be left as either spillways, in which case accu-
mulated sediment would be graded and seeded, or as check dams to prevent further
sediment from leaving the site.
. The maximum spacing between check dams shall be such that the downstream toe of the
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 351 PLN2022-004 Packet Pg. 554
1.t
upstream dam is at the same elevation as the top of the downstream dam.
• Keep the maximum height at 2 feet at the center of the check dam.
• Keep the center of the check dam at least 12 inches lower than the outer edges at natural
ground elevation.
• Keep the side slopes of the check dam at 2H:1 V or flatter.
. Key the stone into the ditch banks and extend it beyond the abutments a minimum of 18
inches to avoid washouts from overflow around the dam.
• Use filter fabric foundation under a rock or sand bag check dam. If a blanket ditch liner is used,
filter fabric is not necessary. A piece of organic or synthetic blanket cut to fit will also work for
this purpose.
. In the case of grass -lined ditches and swales, all check dams and accumulated sediment shall
be removed when the grass has matured sufficiently to protect the ditch or swale - unless the
slope of the swale is greater than 4 percent. The area beneath the check dams shall be
seeded and mulched immediately after dam removal.
• Ensure that channel appurtenances, such as culvert entrances below check dams, are not
subject to damage or blockage from displaced stones.
. See Figure II-3.16: Rock Check Dam.
Maintenance Standards
Check dams shall be monitored for performance and sediment accumulation during and after each
rainfall that produces runoff. Sediment shall be removed when it reaches one half the sump depth.
. Anticipate submergence and deposition above the check dam and erosion from high flows
around the edges of the dam.
. If significant erosion occurs between dams, install a protective riprap liner in that portion of the
channel. See BMP C202: Riprap Channel Lining.
Approved as Functionally Equivalent
Ecology has approved products as able to meet the requirements of this BMP. The products did not
pass through the Technology Assessment Protocol — Ecology (TAPE) process. Local jurisdictions
may choose not to accept these products, or may require additional testing prior to consideration for
local use. Products that Ecology has approved as functionally equivalent are available for review on
Ecology's website at:
https://ecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Stormwater-per-
mittee-guidance-resources/Emerging-stormwater-treatment-technologies
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 352 PLN2022-004 Packet Pg. 555
1.t
Figure II-3.16: Rock Check Dam
View Looking Upstream
A 18"
12" (0.5m)
(150mm)
(0.6m)
Note:
Key stone into channel banks and extend it
beyond the abutments a minimum of 18"
(0.5m) to prevent flow around dam. A
Section A -A
Spacing Between Check Dams
DEPARTMENT OF
ECOLOGY
State of Washington
'L' = the distance such that points
'A' and 'B' are of equal elevation.
Rock Check Dam
NOT TO SCALE
Revised June 2016
Please see http://wwwecy.wa.gov/copyright.html for copyright notice including permissions,
limitation of liability, and disclaimer.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 353 PLN2022-004 Packet Pg. 556
1.t
and staples.
In the case of grass -lined ditches and swales, check dams and accumulated sediment
shall be removed when the grass has matured sufficiently to protect the ditch or swale
unless the slope of the swale is greater than 4 percent. The area beneath the check
dams shall be seeded and mulched immediately after dam removal.
Maintenance Standards
. Inspect TSDs for performance and sediment accumulation during and after each rainfall that
produces runoff. Remove sediment when it reaches one half the height of the TSD.
. Anticipate submergence and deposition above the TSD and erosion from high flows around
the edges of the TSD. Immediately repair any damage or any undercutting of the TSD.
BMP C209: Outlet Protection
Purpose
Outlet protection prevents scour at conveyance outlets and minimizes the potential for downstream
erosion by reducing the velocity of concentrated stormwater flows.
Conditions of Use
Use outlet protection at the outlets of all ponds, pipes, ditches, or other conveyances that discharge
to a natural or manmade drainage feature such as a stream, wetland, lake, or ditch.
Design and Installation Specifications
. The receiving channel at the outlet of a pipe shall be protected from erosion by lining a min-
imum of 6 feet downstream and extending up the channel sides a minimum of 1—foot above
the maximum tailwater elevation, or 1-foot above the crown, whichever is higher. For pipes lar-
ger than 18 inches in diameter, the outlet protection lining of the channel shall be four times
the diameter of the outlet pipe.
• Standard wingwalls, tapered outlets, and paved channels should also be considered when
appropriate for permanent culvert outlet protection (WSDOT, 2015).
• BMP C122: Nets and Blankets or BMP C202: Riprap Channel Lining provide suitable options
for lining materials.
• With low flows, BMP C201: Grass -Lined Channels can be an effective alternative for lining
material.
. The following guidelines shall be used for outlet protection with riprap:
If the discharge velocity at the outlet is less than 5 fps, use 2-inch to 8-inch riprap. Min-
imum thickness is 1-foot.
For 5 to 10 fps discharge velocity at the outlet, use 24-inch to 48-inch riprap. Minimum
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 355 PLN2022-004 Packet Pg. 557
1.t
thickness is 2 feet.
For outlets at the base of steep slope pipes (pipe slope greater than 10 percent), use an
engineered energy dissipator.
Filter fabric or erosion control blankets should always be used under riprap to prevent
scour and channel erosion. See BMP C122: Nets and Blankets.
Bank stabilization, bioengineering, and habitat features maybe required for disturbed areas.
This work may require a Hydraulic Project Approval (HPA) from the Washington State Depart-
ment of Fish and Wildlife. See 1-2.11 Hydraulic Project Approvals.
Maintenance Standards
. Inspect and repair as needed.
. Add rock as needed to maintain the intended function.
Clean energy dissipator if sediment builds up.
BMP C220: Inlet Protection
Purpose
Inlet protection prevents coarse sediment from entering drainage systems prior to permanent sta-
bilization of the disturbed area.
Conditions of Use
Use inlet protection at inlets that are operational before permanent stabilization of the disturbed
areas that contribute runoff to the inlet. Provide protection for all storm drain inlets downslope and
within 500 feet of a disturbed or construction area, unless those inlets are preceded by a sediment
trapping BMP.
Also consider inlet protection for lawn and yard drains on new home construction. These small and
numerous drains coupled with lack of gutters can add significant amounts of sediment into the roof
drain system. If possible, delay installing lawn and yard drains until just before landscaping, or cap
these drains to prevent sediment from entering the system until completion of landscaping. Provide
18-inches of sod around each finished lawn and yard drain.
Table 11-3.10: Storm Drain Inlet Protection lists several options for inlet protection. All of the methods
for inlet protection tend to plug and require a high frequency of maintenance. Limit contributing drain-
age areas for an individual inlet to one acre or less. If possible, provide emergency overflows with
additional end -of -pipe treatment where stormwater ponding would cause a hazard.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 356 PLN2022-004 Packet Pg. 558
1.t
Table II-3.10: Storm Drain Inlet Protection
Type of Inlet Pro-
Emergency
Applicable for
tection
Overflow
Paved/ Earthen Sur-
Conditions of Use
faces
Drop Inlet Protection
Yes, temporary
Applicable for heavy flows. Easy
Excavated drop
flooding may
Earthen
to maintain. Large area requirement:
inlet protection
occur
30'x30'/acre
Block and gravel
Applicable for heavy concentrated flows.
drop inlet pro-
Yes
Paved or Earthen
Will not pond.
tection
Gravel and wire
Applicable for heavy concentrated flows.
drop inlet pro-
No
Paved or Earthen
Will pond. Can withstand traffic.
tection
Catch basin filters
Yes
Paved or Earthen
Frequent maintenance required.
Curb Inlet Protection
Curb inlet pro-
Small capacity
Used for sturdy, more compact install-
tection with
overflow
Paved
ation.
wooden weir
Block and gravel
curb inlet pro-
Yes
Paved
Sturdy, but limited filtration.
tection
Culvert Inlet Protection
Culvert inlet sed-
N/A
N/A
18 month expected life.
iment trap
Design and Installation Specifications
Excavated Drop Inlet Protection
Excavated drop inlet protection consists of an excavated impoundment around the storm drain inlet.
Sediment settles out of the stormwater prior to entering the storm drain. Design and installation spe-
cifications for excavated drop inlet protection include:
. Provide a depth of 1-2 ft as measured from the crest of the inlet structure.
. Slope sides of excavation should be no steeper than 2H:1 V.
. Minimum volume of excavation is 35 cubic yards.
Shape the excavation to fit the site, with the longest dimension oriented toward the longest
inflow area.
. Install provisions for draining to prevent standing water.
. Clear the area of all debris.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 357 PLN2022-004 Packet Pg. 559
1.t
• Grade the approach to the inlet uniformly.
• Drill weep holes into the side of the inlet.
• Protect weep holes with screen wire and washed aggregate.
• Seal weep holes when removing structure and stabilizing area.
• Build a temporary dike, if necessary, to the down slope side of the structure to prevent bypass
flow.
Block and Gravel Filter
A block and gravel filter is a barrier formed around the inlet with standard concrete blocks and gravel
See Figure II-3.17: Block and Gravel Filter. Design and installation specifications for block gravel fil-
ters include:
• Provide a height of 1 to 2 feet above the inlet.
• Recess the first row of blocks 2-inches into the ground for stability.
• Support subsequent courses by placing a pressure treated wood 2x4 through the block open-
ing.
• Do not use mortar.
• Lay some blocks in the bottom row on their side to allow for dewatering the pool.
• Place hardware cloth or comparable wire mesh with'/2-inch openings over all block openings.
• Place gravel to just below the top of blocks on slopes of 2H:1 V or flatter.
. An alternative design is a gravel berm surrounding the inlet, as follows:
• Provide a slope of 3H:1 V on the upstream side of the berm.
• Provide a slope of 2H:1 V on the downstream side of the berm.
• Provide a 1-foot wide level stone area between the gravel berm and the inlet.
Use stones 3 inches in diameter or larger on the upstream slope of the berm.
Use gravel'/2- to 3/4-inch at a minimum thickness of 1-foot on the downstream slope of
the berm.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 358 PLN2022-004 Packet Pg. 560
1.t
Figure II-3.17: Block and Gravel Filter
Drain grate
n
Plan View
crete block
Gravel backfill
Concrete block
Wire screen or
filter fabric
Gravel backfill Overflow
i waterer (�Ponding height
9-,on � III Water l 11 l I I I I n o��nno-a
Drop inlet
Section A -A
Notes:
1. Drop inlet sediment barriers are to be used for small, nearly level drainage areas. (less
than 5%)
2. Excavate a basin of sufficient size adjacent to the drop inlet.
3. The top of the structure (ponding height) must be well below the ground elevation
downslope to prevent runoff from bypassing the inlet. A temporary dike may be
necessary on the downslope side of the structure.
DEPARTMENT OF
ECOLOGY
State of Washington
Block and Gravel Filter
NOT TO SCALE
Revised June 2016
Please see http://wwwecy.wa.gov/copyright.html for copyright notice including permissions,
limitation of liability, and disclaimer.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 359 PLN2022-004 Packet Pg. 561
1.t
Gravel and Wire Mesh Filter
Gravel and wire mesh filters are gravel barriers placed over the top of the inlet. This method does not
provide an overflow. Design and installation specifications for gravel and wire mesh filters include:
• Use a hardware cloth or comparable wire mesh with'/2-inch openings.
Place wire mesh over the drop inlet so that the wire extends a minimum of 1-foot bey-
ond each side of the inlet structure.
Overlap the strips if more than one strip of mesh is necessary.
. Place coarse aggregate over the wire mesh.
Provide at least a 12-inch depth of aggregate over the entire inlet opening and extend at
least 18-inches on all sides.
Catch Basin Filters
Catch basin filters are designed by manufacturers for construction sites. The limited sediment stor-
age capacity increases the amount of inspection and maintenance required, which may be daily for
heavy sediment loads. To reduce maintenance requirements, combine a catch basin filter with
another type of inlet protection. This type of inlet protection provides flow bypass without overflow
and therefore may be a better method for inlets located along active rights -of -way. Design and install-
ation specifications for catch basin filters include:
• Provides 5 cubic feet of storage.
• Requires dewatering provisions.
• Provides a high -flow bypass that will not clog under normal use at a construction site.
. Insert the catch basin filter in the catch basin just below the grating.
Curb Inlet Protection with Wooden Weir
Curb inlet protection with wooden weir is an option that consists of a barrier formed around a curb
inlet with a wooden frame and gravel. Design and installation specifications for curb inlet protection
with wooden weirs include:
• Use wire mesh with'/2-inch openings.
• Use extra strength filter cloth.
• Construct a frame.
. Attach the wire and filter fabric to the frame.
• Pile coarse washed aggregate against the wire and fabric.
• Place weight on the frame anchors.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 360 PLN2022-004 Packet Pg. 562
1.t
Block and Gravel Curb Inlet Protection
Block and gravel curb inlet protection is a barrier formed around a curb inlet with concrete blocks and
gravel. See Figure 11-3.18: Block and Gravel Curb Inlet Protection. Design and installation spe-
cifications for block and gravel curb inlet protection include:
• Use wire mesh with'/2-inch openings.
• Place two concrete blocks on their sides abutting the curb at either side of the inlet opening
These are spacer blocks.
• Place a 2A stud through the outer holes of each spacer block to align the front blocks.
• Place blocks on their sides across the front of the inlet and abutting the spacer blocks.
• Place wire mesh over the outside vertical face.
• Pile coarse aggregate against the wire to the top of the barrier.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 361 PLN2022-004 Packet Pg. 563
1.t
Figure II-3.18: Block and Gravel Curb Inlet Protection
Back of sidewalk
Back of curb
Wire sere
filler
. .. 7Q 3i�un �cv nnnj
Chain gravel
�a inch (20 mm)
Drain gravel
Plan View
Ponding height
Overilov�,
Curb inlet
Wire screen or
filter tabric 2x4 Wood stud
(100x50 Timber stud)
Catch
Concrete block
Section A -A
'ud
Mock
Notes:
1. Use block and gravel type sediment barrier when curb inlet is located in gently sloping street
segment, where water can pond and allow sediment to separate trom runoft.
2. Barrier shall allow for overflow from severe storm event.
3. Inspect barriers and remove sediment after each storm event. Sediment and gravel must be
removed trom the traveled way immediately. NOT TO SCALE
I
I
I
Block and Gravel Curb Inlet Protection
Revised June 2016
DEPARTMENT OF,
EC O L OGYr Please see http://www.ecy. wa.govfcapyrlghthiml for copyright notice including permissions,
State of Washington limitation of liability, and disclaimer.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 362 PLN2022-004 Packet Pg. 564
1.t
Curb and Gutter Sediment Barrier
Curb and gutter sediment barrier is a sandbag or rock berm (riprap and aggregate) 3 feet high and 3
feet wide in a horseshoe shape. See Figure II-3.19: Curb and Gutter Barrier. Design and installation
specifications for curb and gutter sediment barrier include:
Construct a horseshoe shaped berm, faced with coarse aggregate if using riprap, 3 feet high
and 3 feet wide, at least 2 feet from the inlet.
. Construct a horseshoe shaped sedimentation trap on the upstream side of the berm. Size the
trap to sediment trap standards for protecting a culvert inlet.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 363 PLN2022-004 Packet Pg. 565
1.t
Figure II-3.19: Curb and Gutter Barrier
Back of sidewalk
Burlap sacks to
overlap onto curb Back of curb
�- Gravel filled sandbags
stacked tightly
Notes:
f 1. Place curb type sediment barriers on gently sloping street segments, where water can
pond and allow sediment to separate from runoff.
f 2. Sandbags of either burlap or woven 'geotextile fabric, are filled with gravel, layered
f and packed tightly.
f 3. Leave a one sandbag gap in the top row to provide a spillway for overflow.
4. Inspect barriers and remove sediment after each storm event. Sediment and gravel
must be removed from the traveled way immediately. NOT TO SCALE
E
E
f
E�
f I
E Curb and Gutter Barrier
f
E
i ..... Revised ,tune 2016
f
f
iDEPARTMENT OF,
"ECOLOGYr Please see http.1AYww.ecy. wa.govlcopyright.htmt for copyright notice including permissions,
f State of Washington limitation of liability, and disclaimer.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 364 PLN2022-004 Packet Pg. 566
1.t
Maintenance Standards
Inspect all forms of inlet protection frequently, especially after storm events. Clean and
replace clogged catch basin filters. For rock and gravel filters, pull away the rocks from the
inlet and clean or replace. An alternative approach would be to use the clogged rock as fill and
put fresh rock around the inlet.
Do not wash sediment into storm drains while cleaning. Spread all excavated material evenly
over the surrounding land area or stockpile and stabilize as appropriate.
Approved as Functionally Equivalent
Ecology has approved products as able to meet the requirements of this BMP. The products did not
pass through the Technology Assessment Protocol — Ecology (TAPE) process. Local jurisdictions
may choose not to accept these products, or may require additional testing prior to consideration for
local use. Products that Ecology has approved as functionally equivalent are available for review on
Ecology's website at:
https://ecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Stormwater-per-
mittee-guidance-resources/Emerging-stormwater-treatment-technologies
BMP C231: Brush Barrier
Purpose
The purpose of brush barriers is to reduce the transport of coarse sediment from a construction site
by providing a temporary physical barrier to sediment and reducing the runoff velocities of overland
flow.
Conditions of Use
Brush barriers maybe used downslope of disturbed areas that are less than one -quarter acre.
Brush barriers are not intended to treat concentrated flows, nor are they intended to treat sub-
stantial amounts of overland flow. Any concentrated flows must be directed to a sediment trap-
ping BMP. The only circumstance in which overland flow can be treated solely by a brush
barrier, rather than by a sediment trapping BMP, is when the area draining to the barrier is
small.
. Brush barriers should only be installed on contours.
Design and Installation Specifications
Height: 2 feet (minimum) to 5 feet (maximum).
Width: 5 feet at base (minimum) to 15 feet (maximum).
Filter fabric (geotextile) maybe anchored over the brush berm to enhance the filtration ability
of the barrier. Ten -ounce burlap is an adequate alternative to filter fabric.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 365 PLN2022-004 Packet Pg. 567
1.t
BMP C233: Silt Fence
Purpose
Silt fence reduces the transport of coarse sediment from a construction site by providing a temporary
physical barrier to sediment and reducing the runoff velocities of overland flow.
Conditions of Use
Silt fence may be used downslope of all disturbed areas.
Silt fence shall prevent sediment carried by runoff from going beneath, through, or over the
top of the silt fence, but shall allow the water to pass through the fence.
Silt fence is not intended to treat concentrated flows, nor is it intended to treat substantial
amounts of overland flow. Convey any concentrated flows through the drainage system to a
sediment trapping BMP.
Do not construct silt fences in streams or use in V-shaped ditches. Silt fences do not provide
an adequate method of silt control for anything deeper than sheet or overland flow.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 370 PLN2022-004 Packet Pg. 568
1.t
Figure II-3.22: Silt Fence
Joints in geolextile fabric shall be
spliced at posts. Use staples, wire rings
or equivalent to attach fabric to posts
2"x2" by 14 Ga. wire or equivalent, it standard strength tabric used
I I 1 t I 1,1-7 7.
I
Minimum 1 I 6' max I
4"x4" trench 1 I
u
Post spacing may be increased 2"x2" wood posts, steel
to 8' if wire backing is used tence posts, or equivalent
2"x2" by 14 Ga. wire or equivalent,
if standard strength tabric used
DEPARTMENT OF
ECOLOGY
State of Washington
Geotextile fabric -
\,
2' min
Backftfl trench with
native soil or 3,14" - A •:
1.$" washed gravel
12" min
Minimum
Vx4" trench
2"x2" wood posts, steel
fence posts, or equivalent
NOT TO SCALE
Silt Fence
Revised July 2017
Please see httP.11www.ecy. wa.govfcopyright.html for copyright notice including permissions,
limitation of liability, and disclaimer.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 371 PLN2022-004 Packet Pg. 569
1.t
Design and Installation Specifications
Use in combination with other construction stormwater BMPs.
Maximum slope steepness (perpendicular to the silt fence line) 1 H:1 V.
Maximum sheet or overland flow path length to the silt fence of 100 feet.
Do not allow flows greater than 0.5 cfs.
Use geotextile fabric that meets the following standards. All geotextile properties listed below
are minimum average roll values (i.e., the test result for any sampled roll in a lot shall meet or
exceed the values shown in Table 11-3.11: Geotextile Fabric Standards for Silt Fence):
Table II-3.11: Geotextile Fabric Standards for Silt Fence
Geotextile Property
Minimum Average Roll Value
0.60 mm maximum for slit film woven (#30 sieve).
Polymeric Mesh AOS
0.30 mm maximum for all other geotextile types (#50 sieve).
(ASTM D4751)
0.15 mm minimum for all fabric types (#100 sieve).
Water Permittivity
0.02 sec-1 minimum
(ASTM D4491)
Grab Tensile Strength
180 lbs. Minimum for extra strength fabric.
(ASTM D4632)
100 Ibs minimum for standard strength fabric.
Grab Tensile Strength
30% maximum
(ASTM D4632)
Ultraviolet Resistance
70% minimum
(ASTM D4355)
Support standard strength geotextiles with wire mesh, chicken wire, 2-inch x 2-inch wire,
safety fence, or jute mesh to increase the strength of the geotextile. Silt fence materials are
available that have synthetic mesh backing attached.
. Silt fence material shall contain ultraviolet ray inhibitors and stabilizers to provide a minimum
of six months of expected usable construction life at a temperature range of 0°F to 120°F.
One -hundred percent biodegradable silt fence is available that is strong, long lasting, and can
be left in place after the project is completed, if permitted by the local jurisdiction.
Refer to Figure II-3.22: Silt Fence for standard silt fence details. Include the following Stand-
ard Notes for silt fence on construction plans and specifications:
The Contractor shall install and maintain temporary silt fences at the locations shown in
the Plans.
2. Construct silt fences in areas of clearing, grading, or drainage prior to starting those
activities.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 372 PLN2022-004 Packet Pg. 570
1.t
3. The silt fence shall have a 2-feet min. and a 2'/2-feet max. height above the original
ground surface.
4. The geotextile fabric shall be sewn together at the point of manufacture to form fabric
lengths as required. Locate all sewn seams at support posts. Alternatively, two sections
of silt fence can be overlapped, provided that the overlap is long enough and that the
adjacent silt fence sections are close enough together to prevent silt laden water from
escaping through the fence at the overlap.
5. Attach the geotextile fabric on the up -slope side of the posts and secure with staples,
wire, or in accordance with the manufacturer's recommendations. Attach the geotextile
fabric to the posts in a manner that reduces the potential for tearing.
6. Support the geotextile fabric with wire or plastic mesh, dependent on the properties of
the geotextile selected for use. If wire or plastic mesh is used, fasten the mesh securely
to the up -slope side of the posts with the geotextile fabric up -slope of the mesh.
7. Mesh support, if used, shall consist of steel wire with a maximum mesh spacing of 2-
inches, or a prefabricated polymeric mesh. The strength of the wire or polymeric mesh
shall be equivalent to or greater than 180 lbs. grab tensile strength. The polymeric mesh
must be as resistant to the same level of ultraviolet radiation as the geotextile fabric it
supports.
8. Bury the bottom of the geotextile fabric 4-inches min. below the ground surface. Backfill
and tamp soil in place over the buried portion of the geotextile fabric, so that no flow can
pass beneath the silt fence and scouring cannot occur. When wire or polymeric back-up
support mesh is used, the wire or polymeric mesh shall extend into the ground 3-inches
min.
9. Drive or place the silt fence posts into the ground 18-inches min. A 12—inch min. depth
is allowed if topsoil or other soft subgrade soil is not present and 18-inches cannot be
reached. Increase fence post min. depths by 6 inches if the fence is located on slopes of
3H :1 V or steeper and the slope is perpendicular to the fence. If required post depths
cannot be obtained, the posts shall be adequately secured by bracing or guying to pre-
vent overturning of the fence due to sediment loading.
10. Use wood, steel or equivalent posts. The spacing of the support posts shall be a max-
imum of 6-feet. Posts shall consist of either:
• Wood with minimum dimensions of 2 inches by 2 inches by 3 feet. Wood shall be
free of defects such as knots, splits, or gouges.
. No. 6 steel rebar or larger.
. ASTM A 120 steel pipe with a minimum diameter of 1-inch.
• U, T, L, or C shape steel posts with a minimum weight of 1.35 lbs./ft.
• Other steel posts having equivalent strength and bending resistance to the post
sizes listed above.
11. Locate silt fences on contour as much as possible, except at the ends of the fence,
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 373 PLN2022-004 Packet Pg. 571
1.t
where the fence shall be turned uphill such that the silt fence captures the runoff water
and prevents water from flowing around the end of the fence.
12. If the fence must cross contours, with the exception of the ends of the fence, place
check dams perpendicular to the back of the fence to minimize concentrated flow and
erosion. The slope of the fence line where contours must be crossed shall not be
steeper than 3H:1 V.
. Check dams shall be approximately 1-foot deep at the back of the fence. Check
dams shall be continued perpendicular to the fence at the same elevation until
the top of the check dam intercepts the ground surface behind the fence.
. Check dams shall consist of crushed surfacing base course, gravel backfill for
walls, or shoulder ballast. Check dams shall be located every 10 feet along the
fence where the fence must cross contours.
Refer to Figure II-3.23: Silt Fence Installation by Slicing Method for slicing method details. The
following are specifications for silt fence installation using the slicing method:
1. The base of both end posts must be at least 2- to 4-inches above the top of the geo-
textile fabric on the middle posts for ditch checks to drain properly. Use a hand level or
string level, if necessary, to mark base points before installation.
2. Install posts 3- to 4-feet apart in critical retention areas and 6- to 7-feet apart in standard
applications.
3. Install posts 24-inches deep on the downstream side of the silt fence, and as close as
possible to the geotextile fabric, enabling posts to support the geotextile fabric from
upstream water pressure.
4. Install posts with the nipples facing away from the geotextile fabric.
5. Attach the geotextile fabric to each post with three ties, all spaced within the top 8-
inches of the fabric. Attach each tie diagonally 45 degrees through the fabric, with each
puncture at least 1-inch vertically apart. Each tie should be positioned to hang on a post
nipple when tightening to prevent sagging.
6. Wrap approximately 6-inches of the geotextile fabric around the end posts and secure
with 3 ties.
7. No more than 24-inches of a 36-inch geotextile fabric is allowed above ground level.
8. Compact the soil immediately next to the geotextile fabric with the front wheel of the
tractor, skid steer, or roller exerting at least 60 pounds per square inch. Compact the
upstream side first and then each side twice for a total of four trips. Check and correct
the silt fence installation for any deviation before compaction. Use a flat -bladed shovel
to tuck the fabric deeper into the ground if necessary.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 374 PLN2022-004 Packet Pg. 572
1.t
Figure II-3.23: Silt Fence Installation by Slicing Method
Ponding height max. 24"
Attach fabric to
upstream side of post
FLOW -
Drive over each side of
sift fence 2 to 4 times
with device exerting 60
p.s.i. or greater
100% compaction
77777777
POST SPACING:
T max. on open runs
4' max. on pooling areas
POST DEPTH:
As much below ground
as fabric above ground. .
No more than 24" of a 36"
fabric is allowed above ground
Top of Fabric 1
777777 Bea T1
top $..
Diagonal attachment
doubles strength
Attachment Details:
• Gather fabric at pasts, if needed.
• Utilize three ties per post, all within top S"
of fabi ic.
• Position each tie diagonally, puncturing
holes vertically a minimum of 1" apart.
• Hang each tie on a post nipple and tighten
securely. Use cable ties (50 fbs) or soft
wire.
-+�--- Operation Amllk
Roll of silt fence
Post
installed
Fabric after
above compaction
ground Silt Fence
t�l�iffif; {►i'f1lNlfflfti200
300mm�
.. Slicing blade
Vibratory plow is not acceptable because of horizontal compaction
Completed Installation
NOT TO SCALE
Silt Fence Installation by Slicing Method
Revised June 2016
DEPARTMENT OF,
EC O L O G Y Please see http://www.ecy. wa.govfcopyright.htmt for copyright notice including permissions,
State of Washington limitation of liability, and disclaimer.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 375 PLN2022-004 Packet Pg. 573
1.t
Maintenance Standards
. Repair any damage immediately.
. Intercept and convey all evident concentrated flows uphill of the silt fence to a sediment trap-
ping BMP.
. Check the uphill side of the silt fence for signs of the fence clogging and acting as a barrier to
flow and then causing channelization of flows parallel to the fence. If this occurs, replace the
fence and remove the trapped sediment.
Remove sediment deposits when the deposit reaches approximately one-third the height of
the silt fence, or install a second silt fence.
Replace geotextile fabric that has deteriorated due to ultraviolet breakdown.
BMP C234: Vegetated Strip
Purpose
Vegetated strips reduce the transport of coarse sediment from a construction site by providing a
physical barrier to sediment and reducing the runoff velocities of overland flow.
Conditions of Use
. Vegetated strips may be used downslope of all disturbed areas.
Vegetated strips are not intended to treat concentrated flows, nor are they intended to treat
substantial amounts of overland flow. Any concentrated flows must be conveyed through the
drainage system to BMP C241: Sediment Pond (Temporary) or other sediment trapping
BMP. The only circumstance in which overland flow can be treated solely by a vegetated strip,
rather than by a sediment trapping BMP, is when the following criteria are met (see Table 1I-
3.12: Contributing Drainage Area for Vegetated Strips):
Table II-3.12: Contributing Drainage Area for Vegetated Strips
Average Contributing Area
Slope
Average Contributing Area Per-
cent Slope
Max Contributing area Flowpath
Length
1.5H : 1 V or flatter
67% or flatter
100 feet
2H : 1 V or flatter
50% or flatter
115 feet
4H : 1 V or flatter
25% or flatter
150 feet
6H : 1 V or flatter
16.7% or flatter
200 feet
1 OH : 1 V or flatter
10% or flatter
250 feet
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 376 PLN2022-004 Packet Pg. 574
1.t
Design and Installation Specifications
The vegetated strip shall consist of a continuous strip of dense vegetation with topsoil for a min-
imum of a 25-foot length along the flowpath. Grass -covered, landscaped areas are generally
not adequate because the volume of sediment overwhelms the grass. Ideally, vegetated strips
shall consist of undisturbed native growth with a well -developed soil that allows for infiltration
of runoff.
. The slope within the vegetated strip shall not exceed 4H:lV.
. The uphill boundary of the vegetated strip shall be delineated with clearing limits.
Maintenance Standards
. Any areas damaged by erosion or construction activity shall be seeded immediately and pro-
tected by mulch.
If more than 5 feet of the original vegetated strip width has had vegetation removed or is being
eroded, sod must be installed.
If there are indications that concentrated flows are traveling across the vegetated strip, storm -
water runoff controls must be installed to reduce the flows entering the vegetated strip, or addi-
tional perimeter protection must be installed.
BMP C235: Wattles
Purpose
Wattles are temporary erosion and sediment control barriers consisting of straw, compost, or other
material that is wrapped in netting made of natural plant fiber or similar encasing material. They
reduce the velocity and can spread the flow of rill and sheet runoff, and can capture and retain sed-
iment.
Conditions of Use
. Wattles shall consist of cylinders of plant material such as weed -free straw, coir, wood chips,
excelsior, or wood fiber or shavings encased within netting made of natural plant fibers
unaltered by synthetic materials.
. Use wattles:
In disturbed areas that require immediate erosion protection.
On exposed soils during the period of short construction delays, or over winter months
o On slopes requiring stabilization until permanent vegetation can be established.
The material used dictates the effectiveness period of the wattle. Generally, wattles are effect-
ive for one to two seasons.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 377 PLN2022-004 Packet Pg. 575
1.t
Prevent rilling beneath wattles by entrenching and overlapping wattles to prevent water from
passing between them.
Design Criteria
. See Figure 11-3.24: Wattles for typical construction details.
• Wattles are typically 8 to 10 inches in diameter and 25 to 30 feet in length.
. Install wattles perpendicular to the flow direction and parallel to the slope contour.
• Place wattles in shallow trenches, staked along the contour of disturbed or newly constructed
slopes. Dig narrow trenches across the slope (on contour) to a depth of 3- to 5-inches on clay
soils and soils with gradual slopes. On loose soils, steep slopes, and areas with high rainfall,
the trenches should be dug to a depth of 5- to 7- inches, or 1 /2 to 2/3 of the thickness of the
wattle.
. Start building trenches and installing wattles from the base of the slope and work up. Spread
excavated material evenly along the uphill slope and compact it using hand tamping or other
methods.
. Construct trenches at intervals of 10- to 25-feet depending on the steepness of the slope, soil
type, and rainfall. The steeper the slope the closer together the trenches.
. Install the wattles snugly into the trenches and overlap the ends of adjacent wattles 12 inches
behind one another.
. Install stakes at each end of the wattle, and at 4-foot centers along entire length of wattle.
. If required, install pilot holes for the stakes using a straight bar to drive holes through the wattle
and into the soil.
• Wooden stakes should be approximately 0.75 x 0.75 x 24 inches min. Willow cuttings or 3/8-
inch rebar can also be used for stakes.
• Stakes should be driven through the middle of the wattle, leaving 2 to 3 inches of the stake pro-
truding above the wattle.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 378 PLN2022-004 Packet Pg. 576
1.t
Straw rolls must be
placed along slope
contours
Spacing depends
on soil type and
slope steepness
Liv
DEPARTMENT OF
ECOLOGY
State of Washington
Figure II-3.24: Wattles
10' - 25' (3-8m)
3' - 4'
(1.2m)
Overlap adjacent
�f / rolls 12" behind
one another
�V
\'I Y,--- 4
Sediment, organic matter,
and native seeds are
captured behind the rolls.
3" - 5" (75-125mm)
V x 1" Stake
(25 x 25mm)
8" - 10" Dia.
(200-250mm)
l� NOTE:
1. Straw roll installation requires the placement and secure staking
of the roll in a trench, 3" - 5" (75-125mm) deep, dug on contour.
Runoff must not be allowed to run under or around roll. NOT TO SCALE
Wattles
Revised December 2016
Please see http://wwwecy.wa.gov/copyright.html for copyright notice including permissions,
limitation of liability, and disclaimer.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 379 PLN2022-004 Packet Pg. 577
1.t
Maintenance Standards
Wattles may require maintenance to ensure they are in contact with soil and thoroughly
entrenched, especially after significant rainfall on steep sandy soils.
. Inspect the slope after significant storms and repair any areas where wattles are not tightly
abutted or water has scoured beneath the wattles.
Approved as Functionally Equivalent
Ecology has approved products as able to meet the requirements of this BMP. The products did not
pass through the Technology Assessment Protocol — Ecology (TAPE) process. Local jurisdictions
may choose not to accept these products, or may require additional testing prior to consideration for
local use. Products that Ecology has approved as functionally equivalent are available for review on
Ecology's website at:
https://ecology.wa.gov/Regulations-Permits/Guidance-technical-assistance/Stormwater-per-
mittee-guidance-resources/Emerging-stormwater-treatment-technologies
BMP C236: Vegetative Filtration
Purpose
Vegetative filtration as a BMP is used in conjunction with detention storage in the form of portable
tanks or BMP C241: Sediment Pond (Temporary), BMP C206: Level Spreader, and a pumping sys-
tem with surface intake. Vegetative filtration improves turbidity levels of stormwater discharges by fil-
tering runoff through existing vegetation where undisturbed forest floor duff layer or established lawn
with thatch layer are present. Vegetative filtration can also be used to infiltrate dewatering waste
from foundations, vaults, and trenches as long as runoff does not occur.
Conditions of Use
• For every five acres of disturbed soil use one acre of grass field, farm pasture, or wooded
area. Reduce or increase this area depending on project size, ground water table height, and
other site conditions.
• Wetlands shall not be used for vegetative filtration.
• Do not use this BMP in areas with a high ground water table, or in areas that will have a high
seasonal ground water table during the use of this BMP.
. This BMP may be less effective on soils that prevent the infiltration of the water, such as hard
till.
• Using other effective source control measures throughout a construction site will prevent the
generation of additional highly turbid water and may reduce the time period or area need for
this BMP.
. Stop distributing water into the vegetated filtration area if standing water or erosion results.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 380 PLN2022-004 Packet Pg. 578
1.t
Maintenance Standards
• Monitor the spray field on a daily basis to ensure that over saturation of any portion of the field
doesn't occur at any time. The presence of standing puddles of water or creation of con-
centrated flows visually signify that over saturation of the field has occurred.
• Monitor the vegetated spray field all the way down to the nearest surface water, or farthest
spray area, to ensure that the water has not caused overland or concentrated flows, and has
not created erosion around the spray nozzle(s).
• Do not exceed water quality standards for turbidity.
• Ecology recommends that a separate inspection log be developed, maintained and kept with
the existing site logbook to aid the operator conducting inspections. This separate "Field Filtra-
tion Logbook" can also aid in demonstrating compliance with permit conditions.
. Inspect the spray nozzles daily, at a minimum, for leaks and plugging from sediment particles.
. If erosion, concentrated flows, or over saturation of the field occurs, rotate the use of branches
or spray heads or move the branches to a new field location.
. Check all branches and the manifold for unintended leaks.
BMP C240: Sediment Trap
Purpose
A sediment trap is a small temporary ponding area with a gravel outlet used to collect and store sed-
iment from sites during construction. Sediment traps, along with other perimeter controls, shall be
installed before any land disturbance takes place in the drainage area.
Conditions of Use
• Sediment traps are intended for use on sites where the tributary drainage area is less than 3
acres, with no unusual drainage features, and a projected build -out time of six months or less.
The sediment trap is a temporary measure (with a design life of approximately 6 months) and
shall be maintained until the tributary area is permanently protected against erosion by veget-
ation and/or structures.
• Sediment traps are only effective in removing sediment down to about the medium silt size
fraction. Runoff with sediment of finer grades (fine silt and clay) will pass through untreated,
emphasizing the need to control erosion to the maximum extent first.
Projects that are constructing permanent Flow Control BMPs, or Runoff Treatment BMPs
that use ponding for treatment, may use the rough -graded or final -graded permanent BMP
footprint for the temporary sediment trap. When permanent BMP footprints are used as tem-
porary sediment traps, the surface area requirement of the sediment trap must be met. If the
surface area requirement of the sediment trap is larger than the surface area of the per-
manent BMP, then the sediment trap shall be enlarged beyond the permanent BMP footprint
to comply with the surface area requirement.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 383 PLN2022-004 Packet Pg. 579
1.t
. A floating pond skimmer maybe used for the sediment trap outlet if approved by the Local Per-
mitting Authority.
Sediment traps may not be feasible on utility projects due to the limited work space or the
short-term nature of the work. Portable tanks may be used in place of sediment traps for utility
projects.
Design and Installation Specifications
• See Figure II-3.26: Cross Section of Sediment Trap and Figure II-3.27: Sediment Trap Outlet
for details.
. To determine the sediment trap geometry, first calculate the design surface area (SA) of the
trap, measured at the invert of the weir. Use the following equation:
SA = FS(Q2/Vs)
where
Q2 =
o Option 1 - Single Event Hydrograph Method:
Q2 = Peak volumetric flow rate calculated using a 10-minute time step from a Type 1A,
2-year, 24-hour frequency storm for the developed condition. The 10-year peak volu-
metric flow rate shall be used if the project size, expected timing and duration of con-
struction, or downstream conditions warrant a higher level of protection.
o Option 2 - For construction sites that are less than 1 acre, the Rational Method may be
used to determine Q2.
Vs = The settling velocity of the soil particle of interest. The 0.02 mm (medium silt) particle with
an assumed density of 2.65 g/cm3 has been selected as the particle of interest and has a set-
tling velocity (Vs) of 0.00096 ft/sec.
FS = A safety factor of 2 to account for non -ideal settling.
Therefore, the equation for computing sediment trap surface area becomes:
SA = 2 x Q2/0.00096
or
2080 square feet per cfs of inflow
Sediment trap depth shall be 3.5 feet minimum from the bottom of the trap to the top of the
overflow weir.
. To aid in determining sediment depth, all sediment traps shall have a staff gauge with a prom-
inent mark 1-foot above the bottom of the trap.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 384 PLN2022-004 Packet Pg. 580
1.t
Design the discharge from the sediment trap by using the guidance for discharge from tem-
porary sediment ponds in BMP C241: Sediment Pond (Temporary).
Maintenance Standards
Sediment shall be removed from the trap when it reaches 1-foot in depth.
. Any damage to the trap embankments or slopes shall be repaired.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume 11 - Chapter 3 - Page 385 PLN2022-004 Packet Pg. 581
1.t
Figure II-3.26: Cross Section of Sediment Trap
Surface area determined
at top of weir
'Min.
3.5' - S'
b 1.5' Min.
_ Overflow
�T
Washed gravel Discharge to
Note: Trap may be formed by berm or by Geotextile stabilized
partial or complete excavation. 2" . 4". Rock conveyance,
outlet, or level
spreader
Rip Rap
NOT TO SCALE
f
f
E�
i
E E Cross Section of Sediment Trap
E
i ..... Revised June 2016
f
f
iDEPARTMENT OF,
EE C C L C G Y Please see http.11www.ecy. wa.govlcopyright.htmt for copyright notice including permissions,
E State of Washington limitation of liability, and disclaimer.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume ll - Chapter 3 - Page 386 PLN2022-004 Packet Pg. 582
1.t
Figure II-3.27: Sediment Trap Outlet
6' Min.
1' Min. depth ovefflow spilWay
r. Min. II'depth 2" - 4" rock
Native soil or Min. i' depth 34" - 1.5"
compacted backtill washed gravel
Geolextile
NOT TO SCALE
f
` Illliltir
f E
f E
f
f E
E Sediment Trap Outlet
f
E Revised June 2015
iDEPARTMENT OF,
EE C O L O G Y Please see hffp.1Avww.ecy. wa.govlcopyright.htmt for copyright notice including permissions,
f State of Washington limitation of liability, and disclaimer.
2019 Stormwater Management Manual for Western Washington
Exhibit 19 - Green
Volume /I - Chapter 3 - Page 387 PLN2022-004 Packet Pg. 583
1.t
C. Correspondence
nF\/FI nPFR
Fernandez & Barnes LLC
10529 NE 58th Street
Kirkland, WA 98033
Contact: Steve Barnes
Phone: (206) 550-9296
ENGINEER OF RECORD
Terraforma Design Group, Inc
Pedro DeGuzman, PE
(206) 795-9023
Pedro(a-)_terraformadesigngroup.com
REVIEW AGENCY
City of Edmonds
Contact: Taylor Brown, PE
Phone: (425) 771-0220
Exhibit 19 - Green
PLN2022-004 Packet Pg. 584
1.t
D. Site Inspection Form
Exhibit 19 - Green
PLN2022-004 Packet Pg. 585
Construction Stormwater Site Inspection Form
1.t
Project Name
Permit #
Inspection Date
Name of Certified Erosion Sediment Control Lead (CESCL) or qualified inspector if less than one acre
Print Name:
Approximate rainfall amount since the last inspection (in inches):
Approximate rainfall amount in the last 24 hours (in inches):
Current Weather Clear ❑ Cloudy ❑ Mist ❑ Rain ❑ Wind ❑ Fog ❑
A. Type of inspection: Weekly ❑ Post Storm Event ❑ Other ❑
B. Phase of Active Construction (check all that apply):
Pre Construction/installation of erosion/sediment
controls
Concrete pours
Offsite improvements
C. Questions:
Time
Clearing/Demo/Grading Infrastructure/storm/roads
Vertical Utilities
Construction/buildings
Site temporary stabilized Final stabilization
1.
Were all areas of construction and discharge points inspected?
Yes
No
2.
Did you observe the presence of suspended sediment, turbidity, discoloration, or oil sheen
Yes
No
3.
Was a water quality sample taken during inspection? (refer to permit conditions S4 & S5)
Yes
No
4.
Was there a turbid discharge 250 NTU or greater, or Transparency 6 cm or less?*
Yes
No
5.
If yes to #4 was it reported to Ecology?
_
Yes
No
6.
Is pH sampling required? pH range required is 6.5 to 8.5.
_
Yes
No
If answering yes to a discharge, describe the event. Include when, where, and why it happened; what action was taken,
and
when.
*If answering yes to # 4 record NTU/Transparency with continual sampling daily until turbidity is 25 NTU or less/ transparency is 33
cm or greater.
Sampling Results: Date:
Parameter
Method (circle one)
Result
Other/Note
NTU
cm
pH
Turbidity
tube, meter, laboratory
pH
Paper, kit, meter
Exhibit 19 - Green
PLN2022-004 Packet Pg. 586
1.t
E. Construction Stormwater General Permit (CSWGP)
A Department of Ecology Construction Stormwater General Permit will be obtained
since the site disturbance exceeds one (1) acre.
F. 303(d) List Waterbodies / TMDL Waterbodies Information
Not Applicable. No known downstream Listed Waterbody
G. Contaminated Site Information
Not Applicable. No known site contamination.
Exhibit 19 - Green
PLN2022-004 Packet Pg. 587
1.t
H. Engineering Calculations
INSERT SEDIMENT POND CALCS
Exhibit 19 - Green
PLN2022-004 Packet Pg. 588
1.t
SEDIMENT TRAP DESIGN
Project Name: GREEN'NALK PARK
Project Number: 21027
DRAINAGE CRITERIA:
RAINFALL METHOD:
Step 1) Basin Data
Precipitation (100yr):
Tributary area =
H = Storage depth =
Z = Sideslope =
T = Dewatering time =
G = Gravity =
CITY OF EDMONDS. 2019 SWIvIIvI'.NW
Santa Barbara Unit Hydrograph (SBUH)
BASIN -WEST
3.3 in
1.59 ac
2 ft
3 ftlft
24 hr
32.2 fUs^2
DESIGN INVOLVES FULL ONSITE INFILTRATION OF 100YR STORM
Step 21 Provided Trap Surface Area
Provided trap dimensions: width ft len th ft
bottom = 22 48
water surface = 34 60
top = 40 66
Step 3) SBUH Infiltration Routing Analysis using Stormshed2G
Design Infiltration Rate:
Routing Results
1 0 in hr
AREA= 2040 sf
Max Level Pool Depth (10yr;: 1.91 it » Infiltration sediment trap can accommodate 100yr/24 hr storm
Start of ln•e storage: 100.0000 ft
Event IMatcb Q Ws) 1peak Q (cfs) 1peak Sti (fl) Fvoi (co Vol (acil) Time to Empty
100)R 1 0.0000 1 0.1892 1 101.9149 12876.85 FO.Oii6 1 28.50
Exhibit 19 - Green
PLN2022-004 Packet Pg. 589
1.t
Start of live storage: 100.0000 ft
Event IMatch Q (cfs) Peak Q (cfs) IPeak Stg (ft) Vol (cf) Vol (acft) ITime to Empty
100YR 1 0.0000 F 0.1892 1 101.9149 2876.85 6.6660 28.50
BasinID Event Peak Q (cfs) IPeak T (hrs) IPeak Vol (ac-cf) Area (ac) Method/Loss Raintype
ERO-WEST 100YR 0.8655 1 8.02 0.2881 1.59 SCS/SCS TYPEIA
Record Id: ERO-WEST
Design Method SCS Rainfall type I TYPEIA
Hyd Intv F 10.00 min IPeaking Factor 1 484.00
Abstraction Coeff 0.20
Pervious Area F 1.59 ac JDCIA F 0.00 ac
Pervious CN F 89.00
JDC CN 1 0.00
Pervious TC F 10.00 min
JDC TC
1 0.00 min
Pervious CN Calc
Description I SubArea Sub en
Dirt roads & Parking Lots 1.59 ac 89.00
Pervious Composited CN (AMC 2) 89.00
Pervious TC Calc
Type Description I Length Slope Coeff Misc I TT
Fixed GRAVEL
10.00 min
Pervious TC
10.00 min
Record Id: TRAP -WEST
Descrip: MH Increment 0.10 ft
Start El. 100.0000 ft Max El. 105.0000 ft
Length 48.0000 ft Width 22.0000 ft
Length ssl 3.00v:lh Length ss2 3.00OOv:Ih
Width ssl
3.00v.lh
Width ss2
3.00OOv:Ih
Record Id: INFILT
Descrip: Prototype Structure lIncrement 0.10 ft
Start El. 100.0000 ft IMax El. 105.0000 ft
Exhibit 19 - Green
PLN2022-004 Packet Pg. 590
1.t
Infiltration rate 4.0000 in/hr WP Multiplier 1.00
SEDIMENT TRAP DESIGN
Project Name:
Project Number:
DRAINAGE CRITERIA:
RAINFALL METHOD:
Step 1) Basin Data
Precipitation (100yr):
Tributary area =
H = Storage depth =
Z = Sideslope =
T = Dewatering time =
G = Gravity =
GREENWALK PARK
21027
CITY OF EDMONDS, 2019 SWMMWW
Santa Barbara Unit Hydrograph (SBUH)
BASIN - EAST
3.3 in
1.52 ac
2ft
3 ft/ft
24 hr
32.2 ft/s^2
DESIGN INVOLVES FULL ONSITE INFILTRATION OF 100YR STORM
Step 2) Provided Trap Surface Area
Provided trap dimensions: width ftlength ft
bottom = 22 48
water surface = 34 60 AREA= 2040 sf
top = 40 66
Step 3) SBUH Infiltration Routing Analysis using Stormshed2G
Design Infiltration Rate: 4.0 in/hr
Routing Results
Max Level Pool Depth (10yr): 1.91 ft » Infiltration sedimenttrap can accommodate 100yr/24 hr storm
Start of live storage: 100.0000 ft
Event Imatch Q (cfs) Peak Q (cfs) 1PeA Sts (!i) vol (ci) V01(actt) ITime to Empty
100)? 0.0000 1 0.1839 1 101.8172 2684.82 0.0616 1 28.17
Exhibit 19 - Green
PLN2022-004 Packet Pg. 591
1.t
Start of live storage: 100.0000 ft
Event IMatch Q (cfs) Peak Q (cfs) IPeak Stg (ft) Vol (cf) Vol (acft) ITime to Empty
100YR 1 0.0000 F 0.1839 1 101.8172 2684.82 0.0616 F 28.17
BasinID Event Peak Q (cfs) IPeak T (hrs) IPeak Vol (ac-cf) Area (ac) Method/Loss Raintype
ERO-EAST 100YR F 0.8274 1 8.02 1 0.2754 1.52 I SCS/SCS TYPEIA
Record Id: ERO-EAST
Design Method F SCS lRainfall type I TYPElA
Hyd Intv F 10.00 min Peaking Factor 484.00
Abstraction Coeff 1 0.20
Pervious Area F 1.52 ac JDCIA F 0.00 ac
Pervious CN F 89.00
JDC CN
1 0.00
Pervious TC 7 10.00 min
JDC TC
1 0.00 min
Pervious CN Calc
Description
I SubArea Sub cn
Dirt roads & Parking Lots
1.52 ac 89.00
Pervious Composited CN (AMC 2)
89.00
Pervious TC Calc
Type F Description I Length F Slope
Coeff Misc I TT
Fixed GRAVEL
F
110.00min
Pervious TC
10.00 min
Record Id: TRAP -EAST
Descrip: MH Increment 0.10 ft
Start El. 100.0000 ft Max El. 105.0000 ft
Length 48.0000 ft Width 22.0000 ft
Length ssl 3.00v:lh Length ss2 3.000Ov:1h
Width ssl
3.00v:lh
Width ss2
3.000Ov:Ih
Record Id: INFILT
Descrip: Prototype Structure lIncrement 0.10 ft
Start El. 100.0000 ft IMax El. 105.0000 ft
Infiltration rate 4.0000 in/hr JWP Multiplier 1.00
5
E
0
0
a
_
m
E
a-
0
m
m
0
_
d
.N
m
a�
_
c�
a
�a
c
E
L
a
L
a
l3
3
c
a�
,L^
V
IL
IL
IL
3
U)
Ca
t
0
Q.
L
L
a�
3
E
L
0
0
E
L
IL
rn
z
x
w
w
_
as
E
ea
a
Exhibit 19 - Green
PLN2022-004 Packet Pg. 592
Planning &
Development
Received
09/07/2023
PROPERTY INFO
PARCEL NO:
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
27032500308300 GREENWALK PARK.
540 EDMONDS WAY
AREA= 2.55 AC 540 + 550 EDMONDS WAY
27032500308400EDMONDS, WA 98020
550 EDMONDSONDSWAAYY
AREA= 0.55 AC
ZONING: RS—MP
LEGAL DESCRIPTION
THAT PORTION OF THE NORTH HALF OF THE NORTHWEST QUARTER OF
THE SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER OF SECTION
25, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M., IN SNOHOMISH
COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS:
BEGINNING AT THE NORTHWEST CORNER OF SAID NORTH HALF OF
THE NORTHWEST QUARTER OF THE SOUTHWEST QUARTER OF THE
SOUTHWEST QUARTER; THENCE SOUTH, ALONG THE WEST LINE
THEREOF, 321.83 FEET; THENCE EAST, 300 FEET, MORE OR LESS, TO
A POINT WHICH IS 300 FEET EAST AND 321.03 FEET SOUTH OF THE
NORTHWEST CORNER OF THE SOUTHWEST QUARTER OF THE
SOUTHWEST QUARTER;
THENCE NORTH 41°28'23" EAST, TO THE SOUTHERLY BOUNDARY OF
TRACT CONVEYED TO STATE OF WASHINGTON BY DEED RECORDED
NOVEMBER 2, 1977 UNDER RECORDING NO. 2171113; THENCE
NORTHWESTERLY ALONG SOUTHERLY LINE OF TRACT, AS CONVEYED
TO STATE OF WASHINGTON TO THE NORTH LINE OF THE SOUTHWEST
QUARTER OF THE SOUTHWEST QUARTER; THENCE WEST, ALONG SAID
NORTH LINE TO A POINT OF BEGINNING. EXCEPT THE NORTH 35 FEET
THEREOF. SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF
WASHINGTON.
BASIS OF BEARING
WASHINGTON COORDINATE SYSTEM, NAD83(2011), NORTH ZONE,
DERIVED FROM WASHINGTON STATE REFERENCE NETWORK — ACCEPTED
THE BEARING OF N 88°38'03" W FOR THE NORTH LINE OF THE
SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER OF THE
SOUTHWEST QUARTER OF SECTION 25, TOWNSHIP 27 N., RANGE 3 E.,
W.M., BASED ON FOUND MONUMENTS IN CASE.
VERTICAL DATUM
NAVD88 PER GNSS OBSERVATIONS, DERIVED FROM WASHINGTON
STATE REFERENCE NETWORK
Brackett's
ending North
'ry Terminal' uTeslas Drones - -
ECmr...-r; Main 51
Scratch©s i lery
i
a
dmands
Idmonds
OSauna Hut Edmonds
Farina
--
each Park G'rty?ark
Walnut St
Main S1
�oQ
Q
PINE PARK
NEIGHBORHOOD
- 2201h Sr S W
g
3�
•54C Edmonds Way,
Edmonds, WA 98020
SITES
g
221TH St. SW T
f
i76ih S[ SW � o
EdmondsGood�will WESTGATE
Ngeeo
PCCCkmn-unity
Markets- Edmonds--
!•`II\/I IA cn
TOTAL DISTURBED AREA: 2.33 AC I
EX. IMPERVIOUS AREA: 22,357 SF
PROP. IMPERVIOUS AREA: 66,604 SF
NET CHANGE IMPERVIOUS AREA: +44,247 SF
EARTHWORK QUANTITIES
TOTAL CUT = 3569 BCY
TOTAL FILL = 1990 BCY
* FOR PERMIT USE ONLY
COMPLIES WITH APPLICABLE
CITY STORMWATER CODE
10/11/2023
n
SHERWOOD ' £
FOREST
c
228TH ST. SW
2241h S1 SW
Madrona K-8 School
cr w
3 s v
�L A
Aquarium Co-op 4
2491h Sl sW
Kruckeberg m
Botanic Carder n
VICINITY MAP
SCALE: N.T.S.
PROJECT TEAM
DEVELOPER
FERNANDEZ & BARNES LLC
10529 NE 58TH STREET
KIRKLAND, WA 98033
CONTACT: STEVE BARNES
PHONE: (206) 550-9296
EMAIL: sbarnes0cornerstonearch.com
ARCHITECT
GREENWALK DESIGNS LLC
CONTACT: STEVE BARNES
PHONE: (206) 550-9296
EMAIL: sbarnes0cornerstonearch.com
CIVIL ENGINEER
TERRAFORMA DESIGN GROUP, INC.
5027 51ST AVENUE SW
SEATTLE, WA 98136
CONTACT: PEDRO DEGUZMAN, PE
PHONE: (206) 795-9023
EMAIL: pedro0terraformadesigngroup.com
GOVERNING AGENCIES
w
co
M
UU
�
U
W
�
_
Q
o
m
rn
0:f
\
<
v
o
^
!�{
wd
v
� Edmonds
O
!��%i
U
(n
o
o
Q
(
3
n
3
_ J
D^/1
J
a>
3
z
a'
w
3
o
ZU-)
Lr)
O
z
N
N
22Pth SR SW
�
W
CD
�
�
>
U
O
N
r
1�
n
Esperance
3
i
2281h St SW
C
pg f
TJ- Maxx V j�
2381h St
\`}II& 49
Panera Bye
1M
PLANNING, GRADING, DRAINAGE
CITY OF EDMONDS
121 5TH AVENUE NORTH
EDMONDS, WA 98020
PLANNING: MIKE CLUGSTON, michael.clugston0edmondswa.gov
ENGINEERING: JEANIE MCDONNELL, jeanie.mcconnell0edmondswo.gov
WATER & SEWER
OLYMPIC VIEW WATER & SEWER
CONTACT: CHRIS SCOTT
EMAIL: chriss0ovwater.com
EDMONDS WAY (SR104) ACCESS
WASHINGTON STATE D.O.T.
CONTACT: PETER ALM
EMAIL: almp0wsdot.wo.gov
SHEET INDEX
C1
CIVIL COVER SHEET
C1.1
SITE PLAN
C2
DEMO & TESDC PLAN
C3
GRADING & DRAINAGE PLAN
C4
UTILITY PLAN
C5
PROFILES & SECTIONS
C6
STORM DETAILS
C7
STORM DETAILS
C8
TESC DETAILS
C9
CIVIL DETAILS
C10
CIVIL DETAILS
o
8/23/23 La
3
R
E
0
U.
0
a
E
(D
a
o
O
CV (D
O
v)
d
C _
0
rn
Z
Q�
L
�a
0
IL
M
R
Q
U) =
w
Q E
ZLoO�
OZ.
a
W
L
Y
LLJ
owS
d
L
rya
N
d
2
O
O
LO
W
W
C/)
O
Z
ry
F
W
>
W
0
U
ry
J
�
U
Iii
�
N
M
N
z
O
wILL]
00
U)
ILL]
U)
w
o
>
LU
0Y
a
0
N
CONDITIONALLY APPROVED FOR PRELIMINARY DESIGN.
SEE PRELIM APVD STM PLN2022-0053 FOR CONDITIONS
Exhibit 20 - Greenwalk C4kl
PRELIMINARY DE\PtI22 9 & -0
Packet Pg. 593
Planning &
Development
Received
09/07/2023
N
i
1.0
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA LEGEND
DEVELOPER TO CONSTRUCTION MAIN � -
EXISTING PROPOSED O
ACCESS ROAD, STORM FACILITIES AND \ ' // 3 u IVI F1 - - � - - - PROPERTY LINE V a'
�Q
UTILITY SERVICES. ONSITE ROOF, / �� IM=266.00 ----- EASEMENT
DRIVEWAYS, WALKWAYS & LANDSCAPING \ I W)=250.4648 A.C. PAVING w
TO BE CONSTRUCTED SEPARATELY AT \ o
� \ o � I E 250.80 48 CONCRETE O � U (n o
TIME OF INDIVIDUAL LOT CONSTRUCTION. --�--- sAwcuT LINE
O IE(S 26 08' 8"CO C _ J 3
N Q
\ \ \�\ �= RETAINING WALLN►, : m
- - z a
w Cn o
W N N
•� 1 Uj �' CDJ_ co
� N
S a
\ a 9
_ N 88°38'01 " VV 251.09' El El El
I I�------------ ----� i �� 9, \ 2 0w
100100001
✓ I �`
I C I
LOT I EX. POND j PLAY AREA 280 I I 2� - ,�
LOT 11 ,, 2 �r LOT 16
I I I I 11 I I I li � / ,• �
I LOT 3 �o
0 10 20 40
1 inch = 20 ft.
01%
0
8/23/23
co
M
E
L
0
um
0
a
m
E
a
o
O °'
N
O
(0 0 _
0
O�
Z
Q�
O
M
Q
C
U/ E
Lu
p
Z
O
Lo
Z
a
O
W
L
Y
LLJ
owS
L
r /
�
rL
Lil
W
9 SAWCUT & SEAL LINE = Q W
PATCH EX. ASPHALT PAVING (n p
10 ONSITE CURBS & SIDEWALKS PER CITY STD. PLAN
TR-520, TR-531
11 ONSITE RAMPS PER CITY STD. DTL. T-540
12 HOT -MIX ASPHALT ROADWAY
Exhibit 20 - Greenwa a •
PRELIMINARY DE\PtI22 9 & -0
Packet Pg. 594
Planning &
Development
Received
09/07/2023
16
28
1 4"ER
Ln
0
1-0
0
M
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
`♦ `\ �� �� "vim/ \ 3ulvirl
IM=266.00'
IE W)=250.46' 48
E 250.80' 48"
IE(S 26 08' 8"CO C
SMH
=266. 5'
N -A_ _ _ _ N 8' 1 " 2g'1.09' 12 1
\�` \ \ \
-2 — — -- - - - - \ I \� �PFED � c \•,O �/� 1\' / RI 68.4 '
C-E-P / - --_ C F " \ ..� `�/ / IE(NE)= .04' 12
F -r\ F F F IE(SE)=259.
\' SILT FENCE (BMP C233)
/ PR
CITY STD. DTL. ER-900
FEX. DRIVEWAY TO
ti \ BE USED FOR
� `� � CONSTRUCTION ACCESS I \ FI F F F F F /% �Q ' Q 1 0 \ \`� \` \ \ G �
2.0'40 ' D i \ --- _ C\ \ 'i/ F " J \`\ �` \ s \ AND THEN
A. 6 DEC �'' °°, D \\� \ ° c "-RECONSTRUCTED FOR
' `�- �� ,' y ' ' \ 1 D `:. A PRIMARY ACCESS. H
x I `\ y CI i V �` 16"DO ° \\\�\ °�� 0 � , RIM- 2.26'
7
�mco SEDIMENT %�- o�_ o "CE ? c IE(NW)=2 58' 12"
3:1 w 0' "' SILT FENCE F R TREE `\ `\ °
m m (BMP C240) x
o I F i I INFILTRATE INTO OUTWASH PROTECTION (TYP). ----
I „` \� \ W \ \ c S
PER DTL. 11C8 (BMP C103, C233) E�\\ \\
ADD TEMP CHAIN LINK AS r � `\ `--------_-__�___a_
x N N `D (SIZED OR 10 YR S 0 M) -- -- J r ._� g y 2 \
1 I I \ " '
N , NECESSARY. I I 1 ----- r--- \�`��.. 8 F 2 12 A
4 EAR_ --- I --� s I- -- ° D "A D i0 w v v
o OUTLE PRO CTION I _ - -- I CRAWL \ �' 41 W , � ly O %UX
(BMP 9) PE DTL.. E I I/� ,. I ..II D _ I O O /o
SPACE 9Q9
�',� LOWER - 6- O \
x I 1 [DEMO] \ i � \F --- O�
I _-- ii i\ ACCESS
ISE 6MA \/ y�O ���\°\ w/OO J/Id\ c
STRAW
WATTLE DURING
11 BLO O
/1�
... .. I ' I F
O-O,I
O
\c ROADWAYIMPROVEMENT
--------- - L O I1-7 WORK BMP C3)12 �I G _------48"C PER DTL. 51C8
1�� r. CON O
I. _
PLUM ISTEP O 2 CED
�
(5)6 MAP I i' // — /'x\ \------ \ O O
\ III WEST BASIN ' -- D I[DEMO].
DEMO I / O
1 � 'APPE� ' � 1.59ACRES ; �; a �- D_. � � a � , ,.. .�,', , , 99 \ cc)
r--- -�_--__ /� =-' ' 14 CED`v
INTERCEPTOR SWALE •' d ,/ ---'' A�i'�%�LT \� r /28 ED ^ O _�jrr,
0
`�,. i / / VC D / v \ /` /✓. f 1
/ y ED..
(BMP C200) PER DTL. 2/C8\ \
R F PROPOSED STORMTECH INFILTRATION , r , ,� \ \ \ - �, O / �� _ '. ' 6
- r FOOTPRINT. AFTER REGRADING TO DESIGNED �' �' "\ ` ' /' ' ` \ EX. DRIVEWAY T'� v
ROCK CHECK DAM / / 1 / , 18 CED , \ O l / ......
F ' '' `` v I FINAL GRADE, AREA SHALL BE PROTECTED WITH �1 �_ j vv /' 2 %'r BE REMOVED. .y
(BMP C207) / v I / / ,,r---
PER DTL. 41C8 i B I R 1 0"B �` 1 r HIGH VISIBILITY ORANGE FENCING. NO HEAVY i\ r y i - 2 x 1 --0' " / , I ' :` `��: `., : '. `: �': NOT A CONSTRUCTION
_ i 0 00 O O O \ r C S. `
EQUIPMENT OR STAGING OVER FACILITY. \ , \ i O O / '
STABILIZED r f / r
^„B R ' \- \ / / \o O / r z ..., ,�i CONCRETE WASHOUT
\ yV< I
/ I / 1 8 CED / CONSTRUCT] O /.... ...� , \
x i \\ i< ' // \\ \ / /1 �/ / `\ y t\ �.. .:'. �:, : p :\.... METAL BASIN
O 5._.: �: f, .
'' / ENTRANCEr.i..:
3p CEC_ �� �� - (BMP /.>'`• �// \; r
-- --- -li c> ,� --- ( ) (BMP C154) PER
j -rt`\ -� m �__ i / \\\ / r r DTL.6/C8
2„C / ��- '� i - ---- CITY STD. DTL. ER-900 / rr r i�
/ --n-� D I I , o �I / 5 / . ; / /\\ / /r r (CODER)
46 C E v y �� I t DEM THE _v / / v c r r� r PARKING AREA k
x � ��\� �i � \�\\ ,' T / . , MAINTAIN EX. POND, I Z ,, \ t � �
6 MAP I ,-t t � / G---�
DECK &PATIO I -'; � �.� / `� \ (Ty34" D r STABILIZATION 40 ' D E 0 -
-----------
- INTERCEPTOR SWAyLE CRUSIRSE 50" L
�D SURF ING
DEMO TREE � (BMP C200) PER BASE COU�.
�
T 0
/ TYP „ r, O
' '-- - 6 MIN. B�PTH
x -- 40 CFDt =-'� D - t�� [DEMO]
/ :----x lu- GARAGE
3
[DEMO �
`r/r
�r
6 C
/6 E-D- RKCEK
4/ � (BMP C207)30 CEDI8\OE-D 2Eb PER DTL.41C8
U Lu K `L
LEGEND
/ T \\/ / \ \\ r \
/ \ \ OUTFALL PROTECTION # rr \
CAE �_ � \
42"CED \\` 3 QED/ [DEMO] tt tt O �'��� '.�/ �`� � �T- BMPC209 \\\ \\ -- _--_
1 i , ` ` t t� - ; J' - ° / ( ) EXISTING PROPOSED
\ / \ BRIQGE I \\\\ / �\�_ / / t Z 11\ ` PER DTL. 31C8 �. \k\ % \\� \\ PROPERTY LINE
EASEMENT
1 EC \ 66"CED NVOOD — GRADING CONTOUR
\ 6 MAP --- �' ` WALL cC t-, - -_--- �- / D. ' 90.00
X v t �� t / / ,\ SEDIMENT TRAP EAST / / r +
( ) SPOT ELEVATION
t [DEMO] y � - `� __ .`�� � � (BMP C240) /�� \\\\ arY 8" W WATER MAIN
1 2'oB R ��� PROPOSED STORMTECH INFILTRATION / �/ / ��� INFILTRATE INTO OUTWASH �,�, a s
V' \� 6 `\MAP � / PER DTL. 1/C8 � g SEWER MAIN
FOOTPRINT. AFTER REGRADING TO /
l I / ' � �\ FINAL GRADE, AREA SHALL BE PROTECTED WITH - J�(SIZED FOR 100YR STORM)
12" C STORM DRAIN
ti o
---7� 8"M / HIGH VISIBILITY ORANGE FENCING. NO HEAVY v
\ / 5k Q y U FIRE HYDRANT
`� � ---+, '- \ / ` t ��� t �� �4 ' ���� EQUIPMENT OR STAGING OVER FACILITY. / / \\ / 8/ <v�
12 M _- „ ` `\. \� \ a\, ` EAST BASIN / / / �; ® WATER METER
`� ��,0 ��N I I-_�� /� ,\ ` / 1.52 ACRES r' �VQ D4 GATE VALVE
�' II
/, \\ � o
1/ 1 2 CED 1 �� t ��. A I I I / / \ / �� O SEWER MANHOLE
r M I I , / �' �.
\�� \ iII p � /i' � / � �\ y�i�i� I I \`\�� II D I / / /j ` •'� /•• O� � �\
i
\ i
2 E�jYV 4 j 1 / ❑ STORM CB
�cr
20" -ter w �120 EDP '� ` / ' /� '� �`� k
1 4'i ED // I I / g _Lv-_� 0❑ STORM MANHOLE
L` / \ i/ /' n i i� I / Y / i \ 0' SILT FENCE FOR TREE II�
/ / 0 I
I/ , ELECTRICAL LINE
/ i� \ \\ 6 " 0- - ��";' i ' \ \ u I ___- I F�F PROTECTION (TYP).
\ \ �- INTERCEPTOR SWAt / , r
EiR(CRAN�) 30 CED o �/ / `,2 y BMPC103, C233 I I --- T -- COMMUNICATION LINE
vy-� �; F� F ' F o `o 14 LfL I " (BMP C200)PER �/ / / vi _ ( ) L+�
36 CED --- R N i° i /' DTL.2/C8 ADD TEMP CHAIN LINK AS /�' BASIN DIVIDER
/
' / 1 D \
_------ ° "LI L 6" / - L-------� - / -� / % \ / NECESSARY. F FILTER FENCE
u \ �/' \ \ / °9 ice'—_ " _t— __— L—���— —f -/— _ —t1'— _ / / R I— / \�-- —� " A P — _>_\_ //
12 M AP �\ 30 CED 1 --- 4fl CE __ -- -\_ -ti- _r y- - -- --- -L--- 5 F� F --____ �/ STRAW WATTLE
�\ _ 7 /
-----�--�------- - - - S T F CE (BM C233) \ F F F
ED / 6 6 MAPS `\ -��Ir ini i v 0 CB INLET PROTECTION
CITY STD. DTL. ER 900 ,X ,- - -
�_ --------------_ ROCK ENTRANCE
F— F - F I F- F ' _
\ - - / N 8 /8' 2„ W� 300 Oo \ T — _ ROCK CHECK DAM
- V
3 " E EACH LOT WILL INCLUDE A PRIVATE DRYWELL FOR ROOF AND PLANTER SMH '
_ _
DRAINAINAGE INFILTRATION. DRYWELLS SHALL NOT RECEIVED RIM=271.15' x OUTLET PROTECTION
SEDIMENT LADEN RUNOFF. DRYWELLS SHALL BE STAKED, FLAGGED & IE(NE)=260.59' 12"
PROTECTED DURING CONSTURCTION. SEAL THE SURFACE GRATE AND IE(SW)=260.73' 12"
INLETS UNTIL THE UPSTREAM DRAINAGE AREA IS STABILIZED.
0 10 20 40
1 inch = 20 ft.
SEDIMENT TRAPS SHALL BE SHALL REMAIN IN PLACE UNTIL CIVIL
INFRASTRUCTURE IS INSTALLED, ACCESS ROADS PAVED AND SITE IS
STABILIZED. THEREON, TESC MEASURES SHALL BE THE
RESPONSIBILITY OF EACH LOT
PROTECTIVE FENCING
FOR INFILTRATION AREA
1m
CK
r)
a
VU
-7)
~
°°
a
w
Q
o
w
cl-
E
Q
w
2
o
O
o
v)
Q
3
z
Q
3
o
rl�
z
c-D
LO
LO
o
V
M►j
,Z
N
(D
N
v J
W
J
�
a,
cD
o
SEEM
qw
c
p,. DEG
OF WASry/ C
2
v�F RFGISTER� �'
SS�ONAL ECG
0
8/23/23 .T
Cn
M
0
ILL
C
0
a
E
m
a
o
O
N�
O
00
d
Q N
Z
O `
0 (f) s
W p-�@
a
C:)zY
ZLOO�
a
1 P1 Y
W i C �o
+ G �
0 i
WC:) w"
qqztN
L
a
c
a�
a
2
ell
O
z
110
Li7
J
1:-Z)
Oz
U
W
U
°15
O
O
Lu
0
W
N
M
Cn
---
z
N
O
00
W
LL1
W
>
0
EXISTING TREE
(TO REMAIN)
tl
EXISTING TREE
(REMOVE)
Exhibit 20 - Greenwalk
PRELIMINARY DE\PILI22 9 & -0
Packet Pg. 595
Planning &
Development
Received
09/07/2023
I
o
0
x
z
STORMWATER PER 2019 DOE SWMMWW (LRG. SITE CRITERIA).
FULL INFILTRATION PROPOSED.
INFILTRATION GALLERIES FOR ROADWAY &DRIVEWAYS.
DRYWELLS FOR INDIVIDUAL ROOF /LANDSCAPE INFILTRATION.
"- ROOF AREA /180.00
= 2650 SF
L
0 ( 12' M A P
N
o
N
O
N I
O
M
N
3
I
0
CD
cV
O
N
1.0
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA LEGEND
w co
EXISTING PROPOSED 00
SDMH PROPERTY LINE
U
REFER TO MAIN ACCESS DRIVE tiq�� \` �J-� �\ IM=266.00' ----- EASEMENT g
ROADWAY PROFILE ON SHEET C5 �q�� \\.\ ��� \ o `\\ IE W)=250.46' 48� A.C. PAVING �� c- o
\ o \ I E 250.80 48 CONCRETE O N o
\ \ 0 \---sa--- SAWCUT LINE z cn 3
IE(S 26 08' 8"CO C � ¢ � 3
\77777777777, Essr-REI RETAINING WALL h►j s :3 m
\ o \ 100 -100 - GRADING CONTOUR z_ a
�
+90.00 90.00 SPOT ELEVATION I�j w o
rn
a a \\ \ o \ \ S \ SMH 8„ W w- WATER MAIN v z N
1 \\ \ =266. 5' 8" S r . ' I►1 w Lo rn
\ s SEWER MAIN W J CDEX. TREE TO REMAIN (TYP) c \ \ 12" D 12" DD STORM DRAIN ^ v
30 C \ \\ O�/ FIRE HYDRANT �►I n
N R R'(111 " 7 �1 (1C�' 1 2 \ \ /t /C�� V\ c�� WATER METER ArW 61
TRACT BLl - 2 s.5o - 280 00 ui
78 ❑ I ;' > 2 \ p c?
iM O N S P A C I 279. 288 SF >> D F W
o
177- - - �274.0o C0 50' F
278.00 I / ,' 9�,� g LO
' _
I �CL
/ 280 I 2j2 ,�� p� DRIVEWA / v LOT 16 =
0 1 1 ROOF AREA
= 2158 SF I I % • '3S 30/ 274.00 \5712 LC 11 01 T 1 11 A-11 9)
v N I _� I C 8" CPE 15 1.67%
� I L 1 0 ti� g \ ROOF AREA 11 D 8" CPE 20 1.75%
00 ao I I / 1 2228 SF / I z �
29.4 `� N I E 10 • / I ROOF AREA I E 8" CPE 5 5.00%
y I - - - I i ROOF AREA I / / ct O• / <\ I = 2156 SF I 0
456 F 2061 SF ❑ I i /
/ � \ STORM STRUCTURE CLEANOUT SCHEDULE Q
- - ❑ J `' �,� DRYWELL (TYP) \ / I I CB CO TYPE RIM IE elf
D --- ----- / PER DTL. 1/C7 \ (D-�
o f �,' DEPTH= 7-FT (TYP) \ \ / / I 1 TY. 2- 54", SL 271.60 266.60 (24"N,E) V
38 I 2 TY. 2- 54 , SL 271.10 268.20 (8"W) co 5 / R I_ / o A P - - - - - 266.60 (24"S) J N
(!j
CD/ ' 6"MAP ® 3 STREAMFILTER CB 271.00 268.25 (8"E) (y) z
Ij cx R PER DTL. 5/C6 CV
"' N 88*38 2 W 300.0 E7111 III
- - - - - --- = 4 TY. 2- 54", SL 273.00 268.75 (8"N) W 00 U)
267.60 (24"W)
SMH INFILTRATION GALLERY #3 - LJJ W >
EX. TREE TO REMAIN (TYP) PER DTL. 3/C7 5 TY. 1, SL 272.10 269.00 (8"E,S) �
RIM=271.15' x I Q W
IE(NE)=260.59' 12" BOTTOM EL= 264.75 6 STREAMFILTER CB 272.00 269.25 (8"E) U)
IE(SW)=260.73' 12" STORMTECH SC-740 CHAMBERS PER DTL. 5/C6 269.25 (8"W)
7 TY. 1, GR 272.30 269.60 (8"W)
8 TY. 2- 54", SL 270.30 266.50 (8-NW)
265.35 (24"SW)
0 10 20 40 9 STREAMFILTER CB 269.50 266.75 (8"SE)
PER DTL. 5/C6
1 inch = 20 ft. Exhibit 20 - Greenwalk
PRELIMINARY DE\PtI22 9 & _0
Packet Pg. 596
Planning &
Development
Received
09/07/2023
30""CEO
N 88°38' 251.09'
1 D -
o -
16' "CED „C �,/
28----- - - - - - - 14 G STA 52+61.3, 0.5' LT.
�,
SSCO#2 PER STD. DTL. S-3
RIM= 271.55
IE= 266.70 (6")
�----® -- - - - -
I I I
1.0
SW1/4 OF SW1/4 OF SEC. 25, T27N, RK, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA LEGEND
a
EXISTING PROPOSED V w �' o
- - - PROPERTY LINE g
C
- - - - - EASEMENT ^ ¢ °' o
---sc--- SAWCUT LINE F► < N 2
r••� Cn 07
RETAINING WALL r , t� 3
g° W $-.w w J a� 3
WATER MAIN �3 m
a C) 'D G9
\ 8" S $ $ S SEWER MAIN Q
CK
uj CO
z
S D M H 1 2 U - STORM DRAIN
I W)=250.46' 48 FIRE HYDRANT JID
\ o° CD C"I
I E 250.80' 48" ® WATER METER >
T E S 26 08' 8"CO C Q
\ \O \ ( D4 N GATE VALVE a
` � \ \N� s O • SEWER MANHOLE
10 \ o
❑ STORM CB
SMH O❑ STORM MANHOLE
=266. 5' - E UP ELECTRICAL LINE C
--
� UC COMMUNICATION LINE
QnA� P D t
UT TELEPHONE LINE ��O ov WAsti�
12 /s v0s �� \ ( � \ UL LIGHTING LINE ti z
RI 68.4 '
' F o o \ \ / / IE(NE)= 04' 12 - - - G - - G GAS LINE
' / R 35646
IE(SE)=259. �E� DE POWER VAULT
" �� \ EX. FIRE HYDRANT. Ox0 l.� } SION-1 E�
PR ° �v �� \ UTILITY POLE
REQUIRES A UL 2
8"PL �6A APPROVED 4" STORZ -� \� °�1 STREET LIGHT 8123/23 :�
' TYPE FITTING. t -
- - - - - - - -- -� "no
F �� ' s
�� v Q Cn
I 0 5 I I STA 22+93.6, 0.4 LT: . p i\Wl<\ o H
X i I 8"x4" TEE (MJxFL) \ 2� RIM- 2.26'
U V 1 - 4" GATE VALVE (FLxFL, SE) / CE ^�� \ o IE(NW)=2 8' 12"
1 - 4" N 22.5 DEG BEND FLxFL SE STA 22+99.1, 0.5' RT: �� \ �2QX IE(sw)=259.s
STA 52+25.9, 10.6 LT. I ( ) W \ Goo \ s \ o
1 - 4" CAP (DI) LOT 4 T 3 1 - 4" ADAPTOR (FLxMJ, SE) 1 - 8" N 22.5 DEG BEND (MJ) ° / a
I I --- CONC. BLKG.
1 - 2" BLOW -OFF ASSY. V CONC. BLKG. 8..
_ PER STD. DTL. W-10 I V EM / /� "Ij^ p 12 A A D \ o E
N
44CONC. BLKG. - - - - I I \ 284 3.79' '' �° �,�\ �'
a I I STA 22+86.1, 0.8 LT: ■ - - ` �� 09Q9�� Q O o
- - _ > 1 _ 8„ N 11.25 DEG BEND MJ ■ ■ ■ ■ ■ ■ ■ a, ° ` \ N
CONC. BLKG. 6 ,
00
----
--- C)I ----- I .2
I I I STA 22+25.7,
o L - - - - - - - ■ - - -
- - - \ Vl
I
- - _ Tj
*- 1 - 8"x4"x6" REDUCING TEE (FLxFLxFL) ■ o ,' w ° Z
�L , I � � + I 1 - 6" GATE VALVE (FLxMJ, N) � ■ N ` � ' � v v
L �- I z I �, Oi I N 1- 4 GATE VALVE (FLxMJ, W) ■ - z i CC a
b I �6 1- FIRE HYD. ASSY. PER STD. DTL. W-6 ■ A T A ^� 3 �/ o\ Q G , M
L0 I I Ln ° CONC. BLKG. - ■; o , ON SPA \ � � � Q s
STA 19+89.5, 0.5 RT: o ,' `, -
G 1 - 4»x4" TEE FLxFL i - -------- o ��� / ` / �O iw z a
( ) I I o a
2 - 4" GATE VALVE (FLxMJ, N/S) C �� - _ _ - - _ _ - ° ° �� ; ' "D �, w ° C:)
z M
0.
1 - 4" ADAPTOR (FLxMJ, E) I `233' N 4" DI �. ,��i , J OT OCC
CONC. BLKG. o '" "' w w w w w 57' N 8„ DI G 3
10" L I 273 N 8 S C� 0.75% [PRIVATE] ` + 32' AccEss w w oo e / STA 22+98.8 29.3' RT= STA 41 +91.7 4.2'LT: , 6 , +
N & U11L. ESSMMT. 6 N 8 1 , o v 0
� - - S S o 4 N 8 DI ; SEWER MH #1 (48"� SADDLE TYPE) ` �' g" w w
STA 19+99.4 , 10.7 RT: S S S S S s `'� PER STD. DTL. S-4A, S-46, S-6 \
SEWER MH #3 (48"0)�
O, u� N S ♦ A
PER STD. DTL. S-4A, S-4B/- RIM= 273.30 " :z
X [PRIVATE MH] �� - - - 10 274
�� ' IE_ 260.36 (8 NW) " E
_� - RIM= 271.80 N�©% - - 278 L; `� IE- 260.03f (EX. 12 CTR) o
IE= 264.70 (6��N,S) 2�z --L o% I I - - =STA 22+71.9', 5.1' RT- _ _ \ I ` / (CLUSTER)
o IE= 264.60 (8 E) ' 1s' AccEss I _ I „ - - - - , STA 41+70.0, 11.0 LT:
CD SEWER MH 2 48
z x [ESMT.DTRACT B ; �---Ex. WELD I 278 PER STD. DL. S-4A, S-46 40' 8" PVC �1 - 4 - 45 DEG BEND (MJ)/°�/N � COM ON SPAG� � I I TO REMAIN - - - - I � 29 N 4, DI ,; � � 5 23% CONC. BLKG. C0 ° � � a
N I I I [PRIVATE MH] - / �, �, J 0 50 F �0 �00 N
OT I 0 11 280RIM= 273.80 " / 2,2 [PRIVATE]
a I I I IE= 262.55 (8 W) LOT16
/ P 0
2� 0 I n ► I IE= 262.45 (8-SE) / / �\ / /i g,� ���� w
w�o I I L 1 I I - - / / �� 6 C `Z CD
o
Z ,
I a I j I I I I // �/ ` 0 L
FIE
" I I I I I / ��� ��� C M 0 Y
�\ SEWER MA OLES W
SSMH #1
„ 1---------- L- -- - 270 D
l TY. 1-48" - SADDLE MH LLJ (�
RIM= 273.30 C/) W
to - - ° `, / o�, / I / • IE= 263.00 (8"W, INSIDE DROP) 0
3 ° / / I IE= 260.03± (EX. 12" CTR)
L_ VVL-TT
A.F.N. 2013162 SSMH#2 Lu
L) TY. 1-48" - PRIVATE MH
z C 4 -' STA 40+68.3, 11.0 LT:
�, / / / RIM=273.80 Q
3 ' ` 1 - 4 CAP (DI) / / / / J I IE= 263.50 (8"W)
T I O j 1 - 2" BLOW -OFF ASSY. PER STD. DTL. W-10 �� / / /� I LO 15 / IE= 263.40 (8"E)
T 9 ® I CONC. BLKG. �' / L 14 I // SSMH #3 ui N .
"
�3 / I / TY. 1-48- PRIVATE MH J (n
_ � I L 10 J I / RIM= 271.80 ~ M z
00
I C l� • I / IE= 265.60 (6"N,S) N 0
e I \ i I / IE= 265.50 (8"E) 00 U)
\ X I STA 50+25.0, 10.6' LT: iao I I o �;/ / i 2 / / pj
1- 4 CAP (DI) I / / 1� 2 Q W
'� I �I
L _ 1 - 2" BLOW -OFF ASSY. / / / U)
PER STD. DTL. W-10 ---j - - - - - - - - - -- -- -� L � RLi �°--�,-AP ---- --� L
12 MAP CONC�
. BLKG. 7 = ----- ---
6"MAP ® o 10 20 40
o8
STA 50+32.9, 0.5 LT `n N 88°38' 2" W 300.00
SSCO#2 PER STD. DTL. S-3 - - - _ _ 1 inch = 20 ft.
RIM= 279.10 SMH 4
` IE= 273.50 (6') IE(NE)=2 0.59'1 15' Exhibit 20 - G ree nwa l kC4k
` IE(SW)=260.73' 12" PRELIMINARY DE\PILI22 9 & _0
Packet Pg. 597
1.0
Planning &
Development
Received
09/07/2023
285
WE
270
RON
901
32.0' ACCESS ESMT.
I J
U
5.0' 2.0' 10.0'
SIDEWALK
` SOUTH SIDE 2%
5" THICK CONC. J
SIDEWALK
(FIRE TRUCK RATED)
4" HIGH CONC.
ROLLED CURB
:8
2%
ASPHALT ROAD
SECTION
2.0' 5.0'
SIDEWALK
NORTH SIDE
SECTION - ACCESS ROAD
SCALE: 1 " = 5'
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
PROFILE: ROAD STA 19+88 - 24+00
5" THICK CONC.
SIDEWALK
(FIRE TRUCK RATED)
4" HIGH CONC.
ROLLED CURB
= 20' HORIZ.,
TY. 1-48" - PRIVATE MF
RIM= 273.80
IE= 262.55 (8"W)
IE= 262.45 (8"SE)
40' - 8" PVC, SDR35
4.23% [PRIVATE]
TY. 1-48" - SADDLE TYPE
RIM= 273.30
IE= 260.36 (8"NW)
IE= 260.03t (EX. 12" CTR)
EXISTING SSMH
RIM= 272.26
IE= 259.65 (12"SE)
IE= 259.58 (12"NW)
0 10 20 40
1 inch = 20 ft.
285
E
010
270
265
260
w co
ft� M U
UU � w o
Q o,
o
w �
d v
O � o
U (n o
t/)
N
J
N
3
N
�
z
<
w
�
3
o
_ J
z
U-)
LO
M►j
w
N
O
N
J
�
W
(p
O
N
U
a
C
C
0
8/23/23
C0
M
E
0
U.
R
0
IL
c
m
a
o
O
N°'
0
O
'^ M c
v J vTT�.I �
ch
Zm
O3: am
1
73
Q VJ R
c
LU p
O ZL
Lo0�
'^ a
L , Y
2
0
L
O W V
L
�a
WE
U)
O
Z
LO
O
U
O
W
z
�
U
06
LU
W
�
ry
L.L
�
O
W
LLI
co
N
M
N
z
O
w
M
w
n
W
U)
6j
0
N
N
Exhibit 20 - Greenwalk Cdk!5
PRELIMINARY DE\jI5tI22 9 & -0
Packet Pg. 598
1.0
Planning &
Development
Received
09/07/2023
CB #3 - STREAMFILTER CB
1-CARTRIDGE
RIM= 271.00
IE= 268.25 (8"E)
CB #1
TYPE 2 - 54"0
RIM= 271.60
IE= 266.60 (24"E,N)
0
N
O
N
M
01
Q
43
0
3
v
J
U
I
3
c
a>
(j
I
n
cal
0
Q
CB #2
TYPE 2 - 54"0
RIM= 271.10
IE= 268.20 (8"W)
IE= 266.60 (24"S)
FINISH GRADE
COMPACTED FILL EL= 271.1 MIN.
L= 269.50
- EL= 269.0
-_-_-_- DRAINAGE ROCK
EL= 266.50
Q EL= 266.00
SECTION A -A GEOTEXTILE FABRIC
ill =5'
DESIGN INFILTRATION
RATE = 4 IN/HR 11
STORMTECH SC-740 CHAMBERS - 15 QTY.
-EDGE OF ROCK
GALLERY`
24" CPE @ 0.0% (TYP) A
DETAIL - INFILTRATION GALLERY #1
SCALE: 1 " = 10'
O
INSPECTION RISER
WITH CAST IRON
FRAME & LID
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
DESIGN INFILTRATION
RATE = 4 IN/HR
FINISH GRADE
EL= 273.0 MIN.
w.� •��i=======i_
�••••••
11:=11: I:Il�llWli� • 11
• • • C' 1
STORMTECH SC-740 CHAMBERS - 9
INSPECTION RISER q
rn O
N
A 72.0'
EDGE OF ROCK GALLERY
DETAIL - INFILTRATION GALLERY #2
SCALE: 1 " = 10'
NOTE: ALL INFILTRATION FACILITIES SHALL BE EXCAVATED
AND EMBED AT LEAST 2 FEET INTO THE NATIVE,
UNDERGROUND ADVANCE OUTWASH SOILS. GEOTECH
FIELD INSPECTION REQUIRED AT TIME OF INSTALLATION.
�o
32" 32"
I I ♦ JJ / /I
\ , a• ♦ a \ \
`I/!II/ I ! al\// / lI1I
a\a\\aa• a\a,\\
BAYSAVER�BAYSAVER
\ \ \ \ \ \ fJJ
HiYOLOGI.5
\ \ \ \ \ \ \ \ ff
J/JIJrf JI r/rrrJJlr
\\\ \ \\ \ \\,\\\\\\ \,,,
!/rJ IJrr rr Jr rrrl
♦\ \\\I\r\rff\ \ \\\\ \ \\ \t„�
fffrr //s: /rfff
�
ff///ff/ !
r ! l,/rrrr rrr ! r
1!rlrr lrrrrr,///rr,
`// /r/r/r♦/`r JJJ
//r/lr/rr///Jrr/lJ/r
rff rrr Jrl rJrf rr
/ rrr/ J/rr lr/
u
04ifif
BAYFILTER
POLYMER
SEAL
INLET
DRAINAGE
MATERIAL
MEDIA
SPIRAL
OUTLET
DRAINAGE
MATERIAL
i
NLET
CB #6 - STORMFILTER
RIM= 272.00
IE= 269.25 (8"E,W)
CB 4
TYPE 2 - 54"0
RIM= 273.00
IE= 268.75 (8"N)
IE= 267.60 (24"W)
0 5 10 20
1 inch = 10 ft.
SOLID COVER
PLAN VIEW
OUTLET PIPE
AIR RELEASE VALVE
FLOW
CONTROL
ORIFICE
r- INLET
PLATE
FILTER
LEG
\NLET
DESIGN INFILTRATION
RATE = 4 IN/HR 11
CB #9 - STORMFILTER
RIM= 269.50
IE= 266.75 (8"SE)
8" CPE
A
FINISH GRADE
EL= 270.0 MIN.
EL= 268.25
EL= 267.75
DRAINAGE ROCK
F EL= 265.25
EL= 264.75
GEOTEXTILE FABRIC
STORMTECH SC-740
CHAMBERS - 5 QTY.
INSPECTION RISER
CB #8 43.0'
TYPE 2 - 54"0
RIM= 270.50 A EDGE OF ROCK GALLERY
IE= 266.50 (8"NW�
IE= 265.35 (24"SIN)
3 DETAIL - INFILTRATION GALLERY #3
SCALE: 1 " = 10'
SECTION A -A
33"
(MIN.)
30x30
SOLID COVER
RIM= PER PLAN
33"
(MIN-)
12"
5Tr OUTLET
IE= PER PLAN
OPTIONAL 'DRAIN
INLET DOWN
STUBS
SECTION B-B
w co
M U
UU rn o
w
Q � o
w � �
U (n o
Wool
N
j
J
N
3
w
Cn
a
o
�3
o
L1r�/j
IN"
w
N
CDrn
N
cn
J
W
>
(p
CD
N
U
a
C
O
8/23/23
co
R
0
U.
0
a
E
0
O
Z °'
O
0_
0
O�
Z
Q�
O�a
M
VJ c
ui
p
Z
O
LO
IL
ZL
O
W
/
Y
C lC
c 3.1
W
�
0 SD
L
UJ
r '
LO
C
Q
d
O
STREAMFILTER TM
O
CBF-1
LO
(n
O
PROJECT GREENWALK PARK
J
LOCATION EDMONDS,WA
Q
O
z
WATER QUALITY FLOW VARIES, 0.023 CFS MAX
w
DRAINAGE AREA VARIES
Q
U
CARTRIDGE DESIGN FLOW RATE 22.5 GPM / CARTRIDGE
C
L]i
# BAYFILTER CARTRIDGES 1
O
TREATED SEDIMENT CAPACITY 175 LBS
O
0-
THE BAYFILTER STORMWATER MANAGEMENT SYSTEM IS
U)
A STORMWATER FILTRATION DEVICE DESIGNED TO
REMOVE FINE SEDIMENTS, HEAVY METALS, AND
PHOSPORUS. THE BAYFILTER SYSTEM RELIES ON A
SPIRAL WOUND MEDIA FILTER CARTRIDGE WITH
APPROXIMATELY 45 SQUARE FEET OF FILTRATION AREA -
co
THE FILTER CARTRIDGES REMOVE POLLUTANTS FROM
W
CN
RUNOFF BY FILTRATION (INTERCEPTIONIATTACHMENT)
J
AND ADSORPTION.
CY)
z
N
O
00
W
W
LLI
5;
I-
U)
lY
4 STREAMFILTER CB
C6 SCALE: N.T.S.
a
O
Exhibit 20 - Greenwalk
PRELIMINARY DE\jI5tI22 FIO&g & -0
Packet Pg. 599
Planning &
Development
Received
09/07/2023
UNDISTURBED
NATIVE VEGETATION
UNDISTURBED NATIVE SOIL
2" ORGANIC MULCH
3" OF COMPOST
INCORPORATED INTO 5" OF
SITE SOIL (TOTAL AMENDED
DEPTH OF 9.5", FOR A
SETTLED DEPTH OF 8")
SUBSOIL SCARIFIED 4" BELOW
COMPOST AMENDED LAYER
(12" BELOW SOIL SURFACE)
2" ORGANIC
MULCH
6" IMPORTED
TOPSOIL MIX
(COMPACTED
DEPTH)
SUBSOIL IS
SCARIFIED 6"
BELOW
IMPORTED
TOPSOIL MIX
`st. 18` -
UNDISTURBED PLANTS UNDISTURBED TURF (LAWN)
(SEE NOTE 1) AREAS (SEE NOTE 1)
0"
OPTION 1 — NO DISTURBANCE
PLANTING BEDS TURF (LAWN) AREAS
r�
8,.
III, � �'llll'I�ICW�II�i
UNDISTURBED
TURF/LAWN/LANDSCAPE
UNDISTURBED NATIVE SOIL
STEEP SLOPE NOTE:
AMENDED SOILS SHOULD NOT BE
INSTALLED ON FINISHED SLOPES
EXCEEDING 33%. AREAS EXCEEDING
33% SHALL BE STABILIZED PER THE
ENGINEER/GEOTECH OF RECORD,
GRASS: SEED OR SOD
.75" OF COMPOST INCORPORATED
JTO 6.25" OF SITE SOIL (TOTAL
AMENDED DEPTH OF 9.5", FOR A
;ETTLED DEPTH OF 8")
SUBSOIL SCARIFIED 4" BELOW
COMPOST AMENDED LAYER
(12" BELOW SOIL SURFACE)
OPTION 2 — AMEND IN PLACE OR STOCKPILE AND AMEND
GENERAL NOTES:
PLANTING BEDS TURF (LAWN) AREAS
1- AREAS OF NO DISTURBANCE
SHALL BE AD
GRASS: SEED VEGETATIONFENCED AND SOIL SHALLTING BE
0" OR SOD PROTECTED FROM CONSTRUCTION
11=11 H 11=111 111_111 lir 1 III-1111=1-1 1=1 11=1 I IMPACTS.
11—I �I I— 11 DI -1 I�T� �—
11=111-1-111-111—III-11 1=1I 1-I I1=1I 1=111-111=1I 1
III=1IL--III=III—III—ICI 1-111=IIEEI1EE111=III=III 2. TO MEASURE SETTLED DEPTH,
11=IIIEIC111=III=III-11 1-111=III—III=III—III-111 6" IMPORTED WATER SOIL SUFFICIENTLY TO
TOPSOIL MIX FULLY SATURATE WITHOUT
I-T III— I I —I —II I—III—�—III=III—III-11I (COMPACTED CAUSING EROSION.
l�i f- �i 11T=iT� �i-jj�Tf�TTf=�i= I
I -1 JIB-if-1Tl-1 I-1T(-11I IIIf�l�-1Tl DEPTH)
II-I.11-11=911. III-II.1-1 6 III-111=1111-III=III=111=11 3. COMPOST SHALL MEET SPEC.
I- I' 1 I' = REQUIREMENTS IN THE 2017
�� �- )l EDMONDS STORMWATER
IF /k- II SUBSOIL IS
y/ f� SCARIFIED 6" ADDENDUM (CHECKLIST 7).
BELOW
4. COMPACTION OF TOPSOIL (WHERE
12//%/ TOPOSOIL©MIX REQUIRED) TO BE TO 85% (MAX)
- OF THE MAXIMUM DRY DENSITY
OPTION 3 — IMPORT TOPSOIL PER MODIFIED PROCTOR TEST
(ASTM D1557).
CITY
OF EDIMONDSI POST CONSTRUCTION SOIL
QUALITY AND DEPTH
PUBLIC WORKS
DEPARTMENT
APPROVED BY: R. ENGLISH
REVISION DATE
APRIL 2021
STANDARD
DETAIL
SD-642
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
Manhole. frame, and cover
Slope a1 112 to 1
Filter fabric
314" to 2" washed river rock
Precast drywell base
Notes:
1. Backfill above filter fabric to base of asphalt with crushed
surfacing base course.
2. Size and spacing of drywells determined by drainage analysis.
Typical Infiltration Drywell
49010M
Type 2
DSPARTMFIdT C7F
ECOLOGYPlease see httpJAwtw,acywa.gavlcopyrfght.hW for copyright notice including permissions,
State of Washington limilaiion of liability, and disclaimer.
NOTE: DRYWELL SHALL BE EXCAVATED AND EMBED AT
LEAST 2 FEET INTO THE NATIVE, UNDERGROUND ADVANCE
OUTWASH SOILS. GEOTECH FIELD INSPECTION REQUIRED
AT TIME OF INSTALLATION.
DETAIL - DRYWELL
SCALE: N.T.S.
NOT TO SCALE
Revised ,tune 2018
REFER TO EDMONDS STD. DWG. SD-638 FOR
ADDITIONAL INFORMATION.
DRYWELL STRUCTURE TO BE A PEFORATED MH PER
DETAIL ABOVE.
DRYWELLS SHALL BE INSTALLED BY EACH LOT
CONTRACTOR / DEVELOPER.
SEE PLAN DIMENSIONS FOR DRYWELL LOCATIONS
AND CITY STD. PLAN FOR MIN. SETBACKS.
UPON COMPLETION OF DRYWELL, THE DRYWELL
SHALL BE STAKED AND FLAGGED TO AVOID DAMAGE
DURING CONSTRUCTION.
OBSERVATION PIPE MARKING
CENTER OF DRYWELL
48" DIA. (MIN) DRYWELL
4" (MIN) PERFORATED
PVC UNDERDRAIN PIPE
CLEANOUT
TYPE 1 OR 1-L CATCH
BASIN W/ SOLID LID PER
CITY STANDARD DETAIL
SD-303 OR SD-304
I
.......... . ..........
Uj
Z 5'
J,? (MIN) \� /
w
a
0
� (MIN)
4" (MIN) PVC DRAIN PIPE PER WSDOT
SPEC. 9-05.1(5), 1 % (MIN) SLOPE
TEST PLUG IN PLASTIC
BOX MARKED 'DRAIN"
CLEANOUT
12" (MIN)
TOPSOIL
GUTTER
u
5' (MIN)
10' (MIN)
PROPERTY LINE/EASEMENT
PLAN RooF
NTS
ROOF
DOWNSF
4" (MIN) PVC
DRAIN PIPE (TYP)
12" BUILDING
4" (MIN) PVC DRAIN PIPE PER
WSDOT SPEC. 9-05.1(5), POSITIVE
SLOPE
TPVC
VEHICULAR TRAFFIC ANTICIPATED.
WASHED DRAIN ROCK, 3. PROVIDE 10 FEET (MIN) SPACING
SEE NOTE 2 = BETWEEN DRY WELLS.
NOTES:
UNCOMPACTED NATIVE
MATERIAL, SCARIFY 3" 1. PLACE GEOTEXTILE FABRIC ALONG WALLS AND TOP OF WASHED
(MIN) ROCK. GEOTEXTILE SHALL CONFORM TO WSDOT SPEC. 9-33.2(1),
1' (MIN) ABOVE SEASONAL GEOTEXTILE FOR SEPARATION, NON -WOVEN TYPE.
HIGH GROUNDWATER TABLE
OR HYDRAULICALLY 2. WASHED DRAIN ROCK SHALL CONFORM TO WSDOT SPEC.
RESTRICTIVE LAYER 9-03.12(5), GRAVEL BACKFILL FOR DRYWELLS.
PROFILE 3. OBSERVATION WELL SHALL CONFORM TO WSDOT SPEC.
NTS 9-05.2(6), PERFORATED PVC UNDERDRAIN PIPE.
tEN
CITY OF EDMONDS TYPICAL DOWNSPOUT
INFILTRATION DRYWELL
PUBLIC WORKS DEPARTMENTAPPROVED BY: R. ENGLISH
NOTE: PROPOSED DRYWELL STRUCTURE PER DTL. VC7
C
1.0
W c0 E
r7 O
U
U d
w
U •�
Q � �
0
W E
Q
Q
J � 3
c7 >
z Q
it 3
wCn o
z � �
CD o
z N �
W p C"j
J Ln p
O
N
a)
0
L
a
►' " P. ec
o�fi MWAsy,,��
1 rnIr
Q11J1� z -
� �F�ISTERE�
1S�NAL
c
0
8/23/23 -Ln
rn
70
O
u-
c
0
a
a�
rz
O
O>
N
O°
W CI W
TT m
VJ �
N
Z
Q �
O
a
0 U
W 0 a@
L
0.
o zY
LO0�
a
L
+
0 w c?
N
L
H
cn
o
Q
0
z
w
0
U
7
O
F_
cn
li.i
CY)
N
(y)
N
(n
z
O
ILL]
00
U)
w
U)
w
o
>
�
7
Exhibit 20 - Greenwalk Cdk
[PRELIMINARY DE\PtI22 9 & -0
Packet Pg. 600
Planning &
Development
Received
09/07/2023
2` x 2" WOOD/STEEL
FILTER FABRIC SECURED
TO 2" x 2- 14 GA
WIRE FABRIC EQUAL
N
NATIVE BACKFILL MATERIAL
8"
FILTER FABRIC MATERIAL IN CONTINOUS ROLLS
USE STAPLES OR WIRE RINGS TO ATTACH
FABRIC TO WIRE
2" x 2" WOOD/STEEL POSTS--`
WIRE MESH FENCE
TO SUPPORT FILTER
FABRIC
BURY BOTTOM OF FILTER
MATERIAL 8" TO 12"
6' MAX
NOTES:
1. CONTRACTOR/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER
EROSION CONTROL THROUGHOUT PROJECT.
2. SILT FENCE T4 BE PLACED DOWNSLrOPE OF CONSTRUCTION
ACTIVITY,
CITY OF EDMONDS
PUBLIC WORKS
DEPARTMENT
CITY INSPECTION REQUIRED ON
ALL EROSION CONTROL METHODS
BEFORE OTHER WORK CAN BEGIN
REVISION DATE
FILTER FABRIC FENCE JANUARY 2018
FILTRATION SYSTEMS
STANDARD
DETAIL
APPROVED BY: R. ENGLISH ER-900
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
a
TH
IN
DE FULL WIDTH
DRESS/EGRESS
DETAIL NOTES:
THE MINIMUM LENGTH SHALL BE EXTENDED AS NECESSARY TO ENSURE MATERIAL IS NOT TRACKED OFF SITE
AND/OR INTO THE PUBLIC RIGHT-OF-WAY.
ATB DRIVEWAY RAMP AND/OR SITE ACCESS ROAD 15' WIDE MIN. SEE TABLE BELOW FOR REQUIRED LENGTH.
NOTES:
1. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED
ACROSS THE ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5-1 SLOPES WILL BE PERMITTED.
2. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING
Of SEDIMENT OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH
ADDITIONAL QUARRY SPALLS AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO
TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED OFF SITE AND/OR ONTO PUBLIC
RIGHT-OF-WAY MUST BE REMOVED IMMEDIATELY.
3. WHEELS SHALL 6E CLEANED TO REMOVE SEDIMENT PRIOR TO LEAVING, THE SITE. WHEN WASHING IS USED. IT SHALL
BE DONE ON AN AREA STABILIZED WITH QUARRY SPALLS AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING
DEVICE,
4. INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAIN.
PROJECT
SIZE
MIN LENGTH OF (FEET)
QUARRY SPALLS'
< 1/4 ACRE
30
< 1 ACRE
50
< 3 ACRE
1CC
> 3 ACRE
1OC
*PROVIDE ATB OR ASPHALT
TRANSITION WHERE FRONTAGE
ROAD IS AN ARTERIAL.
LENGTH TO BE DETERMINED
BY CITY INSPECTOR. CITY INSPECTION REQUIRED ON
ALL EROSION CONTROL METHODS
BEFORE OTHER WORK CAN BEGIN
CATCH BASIN
GRATE
FILTER SOCK WITH
OVER FLOW HOLES
(T'P)
CATCH BASIN
NOTES:
1. CONTRACTOR/DEVELOPER SHALL MAINTAIN
THIS APPLICATION AT ALL TIME5 DURING
CONSTRUCTION PERIOD.
2. ANY SEDIMENT IN CATCH BASIN INSERT
SHALL BE REMOVED WHEN INSERT IS
ONE-THIRD FULL.
3. CITY INSPECTION REQUIRED ON ALL
EROSION CONTROL METHODS BEFORE
OTHER WORK CAN BEGIN.
F='v = ._,"ti CATC REVISION DATE
CITY OF EDMONDS STABILIZED CONSTRUCTION JANUARY 2018 � CITY OF EDMONDS TEMPORARY JANUARY 2018
ENTRANCE SEDIMENT TRAP
PUBLIC WORKS STANDARD PUBLIC WORKS FOR CATCH BASINS STANDARD
I (i_i DEPARTMENT lD7ETAIL DEPARTMENT -.'�: Ti ll.
$ APPROVED 8Y R_ ENGLISH Eft,-901 APPROVED BY: R. ENGLISH ER'`902
MAINTENANCE STANDARDS `-
1. THE KEY TO HAVING A FUNCTIONAL SEDIMENT TRAP IS CONTINUAL MONITORING AND REGULAR MAINTENANCE. THE SIZE OF
THE TRAP IS LESS IMPORTANT TO ITS EFFECTIVENESS THAN IS REGULAR SEDIMENT REMOVAL. SEDIMENT SHOULD BE REMOVED
FROM THE TRAP WHEN IT REACHES APPROXIMATELY ONE FOOT IN DEPTH (ASSUMING A 1 1/2 SEDIMENT ACCUMULATION DEPTH).
REGULAR INSPECTIONS SHOULD BE DONE AND ADDITIONAL INSPECTIONS MADE AFTER EACH LARGE RUNOFF -PRODUCING STORM.
2. ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED AND REPAIRED AS
NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL MAINTENANCE AND REPAIR SHALL BE
CONDUCTED IN ACCORDANCE WITH AN APPROVED MANUAL. REPAIR ANY DAMAGE OR EROSION WITHIN SIDESLOPES AS
NECESSARY.
3. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE
STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY BMPS ARE NO LONGER NEEDED. TRAPPED SEDIMENT SHALL BE REMOVED
OR STABILIZED ON SITE. DISTURBED SOIL AREAS RESULTING FROM REMOVAL SHALL BE PERMANENTLY STABILIZED.
MAX. WATER SURFACE
2'1 MAX
ABOVE
FREEBOARD
OUTFALL PROTECTION
PER PLAN & DTL. 3/C8
(100YR STORM)
1.0' FREEBOARD[
TOP EL= PER PLAN
SWALE =11 1 7 j 2.0' LIVE STORAGE
1.5' SEDIMENT STORAGE 3.1 -=I I
i=-
=1 -- 11=1 11=1 11=1 11=1 11=1 I I =1 i I—'
TRAP DESIGN TO INFILTRATE RUNOFF. DEPTH MARKER
DESIGN INFILTRATION RATE= 4.0 IN/HR
SEDIMENT TRAP (BMP C240)
MAINTENANCE STANDARDS
1. DAMAGE RESULTING FROM RUNOFF OR CONSTRUCTION ACTIVITY SHALL BE REPAIRED IMMEDIATELY.
2. IF THE SWALES DO NOT REGULARLY RETAIN STORM RUNOFF, THE SIZE AND/OR FREQUENCY OF
THE SWALES SHALL BE INCREASED.
3. INSPECT ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE
FLOW AREA.
LEVEL BOTTOM
l GRASS OR ROCK
L 2lo
1' IN.
2' MIN
TEMPORARY SWALE (BMP C200
SCALE: N.T.S.
TOP OF SEDIMENT TRAP
8' LONG (4'WIDE)
INTERCEPTOR SWALE �1
12" MIN.
ROCK GRADATION GEOTEXTILE UNDER ROCK LINING
(MIRAFI 50OX OR APPROVED
PASSING 8-IN SQUARE SIEVE: 100% EQUIVALENT)
PASSING 3-IN SQUARE SIEVE: 40-60% MAX.
PASSING 3/4-IN SQUARE SIEVE: 0-10% MAX.
3 OUTFALL PROTECTION BMP C209
C8 SCALE: N.T.S.
STRAW WATTLE ROLL
8"-10"DIA.
FLOW
j
STRAW WATTLE (BMP C235'
SCALE: N.T.S.
TEMPORARY HYDROSEED MIXTURE
HYDROSEED MEADOW MIX (TEMPORARY SOIL STABILIZATION AREAS)
RATIO, BY WEIGHT, OF 40% PERENNIAL RYEGRASS, 40% TALL FESCUE,
20% RED FESCUE.
APPLY AT 350 LB./ACRE
APPLY 10-20-20 FERTILIZER AT 435 LB./ACRE
APPLY WOOD FIBER MULCH AT 2000 LB./ACRE
SEED MIXTURE:
SEEDING ALONE IS ACCEPTABLE ONLY ON FLAT AREAS AND
LIMITED TO MARCH 1ST TO MAY 15TH AND AUGUST 15TH TO
OCTOBER 1ST. JUTE MATTING MAY BE REQUIRED ON STEEP
SLOPES.
SEED SHALL CONFORM TO THE STANDARDS FOR "CERTIFIED"
GRADE SEED OR BETTER, AS OUTLINED BY THE STATE OF WA.
DEPARTMENT OF AGRICULTURE'S "RULES FOR SEED CERTIFICATION"
LATEST EDITION. SEED SHALL BE FURNISHED IN UNOPENED
CONTAINERS WITH SEED MIXTURE CONTENT AND INERT MATERIAL
PLAINLY MARKED ON THE OUTSIDE OF CONTAINERS. FURNISH
DUPLICATE COPIES OF A STATEMENT SIGNED BY THE VENDOR
CERTIFYING THAT A CERTIFIED SEED -TESTING LAB HAS TESTED
EACH LOT OF SEED WITHIN 6 MONTHS OF DELIVERY TO THE
PROJECT SITE
View Looking Upstream
NOTE:
Key stone Into channel banks and
extend it beyond the abutments a
minimum of 18" (0.5m) to Prevent
flow around dam.
Section A - A
FLOvd,
A
18" (0.5m)
j r
12" (1 Somm)
Spacing Between Check Darns
'L' = the distance such that points `A' and
V are of equal elevation.
lu
'%.
POINT 'A'
ROCK CHECK DAM (BMP C207
SCALE: N.T.S.
r6� CONCRETE WASHOUT BASIN (BMP C154)
SCALE: N.T.S.
24" (0.8m)
POINT V
NOT TO SCALE
UME
c
1.0
W c0 E
O
U
� � d
w
U •�
Q��
0
W E
�
Q o
V
0
Q
J � 3
rt�+
c7 >
z Q
CK 3
wO
CD O
z N �
W O Ln �
J c0
O
Q)
0
L
a
►' " P. ec
OVfi MWAsy/,��
1 rn Q11J1� z -
v�F �F�ISTERE� �
SS�ONAL ��G
O
8/23/23
Cn
O
c
0
a
E
a
O
Q �
N
O
00
0
�
a�
Z
Q �
O
c
W
p�
L
Z
O
Lo
a.
7
a
O
W
r1 1
�i i
+
�C
C �m
G �
WCl)
0
w
u ,
c
a
(D
c
a�
E
'ell
U
O
Q
W
0
W
U
�
U)
li
LU
W
co
N
M
N
Z
W
M
..
�O
Vl
W
LU
>
a
0
SCALE: N.T.S.
C41c8Exhibit 20 - Greenwalk
PRELIMINARY DE�6012 9 & _O
P-5-11
Packet Pg. 601
Planning &
Development
Received
09/07/2023
6 1 /2"
R =1/2" 5 1/2"
1"
° it R=1 .
G III
iy 0.05 FT/1 f
N
e 4
� - e • R=1-/2
4- -A a
2' MINIMUM SAWCUT
SEE NOTE 10
HMA DEPTH SHALL BE
4" FOR RESIDENTIAL ROADS
AND 6" FOR ARTERIALS AND
COLLECTORS
__ SEE NOTE 12
OF 5/8" 18" STANDARD 5' CSTC OR CSBC PER WSD07
MINUS CSTC SEE NOTE 11 STD SPEC 9-03.9(3)
SEE NOTE 13
STANDARD TYPE "A" CURB/GUTTER
NOTES: (NOT TO SCALE)
1. CITY INSPECTION REQUIRED ON FORM WORK PRIOR TO POUR.
2. FORMS SHALL BE TRUE TO LINE AND GRADE .AND SECURELY STAKED.
3. FULL DEPTH EXPANSION JOINTS SHALL BE PLACED ADJACENT TO ANY STRUCTURE.
4. FULL DEPTH EXPANSION JOINTS SHALL BE PLACED EVERY 10 FEET.
5. FULL DEPTH EXPANSION JOINTS SHALL HAVE 1/2" WIDE PREMOLDED JOINT FILLER.
6. CONCRETE SHALL BE CLASS 3D01?/COMMERCIAL MIX.
7. FINISH SHALL BE LIGHT BROOM.
8. CURB AND GUTTER SHALL BE SPRAYED WITH CLEAR CURING COMPOUND OR SHALL BE COVERED AND KEPT MOIST FOR
72 HOURS.
9, REMOVAL/REPLACEMENT OF CONCRETE CURB SHALL BE FROM EXPANSION JOINT TO EXPANSION JOINT, UNLESS
OTHERWISE DIRECTED BY CITY ENGINEER,
10. A 2-FT MINIMUM ASPHALT SAWCUT MAY RE REQUIRED WHEN EXISTING PAVEMENT WOULD ABUT NEW CURB/GUTTER.
11, CURB/GUTTER SHALL BE 18" OR AS DIRECTED 13Y CITY ENGINEER. REFER TO CITY STANDARD CONCRETE CURB AND
GUTTER DETAIL TR-520.
12. FINAL JOINT SHALL BE A NEAT SAW CUT STRAIGHT LINE. ALL EXPOSED VERTICAL EDGES SHALL 6E TACKED NEATLY PER
WSDOT STANDARD SPECIFICATION 5-04.3(4) APPROVED TACK OR APPROVED EQUAL AND SEALED PER WSDOT STD
5-04.3 (4)A.
13, CSTC SHALL BE INSTALLED UNDER HMA WHEN HMA SAWCUT IS REQUIRED, CSBC SHALL BE INSTALLED UNDER HMA
WHEN FULL ROAD RECONSTRUCTION IS REQUIRED.
14. NATIVE AND GRAVEL SUBGRADE SHALL BE COMPACTED TO A MINIMUM OF 95% MAX DENSITY.
REVISION DATE
CITY OF EDMONDS VERTICAL 2021
CONCRETE CURB
PUBLIC WORMS AND CUTTER tAPRIL
TANDARD
DEPARTMENTpAPP-ROVED B-'; R. ENGLISH R-520
"" THERMOPLASTIC STOP BAR
(PICAL AT CONTROL INTERSECTIONS ONLY)
a
U
w
ti
z
r
I�
5,5' O.C.
(SEE NOTE 1)
1' CLEAR SPACE BETWEEN 51TiIPE
AND CURB (TYP)
STRIPES SHALL START AND BE CENTERED ON
THE ROAD CENTERLINE STRIPES SHALL ALSO
BE CENTERED ON LANE DELINEATORS OF
MULTILANE ROADS
1' x 8' THERMOPLASTIC STRIPES (TYP)
1' CLEAR SPACE BETWEEN STRIPES
' (TYP)
NOTES:
1. DIMENSION MAY VARY DEPENDING ON ROAD WIDTH (COORDINATE ACTUAL SPACING WITH ENGINEER)
2. MATERIAL SHALL BE HEAT FUSED LOW PROFILE PREFORM THERMCPLASTIC (90 MILS).
, ju-
CITY OF EDMONDS
PUBLIC WORKS
DEPARTIVENT
CROSSWALK DETAIL
APPROVED BY, R. ENGLISH
REVISION DATE
JUNE 2019
STA N DA R D
D ETAI L
TR-562
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
1/2" FULL DEPTH 10,
EXPANSION
JOINT JOINT
NT
d
a d 4
a A
° 4 4 `r.
I 10' O.C. _I _ 5' O.C.
PLAN VIEW
(NOT TO SCALE)
1'
5' MIN MIN,
2% MAX
FULL 'DEPTH 1/2" EXPANSION
CURB/GUTTER JOINT MATERIAL
SEE COE STD , 2q MAX i•�
DTL TR-524
;4 e 1/2" R " R e
.4
4
2" MIN 5/8" MINUS CSTC ON SEE NOTES 4 v:
NATIVE SUBGRADE BEARING SDIL
SEE NOTE 9
SECTION VIEW
NOTES: (NOT TO SCALE) p 1 /S" TO 1 /4"
1. CITY INSPECTION REQUIRED ON FORM WORK PRIOR TO POUR, +
2, CONCRETE SHALL BE CLASS 3000/COMMERCIAL MIX. ' rT- . .:.-
3. FINISH SHALL BE LIGHT BROOM.
DUMMY JOINT
4. SIDEWALK THICKNESS SHALL BE 4". (NOT TO SCALE)
5. SIDEWALK THICKNESS AT DRIVEWAYS AND DRIVEWAY TRANSITIONS SHALL BE 6".
6. CURB AND GUTTER SHALL BE POURED SEPARATELY FROM SIDEWALK,
7. LIDS FOR JUNCTION BOXES AND UTILITY 'VAULTS SHALL BE NON-SKID AS SPECIFIED BY ENGINEER.
S. SEE COF STD DTL TR-550 FOR POSSIBLE ROOT BARRIER INSTALLATION.
9. NATIVE SUBGRADE BEARING SOIL AND CSTC SHALL BE COMPACTED TG 95% MAXIMUM DENSITY.
10. ALL EDGES AND JOINTS SHALL HAVE 1/2" RADIUS
R
CITY OF EDMONDS
PUBLIC WORKS
DEPARTMENT
ANCHOR SQUARE
2.5'x2.5" OD
2 CUBIC FT
CONCRETE
SQUARE FETAL POST
jAFRIL
ION DATE
2021
CONCRETE SIDEWALK
STANDARD D
DETAIL
APPROVED BY: R. ENGLISH T R - S 1
SIGN POST.
1, SIGN POST SHALL 13E 2"x2" SQUARE STEEL
POSTS, MINIMUM 14 GAUGE, WITH 7/16"
DIE -PUNCHED KNOCKOUTS ON 1" CENTERS FULL
LENGTH FOUR SIDES COMPLYING W/ ASTM SPEC
A653 AND BE HOT DIPPED GALVANIZED.
ANCHOR SHALL BE 2.25"x2,25" OD SQUARE STEEL,
MINIMUM 14 GAUGE WITH 7/16" DIE PUNCHED
KNOCKOUTS ON 1" CENTER COMPLYING WITH ASTM
SPEC, A653 AND BE HOT DIPPED GALVANIZED.
ANCHOR SHALL HAVE MINIMUM OF 3 HOLES ABOVE
GRADE"
3 ANCHOR SHALL HAVE TAPE INSTALLED ON BOTTOM
AS WELL AS ALL SIDES TO KEEP INSIDE CLEAR OF
ALL MATERIAL.
a FOR IN -SIDEWALK INSTALLATIONS, CORE 4" ❑IA
HOLE. ANCHOR LENGTH SHALL BE 12'.
Q INSTALL TWO DRIVE RIVETS
ZUMIAR INDUSTRIES #TL3806 OR EQUIVALENT
INSTALL TWO CORNER BOLTS AND NUTS
ZUMAR INDUSTRIES #TLO70 OR EQUIVALENT
SIGN INSTALLATION;
SEE TRAFFIC STREET SIGN DETAIL TR-575 FOR
GUIDANCE ON SIGN INSTALLATIONS.
REVISION DATE
CITY OF EDMONDS SIGN POST INSTALLATION rrsrtuARY 2o1s
IN SIDEWALK AREA
PUBLIC WORKS STANDARD
DEPARTMENT TDETAIL r�
APPROVED BY- R. ENGLISH 1 R-572
}. -
PARALLEL A PARALLEL CURB RAMP PARALLEL B
WSDOT STANDARD PLAN F-40.12-03
http://www.wsdot,wa.gow/publications/fulltext/Standards/english/PDF/f40.12-03-e.pd€
s--F'
COMBINATION CURB RAMP
WSDOT STANDARD PLAN F-40,14-03
http://www.wsdot.wa.gov/publications/fulltext/5tondar(}s/english/PDF/f40,14-03-e.pdf
PERPENDICULAR A PERPENDICULAR B
PERPENDICULAR CURB RAMP
WSDOT STANDARD PLAN F-40.15-03
http://www.wsdot,wo.gov/publicutiQns/fulltext/Standur+ s/english%PDF/f4O-l5-03-e.pdf
ns____�
SINGLE DIRECTION A SINGLE DIRECTION A (MOD)
SINGLE DIRECTION CURB RAMP
WSDOT STANDARD PLAN F-40.1E-103
http://www.wsdot.wa.gov/publications/fulltext/Stondonds/english/PDF/f40.16-03-e pdf
NOTES;
1 USE WSDOT DETAILS FOR HORIZONTAL LAYOUT, SLOPE, DETECTABLE
WARNING SURFACE PLACEMENT. USE COE STD DTL TR-531 FOR ALL
OTHER SPECIFICATIONS,
DSEE WSDOT DETECTABLE WARNING SURFACE STANDARD PLAN F-45.10-02
FOR DETECTABLE WARNING SURFACE INSTALLATION ON ALL RAMP TYPES
nMUST INCLUDE A MIN. 4'X4' STREET LEVEL LANDING (MAX 2% SLOPE
ALL DIRECTIONS).
CITY OF EDMONDS
PUBLIC WORKS
DEPARTMENT
CURB RAMPS
APPROVED BY: R. ENGLISH
FINAL JOINT SHALL BE A NEAT SAW CUT
STRAIGHT LINE. ALL EXPOSED VERTICAL
EDGES SHALL BE TACKED NEATLY PER
WSDOT STANDARD SPECIFICATIONS 5-04.3(4)
1' APPROVED TACK OR APPROVED EQUAL AND
SEALED PER WSDOT STD 5-04.3(4)A,
SLOPE EXCAVATION TO AVOID UNDERMINING
EXISTING PAVEMENT,
MARCH 2O19
T,' I
TR-540
HMA CLASS 1/2"
PG 58H-22
(SEE NOTES 4 & 5)
1'
s ..'..... ........... ...... -- - • -'- .. - . .......'.'.'.. ...'.'.....'....'......'.
EXISTING. ;-, ":��-•_-•--•.................._._._._...-----__..---_•---•--._.__.__._._•__._---•- �.-�•-
HMA = _ - -- - '--------'-----------'----------------•---'--------------
- .4•................................................ .. .. ...... .... ..... .... .. •,�.
- -;-'- _:---------'_- ._ ----_-::..'::.-'- -
1.
EXISTING\
MATERIAL \ I,\ / � -A / �N
BEDDING MATERIAL (1-1/4" MINUS)
CRUSHED SURFACE BASE COURSE
(SEE NOTE 3)
IMPORT BACKFILL SHALL BE COMPACTED
TO 95% MAXIMUM DENSITY
(SEE NOTE 2)
TRENCH WIDTH
NOTES:
1. SEE CITY OF EDMONDS MODIFICATIONS TO DIVISION 9 OF THE CURRENT WSDOT STANDARD SPECIFICATIONS FOR
BACKFILLING REQUIREMENTS.
2. SUBMIT PROCTOR AND DENSITY TESTS FROM CERTIFIED TESTING COMPANIES DOCUMENTING THAT THE BACKFILL
MEETS A MINIMUM OF 959 DENSITY PER ASTM D 1557.
3. CSBC DEPTH SHALL BE A MINIMUM OF 6", AND SHALL BE INSTALLED IN MULTIPLE EQUAL THICKNESS LIFTS NOT
EXCEEDING 6".
4. ROADWAY HMA DEPTH SHALL BE A MINIMUM OF 4" FOR RESIDENTIAL ROADS AND 6" FOR COLLECTORS/ARTERIALS.
5, ALLEY HMA DEPTH SHALL BE A MINIMUM OF 2" THICK. UNLESS APPROVED BY THE ENGINEER, ANY DEPTH GREATER
THAN 2" SHALL MATCH EXISTING.
5. UNLESS APPROVED BY THE ENGINEER. THE HMA SHALL BE INSTALLED IN MULTIPLE EQUAL THICKNESS LIFTS NOT
EXCEEDING 2'.
7. FINAL PAVEMENT JOINTS SHALL BE NEATLY SAW GUT AND UNIFORMILY SEALED WITH WSDOT STANDARD
SPECIFICATIONS 5-04.3(4)A APPROVED JOINT SEALANT OR APPROVED EQUAL.
`St. 1$�v
REVISION DATE
CITY OF EDMONDS TYPICAL HMA AND APRIL 2021
UTILITY PATCH
PUBLIC WORKS [FGIU-41
TANDARD
DEPARTMENT DETAIL
APPROVED BY: R. ENGLISH 0
w
ft�
co
M
E
UU
rn
U
o
w
Q
�
o
w
d
v
O
Q
U
N
o
o
O
o
N
Q
J
N
3
a>
�
z
<
w
3
o
_ J
z
CDo
LO
w
N
orn
N
J
Op
W
j
o
N
U
a
"w
c
O
8/23/23
=a
co
M
O
um
_
0
d'
IL
O
CL
O
O
N (D
O
V
_
co
Q
TT rn
ch
Z
Q�
=
�a
OIL
CC
G
M
Q
U/ E
Lu
p E
Z
O
Lo
ZL
a
O
W
L
Y
_
W
owS
0 L
Q,
r
d
E
aO
m
O
W
O
LO
I
O
Q
Lu
0
0
�
U
Q
�
0
Q
�
O
ryoo
LIj
C�
N
(�
N
U)
Z
LLI
M
00
�O
V )
w
U)
Lu
0
>
Exhibit 20 - Greenwalk C49
[PRELIMINARY DE\PtI22 9 & -0
Packet Pg. 602
N
Planning &
Development
Received
09/07/2023
M
D_
0
C'4
0.
N
n
[V
O
0
3
v
U
I
0
3
a>
c�
I
n
CV
Co
CV
FACE OF CURB VARIES 12" TO24" FACE OF CURB
VARIES
1" 10" TO22' 1"
(SEE CONTRACT)
MATCH ROADWAY MATCH ROADWAY
SLOPE_ SLOPE
•1" (IN) R. ROADWAY
ROADWAY b
• r , k
1" (IN) R.
` r ,112" pN) R. , 112" (IN) R.
11 112" 11 1!2'
DUAL -FACED CEMENT CONCRETE
a TRAFFIC CURB AND CUTTER
La
La
LL
in
4c
t]
CEMENT CONCRETE OR
• ASPHALT CONCRETE
SIDEWALK OR PATH
31a" (IN) PREMOLUED JOINT FILLER
- (WHEN ADJACENT TO CEMENT
CONCRETE SIDEWALK)
CEMENT CONCRETE PEDESTRIAN CURB
PACE OF CURB FACE OF CURB
VARIES 12" TO 24"
VARIES
1" 10" TO 22" 1"
(SEE CONTRACT)
V (IN) R. 1" (IN) R.
ROADWAY 4 ROADWAY
v qv b.
1 314" �134
"
DUAL -FACED CEMENT
CONCRETE TRAFFIC CURB
FACE OF CURB
6 112"
5 1i2" 1"
1" R.
1&' (IN) R. (IN) MATCH ROADWAY
71 SLOPE
n V7 (IN) ROADWAY
R.
N D .
•b pe
q r m
CEMENT CONCRETE
TRAFFIC CURB AND GUTTER
CEMENT CONCRETE
112" (IN) R. CURB RAMP, LANDING,
I` (IN) OR DRIVEWAY
R_ ENTRANCE
VARIES FROM
5" (IN) TOO" (IN) � •.a_ ••
_ 318" (IN) PREMOLDED
JOINT FILLER
CEMENT CONCRETE PEDESTRIAN CURB
AT CURB RAMPS, LANDINGS,
AND DRIVEWAY ENTRANCES
FACE OF CURB
51l2" i"
112-(IN) R.
r • • sa ROADWAY
4 r . •�
rb`•
• . t, _
CEMENT CONCRETE
TRAFFIC CURB
SW1/4 OF SW1/4 OF SEC. 25, T27N, R3E, W.M., CITY OF EDMONDS, SNOHOMISH COUNTY, WA
FACE OF CURB
6 117" VARIES FROM 6" (IN) TO Cr (IN
MAINTAIN iH : OV SLOPE
VARIES 1" (IN) ON SIDE OF CURB
R.
MATCH ROADWAY
1r2° (IN) R. __-- SLOPE
112" (IN) ROADWAY
R_
rLnQ 7-$ • _ ,a
y # r ° • ° FLUSH WITH GUTTER PAN AT CURB
Ar__0 RAMP ENTRANCE - 1✓•1" (IN) VERTICAL
1 V - fi° LIP AT DRIVEWAY ENTRANCE
DEPRESSED CURB AND GUTTER SECTION
AT CURB RAMPS AND
DRIVEWAY ENTRANCES
NOTE
1. See Standard Plan F•30.10 for Curb Expansion
and Contraction Joint spacing. See Standard
Specification, Sections 8-04 and 9-04 for
additional requirements.
FACE OF CURB
7 114"
3" 4" 1 112" (IN) R.
1r2" (IN1 R.
a ROADWAY
� r
r• D �•
b #
MOUNTABLE CEMENT
CONCRETE TRAFFIC CURB
Michael lael S DqL y signee by MrnaeiS
Flen■ng
Fleming Date ZQX).09.240739.38-07W
CEMENT CONCRETE CURBS
STANDARD PLAN F-10.12-04
SHEET 1 OF 1 SHEET
APPROVED FOR PUBLICATION
Date: 2020.09.24
47:57:43-07'00'
STATE DESIGN ENGINEER
Waahing6en State Deparlmenl of Transportation
NOTES
4'-U"MIN. - A 4'-0"MIN. - {L
SEE CONTRACT PLANS SEE CONTRACT PLANTS 1. At marked crosswalks, the connection between the landing and the
318" EXPANSION PEDESTRIAN CURB - S'B" (IN) EXPANSION roadwaymust be contained within the width of the crosswalk markings.
JOINT (TYP.) - SEE SEE NOTE 9 JOINT {TYP,) SEE PEDESTRIAN CURB
STANDARD PLAN F-30.10 STANDARD PLAN F-30.10 LANDING SEE NOTES 2, Where "GRADE BREAK" is called out, the entire length of the grade
LANDING break between the two adjacent surface planes .shall be flush.
B SIDFWALK 3. Do not place Gratings, Junction Boxes, Access Covers, or other appurte-
nances on any part of the Curb Ramp or Landing, or in the Depressed
SIDEWALK Curb and Gutter where the Landing connects to the roadway.
3" R. 4. See Contract Plans for the curb design specified. See Standard Plan
F-10-12 for Curb, Curb and Gutter, Depressed Curb and Gutter, and
CURB AND GUTTER Pedestrian Curb details.
OURS RAMP CURB RAMP CURB RAMP 5. See Standard Plan F-30.1D for Cement Concrete Sidewalk Details.
4' - Cr MIN. •- DETECTABLE WARNING SURFACE
SEE CONTRACT PLANS DETECTABLE WARNING SURFACE 4'- 0" MIN. - SEE STANDARD PLAN F-45.10 See Contract Plans for width and placement of sidewalk.
SEE STANDARD PLAN F-46.10 S EE CONTRACT PLANS
FACE OF CURB FACE OF CURB DEPRESSED CURB AND GUTTER 6 The Bid Item "Cement Concrete Curb Ramp Type does not include
CL DEPRESSED CURB AND GUTTER � the adjacent Curb, Curb and Gutter, Depressed Curb and Gutter,
w CROSSWALK cRossVtifALK Pedestrian Curb, or Sidewalks.
a
7. The Curb Ramp length is not required to exceed 15 feet (unless otherwise
z shown in the Contract Plans). When applying the 15-feet max. length,
w PLAN VIEW DETECTABLE WARNING SURFACE PLAN VIEW the running slope of the curb ramp is allowed to exceed 8.3%. Use a single
LL TYPE PARALLEL A SEE STANDARD PLAN F-4 10 TYPE PARALLEL B constant slope from bottom of ramp to top of ramp to match into the sidewalk
4`-0" MIN over a horizontal distance of 15 feet. too not include abutting landings) in
SEE CONTRACT PLANS GRADE BREAK the15-foot max. measurement. When a ramp is constructed on a radius, the
15-foot max. length is measured on the inside radius along the back of the
o CONTRACTION JOINT (TYP.) - SEE STANDARD PLAN F440.1 walkway.
FOR CURB RAMP LENGTHS GREATER THAN 8'-4"PROVIDE a a COUNT€R SLOPE TOP OF
CONTRACTION JOINT EQUALLY SPACED 4• - Cr MIN. OC. * _ 59 ROADWAY 8. Curb Ramps and Landings shall receive a broom finish. See Standard
Specifications 8-14.
w DEPRESSED cuRe AND GUTTER - 9. Pedestrian Curb may be omitted if the ground surface at the back of the
CEMENT CONCRETE PEDESTRIAN LANDING
¢ SEE STANDARD PLAN FA0.12 Curb Ramp and{or Landing will be at the same elevation as the Curb
CURB - SEE NOTE 9 AND NOTE B Ramp or Landing and there will be no material to retain.
SECTION ( A ) 4•-T MIN, 15' -0- MAX. (TYP.) LEGEND
�� SEE CONTRACT PLANS SEE NOTE 7
SLOPE IN EITHER DIRECTION
SIDL�VJALK
4'-Sr'MIN, 16 -0`• MAX. (TYP.) GRADE BREAK 1.5%OR FLATTER RECOMMENDED FOR
15' - 0" MAX, (TYP.) GRADE BREAK - DESIGNJFORMWORK (2% MAX.)
SEE NOTE 7 SEE CONTRACT PLANS SEE NOTE 7 CL
GRADE BREAK * 7.6%OR FLATTER RECOMMENDED FOR DESIGN)
SIDEWALK GRADE BREAK " FORMWORK (8.3% MAX.) -• SEE NOTE 7
CURB RAMP
316" IN EXPANSION JOINT TYP.
+ PEDESTRIAN CURB �- •
( ) (TYP-) fi
a ` SEE NOTE 9 LANDING 1 SEE STANDARD PLAN F-34.10 tC,O
CURB RAMP
CURB RAMP LANDINGS 4,
&8" EXPANSION JOINT (TYP.) - 1 SECTION 1 C I
SEE STANDARD PLAN f.J"Q.10 (ALONG INSIDE RADIUS AT BACK OF WALKWAY)
SECTION (B )a, ,pe�eoD
(ALONG INSIDE RADIUS AT BACK OF WALKWAY) "CEMENT CONCRETE CURB RAMP TYPE $r`
PARALLEL B" PAY LIMIT •- SEE NOTE 6 71 �'f'tI �
"CEMENT CONCRETE CURB RAMP TYPE
PARALLEL A" PAY LIMIT - SEE NOTE 6 _
ISOMETRIC VIEW
TYPE PARALLEL A PAY LIMIT
ISOMETRIC VIEW
TYPE PARALLEL B PAY LIMIT
A
zelter, Scott
�- Jun 24 2016 7:19 AM
PARALLEL CURB RAMP
STANDARD PLAN F-40.12-03
SHEET 1 OF 1 SHEET
APPROVED FOR PUBLICATION
carprnkr, ICU
6,d'r�l�'I'An, Jun 29 M 162,27 PM
SrATE.OWn" ENCINEER
Alok
Washingon Stole Uepmftm t M rromportafion
TV
FOR USE WITHIN EDMONDS WAY (WA-104)
11 - 0- B- SIDEWALK
(SEE CONTRACT) FOR SIDE TREATMENT SIDEWALK 6 N2 ' SE E CONTRACTI0) a iF2-
1' SEE OTHER SIDEWALK SECTIONSFACE OF CURB
(SEE CONTRACT) JOINT
ROUNDING 2.0°!0 1J2" (IN) R_ (TYP_)
1 1Q- (IN) R. (TYPJ CURB NOT INCLUDED IN BID ITEM -• 1 2.0°% MAx- v
2.0% MAX. SEE STANDARD PLAN F-10.12 --� • 9 . • a ° �y ROADVdAr
1" (IN) R.
t SEE RAISED EDGE 3W (IN) PREMOLDED ' ` SEE CURB FACE DETAIL b • a
DETAIL -• THIS SHEET JOINT FILLER n
WITH RAISED EDGE MONOLITHIC CEMENT CONCRETE
1 FINISHED GRADE 1" (IN) BELOW B" B 1+2- k
TOP OF CONCRETE SURFACE CURB AND SIDEWALK
2' -0" SIDEWALK NOTE
MIN_ (SEE CONTRACT)
1• _ 0- 1• . 0" CURB FACE DETAIL
112" (IN) R. (TYP,) 1. Gratings, Access Covers, Junction Boxes, Gable Vaults, Pull Boxes and other
ROUNDING - CURB NOT INCLUDED IN BID ITEM - appurtenances within the sidewalk must have slip resistant surfaces, be flush EXTEND SIDEWALK TRANSVERSE EXPANSION
2 duo- MAX SEE STANDARD PLAN F-10.12 with surface, and match grade Of the sidewalk, JOINTS TO INCLUDE CURB (FULL DEPTH)
3W (IN)
5 pt PREMOLDED WALL OR BARRIER
�P JOINT FILLER
ADJACENT TO CURB
(STEEP FILL SLOPES) SIDEWALK
GROOMED FINISH (TYP.)
SIDEWALK 112" (IN) R. �,_I' " (TIN) WIDE, SMOOTH -TROWELED
SLOPES ALL CUT MIN' (SEE GQNTRAGT7 a Q' CEMENT CONCRETE CURB
112" (IN) R. (TYP.) b • h 'I' i (� [CURB AND SHUTTER SHOWN)
J CURB NOT INCLUDED IN BID ITEM - • " NOT INCLUDED IN BID ITEM
2.0% � 2,0� MAX ` SEE 5TANDARD PLAN F-10.12 3fd" {IN) PREMOLDED SEE STANDARD PLAN F-10.12
AHC JOINT FILLER
3ie" (IN) PREMOLDED
JOINT FILLER
SIDEWALK ADJACENT TO WALL DETAIL
ADJACENT TO CURB
BRIDGE OR PEDESTRIAN
RAILING
CONTRACTION JOINT
BARRIER SEE SIDEWALK IN SIDEWALK ONLY
CONTRACT PLANS AJ (SEE CONTRACT) LEVEL SI 112"
rl 112- (IN) R. (TYP.) `oaf EXPANSION JOINT IN BOTHi�'
112" (IN) R. F CURB AND SIDEWALK + OT t1A8gj
FLUSH I I - CURB NOT INCLUDED IN BID ITEM - J
v 2.0% MAxx, SEE STANDARD PLAN roO.12 �
q 0
Lr(IN) R. p . J. ISOMETRIC VIEW
VERTICAL WALL - 31T (IN) PREMOLDED F •�
SEE DETAIL JOINT FILLER (TYP_) JOINT AND FINISH o-a
DETAIL �' ♦� '�77' $�"
ADJACENT TO CURB AND RAILING FOR WALL +f a! STEA �
RAISED EDGE DETAIL J'101VAL g�
EXTEND SIDEWALK TRANSVERSE
3'-0" MIN_ JOINTS TO INCLUDE RAISED EDGE Michael S cigiratysignadnymichael S
FOR SIDE TREATMENT SIDEWALK BUFFER STRIP Date Fleming
Fleming Date 2020.08.24 WAD :16 -0TY)6'
SEE OSECRTOND WALK (sEECONTRACT) (3EECDNTRACT) CEMENT CONCRETE
ir9'" Tfl 114"
1 112" (IN) R. CURB NOT INCLUDED IN BID ITEM - �� SIDEWALK
c 2.0% MAX. (TYP.) SEE STANDARD PLAN F-10.12
. . is• . ..' • STANDARD PLAN F-30.�10-04
t;, d•� O SHEET 1 OF 1 SHEET
FINISHED GRADE 1" (IN) BELOW TOP OF CONCRETE __ APPROVED FOR PUBLICATION
SURFACE FOR PLANTING - FLUSH IF PAVED Date: 2020.09.25
PREMOLDED 15:43:50 -OTO(Y
JOINT FILLER STATE DESIGN ENGINEER
ADJACENT TO BUFFER STRIP I EXPANSION JOINT CONTRACTION JOINT ri Washington stale Departmanl at transportation
NOTES
A A CURB RAMP, LANDING. CUT % 1. Permanent Detectable Warning Surfaces (DWS) shall extend the full width of the curb ramp,
THROUGH OR WALKUVAY
B E ` C - YIN YAX DETECTABLE WARNING landing, or other roadway entrance as applicable_ Exception: If the Manufacturer of the
SURFACE (DWS) - DWS requires a concrete border around the DWS, a variance of up to 2" (in) on each side
SEE TRUNCATED DOME 1 SEE NOTE 3 of the DWS i5 permitted.
A 1 _bd' 2.44"
, �*� �\ DETAIL -THIS SHEET
f ) 0 0_65" - 1' 2. Permanent. Detectable: Waning Surfaces (DWS) shall be placed on a minimum 4" (in)
A B D ,� C a.ds, o.so" thick concrete pad. The DWS panel shall be placed adjacent to the back of the curb and
BACK OF CURB ; with no more than a 2" (in) gap between the DWS and the back of the curb measured at
O 0,9' 1.40" ..as:
}- - ••• 2' • o" MIN. •- the center of the DWS anal. Exception: If the Manufacturer of the selected D`VVS requires
- TRUNCATED DOME SEE NOTE 2 -••• P PI
E 0,3" a,s" TYP. OF ALL a concrete border around the DWS, a variance of up to 2" (in) from the back of the: curb is
APPLICATIONS permitted measured at the leading corners of the DWS nel
SECTION }�� � P ( � pa )-
TRUNCATrD Dt WSPAGING - - 3. The rows of truncated domes shall be aligned to be parallel to the dirediorl of travel,
SEE NOTE 3 SEE STANDARD SPECIFICATIONS
FOR COLOR OF SURFACE and perpendicular to the grade break at the back of curb.
TRUNCATED DOME DETAILS MATCH TO WIDTH aF CURB RAMP, 4. If curb and gutter are not present, such as a shared -use path connection, the Detectable
CURB AND GUTTER LANDING, Cur -THROUGH OR Waming Surface shall be placed at the pavement edge.
WALKWAY S. Standard Plans for sidewalk and curb ramp details,
Q DETECTABLE WARNING SURFACE DETAIL 6. If a curb ramp is required, the location of the Detectable Warning Surface must be at
LANDING OFFSET the bottom of the ramp and within the required distance from the rail crossing.
WALKWAY - CURD RAMP SEE NOTE 7
LANDING 7. When the grade break between the curb ramp and the landing is less than or equal to
4MDTH DF 5 ft. from the back ref oath at all points, place the Detectable Waming Surface Dn the
WALKWAY bottom of the curb ramp directly above the grade break.
VdALKVAY titi• WALKIVAY WIDTH OF CUT- H_ Glued or stick down Detectable Warning Surfaces are allowed only for temporary
THROUGH (TYP,) work Zane applications.
y DETECTABLE WARNING
o +• SURFACE (DWS) -"
zi SEE NOTE 9 - RAMP "" VIADTH OF CUT -THROUGH
= BACK OF CURB } (TYP.)
w r
LL
FLARE FLARE'
SINGLE DIRECTION CURB RAMP !- _4-- ; ; ;w; - - = fitlN o-
m (GRADE BREAK BETWEEN CURB AND � - Mry•
LANDING s 5 FT. FROM BACK OF CURB) LEGEND
(SEE NOTE a) BACK OF CURB - DETECTABLE WARNING - DETECTABLE WARNING
G WHEELCHAIR DIRECTION SEE NOTE 2 - SURFACE (DWS) •- SURFACE (TYP.) - �- DIRECTION OF TRAVEL
CURB RAMP w LANDING OF TRAVEL SEE NOTE 3 SEE NOTE 3 =
a I WIDTH OF CURB RAMP
WALKWAY li I BACK OF CURB - BACK 01: CURB •-
II PERPENDICULAR CURB RAMP SEE NOTES 2 S 8 i~ SEE NOTE 2
V IADTH OF
C WALKWAY IEEE NOTE 6) 2-
�
N07H OF CURB RAMP,
ISLAND GUT -THROUGH cs� ?;6 MIN.
LANDING. OR WALKWAY DETECTABLE WARNING
SURFACE (TYP.) •-- �C 1
DETESTABLE WARNING SEE NOTES 3 AND R
- SURFACE(DWS)- ,�•06i7�
SEE NOTE 3 _ +
BACK OF CURB - SACK OF CURB .
SEE NOTE 2 _ _ SEE NOTE 2
SINGLE DIRECTION CURB RAMP a IIIIIII II k MEDIAN CUT -THROUGH fi Ju
DETECTABLE WARNING i� tv 5
(GRADE BREAK BETWEEN CURB AND SURFACE (DWS) _ WIDTH OF SHARED- ¢�, P 2esao ram
LANDING a 5 FT. FROM BACK OF CURB) SEE NOTES 3 & 6 _ I USE PATH D- S T ia� i+�n
OR
(SEE NOTE SI 3 + WALKWAY (TYP-)7 ��'O,VAI 'w
CURB RAMP �, i CURB RAMP 50 r.D r +
WALKWAY LANDING + III � ►*kLKVAAAY t '� f WIDTH OF CUT -THROUGH Aug30, 2021
�P`) SHARED -USE
PATH OR DETECTABLE WARNING
ROUNDAf3(7UT SPUTTER WALKWAY
BACK OF CURB - _/ I � DETECTABLE WARNING
SEE NOTE 2 VADTH OF SURFACE (DWS) - SEE NOTE 3
LAN DINQ
PARALLEL CURB RAMP
(SEE NOTE B)
ISLAND SURFACE
PAVEMENT
RAIL S -- EDGE ! � SHOULDER STANDARD PLAN F-45.10-03
SHEET 1 OF 1 SHEET
PATH OR DETECTABLE WARNING
WALKWAY SURFACE (DWS) -
SEE NOTES 3 S 4
PEDESTRIAN RAILROAD CROSSING PLACEMENT GUIDELINES SHARED -USE PATH CONNECTION
1.0
w co E
� M U
VU � o
w
'�7•I � Q o,
O
�►I �,cl-�
L,J , E
U (n o
O_J 3
J � 3
a> q
Z Q
3
h w n O
,an'
Cq o
Mrs^ w `D N
W v J o a,
> o
^ v m
H
SEEM
Op.DEG
<vO� F of WAsjy7�c���
it o
0 z
35646
ST
Is,
ANAL ECG `v
O
8/23/23
3
rn
R
E
O
U.
C
III
O.
E
0)
o
O °'
rL
N�
O20
2,
C^ M C
VI �
Q �
Q1
ZO
0
5 a.
R
L M
V J ,s
c
W p�
O Za.
Y
Z�O�
d
1 P1 '[
�1 �
W +
i
W O w"
' ^�' N
L ! C
a
c
d
Q
O
m
Q
0
Z
U
0
Q
O
I..L
■
Li
CM
N_
~
M
U7
Z
N
W
00
_O
U)
W
I_I-I
0
Exhibit 20 - Greenwal ar 0
[PRELIMINARY DE�I22 9 & -0
Packet Pg. 603
1.v
When Recorded, Return to:
FERNANDEZ & BARNEs LLC
Attention: Leandro Fernandez
930 NW 52nd Street
Seattle, WA 98107
DECLARATION OF COVENANTS, CONDITIONS,
RESTRICTIONS AND EASEMENTS
FOR
GREENWALK PARK, A PLAT COMMUNITY
Grantor: Fernandez & Barnes LLC
Grantee: Greenwalk Park, a Plat Community
Legal Description PTN SW 1/4, SEC 25-27N-3E, WM, Snohomish County, WA
(abbreviated):
0 Additional on: SCHEDULE A
Assessor's Tax Parcel ID #s: 27032500308300; 27032500308400
Reference Nos. of Related Documents:
THE MAP WAS RECORDED WITH THE RECORDER OF SNOHOMISH COUNTY,
WASHINGTON, CONTEMPORANEOUSLY WITH THE RECORDING OF THIS
DECLARATION UNDER REC. NO. , IN VOLUME OF
COMMUNITYS, PAGES THROUGH
Examined and approved this _
Snohomish County Assessor
By:
ASSESSOR
day of , 20_.
M.
DEPUTY ASSESSOR
This Community is subject to the Washington Uniform Common Interest
Ownership Act, codified at Ch. 64.90 RCW, as it may be from time to time
amended.
Exhibit 21 -Green
PLN2022-004 Packet Pg. 604
1.v
TABLE OF CONTENTS
Page
ARTICLE 1. DEFINITIONS...
I.I. WORDS DEFINED..............................................................................................1
1.2. FORM OF WORDS.............................................................................................5
1.3. STATUTORY DEFINITIONS................................................................................5
ARTICLE 2. CREATION OF COMMUNITY...............................................................5
ARTICLE 3. NAME OF COMMUNITY........................................................................6
ARTICLE 4. DESCRIPTION OF REAL PROPERTY.................................................6
ARTICLE 5. DESCRIPTION OF BUILDINGS............................................................6
ARTICLE 6. DESCRIPTION OF UNIT LOTS; ALLOCATED INTERESTS ..........6
6.1. NUMBER AND IDENTIFICATION OF UNIT LOTS...............................................6
6.2. UNIT LOT BOUNDARIES...................................................................................6
6.3. UNIT LOT DATA...............................................................................................6
6.4. ALLOCATED INTERESTS...................................................................................7
ARTICLE 7. COMMON ELEMENTS............................................................................7
7.1. DESCRIPTION....................................................................................................7
7.2. USE....................................................................................................................7
7.3. CONVEYANCE OR ENCUMBRANCE OF COMMON ELEMENTS ..........................7
ARTICLE 8. PARKING AND STORAGE; LIMITED COMMON ELEMENTS .....7
ARTICLE 9. PERMITTED USES, MAINTENANCE OF UNIT LOTS;
CONVEYANCES.......................................................................................8
9.1.
USE; TIMESHARING PROHIBITED....................................................................8
9.2.
LEASING............................................................................................................8
9.3.
MAINTENANCE OF UNIT LOTS, COMMON ELEMENTS, AND LIMITED
COMMON ELEMENTS, RECORDS.....................................................................9
9.4.
EXTERIOR APPEARANCE..................................................................................9
9.5.
SATELLITE DISHES AND ANTENNAE..............................................................10
9.6.
EFFECT ON INSURANCE..................................................................................10
Declaration of Covenants, Conditions, Restrictions and Easements — Table of Contents page i
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 605
1.v
9.7. USE OR ALTERATION OF COMMON AND LIMITED COMMON ELEMENTS ....10
9.8.
DISPLAYS........................................................................................................10
9.9.
PETS................................................................................................................10
9.10.
QUIET ENJOYMENT........................................................................................10
9.11.
OFFENSIVE ACTIVITY....................................................................................10
9.12.
VEHICLES.......................................................................................................11
9.13.
WASTE REMOVAL..........................................................................................11
9.14.
HAZARDOUS SUBSTANCES.............................................................................11
9.15.
CONVEYANCE BY OWNERS, NOTICE REQUIRED...........................................11
ARTICLE 10. SPECIAL DECLARANT RIGHTS......................................................12
10.1. SPECIAL DECLARANT RIGHTS.......................................................................12
10.2. DECLARANT INSPECTIONS.............................................................................12
10.3. DECLARANT RIGHT TO ATTEND ASSOCIATION MEETINGS AND
RECEIVE MINUTES AND NOTICES..................................................................13
10.4. TRANSFER.......................................................................................................13
10.5. EXPIRATION OF SPECIAL DECLARANT RIGHTS............................................13
ARTICLE 11. ENTRY FOR REPAIR OR MAINTENANCE....................................13
ARTICLE 12.OWNERS ASSOCIATION...................................................................14
12.1. FORM OF ASSOCIATION.................................................................................14
12.2. BYLAWS..........................................................................................................14
12.3. QUALIFICATION AND TRANSFER...................................................................14
12.4. POWERS OF THE ASSOCIATION......................................................................14
12.5. FINANCIAL STATEMENTS AND RECORDS......................................................16
12.6. INSPECTION OF COMMUNITY DOCUMENTS, BOOKS, AND RECORDS ............ 17
ARTICLE 13. DECLARANT CONTROL PERIOD...................................................17
13.1. DECLARANT CONTROL UNTIL TRANSITION DATE.......................................17
13.2. TRANSITION DATE..........................................................................................17
13.3. TRANSITION MEETING...................................................................................17
13.4. AUDIT OF RECORDS UPON TRANSFER...........................................................19
13.5. TERMINATION OF CONTRACTS AND LEASES MADE BY DECLARANT ........... 19
ARTICLE 14. THE BOARD..........................................................................................20
14.1. SELECTION OF THE BOARD AND OFFICERS...................................................20
14.2. POWERS OF THE BOARD.................................................................................20
14.3. LIMITATIONS ON BOARD AUTHORITY...........................................................20
14.4. RIGHT TO NOTICE AND OPPORTUNITY TO BE HEARD..................................20
ARTICLE 15. BUDGET AND ASSESSMENTS..........................................................21
Declaration of Covenants, Conditions, Restrictions and Easements — Table of Contents page ii
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 606
1.v
15.1.
FISCAL YEAR..................................................................................................21
15.2.
PREPARATION OF BUDGET.............................................................................21
15.3.
RATIFICATION OF BUDGET............................................................................21
15.4.
SUPPLEMENTAL BUDGET...............................................................................21
15.5.
MONTHLY ASSESSMENTS...............................................................................21
15.6.
COMMON EXPENSES.......................................................................................22
15.7.
LIMITED COMMON ELEMENT........................................................................22
15.8.
ONLY SOME UNIT LOTS BENEFITED.............................................................22
15.9.
SPECIALLY ALLOCATED EXPENSES...............................................................22
15.10.
CONTRIBUTION TO INITIAL WORKING CAPITAL..........................................22
15.11.
SPECIAL ASSESSMENTS..................................................................................23
15.12.
CREATION OF RESERVES, ASSESSMENTS......................................................23
15.13.
NOTICE OF ASSESSMENTS..............................................................................23
15.14.
PAYMENT OF MONTHLY ASSESSMENTS........................................................23
15.15.
RECONCILIATION OF ASSESSMENTS TO ACTUAL EXPENSES ........................23
15.16.
PROCEEDS BELONG TO ASSOCIATION...........................................................24
15.17.
FAILURE TO ASSESS.......................................................................................24
15.18.
CERTIFICATE OF UNPAID ASSESSMENTS.......................................................24
15.19.
RECALCULATION OF ASSESSMENTS..............................................................24
15.20.
RESERVE STUDY.............................................................................................24
ARTICLE 16. LIEN AND COLLECTION OF ASSESSMENTS...............................25
16.1. ASSESSMENTS ARE A LIEN; PRIORITY..........................................................25
16.2. LIEN MAY BE FORECLOSED; JUDICIAL FORECLOSURE...............................25
16.3. NONJUDICIAL FORECLOSURE........................................................................26
16.4. RECEIVER DURING FORECLOSURE...............................................................26
16.5. ASSESSMENTS ARE PERSONAL OBLIGATION................................................26
16.6. EXTINGUISHMENT OF LIEN AND PERSONAL LIABILITY...............................26
16.7. JOINT AND SEVERAL LIABILITY....................................................................26
16.8. LATE CHARGES AND INTEREST ON DELINQUENT ASSESSMENTS.................27
16.9. RECOVERY OF ATTORNEYS' FEES AND COSTS.............................................27
16.10. SECURITY DEPOSIT........................................................................................27
16.11. REMEDIES CUMULATIVE...............................................................................27
16.12. RENT PAID TO ASSOCIATION.........................................................................27
ARTICLE 17. ENFORCEMENT OF DECLARATION, BYLAWS AND
RULES AND REGULATIONS..............................................................28
17.1. RIGHTS OF ACTION........................................................................................28
17.2. FAILURE OF BOARD TO INSIST ON STRICT PERFORMANCE ..........................28
17.3. BOARD ENFORCEMENT..................................................................................28
ARTICLE 18. TORT AND CONTRACT LIABILITY...............................................28
18.1. DECLARANT LIABILITY..................................................................................28
Declaration of Covenants, Conditions, Restrictions and Easements — Table of Contents page iii
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 607
1.v
18.2. LIMITATION OF LIABILITY FOR UTILITY FAILURE, ETC..............................29
18.3. NO PERSONAL LIABILITY..............................................................................29
ARTICLE 19. INDEMNIFICATION............................................................................29
ARTICLE20. INSURANCE...........................................................................................30
20.1. OWNER'S INSURANCE....................................................................................30
20.2. INSURANCE COVERAGE.................................................................................30
20.3. COVERAGE NOT AVAILABLE.........................................................................31
20.4. REQUIRED PROVISIONS..................................................................................31
20.5. CLAIMS ADJUSTMENT....................................................................................32
20.6. CERTIFICATE..................................................................................................32
20.7. NOTIFICATION ON SALE OF UNIT LOT..........................................................32
ARTICLE 21. DAMAGE OR DESTRUCTION; RECONSTRUCTION ..................33
21.1.
DEFINITIONS; SIGNIFICANT DAMAGE: REPAIR: EMERGENCY WORK
......... 33
21.2.
INITIAL BOARD DETERMINATIONS................................................................33
21.3.
NOTICE OF DAMAGE OR DESTRUCTION........................................................34
21.4.
GENERAL PROVISIONS...................................................................................34
21.5.
RESTORATION BY BOARD..............................................................................35
21.6.
DECISION TO TERMINATE..............................................................................35
ARTICLE 22. CONDEMNATION................................................................................35
22.1. IN GENERAL...................................................................................................35
22.2. PARTIAL UNIT LOT CONDEMNATION............................................................36
22.3. COMMON ELEMENT CONDEMNATION...........................................................36
22.4. RECORDING OF JUDGMENT...........................................................................36
22.5. ASSOCIATION TO REPRESENT OWNERS........................................................36
ARTICLE23. EASEMENTS..........................................................................................36
23.1.
IN GENERAL...................................................................................................36
23.2.
ENCROACHMENTS..........................................................................................37
23.3.
EASEMENTS RESERVED BY DECLARANT.......................................................37
23.4.
UTILITY EASEMENTS GRANTED BY DECLARANT..........................................37
23.5.
MAINTENANCE EASEMENT............................................................................38
23.6.
UTILITY AND REPAIR EASEMENTS................................................................38
23.7.
EASEMENT FOR ASSOCIATION.......................................................................38
23.8.
ACCESS EASEMENT........................................................................................38
23.9.
WASTE STORAGE EASEMENT........................................................................38
23.1.
COMMON ELEMENT EASEMENT....................................................................39
ARTICLE 24. PROCEDURES FOR SUBDIVIDING.................................................39
Declaration
of Covenants, Conditions, Restrictions and Easements — Table of Contents
page iv
ND: 22630.009
4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 608
1.v
24.1. SUBDIVISION OF UNIT LOTS...........................................................................39
24.2. RELOCATION OF BOUNDARIES......................................................................39
ARTICLE 25. AMENDMENT OF DECLARATION, MAP, ARTICLES OR
BYLAWS..................................................................................................40
25.1. PROCEDURES..................................................................................................40
25.2. PERCENTAGES OF CONSENT REQUIRED........................................................40
25.3. LIMITATIONS ON AMENDMENTS....................................................................42
25.4. UNILATERAL CORRECTIONS BY DECLARANT...............................................42
25.5. UNILATERAL CORRECTIONS BY BOARD.......................................................42
ARTICLE 26. TERMINATION OF COMMUNITY...................................................42
26.1. ACTION REQUIRED.........................................................................................42
26.2. WUCIOA GOVERNS......................................................................................42
26.3. COVENANTS RUNNING WITH LAND...............................................................42
ARTICLE27. NOTICES................................................................................................43
27.1. FORM AND DELIVERY OF NOTICE.................................................................43
27.2. NOTICES TO ELIGIBLE MORTGAGEES...........................................................44
ARTICLE 28. SEVERABILITY....................................................................................45
ARTICLE 29. EFFECTIVE DATE...............................................................................45
ARTICLE 30. ASSIGNMENT BY DECLARANT.......................................................45
SCHEDULE A Legal Description of All Property in the Community
SCHEDULE B Unit Lot Data, Allocated Interests, Parking and Storage
Declaration of Covenants, Conditions, Restrictions and Easements — Table of Contents page v
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 609
1.v
DECLARATION OF COVENANTS, CONDITIONS,
RESTRICTIONS AND EASEMENTS
FOR
GREENWALK PARK, A PLAT COMMUNITY
THIS DECLARATION OF COVENANTS, CONDITIONS, RESTRICTIONS AND EASEMENTS
is dated for reference purposes as of the date hereinafter set forth by Declarant, and is
made by Fernandez & Barnes LLC, a Washington limited liability company
("Declarant').
RECITALS
A. Declarant is the sole owner, in fee simple, of the Property (as defined
herein), which is located in Snohomish County, Washington, and legally described in
SCHEDULE A.
B. Declarant has recorded contemporaneously herewith a Map of the
Greenwalk Park, a Plat Community.
C. The Greenwalk Park, a Plat Community is comprised of 16 Unit Lots (as
defined herein) and 2 Tracts (as defined herein). A single-family residence has been
constructed on each of the Unit Lots within the Property.
D. As of the time of recording of this Declaration, (i) the Common Elements
(as defined herein) include, but are not limited to, all air space above the top horizontal
boundary of the Unit Lots, (ii) the two Tracts, and (iii) no Limited Common Elements (as
defined herein) exist within the Property.
E. By recording this Declaration and the Map, Declarant desires to submit the
Property, together with all improved appurtenances thereto, to the provisions of the
Washington Uniform Common Interest Ownership Act, as the same may be amended
from time to time.
ARTICLE 1.
DEFINITIONS
1.1. Words Defined. For the purposes of this Declaration and any
amendments hereto, the following definitions shall apply.
1.1.1. "Allocated Interests" means the allocation of Common Expense
Liability, undivided interest in Common Elements and voting for each of the Unit Lots in
the Community determined in accordance with the formula set forth in Section 6.4 and as
listed in SCHEDULE B.
Declaration of Covenants, Conditions, Restrictions and Easements page I
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 610
1.v
1.1.2. "Articles" means the articles of incorporation for the
Association.
1.1.3. "Assessments" means all sums chargeable by the Association
against a Unit Lot, including, without limitation, (a) general and special Assessments for
Common Expenses and Specially Allocated Expenses, if any (b) fines or fees levied or
imposed by the Association; (c) interest and late charges on any delinquent account, and
(d) costs of collection, including reasonable attorneys' fees, incurred by the Association
in connection with the collection of a delinquent Owner's account.
1.1.4. "Association" means the Greenwalk Park Homeowners
Association, as more particularly described and defined in Article 12.
1.1.5. "Board" means the board of directors of the Association, as
described in Article 14.
1.1.6. "Building Envelope" means, with respect to each Unit Lot, the
portions of the Unit Lot on which the Home is originally constructed within such Unit
Lot, as shown on the Map (the "Home Footprint"), potentially plus certain additional
portions of such Unit Lot located outside of and adjacent to the Home Footprint, all as
shown and designated on the Map. As further described in Section 9.4, subject to certain
limited exceptions and conditions, installation or construction of improvements outside
the Building Envelope of a Unit Lot is generally prohibited.
1.1.7. "Bylaws" means the bylaws of the Association as they may
from time to time be amended.
1.1.8. "Common Elements" means Tract A and Tract B of the Map,
and all portions of the Community other than the Unit Lots and any other interests in real
estate for the benefit of any Unit Lot Owners that are subject to the Declaration.
Common Elements may be further designated as Limited Common Elements.
1.1.9. "Common Expense Liability" means the liability for Common
Expenses allocated to each Unit Lot in proportion to its Allocated Interest.
1.1.10. "Common Expenses" means expenditures made by or financial
liabilities of the Association made in accordance with the terms of this Declaration, and
Common Elements, other than the Limited Common Elements, including allocations to
reserves.
1.1.11. "Community" means Greenwalk Park, a Plat Community,
created under the Declaration and the Map.
Declaration of Covenants, Conditions, Restrictions and Easements page 2
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 611
1.v
1.1.12. "Conveyance" means any transfer of the ownership of a Unit
Lot, including a transfer by deed or by real estate contract, but does not include the
creation, transfer, or release of a security interest.
1.1.13. "Declarant" means Fernandez & Barnes LLC, a Washington
limited liability company, and its successors and assigns.
1.1.14. "Declarant Control" means the right of Declarant or persons
designated by Declarant to appoint and remove officers and members of the Board, or to
veto or approve a proposed action of the Board or Association, pursuant to Article 13.
1.1.15. "Declaration" means this Declaration of Covenants,
Conditions, Restrictions and Easements for Greenwalk Park, a Plat Community, as it may
from time to time be amended.
1.1.16. "Eligible Mortgagee" means any Mortgagee that has filed with
the Secretary of the Association a written request that it be given copies of notices of any
action by the Association that requires the consent of Mortgagees.
Corporation.
1.1.17. "FHLMC" means the Federal Home Loan Mortgage
1.1.18. "FNMA" means the Federal National Mortgage Association.
1.1.19. "Foreclosure" means a statutory forfeiture or judicial or
nonjudicial foreclosure of a Mortgage or a deed in lieu thereof.
1.1.20. "Governing Documents" means the Articles, Bylaws,
Declaration, Map, rules, or other written instrument, as each may be amended, by which
the Association has the authority to exercise any of the powers provided for in this
chapter or to manage, maintain, or otherwise affect the property under its jurisdiction.
1.1.21. "Home" means the improvements located or to be located
within a Unit Lot which are designed and intended for use and occupancy as a single-
family residence, including any garage or other auxiliary structure.
1.1.22. "HUD" means the Department of Housing and Urban
Development.
1.1.23. "Identifying Number" means the number, symbol or
designation on the Map and as listed in SCHEDULE B, which identifies each Unit Lot in
the Community.
1.1.24. "Limited Common Element" means a portion of the Common
Elements allocated in Article 8 for the exclusive use of one or more but fewer than all of
the Unit Lots.
Declaration of Covenants, Conditions, Restrictions and Easements page 3
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 612
1.v
1.1.25. "Map" means the survey map and plans recorded
contemporaneously with this Declaration and any amendments, corrections, and addenda
thereto subsequently filed.
1.1.26. "Mortgage" means a mortgage, deed of trust or real estate
contract.
1.1.27. "Mortgagee" means any holder, insurer or guarantor of a
Mortgage on a Unit Lot.
1.1.28. "Notice and Opportunity to Be Heard" means the procedure
described in Section 14.4.
1.1.29. "Owner" or "Unit Lot Owner" means Declarant or other Person
who owns a Unit Lot, but does not include any person who has an interest in a Unit Lot
solely as security for an obligation. Each Unit Lot Owner is a member of the
Association.
1.1.30. "Person" means an individual, corporation, partnership, limited
partnership, limited liability company, trust, association, joint venture, public
corporation, government, or governmental subdivision, agency, or instrumentality, or
other legal entity.
1.1.31. "Project Mortgagee" means the holder of a Mortgage secured
by Declarant's interest in the Community, including any Unit Lots owned by Declarant or
any Special Declarant Rights held by Declarant.
1.1.32. "Property" means the real property described in SCHEDULE A
subjected to WUCIOA and made part of the Community. The Property includes both the
Unit Lots and Common Elements.
1.1.33. "Reserve Study" means a reserve study prepared by a reserve
study professional engaged by the Association in accordance with WUCIOA that
estimates the anticipated major maintenance, repair, and replacement costs the
Association is projected to incur, and provides the amount to be collected to establish and
fund reserve accounts in amounts sufficient to pay such costs when due.
1.1.34. "Special Declarant Rights" means rights reserved for the
benefit of Declarant as specified in Article 10.
1.1.35. "Specially Allocated Expenses" means certain expenditures or
liabilities of the Association which are specially allocated among Unit Lots in accordance
with usage or benefit, if any.
Declaration of Covenants, Conditions, Restrictions and Easements page 4
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 613
1.v
1.1.36. "Structure" means any building, fence, wall, pole, driveway,
walkway, patio, antenna or the like within a Unit Lot.
1.1.37. "Tract" means Tract A and Tract B, which are physical portions
of the Community designated for common ownership to be used as a Common Element,
the boundaries of which are described in Section 7 and shown on the Map.
1.1.38. "Transition Date" means the date upon which the period of
Declarant Control terminates as determined in Article 13.
1.1.39. "Transition Meeting" means the meeting of Owners held
pursuant to Section 13.3.
1.1.40. "Unit Lot" means a physical portion of the Community
designated for separate ownership or occupancy, the boundaries of which are described in
Section 6.2 and shown on the Map.
1.1.41. "VA" means the Veterans Administration.
1.1.42. "WUCIOA" means the Washington Uniform Common Interest
Ownership Act, codified at Ch. 64.90 RCW, as it may be from time to time amended.
1.2. Form of Words. The singular form of words shall include the plural and
the plural shall include the singular. Masculine, feminine, and gender -neutral pronouns
shall be used interchangeably.
1.3. Statutory Definitions. Some of the terms defined above are also defined
in WUCIOA. The definitions in the Declaration are not intended to limit or contradict
the definitions in WUCIOA. If there is any inconsistency or conflict, the definition in
WUCIOA will prevail.
ARTICLE 2.
CREATION OF COMMUNITY
The Declaration and WUCIOA provide the framework by which the Community
is created and operated. In the event of a conflict between the provisions of the
Declaration and WUCIOA, WUCIOA shall prevail. In the event of a conflict between
the provisions of this Declaration and the Bylaws, the Declaration shall prevail except to
the extent the Declaration is inconsistent with WUCIOA. The creation of the Community
shall not be impaired, and title to a Unit Lot and its interest in the Common Elements
shall not be rendered unmarketable or otherwise affected by reason of an insignificant
failure of this Declaration, the Map or any amendment thereto to comply with WUCIOA.
Declaration of Covenants, Conditions, Restrictions and Easements page S
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 614
1.v
ARTICLE 3.
NAME OF COMMUNITY
The name of the Community created by this Declaration and the Map is
Greenwalk Park, a Plat Community.
ARTICLE 4.
DESCRIPTION OF REAL PROPERTY
The real property included in the Community and submitted to WUCIOA
is described in the Map and legally described on SCHEDULE A. The Declarant has
created 16 Unit Lots.
ARTICLE 5.
DESCRIPTION OF BUILDINGS
Declarant anticipates that each Unit Lot will be improved with a single-family style
Home of wood -frame construction which shall lie within the boundaries of the applicable
Unit Lot. There shall be a total of 16 Buildings with 16 Homes.
ARTICLE 6.
DESCRIPTION OF UNIT LOTS; ALLOCATED INTERESTS
6.1. Number and Identification of Unit Lots. The Community has 16 Unit
Lots. The Identifying Number of each Unit Lot is set forth in SCHEDULE B. The
location of each Unit Lot is shown on the Map.
6.2. Unit Lot Boundaries. The Unit Lots are commonly known as "air space
Unit Lots." The horizontal and vertical boundaries of the Unit Lots are the planes in
space shown on the Map. The Home or other Structures or improvements within the
boundaries of a Unit Lot together with any open space are a part of the Unit Lot.
6.3. Unit Lot Data. SCHEDULE B sets forth the following data for each Unit
Lot.
6.3.1. The approximate area of the Unit Lot (which is the square
footage of the air space Unit Lot as viewed in plan format, not the square footage of the
Home located within the Unit Lot);
6.3.2. The number of bathrooms, whole or partial in the Home (if
constructed as of the date hereof) within the Unit Lot;
6.3.3. The number of rooms designated primarily as bedrooms in the
(if constructed as of the date hereof) Home within the Unit Lot;
Declaration of Covenants, Conditions, Restrictions and Easements page 6
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 615
1.v
6.3.4. The level or levels of the Home (if constructed as of the date
hereof) within the Unit Lot;
6.3.5. Whether the Home (if constructed as of the date hereof) within
the Unit Lot has a fireplace; and
6.3.6. The Allocated Interest of each Unit Lot.
6.4. Allocated Interests. The Allocated Interest of each Unit Lot in the
Community, for purposes of Common Expense Liability and interest in the Common
Elements, is a fraction, the numerator of which is one and the denominator of which is
the total number of Unit Lots in the Community. The Owner of each Unit Lot shall
have one vote.
ARTICLE 7.
COMMON ELEMENTS
7.1. Description. The Common Elements include, without limitation, Tract A,
Tract B, and areas and structures not lying within any Unit Lot as depicted on the Map.
7.2. Use. Each Owner shall have a 1/16th ownership interest in the Common
Elements and the right to use the Common Elements in common with all other Owners
and a right of access from the Owner's Unit Lot across the Common Elements to the
public streets. The right to use the Common Elements extends not only to each Owner,
but also to the Owner's agents, tenants, family members, invitees and licensees. The
right to use the Common Elements, including the Limited Common Elements, shall be
governed by the provisions of WUCIOA, this Declaration, the Bylaws, and the rules
and regulations of the Association.
7.3. Conveyance or Encumbrance of Common Elements. Subject to
RCW 64.90.465, portions of the Common Elements may be conveyed or subjected to a
security interest by the Association if approved. All of the Owners of Unit Lots to
which any Limited Common Element is allocated must agree in order to convey that
Limited Common Element or subject it to a security interest. Any conveyance,
encumbrance, judicial sale or other transfer (voluntary or involuntary) of an individual
interest in the Common Elements shall be void unless the Unit Lot to which that
interest is allocated is also transferred.
ARTICLE 8.
PARKING AND STORAGE; LIMITED COMMON ELEMENTS
Currently, parking for each Unit Lot is located within the garage located within such Unit
Lot, and all storage is within the Home constructed within each Unit Lot. It is not
anticipated that there will be any Limited Common Elements created or assigned.
Declaration of Covenants, Conditions, Restrictions and Easements page 7
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 616
1.v
ARTICLE 9.
PERMITTED USES, MAINTENANCE OF UNIT LOTS; CONVEYANCES
9.1. Use; Timesharing Prohibited. The Unit Lots are intended for and
restricted to residential use and for social, recreational or other reasonable activities
normally incident to such use.
9.1.1. No business, trade or similar activity shall be conducted within
the Community except that an Owner or occupant residing in a Home may conduct
business activities within the Home, and may include a home office as part of the Home
to the extent consistent with all applicable ordinances, so long as (a) the existence or
operation of the business activity is not apparent or detectable by sight, sound or smell
from outside the Home, (b) the business activity conforms with all zoning requirements
applicable to the Community, (c) the business activity does not involve regular visitation
of the Home by clients, customers, suppliers or other business invitees or door-to-door
solicitation of residents of the Community, and (d) the business activity is consistent with
the residential character of the Community and does not constitute a nuisance, a
hazardous or offensive use or threaten the security or safety of other residents of the
Community, as may be determined in the discretion of the Board.
9.1.2. The restrictions set forth in Section 9.1.1 shall not apply to any
activity conducted by Declarant with respect to the development, operation and/or sale of
any Unit Lots owned by Declarant.
9.1.3. Timesharing of Unit Lots, as defined in RCW ch. 64.36, is
prohibited.
9.2. Leasing. No lease or rental of a Unit Lot may be for a term of less than
thirty (30) days. Any lease or rental agreement for a Unit Lot shall be in writing and
provide that it is subject in all respects to the provisions of this Declaration and the
Bylaws and rules and regulations of the Association and that any failure by the tenant to
comply with the terms of such documents, rules, and regulations shall be a default
under the lease or rental agreement. If any lease does not contain the foregoing
provisions, such provisions shall nevertheless be deemed to be part of the lease and
binding upon the Owner and the tenant by reason of their being stated in this
Declaration. If any lessee or occupant of a Unit Lot violates or permits the violation by
his or her guests and invitees of any provisions hereof or of the Bylaws or of the rules
and regulations of the Association, and the Board determines that such violations have
been repeated and that a prior notice to cease has been given, the Board may give notice
to the lessee or occupant of the Unit Lot and the Owner thereof to forthwith cease such
violations, and if the violation is thereafter repeated, the Board shall have the authority,
on behalf and at the expense of Owner, to evict the tenant or occupant if Owner fails to
do so after Notice from the Board and an Opportunity to be Heard. The Board shall
have no liability to an Owner or tenant for any eviction made in good faith. The
Association shall have a lien against the Owner's Unit Lot for any costs incurred by it
Declaration of Covenants, Conditions, Restrictions and Easements page 8
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 617
1.v
in connection with such eviction, including reasonable attorneys' fees, which may be
collected and foreclosed by the Association in the same manner as Assessments are
collected and foreclosed under Article 16. Other than as stated in this Section, there is
no restriction on the right of any Owner to lease or rent the Owner's Unit Lot. To the
extent that any provision set forth in this Declaration or the Bylaws regarding leasing is
inconsistent with the requirement(s) of guaranteed or direct loan programs of the
United States Department of Veterans Affairs, as set forth in chapter 37 of title 38,
United States 2 Code, or part 36 of title 38, Code of Federal Regulations ("DVA
Financing"), such provision shall not apply to any Unit Lot that is: (i) encumbered by
DVA Financing; or (ii) owned by the Department of Veterans Affairs.
9.3. Maintenance of Unit Lots, Common Elements, and Limited Common
Elements, Records. Unless otherwise provided herein, the Association is responsible
for maintenance, repair, and replacement of the Common Elements and Limited
Common Elements, and submeters, if any, described in Section 15.9.2. Each Owner
shall, at Owner's sole expense, keep such Owner's Unit Lot, except for Common
Elements and Limited Common Elements, and all improvements, landscaping and yard
areas thereon, in good order and repair and free of debris, in a manner and with such
frequency as is consistent with good property management, subject to the following:
9.3.1. The cost of maintaining and repairing fences constructed along
a Unit Lot boundary, if any, shall be shared equally by the Owners sharing such fence.
9.3.2. The cost of maintaining, repairing, and replacing the shared
easement areas described in ARTICLE 23 shall be shared equally by the Owners. The
Association may accumulate reserves for replacement purposes, so long as the reserves
were provided for in the Association's budget.
9.3.3. Each Owner shall keep its respective Limited Common
Elements (if any) in a neat, clean and orderly condition and in accordance with the rules
and regulations of the Association.
9.3.4. The cost of maintaining, repairing, and replacing the shared
mailboxes for the Property, if any, shall be shared equally by the Owners using such
mailboxes. The Association may perform such services on behalf of the Owners, in
which case the associated costs and expenses may be treated as a Common Expense.
9.4. Exterior Appearance. No Owner may make any structural modifications
or change the originally installed materials and colors of its Home, without the prior
written consent of the Board or in accordance with the rules and regulations of the
Association. If the Board's written consent is obtained, the Owner may make such
structural modifications or changes so long as all necessary permits have been obtained,
and applicable legal conditions met, as required for the lawful construction or
installation thereof in accordance with applicable laws, rules and regulations of the
State of Washington, King County, and any other governmental authority having
Declaration of Covenants, Conditions, Restrictions and Easements page 9
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 618
1.v
jurisdiction over such matters, and to the extent that the cooperation of the other
Owners is required in order to obtain such permits, the other Owners shall cooperate
with such efforts to obtain such permits so long as the other Owners are not required to
incur any cost with respect to the same. This restriction does not apply to Declarant
with respect to Units owned by Declarant.
9.5. Satellite Dishes and Antennae. An Owner may not install a satellite
dish, antenna, or other receiving device in or on any portion of the Common Elements.
Any such installation as part of the Owner's Unit Lot shall be in accordance with any
rules and regulations adopted by the Association, except for "Protected Antenna," as
defined in 47 C.F.R. § 1.4000, as it may be amended.
9.6. Effect on Insurance. Nothing shall be done or kept in any Unit Lot or in
any Common Element or Limited Common Element that will increase the rate of
insurance on the property without the prior written consent of the Board. Nothing shall
be done or kept in any Unit Lot or in any Common Element or Limited Common
Element that will result in the cancellation of insurance on any part of the property or
that would be in violation of any laws.
9.7. Use or Alteration of Common and Limited Common Elements. Use of
the Common Elements and Limited Common Elements shall be subject to the
provisions of this Declaration and the rules and regulations of the Board. Nothing shall
be altered or constructed in or removed from any Common Element or Limited
Common Element by an Owner without the prior written consent of the Board.
9.8. Displays. The installation and display of flags, signage, and solar panels
within the Community shall be subject to such rules and regulations as may be adopted
by the Association, provided that the rules and regulations are subject to and in
accordance with RCW 64.90.510. Notwithstanding the foregoing, so long as Declarant
owns a Unit Lot, Declarant shall be permitted to maintain on any Unit Lot owned by
Declarant such signage and other facilities (including model homes) as Declarant may
choose.
9.9. Pets. Except for no more than three (3) domesticated pets (such as dogs,
cats, birds, fish, hamsters, or other pet sold at a licensed pet store in Washington State),
no animals shall be kept on any Unit Lot. No such pet shall disturb any other Owner
through noise or other behavior.
9.10. Quiet Enjoyment. No Owner shall permit anything to be done or kept in
the Owner's Unit Lot, Limited Common Elements or Common Elements which would
interfere with the right of quiet enjoyment of the other residents of the Community.
9.11.Offensive Activity. No noxious or offensive activity shall be carried on
in any Unit Lot, Limited Common Element or Common Element, nor shall anything be
done therein that may be or become an annoyance or nuisance to other Owners.
Declaration of Covenants, Conditions, Restrictions and Easements page 10
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 619
1.v
Owners shall not permit any condition to exist that will induce, breed or harbor
infectious plant diseases or noxious insects or vermin.
9.12. Vehicles. No parking or storage of boats, trailers, commercial trucks,
campers, recreational vehicles, other equipment or devices or inoperable vehicles shall
be permitted in open view on the Property nor shall any vehicle be parked so as to
block or hinder ingress to or egress from the Unit Lots or easement areas.
9.13. Waste Removal. No Unit Lot shall be used as a dumping ground for
rubbish, trash or garbage and each Unit Lot shall be kept free of debris by the Owner
thereof. If possible, Owners shall individually contract for waste collection. The waste
containers serving each Unit Lot shall be stored in its designated waste storage area.
Each Owner shall be responsible for placing such containers at the appropriate location
for pick up the evening before collection and shall be responsible for returning the
containers to their proper storage location not later than the evening after collection has
occurred.
9.14. Hazardous Substances. The Owner of each Unit Lot shall not permit any
Hazardous Substance to be generated, processed, stored, transported, handled or
disposed of on, under, in or through the Owner's Unit Lot or the Property. Each Owner
shall indemnify, defend, and hold harmless the other Owners and the Association from
all fines, suits, procedures, claims, and actions of any kind arising out of or in any way
connected with any spills or discharges of Hazardous Substances or wastes arising from
the operation or use of the Unit Lot or the Property by the Owner, tenants or invitees of
the Unit Lot. As used herein, the term "Hazardous Substance" means any hazardous,
toxic or dangerous substance, waste or material that is or becomes regulated under any
federal, state or local statute, ordinance, rule, regulation or other law now or hereafter
in effect pertaining to environmental protection, contamination or cleanup, including
without limitation any substance, waste or material that now or hereafter is designated
as a "Hazardous Substance" under the Comprehensive Environmental Response,
Compensation and Liability Act (42 U.S.C. § 9601 et seq.) or under any local or state
rule or regulation. Without limiting the foregoing, Hazardous Substances shall include,
but not be limited to, any substance which after being released into the environment and
upon exposure, ingestion, inhalation or assimilation, either directly from the
environment or indirectly by ingestion through food chains, will or may reasonably be
anticipated to cause death, disease, behavior abnormalities, cancer, and/or genetic
abnormalities.
9.15. Conveyance by Owners, Notice Required. The right of an Owner to
convey the Unit Lot shall not be subject to any right of approval, disapproval, first
refusal or similar restriction by the Association or the Board, or anyone acting on their
behalf. An Owner intending to convey a Unit Lot shall deliver a written notice to the
Board, at least two weeks before closing, specifying (a) the Unit Lot being sold, (b) the
name and address of the purchaser, of the closing agent, and of the title insurance
Declaration of Covenants, Conditions, Restrictions and Easements page 11
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 620
1.v
company insuring the purchaser's interest, and (c) the estimated closing date. The
Board shall have the right to notify the purchaser, the title insurance company, and the
closing agent of the amount of unpaid Assessments and charges outstanding against the
Unit Lot, whether or not such information is requested. Promptly upon the conveyance
of a Unit Lot, the new Unit Lot Owner shall notify the Association of the date of the
conveyance and the Unit Lot Owner's name and address. The Association shall notify
each insurance company that has issued an insurance policy under Article 20 of the
name and address of the new Owner and request that the new Owner be made a named
insured under such policy. At the time of the first conveyance of each Unit Lot, every
Mortgage, lien or other encumbrance affecting that Unit Lot and any other Unit Lot or
Unit Lots or real property, other than the percentage of undivided interest of that Unit
Lot in the Common Elements, shall be paid and satisfied of record or the Unit Lot being
conveyed and its undivided interest in the Common Elements shall be released
therefrom by partial release duly recorded or the purchaser of that Unit Lot shall
receive title insurance from a licensed title insurance company against such Mortgage,
lien or other encumbrance.
ARTICLE 10.
SPECIAL DECLARANT RIGHTS
10.1. Special Declarant Rights. Declarant reserves the following Special
Declarant Rights so long as Declarant owns a Unit Lot: (a) to complete any Homes,
Structures or other improvements and otherwise perform work indicated on the Map, or
described in this Declaration or Declarant's public offering statement, authorized by
building permits applicable to the Community, provided for under any purchase and
sale agreement between Declarant and a purchaser of a Unit Lot, necessary to satisfy
any express or implied warranty under which Declarant is obligated or as otherwise
authorized or required by law; (b) to maintain sales offices, management offices,
interior and exterior signs advertising the Community, and models in Unit Lots that are
not occupied and are for sale by Declarant, in Unit Lots owned by Declarant, and in the
Common Elements of the Community; (c) to conduct sales events and other activities
relating to the marketing of Unit Lots in the Common Elements of the Community;
(d) to use easements through the Common Elements for the purpose of making
improvements within the Community; (e) to elect, appoint or remove any officer of the
Association or any member of the Board or to veto or approve a proposed action of the
Board or Association during the period of Declarant Control as provided by Article 13;
(f) to control any construction, design review, or aesthetic standards committee or
process; (g) to attend meetings of the Unit Lot Owners and, except during an executive
session, the Board; and (h) to have access to the records of the Association to the same
extent as a Unit Lot Owner.
10.2. Declarant Inspections. Declarant shall have the right, but not the
obligation, to conduct inspections and tests from time to time of all or any parts of the
Community in order to ascertain the physical condition of the improvements in the
Declaration of Covenants, Conditions, Restrictions and Easements page 12
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 621
1.v
Community and to determine whether maintenance, repairs or replacements of any such
improvements are indicated. Declarant shall pay all costs of such inspections and tests
made pursuant to this Section, shall restore the affected portion of the property to its
condition immediately prior thereto, and shall indemnify the Association and Owners
of any affected Unit Lots from any damage resulting therefrom. Declarant shall have
such rights of entry on, over, under, across and through the property as may be
reasonably necessary to exercise the rights described in this Section.
10.3. Declarant Right to Attend Association Meetings and Receive Minutes
and Notices. Until the fifth anniversary of the recording of this Declaration,
(a) Declarant shall have the right to attend all meetings of the Board and the
Association; (b) the Association shall send Declarant notices of such meetings at the
same time notices are given to the members of the Board or the Association, as the case
may be, and copies of minutes of all meetings of the Board and the Association; and
(c) Declarant shall have the right to inspect the books and records of the Association as
further provided in Section 12.6. Notices and minutes shall be given to Declarant in
writing to Declarant in such other manner as Declarant shall specify.
10.4. Transfer. The rights described in this Article shall not be transferred
except by instrument evidencing the transfer executed by Declarant or Declarant's
successor and the transferee, and recorded in Snohomish County. The rights and
liabilities of the parties involved in such a transfer, and of all persons who succeed to
any Development Right or Special Declarant Right, are set out in RCW 64.90.425.
10.5. Expiration of Special Declarant Rights. The Special Declarant Rights
shall expire on the earlier of (a) the fifth anniversary of the recording of this
Declaration or (b) the recording of a notice signed by Declarant that it no longer wishes
to exercise any of the Special Declarant Rights.
ARTICLE 11.
ENTRY FOR REPAIR OR MAINTENANCE
The Association and its agents may enter any Unit Lot and the Limited Common
Elements allocated thereto to effect repairs, improvements, replacements, maintenance or
sanitation work deemed by the Board to be necessary in the performance of its duties, to
do necessary work that Owner has failed to perform to prevent such Owner's Unit Lot
from falling into disrepair or to prevent damage to the Common Elements or to another
Unit Lot. Without limitation, the Association and its agents shall be deemed to have the
right to enter upon any Unit Lot for regular maintenance of the landscaping and all other
portions of such Unit Lot except the interiors of the Homes, all of which shall be a
Common Expense of the Association. Except in cases of great emergency that preclude
advance notice, the Board shall cause the Unit Lot occupant to be given Notice and an
Opportunity to be Heard as far in advance of entry into the interior portion of a Home as
is reasonably practicable, and such entry shall be made with as little inconvenience to
Owners and occupants as practicable. The Board may levy a special Assessment against
Declaration of Covenants, Conditions, Restrictions and Easements page 13
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 622
1.v
Owner of the Unit Lot for all or part of the cost of work that Owner has failed to perform
which may be collected and foreclosed by the Association in the same manner as
Assessments are collected and foreclosed under Article 16.
ARTICLE 12.
OWNERS ASSOCIATION
12.1. Form of Association. The Owners of Unit Lots shall be members of the
Association. The Association shall be organized as a nonprofit corporation, no later
than the date the first Unit Lot in the Community is conveyed. The number of Board
members and qualifications and procedures for election to the Board shall be provided
in the Bylaws. The rights and duties of the Board and of the Association shall be
governed by the provisions of WUCIOA, the Declaration, and the Bylaws.
12.2. Bylaws. The Board will adopt Bylaws to supplement the Declaration,
provide for the administration of the Association and the property, and for other
purposes not inconsistent with WUCIOA or the Declaration.
12.3. Qualification and Transfer. Each Owner of a Unit Lot (including
Declarant) shall be a member of the Association and shall be entitled to one
membership for each Unit Lot owned, which membership shall be considered
appurtenant to that member's Unit Lot. Ownership of a Unit Lot shall be the sole
qualification for membership in the Association. A membership shall not be transferred
in any way except upon the transfer of title to the Unit Lot and then only to the
transferee of title to the Unit Lot, provided that if a Unit Lot has been sold on contract,
the contract purchaser shall exercise the rights of Owner for purposes of the
Association, this Declaration, and the Bylaws, except as hereinafter limited, and shall
be the voting representative unless otherwise specified. Any attempt to make a
prohibited transfer shall be void. Any transfer of title to a Unit Lot shall operate
automatically to transfer the membership in the Association to the new Owner.
12.4. Powers of the Association. In addition to those actions authorized
elsewhere in the Declaration, the Association shall have the power to:
12.4.1. Adopt and amend the Bylaws and the rules and regulations for
the Community;
12.4.2. Adopt and amend budgets for revenues, expenditures, and
reserves, and impose and collect Common Expenses and special Assessments from
Owners;
12.4.3. Hire and discharge or contract with agents, and independent
contractors;
Declaration of Covenants, Conditions, Restrictions and Easements page 14
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 623
1.v
12.4.4. Institute, defend or intervene in litigation or administrative
proceedings in its own name on behalf of itself or two or more Unit Lot Owners on
matters affecting the Community, provided, however, that the approval of Owners
holding at least 67% of the votes in the Association shall be required before the
Association may institute, commence or intervene in any litigation or administrative
proceeding, including arbitration, other than litigation or other proceedings against
Owners for collection of delinquent Assessments or for enforcement of the Declaration or
rules and regulations of the Association; but Owner approval shall not be required for
settlement of such litigation or administrative proceedings;
12.4.5. Make contracts, borrow money and incur liabilities;
12.4.6. Regulate the use, maintenance, repair, replacement, and
modification of Common Elements and Limited Common Elements;
12.4.7. Cause additional improvements to be made as a part of the
Common Elements;
12.4.8. Acquire, hold, encumber, convey, and dispose of, in the
Association's name, right, title or interest to real or tangible and intangible personal
property, and arrange for and supervise any addition or improvement to the Community,
provided that:
12.4.8.1. If the estimated cost of any separate property
acquisition, addition or improvement to the Community exceeds $5,000, the approval of
the Owners holding a majority of the votes in the Association shall be required
12.4.8.2. No structural change shall be made to a Unit Lot without
the approval of the Owner of that Unit Lot; and
12.4.8.3. The beneficial interest in any property acquired by the
Association pursuant to this Section shall be owned by the Owners in the same proportion
as their respective interests in the Common Elements and shall thereafter be held, sold,
leased, mortgaged or otherwise dealt with as the Board shall determine.
12.4.9. Grant easements, leases, licenses, and concessions through or
over the Common Elements and petition for or consent to the vacation of streets and
alleys;
12.4.10. Impose and collect any payments, fees or charges for the use,
rental or operation of the Common Elements and for services provided to Owners;
12.4.11. Acquire and pay for all goods and services reasonably necessary
or convenient for the efficient and orderly functioning of the Community;
Declaration of Covenants, Conditions, Restrictions and Easements page 15
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 624
1.v
12.4.12. Impose and collect charges for late payment of Assessments as
further provided in Article 15 and, after Notice and an Opportunity to be Heard by the
Board or by such representative designated by the Board and in accordance with such
procedures as provided in this Declaration, the Bylaws or rules and regulations adopted
by the Board, levy reasonable fines in accordance with a previously established schedule
thereof adopted by the Board and furnished to the Owners for violations of this
Declaration, the Bylaws, and rules and regulations of the Association;
12.4.13. Impose and collect reasonable charges for the preparation and
recording of amendments to this Declaration, resale certificates required by
RCW 64.90.640, and statements of unpaid Assessments;
12.4.14. Provide for the indemnification of its officers and Board, and
maintain directors' and officers' liability insurance;
12.4.15. Assign its right to future income, including the right to receive
Assessments;
12.4.16. Provide or pay, as part of the Common Expenses, utility
services to the Unit Lot Owners as reasonably determined by the Board;
12.4.17. Exercise any other powers conferred, by this Declaration or the
Bylaws;
12.4.18. Exercise all other powers that may be exercised in this state by
the same type of corporation as the Association; and
12.4.19. Exercise any other powers necessary and proper for the
governance and operation of the Association.
12.5. Financial Statements and Records. The Association shall keep financial
records in accordance with generally accepted accounting principles and in sufficient
detail to enable the Association to comply with the resale certificate requirements set
forth in RCW 64.90.640. All financial and other records shall be made reasonably
available for examination by any Unit Lot Owner and the Owner's authorized agents.
At least annually, the Association shall prepare or cause to be prepared, a financial
statement of the Association in accordance with accrual based accounting practices.
The annual financial statement shall be audited at least annually by a certified public
accountant who is not a member of the Board or an Owner, unless waived in
accordance with RCW 64.90.530(2). The financial statement shall be completed in
time for the Association's annual meeting and in any event within 120 days following
the end of the fiscal year. Any Mortgagee will, upon request, be entitled to receive the
annual financial statement within 120 days following the end of the fiscal year. The
Board, or persons having 35% of the voting power of the Association, may require that
an audit of the Association be presented at any special meeting. An Owner, at such
Declaration of Covenants, Conditions, Restrictions and Easements page 16
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 625
1.v
Owner's expense, may at any reasonable time conduct an audit of the books of the
Association. Upon written request of FHLMC, FNMA, HUD or VA, if it is a
Mortgagee, the Association shall provide such Mortgagee within a reasonable time the
audited financial statement of the Association for the preceding fiscal year.
12.6. Inspection of Community Documents, Books, and Records. The
Association shall make available to Owners, Mortgagees, prospective purchasers and
their prospective Mortgagees, and the agents or attorneys of any of them, current copies
of this Declaration, the Articles, the Bylaws, the rules and regulations of the
Association, and other books, records, and financial statements of the Association.
"Available" shall mean available for inspection upon request, during normal business
hours or under other reasonable circumstances. The Association may require the
requesting party to pay a reasonable charge to cover the cost of making the copies.
ARTICLE 13.
DECLARANT CONTROL PERIOD
13.1. Declarant Control Until Transition Date. Until the Transition Date,
Declarant shall have the right to set the number of members and to appoint and remove
all such members of the Board, provided that (a) not later than 60 days after
conveyance of 25% of the Unit Lots that may be created to Owners other than
Declarant, at least one member and not less than 25% of the members of the Board
must be elected by Owners other than Declarant and (b) not later than 60 days after
conveyance of 50% of the Unit Lots that may be created to Owners other than
Declarant, not less than one-third of the members of the Board must be elected by
Owners other than Declarant.
13.2. Transition Date. Declarant Control of the Association shall terminate on
the Transition Date. The Transition Date shall be no later than the earliest of. (a) five
years after the recording of this Declaration, (b) 60 days after conveyance of 75% of the
Unit Lots that may be created to Owners other than Declarant, (c) two years after the
last conveyance of a Unit Lot, except to a dealer, or (d) the date on which Declarant,
after giving notice in a record to Unit Lot Owners, records an amendment to this
Declaration signed by Declarant and the Project Mortgagee pursuant to which
Declarant voluntarily surrenders the right to further appoint and remove officers and
members of the Board. If Declarant voluntarily surrenders control pursuant to (d)
above, Declarant may require that for the duration of the period of Declarant Control,
specified actions of the Association or the Board, as described in a recorded instrument
executed by Declarant, be approved by Declarant before they become effective.
13.3. Transition Meeting. Within 30 days after the Transition Date or not later
than 60 days after conveyance of 75% of the Unit Lots that may be created to Owners
other than Declarant, Declarant or the Board must schedule a special meeting of
Owners to elect a Board in accordance with Section 4.1 of the Bylaws. Within 30 days
after such special meeting, Declarant shall deliver to the Board elected at the special
Declaration of Covenants, Conditions, Restrictions and Easements page 17
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 626
1.v
meeting all property of the Owners and of the Association held or controlled by
Declarant including, but not limited to, the following:
(a) The original or a photocopy of the recorded Declaration and each
amendment to the Declaration;
(b) The certificate of incorporation and a copy of the Articles as filed
with the Secretary of State and the Bylaws;
(c) The minute books, including all minutes and other books and
records of the Association;
(d) Current rules and regulations that have been adopted;
(e) Resignations of officers and members of the Board who are
required to resign because Declarant is required to relinquish control of the
Association;
(f) The financial records, including cancelled checks, bank statements,
and financial statements of the Association, and source documents from the time
of incorporation of the Association through the date of transfer or control to
Owners;
(g) Association funds or the control of the funds of the Association;
(h) Originals or copies of any recorded instruments of conveyance for
any Common Elements included within the Community but not appurtenant to the
Unit Lots;
(i) All tangible personal property of the Association;
0) Except for alterations to a Unit Lot done by a Unit Lot Owner
other than Declarant, the copy of the most recent plans and specifications used in
the construction or remodeling of the Community, except for buildings containing
fewer than three Unit Lots;
(k) Originals or copies of insurance policies for the Community and
the Association;
p) Originals or copies of any certificates of occupancy that may have
been issued for the Community;
(m) Originals or copies of any other permits obtained by or on behalf
of the declarant and issued by governmental bodies applicable to the Community;
Declaration of Covenants, Conditions, Restrictions and Easements page 18
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 627
1.v
(n) Originals or copies of all written warranties that are still in effect
for the Common Elements, or any other areas or facilities that the Association has
the responsibility to maintain and repair, from the contractor, subcontractors,
suppliers, and manufacturers and all owners' manuals or instructions furnished to
Declarant with respect to installed equipment or building systems;
(o) A roster of Unit Lot Owners and Eligible Mortgagees and their
addresses and telephone numbers, if known, as shown on Declarant's records and
the date of closing of the first sale of each Unit Lot sold by Declarant;
(p) Originals or copies of any leases of the Common Elements and
other leases to which the Association is a party;
(q) Originals or photocopies of any employment contracts or service
contracts in which the Association is one of the contracting parties or service
contracts in which the Association or the Unit Lot Owners have an obligation or a
responsibility, directly or indirectly, to pay some or all of the fee or charge of the
Person performing the service;
(r) Originals or copies of any qualified warranty issued to the
Association as provided for in RCW 64.35.505, if any; and
(s) All other contracts to which the Association is a party.
13.4. Audit of Records Upon Transfer. Within 60 days of the Transition
Meeting, the Board must retain the services of a certified public accountant to audit the
records of the Association as of the date of such special meeting in accordance with
generally accepted auditing standards unless the Owners, other than Declarant, to which
a majority of the votes are allocated elect to waive the audit. The costs of the audit
shall be a Common Expense.
13.5. Termination of Contracts and Leases Made by Declarant. Within two
years after the Transition Meeting, the Association may terminate without penalty,
upon not less than 90 days' notice to the other party (or within such less notice period
provided for without penalty in the contract or lease), any of the following if it was
entered into before the Board elected at the Transition Meeting takes office: (a) any
management, maintenance, operations, or employment contract, or lease of recreational
or parking areas or facilities; or (b) any other contract or lease, including franchises and
licenses, between the Association and Declarant or an affiliate of Declarant (as defined
by RCW 64.90.010(1)). Further, the Association may terminate without penalty, at any
time after the Board elected at the Transition Meeting takes office, upon not less than
90 days' notice to the other party (or within such less notice period provided for
without penalty in the contract or lease), any contract or lease that is not bona fide or
was unconscionable to the Owners at the time entered into. This Section does not apply
to any lease, the termination of which would terminate the Community or reduce its
Declaration of Covenants, Conditions, Restrictions and Easements page 19
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 628
1.v
size, unless the real property subject to that lease was included in the Community for
the purpose of avoiding the right of the Association to terminate a lease under this
Section, or a proprietary lease.
ARTICLE 14.
THE BOARD
14.1. Selection of the Board and Officers. Prior to the Transition Meeting,
election or appointment of members of the Board shall be governed by Section 13.1.
The number of Board members and their terms of services shall be specified in the
Bylaws. The Board shall elect officers in accordance with the procedures provided in
the Bylaws. The members of the Board and officers shall take office upon election.
Removal of Board members, and their terms of service shall be as provided in the
Bylaws.
14.2. Powers of the Board. Except as provided in this Declaration, the Bylaws,
or WUCIOA, the Board shall at all times act on behalf of the Association. The Board
may exercise all powers of the Association, except as otherwise provided in WUCIOA,
the Declaration or the Bylaws.
14.3. Limitations on Board Authority. The Board shall not act on behalf of
the Association, without the necessary vote or approval of the Unit Lot Owners or
Eligible Mortgagees, to amend this Declaration, except as provided in RCW 64.90.285,
to amend the Articles or Bylaws, to terminate the Community, to elect members of the
Board, or to determine the qualifications, powers, and duties or terms of office of
members of the Board. The Board may, in accordance with the Bylaws, fill vacancies
in its membership for the unexpired portion of any term.
14.4. Right to Notice and Opportunity to Be Heard. Whenever this
Declaration requires that an action of the Board be taken after "Notice and Opportunity
to be Heard," the following procedure shall be observed: The Board shall give written
notice of the proposed action to all Owners, Eligible Mortgagees, tenants or occupants
of Unit Lots whose interest would be significantly affected by the proposed action. The
notice shall include a general statement of the proposed action and the date, time, and
place of the hearing, which shall not be less than five days from the date notice is
delivered by the Board. At the hearing, the affected person shall have the right,
personally or by a representative, to give testimony orally, in writing, or both (as
specified in the notice), subject to reasonable rules of procedure established by the
Board to assure a prompt and orderly resolution of the issues. Such evidence shall be
considered in making the decision but shall not bind the Board. The affected person
shall be notified of the decision in the same manner in which notice of the meeting was
given.
Declaration of Covenants, Conditions, Restrictions and Easements page 20
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 629
1.v
ARTICLE 15.
BUDGET AND ASSESSMENTS
15.1. Fiscal Year. The Board may adopt such fiscal year for the Association as
it deems to be convenient. Unless another year is adopted, the fiscal year will be the
calendar year.
15.2. Preparation of Budget. Not less than 30 days before the end of the fiscal
year the Board shall prepare a budget for the Association for the coming year. The
budget shall include: (a) the projected income to the Association by category; (b) the
projected Common Expenses and, if any, those Specially Allocated Expenses that are
subject to being budgeted, both by category; (c) the amount of the Assessments per
Unit Lot and the date the Assessments are due; (d) the current amount of regular
assessments budgeted for contribution to the reserve account; (e) a statement of
whether the association has a reserve study that meets the requirements of
RCW 64.90.550 and, if so, the extent to which the budget meets or deviates from the
recommendations of that reserve study; and (f) the current deficiency or surplus in
reserve funding expressed on a per Unit Lot basis.
15.3. Ratification of Budget. Within 30 days after adoption of any proposed
budget for the Community after the Transition Date, the Board shall provide a copy of
the budget to all the Owners and shall set a date for a meeting of the Owners to
consider ratification of the budget not less than 14 nor more than 50 days after mailing
of the budget. Unless at that meeting the Owners to which a majority of the votes in the
Association are allocated reject the budget, the budget is ratified, whether or not a
quorum is present. In the event the proposed budget is rejected or the required notice is
not given, the periodic budget last ratified by the Unit Lot Owners shall be continued
until such time as the Unit Lot Owners ratify a subsequent budget proposed by the
Board.
15.4. Supplemental Budget. If during the year the budget proves to be
inadequate for any reason, including nonpayment of any Owner's Assessment, the
Board may prepare a supplemental budget for the remainder of the year. A
supplemental budget that results in an increase in an Owner's Assessments shall be
subject to ratification pursuant to Section 15.3.
15.5. Monthly Assessments. The amounts required by the Association for
Common Expenses as reflected by the annual budget and any supplemental budgets
shall be divided into installments to be paid each month over the period of time covered
by the budget or supplemental budget. The monthly Assessment for each Unit Lot is
the annual Common Expense Liability of that Unit Lot divided by the number of
months covered by the budget, plus any Specially Allocated Expenses for such Unit
Lot. Monthly Assessments begin accruing for all Unit Lots upon the closing of the sale
of the first Unit Lot by Declarant, provided that Declarant may delay the
commencement of Assessments for Common Expenses and pay all actual Common
Declaration of Covenants, Conditions, Restrictions and Easements page 21
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 630
1.v
Expenses (but no allocations to reserves). Once Common Expenses have commenced,
Declarant may, but is not obligated to, supplement the budget by paying a portion of the
Common Expenses from its own funds. The Association may opt to collect an annual
Assessment, if that is more administratively convenient.
15.6. Common Expenses. Common Expenses shall include the cost of
operation, maintenance, repair and replacement of Common Elements, Limited
Common Elements, any other specific items described herein, and the general expenses
of the Association, including management and professional fees and costs, insurance
and any other costs that the Board determines benefits the Unit Lots. Common
Expenses shall be allocated to all Unit Lot Owners in accordance with their Common
Expense Liability, except as provided in Sections 15.7 and 15.8.
15.7. Limited Common Element. Any Common Expense associated with the
operation, maintenance, repair or replacement of a Limited Common Element shall be
paid by the Owner(s) of the Unit Lot(s) to which it is assigned.
15.8.Only Some Unit Lots Benefited. Any Common Expense or portion
thereof benefiting fewer than all of the Unit Lots must be assessed exclusively against
the Unit Lots benefited.
15.9. Specially Allocated Expenses.
15.9.1. Any expenses or liabilities attributable to goods or services
benefiting fewer than all of the Unit Lots shall be specially allocated, to the extent
reasonably practicable, to the Unit Lot benefited in proportion to the benefit received. In
determining whether a Specially Allocated Expense is practicable, the Association shall
consider the extent to which a Unit Lot benefits more than the other Unit Lot with regard
to the particular good or service involved in each particular case, whether it is possible to
separately contract for the applicable good or service, and the amount of the liability or
expense involved.
15.9.2. The cost of utilities to each Unit Lot, including but not limited
to water, sewer, gas, solid waste and electricity, shall be paid either directly by the Owner
of the Unit Lot receiving the utility or specially allocated to the Unit Lots directly
benefitted by the utility (a) based on usage, which may be determined by a submeter
maintained by the Association, or (b) pro rata based on the benefitted Unit Lot's
Allocated Interest, with adjustments made by the Board based on actual usage as
reasonably determined by the Board, if the utility is not submetered. The Association
may initially base its allocations on estimates of usage provided the Association
reconciles the estimates against actual usage at least annually.
15.10. Contribution to Initial Working Capital. The initial purchaser of each
Unit Lot from Declarant shall pay to the Association as a nonrefundable contribution to
an initial working capital fund in the amount $1,000, which amount shall not be
Declaration of Covenants, Conditions, Restrictions and Easements page 22
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 631
1.v
considered as an advance payment of regular Assessments. On the Transition Date,
Declarant shall make such contribution for any Unit Lots remaining unsold on that date
and shall be entitled to be reimbursed the amount so paid as each such Unit Lot is
conveyed. Declarant shall not use any of the working capital fund to defray any of its
expenses, reserve contributions or construction costs or to make up any budget deficits
prior to the Transition Date.
15.11. Special Assessments. For those Common Expenses and any Specially
Allocated Expenses which cannot reasonably be calculated and paid on a monthly
basis, the Board may levy special Assessments for such expenses against the Unit Lots,
subject to ratification by Owners pursuant to Section 15.3. To the extent that any
Common Expense or Specially Allocated Expense is caused by the misconduct of an
Owner or tenant of any Unit Lot, the Association may, after Notice and Opportunity to
Be Heard, levy a special Assessment for the expense against the Owner of that Unit
Lot.
15.12. Creation of Reserves, Assessments. The Board shall create reserve
accounts for anticipated expenses for repair or replacement of the Common Elements,
Limited Common Elements, and exterior portions of the Homes which will occur in the
future in order to accumulate sufficient funds to pay such expenses when they occur.
The operation of reserve accounts and Assessments for reserve accounts shall be further
governed by the Bylaws.
15.13. Notice of Assessments. The Board shall notify each Owner in writing
of the amount of the monthly general and special Assessments to be paid for the
Owner's Unit Lot and shall furnish copies of all budgets on which the general and
special Assessments are based. The Board shall furnish the same information to an
Owner's Mortgagee if so requested.
15.14. Payment of Monthly Assessments. On or before the first day of each
calendar month each Owner shall pay or cause to be paid to the treasurer or designated
agent of the Association all Assessments against the Unit Lot for that month. Any
Assessment not paid by the fifth day of the calendar month for which it is due shall be
delinquent and subject to late charges, interest charges and collection procedures as
provided in Article 16.
15.15. Reconciliation of Assessments to Actual Expenses. The Association
shall establish and maintain its accounts and records in a manner that will enable it to
credit Assessments, including allocations to reserves, and other income to the
Association, and to charge expenditures to the account of the appropriate Unit Lots in
accordance with the provisions of the Declaration. The accounts of the Association
must be reconciled at least annually unless the Board determines that a reconciliation
would not result in a material savings to any Unit Lot Owner. Any surplus funds of the
Association remaining after the payment of or provision for Common Expenses and
any prepayment of reserves must be paid annually to the Unit Lot Owners in proportion
Declaration of Covenants, Conditions, Restrictions and Easements page 23
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 632
1.v
to their Common Expense liabilities or credited to them to reduce their future Common
Expense Assessment.
15.16. Proceeds Belong to Association. All Assessments and other receipts
received by the Association on behalf of the Community shall belong to the
Association.
15.17. Failure to Assess. Any failure by the Board or the Association to make
the budgets and Assessments hereunder before the expiration of any year for the
ensuing year shall not be deemed a waiver or modification in any respect of the
provisions of this Declaration, or a release of Owners from the obligation to pay
Assessments during that or any subsequent year, and the monthly Assessments amounts
established for the preceding year shall continue until new Assessments are established.
15.18. Certificate of Unpaid Assessments. Upon the request of any Owner or
Mortgagee of a Unit Lot, the Board will furnish a certificate stating the amount, if any,
of unpaid Assessments charged to the Unit Lot. The certificate shall be conclusive
upon the Board and the Association as to the amount of such indebtedness on the date
of the certificate in favor of all purchasers and Mortgagees of the Unit Lot who rely on
the certificate in good faith. The Board may establish a reasonable fee to be charged to
reimburse it for the cost of preparing the certificate.
15.19. Recalculation of Assessments. If Common Expense Liabilities are
reallocated, Assessments, special Assessments, and any installment thereof not yet due
shall be recalculated in accordance with the reallocated liabilities.
15.20. Reserve Study. The Association expects to be exempt under
RCW 64.90.545(2) from the Reserve Study requirements, because the Association
anticipates that it will have only nominal reserve costs and the cost of a Reserve Study
will exceed ten percent of the Association's annual budget. If, however, the
Association no longer qualifies under such exemption, then the Board shall prepare and
update a Reserve Study in accordance with WUCIOA. An initial Reserve Study must
be prepared by a reserve study professional and based upon either a visual site
inspection of completed improvements or a review of plans and specifications of or for
unbuilt improvements, or both if construction of improvements is only partially
complete. An updated Reserve Study must be prepared annually. At least every three
years, an updated Reserve Study must be prepared by a reserve study professional and
based upon a visual site inspection by the reserve study professional. The Reserve
Study shall include each of the items required by WUCIOA. No failure of the Board to
fulfill its obligations under this Section will excuse an Owner's duty to pay
Assessments or invalidate a ratified budget.
Declaration of Covenants, Conditions, Restrictions and Easements page 24
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 633
1.v
ARTICLE 16.
LIEN AND COLLECTION OF ASSESSMENTS
16.1. Assessments Are a Lien; Priority. The Association has a lien on a Unit
Lot for any unpaid Assessment levied against a Unit Lot from the time the Assessment
is due. A lien under this Article shall be prior to all other liens and encumbrances on a
Unit Lot except (a) liens and encumbrances recorded before the recording of this
Declaration; (b) a Mortgage on the Unit Lot recorded before the date on which the
Assessment sought to be enforced became delinquent, EXCEPT to the extent of
Assessments for Common Expenses, excluding any amounts for capital improvements,
based on the periodic budgets adopted by the Association pursuant to Article 15 which
would have become due during the six months immediately preceding the date of a
sheriffs sale in an action for judicial foreclosure by either the Association or a
Mortgagee, the date of trustee's sale in a nonjudicial foreclosure of a Mortgage, or the
date of recording of the declaration of forfeiture in a proceeding by the vendor under a
real estate contract, provided that the priority of the Association's lien against Unit Lots
encumbered by a Mortgage held by an Eligible Mortgagee or by a Mortgagee which
has given the Association a written request for a notice of delinquent Assessments shall
be reduced by up to three months if and to the extent that such lien priority includes any
delinquencies which relate to a period after such Mortgagee becomes an Eligible
Mortgagee or has given such notice and before the Association gives such Mortgagee a
written notice of the delinquency, and (c) liens for real property taxes and other
governmental assessments or charges against the Unit Lot. Recording of this
Declaration constitutes record notice and perfection of the lien for Assessments;
however, the Association may record a notice of claim of lien for Assessments in the
real property records of the county in which the Community is located. Such recording
shall not constitute the written notice of delinquency to a Mortgagee referred to above.
16.2. Lien May Be Foreclosed; Judicial Foreclosure. The lien arising under
this Article may be enforced judicially by the Association or its authorized
representative in the manner set forth in RCW ch. 61.12 or nonjudicially in the manner
set forth in Section 16.3. The Association or its authorized representative shall have the
power to purchase the Unit Lot at the foreclosure sale and to acquire, hold, lease,
mortgage or convey the same. Upon an express waiver in the complaint of any right to
a deficiency judgment in a judicial foreclosure action, the period of redemption shall be
eight months. Nothing in this Section shall prohibit the Association from taking a deed
in lieu of foreclosure. Except as provided in the exception to (b) in Section 16.1, the
holder of a Mortgage or other purchaser of a Unit Lot who obtains the right of
possession of a Unit Lot through foreclosure or deed in lieu of foreclosure shall not be
liable for any Assessments or installments thereof that became due prior to such right of
possession. Such unpaid Assessments shall be deemed to be Common Expenses
collectible from all the Owners, including such Mortgagee or other purchaser of the
Unit Lot. Foreclosure of a Mortgage does not relieve the prior Owner of personal
liability for Assessments accruing against the Unit Lot prior to the date of such sale.
Declaration of Covenants, Conditions, Restrictions and Easements page 25
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 634
1.v
16.3. Nonjudicial Foreclosure. A lien arising under this Article may be
foreclosed nonjudicially in the manner set forth in RCW ch. 61.24 for nonjudicial
foreclosure deeds of trust. For the purpose of preserving the Association's nonjudicial
foreclosure option, this Declaration shall be considered to create a grant of each Unit
Lot in trust to First American Title Insurance Company, or its successors or assigns
("Trustee"), to secure the obligations of each Unit Lot Owner ("Grantor") to the
Association ("Beneficiary") for the payment of Assessments. Grantor shall retain the
right to possession of Grantor's Unit Lot so long as Grantor is not in default of an
obligation to pay Assessments. Trustee shall have a power of sale with respect to each
Unit Lot, which becomes operative in the case of a default in a Grantor's obligation to
pay Assessments. The Unit Lots are not used principally for agricultural or farming
purposes. If the Association forecloses its lien nonjudicially pursuant to this Section, it
shall not be entitled to the lien priority over Mortgages provided in exception (b) of
Section 16.1.
16.4. Receiver During Foreclosure. From the time of commencement of an
action by the Association to foreclose a lien for nonpayment of delinquent Assessments
against a Unit Lot that is not occupied by Owner thereof, the Association shall be
entitled to the appointment of a receiver to collect from the lessee thereof the rent for
the Unit Lot as and when due. If the rent is not paid, the receiver may obtain
possession of the Unit Lot, refurbish it for rental up to a reasonable standard for rental
Unit Lots in this type of Community, rent the Unit Lot or permit its rental to others, and
apply the rents first to the cost of the receivership and attorney fees thereof, then to the
cost of refurbishing the Unit Lot, then to applicable charges, then to costs, fees, and
charges of the foreclosure action, and then to the payment of the delinquent
Assessments. Only a receiver may take possession and collect rents under this Section,
and a receiver shall not be appointed less than 90 days after the delinquency. The
exercise by the Association of the foregoing rights shall not affect the priority of
preexisting liens, on the Unit Lot.
16.5. Assessments Are Personal Obligation. In addition to constituting a lien
on the Unit Lot, all sums assessed by the Association chargeable to any Unit Lot,
including all charges provided in this Article, shall be the personal obligation of Owner
of the Unit Lot when the Assessment is made. Suit to recover personal judgment for
any delinquent Assessments shall be maintainable without foreclosing or waiving the
liens securing them.
16.6. Extinguishment of Lien and Personal Liability. A lien for unpaid
Assessments and the personal liability for payment of Assessments is extinguished
unless proceedings to enforce the lien or collect the debt are instituted within three
years after the amount of the Assessments sought to be recovered becomes due.
16.7. Joint and Several Liability. In addition to constituting a lien on the Unit
Lot and except as provided in Section 16.2 for a deed in lieu of foreclosure, each
Declaration of Covenants, Conditions, Restrictions and Easements page 26
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 635
1.v
Assessment shall be the joint and several obligation of Owner or Owners of the Unit
Lot to which the same are assessed as of the time the Assessment is due. In a voluntary
conveyance, the grantee of a Unit Lot shall be jointly and severally liable with the
grantor for all unpaid Assessments against the grantor up to the time of the grantor's
conveyance, without prejudice to the grantee's right to recover from the grantor the
amounts paid by the grantee therefor. Suit to recover a personal judgment for any
delinquent Assessment shall be maintainable in any court of competent jurisdiction
without foreclosing or waving the lien securing such sums.
16.8. Late Charges and Interest on Delinquent Assessments. The
Association may from time to time establish reasonable late charges and a rate of
interest to be charged on all subsequent delinquent Assessments or installments thereof.
In the absence of another established nonusurious rate, delinquent Assessments shall
bear interest from the date of delinquency at the maximum rate permitted under
RCW 19.52.020 on the date on which the Assessments became delinquent.
16.9. Recovery of Attorneys' Fees and Costs. The Association shall be
entitled to recover any costs and reasonable attorneys' fees incurred in connection with
the collection of delinquent Assessments, whether or not such collection activities
result in suit being commenced or prosecuted to judgment. In addition, the Association
shall be entitled to recover costs and reasonable attorneys' fees if it prevails on appeal
and in the enforcement of a judgment.
16.10. Security Deposit. An Owner who has been delinquent in paying his
monthly Assessments for three of the five preceding months may be required by the
Board, from time to time, to make and maintain a security deposit not in excess of three
months' estimated monthly Assessments, which shall be collected and shall be subject
to penalties for nonpayment as are other Assessments. The deposit shall be held in a
separate fund, credited to such Owner, and may be resorted to at any time when such
Owner is 10 days or more delinquent in paying Assessments.
16.11. Remedies Cumulative. The remedies provided herein are cumulative
and the Board may pursue them, and any other remedies that may be available under
law although not expressed herein, either concurrently or in any order.
16.12. Rent Paid to Association. If a Unit Lot is rented by its Owner to a
tenant ("Tenant"), the Board may collect, and the Tenant shall pay over to the Board,
so much of the rent for such Unit Lot as is required to pay any amounts due from the
Owner or the Tenant to the Association hereunder, plus interest, costs, litigation
expenses and attorney's fees if the same are in default over 30 days. The Tenant shall
not have the right to question payment to the Board, and such payment will discharge
the Tenant's duty of payment to the Owner for rent to the extent such rent is paid to the
Association, but will not discharge the liability of the Owner or purchaser of the Unit
Lot under this Declaration for Assessments and charges, or operate as approval of the
Rental Agreement. The Board shall not exercise this power where a receiver has been
Declaration of Covenants, Conditions, Restrictions and Easements page 27
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 636
1.v
appointed with respect to the Unit Lot or its Owner, nor in derogation of any right
which a Mortgagee of such Unit Lot may have with respect to such rents.
ARTICLE 17.
ENFORCEMENT OF DECLARATION,
BYLAWS AND RULES AND REGULATIONS
17.1. Rights of Action. Each Owner, the Board, and the Association shall
comply strictly with this Declaration, the Bylaws, and the rules and regulations adopted
pursuant thereto, as they may be lawfully amended from time to time, and the decisions
of the Board. Failure to comply with any of the foregoing shall be grounds for an
action to recover sums due, damages, and for injunctive relief, or any or all of them,
maintainable by the Board on behalf of the Association or by an Owner.
17.2. Failure of Board to Insist on Strict Performance. The failure of the
Board in any instance to (i) insist upon the strict compliance with this Declaration or
the Bylaws or the rules and regulations, (ii) exercise any right contained in such
documents, (iii) serve any notice or to institute any action, shall not be construed as a
waiver or a relinquishment in the future of any term, covenant, condition or restriction.
The receipt by the Board of payment of an Assessment from an Owner, with knowledge
of a breach by Owner, shall not be a waiver of the breach. No waiver by the Board of
any requirement shall be effective unless expressed in writing and signed for the Board.
This Article also extends to Declarant.
17.3. Board Enforcement. The Board has the authority to enforce the
Declaration, the Bylaws and the rules and regulations by imposing the remedies
provided herein. After repeated violations of the Declaration, Bylaws or rules and
regulations by an Owner and after an Owner's Right to Notice and Opportunity to be
Heard, the Board shall have the authority to file an action for damages and for
injunctive relief, including in a proper case, removal of the Owner from the Owner's
Unit Lot and the authority to pursue any and all remedies available in law or equity.
ARTICLE 18.
TORT AND CONTRACT LIABILITY
18.1. Declarant Liability Neither the Association nor any Owner except
Declarant is liable for Declarant's torts in connection with any part of the Community
which Declarant has the responsibility to maintain. Otherwise, an action alleging a
wrong done by the Association must be brought against the Association and not against
any Owner or any officer or director of the Association. If the wrong by the
Association occurred during the period of Declarant Control and the Association gives
Declarant reasonable notice of and an opportunity to defend against the action,
Declarant who then controlled the Association is liable to the Association or to any
Owner (a) for all tort losses not covered by insurance suffered by the Association or
that Owner and (b) for all costs that the Association would not have incurred but for a
Declaration of Covenants, Conditions, Restrictions and Easements page 28
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 637
1.v
breach of contract, other wrongful act or omission by the Association. If Declarant
does not defend the action and is determined to be liable to the Association under this
Section, Declarant is also liable for all litigation expenses, including reasonable
attorneys' fees, incurred by the Association in such defense. Any statute of limitations
affecting the Association's right of action under this Section is tolled until the period of
Declarant Control terminates. An Owner is not precluded from bringing an action
contemplated by this Section because he or she is a Unit Lot Owner or a member or
officer of the Association.
18.2. Limitation of Liability for Utility Failure, etc. Except to the extent
covered by insurance obtained by the Board, none of the Association, the Board, or
Declarant shall be liable for: the failure of any utility or other service to be obtained and
paid for by the Board; or for injury or damage to person or property caused by the
elements or resulting from electricity, water, rain, dust or sand that may leak or flow
from outside or from any parts of the Homes, or from any of their pipes, drains,
conduits, appliances or equipment or from any other place; or for inconvenience or
discomfort resulting from any action taken to comply with any law, ordinance or orders
of a governmental authority. No diminution or abatement of Assessments shall be
claimed or allowed for any such utility or service failure, or for such injury or damage,
or for such inconvenience or discomfort.
18.3. No Personal Liability. So long as a Board member, Association
committee member, Association officer, or Declarant has acted in good faith, without
willful or intentional misconduct, or any of their agents, upon the basis of such
information as is then possessed by such person, no such person shall be personally
liable to any Owner, or to any other person, including the Association, for any damage,
loss or prejudice suffered or claimed on account of any act, omission, error or
negligence of such person and shall be entitled to the immunities provided to officers
and board members under RCW 64.90.410(b), provided that this Section shall not apply
where the consequences of such act, omission, error or negligence is covered by
insurance obtained by the Board or an Owner. Without limiting the foregoing this
Section shall apply to limit the liability for damages or losses arising from or related to
the Association or any of its agents carrying out its repair and maintenance obligations
with respect to the Unit Lots and Common Elements pursuant to the terms of the
Declaration.
ARTICLE 19.
INDEMNIFICATION
Each Board member, Association committee member, Association officer, and
Declarant shall be indemnified by the Association against all expenses and liabilities,
including attorneys' fees, reasonably incurred by or imposed in connection with any
proceeding to which such person may be a party, or in which such person may become
involved, by reason of holding or having held such position, or any settlement thereof,
Declaration of Covenants, Conditions, Restrictions and Easements page 29
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 638
1.v
whether or not such person holds such position at the time such expenses or liabilities are
incurred, except to the extent such expenses and liabilities are covered by any type of
insurance and except in such cases wherein such person is adjudged guilty of willful
misfeasance in the performance of such person's duties; provided, that in the event of a
settlement, the indemnification shall apply only when the Board approves such settlement
and reimbursement as being for the best interests of the Association.
ARTICLE 20.
INSURANCE
20.1.Owner's Insurance. Each Owner shall obtain and maintain property
insurance on their Unit Lot, including, but not limited to, the Home, Structures,
equipment and improvements in their Unit Lot, insuring against all risks of direct
physical loss commonly insured against. The total amount of insurance after
application of any deductibles shall not be less than 80% of the actual cash value of the
insured property at the time the insurance is purchased and at each renewal date,
exclusive of land, excavations, foundations and other items normally excluded from
property policies. Each Owner is hereby required to file a copy of such individual
policy or policies with the Board within 30 days after purchase of such insurance, and
the Board may review its effect with the Board's insurance broker, agent or carrier. If,
at any time, an Owner fails to fulfill the requirements of this Section 20.1, then the
Association may obtain such insurance and shall assess against such Owner a special
charge for the cost of such insurance. Otherwise, any insurance policy issued to the
Association does not prevent a Unit Lot Owner from obtaining insurance of the
Owner's own benefit. The Association's failure to enforce this obligation does not
constitute a waiver of its right to do so.
20.2. Insurance Coverage. Notwithstanding the provisions of Section 20.1,
commencing not later than the time of the first conveyance of a Unit Lot to a person
other than Declarant, the Association shall maintain to the extent reasonably available
and subject to reasonable deductibles:
20.2.1. Property insurance on the Common Elements, insuring against
risks of direct physical loss commonly insured against. The total amount of insurance
after application of any deductibles shall not be less than 80% of the actual cash value of
the insured property at the time the insurance is purchased and at each renewal date,
exclusive of land, excavations, foundations and other items normally excluded from
property policies.
20.2.2. Commercial general liability insurance, including medical
payments insurance, in an amount determined by the Board covering all occurrences
commonly insured against for death, bodily injury and property damage arising out of or
in connection with the use, ownership or maintenance of the Common Elements and
Declaration of Covenants, Conditions, Restrictions and Easements page 30
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 639
1.v
other portions of the Community for which the Association has maintenance
responsibilities.
20.2.3. Workmen's compensation insurance to the extent required by
applicable laws.
20.2.4. Fidelity insurance as the Board deems advisable.
20.2.5. Insurance against loss of personal property of the Association
by fire, theft and other losses with deductible provisions as the Board deems advisable.
20.2.6. Such other insurance (including directors' and officers'
liability) as the Board deems advisable; provided that, notwithstanding any other
provisions herein, the Association shall continuously maintain in effect such casualty,
flood and liability insurance and a fidelity bond meeting the insurance and fidelity bond
requirements for Community projects established by HUD, FNMA, FHLMC, VA or
other governmental or quasi -governmental agencies involved in the secondary mortgage
market, so long as any such agency is a Mortgagee or Owner of a Unit Lot within the
Community, except to the extent such coverage is not available or has been waived in
writing by such agency.
20.3. Coverage Not Available. If the insurance described in Section 20.2 is not
reasonably available, or is modified, cancelled or not renewed, the Association shall
promptly cause notice of that fact to be sent to all Owners, to each Eligible Mortgagee
and to each Mortgagee to whom a certificate of insurance has been issued at their
respective last known addresses in accordance with Sections 27.1 and 27.2, as
applicable. The Association in any event may carry any other insurance it deems
appropriate to protect the Association or the Owners.
shall:
20.4. Required Provisions. Insurance policies carried pursuant to this Article
20.4.1. Provide a standard mortgage clause or equivalent endorsement;
20.4.2. Provide that each Owner is an insured person under the policy
with respect to liability arising out of the Owner's interest in the Common Elements or
membership in the Association;
20.4.3. Provide that the insurer waives its right to subrogation under the
policy as to any and all claims against the Association, the Owner of any Unit Lot and/or
their respective agents, employees or tenants, and members of their household, and of any
defenses based upon co-insurance or upon invalidity arising from the acts of the insured;
20.4.4. Provide that no act or omission by any Owner, unless acting
within the scope of the Owner's authority on behalf of the Association, nor any failure of
Declaration of Covenants, Conditions, Restrictions and Easements page 31
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 640
1.v
the Association to comply with any warranty or condition regarding any portion of the
premises over which the Association has no direct control, will void the policy or be a
condition to recovery under the policy;
20.4.5. Provide that if, at the time of loss under a policy, there is other
insurance in the name of an Owner covering the same risk covered by the policy, the
Association's policy provides primary insurance, and the liability of the insurer
thereunder shall not be affected by, and the insurer shall not claim any right of setoff,
counterclaims, apportionment, proration, contribution or assessment by reason of any
other insurance obtained by or for any Owner or any Mortgagee;
20.4.6. Provide that the policy cannot be canceled or substantially
modified without 10 days' prior written notice to the Association and to each Mortgagee
of a first Mortgage;
20.4.7. Contain no provision (other than insurance conditions) which
will prevent Mortgagees from collecting insurance proceeds; and
20.4.8. Contain, if available, an agreed amount and Inflation Guard
Endorsement.
20.5. Claims Adjustment. Any loss covered by the property insurance
obtained by the Association under this Article must be adjusted with the Association,
but the insurance proceeds for that loss are payable to any insurance trustee designated
for that purpose, or otherwise to the Association, and not to any holder of a Mortgage.
The insurance trustee or the Association shall hold any insurance proceeds in trust for
Unit Lot Owners and lienholders as their interests may appear. Subject to the provisions
of Article 21, the proceeds must be disbursed first for the repair or restoration of the
damaged property, and Unit Lot Owners and lienholders are not entitled to receive
payment of any portion of the proceeds unless there is a surplus of proceeds after the
property has been completely repaired or restored or the Community is terminated.
20.6. Certificate. An insurer that has issued an insurance policy under this
Article shall issue certificates or memoranda of insurance to the Association and, upon
written request, to any Unit Lot Owner or holder of a Mortgage. The insurer issuing
the policy may not modify the amount or the extent of the coverage of the policy or
cancel or refuse to renew the policy unless the insurer has complied with all applicable
provisions of RCW 48.18 pertaining to cancellation or non -renewal of contracts of
insurance. The insurer shall not modify the amount or the extent of the coverage of the
policy, or cancel or refuse to renew the policy, without complying with the
requirements of the Act.
20.7. Notification on Sale of Unit Lot. Promptly upon the conveyance of a
Unit Lot, the new Unit Lot Owner shall notify the Association of the date of the
conveyance and the Unit Lot Owner's name and address. The Association shall notify
Declaration of Covenants, Conditions, Restrictions and Easements page 32
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 641
1.v
each insurance company that has issued an insurance policy to the Association for the
benefit of the Owners under this Article 20 of the name of the new Owner and request
that the new Owner be made named insured under such policy.
ARTICLE 21.
DAMAGE OR DESTRUCTION; RECONSTRUCTION
21.1. Definitions; Significant Damage: Repair: Emergency Work.
21.1.1. As used in this Article, the term "Significant Damage" means
damage or destruction, whether or not caused by casualty, to any part of the property
which the Board is responsible to maintain or repair: (a) for which funds are not
available in the maintenance and repair or contingency budget of the Association to make
timely repairs and (b) which has a significant adverse impact on the habitability of any
Unit Lot or the ability of an Owner or Owners to use the property or any significant
portion of the property for its intended purpose.
21.1.2. As used in this Article, the term "repair" means to repair,
reconstruct, rebuild or restore the improvements which suffered Significant Damage to
substantially the same condition in which they existed prior to the damage or destruction,
with each Unit Lot and the Common and Limited Common Elements having substantially
the same vertical and horizontal boundaries as before. Modifications to conform to then
applicable governmental rules and regulations or available means of construction may be
made.
21.1.3. As used in this Article the term "Emergency Work" shall mean
that work which the Board deems reasonably necessary to avoid further damage,
destruction or substantial diminution in value to the improvements and to reasonably
protect the Owners from liability arising out of the condition of the property.
21.2. Initial Board Determinations. In the event of Significant Damage to any
part of the Community, the Board shall promptly, and in all events within 30 days after
the date of Significant Damage, or, if the Significant Damage did not occur at a
particular identifiable time, after the date of its discovery, make the following
determinations with respect thereto employing such advice as the Board deems
advisable:
21.2.1. The nature and extent of the Significant Damage, together with
an inventory of the improvements and property directly affected thereby;
21.2.2. A reasonably reliable estimate of the cost to repair the
Significant Damage, which estimate shall, if reasonably practicable, be based upon a firm
bid obtained from a responsible contractor;
Declaration of Covenants, Conditions, Restrictions and Easements page 33
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 642
1.v
21.2.3. The anticipated insurance proceeds, if any, to be available from
insurance covering the loss based on the amount paid or initially offered by the insurer;
21.2.4. The amount, if any, that the estimated cost of repair exceeds the
anticipated insurance proceeds therefor and the amount of Assessment to each Unit Lot if
such excess was paid as a Common Expense and specially assessed against all of the Unit
Lots in proportion to their Allocated Interest in the Common Elements; and
21.2.5. The Board's recommendation as to whether such Significant
Damage should be repaired.
21.3. Notice of Damage or Destruction. The Board shall promptly, and in all
events within 30 days after the date of Significant Damage, provide each Owner and
each first Mortgagee with a written notice summarizing the initial Board determination
made under Section 21.2. If the Board fails to do so within said 30 days, then any
Owner or Mortgagee may make the determination required under Section 21.2 and give
the notice required under this Section.
21.4. General Provisions.
21.4.1. Duty to Restore. Any portion of the Community which the
Association is responsibe for insuring that is Significantly Damaged shall be repaired
promptly by the Association unless: (a) the Community is terminated; (b) repair would
be illegal under any state or local health or safety statute or ordinance; or (c) 80% of the
Owners, including every Owner of a Unit Lot or assigned Limited Common Element
which will not be repaired, vote not to repair. Even if the Significant Damage is not to be
repaired, the Board shall still have authority to perform emergency work. The cost of
repair in excess of insurance proceeds and reserves is a Common Expense.
21.4.2. Restoration in accordance with Declaration. Any restoration
or repair of the Community after a partial condemnation or damage due to an insurable
hazard shall be substantially in accordance with the Declaration, the Map and original
specifications unless consent is obtained from Eligible Mortgagees of Unit Lots to which
at least 5 1 % of the votes of Unit Lots subject to Mortgages held by Eligible Mortgagees
are allocated.
21.4.3. Damage Not Restored. If all or any portion of the damaged
portions of the Community are not repaired (regardless of whether such damage is
Significant): (a) the insurance proceeds attributable to the damaged Common Elements
shall be used to restore the damaged area to a condition compatible with the remainder of
the Community; (b) the insurance proceeds attributable to Unit Lots (if any) and Limited
Common Elements which are not repaired shall be distributed to the Owners of those
Unit Lots and the Owners of the Unit Lots to which those Limited Common Elements
were allocated, or to lienholders, as their interests may appear; and (c) the remainder of
the proceeds shall be distributed to all the Unit Lot Owners or lienholders, as their
Declaration of Covenants, Conditions, Restrictions and Easements page 34
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 643
1.v
interests may appear, in proportion to the Allocated Interests in the Common Elements of
all Unit Lots.
21.4.4. Reallocation. If the Owners vote not to repair any Home for
which it has insurance obligations hereunder (if any), that Unit Lot's Allocated Interests
are automatically reallocated upon the vote as if the Unit Lot had been condemned under
Article 22, and the Association promptly shall prepare, execute and record an amendment
to the Declaration reflecting the reallocations.
21.5. Restoration by Board. If the damage (regardless of whether such
damage is Significant) is to be repaired pursuant to Section 21.4, then:
21.5.1. Contract and Contractors. The Board shall have the authority
to employ architects and attorneys, advertise for bids, let contracts to contractors and
others, and take such other action as is reasonably necessary to effectuate the repair and
restoration. Contracts for such repair and restoration shall be awarded when the Board, by
means of insurance proceeds and sufficient Assessments, has provision for the cost
thereof. The Board may further authorize the insurance carrier to proceed with repair
upon satisfaction of the Board that such work will be appropriately carried out.
21.5.2. Insurance Trustee. The Board may enter into a written
agreement in recordable form with any reputable financial institution, trust or escrow
company that such firm or institution shall act as an insurance trustee to adjust and settle
any claim for a loss in excess of $50,000, or for such firm or institution to collect the
insurance proceeds and carry out the provisions of this Article.
21.6. Decision to Terminate. In the event of a decision to terminate the
Community and not repair and restore damage and destruction, the Board may
nevertheless expend such of the insurance proceeds and funds of the Association as the
Board deems reasonably necessary for Emergency Work (which Emergency Work may
include but is not necessarily limited to removal of the damaged or destroyed
improvements and clearing, filling and grading the real property), and the remaining
funds, if any, and property shall thereafter be held and distributed as provided in
RCW 64.90.290.
ARTICLE 22.
CONDEMNATION
22.1. In General. If a Unit Lot is acquired by condemnation, or if part of a Unit
Lot is acquired by condemnation leaving the Unit Lot Owner with a remnant of a Unit
Lot which may not practically or lawfully be used for any purpose permitted by the
Declaration, the award must compensate the Owner for the Owner's Unit Lot and its
appurtenant interest in the Common Elements, whether or not any Common Elements
are acquired. Upon acquisition, unless the decree otherwise provides, that Unit Lot's
Allocated Interests are automatically reallocated to the remaining Unit Lots in
Declaration of Covenants, Conditions, Restrictions and Easements page 35
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 644
1.v
proportion to the respective Allocated Interests of those Unit Lots before the taking,
and the Association shall promptly prepare, execute and record an amendment to the
Declaration reflecting the reallocations. Any remnant of a Unit Lot remaining after part
of a Unit Lot is taken under this Section is thereafter a Common Element.
22.2. Partial Unit Lot Condemnation. Except as provided in Section 22.1, if
part of a Unit Lot is acquired by condemnation, the award must compensate the Unit
Lot Owner for the reduction in value of the Unit Lot and its appurtenant interest in the
Common Elements, whether or not any Common Elements are acquired. Upon
acquisition, unless the decree otherwise provides: (a) that Unit Lot's Allocated
Interests are reduced in proportion to the reduction in the size of the Unit Lot and/or
Home (as the case may be), and (b) the portion of the Allocated Interests divested from
the partially acquired Unit Lot are automatically reallocated to that Unit Lot and the
remaining Unit Lots in proportion to the respective Allocated Interests of those Unit
Lots before the taking, with the partially acquired Unit Lot participating in the
reallocation on the basis of its reduced allocated Interests.
22.3. Common Element Condemnation. If part of the Common Elements is
acquired by condemnation, the portion of the award attributable to the Common
Elements taken shall be paid to the Owners based on their respective Allocated Interests
in the Common Elements. Any portion of the award attributable to the acquisition of a
Limited Common Element must be equally divided among the Owners of the Unit Lots
to which that Limited Common Element was allocated at the time of acquisition.
22.4. Recording of Judgment. The court judgment shall be recorded in the
county in which the Community is located.
22.5. Association to Represent Owners. The Association shall represent the
Unit Lot Owners in any proceedings, negotiations, settlements or agreements regarding
a condemnation of any part of the Community, and any condemnation proceeds shall be
payable to the Association for the benefit of the Owners of affected Unit Lots and their
Mortgagees. Should the Association not act on the Owner's behalf in a condemnation
process, the affected owners may individually or jointly act on their own behalf.
Ownership of condemnation proceeds, as between the Owners and Mortgagees of the
affected Unit Lots, shall be controlled by the terms of the mortgage agreements
between the respective owners and their Mortgagees.
ARTICLE 23.
EASEMENTS
23.1. In General. Each Owner has an easement in the Common Elements for
access to such Owner's Unit Lot, subject to applicable rules and regulations of the
Association or permitted conveyances or encumbrances of such Common Elements.
Each Unit Lot has an easement for ingress to and egress from the Unit Lot and an
easement in and through each other Unit Lot and the Common Elements and Limited
Declaration of Covenants, Conditions, Restrictions and Easements page 36
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 645
1.v
Common Elements for all support elements and utility, wiring, heat, and service
elements, and for reasonable access thereto, as required to effectuate and continue
proper operation of the Community. Such easements are perpetual and appurtenant to
each Unit Lot.
23.2. Encroachments. To the extent not provided by the definition of "Unit
Lot" in the Declaration and in WUCIOA, each Unit Lot and all Common Elements and
Limited Common Elements are hereby declared to have an easement over all adjoining
Unit Lots and Common and Limited Common Elements for the purpose of
accommodating any present or future encroachment as a result of engineering errors,
construction, reconstruction, repairs, settlement, shifting or movement of any portion of
the property, or any other similar cause, and any encroachment due to building
overhang or projection. There shall be valid easements for the maintenance of the
encroaching Unit Lots and Common Elements and Limited Common Elements so long
as the encroachments shall exist, and the rights and obligations of Owners shall not be
altered in any way by the encroachment; provided, however, that in no event shall a
valid easement for encroachment be created in favor of a Unit Lot if the encroachment
was caused by the willful act with full knowledge of Owner. The encroachments
described in this Section shall not be construed to be encumbrances affecting the
marketability of title to any Unit Lot.
23.3. Easements Reserved by Declarant. Declarant reserves an easement
over, across, and through the Unit Lots, Common Elements and Limited Common
Elements of the Community for the purposes of completing any unfinished Homes or
other improvements, exhibiting and preparing Homes for sale, making repairs required
pursuant to any contract of sale, and discharging Declarant's obligations or exercising
Special Declarant Rights. Declarant further reserves mutual nonexclusive easements
over, across, and through the Common Elements of the Community (i.e., the real
property described in Schedule A, as it may from time to time be amended by
Declarant) for the benefit of Declarant and its successors and assigns, the Association,
and all Owners of Unit Lots in the Community for ingress to and egress to the
Community, the right to have access to and to tie into and utilize any water, sanitary
sewer, storm sewer, electricity, gas, telephone, cable, television, or other utility lines
now or hereafter established in the Community.
23.4. Utility Easements Granted by Declarant. Declarant grants to each
company or municipality providing utility services to the Community or to Owners of
Unit Lots in the Community an easement for the installation, construction,
maintenance, repair, and reconstruction of all utilities serving the Community or
Owners, including, without limitation, such utility services as gas, water, sanitary
sewer, storm sewer, electricity, cable television and telephone, and an easement for
access over and under the Common Elements of the Community to the utility service
facilities.
Declaration of Covenants, Conditions, Restrictions and Easements page 37
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 646
1.v
23.5. Maintenance Easement. The Association is hereby granted an easement
over, across and through the Common Elements and Unit Lots of the Community for
the right to install, maintain and/or replace the exterior of the Homes and other
Structures, landscaping, or any other items in accordance with Section 9.3. Any such
work undertaken by the Association shall be done in a good and workmanlike manner.
23.6. Utility and Repair Easements. Each Unit Lot (the "Owner's Unit Lot")
shall have a nonexclusive easement over the other Unit Lots ("Other Unit Lots") for all
existing utility lines that serve the Owner's Unit Lot and for a right of access to the
utility lines serving the Owner's Unit Lot for the purpose of repair and replacement,
and shall include such additional area as is necessary to facilitate its intended purposes,
provided the Owner promptly restores the other Unit Lot(s) to its prior condition. In
addition, each Unit Lot shall have a nonexclusive easement over that portion of any
Other Unit Lots that (i) lie outside of the Home Footprint of the Homes located within
such Other Unit Lots and (ii) are adjacent to the boundary of the Owner's Unit Lot for
the purposes of accessing the Home in the Owner's Unit Lot for repair and maintenance
of the Home, if reasonably necessary, provided the Owner promptly restores the Other
Unit Lot(s) to their prior condition.
23.7. Easement for Association. There is hereby reserved to Declarant and the
Association for the benefit of the Owners, or their duly authorized agents and
representatives, over and across and through all portions of the Community, such
easements as are necessary to perform the duties and obligations of the Association as
set forth herein. Without limiting the generality of the foregoing, such easements
include an easement over, under and across the Community for maintenance, repair and
replacement, as applicable, of all Common Elements, exterior Structures, exteriors of
Homes, landscaping, and any related maintenance, repair and replacement obligations
of the Association hereunder. The Declarant's easement under this Section
automatically terminates when the Declarant no longer owns a Unit Lot in the
Community.
23.8. Access Easement. There is hereby declared and granted to the Owners of
the Unit Lot a perpetual, non-exclusive easement for pedestrian and vehicular access,
ingress, and egress over, under, through, across and upon, that portion of the Property
more particularly described in the Map as the "Private Ingress, Egress & Utilities
Easement" (the "Access Easement").
23.9. Waste Storage Easement. There is hereby declared and granted to the
Owners of Unit Lots a nonexclusive easement for the placement and storage of waste
containers over that portion of the Access Easement required for waste pick-up. Owner
shall place the waste containers in the designated pick-up location on the day or days
designated for waste pickup.
Declaration of Covenants, Conditions, Restrictions and Easements page 38
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 647
1.v
23.1. Common Element Easement. Each Unit Lot is hereby granted a
perpetual, non-exclusive easement for community use and pedestrian access, ingress,
and egress through, across and upon, Tract A and Tract B as shown on the Map.
ARTICLE 24.
PROCEDURES FOR SUBDIVIDING
24.1. Subdivision of Unit Lots. No Unit Lot shall be subdivided either by
agreement or legal proceedings, unless otherwise provided by an amendment to this
Declaration.
24.2. Relocation of Boundaries.
24.2.1. Adjoining Unit Lots. The boundaries between adjoining Unit
Lots may be relocated upon application to the Board by Owners of those Unit Lots and
approval by the Board under this Section 24.2.1. The application must include plans
showing the relocated boundaries and such other information as the Board may require.
If the Unit Lot Owners of the adjoining Unit Lots have specified a reallocation between
their Unit Lots of their Allocated Interests, the application must state the proposed
reallocations. Unless the Board determines, after receipt of all required information, that
the reallocations are unreasonable or that the proposed boundary relocation does not
comply with the Declaration, WUCIOA, or other provisions of law, the Board must
approve the application and prepare any amendments to the Declaration and Map in
accordance with the requirements of Section 24.2.3.
24.2.2. Unit Lots and Common Elements. Boundaries between Unit
Lots and Common Elements may be relocated to incorporate Common Elements within a
Unit Lot by an amendment to the Declaration upon application to the Association by the
Unit Lot Owner of the Unit Lot who proposes to relocate a boundary. The amendment
may be approved only if the Unit Lot Owner of the Unit Lot, the boundary of which is
being relocated, and persons entitled to cast at least 67% of the votes in the Association,
including 67% of the votes allocated to Unit Lots not owned by the Declarant, agree. The
Association may require payment to the Association of a one-time fee or charge or
continuing fees or charges payable by the Unit Lot Owners of the Unit Lots whose
boundaries are being relocated to include Common Elements.
24.2.3. Preparation of Amendments to Declaration and Map. The
Association must prepare any amendment to the Declaration in accordance with
RCW 64.90.225 and any amendment to the Map in accordance with RCW 64.90.245
necessary to show or describe the altered boundaries of affected Unit Lots and their
dimensions and Identifying Numbers. The amendment to the Declaration must be
executed by the Unit Lot Owner of the Unit Lot, the boundaries of which are being
relocated, and by the Association, contain words of conveyance between them, and be
recorded in the names of the Unit Lot Owner or Owners and the Association, as grantor
Declaration of Covenants, Conditions, Restrictions and Easements page 39
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 648
1.v
or grantee, as appropriate and as required under RCW 64.90.285(3). The amendments
are effective upon recording
24.2.4. Costs for Amendments. All costs, including reasonable
attorneys' fees, incurred by the Association for preparing and recording amendments to
the Declaration and Map under this Section must be assessed to the Unit Lot, the
boundaries of which are being relocated.
ARTICLE 25.
AMENDMENT OF DECLARATION,
MAP, ARTICLES OR BYLAWS
25.1. Procedures. Except in cases of amendments that may be executed by
Declarant under the Declaration or WUCIOA, this Declaration, the Map, the Articles,
and the Bylaws may be amended only by vote or agreement of Owners, as specified in
this Article. An Owner may propose amendments to this Declaration or the Map, the
Articles or the Bylaws to the Board. A majority of the members of the Board may
cause a proposed amendment to be submitted to the members of the Association for
their consideration. If an amendment is proposed by Owners with 20% or more of the
votes in the Association, then, irrespective of whether the Board concurs to the
proposed amendment, it shall be submitted to the members of the Association for their
consideration at their next regular or special meeting for which timely notice must be
given. Notice of a meeting at which an amendment is to be considered shall include the
text of the proposed amendment. Amendments may be adopted at a meeting of the
Association or by written consent of the requisite number of persons entitled to vote,
after notice has been given to all persons (including Eligible Mortgagees) entitled to
receive notices. Upon the adoption of an amendment and the obtaining of any
necessary consents of Eligible Mortgagees as provided below, amendment to the
Declaration or the Map will become effective when it is recorded or filed in the real
property records of Snohomish County. The amendment shall be indexed in the name
of the Community and shall contain a cross-reference by recording number to the
Declaration and each previously recorded amendment thereto. Such amendments shall
be prepared, executed, recorded, and certified on behalf of the Association by any
officer of the Association designated for that purpose or, in the absence of designation,
by the president of the Association. No action to challenge the validity of an
amendment adopted by the Association pursuant to this Article may be brought more
than one year after the amendment is recorded. An amendment to the Articles shall be
effective upon filing the amendment with the Secretary of State. An amendment to the
Bylaws shall be effective upon adoption.
25.2. Percentages of Consent Required. Except as otherwise provided in
Article 21 and Article 22 in the case of damage or condemnation of the property, the
percentages of consent of Owners and Mortgagees required for adoption of
amendments to the Declaration, the Map, the Articles, and the Bylaws are as follows:
Declaration of Covenants, Conditions, Restrictions and Easements page 40
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 649
1.v
25.2.1. The consent of Owners holding at least 67% of the votes in the
Association and the consent of Eligible Mortgagees of Unit Lots to which at least 51 % of
the votes of Unit Lots subject to Mortgages held by Eligible Mortgagees are allocated
shall be required to materially amend any provisions of the Declaration, the Map, the
Articles or the Bylaws, or to add any material provisions thereto, which establish, provide
for, govern or regulate any of the following (a) voting rights; (b) Assessments,
Assessment liens or subordination of such liens; (c) reserves for maintenance, repair or
replacement of the Common Elements; (d) responsibility for maintenance and repair of
any portion of the Community; (e) rights to use Common Elements and Limited Common
Elements; (f) reallocation of interests in Common Elements or Limited Common
Elements or rights to their use; (g) redefinition of any Unit Lot boundaries;
(h) convertibility of Unit Lots into Common Elements or Limited Common Elements,
Common Elements or Limited Common Elements into Unit Lots or Common Elements
into Limited Common Elements; (i) expansion or contraction of the Community or the
addition, annexation or withdrawal of property to or from the Community; 0) hazard or
fidelity insurance requirements; (k) imposition of any restrictions on leasing of Unit Lots;
(1) imposition of any restriction on the right of an Owner to sell or transfer a Unit Lot;
(m) establishment of self -management of the Community after professional management
has been required by HUD, FNMA, VA, FHLMC or other similar agency or corporation
or by an Eligible Mortgagee; (n) restoration or repair (after damage or partial
condemnation) in a manner other than specified in the Declaration or the Map; or (o) any
provisions that are for the express benefit of holders of first Mortgages.
25.2.2. An amendment that creates or increases Special Declarant
Rights, increases the number of Unit Lots, changes the boundaries of any Unit Lot, the
Allocated Interests of a Unit Lot, or the uses to which any Unit Lot is restricted shall
require the vote or agreement of the Owner of each Unit Lot particularly affected,
Declarant (if Declarant owns a Unit Lot or has the rights to exercise any Special
Declarant Rights) and Owners having at least 90% of the votes in the Association other
than Declarant, and Project Mortgagee.
25.2.3. In addition to the foregoing requirements, the consent of
Declarant and the Project Mortgagee shall be required for any amendment to Article 10,
Section 13.1, Section 13.2, Section 18.1, Section 18.3 or Article 19 relating to Declarant.
25.2.4. All other amendments shall be adopted if consented to by
Owners holding at least 67% of the votes in the Association.
25.2.5. An Eligible Mortgagee or Mortgagee who receives a written
request to consent to an amendment who does not deliver or post to the requesting party a
negative response within 60 days shall be deemed to have consented to such request.
25.2.6. If the Community has received a project approval from the VA,
the approval of the VA will be required for any amendment to the Declaration, Articles,
Bylaws or Map adopted prior to the Transition Date.
Declaration of Covenants, Conditions, Restrictions and Easements page 41
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 650
1.v
25.3. Limitations on Amendments. No amendment may restrict, eliminate or
otherwise modify any Development Right or Special Declarant Right provided in this
Declaration without the consent of Declarant and Project Mortgagee and no amendment
may restrict, eliminate or otherwise modify any right granted to Project Mortgagee
without the consent of Project Mortgagee.
25.4. Unilateral Corrections by Declarant. In accordance with
RCW 64.90.285(10), upon 30 days' advance notice to Owners, Declarant may, without
a vote of the Unit Lot Owners or approval by the Board, unilaterally adopt, execute,
and record a corrective amendment or supplement to the Governing Documents to
correct a mathematical mistake, an inconsistency or a scrivener's error, or clarify an
ambiguity in the Governing Documents, within 5 years after the recordation or adoption
of the Governing Document containing or creating the mistake, inconsistency, error or
ambiguity.
25.5. Unilateral Corrections By Board. Upon 30 days' advance notice to
Owners, the Association may, upon a vote of two-thirds of the members of the Board,
without a vote of the Unit Lot Owners, adopt, execute, and record an amendment to the
Declaration for the purposes described in RCW 64. 90.285(11).
ARTICLE 26.
TERMINATION OF COMMUNITY
26.1. Action Required. Except as provided in Article 21 and Article 22, the
Community may be terminated only by agreement of Owners of Unit Lots to which at
least 80% of the votes in the Association are allocated and with the consent of Eligible
Mortgagees of Unit Lots to which at least 51 % of the votes of Unit Lots subject to
Mortgages held by Eligible Mortgagees are allocated and in accordance with
WUCIOA; provided that the consent of Eligible Mortgagees of Unit Lots to which at
least 67% of the votes of Unit Lots subject to Mortgages held by Eligible Mortgagees
are allocated is required to terminate the Community for reasons other substantial
destruction or a substantial taking in condemnation of the Property. An Eligible
Mortgagee who receives a written request to consent to termination who does not
deliver or post to the requesting party a negative response within 60 days shall be
deemed to have consented to such request, provided the request was delivered by
certified or registered mail, return receipt requested.
26.2. WUCIOA Governs. The provisions of WUCIOA relating to termination
of a Community contained in RCW 64.90.290 as it may be amended, shall govern the
termination of the Community, including, but not limited to, the disposition of the real
property in the Community and the distribution of proceeds from the sale of that real
property.
26.3. Covenants Running with Land. This Declaration (until terminated as
provided above) shall be operative as covenants running with the land, or equitable
Declaration of Covenants, Conditions, Restrictions and Easements page 42
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 651
1.v
servitudes, binding on Declarant, its successors and assigns, and all subsequent owners
of all or any portion of the real property made subject to this Declaration, together with
their grantees, successors, heirs, executors, administrators, devisees or assigns,
supplementing and interpreting WUCIOA, and operating independently of WUCIOA
should WUCIOA be, in any respect, inapplicable.
ARTICLE 27.
NOTICES
27.1. Form and Delivery of Notice. Except as otherwise provided in the
Declaration, all notices, demands, bills, statements, or other communications under the
Declaration or these Bylaws shall be in writing.
27.1.1. Tangible Medium. Notice provided in a tangible medium may
be transmitted by mail, private carrier, or personal delivery; telegraph or teletype; or
telephone, wire, or wireless equipment that transmits a facsimile of the notice.
(a) Notice in a tangible medium to the Association or to a
committee may be addressed to the Association's registered agent at its registered office,
to the Association at its principal office shown in its most recent annual report or
provided by notice to the Owners, or to the president or secretary of the Association at
the address shown in the Association's most recent annual report or provided by notice to
the Owners.
(b) Notice in a tangible medium to an Owner must be
addressed to the address of the Unit Lot of such Owner unless the Owner has requested in
writing, delivered to the Association that notices be sent to an alternate address or by
other method allowed by law and the Governing Documents.
27.1.2. Electronic Transmission.
(a) Notice to Owners or directors by electronic transmission is
effective only upon Owners and directors who have consented in writing to receive
electronically transmitted notices under WUCIOA and have designated in the consent the
address, location, or system to which such notices may be electronically transmitted,
provided that such notice otherwise complies with any other requirements of WUCIOA
and applicable law.
(b) Notice to Owners or directors under this Section 27.1.2
includes material that WUCIOA or the Governing Documents requires or permits to
accompany the notice.
(c) An Owner or director who has consented to receipt of
electronically transmitted notices may revoke this consent by delivering a written
revocation to the Association.
Declaration of Covenants, Conditions, Restrictions and Easements page 43
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 652
1.v
(d) The consent of any Owner or director is revoked if. The
Association is unable to electronically transmit two consecutive notices given by the
Association in accordance with the consent, and this inability becomes known to the
secretary of the Association or any other person responsible for giving the notice. The
inadvertent failure by the Association to treat this inability as a revocation does not
invalidate any meeting or other action.
(e) Notice to Owners or directors who have consented to
receipt of electronically transmitted notices may be provided by posting the notice on an
electronic network and delivering to the Owner or director a separate record of the
posting, together with comprehensible instructions regarding how to obtain access to the
posting on the electronic network.
(f) Notice to an Association in an electronic transmission is
effective only with respect to an Association that has designated in a record an address,
location, or system to which the notices may be electronically transmitted.
27.1.3. Alternative Methods. Notice may be given by any other
method reasonably calculated to provide notice to the recipient.
27.1.4. Effectiveness. Notice is effective as follows:
(a) Notice provided in a tangible medium is effective as of the
date of hand delivery, deposit with the carrier, or when sent by fax.
(b) Notice provided in an electronic transmission is effective as
of the date it: (y) is electronically transmitted to an address, location, or system
designated by the recipient for that purpose; or (z) has been posted on an electronic
network and a separate record of the posting has been sent to the recipient containing
instructions regarding how to obtain access to the posting on the electronic network.
27.1.5. Failure to Deliver. The ineffectiveness of a good -faith effort to
deliver notice by an authorized means does not invalidate action taken at or without a
meeting.
27.2. Notices to Eligible Mortgagees. An Eligible Mortgagee is a Mortgagee
that has filed with the secretary of the Board a written request that it be given copies of
the notices listed below and shall also mean the Project Mortgagees with respect to Unit
Lots owned by Declarant upon which it has a Mortgage. The request must state the
name and address of the Eligible Mortgagee and the Identifying Number or address of
the Unit Lot on which it has (or insures or guarantees) a Mortgage. Until such time
thereafter that the Eligible Mortgagee withdraws the request or the Mortgage held,
insured or guaranteed by the Eligible Mortgagee is satisfied, the Board shall send to the
Eligible Mortgagee timely written notice of (a) any proposed amendment of this
Declaration or Map effecting a change in (1) the boundaries of any Unit Lot and (2) the
Declaration of Covenants, Conditions, Restrictions and Easements page 44
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 653
1.v
exclusive easement rights, if any, appertaining to any Unit Lot, (3) the interest in the
Common Elements or the liability for Common Expenses of any Unit Lot, (4) the
number of votes in the Association allocated to any Unit Lot, or (5) the purposes to
which a Unit Lot or the Common Elements are restricted; (b) any proposed termination
of Community status, transfer or mortgage of any part of the Common Elements, or
termination of professional management of the Community; (c) any condemnation loss
or casualty loss that affects a material portion of the Community or that affects any Unit
Lot on which an Eligible Mortgagee has a first Mortgage; (d) any delinquency that has
continued for 60 days in the payment of Assessments or charges owed by an Owner of
a Unit Lot on which an Eligible Mortgagee had a Mortgage; (e) any lapse, cancellation
or material modification of any insurance policy maintained by the Association
pursuant to Article 20; (f) any proposed action that would require the consent of a
specified percentage of Eligible Mortgagees pursuant to this Declaration, the Articles or
Bylaws; and (g) any proposed special Assessment or supplemental budget.
ARTICLE 28.
SEVERABILITY
The provisions of this Declaration shall be independent and severable, and the
unenforceability of any one provision shall not affect the enforceability of any other
provision, if the remaining provision or provisions comply with WUCIOA.
ARTICLE 29.
EFFECTIVE DATE
This Declaration shall take effect upon recording.
ARTICLE 30.
ASSIGNMENT BY DECLARANT
Declarant reserves the right to assign, transfer, sell, lease or rent all or a portion of
the property then owned by it and reserves the right to assign all or any of its rights,
duties, and obligations created under this Declaration.
[Remainder of the page blank; signature on following page.]
Declaration of Covenants, Conditions, Restrictions and Easements page 45
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 654
1.v
EXECUTED AS of . 2022.
DECLARANT:
Fernandez & Barnes LLC,
a Washington limited liability company
By:
Name: Leandro Fernandez
Its: Manager
STATE OF WASHINGTON
ss.
COUNTY OF
This record was acknowledged before me on , 2022, by Leandro
Fernandez as Manager of Fernandez & Barnes LLC, a Washington limited liability
company.
[Stamp Below]
Signature
NOTARY PUBLIC in and for the State of Washington
My Commission
Expires
Declaration of Covenants, Conditions, Restrictions and Easements page 46
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 655
1.v
SCHEDULE A
Greenwalk Park, a Plat Community
THAT PORTION OF THE NORTH HALF OF THE NORTHWEST QUARTER OF THE SOUTHWEST
QUARTER OF THE SOUTHWEST QUARTER OF SECTION 25. TOWNSHIP 27 NORTH RANGE 3
EAST, W.M . IN SNOHOMISH COUNTY WASHINGTON DESCRIBED AS FOLLOWS
BEGINNING AT THE NORTHWEST CORNER OF SAID NORTH HALF OF THE NORTHWEST
QUARTER OF THE SOUTHWEST QUARTER OF THE SOUTHWEST QUARTER;
714ENCE SOUTH. ALONG THE WEST LINE THEREOF 321.83 FEET.
THENCE EAST, 300 FEET. MORE OR LESS, TO A POINT WHICH IS 300 FEET EAST AND 321.03
FEET SOUTH OF THE NORTHWEST CORNER OF THE SOUTHWEST QUARTER OF THE
SOUTHWEST QUARTER,
THENCE NORTH 41'28'23' EAST, TO THE SOUTHERLY BOUNDARY OF TRACT CONVEYED TO
STATE OF WASHINGTON BY DEED RECORDED NOVEMBER 2. 1977 UNDER RECORDING NO,
21711 13;
THENCE NORTHWESTERLY ALONG SOUTHERLY LINE OF TRACT, AS C04VEYED TO STATE
OF WASHINGTON TO THE NORTH LINE OF THE SOUTHWEST QUARTER OF THE
SOUTHWEST QUARTER;
THENCE WEST, ALONG SAID NORTH LINE TO A POINT OF BEGINNING
EXCEPT THE NORTH 35 FEET THEREOF.
SITUATE IN THE COUNTY OF SNOHOMISH. STATE OF WASHINGTON
\p
THAT PORTION OF THE NORTHWEST QUARTER OF THE SOUTHWEST QUAR`ER OF THE
SOUTHWEST QUARTER OF SECTION 25, TOWNSHIP 27 NORTH, RANGE 3 EAST. W M.,
DESCRIBED AS FOLLOWS'
COMMENCING AT THE NORTHWEST CORNER OF SAID NORTHWEST QUARTER OF THE
SOUTHWEST OUARTER OF THE SOUTHWEST QUARTER;
THENCE SOUTH 01*11'380 WEST, A DISTANCE OF 321.93 FEET ALONG THE WEST LINE OF
THE NORTHWEST QUARTER OF THE SOUTHWEST QUARTER OF THE SOUTHWEST
QUARTER OF SAID SECTION 25;
THENCE SOUTH 88'21'06` EAST, A DISTANCE OF 300 FEET TO THE POINT OF BEGINNING;
THENCE CONTINUING SOUTH 88'21'06' EAST, A DISTANCE OF 28.61 FEET TO A POINT ON A 4
FOOT CHAIN LINK FENCE BEARING NORTH 01.11'11" EAST;
THENCE ALONG SAID 4 FOOT CHAIN LINK FENCE AT A BEARING OF NORTH 01'11'i I'EAST, A
DISTANCE OF 4.75 FEET TO THE CORNER OF SAID FENCE.
THENCE ALONG SAID 4 FOOT CHAIN LINK FENCE AT A BEARING OF NORTH 88.42'%, EAST, A
DISTANCE OF 129.59 FEET TO THE INTERSECTION OF A S FOOT WOOD FENCE BEARING
NORTH 30'29'51" EAST;
THENCE FOLLOWING SAID 5 FOOT WOOD FENCE AT A BEARING OF NORTH 30'29'51` EAST,
A DISTANCE Of 194.48 FEET TO THE INTERSECTION WITH THE SOUTHWESTERLY MARGIN
OF SR-104;
THENCE ALONG SAID RIGH'-OF-WAY LINE NORTH 62'46'18' WEST, A DISTANCE OF 44 17
FEET;
THENCE CONTINUING ALONG SAID RIGHT-OF-WAY LINE NORTH 60'27'48- WEST, A
DISTANCE OF 37.64 FEET;
THENCE SOUTH 41.433V WEST, A DISTANCE OF 277.82 FEET TO THE POINT OF BE04NNINQ.
(ALSO KNOWN AS LOT 1, BOUNDARY LINE AGREEMENT AND SURVEY RECORDED AUGUST
14. 2000. UNDER SNOHOMISH COUNTY RECORDING NUMBER 200808145058).
SITUATE IN THE COUNTY OF SNOHOMISH. STATE OF WASHINGTON.
Declaration of Covenants, Conditions, Restrictions and Easements Schedule A
ND: 22630.009 4859-6394-4241v1
Exhibit 21 - Green
PLN2022-004 Packet Pg. 656
1.v
SCHEDULE B
UNIT LOT DATA, ALLOCATED INTERESTS, PARKING AND STORAGE
Unit Lot
Home
Unit Lot Address
Unit Lot Data' 2
Area
Area
Allocated
Parking6
(Sq. Ft.)'
(Sq. Ft.)'
Interests
Unit Lot 1
540 Edmonds Way A
5 BD, 3 BA, 0 F
8,650
2,907
1/16
Garage
Edmonds, WA 98020
Unit Lot 2
540 Edmonds Way B
4 BD, 2.5 BA, 0 F
8,685
2,753
1/16
Garage
Edmonds, WA 98020
Unit Lot 3
540 Edmonds Way C
5 BD, 3 BA, 0 F
8,801
3,223
1/16
Garage
Edmonds, WA 98020
Unit Lot 4
540 Edmonds Way D
5 BD, 3 BA, 0 F
8,695
3,223
1/16
Garage
Edmonds, WA 98020
Unit Lot 5
540 Edmonds Way E
5 BD, 3.5 BA, 0 F
7,213
3,686
1/16
Garage
Edmonds, WA 98020
Unit Lot 6
540 Edmonds Way F
5 BD, 3.5 BA, 0 F
7,338
3,601
1/16
Garage
Edmonds, WA 98020
Unit Lot 7
540 Edmonds Way G
5 BD, 3.5 BA, 0 F
7,289
3,686
1/16
Garage
Edmonds, WA 98020
Unit Lot 8
540 Edmonds Way H
5 BD, 3.5 BA, 0
7,187
3,601
1/16
Garage
Edmonds, WA 98020
' Legend:
BD - bedroom
BA — bathroom
F — gas fireplace
2 Boundaries of Unit Lots are "planes in space" as shown on the Map and include all Homes and Structures
now or hereafter constructed within the Unit Lot. Accordingly, the Unit Lots are not located on a floor or
level of a building.
3 The square footage of each Unit Lot refers the single, horizontal plane in space of the Unit Lot bounded
by the exterior boundaries of such Unit Lot, as shown in plan format on the Map.
4 The square footage of each Home located within a Unit Lot refers to the living areas of the Home located
within the "air space" Unit Lot, and does not include the exterior portions of such Unit Lot, nor any patios
or garage areas.
5 See Section 6.4 for method of calculation.
6 There are no Limited Common Element parking spaces. Parking for Unit Lots is located in the garages
located within such Unit Lots. See ARTICLE 8 of the Declaration.
Declaration of Covenants, Conditions, Restrictions and Easements Schedule B
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 657
1.v
Unit Lot
Home
Unit Lot Address
Unit Lot Data','
Area
Area
Allocated
Parking6
(Sq. Ft.)'
(Sq. Ft.)'
Interests5
Unit Lot 9
550 Edmonds Way A
5 BD, 4 BA, 0 F
6,939
3,607
1/16
Garage
Edmonds, WA 98020
Unit Lot 10
550 Edmonds Way B
4 BD, 3.5 BA, 0 F
7,024
3,195
1/16
Garage
Edmonds, WA 98020
Unit Lot 11
550 Edmonds Way C
5 BD, 3 BA, 0 F
5,604
2,561
1/16
Garage
Edmonds, WA 98020
Unit Lot 12
550 Edmonds Way D
5 BD, 3 BA, 0 F
5,384
2,561
1/16
Garage
Edmonds, WA 98020
Unit Lot 13
550 Edmonds Way E
4 BD, 3.5 BA, 0 F
8,066
3,195
1/16
Garage
Edmonds, WA 98020
Unit Lot 14
550 Edmonds Way F
4 BD, 2.5 BA, 0 F
6,909
2,753
1/16
Garage
Edmonds, WA 98020
Unit Lot 15
550 Edmonds Way G
5 BD, 3 BA, 0 F
6,684
2,561
1/16
Garage
Edmonds, WA 98020
Unit Lot 16
550 Edmonds Way H
5 BD, 3 BA, 0 F
8,489
2,907
1/16
Garage
Edmonds, WA 98020
100%
Note: There are no Limited Common Element parking or storage spaces as part of
the Community. Storage and parking for each Unit Lot is within the Home
located within such Unit Lot.
Declaration of Covenants, Conditions, Restrictions and Easements Schedule B
ND: 22630.009 4859-6394-4241v1
Exhibit 21 -Green
PLN2022-004 Packet Pg. 658
1.w
Y MEMORANDUM
ENGINEERING MEMO OF COMPLIANCE
Date: October 17, 2023
To: Michael Clugston, Planning Division
From: Jeanie McConnell, Engineering Division
Subject: PLN2022-0049 PRD and PLN2022-0053 PLAT
Greenwalk Plat/PRD — 540/550 Edmonds Way
Engineering has reviewed the preliminary plat application for the Greenwalk Plat/PRD at
540/550 Edmonds Way. The information provided indicates general engineering feasibility.
As part of the preliminary plat review, requirements regarding development of the property
and adjacent public infrastructure were determined.
Street Right -of -Way Dedication:
Consistent with the City's Official Street Map, there are no street dedications required along
the Edmonds Way (SR-104) property frontage.
Lot and Street Lavout and Sidewalks:
The subject property fronts on Edmonds Way (SR-104), which is a principal arteral and state
highway. The Washington State Department of Transportation (WSDOT) has limited access
rights along the subject property frontage and is processing a real estate transaction to
upgrade access to the properties. As a condition of preliminary plat approval, the property
owner/applicant will need to obtain access rights and permit approval from WSDOT.
Sidewalks exist along the Edmonds Way property frontage, which falls under WSDOT
jurisdiction due to the limited access designation.
Improvements:
Edmonds Community Development Code Chapter 18.80 establishes right-of-way and
pavement widths for public and private streets. The subject property also falls under the
jurisdiction of WSDOT for right-of-way improvements.
City of Edmonds
Exhibit 22 - Green
PLN2022-004 Packet Pg. 659
1.w
Public Improvements
• New plat road connection to Edmonds Way (SR-104) to be per WSDOT requirements and
approval.
• Turning movement restrictions for ingress and egress to the site via Edmonds Way to be
per WSDOT requirements.
• Any reconfiguration of existing sidewalks along the property frontage and at the plat
road shall be as required by WSDOT. At a minimum, however, the sidewalks shall be
removed and replaced as needed to comply with current ADA standards.
• The subject development is served by the City of Edmonds for sewer; however, the
sewer main is owned by the Olympic View Water and Sewer District. A sewer availability
certificate is on file.
• The subject development falls within the Olympic View Water and Sewer District for
water service. Any required water system improvements will be established by OVWSD
Private Property Improvements:
• The interior plat road will be located entirely on private property and shall be
privately owned and maintained.
• The plat road will provide access to 16 lots. As a PRD alternative design standard
allowance, the pavement width will be allowed to narrow to 18-ft.
• 5-ft sidewalks shall be provided on both sides of the street and rolled curb shall be
provided.
• Edmonds Community Development Code (ECDC) Chapter 18.80.060 regulates the
construction of driveways. Driveway slopes shall not exceed 14 percent. The current
proposal indicates an access road/driveway slope of less than 14%.
Public Easements:
• Water and sewer easements shall be provided to Olympic View Water and Sewer
District as required by the District.
Public Comments:
A comment letter was received from Mitch Lemas and Kathy Martinelli, owners of adjacent
properties respectively — 10609 and 10615 2261" St SW, Edmonds. Both homes are currently
on septic systems and have requested connection to the public sewer main as part of the
subject development. Mr. Lemas was informed that the sewer main is owned by the Olympic
View Water and Sewer District (OVWSD) and the City did not have the ability to require the
developer to connect properties that fall outside the limits of the proposed development. It
was recommended, however, that the property owners work directly with the developer
and OVWSD to understand the feasibility of this proposal and subsequent connection to the
sewer main.
Exhibit 22 - Green
PLN2022-004 Packet Pg. 660
1.w
Another comment letter was received from Lisa and John Lecky of 10820 Kulshan Rd,
Woodway. Concerns were expressed regarding stormwater runoff and changes that may
occur as a result of development. While underground natural drainage patterns cannot fully
be controlled, the stormwater runoff surface flows will be managed according to established
City of Edmonds and Department of Ecology regulations. As a condition of approval,
stormwater surface flows will be collected and discharged to an approved stormwater
management facility. Compliance with all applicable codes and requirements will be
reviewed in detail during the civil construction plan review phase of the project, which
follows preliminary approval.
Please find attached the Engineering Requirements for the subject development. The
applicant will be required to satisfy these requirements as a condition of plat approval. In
advance of obtaining final plat approval from the Planning Division, the applicant will be
required to submit civil construction plans addressing all plat conditions.
• Civil plans are to be submitted electronically through MyBuildingPermit.com. Contact
engineeringpermits@edmondswa.gov with any questions related to this submittal
process.
A civil plan review fee is to be paid at the time of submittal. Currently the civil
construction plan review fee for plats is $5333. Upon submittal of civil construction plans
you will be prompted to make payment so review of the project can commence.
The following information is provided to assist with the civil construction plan review
process and is not intended to address all potential comments that may arise from a
complete civil construction plan review.
1) While the preliminary stormwater management design was found to be feasible, a few
comments have been provided by the City's consulting Stormwater Engineer and
provided under separate cover. Please refer to comments and address each during the
civil plat phase of the project.
2) WSDOT approved permit and plans shall be submitted to the City prior to final approval
of the civil plans by the City.
3) Civil plan sheets shall include an approval block similar to that provided on the City
website.
4) Olympic View Water and Sewer District shall have their own approval block on pages
specific to their review and approval. The applicant will be required to obtain OVWSD
project approval prior to final approval of the civil plans by the City.
5) Include utility purveyor information consistent with EUC Handout #E28, available on the
City website. Add Stormwater purveyor, City of Edmonds as well as South County Fire.
Exhibit 22 - Green
PLN2022-004 Packet Pg. 661
1.w
6) Include/Update General Notes for consistency with notes found on the City website and
reference current year of codes/standard specifications.
7) Include construction sequence consistent with that found on the City website. Include
phasing of work and protection of areas where low impact development techniques will
be used to meet stormwater management requirements or where tree
retention/protection is required.
8) Civil plans shall clearly identify improvements to be constructed as part of the
subdivision and those improvements to be constructed as future building permit
improvements. Typically, existing and future separate building permit improvements are
shown in a light line weight. Improvements and notes specific to the construction of the
subdivision improvements shall be shown using a dark line weight.
9) A separate demolition permit is required for demolition of structures on the property.
Plans shall note this requirement.
10) Where fire sprinkler systems are required to comply with fire department requirements,
the single-family residence will typically need a 1" water meter with 1" service line from
water main to property line. Water service line from meter to house to be a minimum of
1 %".
2
Thank you.
Exhibit 22 - Green
PLN2022-004 Packet Pg. 662
1.w
CITY OF EDMONDS
v
J STORMWATER REVIEW COMMENTS
ENGINEERING DIVISION
(425) 771-0220
City Website: www.edmondswa.gov
DATE: October 11, 2023
TO: Permit Coordinator
FROM: Taylor Brown, PE, Stormwater Engineer
RE: Application #: PLN2022-0053
Project: Greenwalk Park
Address: 540 Edmonds Way
It is recommended that the project be approved to move into engineering design. Note that this
approval is in no -way intended to be a warranty as to the proposed system's adequacy and the project
engineer is responsible for ensuring the drainage system can be designed to meet all design and
maintenance standards without impacting the building footprint or site plan. The review comments
below are specific concerns found during preliminary review which must be addressed for final
stormwater approval.
1. Per Appendix B, Checklist 6 — item 35: Additional infiltration test pits are needed. At least one
test pit or test hole per 5,000 square feet of basin infiltrating surface (minimum of two per
basin)
2. Downspout Full Infiltration Systems used to meet Minimum Requirement #5 shall be designed
using guidance in Appendix D, Checklist 13.
3. All other infiltration facilities must be sized using guidance in Appendix C, Checklist 6.
4. The project must obtain coverage for work under the Depart of Ecology Construction General
Stormwater Permit
5. An appropriate overflow method shall be identified for Sediment Trap West. The method must
demonstrate that all runoff from the trap shall be dispersed onsite, conveyed to the public
stormwater system, or transported off site. Runoff shall not create a flooding or erosion
problem on neighboring properties or in the right-of-way.
o If infiltration is proposed, the detailed method must be used to size the facility (see Appendix B,
Checklist 6 — item 35). The geometry and design shall still comply with BMP C240/241
Exhibit 22 - Green
PLN2022-004 Packet Pg. 663
1.w
v
121 5`h Ave N Edmonds WA. 98020
12425 Meridian Ave, Everett, WA 98208
Serving the cities of Brier, Edmonds, Lynnwood and Mountlake Terrace
Department of Fire Prevention
FIRE COMMENTS
From: Fire Marshal Karl Fitterer
Date: July 18, 2022
Re: Greenwalk Park 540 Edmonds Way
1. Approved turnaround
2. Need a hydrant at the hammerhead intersection Lot #4 per Edmonds Municipal
Code19.25.055
3. Hydrant on Edmonds way will need a, UL approved, 4" Storz type fitting
4. All underground vaults or infiltration galleries, in drive isles will need to be built in excess
of HS20 for ladder truck operations.
5. All homes over 3,000 square feet will be required fire sprinklers. A 13D type is
recommended for cost and installation. A 1 inch meter is required unless it can be shown
that a smaller meter will be sufficient.
6. Lots #10, 13, 14, 15 and 16 will be required to have fire sprinklers because of driveway
access, no matter the square footage.
Exhibit 22 - Green
PLN2022-004 Packet Pg. 664
1.w
of EDA40�V
s
t
INC. i S'� J
SECTION A
SEWER AVAILABILITY APPLICATION
Complete and submit this form through www.MyBuildingPermit.com. Submit as a
new application using the following prompts: Application Type — Utilities, Activity
Type — Utility Availability, Scope of Work — Sanitary Sewer Main.
Applicant
Contact/Applicant Name
Phone Number
Email
Address
City
State
Zip
Property
Project Name
Address
City
State
Zip
Parcel No.
Does the property currently have sewer service? ❑ Yes (City of Edmonds sewer) ❑ No
Describe project (number of buildings, number of units, number of stories per building):
In what phase is the project?
❑ Design Review
❑ Preliminary Plat
❑ Building Permit
❑ Rezone or Other
Associated permit application number(s), if applicable:
SECTION B
Exemptions from Utility Availability Study: 1) Single-family residence; 2) Multi -family project of four
units or less; 3) Short plat subdivision (four single-family lots or less). Please check one of the following:
❑ A utility availability study IS NOT requested/required. The applicant certifies that this project
is exempt from needing a study as described above and is not requesting a full utility availability
study at this time. Please sign below and submit this form through www.MyBuildingPermit.com.
❑ A utility availability study IS requested/required for the project, and associated fees will be
due. Please submit the complete application through www.MyBuildingPermit.com.
APPLICANT SIGNATURE: DATE:
APPLICANT PRINTED
Form Updated 3
Packet Pg. 665
1.w
CITY OF EDMONDS
121 - 5TH AVENUE NORTH, EDMONDS, WA 98020
PUBLIC WORKS DEPARTMENT - ENGINEERING DIVISION
REQUIREMENTS FOR PLATS
To:
Planning Division
From:
Jeanie McConnell, Engineering Program Manager
Engineering Division
Date:
October 17, 2023
Project:
Greenwalk Plat/PRD
Address:
540/550 Edmonds Way
File Number: PLN2022-0049 PRD
PLN2022-0053 PLAT
Required as a
Required as a
Requirement
Condition of
Condition of
Already
Subdivision
Building Permit
Satisfied
1. Right -of Way Dedication for Public Streets:
N/A
2. Public Street Improvements & Access
(Asphalt, curb, gutter and sidewalks):
a) Edmonds Way (SR-104) improvements shall comply with W SDOT street
X
standards for the specific roadway classification.
b) Curb and gutter shall be removed and replaced along property frontage as
X
required to comply with WSDOT and ADA standards and requirements.
c) Existing sidewalk to be removed and replaced along property frontage on
Edmonds Way (SR-104) as required to comply with WSDOT and ADA
X
standards and requirements.
d) Plat entrance improvements shall comply with WSDOT standards and
requirements.
X
e) All lots shall take access from a single shared point of access on Edmonds
X
Way (SR-104) per WSDOT requirements and approval.
3. Private Access Requirements & Improvements:
a) All lots shall take access from private access road.
X
b) Private access road shall be paved to a minimum of 18.0-feet in width.
X
c) Rolled curbs shall be provided on each side of the private access road to City
X
standards.
d) 5-ft wide sidewalk shall be constructed along each side of the private access
X
road to City standards.
e) Slope of private access road and driveways shall comply with City Codes and
standards.
X
f) Cross slope of private access road shall not exceed 2%.
X
g) Driveway entrance for each point of access shall be provided to City
standards.
X
h) Provide asphalt or concrete driveway approaches on each lot per City Code.
X
4. Street Turnaround:
a) Provide on -site turnaround for individual lots as required.
X
b) Construct hammerhead turnaround along private access road per City
standards and fire department requirements.
X
1 of 3
ENG REQUIREMENTS PLN2022-0049 PRD and PLN2022-0053 PLAT printed 10/17/2023
Exhibit 22 - Green
PLN2022-004 Packet Pg. 666
1.w
Required as a
Condition of
Subdivision
Required as a
Condition of
Building Permit
Requirement
Already
Satisfied
5. Easements
(City utilities, private access, other utilities): --,&bb
a a
a) Provide all easements as required - access, utility, etc.
X
b) All lots shall take access off private access road.
X
c) Private access easement shall be a minimum 32 (thirty-two) feet in width.
X
6. Street Lights:
a) Install street lighting, as required, at entrance to and within plat. Lighting
requirements and spacing shall be determined by a licensed professional
engineer experienced in street lighting.
X
b) Light poles on Edmonds Way (SR-104) shall comply with WSDOT
requirements.
X
7. Street Trees/Planting Strip
a) Street trees shall be planted along Edmonds Way (SR-104) per WSDOT and
City of Edmonds requirements.
X
8. Water System Improvements OVWSD :
a) Applicant must meet requirements set forth by Olympic View Water and
Sewer District for connection to public water system.
X
b) Public hydrant spacing shall meet requirements of ECDC 19.25.
X
c) Provide water service stub to each Lot
X
d) Connect to public water system.
X
X
e) Install storz adapter on existing fire hydrant, as required.
X
9. Sanitary Sewer System Improvements:
a) Subject property is a City of Edmonds sewer customer, but sewer connection
is to an Olympic View Water and Sewer District (OVWSD) main. Applicant
must meet requirements set forth by both the City of Edmonds and OVWSD
for connection to public sewer system.
X
b) Provide new sewer laterals within access/utility easements sized to comply
with Department of Ecology and City of Edmonds requirements.
X
c) Provide new 4" side sewer to individual lots.
X
X
d) Connect to public sewer system.
X
X
10. Stormwater System Improvements:
a) Provide a Stormwater Management Report and Site Plan that shows
compliance with ECDC 18.30, Stormwater Addendum and 2019 Department
of Ecology Stormwater Manual.
i. Stormwater management design shall account for proposed plat
improvements and future lot development.
ii. Stormwater management system to be located on private property.
X
b) Connect all new hard surfaces to storm system as required.
X
X
c) Provide storm sewer stub to all proposed lots, as applicable.
X
d) Connect to public storm system or manage stormwater on site if soils allow.
X
X
e) Public and private storm catch basins shall be installed as required.
X
11. Underground Wiring per Ord. 1387
a) Required for all new services.
X
X
2 of 3
ENG REQUIREMENTS PLN2022-0049 PRD and PLN2022-0053 PLAT printed 10/17/2023
Exhibit 22 - Green
PLN2022-004 Packet Pg. 667
1.w
Required as a
Condition of
Subdivision
Required as a
Condition of
Building Permit
Requirement
Already
Satisfied
12. Excavation and Grading (per IBC
a) Submit a grading plan as part of engineered site plan.
X
X
b) Submit grading plan for foundations with building permit.
X
13. Si na a and Striping per City Engineer):
a) All signs shall be vinyl letters and to City standards.
X
b) Provide high intensity stop sign at the intersection of Edmonds Way (SR-104)
and the private access road.
X
c) Provide "No Parking - Fire Lane" signage/striping as required by Fire Dept.
X
d) Install fire and aid address signage.
X
14. Survey Monumentation(per Ord., Sect. 12.10.120 :
N/A
. As -built Drawings(per City Engineer):
a) Provide an as -built drawing of all street and utility improvements in electronic
format.
X
X
16. Other Requirements:
a) Plat showing lots, easements, legals, survey information
X
X
b) Legal documents for each lot
X
c) Field stake lot corners (by professional surveyor)
X
d) Field stake utility stubs at property lines
X
e) Clustered mailbox location per Postmaster
X
f) Maintenance agreements
X
g) Transportation Impact Study as required by WSDOT.
X
h) Transporation Impact Fee Analysis
X
17. Engineering Fees:
a) Storm system development charge (public road & shared hard surface)
X
b) Storm system development charge (each new lot)
X
c) Sewer general facility charge
X
d) Water general facility charge - OVWSD
X
X
e) Water meter fee - OVW SD
X
X
f) Transportation impact fee per each new SFR
X
g) Parks impact fees
X
h) Plat/PRD civil plan review fee
X
i) Right -of -Way Construction Permit
X
j) Inspection fees
X
w
a�
.y
d
_
_
M
a
M
_ E
L
a
L
a
3
a�
0
3 of 3
ENG REQUIREMENTS PLN2022-0049 PRD and PLN2022-0053 PLAT printed 10/17/2023
Exhibit 22 - Green
PLN2022-004 Packet Pg. 668
1.x
01, ED2,j lJ
CITY OF EDMONDS
rest, isc)o 121 5TH AVENUE NORTH, EDMONDS, WA 98020 (425) 771-0220
DETERMINATION OF NONSIGNIFICANCE
Description of proposal: The proposal is for a preliminary formal subdivision of a 2.88-acre site into 16
single family residential lots using the planned residential development (PRD) process. All existing
improvements would be removed, and a new plat road constructed to serve the new lots with access to
Edmonds Way (SR-104). The site is zoned Single Family Residential — Master Plan (RS-MP). A master plan
like a planned residential development allows development at the site to achieve an RS-8 zoning density
(5.5 du/acre) while being able to modify some of the RS-12 development standards that apply to the site
(excluding height). A PRD first requires review of home designs and site layout, including usable open
space, by the Architectural Design Board (ADB). The ADB reviewed the project and made a
recommendation on design to the Hearing Examiner on July 27, 2023. The Hearing Examiner makes the
final decision on the preliminary PRD and preliminary formal subdivision following a public hearing.
Proponent: Fernandez Barnes LLC (Steve Barnes)
Location of proposal, including street address if any: 540 & 550 Edmonds Way (Tax ID #s
27032500308300 & 27032500308400)
Lead agency: City of Edmonds
The lead agency for this proposal has determined that it does not have a probable significant adverse
impact on the environment. An environmental impact statement (EIS) is not required under RCW
43.21C.030 (2)(c). This decision was made after review of a completed environmental checklist and
other information on file with the lead agency. This information is available to the public on request.
The City of Edmonds has determined that the requirements for environmental analysis and protection
have been adequately addressed in the development regulations and comprehensive plan adopted under
chapter 36.70A RCW, and in other applicable local, state, or federal laws or rules, as provided by RCW
43.21C.240 and WAC 197-11-158 and/or mitigating measures have been applied that ensure no significant
adverse impacts will be created.
There is no comment period for this DNS.
This DNS is issued after using the optional DNS process in WAC 197-11-355. There is no
further comment period on the DNS.
X This DNS is issued under WAC 197-11-340(2); the lead agency will not act on this proposal for
14 days from the date below. Comments must be submitted by October 18, 2023.
Project Planner: Mike Clugston, AICP, Acting Planning Manager
Responsible Official: Mike Clugston, AICP, Acting Planning Manager
Contact Information: City of Edmonds 1 121 5th Avenue North, Edmonds WA 98020 1 425-771-0220
Date. October 4, 2023 Signature..
XX You may appeal this determination to Mike Clugston, AICP, Acting Planning Manager, at 121
5th Avenue North, Edmonds, WA 98020, by filing a written appeal citing the specific reasons
for the appeal with the required appeal fee no later than October 25, 2023. You should be
prepared to make specific factual objections. Contact Mike Clugston to read or ask about the
procedures for SEPA appeals.
XX Posted on October 4, 2023, at City Hall, the Edmonds Public Safety Building, and Edmonds
Public Library. Published in the Everett Herald. Uploaded to the Department of Ecology SAW.
r
w
a
Page 1 of 2
SEPA DNS PLN2022-0049 & -0053 Exhibit 23 - Green
10/4/23.SEPA PLN2022-004 Packet Pg. 669
1.x
XX Distribute to "Checked" Agencies below.
The SEPA Checklist, DNS, and associated documents can be obtained online at
https://www.edmondswa.gov/services/public involvement/public notices/development notices under
permit number PLN2022-0049/PLN2022-0053 and, by emailing the project planner
(michael.clugston@edmondswa.gov), or by calling the City of Edmonds at 425-771-0220.
Distribution List: This DNS and SEPA checklist were distributed to the following:
❑X
Applicant
❑X
Dept. of Ecology
❑ City of Everett
❑X
Parties of Record
❑
Dept. of Ecology - Shorelands
❑ City of Lynnwood
❑
Dept. of Natural Resources
❑ City of Mountlake Terrace
❑
US Army Corps of Engineers
©
Dept. of Commerce
❑ City of Mukilteo
❑
US Fish and Wildlife
©
WSDOT
❑ City of Shoreline
❑
WSDOT — Ferries
❑X Town of Woodway
❑X
Puget Sound Energy
❑
Dept. of Fish & Wildlife
❑X
Snohomish PUD
❑
Dept. of Health — Drinking Water
❑ Snohomish Co. Public Works
❑X
Olympic View Water & Sewer
©
Dept. of Arch. & Historic Pres.
❑ Snohomish Co. PDS
❑
Alderwood Water District
❑
Dept. of Parks and Rec. Commission
❑ Snohomish Co. Health Dist.
❑
Edmonds School District
❑
Port of Edmonds
❑
Puget Sound Clean Air Agency
❑ King County - Transit
❑X
South County Fire
❑
Puget Sound Regional Council
❑ King County — Environ. Planning
❑
Swedish Hospital
❑
Puget Sound Partnership
❑X
Community Transit
❑X
Tulalip Tribe
❑ Other
pc: File No.
SEPA Notebook
Page 2 of 2
SEPA DNS PLN2022-0049 & -0053 Exhibit 23 - Green
10/4/23.SEPA PLN2022-004 Packet Pg. 670
OF EDAf
O
#P%1
1.x
St. i
Purpose of Checklist.
CITY OF EDMONDS
ENVIRONMENTAL CHECKLIST
The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all governmental agencies to consider the environmental
impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with
probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help
you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to
help the agency decide whether an EIS is required.
Instructions for Applicants:
This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this
checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer
the questions briefly, with the most precise information known, or give the best description you can.
You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer
the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if
a question does not apply to your proposal, write "do not know" or does not apply". Complete answers to the questions now may
avoid unnecessary delays later.
Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if
you can. If you have problems, the governmental agencies can assist you.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of
land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you
submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there
may be significant adverse impact.
Use of checklist for nonproject proposals:
For nonproject proposals complete this checklist and the supplemental sheet for nonproject actions (Part D). the lead agency may
exclude any question for the environmental elements (Part B) which they determine do not contribute meaningfully to the analysis of
the proposed nonproject actions, the references in the checklist to the words "project," "applicant," and "property or site" should be
read as "proposer," and "affected geographic area," respectively.
A. BACKGROUND
1. Name of proposed project, if applicable: Greenwalk Park
2. Name of applicant: Fernandez & Barnes LLC.
3. Address and phone number of applicant and contact person:
28720 SE 63''d Street, Issaquah, WA 98027
Justin Barnes 206-228-2564
Steve Barnes 206-550-9296
4. Date checklist prepared: 1-24-22
5. Agency requesting checklist: City of Edmonds
Revised on 9116116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green P 'ge 1 of 27
PLN2022-004 Packet Pg. 671
1.x
6.
7.
8.
9.
Proposed timing or schedule (including phasing, if applicable): Subdivision construction will start in 2023 and
project will extend through 2024-2025
(STAFF COMMENTS)
Do you have any plans for future additions, expansion, or further activity related to or connected with this
proposal? If yes, explain.
Once the subdivision is complete we will construct the houses.
(STAFF COMMENTS)
List any environmental information you know about that has been prepared, or will be prepared, directly related
to this proposal.
Geotechnical stud
y_performed by Associated Earth Sciences dated January 11. 2022.
(STAFF COMMENTS)
Do you know whether applications are pending for governmental approvals of other proposals directly affecting
the property covered by your proposal? If yes, explain.
State of Washington Department of Transportation for access to SR 104.
(STAFF COMMENTS)
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green P 'ge 2 of 27
PLN2022-004 Packet Pg. 672
1.x
10.
11
12.
List any government approvals or permits that will be needed for your proposal, if known.
Washington DOT for right of way improvements, water main extension, side sewer permits, power and data to site,
(STAFF COMMENTS)
Give brief, complete description of your proposal, including the proposed uses and size of the project and site.
There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You
do not need to repeat those answers on this page.
Creating a subdivision and taking two parcels and platting into 16 parcels along with entry drive and access/utility
easements.
(STAFF COMMENTS)
Location of the proposal. Give sufficient information for a person to understand the precise location of your
proposed project, including a street address, if any, and section, township, and range, if known. If a proposal
would occur over a range of area, provide range or boundaries of the site(s). Provide legal description, site plan,
vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the
agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related
to this checklist.
On the south side of SR 104 where it transitions into 5" Ave near downtown Edmonds.
(STAFF COMMENTS)
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green P 'ge 3 of 27
PLN2022-004 Packet Pg. 673
1.x
TO BE COMPLETED BY APPLICANT
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other:
Flat
(STAFF COMMENTS)
b. What is the steepest slope on the site (approximate percent slope)?
10% except one small slope on site next to existing garage.
(STAFF COMMENTS)
C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, and muck)? If you
know the classification of agricultural soils, specify them and note any agricultural land of long term
commercial significance and whether the proposal results in removing any of these soils.
Sand
(STAFF COMMENTS)
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe.
No
(STAFF COMMENTS)
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green P 'ge 4 of 27
PLN2022-004 Packet Pg. 674
1.x
►P1
e.
f.
9.
h.
AIR
a.
Describe the purpose, type, total area and approximate quantities and total affected area of any filling,
excavation, and grading proposed. Indicate source of fill.
Site will be graded with only organics being removed from the site and import material will only be used for
utiliies and under or around the new buildings.
(STAFF COMMENTS)
Could erosion occur as a result of clearing, construction, or use? If so, generally describe.
No
(STAFF COMMENTS)
About what percent of the site will be covered with impervious surfaces after project construction (for
example, asphalt or buildings)?
20%
(STAFF COMMENTS)
Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
Erosion control measures will be put in place.
(STAFF COMMENTS)
What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, and
industrial wood smoke) during construction and when the project is completed? If any, generally describe
and give approximate quantities if known.
Standard construction activities, development is single family residential.
(STAFF COMMENTS)
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green P 'ge S of 27
PLN2022-004 Packet Pg. 675
1.x
C.
Are there any off -site sources of emissions or odor that may effect your proposal? if so, generally describe.
No
(STAFF COMMENTS)
Proposed measures to reduce or control emissions or other impacts to the, if any:
N/A
(STAFF COMMENTS)
3. WATER
a.
Surface:
(1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and
seasonal streams, saltwater, lakes, ponds, and wetlands)? If yes, describe type and provide names. If
appropriate, state what stream or river it flows into.
(STAFF COMMENTS)
(2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If
yes, please describe and attach available plans.
N/A
(STAFF COMMENTS)
(3) Estimate the amount of fill and dredge material that would be placed in or removed from surface
water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill
material.
N/A
(STAFF COMMENTS)
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green P 'ge 6 of 27
PLN2022-004 Packet Pg. 676
1.x
(4) Will the proposal require surface water withdrawals or diversions? Give general description,
purpose, and approximate quantities if known.
N/A
(STAFF COMMENTS)
(5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan.
No
(STAFF COMMENTS)
(6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the
type of waste and anticipated volume of discharge.
No
(STAFF COMMENTS)
b. Ground:
(1) Will ground water be withdrawn from a well for drinking water or other purposes? If so, give a
general description of the well, proposed uses and approximate quantities withdrawn from the well
Will water be discharged to ground water? Give general description, purpose, and approximate
quantities if known.
There is an existing well on site that will be maintained for future irrigation system.
(STAFF COMMENTS)
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green P ge 7 of 27
PLN2022-004 Packet Pg. 677
1.x
C.
(2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if
any (for example: Domestic sewage; industrial, containing the following chemicals...; agricultural;
etc.). Describe the general size of the system, the number of such systems, the number of houses to be
served (if applicable), or the number of animals or humans the system(s) are expected to serve.
N/A. nroiect is on citv sewer.
(STAFF COMMENTS)
Water Runoff (including storm water):
(1) Describe the source of runoff (including storm water) and method of collection and disposal, if any
(include quantities, if known). Where will this water flow? Will this water flow into other waters? If
so, describe.
There will be no water running off the site once completed, all storm water will be infiltrated.
(STAFF COMMENTS)
(2) Could waste materials enter ground or surface waters? If so, generally describe.
No
(STAFF COMMENTS)
(3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so,
describe.
No
(STAFF COMMENTS)
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green P 'ge 8 of 27
PLN2022-004 Packet Pg. 678
1.x
d. Proposed measures to reduce or control surface, ground, runoff water, and drainage pattern impacts, if
any:
Infiltration systems will be installed for all pervious areas.
4. Plants
a.
b.
(STAFF COMMENTS)
Check or circle types of vegetation found on the site:
X deciduous tree: alder, maple, aspen, other:_
X evergreen tree: fir, cedar, pine, other:
X shrubs
X grass
pasture
crop or grain
Orchards, vineyards or other permanent crops
wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other:
water plants: water lily, eelgrass, milfoil, other:
other types of vegetation:
(STAFF COMMENTS)
What kind and amount of vegetation will be removed or altered?
Most vegetation on the site will be altered for new development, significant trees will be maintained and protected
as required by city.
(STAFF COMMENTS)
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 Green P ge 9 of 27
PLN2022-004 Packet Pg. 679
1.x
C.
d.
e.
List threatened or endangered species known to be on or near the site.
N/A
(STAFF COMMENTS)
Proposed landscaping, use of native plants, or other materials to preserve or enhance vegetation on the site,
if any:
Native plants and trees will be planted as appropriate for single family residential development.
(STAFF COMMENTS)
List all noxious weeds and invasive species known to be on or near the site.
N/A
(STAFF COMMENTS)
5. Animals
a. List any birds and other animals that have been observed on or near the site or are known to be on or near
the site. Examples include:
birds: hawk, heron, eagle, songbirds, other: N/A
mammals: deer, bear, elk, beaver, other: N/A
fish: bass, salmon, trout, herring, shellfish, other: N/A
(STAFF COMMENTS)
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green a e 10 of 27
PLN2022-004 Packet Pg. 680
1.x
b. List any threatened or endangered species known to be on or near the site.
N/A
(STAFF COMMENTS)
C. Is the site part of a migration route? If so, explain.
No
(STAFF COMMENTS)
d. Proposed measures to preserve or enhance wildlife, if any:
N/A
(STAFF COMMENTS)
e. List any invasive animal species known to be on or near the site.
N/A
(STAFF COMMENTS)
6. Energy and Natural Resources
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc
Exhibit 23 - Green a e 11 of27
PLN2022-004 Packet Pg. 681
1.x
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed
project's energy needs? Describe whether it will be used for heating, manufacturing, etc.
Electric for heating and cooling, natural gas for cooking appliances.
r
_
m
E
a
0
d
(STAFF COMMENTS)
a)
�a
_
d
.N
d
b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally
M0
M0
describe.
0
No
c
0
a
M
c
E
P
L
IL
Y
L
(STAFF COMMENTS)
a
Y_
M
3
_
a)
a)
L-
C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed
measures to reduce or control energy impacts, if any:
cn
z
Buildings will be contructed to meeting current energy standards required by residential energy code.
c
�a
m
t
(STAFF COMMENTS)
Q
n
w
U)
Y
L
IL
7. Environmental Health
Y
M
3
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and
explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so describe.
P
No
'
M
N
B
L
K
W
_
4)
E
(STAFF COMMENTS)
0
R
Q
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc age 12 of 27
Exhibit 23 - Greern� .-"-
�
PLN2022-0041 Packet Pg. 682
1.x
(1) Describe any known or possible contamination at the site from present or past uses.
N/A
(STAFF COMMENTS)
(2) Describe existing hazardous chemicals/conditions that might affect project development and design.
This includes underground hazardous liquid and gas transmission pipelines located within the
project area and in the vicinity.
N/A
(STAFF COMMENTS)
(3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the
project's development or constructions, or at any time during the operating life of the project.
N/A
(STAFF COMMENTS)
(4) Describe special emergency services that might be required.
N/A
(STAFF COMMENTS)
(5) Proposed measures to reduce or control environmental health hazards, if any:
N/A
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green a e 13 of 27
PLN2022-004 Packet Pg. 683
1.x
b.
(STAFF COMMENTS)
Noise
(1) What types of noise exist in the area which may affect your project (for example: traffic, equipment,
operation, other)?
Single family residential zoning surrounds the site, SR 104 services the site so there will be road traffic
close to the right of way.
(STAFF COMMENTS)
(2) What types and levels of noise would be created by or associated with the project on a short-term or
a long-term basis (for example: traffic, construction, operation, other)? Indicate what hour's noise
would come from the site.
Contruction noise while the site is beingdeveloped.
eveloped.
(STAFF COMMENTS)
(3) Proposed measures to reduce or control noise impacts, if any:
None
(STAFF COMMENTS)
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green a e 14 of 27
PLN2022-004 Packet Pg. 684
1.x
8. Land and Shoreline Use
a.
C.
What is the current use of the site and adjacent properties? Will the proposal affect current land uses on
nearby or adjacent properties? If so, describe.
Single family residential, same as being proposed.
(STAFF COMMENTS)
Has the project site been used as working farmlands or working forest lands? If so, describe. How much
agricultural or forest land of long-term commercial significance will be converted to other uses as a result
of the proposal, if any? If resource lands have not been designated, how many acres in farmland or forest
land tax status will be converted to nonfarm or nonforest use?
No
(STAFF COMMENTS)
(1) Will the proposal affect or be affected by surrounding working farm or forest land normal business
operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If
so, how:
No
(STAFF COMMENTS)
Describe any structures on the site.
Three existing residential buildings and two free standine garages.
(STAFF COMMENTS)
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green a e 15 of 27
PLN2022-004 Packet Pg. 685
1.x
d.
e.
f.
9.
Will any structures be demolished? If so, what?
Yes, all existing structures will be demolished.
(STAFF COMMENTS)
What is the current zoning classification of the site?
RS-MP
(STAFF COMMENTS)
What is the current comprehensive plan designation of the site?
Single Family Urban 1
(STAFF COMMENTS)
If applicable, what is the current shoreline master plan designation of the site?
N/A
(STAFF COMMENTS)
Has any part of the site been classified critical area by the city? if so, specify.
No
(STAFF COMMENTS)
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green a e 16 of 27
PLN2022-004 Packet Pg. 686
1.x
j•
k.
In.
Approximately how many people would reside or work in the completed project?
(STAFF COMMENTS)
Approximately how many people would the completed project displace?
0
(STAFF COMMENTS)
Proposed measures to avoid or reduce displacement impacts, if any:
N/A
(STAFF COMMENTS)
Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if
any:
Project will meet all requirements of existing and proposed land uses.
(STAFF COMMENTS)
Proposed measures to reduce or control impacts to agricultural and forest lands of long-term commercial
significance, if any:
N/A
(STAFF COMMENTS)
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green page 17 of 27
PLN2022-004 Packet Pg. 687
1.x
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income
housing.
16 Middle to High income homes.
(STAFF COMMENTS)
b. Approximately how many units, if any would be eliminated? Indicate whether high, middle, or low-income
housing.
0
(STAFF COMMENTS)
C. Proposed measures to reduce or control housing impacts, if any:
Project will have a variety of house and lot sizes to satisfy a variety of housing needs.
(STAFF COMMENTS)
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is the principle
exterior building material(s) proposed?
25' — 30' with sloped roofs.
(STAFF COMMENTS)
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green page 18 of 27
PLN2022-004 Packet Pg. 688
1.x
11.
b. What views in the immediate vicinity would be altered or obstructed?
(STAFF COMMENTS)
C. Proposed measures to reduce or control aesthetic impacts, if any:
N/A
(STAFF COMMENTS)
Light and Glare
a. What type of light or glare will the proposal produce? What time of day would it mainly occur?
None
(STAFF COMMENTS)
b. Could light or glare from the finished project be a safety hazard or interfere with views?
No
(STAFF COMMENTS)
C. What existing off -site sources of light or glare may affect your proposal?
Street lights along right of way.
(STAFF COMMENTS)
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green page 19 of 27
PLN2022-004 Packet Pg. 689
1.x
d. Proposed measures to reduce or control light and glare impacts, if any:
EL
m
E
a
0
(STAFF COMMENTS)
d
�a
r
a�
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity?
Recreational space (common space) for 10% of the overall site area is being provided.
a
M
E
L
a
Y
L
(STAFF COMMENTS)
a
R
3
_
a�
m
L
b. Would the proposed project displace any existing recreation uses? If so, describe.
CD
No
Z
_
c�
N
a�
s
(STAFF COMMENTS)
a
w
U)
Y
L
a
A
C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be
provided by the project or applicant, if any:
3
_
None
a�
L
C9
M
N
Z
t
(STAFF COMMENTS)
k
W
m
E
t
c�
r
w
Q
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version). doc gage 20 of 27
Exhibit 23 - Greem� -"-
�
PLN2022-0041 Packet Pg. 690
1.x
13. Historic and Cultural Preservation
a.
b.
C.
d.
Are there any buildings, structures, or sites located on or near the site that are over 45 years old listed in, or
eligible for listing in national, state, or local preservation registers? If so, specifically describe.
(STAFF COMMENTS)
Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may
include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural
importance on or near the site? Please list any professional studies conducted at the site to identify such
resources.
No
(STAFF COMMENTS)
Describe the methods used to assess the potential impacts to cultural and historic resources on or near the
project site. Examples include consultation with tribes and the Department of Archeology and Historic
Preservation, archaeological surveys, historic maps, GIS date, etc.
N/A
(STAFF COMMENTS)
Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources.
Please include plans for the above and any permits that may be required.
N/A
(STAFF COMMENTS)
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green a e 21 of 27
PLN2022-004 Packet Pg. 691
1.x
14. Transportation
a.
b.
C.
d.
Identify public streets and highways serving the site or affected geographic area, and describe proposed
access to the existing street system. Show on site plans, if any.
New access/utility easements for access will be provided off SR 104, there is no other access to the site nor will
there be in the future.
(STAFF COMMENTS)
Is the site or affected geographic area currently served by public transit? if so, generally describe. If not,
what is the approximate distance to the nearest transit stop?
Yes, there are bus routes and bus stops along SR 104 within walking distance of the development.
(STAFF COMMENTS)
How many additional parking spaces would the completed project or nonproject proposal have? How
many would the project or proposal eliminate?
32 in driveways.
(STAFF COMMENTS)
Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state
transportation facilities not including driveways? If so, generally describe (indicate whether public or
private).
Right of way improvements will be required along SR 104.
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green page 22 of 27
PLN2022-004 Packet Pg. 692
1.x
e.
f.
9.
h.
(STAFF COMMENTS)
Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air transportation? If
so, generally describe.
No
(STAFF COMMENTS)
How many vehicular trips per day would be generated by the completed project? If known, indicate when
peak volumes would occur and what percentage of the volume would be trucks (such as commercial and
passenger vehicles). What data or transportation models were used to make these estimates?
The site traffic is 13 net new PM peak hour trips.
(STAFF COMMENTS)
Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products
on roads or streets in the area? If so, generally describe.
No
(STAFF COMMENTS)
Proposed measures to reduce or control transportation impacts, if any:
N/A
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green page 23 of 27
PLN2022-004 Packet Pg. 693
1.x
(STAFF COMMENTS)
15. Public Services
a. Would the project result in an increased need for public services (for example: fire protection, police
protection, public transit, health care, schools, other)? If so, generally describe.
No
(STAFF COMMENTS)
b. Proposed measures to reduce or control direct impacts on public services, if any:
N/A
(STAFF COMMENTS)
16. Utilities
a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone,
sanitary sewer, septic system, other:
Electricity, natural gas, public water, refuse service, telephone and data, sanitary sewer.
(STAFF COMMENTS)
b.
Describe the utilities that are proposed for the project, the utility providing the service, and the general
construction activities on the site or in the immediate vicinity which might be needed.
Site will have power from Snohomish county PUD, water from Olympic Veiw water district, sewer from city of
Edmonds or Olympic view water district, phone and data from local supplier.
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green page 24 of 27
PLN2022-004 Packet Pg. 694
1.x
(STAFF COMMENTS)
C. SIGNATURE
I declare under penalty of perjury laws that the above answers are true and correct to the best of my knowledge.
that the lead agency is relying on them to make its decision.
!�� i� �—�
Signature of Proponent Date Submitted
I understand
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 23 - Green Rage 25 0 27
PLN2022-004 Packet Pg. 695
1.y
CITY OF EDMONDS
NOTICE OF PUBLIC HEARING AND
SEPA THRESHOLD DETERMINATION
'hC. tgy1J
PROJECT DESCRIPTION: The proposal is for a preliminary formal subdivision of a 2.88-acre site into 16 single
family residential lots using the planned residential development (PRD) process. All
existing improvements would be removed, and a new plat road constructed to serve the
new lots with access to Edmonds Way (SR-104). The site is zoned Single Family
Residential — Master Plan (RS-MP). A master plan like a planned residential
development allows development at the site to achieve an RS-8 zoning density (5.5
du/acre) while being able to modify some of the RS-12 development standards that
apply to the site (excluding height). A PRD first requires review of home designs and site
layout, including usable open space, by the Architectural Design Board (ADB). The ADB
reviewed the project and made a recommendation on design to the Hearing Examiner
on July 27, 2023. The Hearing Examiner makes the final decision on the preliminary PRD
and preliminary formal subdivision following a public hearing.
PROJECT LOCATION: 540 & 550 Edmonds Way (Tax ID #s: 27032500308300 & 27032500308400)
NAME OF APPLICANT: Fernandez Barnes LLC (Steve Barnes)
FILE NO.: PLN2022-0049 & PLN2022-0053
REQUESTED PERMIT: Preliminary planned residential development and preliminary formal subdivision
(consolidated Type III -A Permit, Public Hearing and Decision by the Hearing Examiner)
COMMENTS ON
PROPOSAL DUE: October 26, 2023
Any person has the right to comment on this application during public comment period,
receive notice and participate in any hearings, and request a copy of the decision on the
application. The City may accept public comments at any time prior to the closing of the
record of an open record predecision hearing, if any, or, if no open record predecision
hearing is provided, prior to the decision on the project permit.
Information on this development application can be obtained online at
httD://edmondswa.eov/public-notices-text/development-notices.html under the
development notice for application number PLN2022-0049/PLN2022-0053, by emailing
the City contact listed below, or by calling the City of Edmonds at 425-771-0220. Please
refer to the application number for all inquiries. A copy of the staff report will be
available seven days prior to the hearing.
PUBLIC HEARING
INFORMATION: A hybrid public hearing will be held by the Hearing Examiner on October 26, 2023 at 3
p.m. The physical location is Edmonds City Hall, 121 5th Avenue N, 3rd Floor, Brackett
Room.
Or join the Zoom meeting at:
https://us06web.zoom.us/I/84274057639?pwd=ZFdpQzg4bOFEUU9ZcElVbkd4bnF5UT09
Meeting ID: 842 7405 7639
Passcode: 882737
Or via phone by dialing 253-215-8782
Exhibit 24 - Green
PLN2022-004 Packet Pg. 696
1.y
SEPA DETERMINATION: Notice is hereby given that the City of Edmonds has issued a Determination of
Nonsignificance under WAC 197-11-340 for the above project.
DATE OF ISSUANCE: October 4, 2023
SEPA COMMENTS: Any comments regarding the SEPA determination are due October 18, 2023.
SEPA APPEAL: This SEPA determination may be appealed by filing a written appeal citing the specific
reasons for appeal with the required appeal fee no later than October 25, 2023 by 4:00
p.m. Only parties of record as defined in ECDC 20.06.020 have standing to initiate an
administrative appeal to the Hearing Examiner.
CITY CONTACT: Mike Clugston, AICP, Acting Planning Manager
michael.clugston@edmondswa.gov
425-771-0220
RNERSTONE
IITECTUNAL GROUP
Exhibit 24 - Green
PLN2022-004 Packet Pg. 697
Cityof Edmonds ureenwaiK ram AUjaceni rroperty
monRA.%ll
ALGOfVQU/N RD
1 1219 01 IL
3 12k1 129IN • o0
12�
�Q P4RAO 3� 1314 6
KULSH� RD
s/
1351
40,/ps 0iq�s �
-i4 10708 10624 22f
O.'
W
W
z
.fl Ab
226TH ST SW
z26v,
11
v
0
2<6l_
22612
I 22MO
226z10 22G
zr ' •c
22ij 227�
22M [j. 3,031 O
zz
1.y
M
E
•L
O
la
Legend
Sections Boundary
d
Sections
i
Edmonds Boundary
0
ArcSDE.GIS.PROPERTY_BUILDIP
0)
ArcSDE.GIS.STREET_CENTERLIN
— <all other values>
Interstate
2
Principal Arterial
.0
7
Minor Arterial; Collector
13
Local Street; On Ramp
State Highways
p
<all other values>
C
0
E
1
L
2
County Boundary
d
Parks
LU
to
ArcSDE.GIS.PROPERTY_WASHII
"
ArcSDE.GIS.PROPERTY_CITIES
W
ArcSDE.GIS.PROPERTY_CITIES
o
City of Edmonds
Z
City of Lynnwood
N
City of Mountlake Terrace
Unincorporated King Co; Unincor
t
x
City of Woodway
LLJ
Citv of Arlington: Citv of Bothell: (
r
�
d
c
Notes
v
to
0 252.60 505.2 Feet
Parcels within 300' of 540 & 550 4z
4,514 376.2 This map is a user generated static output from an Internet mapping site and is for Edmonds Way Q
reference only. Data layers that appear on this map may or may not be accurate, Files: PLN2022-0049 & -0053
WGS_1984_Web-Mercator _Auxiliary -Sphere current, or otherwise reliable.
© City of Edmonds THIS MAP IS NOT TO BE USED FOR DESIGN OR CONSTRUCTION E xpibit 24 - Green
_ Packet Pg. 698
1.y
PARCEL_ID
OWNERNAME
OWNERLINEI
OWNERCITY
OWNERSTATE
OWNERZIP
00384700500200
ECONOMOU CHRIS & MARLA
10828 KULSHAN RD
WOODWAY
WA
98020
27032500307100
HALE LINDSAY K & GARY KENDALL K
619 PARADISE LN
EDMONDS
WA
98020-4651
27032500308100
OWENS OWEN L 401K TRUST
PO BOX 12922
MILL CREEK
WA
98082
E
00539100000100
PENA MICHAEL G & TERRI L
1370 6TH PL S
EDMONDS
WA
98020
L
d
00539100004100
CIVARRA JAMES & MARTHA
1371 6TH PL S
EDMONDS
WA
98020
27032500302600
PARADISE HEIGHTS HLD LLC
190 W DAYTON ST STE 103
EDMONDS
WA
98020
27032500303200
REEDY PATRICK L
541 EDMONDS WAY
EDMONDS
WA
98020-4638
(L
Y
27032500303300
OWENS OWEN L & JACQUELINE L
PO BOX 12922
LYNNWOOD
WA
98082
ca
=
27032500303400
NEWKIRK DARALEE LOUISE & SCOTT
13404 N ECHO LAKE RD
SNOHOMISH
WA
98296-6193
00384700500100
LECKY LIVING TRUST
10820 KULSHAN RD
WOODWAY
WA
98020-6127
L
27032500302900
KIM BYUNG H & IM HEE-SUNG
10826 KULSHAN RD
WOODWAY
WA
98020-6127
C9
27032500308300
FERNANDEZ & BARNES LLC
10529 NE 58TH ST
KIRKLAND
WA
98033
27032500308400
MOLNAR BUILDING LLC
PO BOX 55576
SHORELINE
WA
98155
L
27032500308500
BONN DALE W
PO BOX 72
EDMONDS
WA
98020
m
27032500307300
1ST SECURITY BANK
6920 220TH ST SW STE 208
MOUNTLAKE TERRACE
WA
98043
00384700501100
ZEVENBERGEN JOHN & JACLYN
10901 ALGONQUIN RD
WOODWAY
WA
98020-6108
s2
27032500308900
EDMONDS WESTGATE LLC
606 EDMONDS WAY
EDMONDS
WA
98020
3
Q
27032500310000
GEORGE LORI J
10605 226TH ST SW
EDMONDS
WA
98020
27032500308800
LEWIS SCOTT F & MARGARITA 0
612 EDMONDS WAY
EDMONDS
WA
98020-4641
00384700501200
MILLER GLENN R & CATHERINE A
5916 STANDREWS DR
MUKILTEO
WA
98275-4847
=
O
27032500309900
NELSON MICHAEL LEE
10607 226TH ST SW
EDMONDS
WA
98020-6100
27032500310400
KOFLER RALPH R & IRENE M
10611 226TH ST SW
EDMONDS
WA
98020
=
27032500308700
REDELFS RICHARD HENRY & LIU XIAO WEI
606 EDMONDS WAY
EDMONDS
WA
98020-4641
E
27032500310100
MARTINELLI MICHAEL
10615 226TH SW
EDMONDS
WA
98020
m
27032500309800
LEMAS MITCHEL J & ALICE
10609 226TH ST SW
EDMONDS
WA
98020-6100
27032500316200
MAHMOUD MOHAMMED & MAHMOUD-HOWELL BETH
10705 226TH ST SW
EDMONDS
WA
98020-6132
a
27032500316400
BAYER KIM/AUGUSTAVO ED
10707 226TH STREET SW
EDMONDS
WA
98020
W
27032500316300
WILSON JAMES R & SHARON
10703 226TH ST SW
EDMONDS
WA
98020-6132
0
27032500310700
PETERS MARVIN T & LLYNDA F
10525 226TH ST SW
EDMONDS
WA
98020-5123
a)
t2
27032500311000
KIMMELMAN LEE/SHU HUI HOU TTEE
1054 9TH AVENUE S
EDMONDS
WA
98020
C
27032500310800
SHEPSIS VLADIMIR & ANETA TRUST
8034 CYRUS PL
EDMONDS
WA
98026
Z
27032500316500
HELLEREN LEIF T & KIMBERLY J
2522 192ND ST
SHORELINE
WA
98177
1;
27032500316700
JOHANNESSEN JOHN M CREDIT TRUST
10727 226TH ST SW
EDMONDS
WA
98020-6132
N
r
27032500308400
MOLNAR BUILDING LLC
1240 NE 175TH ST STE A
SHORELINE
WA
98155
Exhibit 24 - Green
PLN2022-004 Packet Pg. 699
1.y
File No.: PLN2022-0049/0053
Applicant: Fernandez and Barnes LLC
DECLARATION OF MAILING
On the 4th day of October, 2023, the attached Notice of SEPA Determination
and Public Hearing was mailed as prescribed by Ordinance and to property
owners within 300 feet of the property that is the subject of the above -
referenced application.
I, Mike Clugston, hereby declare under penalty of perjury under the laws of the
State of Washington that the foregoing is true and correct this 4th day of
October, 2023 at Edmonds, Washington.
Signed:
Exhibit 24 - Green
PLN2022-004 Packet Pg. 700
1.y
File No.: PLN2022-0049 & PLN2022-0053
Applicant: Fernandez and Barnes LLC
DECLARATION OF POSTING
On the 4th day of October, 2023, the attached Notice of Public Hearing and
SEPA Threshold Determination was posted as prescribed by Ordinance and in
any event where applicable on or near the subject property. It was not posted
at the Edmonds Library since it is being renovated following the 2022 water leak.
I, Mike Clugston, hereby declare under penalty of perjury under the laws of the
State of Washington that the foregoing is true and correct this 4th day of
October, 2023, at Edmonds, Washington.
Signed:
Exhibit 24 - Green
PLN2022-004 Packet Pg. 701
1.y
Everett Daily Herald
Affidavit of Publication
State of Washington }
County of Snohomish } ss
Michael Gates being first duly Sworn, upon
oath deposes and says: that he/she is the legal
representative of the Everett Daily Herald a
daily newspaper. The said newspaper is a legal
newspaper by order of the superior court in the
county in which it is published and is now and
has been for more than six months prior to the
date of the first publication of the Notice
hereinafter referred to, published in the English
language continually as a daily newspaper in
Snohomish County, Washington and is and
always has been printed in whole or part in the
Everett Daily Herald and is of general
circulation in said County, and is a legal
newspaper, in accordance with the Chapter 99
of the Laws of 1921, as amended by Chapter
213, Laws of 1941, and approved as a legal
newspaper by order of the Superior Court of
SIIOIIOI111SI1 County, State of Washington, by
order dated .tune 16, 1941, and that the annexed
is a true copy of EDI-1985194 PLN2022-0049 &
0053 as it was published in the regular and
entire issue of said paper and not as a
supplement form thereof for a period of I
issue(S), such publication commencing on
10/04/2023 and ending on 10/04/2023 and that
said newspaper was regularly distributed to its
subscribers during all of said period.
The amount of the ee for such blic-
$122.12.
Subscribed and sworn boo—rp me on this
day of
1
Notary Public in and for the State oil
Washington.
Cuy M Edmonds D—I.pmcm Scn —1 86031703
M IC'HA EL C'LUGS'I'ON
Linda Phillips
Notary Public
State of Washington
My Appointment Expires 8/29/2025
Commission Number 4.417
Exhibit 24 - Green
PLN2022-004 Packet Pg. 702
Classified Proof
1.y
CITY OF EDMONDS
NOTICE OF PUBLIC HEARING AND
SEPA THRESHOLD DETERMINATION
PROJECT DESCRIPTION: The proposal is for a preliminary formal
subdivision of a 2.88-acre site Into 16 single family residential
lots using the planned residential development (PRD) process.
All existing Improvements would be removed, and a new plat
road constructed to serve the new lots with access to Edmonds
Way (SR-104). The site is zoned Single Family Residential -
Master Plan (RS-MP). A master plan like a planned residential
development allows development at the site to achieve an RS-8
zoning density (5.5 dulacre) while being able to modify some of
the RS-12 development standards that apply to the site
(excludrnq height). A PRD first requires review of home designs
and site layout, including usable open space, by the
Architectural Design Board (ADS). The ADS reviewed the
project and made a recommendation on design to the Hearing
Examiner on July 27, 2023. The Hearing Examiner makes the
final decision on the preliminary PRD and preliminary fomlal
subdivision following a public hearing.
PROJECT LOCATION: 540 & 550 Edmonds Way
(Tax ID Ill 27032500308300 & 27032500308400)
NAME OF APPLICANT: Fernandez Barnes LLC (Steve Barnes)
FILE NO.: PLN2022.OD49 & PLN2022-0053
REQUESTED PERMIT: Preliminary planned residential
development and preliminary formal subdivision (consolidated
Type III -A Permit, Public Hearing and Decision by the Hearing
Examiner)
COMMENTS ON PROPOSAL DUE: October 26, 2023
Any person has the right to comment on this application during
public comment period, receive notice and participate in any
hearings, and request a copy of ins decision on the application.
The City may accept public comments at any time prior to the
closing of the record of an open record predecision hearing, if any,
or, if no open record predecision hearing is provided, prior to the
decision on the project permit.
Information on this development application can be obtained online
at
hltp://ecimondswa .govlpublic-notices-lex t/deve to pme nt-
nobces.htiml
under the development notice for application number PLN2022-
00491PLN2022-0053, by emalling the City contact listed below, or
by calling the City of Edmonds al 425-771-0220. Please refer to
the application number for all inquiries. A copy of the staff report
will be available seven days prior to the hearing.
PUBLIC HEARING INFORMATION: A hybrid public hearing will be
held by the Hearing Examiner on October 26, 2023 a( 3 p.m.
The physical location Is Edmonds City Hall, 121 51h Avenue N,
3rtl Floor. Brackett Room.
Or join the Zoom meeting at;
hltpsl/uso6web.zoom.uslyB42740576397pwd=ZFdpQzg4hOFEUU
9ZcElybkd4bnF$UT09
Meeting ID: 842 7406 7639
Passcode:882737
Or via phone by chafing 263.215.8782
SEPA DETERMINATION: Notice is hereby given that the City of
Edmonds has issued a Determination of Nonsidnificance under
WAC 197-11-340 for the above project.
DATE OF ISSUANCE: October 4, 2023
SEPA COMMENTS: Any comments regarding the $EPA
determination are clue October 18, 2023.
SEPA APPEAL: This SERA determination may be appealed by
filing a written appeal citing the specific reasons for appeal with
the required appeal fee no later than October 25, 2023 by 4:00
p.m. Only parties of record as defined in ECDC 20.08.020 have
standing to initiate an administrative appeal to the Hearing
Examiner.
CITY CONTACT: Mike Clugston, AICP, Acting Planning Manager
mlchael.clulslonQe dma ndsw a. gov
425.771.020
Published: October4,2023. EOH985194
Proofed by Phillips, Linda, 10/04/2023 09:22:30 am
:W
d
V
O
Z
N
L
K
W
Page:2
r
Q
Exhibit 24 - Green
PLN2022-004 Packet Pg. 703
1.z
Clugston, Michael
From: ECY RE NW SEPA (NWRO) <nwsepa@ECY.WA.GOV>
Sent: Wednesday, October 18, 2023 7:41 AM
To: Clugston, Michael
Cc: Myers, Michelle A. (ECY)
Subject: ECY SEPA 202304801 - Greenwalk Park Planned Residential Development and Formal Plat -
Comments
Attachments: 202304801_ECYCommentLetter.pdf
Good Morning,
Thank you for the opportunity to comment on the Greenwalk Park Planned Residential Development and Formal Plat
project (Lead Agency File No(s). PLN2022-0049 & PLN2022-0053). Ecology's comments are attached.
[ Statewide SEPA Register No. 202304801 ]
Kelli Price (she/her)
ERTS & SEPA Coordinator
15700 Dayton Ave N I Shoreline, WA 98133
Department of Ecology I Northwest Region
Desk: (206) 594-0014
ECOLOGY
NOTICE: This communication is a public record and may be subject to disclosure pursuant to the Public Records Act (RCW 42.56).
Exhibit 25 - Green
PLN2022-004 Packet Pg. 704
sTA'' 1.Z
z
oy
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
Northwest Region Office
PO Box 330316, Shoreline, WA 98133-9716 • 206-594-0000
October 18, 2023
Michael Clugston, AICP, Acting Planning Manager
City of Edmonds
121 51h Ave N
Edmonds, WA 98020
Re: Greenwalk Park Planned Residential Development and Formal Plat
File# PLN2022-0049 & PLN2022-0053, Ecology SEPA# 202304801
Dear Michael Clugston:
Thank you for the opportunity to provide comments on the State Environmental Policy Act
(SEPA) determination of nonsignificance (DNS) for the Greenwalk Park Planned Residential
Development and Formal Plat project. Based on review of the checklist associated with this
project, the Department of Ecology (Ecology) has the following comments:
This project proposal includes onsite grading. The Snohomish County property database
indicates that the property contains two residences, one built in the 1940s and one in the
1950s. Homes constructed prior to the mid-1960s were commonly fueled by heating oil from
underground storage tanks (USTs). If USTs are encountered during construction of the project,
they must be decommissioned in accordance with local fire department regulations. In
addition, if soil or groundwater contamination is encountered during UST decommissioning, the
contamination must be characterized and cleaned up in accordance with Ecology regulations
(WAC 173-340). If a release is encountered, it may be reported via Ecology's web form
(https://ecology.wa.gov/Footer/Report-an-environmental-issue/statewide-issue-reporting-
form).
Thank you for considering these comments from Ecology. If you have any questions or would
like to respond to these comments, please contact Michelle Myers from the Toxics Cleanup
Program at (206) 773-3498 or by email at michelle.myers2@ecy.wa.gov.
Sincerely,
Exhibit 25 - Green
PLN2022-004 Packet Pg. 705
1.z
Michael Clugston
October 18, 2023
Page 2
Kelli Price
SEPA Coordinator
Sent by email: Michael Clugston, michael.clugston@edmondswa.gov
ecc: Michelle Myers, Ecology
Exhibit 25 - Green
PLN2022-004 Packet Pg. 706
1.z
Clugston, Michael
From: Alm, Peter <AlmP@wsdot.wa.gov>
Sent: Wednesday, October 4, 2023 12:06 PM
To: Clugston, Michael
Cc: Betourne, Lauren
Subject: RE: [EXTERNAL] Notice of Public Hearing and SEPA Determination for Greenwalk Park preliminary
plat and planned residential development
Follow Up Flag: Follow up
Flag Status: Completed
Hi Mike,
WSDOT is waiting for the developer to send us the finalized plat map. Once we have the plat map we can complete the
process to upgrade their access to these properties. So I guess whatever stage after the approved plat map is issued, is
where this should be a requirement.
Thank you,
Peter Alm
WSDOT — NW Region Development Services
206-450-2338 Cell
206-440-4711 Office
PO Box 330310 MS 240
15700 Dayton Avenue North
Seattle, WA 98133-9710
From: Clugston, Michael <Michael.Clugston@edmondswa.gov>
Sent: Wednesday, October 4, 2023 9:42 AM
To: Alm, Peter <AlmP@wsdot.wa.gov>
Cc: Betourne, Lauren <BetourL@wsdot.wa.gov>
Subject: RE: [EXTERNAL] Notice of Public Hearing and SEPA Determination for Greenwalk Park preliminary plat and
planned residential development
Hi Peter,
Understood. Regarding the timing of your permit and ours, how does that go? Subdivisions in Edmonds are a
three -step process: preliminary (feasibility phase), civil subdivision plan (construction doc phase), and final
review (prior to recording at County). My thought is I could include your information below as a proposed
condition to the Hearing Examiner as part of the preliminary phase and the applicant would continue to work
with WSDOT on permit approval during the civil plan phase. If there is another way to approach it, please let
me know.
Thanks
Mike Clugston I Acting Planning Manager
City of Edmonds
425-771-0220, ext. 1330
michael.clugston@edmondswa.gov
Exhibit 25 - Green
PLN2022-004 Packet Pg. 707
1.z
From: Alm, Peter <AlmP@wsdot.wa.gov>
Sent: Wednesday, October 4, 2023 9:24 AM
To: Clugston, Michael <Michael.Clugston@edmondswa.gov>
Cc: Betourne, Lauren <BetourL@wsdot.wa.gov>
Subject: RE: [EXTERNAL] Notice of Public Hearing and SEPA Determination for Greenwalk Park preliminary plat and
planned residential development
Hi Mike,
WSDOT has been working with the developer for access to this site. The developer needs to acquire revised access
rights from WSDOT and then WSDOT will issue a permit for the construction of the new access point within the SR 104
limited access right of way. Thanks.
Thank you,
Peter Alm
WSDOT — NW Region Development Services
206-450-2338 Cell
206-440-4711 Office
PO Box 330310 MS 240
15700 Dayton Avenue North
Seattle, WA 98133-9710
From: Clugston, Michael <Michael.Clugston@edmondswa.gov>
Sent: Wednesday, October 4, 2023 9:06 AM
To: bill@townofwoodway.com; Nelson, Kurt <knelson@tulaliptribes-nsn.gov>; sepa@dahp.wa.gov; Alm, Peter
<AlmP@wsdot.wa.gov>; Reviewteam@commerce.wa.gov; Roland.behee@commtrans.org; kellyb@ovwater.com;
bobd@ovwater.com; cmmurphy@snopud.com; Burt, Chris (Fire District Address) <cburt@southsnofire.org>;
customercare@pse.com
Subject: [EXTERNAL] Notice of Public Hearing and SEPA Determination for Greenwalk Park preliminary plat and planned
residential development
WARNING: This email originated from outside of WSDOT. Please use caution with links and attachments.
Good morning,
Please find attached a notice of public hearing and SEPA checklist/determination for the proposed Greenwalk
Park development at 540 and 550 Edmonds Way.
Mike Clugston I Acting Planning Manager
City of Edmonds
425-771-0220, ext. 1330
michael.clugston@edmondswa.gov
The Building, Planning & Engineering Permit Center is open for walk-in service M-F 8:30am to 2pm (closed for lunch 12-
1 m.
Staff is available via phone, email and/or by appointment during working hours (typically 8-5pm)
For general service:
Phone / 425.771.0220
Exhibit 25 - Green
PLN2022-004 Packet Pg. 708
1.z
Email / enpineeringpermits@edmondswa.gov
GIS / www.maps.edmondswa.gov
Exhibit 25 - Green
PLN2022-004 Packet Pg. 709
1.z
Adft
V,#Washington State
Department of Transportation
March 1, 2023
Fernandez and Barnes LLC
Attn: Steve Barnes
28720 SE 63id St.
Issaquah, WA 98027
RE: Access Modification
Dear Steve:
Northwest Region
15700 Dayton Avenue North
P.O. Box 330310
Seattle, WA 98133-9710
206-440-4000
llY 1-800-833-6388
www.wsdot.wa.gov
The Washington State Department of Transportation (WSDOT) has approved of the purchase of
an upgraded access point on SR 104 that you requested. However, we cannot go through with
the purchase until we have Access approval, which needs the final plat configuration from the
City of Edmonds. Also needed will be the payment for the purchase of the upgraded access
point and any engineering review/documentation required.
Sincerely,
Marty Stickford
WSDOT NWR
stickml@wsdot.wa.gov
Property Management Supervisor/NWRPM
520-647-1659
Exhibit 25 - Green
PLN2022-004 Packet Pg. 710
of ED_o CITY OF EDMONDS
PLAN REVIEW COMMENTS
PLANNING DIVISION
Est. 1 890
(425) 771-0220
City Website: www.edmondswa.gov
DATE: October 18, 2023
TO: Mike Clugston
FROM: Deb Powers, Urban Forest Planner
RE: PLN2022-0053 (Plat)/PLN2022-0049 (PRD)
Greenwalk Park 16-Lot PRD/Subdivision
540 & 550 Edmonds Way
Comments 1 — August 2, 2022
Comments 2 — December 15, 2022
Comments 3 - February 3, 2023
Comments 4 — April 13, 2023
The comments provided below are based upon a fourth review of tree retention plans submitted
for a Planned Residential Development (PRD) and preliminary 16-lot subdivision at the location
shown above. Given that the applicant has proposed sufficient information under the preliminary
Tree Retention Plan, the submittal is procedurally complete per ECDC 23.10. The following
comments in bold are listed as conditions for PRD/subdivision approval:
1. Site plan. Resubmitted Sheets L3.1-2 do not show proposed tree removals and tree
protection fencing and instead reference the arborist report and Sheets Al, L1 and L2.
Revised Sheets Al, L1 and L2 not were submitted. The site map embedded in the arborist
report is not legible due to the reduced scale.
CONDITION FOR APPROVAL: Submit a full-size site plan showing required
information per ECDC 23.10.060.B.2.b with the submittal of subsequent development
permits, including demolition, civils and building permit submittal.
2. Tree Protection Instructions. The applicant's response dated June 8, 2023 indicate that
changes to Sheets L1 and L2 show special instructions to minimize construction impacts to
retained trees. Revised Sheets Al, L1 and L2 not were submitted.
CONDITION FOR APPROVAL: Submit revised Sheets L1 and L2 showing the
diagrams and instructions noted in the response letter dated June 8, 2023 with the
submittal of subsequent development permits, including demolition, civils and
building permit submittal.
3. Fees in lieu. The applicant may opt to use the $2.00 per square feet of lot area "cap"
allowed per ECDC 23.10.080.E.4, versus mitigating viable trees greater than 24 inches DBH
removed with development through payment of their approased value.
CONDITION FOR APPROVAL: With the submittal of subsequent development permits,
show on revised Sheet L1 or L2 the preferred option for mitigating removed viable
trees >24" DBH and the total fee in lieu amount.
Pa Packet Pg. 711
The conditions noted herein are not intended to address all potential comments that may arise
from subsequent civil or building permit plan review.
Note that fees in lieu shall be deposited into the City's Tree Fund prior to the issuance of the
associated development permit (civils). Tree(s) identified for retention and replacement on an
approved tree retention plan shall, as a condition of permit issuance, record a notice on title of
the property with the Snohomish County auditor's office.
Thank you.
Applicable codes, handouts, the City's GIS, and other permit assistance is available at:
https://www.edmondswa.gov
Pa Packet Pg. 712
CITY OF EDMONDS
RE -NOTICE OF PUBLIC HEARING AND
SEPA THRESHOLD DETERMINATION
'12C. 1 gy1J
PROJECT DESCRIPTION: This project is being re -noticed due to an error with the original mailed notice to
property owners within 300 feet of the site. The public hearing is rescheduled from
October 26 to November 9, 2023.
The proposal is for a preliminary formal subdivision of a 2.88-acre site into 16 single
family residential lots using the planned residential development (PRD) process. All
existing improvements would be removed, and a new plat road constructed to serve the
new lots with access to Edmonds Way (SR-104). The site is zoned Single Family
Residential — Master Plan (RS-MP). A master plan like a planned residential
development allows development at the site to achieve an RS-8 zoning density (5.5
du/acre) while being able to modify some of the RS-12 development standards that
apply to the site (excluding height). A PRD first requires review of home designs and site
layout, including usable open space, by the Architectural Design Board (ADB). The ADB
reviewed the project and made a recommendation on design to the Hearing Examiner
on July 27, 2023. The Hearing Examiner makes the final decision on the preliminary PRD
and preliminary formal subdivision following a public hearing.
PROJECT LOCATION: 540 & 550 Edmonds Way (Tax ID #s: 27032500308300 & 27032500308400)
NAME OF APPLICANT: Fernandez Barnes LLC (Steve Barnes)
FILE NO.: PLN2022-0049 & PLN2022-0053
REQUESTED PERMIT: Preliminary planned residential development and preliminary formal subdivision
(consolidated Type III -A Permit, Public Hearing and Decision by the Hearing Examiner)
COMMENTS ON
PROPOSAL DUE: November 9, 2023
Any person has the right to comment on this application during public comment period,
receive notice and participate in any hearings, and request a copy of the decision on the
application. The City may accept public comments at any time prior to the closing of the
record of an open record predecision hearing, if any, or, if no open record predecision
hearing is provided, prior to the decision on the project permit.
Information on this development application can be obtained online at
httD://edmondswa.eov/public-notices-text/development-notices.html under the
development notice for application number PLN2022-0049/PLN2022-0053, by emailing
the City contact listed below, or by calling the City of Edmonds at 425-771-0220. Please
refer to the application number for all inquiries. A copy of the staff report will be
available seven days prior to the hearing.
PUBLIC HEARING
INFORMATION: A hybrid public hearing will be held by the Hearing Examiner on November 9, 2023 at 3
p.m. The physical location is Edmonds City Hall, 121 5th Avenue N, 3rd Floor, Brackett
Room.
Or join the Zoom meeting at:
https://us06web.zoom.us/i/84274057639?pwd=ZFdpQzg4bOFEUU9ZcElybkd4bnF5UT09
Meeting ID: 842 7405 7639
Exhibit 27 - Green
PLN2022-004 Packet Pg. 713
Passcode: 882737
Or via phone by dialing 253-215-8782
SEPA DETERMINATION: Notice is hereby given that the City of Edmonds has issued a Determination of
Nonsignificance under WAC 197-11-340 for the above project.
DATE OF REISSUANCE: October 26, 2023
SEPA COMMENTS: Any comments regarding the SEPA determination are due November 9, 2023.
SEPA APPEAL: This SEPA determination may be appealed by filing a written appeal citing the specific
reasons for appeal with the required appeal fee no later than November 16, 2023 by
4:00 p.m. Only parties of record as defined in ECDC 20.06.020 have standing to initiate
an administrative appeal to the Hearing Examiner.
CITY CONTACT: Mike Clugston, AICP, Acting Planning Manager
michael.clugston@edmondswa.gov
425-771-0220
9
RNERST0NE
Exhibit 27 - Green
PLN2022-004 Packet Pg. 714
of EDA, 1.ab
q o
s CITY OF EDMONDS
r, goo 121 5TH AVENUE NORTH, EDMONDS, WA 98020 (425) 771-0220
DETERMINATION OF NONSIGNIFICANCE - REISSUE
Description of proposal: This determination is being re -issued due to an error with the original mailed
notice to property owners within 300 feet of the site. The proposal is for a preliminary formal subdivision
of a 2.88-acre site into 16 single family residential lots using the planned residential development (PRD)
process. All existing improvements would be removed, and a new plat road constructed to serve the new
lots with access to Edmonds Way (SR-104). The site is zoned Single Family Residential — Master Plan (RS-
MP). A master plan like a planned residential development allows development at the site to achieve an
RS-8 zoning density (5.5 du/acre) while being able to modify some of the RS-12 development standards
that apply to the site (excluding height). A PRD first requires review of home designs and site layout,
including usable open space, by the Architectural Design Board (ADB). The ADB reviewed the project and
made a recommendation on design to the Hearing Examiner on July 27, 2023. The Hearing Examiner
makes the final decision on the preliminary PRD and preliminary formal subdivision following a public
hearing.
Proponent: Fernandez Barnes LLC (Steve Barnes)
Location of proposal, including street address if any: 540 & 550 Edmonds Way (Tax ID #s:
27032500308300 & 27032500308400)
Lead agency: City of Edmonds
The lead agency for this proposal has determined that it does not have a probable significant adverse
impact on the environment. An environmental impact statement (EIS) is not required under RCW
43.21C.030 (2)(c). This decision was made after review of a completed environmental checklist and
other information on file with the lead agency. This information is available to the public on request.
The City of Edmonds has determined that the requirements for environmental analysis and protection
have been adequately addressed in the development regulations and comprehensive plan adopted under
chapter 36.70A RCW, and in other applicable local, state, or federal laws or rules, as provided by RCW
43.21C.240 and WAC 197-11-158 and/or mitigating measures have been applied that ensure no significant
adverse impacts will be created.
There is no comment period for this DNS.
This DNS is issued after using the optional DNS process in WAC 197-11-355. There is no
further comment period on the DNS.
X This DNS is issued under WAC 197-11-340(2); the lead agency will not act on this proposal for
14 days from the date below. Comments must be submitted by November 9, 2023.
Project Planner: Mike Clugston, AICP, Acting Planning Manager
Responsible Official: Mike Clugston, AICP, Acting Planning Manager
Contact Information: City of Edmonds 1 121 5th Avenue North, Edmonds WA 98020 1 425-771-0220
Date: October 26, 2023 Signature:
XX You may appeal this determination to Mike Clugston, AICP, Acting Planning Manager, at 121 iu
5th Avenue North, Edmonds, WA 98020, by filing a written appeal citing the specific reasons
for the appeal with the required appeal fee no later than November 16, 2023. You should be
prepared to make specific factual objections. Contact Mike Clugston to read or ask about the
procedures for SEPA appeals. r
t.
Q
Page 1 of 2
REISSUE SEPA DNS PLN2022-0049 & -0053 Exhibit 27 - Green
I0/26/23.SEPA PLN2022-004 Packet Pg. 715
XX Posted on October 26, 2023, at City Hall, the Edmonds Public Safety Building, and Edmonds
Public Library. Published in the Everett Herald. Uploaded to the Department of Ecology SAW.
XX Distribute to "Checked" Agencies below.
The SEPA Checklist, DNS, and associated documents can be obtained online at
https://www.edmondswa.gov/services/public involvement/public notices/development notices under
permit number PLN2022-0049/PLN2022-0053 and, by emailing the project planner
(michael.clugston@edmondswa.gov), or by calling the City of Edmonds at 425-771-0220.
Distribution List: This DNS and SEPA checklist were distributed to the following:
❑X Applicant
❑X
Dept. of Ecology
❑ City of Everett
0 Parties of Record
❑
Dept. of Ecology - Shorelands
❑
City of Lynnwood
❑
Dept. of Natural Resources
❑
City of Mountlake Terrace
❑ US Army Corps of Engineers
0
Dept. of Commerce
❑
City of Mukilteo
❑ US Fish and Wildlife
Z
WSDOT
❑
City of Shoreline
❑
WSDOT— Ferries
❑X
Town of Woodway
© Puget Sound Energy
❑
Dept. of Fish & Wildlife
© Snohomish PUD
❑
Dept. of Health — Drinking Water
❑
Snohomish Co. Public Works
© Olympic View Water & Sewer
Z
Dept. of Arch. & Historic Pres.
❑
Snohomish Co. PDS
❑ Alderwood Water District
❑
Dept. of Parks and Rec. Commission
❑
Snohomish Co. Health Dist.
❑ Edmonds School District
❑ Port of Edmonds
❑
Puget Sound Clean Air Agency
❑
King County - Transit
© South County Fire
❑
Puget Sound Regional Council
❑
King County— Environ. Planning
❑ Swedish Hospital
❑
Puget Sound Partnership
© Community Transit
Z
Tulalip Tribe
❑
Other
pc: File No.
SEPA Notebook
Page 2 of 2
REISSUE SEPA DNS PLN2022-0049 & -0053 Exhibit 27 - Green
I0/26/23.SEPA PLN2022-004 Packet Pg. 716
Cityof Edmonds ureenwaiK ram AUjaceni rroperty
monRA.%ll
ALGOfVQU/N RD
1219
7
3 12k1 1291� - • o0
12�
o
6 �
KULSH� RD
s
��., •, _ 1351
40,/ps 0iq�s �
-i4 10708 10624 22f
O.'
W
W
z
.fl Ab
226TH ST SW
z26v,
0
2<6l_
22612
11 r
I 22�
226z10 221601§
zr ' c
22Wi1 v
22ij 227�
22M zz 1. 3,031 O
I 1.ab I
d
C
C
M
a
0
c
c
Legend
Sections Boundary
d
Y
Sections
M
Edmonds Boundary
Y
ArcSDE.GIS.PROPERTY_BUILDIF
3
ArcSDE.GIS.STREET_CENTERLIN
y
— <all other values>
i
Interstate
Principal Arterial
•L
Minor Arterial; Collector
d
Local Street; On Ramp
=
V
State Highways
<all other values>
d
0
'♦3
C
1
Q
2
a
W
County Boundary
to
Parks
C
aD
ArcSDE.GIS.PROPERTY_WASHII
ArcSDE.GIS.PROPERTY_CITIES
0
ArcSDE.GIS.PROPERTY_CITIES
City of Edmonds
City of Lynnwood
N
a�
City of Mountlake Terrace
=_
t
Unincorporated King Co; Unincor
W
City of Woodway
C
Citv of Arlinaton: Citv of Bothell: (
d
Notes
r
0 252.60 505.2 Feet
Parcels within 300' of 540 & 550
376.2 This ma is a user generated static output from an Internet mapping site and is for Edmonds Wa
4,514 p B p Pp B Y
reference only. Data layers that appear on this map may or may not be accurate, Files: PLN2022-0049 & -0053
WGS_1984_Web-Mercator _Auxiliary -Sphere current, or otherwise reliable.
© City of Edmonds THIS MAP IS NOT TO BE USED FOR DESIGN OR CONSTRUCTION ibit 27 - Green
Packet Pg. 717
00384700500200
27032500307100
27032500308100
ECONOMOU CHRIS & MARLA
HALE LINDSAY K & GARY KENDALL K
OWENS OWEN L 401K TRUST
10828 KULSHAN RD
619 PARADISE LN
PO BOX 12922
WOODWAY, WA 98020
EDMONDS, WA 98020-4651
MILL CREEK, WA 98082
00539100000100
00539100004100
27032500302600
PENA MICHAEL G & TERRI L
CIVARRA JAMES & MARTHA
PARADISE HEIGHTS HLD LLC
1370 6TH PL S
1371 6TH PL S
190 W DAYTON ST STE 103
EDMONDS, WA 98020
EDMONDS, WA 98020
EDMONDS, WA 98020
27032500303200
27032500303300
27032500303400
REEDY PATRICK L
OWENS OWEN L & JACQUELINE L
NEWKIRK DARALEE LOUISE & SCOTT
541 EDMONDS WAY
PO BOX 12922
13404 N ECHO LAKE RD
EDMONDS, WA 98020-4638
LYNNWOOD, WA 98082
SNOHOMISH, WA 98296-6193
00384700500100
27032500302900
27032500308300
LECKY LIVING TRUST
KIM BYUNG H & IM HEE-SUNG
FERNANDEZ & BARNES LLC
10820 KULSHAN RD
10826 KULSHAN RD
10529 NE 58TH ST
WOODWAY, WA 98020-6127
WOODWAY, WA 98020-6127
KIRKLAND, WA 98033
27032500308400
27032500308500
27032500307300
MOLNAR BUILDING LLC
BONN DALE W
1ST SECURITY BANK
PO BOX 55576
PO BOX 72
6920 220TH ST SW STE 208
SHORELINE, WA 98155
EDMONDS, WA 98020
MOUNTLAKE TERRACE, WA 98043
00384700501100
27032500308900
27032500310000
ZEVENBERGEN JOHN & JACLYN
EDMONDS WESTGATE LLC
GEORGE LORI J
10901 ALGONQUIN RD
606 EDMONDS WAY
10605 226TH ST SW
WOODWAY, WA 98020-6108
EDMONDS, WA 98020
EDMONDS, WA 98020
27032500308800
00384700501200
27032500309900
LEWIS SCOTT F & MARGARITA 0
MILLER GLENN R & CATHERINE A
NELSON MICHAEL LEE
612 EDMONDS WAY
5916 ST ANDREWS DR
10607 226TH ST SW
EDMONDS, WA 98020-4641
MUKILTEO, WA 98275-4847
EDMONDS, WA 98020-6100
27032500310400
27032500308700
27032500310100
KOFLER RALPH R & IRENE M
REDELFS RICHARD HENRY & LIU XIAO WEI
MARTINELLI MICHAEL
10611 226TH ST SW
606 EDMONDS WAY
10615 226TH SW
EDMONDS, WA 98020
EDMONDS, WA 98020-4641
EDMONDS, WA 98020
27032500309800
27032500316200
27032500316400
LEMAS MITCHEL 1 & ALICE
MAHMOUD MOHAMMED & MAHMOUD-
BAYER KIM/AUGUSTAVO ED
10609 226TH ST SW
HOWELL BETH
10707 226TH STREET SW
EDMONDS, WA 98020-6100
10705 226TH ST SW
EDMONDS, WA 98020
EDMONDS, WA 98020-6132
27032500316300
27032500310700
27032500311000
WILSON JAMES R & SHARON
PETERS MARVIN T & LLYNDA F
KIMMELMAN LEE/SHU HUI HOU TTEE
10703 226TH ST SW
10525 226TH ST SW
1054 9TH AVENUE S
EDMONDS, WA 98020-6132
EDMONDS, WA 98020-5123
EDMONDS, WA 98020
Exhibit 27 - Green
PLN2022-004 Packet Pg. 718
27032500310800
SHEPSIS VLADIMIR & ANETA TRUST
8034 CYRUS PL
EDMONDS, WA 98026
27032500308400
MOLNAR BUILDING LLC
1240 NE 175TH ST STE A
SHORELINE, WA 98155
27032500316500
HELLEREN LEIF T & KIMBERLY J
2522 192ND ST
SHORELINE, WA 98177
27032500316700
JOHANNESSEN JOHN M CREDIT TRUST
10727 226TH ST SW
EDMONDS, WA 98020-6132
Exhibit 27 - Green
PLN2022-004 Packet Pg. 719
OF EDAf
O
#P%1
St. i
Purpose of Checklist.
CITY OF EDMONDS
ENVIRONMENTAL CHECKLIST
The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all governmental agencies to consider the environmental
impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with
probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help
you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to
help the agency decide whether an EIS is required.
Instructions for Applicants:
This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this
checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer
the questions briefly, with the most precise information known, or give the best description you can.
You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer
the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if
a question does not apply to your proposal, write "do not know" or does not apply". Complete answers to the questions now may
avoid unnecessary delays later.
Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if
you can. If you have problems, the governmental agencies can assist you.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of
land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you
submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there
may be significant adverse impact.
Use of checklist for nonproject proposals:
For nonproject proposals complete this checklist and the supplemental sheet for nonproject actions (Part D). the lead agency may
exclude any question for the environmental elements (Part B) which they determine do not contribute meaningfully to the analysis of
the proposed nonproject actions, the references in the checklist to the words "project," "applicant," and "property or site" should be
read as "proposer," and "affected geographic area," respectively.
A. BACKGROUND
1. Name of proposed project, if applicable: Greenwalk Park
2. Name of applicant: Fernandez & Barnes LLC.
3. Address and phone number of applicant and contact person:
28720 SE 63''d Street, Issaquah, WA 98027
Justin Barnes 206-228-2564
Steve Barnes 206-550-9296
4. Date checklist prepared: 1-24-22
5. Agency requesting checklist: City of Edmonds
Revised on 9116116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green P 'ge 1 of 27
PLN2022-004 Packet Pg. 720
6.
7.
8.
9.
Proposed timing or schedule (including phasing, if applicable): Subdivision construction will start in 2023 and
project will extend through 2024-2025
(STAFF COMMENTS)
Do you have any plans for future additions, expansion, or further activity related to or connected with this
proposal? If yes, explain.
Once the subdivision is complete we will construct the houses.
(STAFF COMMENTS)
List any environmental information you know about that has been prepared, or will be prepared, directly related
to this proposal.
Geotechnical stud
y_performed by Associated Earth Sciences dated January 11. 2022.
(STAFF COMMENTS)
Do you know whether applications are pending for governmental approvals of other proposals directly affecting
the property covered by your proposal? If yes, explain.
State of Washington Department of Transportation for access to SR 104.
(STAFF COMMENTS)
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green P ge 2 of 27
PLN2022-004 Packet Pg. 721
10.
11
12.
List any government approvals or permits that will be needed for your proposal, if known.
Washington DOT for right of way improvements, water main extension, side sewer permits, power and data to site,
(STAFF COMMENTS)
Give brief, complete description of your proposal, including the proposed uses and size of the project and site.
There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You
do not need to repeat those answers on this page.
Creating a subdivision and taking two parcels and platting into 16 parcels along with entry drive and access/utility
easements.
(STAFF COMMENTS)
Location of the proposal. Give sufficient information for a person to understand the precise location of your
proposed project, including a street address, if any, and section, township, and range, if known. If a proposal
would occur over a range of area, provide range or boundaries of the site(s). Provide legal description, site plan,
vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the
agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related
to this checklist.
On the south side of SR 104 where it transitions into 5" Ave near downtown Edmonds.
(STAFF COMMENTS)
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green P 'ge 3 of 27
PLN2022-004 Packet Pg. 722
TO BE COMPLETED BY APPLICANT
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other:
Flat
(STAFF COMMENTS)
b. What is the steepest slope on the site (approximate percent slope)?
10% except one small slope on site next to existing garage.
(STAFF COMMENTS)
C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, and muck)? If you
know the classification of agricultural soils, specify them and note any agricultural land of long term
commercial significance and whether the proposal results in removing any of these soils.
Sand
(STAFF COMMENTS)
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe.
No
(STAFF COMMENTS)
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green P 'ge 4 of 27
PLN2022-004 Packet Pg. 723
►P1
e.
f.
9.
h.
AIR
a.
Describe the purpose, type, total area and approximate quantities and total affected area of any filling,
excavation, and grading proposed. Indicate source of fill.
Site will be graded with only organics being removed from the site and import material will only be used for
utiliies and under or around the new buildings.
(STAFF COMMENTS)
Could erosion occur as a result of clearing, construction, or use? If so, generally describe.
No
(STAFF COMMENTS)
About what percent of the site will be covered with impervious surfaces after project construction (for
example, asphalt or buildings)?
20%
(STAFF COMMENTS)
Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
Erosion control measures will be put in place.
(STAFF COMMENTS)
What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, and
industrial wood smoke) during construction and when the project is completed? If any, generally describe
and give approximate quantities if known.
Standard construction activities, development is single family residential.
(STAFF COMMENTS)
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green P 'ge S of 27
PLN2022-004 Packet Pg. 724
C.
Are there any off -site sources of emissions or odor that may effect your proposal? if so, generally describe.
No
(STAFF COMMENTS)
Proposed measures to reduce or control emissions or other impacts to the, if any:
N/A
(STAFF COMMENTS)
3. WATER
a.
Surface:
(1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and
seasonal streams, saltwater, lakes, ponds, and wetlands)? If yes, describe type and provide names. If
appropriate, state what stream or river it flows into.
(STAFF COMMENTS)
(2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If
yes, please describe and attach available plans.
N/A
(STAFF COMMENTS)
(3) Estimate the amount of fill and dredge material that would be placed in or removed from surface
water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill
material.
N/A
(STAFF COMMENTS)
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green P 'ge 6 of 27
PLN2022-004 Packet Pg. 725
(4) Will the proposal require surface water withdrawals or diversions? Give general description,
purpose, and approximate quantities if known.
N/A
(STAFF COMMENTS)
(5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan.
No
(STAFF COMMENTS)
(6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the
type of waste and anticipated volume of discharge.
No
(STAFF COMMENTS)
b. Ground:
(1) Will ground water be withdrawn from a well for drinking water or other purposes? If so, give a
general description of the well, proposed uses and approximate quantities withdrawn from the well
Will water be discharged to ground water? Give general description, purpose, and approximate
quantities if known.
There is an existing well on site that will be maintained for future irrigation system.
(STAFF COMMENTS)
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green P 'ge 7 of 27
PLN2022-004 Packet Pg. 726
C.
(2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if
any (for example: Domestic sewage; industrial, containing the following chemicals...; agricultural;
etc.). Describe the general size of the system, the number of such systems, the number of houses to be
served (if applicable), or the number of animals or humans the system(s) are expected to serve.
N/A. nroiect is on citv sewer.
(STAFF COMMENTS)
Water Runoff (including storm water):
(1) Describe the source of runoff (including storm water) and method of collection and disposal, if any
(include quantities, if known). Where will this water flow? Will this water flow into other waters? If
so, describe.
There will be no water running off the site once completed, all storm water will be infiltrated.
(STAFF COMMENTS)
(2) Could waste materials enter ground or surface waters? If so, generally describe.
No
(STAFF COMMENTS)
(3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so,
describe.
No
(STAFF COMMENTS)
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green P 'ge 8 of 27
PLN2022-004 Packet Pg. 727
d. Proposed measures to reduce or control surface, ground, runoff water, and drainage pattern impacts, if
any:
Infiltration systems will be installed for all pervious areas.
4. Plants
a.
b.
(STAFF COMMENTS)
Check or circle types of vegetation found on the site:
X deciduous tree: alder, maple, aspen, other:_
X evergreen tree: fir, cedar, pine, other:
X shrubs
X grass
pasture
crop or grain
Orchards, vineyards or other permanent crops
wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other:
water plants: water lily, eelgrass, milfoil, other:
other types of vegetation:
(STAFF COMMENTS)
What kind and amount of vegetation will be removed or altered?
Most vegetation on the site will be altered for new development, significant trees will be maintained and protected
as required by city.
(STAFF COMMENTS)
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green P ge 9 of 27
PLN2022-004 Packet Pg. 728
C.
d.
e.
List threatened or endangered species known to be on or near the site.
N/A
(STAFF COMMENTS)
Proposed landscaping, use of native plants, or other materials to preserve or enhance vegetation on the site,
if any:
Native plants and trees will be planted as appropriate for single family residential development.
(STAFF COMMENTS)
List all noxious weeds and invasive species known to be on or near the site.
N/A
(STAFF COMMENTS)
5. Animals
a. List any birds and other animals that have been observed on or near the site or are known to be on or near
the site. Examples include:
birds: hawk, heron, eagle, songbirds, other: N/A
mammals: deer, bear, elk, beaver, other: N/A
fish: bass, salmon, trout, herring, shellfish, other: N/A
(STAFF COMMENTS)
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green page 10 of 27
PLN2022-004 Packet Pg. 729
b. List any threatened or endangered species known to be on or near the site.
N/A
(STAFF COMMENTS)
C. Is the site part of a migration route? If so, explain.
No
(STAFF COMMENTS)
d. Proposed measures to preserve or enhance wildlife, if any:
N/A
(STAFF COMMENTS)
e. List any invasive animal species known to be on or near the site.
N/A
(STAFF COMMENTS)
6. Energy and Natural Resources
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc
Exhibit 27 - Green a e 11 of27
PLN2022-004 Packet Pg. 730
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed
project's energy needs? Describe whether it will be used for heating, manufacturing, etc.
Electric for heating and cooling, natural gas for cooking appliances.
IL
d
E
a
0
a)
(STAFF COMMENTS)
4)
7a
2
_
m
b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally
4)
describe.
No
m
c
�a
a
M
c
E
a
(STAFF COMMENTS)
a
Y_
M
3
_
a)
C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed
measures to reduce or control energy impacts, if any:
.�
Buildings will be contructed to meeting current energy standards required by residential energy code.
co
L
M
m
x
a
(STAFF COMMENTS)
Q
a
w
U)
w
0
7. Environmental Health
d
0
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and
0
m
explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so describe.
No
�
N
L
x
w
c
m
E
z
0
(STAFF COMMENTS)
;±
Q
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc age 12 of 27
Exhibit 27 - Greern� .-"-
PLN2022-0041 Packet Pg. 731
(1) Describe any known or possible contamination at the site from present or past uses.
N/A
(STAFF COMMENTS)
(2) Describe existing hazardous chemicals/conditions that might affect project development and design.
This includes underground hazardous liquid and gas transmission pipelines located within the
project area and in the vicinity.
N/A
(STAFF COMMENTS)
(3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the
project's development or constructions, or at any time during the operating life of the project.
N/A
(STAFF COMMENTS)
(4) Describe special emergency services that might be required.
N/A
(STAFF COMMENTS)
(5) Proposed measures to reduce or control environmental health hazards, if any:
N/A
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green a e 13 of 27
PLN2022-004 Packet Pg. 732
b.
(STAFF COMMENTS)
Noise
(1) What types of noise exist in the area which may affect your project (for example: traffic, equipment,
operation, other)?
Single family residential zoning surrounds the site, SR 104 services the site so there will be road traffic
close to the right of way.
(STAFF COMMENTS)
(2) What types and levels of noise would be created by or associated with the project on a short-term or
a long-term basis (for example: traffic, construction, operation, other)? Indicate what hour's noise
would come from the site.
Contruction noise while the site is beingdeveloped.
eveloped.
(STAFF COMMENTS)
(3) Proposed measures to reduce or control noise impacts, if any:
None
(STAFF COMMENTS)
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green a e 14 of 27
PLN2022-004 Packet Pg. 733
8. Land and Shoreline Use
a.
b.
C.
What is the current use of the site and adjacent properties? Will the proposal affect current land uses on
nearby or adjacent properties? If so, describe.
Single family residential, same as being proposed.
(STAFF COMMENTS)
Has the project site been used as working farmlands or working forest lands? If so, describe. How much
agricultural or forest land of long-term commercial significance will be converted to other uses as a result
of the proposal, if any? If resource lands have not been designated, how many acres in farmland or forest
land tax status will be converted to nonfarm or nonforest use?
No
(STAFF COMMENTS)
(1) Will the proposal affect or be affected by surrounding working farm or forest land normal business
operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If
so, how:
No
(STAFF COMMENTS)
Describe any structures on the site.
Three existing residential buildings and two free standing garages.
(STAFF COMMENTS)
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green page 15 of 27
PLN2022-004 Packet Pg. 734
d.
e.
f.
9.
Will any structures be demolished? If so, what?
Yes, all existing structures will be demolished.
(STAFF COMMENTS)
What is the current zoning classification of the site?
RS-MP
(STAFF COMMENTS)
What is the current comprehensive plan designation of the site?
Single Family Urban 1
(STAFF COMMENTS)
If applicable, what is the current shoreline master plan designation of the site?
N/A
(STAFF COMMENTS)
Has any part of the site been classified critical area by the city? if so, specify.
No
(STAFF COMMENTS)
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green a e 16 of 27
PLN2022-004 Packet Pg. 735
j•
k.
In.
Approximately how many people would reside or work in the completed project?
(STAFF COMMENTS)
Approximately how many people would the completed project displace?
0
(STAFF COMMENTS)
Proposed measures to avoid or reduce displacement impacts, if any:
N/A
(STAFF COMMENTS)
Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if
any:
Project will meet all requirements of existing and proposed land uses.
(STAFF COMMENTS)
Proposed measures to reduce or control impacts to agricultural and forest lands of long-term commercial
significance, if any:
N/A
(STAFF COMMENTS)
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green page 17 of 27
PLN2022-004 Packet Pg. 736
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income
housing.
16 Middle to High income homes.
(STAFF COMMENTS)
b. Approximately how many units, if any would be eliminated? Indicate whether high, middle, or low-income
housing.
0
(STAFF COMMENTS)
C. Proposed measures to reduce or control housing impacts, if any:
Project will have a variety of house and lot sizes to satisfy a variety of housing needs.
(STAFF COMMENTS)
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is the principle
exterior building material(s) proposed?
25' — 30' with sloped roofs.
(STAFF COMMENTS)
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green page 18 of 27
PLN2022-004 Packet Pg. 737
11.
b. What views in the immediate vicinity would be altered or obstructed?
(STAFF COMMENTS)
C. Proposed measures to reduce or control aesthetic impacts, if any:
N/A
(STAFF COMMENTS)
Light and Glare
a. What type of light or glare will the proposal produce? What time of day would it mainly occur?
None
(STAFF COMMENTS)
b. Could light or glare from the finished project be a safety hazard or interfere with views?
No
(STAFF COMMENTS)
C. What existing off -site sources of light or glare may affect your proposal?
Street lights along right of way.
(STAFF COMMENTS)
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green page 19 of 27
PLN2022-004 Packet Pg. 738
d. Proposed measures to reduce or control light and glare impacts, if any:
u
a
m
E
a
0
(STAFF COMMENTS)
m
�a
r
a�
12. Recreation
a
m
w
a. What designated and informal recreational opportunities are in the immediate vicinity?
0
Recreational space (common space) for 10% of the overall site area is being provided.
r-
a
M
E
L
a
(STAFF COMMENTS)
a
Y_
R
3
_
d
b. Would the proposed project displace any existing recreation uses? If so, describe.
d
No
_
.L
�a
a�
2
2
3
a
(STAFF COMMENTS)
_
M
Q
(L
w
U)
4-
0
C. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be
a)
provided by the project or applicant, if any:
c
None
m
N
t
k
w
(STAFF COMMENTS)
c
m
E
t
0
t.
r
Q
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version). doc gage 20 of 27
Exhibit 27 - Greem� -"-
PLN2022-0041 Packet Pg. 739
13. Historic and Cultural Preservation
a.
b.
C.
d.
Are there any buildings, structures, or sites located on or near the site that are over 45 years old listed in, or
eligible for listing in national, state, or local preservation registers? If so, specifically describe.
(STAFF COMMENTS)
Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may
include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural
importance on or near the site? Please list any professional studies conducted at the site to identify such
resources.
No
(STAFF COMMENTS)
Describe the methods used to assess the potential impacts to cultural and historic resources on or near the
project site. Examples include consultation with tribes and the Department of Archeology and Historic
Preservation, archaeological surveys, historic maps, GIS date, etc.
N/A
(STAFF COMMENTS)
Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources.
Please include plans for the above and any permits that may be required.
N/A
(STAFF COMMENTS)
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green a e 21 of 27
PLN2022-004 Packet Pg. 740
14. Transportation
a.
b.
C.
d.
Identify public streets and highways serving the site or affected geographic area, and describe proposed
access to the existing street system. Show on site plans, if any.
New access/utility easements for access will be provided off SR 104, there is no other access to the site nor will
there be in the future.
(STAFF COMMENTS)
Is the site or affected geographic area currently served by public transit? if so, generally describe. if not,
what is the approximate distance to the nearest transit stop?
Yes, there are bus routes and bus stops along SR 104 within walking distance of the development.
(STAFF COMMENTS)
How many additional parking spaces would the completed project or nonproject proposal have? How
many would the project or proposal eliminate?
32 in driveways.
(STAFF COMMENTS)
Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state
transportation facilities not including driveways? If so, generally describe (indicate whether public or
private).
Right of way improvements will be required along SR 104.
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green page 22 of 27
PLN2022-004 Packet Pg. 741
e.
f.
9.
h.
(STAFF COMMENTS)
Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air transportation? If
so, generally describe.
No
(STAFF COMMENTS)
How many vehicular trips per day would be generated by the completed project? If known, indicate when
peak volumes would occur and what percentage of the volume would be trucks (such as commercial and
passenger vehicles). What data or transportation models were used to make these estimates?
The site traffic is 13 net new PM peak hour trips.
(STAFF COMMENTS)
Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products
on roads or streets in the area? If so, generally describe.
No
(STAFF COMMENTS)
Proposed measures to reduce or control transportation impacts, if any:
N/A
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green page 23 of 27
PLN2022-004 Packet Pg. 742
(STAFF COMMENTS)
15. Public Services
a. Would the project result in an increased need for public services (for example: fire protection, police
protection, public transit, health care, schools, other)? If so, generally describe.
No
(STAFF COMMENTS)
b. Proposed measures to reduce or control direct impacts on public services, if any:
N/A
(STAFF COMMENTS)
16. Utilities
a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone,
sanitary sewer, septic system, other:
Electricity, natural gas, public water, refuse service, telephone and data, sanitary sewer.
(STAFF COMMENTS)
b.
Describe the utilities that are proposed for the project, the utility providing the service, and the general
construction activities on the site or in the immediate vicinity which might be needed.
Site will have power from Snohomish county PUD, water from Olympic Veiw water district, sewer from city of
Edmonds or Olympic view water district, phone and data from local supplier.
Revised on 9119116
Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green page 24 of 27
PLN2022-004 Packet Pg. 743
(STAFF COMMENTS)
C. SIGNATURE
I declare under penalty of perjury laws that the above answers are true and correct to the best of my knowledge.
that the lead agency is relying on them to make its decision.
!�� i� �—�
Signature of Proponent Date Submitted
I understand
Revised on 9119116 Environmental Checklist - (SEPA - MS Word version).doc Exhibit 27 - Green Rage 25 0 27
PLN2022-004 Packet Pg. 744
File No.: PLN2022-0049 & PLN2022-0053
Applicant: Fernandez and Barnes LLC
DECLARATION OF RE -POSTING
On the 26th day of October, 2023, the attached Notice of Public Hearing and
SEPA Threshold Determination was posted as prescribed by Ordinance and in
any event where applicable on or near the subject property. It was not posted
at the Edmonds Library since it is being renovated following the 2022 water leak.
I, Mike Clugston, hereby declare under penalty of perjury under the laws of the
State of Washington that the foregoing is true and correct this 26th day of
October, 2023, at Edmonds, Washington.
Signed:
Exhibit 27 - Green
PLN2022-004 Packet Pg. 745
File No.: PLN2022-0049/0053
Applicant: Fernandez and Barnes LLC
DECLARATION OF RE -MAILING
On the 26th day of October, 2023, the attached Notice of SEPA Determination
and Public Hearing was mailed as prescribed by Ordinance and to property
owners within 300 feet of the property that is the subject of the above -
referenced application.
I, Mike Clugston, hereby declare under penalty of perjury under the laws of the
State of Washington that the foregoing is true and correct this 26th day of
October, 2023 at Edmonds, Washington.
Signed:
Exhibit 27 - Green
PLN2022-004 Packet Pg. 746
11/2/23, 8:33 AM CITY OF EDMONDS RE -NOTICE OF PUBLIC HEAR I Sound Search
Within 50 Miles `.,
SOUND
PUBLISHING INC
COMMUNITY DEUVERED
98201
Search Q
Enter Search Keyword
ShareThis
EVERYTHING » ANNOUNCEMENTS - LEGAL NOTICES - PUBLIC NOTICES 8
CITY OF EDMONDS RE -NOTICE OF PUBLIC HEAR
0 Watch O Unclip 4 Create Alert �; Print
Placed on 10/26/2023 1 Views: 274
CITY OF EDMONDS RE -NOTICE OF PUBLIC
HEARING AND SEPA THRESHOLD
DETERMINATION PROJECT DESCRIPTION:
This project is being re -noticed due to an error
with the original mailed notice to property owners
within 300 feet of the site. The public hearing is
rescheduled from October 26 to November 9,
2023. The proposal is for a preliminary formal
subdivision of a 2.88-acre site into 16 single
family residential lots using the planned residential
development (PRD) process. All existing
Exhibit 27 - Green
htti)s://secure.adoay.com/DetailsDisr)lay.asox?n=8895&itemid=18719670&networkview=False&catid=8901&i)catid=3030&iFr6M3ggg� Pac�Pg747
11/2/23, 8:33 AM CITY OF EDMONDS RE -NOTICE OF PUBLIC HEAR I Sound Search 1.ab
improvements would be removed, and a new plat
road constricted to serve the new lots with access
to Edmonds Way (SR-104). The site is zoned
Single Family Residential - Master Plan (RS-MP).
A master plan like a planned residential
development allows development at the site to
achieve an RS-8 zoning density (5.5 du/acre) while
being able to modify some of the RS-12
development standards that apply to the site
(excluding height). A PRD first requires review of
home designs and site layout, including usable
open space, by the Architectural Design Board
(ADB). The ADB reviewed the project and made a
recommendation on design to the Hearing
Examiner on July 27, 2023. The Hearing Examiner
makes the final decision on the preliminary PRD
and preliminary formal subdivision following a
public hearing. PROJECT LOCATION: 540 &
550 Edmonds Way (Tax ID #s: 27032500308300
& 27032500308400) NAME OF APPLICANT:
Fernandez Barnes LLC (Steve Barnes) FILE NO.:
PLN2022-0049 & PLN2022-0053 REQUESTED
PERMIT: Preliminary planned residential
development and preliminary formal subdivision
(consolidated Type Ill -A. Permit, Public Hearing
and Decision by the Hearing Examiner)
COMMENTS ON PROPOSAL DUE: November
9, 2023 Any person has the right to comment on
this application during public comment period,
receive notice and participate in any hearings, and
request a copy of the decision on the application.
The City may accept public comments at any time
prior to the closing of the record of an open record
predecision hearing, if any, or, if no open record
predecision hearing is provided, prior to the
decision on the project permit. Information on this
development application can be obtained online at
http://edmondswa.gov/public-notices-
text/development-notices.html under the
development notice for application number
PLN2022-0049/PLN2022-0053, by emailing the
City contact listed below, or by calling the City of
Edmonds at 425-771-0220. Please refer to the
application number for all inquiries. A copy of the
staff report will be available seven days prior to
the hearing. PUBLIC HEARING
INFORMATION: A hybrid public hearing will be
held by the Hearing Examiner on November 9,
2023 at 3 p.m. The physical location is Edmonds
City Hall, 121 5th Avenue N, 3rd Floor, Brackett
Room. Or join the Zoom meeting at:
https:Hus06web.zoom.us/j/84274057639?
pwd=ZFdpQzg4bOFEUU9ZcElybkd4bnF5 UT09
Meeting ID: 842 7405 7639 Passcode: 882737 Or
via phone by dialing 253-215-8782 SEPA
DETERMINATION: Notice is hereby given that
the City of Edmonds has issued a Determination of
Exhibit 27 -Green
httos://secure.adoay.com/DetailsDisr)lay.asr)x?r)=8895&itemid=18719670&networkview=False&catid=8901&ocatid=3030&opcl i Packet Pg. 748
11 /2/23, 8:33 AM
CITY OF EDMONDS RE -NOTICE OF PUBLIC HEAR I Sound Search
Nonsignificance under WAC 197-11-340 for the
above project. DATE OF REISSUANCE: October
26, 2023 SEPA COMMENTS: Any comments
regarding the SEPA determination are due
November 9, 2023. SEPA APPEAL: This SEPA
determination may be appealed by filing a written
appeal citing the specific reasons for appeal with
the required appeal fee no later than November 16,
2023 by 4:00 p.m. Only parties of record as
defined in ECDC 20.06.020 have standing to
initiate an administrative appeal to the Hearing
Examiner. CITY CONTACT: Mike Clugston,
AICP, Acting Planning Manager
michael.clugston@edmondswa.gov 425-771-0220
Published: October 26, 2023. EDH986383
O LESS
FEATURED
Bring your RV I Tiny Home I Park Model!
RELATED
CITY OF EVERETT Public Notice:
The City
Back to Search Results
Terms of Use Privacy Policy
© 2014 Sound Publishing, Inc. All rights reserved.
EXPERIENCED PRIVATE HOME CLEANER "Great...
CITY OF MARYSVILLE NOTICE OF
PUBLIC HEAR...
Mpay
The Port of Friday Harbor will
hold a Pu...
Report Abuse A
About Us Our Titles Careers!
Exhibit 27 - Green
httos://secure.adpay.com/DetailsDisolay.asox?p=8895&itemid=18719670&networkview=Falsa&catid=8901&ocatid=3030&qrg 6§04Packet Pg. 749
Clugston, Michael
From: Wicklund, Mary <MLWicklund@SNOPUD.com>
Sent: Tuesday, October 31, 2023 1:52 PM
To: Clugston, Michael
Subject: PLN2022 0049 & PLN2022 0053 Greenwalk Park
Attachments: 23-10-790 Greenwalk Park.doc
Follow Up Flag: Follow up
Flag Status: Flagged
You don't often get email from mlwicklund@snopud.com. Learn why this is important
Please see attached.
Mary Wicklund
Transmission & Distribution Engineering
Snohomish County PUD
mlwicklund(a)snopud.com
425-783-4318
Exhibit 28 - Green
PLN2022-004 Packet Pg. 750
EP[OECDProviding quality water, power and service at a competitive price that our customers value
October 31, 2023
Mike Clugston
City of Edmonds
121 5th Avenue North
Edmonds, WA 98020
Dear Mr. Clugston:
Reference: PLN2022 0049 & PLN2022 0053 Greenwalk Park
District DR Number: 23-10-790
The District presently has enough electric system capacity to serve the proposed
development. However, the existing District facilities in the local area may require
upgrading. Cost of any work, new or upgrade, to existing facilities that is required to connect
this proposed development to the District electric system shall be in accordance with the
applicable District policy. The developer will be required to supply the District with suitable
locations/easements upon its property for any electrical facilities that must be installed to
serve the proposed development. It is unlikely that easements will be granted on District -
owned property, or consents granted within District transmission line corridors.
Please be advised that per WAC
296-24-960 the minimum worker safety
Building or structure
clearance from an District distribution
y on
PUD Required Clearance
14'Min. for 12.47kV
conductor is 10 feet. Therefore, the
20'Min. for 115kV
District requires a minimum 14-foot
WAC 296-24960 _ 4'
clearance from any structure to
10'Min.
accommodate workers, scaffolding and
ladders. Minimum worker safety
PUD Required Clearance
clearance from 115kV transmission
14'Min.for 12.47kV
wires is 20 feet.
Scaffolding
Any relocation, removal or
undergrounding of District facilities to
accommodate this project and the worker
safety clearances shall be at the expense
of the project developer and must be
coordinated with the PUD in advance of
final design. Please include any required
utility work in the scope of all applicable
Center of pole line
land use/development/stormwater permits.
1802 — 751 Street S.W. • Everett, WA • 982031 Mailing Address: P.O. Box 1107 • Everett, WA • 98206-1107
425-783-4300 • Toll -free in Western Washington at 1-877-783-1000, ext. 4300 • www.snopud.com
Exhibit 28 - Green
PLN2022-004 Packet Pg. 751
The District policy requires the developer to provide a minimum 10-foot easement for
underground electrical facilities that must be installed to serve the proposed development. In
addition, the developer must maintain an 8-foot clearance between transformers and a 10-foot
clearance between switch cabinets and any building/structures upon its property. Additional
clearances may be required depending on the equipment in the area and accessibility of the
equipment.
Please contact the District prior to design of the proposed project. For information
about specific electric service requirements, please call the District's Plat Development team
at (425) 783-8465.
Sincerely,
Mc y w6ckUm& for
Mark Flury, Senior Manager
Transmission & Distribution System
Operations & Engineering
Exhibit 28 - Green
PLN2022-004 Packet Pg. 752
Clugston, Michael
From: Jacinda Carson <JacindaCarson@firstavenuelaw.com>
Sent: Friday, November 3, 2023 11:00 AM
To: Clugston, Michael
Subject: RE: Greekwalk Park Nov. 9 Public Hearing Written Comment
Attachments: Public Comment Final.pdf
You don't often get email from jacindacarson@firstavenuelaw.com. Learn why this is important
Mike,
Our firm would like to submit the attached document as a written public comment to the Greenwalk Park Public Hearing
(File No. PLN2022-0049 & PLN2022-0053). Please let me know if there is anything further that is needed.
Thank you,
Jacie Carson
Associate Attorney
FIRST AVENUE LAW GROUP PLLC
321 First Avenue West
Seattle, WA 98119
206-447-1900
JacindaCarson@firstavenuelaw.com
CONFIDENTIAL: The information contained in this transmission may be attorney -privileged and/or
confidential, intended only for the use of the individual or entity named above. if the reader of this message is
not the intended recipient, you are hereby notified that any dissemination, distribution, or copying of this
communication is strictly prohibited. if you have received this communication in error, please notify us
immediately and delete the e-mail that was erroneously sent to you. Thank you.
NO TAXADVICE.- First Avenue Law Group, LLC does not provide tax or accounting advice. This material has
been prepared for informational purposes only, and is not intended to provide, and should not be relied
on for, tax or accounting advice. You should consult your own tax and accounting advisors before
engaging in any transaction.
From: Clugston, Michael <Michael.Clugston@edmondswa.gov>
Sent: Wednesday, October 25, 2023 12:39 PM
To: Jacinda Carson <JacindaCarson@firstavenuelaw.com>
Subject: RE: Greekwalk Park Nov. 9 Public Hearing Written Comment
Hi Jacie,
Comments are accepted until the close of the public hearing. Send them to me, either as an email or an
attachment to one, and I'll include them in the Hearing Examiner's packet.
i
Exhibit 29 - Green
PLN2022-004 Packet Pg. 753
Thanks
Mike Clugston I Acting Planning Manager
City of Edmonds
425-771-0220, ext. 1330
michael.clugston@edmondswa.gov
The Building, Planning & Engineering Permit Center is open for walk-in service M-F 8:30am to 2pm (closed for lunch 12-
1 m.
Staff is available via phone, email and/or by appointment during working hours (typically 8-5pm)
For general service:
Phone 425.771.0220
Email engineeringpermits@edmondswa.gov
GIS / www.maps.edmondswa.gov
From: Jacinda Carson <JacindaCarson@firstavenuelaw.com>
Sent: Wednesday, October 25, 2023 12:30 PM
To: Planning <Planning@edmondswa.gov>
Subject: Greekwalk Park Nov. 9 Public Hearing Written Comment
Some people who received this message don't often get email from jacindacarson@firstavenuelaw.com. Learn why this is
important
Hello,
Our firm would like to submit a written comment on the Greenwalk Park Public Hearing (File No. PLN2022-0049 &
PLN2022-0053) that is now rescheduled for November 9. Would you please let me know the deadline for submitting a
written comment as well as how we should submit it.
Thank you,
Jacie Carson
Associate Attorney
FIRST AVENUE LAW GROUP PLLC
321 First Avenue West
Seattle, WA 98119
206-447-1900
JacindaCarson(@firstavenuelaw.com
CONFIDENTIAL: The information contained in this transmission may be attorney -privileged and/or
confidential, intended only for the use of the individual or entity named above. if the reader of this message is
not the intended recipient, you are hereby notified that any dissemination, distribution, or copying of this
communication is strictly prohibited. if you have received this communication in error, please notify us
immediately and delete the e-mail that was erroneously sent to you. Thank you.
NO TAXADVICE: First Avenue Law Group, LLC does not provide tax or accounting advice. This material has
been prepared for informational purposes only, and is not intended to provide, and should not be relied
Exhibit 29 - Green
PLN2022-004 Packet Pg. 754
on for, tax or accounting advice. You should consult your own tax and accounting advisors before
engaging in any transaction.
Exhibit 29 - Green
PLN2022-004 Packet Pg. 755
PUBLIC COMMENT TO PRELIMINARY PLANNED RESIDENTIAL
DEVELOPMENT AND PRELIMINARY FORMAL SUBDIVISION
PERMIT APPLICATION
To: Phil Obrechts
Hearing Examiner
City of Edmonds
From: Stephan D. Wakefield
Attorney for Dale Bonn, Owner of Neighboring Property
Project
Location: 540 and 550 Edmonds Way (Tax ID # 27032500308300 & 27032500308400)
FILE No.: PLN2022-0049 & PLN2022-0053
Hearing
Date: November 9, 2023
The commenting/objecting party, Dale Bonn ("Bonn"), has for many years owned a single-family
residence, constructed in 1952, located at 600 Edmonds Way, Edmonds, WA (the "Bonn
Property"). While Bonn previously resided in the home on the Bonn Property, she has more
recently leased it to tenants. Meanwhile, the neighboring parcels at 540 and 550 Edmonds Way,
Edmonds, WA and the subject of the proposed subdivision (the "Development Property"),
comprise 2.88 acres and are owned by Fernandez & Barnes, LLC ("Fernandez & Barnes"); a
limited liability company formed in 2014 and based in Kirkland, WA. Fernandez & Barnes has
made application with the City of Edmonds to subdivide the Development Property into 16 single
family residential lots through the above referenced file number.
Based upon information and belief, when the home on the Bonn Property was constructed in 1952,
it was provided the use of, and has since been benefitted by, a side sewer easement which runs
underneath the Development Property and is apparently shared with one or more existing homes
on the 550 Edmonds Way portion of the Development Property (the "Sewer Easement"). A 1952
survey of the subject properties confirms the Sewer Line running under the Development Property
(See attached Exhibit 1). It is understood that the same sewer line running under the Development
Property pursuant to the Sewer Easement, has been the sole sewer line serving the home on the
Bonn Property since it was constructed in 1952.
Fernandez & Barnes currently seeks approval to subdivide the Development Property into 16
single family residential lots and remove the existing homes. Due to the Sewer Easement, Bonn
is gravely concerned about the effect the proposed development will have on the Bonn Property
Sewer Easement. The depiction of the proposed subdivision in the Notice of Public Hearing
appears to place three new homes in the same location as the existing Sewer Easement. While the
existing public access sewer easement is depicted in the project's renderings, there is no mention
Exhibit 29 - Green
PLN2022-004 Packet Pg. 756
or depiction of the Sewer Easement serving the Bonn Property. In this regard, while the developer
Fernandez & Barnes acknowledged the existence of the Sewer Easement in a September of 2022
letter to Bonn, it did not offer any specific solution merely stating it will coordinate with Bonn
(See attached Exhibit 2). Since September of 2022, Bonn has heard nothing more.
Based on the above, Bonn respectfully requests that any approval of the subject project require
sufficient and necessary measures to ensure the Sewer Easement remain fully intact and
functioning, so it will continue to adequately serve without interruption, the Bonn Property.
Further, Bonn requests that any demolition or construction activity on the Development Property
be limited to specified hours of the day and week to avoid the disruption of noise and dust to the
residents of the home on the Bonn Property (for example, Monday through Friday from 8:00 am
to 6:00 pm).
Thank you for your consideration.
DATED this 3rd day of November, 2023.
FIRST AVENUE LAW GROUP, PLLC
s/s Stephan D. Wakefield
Stephan D. Wakefield. WSBA #22762
FIRST AVENUE LAW GROUP, PLLC
321 First Avenue West
Seattle, WA 98119
(206) 447-1900
Exhibit 29 - Green
PLN2022-004 Packet Pg. 757
EXHIBIT 1
'F
0
cn
FU
E
L
0
U-
_
N❑
6L
a
a)
E
0_
0
m
as
❑
r
m
.N
a�
a=
d
_
_
0
a
_ E
.@
L
IL
L
a
3
m
a�
/L^
V
_
a)
E
E
0
0
_
0
W
L
U
an
N
r�
t
X
W
w
_
d
E
t
U
f�
a
Exhibit 29 - Green
PLN2022-004 Packet Pg. 758
1.
ram' f [-;IA COP�C�� .�� ,,y� / a-�3 S4/ 1.ad
4
67
Ivo V" tr w,
clir-
�tb ~�u� G��•cc��'�. -; �, ; �G ` ..sue- � � o
25
-��
Ir
yaj
�`� ins- � � i � � / /"�� � ! �s� s �6 ��oy�' �✓ � � ` -tea
I � 1+VL/0 (�1
IrEEWE
\�` SR
r_
a
MovSe47
a
Ilk
CL
p'QoMAD �O ,+ �a
I SHOP ;
E
-16
�—— o
QC<AT CF soey.6y �� SCRLE: / S.�Q ,1; :. .l.. ` o4
04
elllvan4 _
l'Q.QT/O/Y O�
%� IG NWT 1!4 ✓ lV �� YL� f . �S / Z 7/' n 3 w
i .Sj1/C�/GJl�/.�� LO(JNT }', !/LN 1` _� y �; • ; � C
-1
A,76yr v.1J,�.SY.�
a
Exhibit 29 Green
PLN2022-004 Packet Pg. 759
EXHIBIT 2
'F
0
cn
FU
E
L
0
U-
_
N❑
6L
a
a)
E
0_
0
m
as
❑
r
m
.N
a�
a=
d
_
_
0
a
_ E
.@
L
IL
L
a
3
m
a�
/L^
V
_
a)
E
E
0
0
_
0
W
L
U
an
N
r�
t
X
W
w
_
d
E
t
U
f�
a
Exhibit 29 - Green
PLN2022-004 Packet Pg. 760
GREENWALK
DESIGNS LLC.
127�3 39TH AVE NE PHONE 20G 550.9296
SEATTLE, WA 98125 WAIL $BARN ESOCOW* RSTQNEARCH COM
September 16, 2022
Dale Bonn
PO Box 72
Edmonds, WA 98020
RE: Project Greenwalk Park 16-Lot Subdivision PLN2022-0053 & PLN2022-0049
Dale, We received the letter forwarded to us from the city. Sorry the invitation didn't make it to you for
the neighborhood meeting but we are happy to communicate with you to reduce your concerns. We
have renters on our site who we intend to keep through the first phase of construction so our hours of
work and control of sound and dust will be a top priority during construction. Below are answers to your
concerns as listed in your letter.
1. The sewer easement on 540 is public and we cannot interrupt service so it will stay as is.
According to Mr Molnar your sewer doesn't go to the sewer easement but in fact is connected
to the side sewer with the houses on 550 Edmonds way which goes directly into the sewer in
SR104. We will need to coordinate this will you, but the disruption will be hours not days.
2. We are not a large developer and are always working on infill projects, so we do a very good job
of controlling noise and dust. We will not be looking to work outside of the normal working
hours allowed by the City of Edmonds. The noise we create will be short in duration and will not
exceed the noise already being generated by traffic on the highway. We do intend to install a 6'
cedar fence along our shared property line which will provide privacy for your outdoor spaces.
3. We have received permission from WSDOT to put in the new driveway for the 16 houses.
WSDOT will be designing the intersection to reduce impacts to traffic and reduce left turns out
of our drive.
4. We had an arborist tag and write a report identifying and measuring all the trees on the sites
which is included in the required arborist report. Tags indicate tree numbers for the report, not
indicating we are cutting down the tagged trees. We are only allowed to cut down a certain
percentage of the on -site trees. All the trees along SR104 and along your property line are being
saved. We will be planting about 100 new trees on the site along with other landscaping
including shrubs and lawns. The city already has requirements for planting trees in this
development which we will be meeting or exceeding. We are also concerned with global
Exhibit 29 - Green
PLN2022-004 Packet Pg. 761
warming and are designing our development accordingly with low impact design techniques and
what are called best management practices for on site water collection and infiltration.
5. There will be two common spaces on our property to comply with City of Edmonds
requirements. We haven't decided exactly what type of amenities we will put in the one
adjacent to SR104 but we feel it's better to have a common space at that location than a house
which would be more disrupted by the traffic noise.
We will be building a number of new houses next to your property. The final layout will not change the
current environment of your property, since there are already houses on S50 Edmonds way your
neighbor. The homes we are building will be new and energy efficient. For the most part the drives are
on the opposite side of the new homes from your property so our on -site vehicle traffic will not impact
your property except for the added vehicles accessing SR104.
Our development complies with zoning requirements and the cities comprehensive plan. Tree retention
complies with city requirements. We are building to the latest energy codes and storm water
development requirements for low impact design.
We would be happy to meet with you or have a zoom or phone conference to address any other
concerns you may have or provide more details to support my answers to your questions. We realize
you have owned property adjacent to a very underutilized residential site and that will be going away.
We know the neighbor to our south is continuing to develop their property as well.
Sincerely,
5� J_�
�4%�
Steve Barnes
Exhibit 29 - Green
PLN2022-004 Packet Pg. 762