Building PermitType: SOLAR Subtype: SOLAR RESIDENTIAL I Status: ISSUED
Parcel No: 00484500300100
Subdivision: 004845
Fire Sprinklers:
Valuation: $0.00
Code Edition: 0
Site Address: 702 CEDAR ST EDMONDS,WA 98020-3417
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: RAMELLA-PEZZA- ROOFTOP SOLAR
Applied: 11/8/2023
Issued:11/8/2023
Final:
Expiration Date: 5/6/2024
Issued by: NED
I WA State Contractor L & I #: SOLTEGL831BZ I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
NEIL GOWLER
2909 1ST AVE S, SEATTLE WA
(800)865-9005
SOLARADMIN@SOLTERRA.COM
98134
CONTACT
SOLTERRA GLOBAL
LLC
2909 1ST AVE S, SEATTLE WA
(800)865-9005
solaradmin@solterra.com
98134
CONTRACTOR
SOLTERRA GLOBAL LLC
2910 1ST AVE S #201, SEATTLE
(800)865-9005
solaradmin@solterra.com
WA 98134
OWNER
M\ROY M E RAMELLA-PEZZA
702 CEDAR ST, EDMONDS WA
98020
?0".. I •
DESCRIPTION
7BLDPERMITIT
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
BASE FEE
001.000.322.10.000.00
$100.00
$100.00
11/8/23
R32572
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
11/8/23
R32572
PERMIT
SOLAR - RESIDENTIAL
001.000.345.83.000.00
$38.00
$38.00
11/8/23
R32572
STATE BUILDING CODE SURCHARGE
001.000.237.150
$6.50
$6.50
11/8/23
R32572
RES
TOTALS: $189.50
$189.50
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Wednesday, November 08, 2023 3:11:40 PM 1 of 2
SOLARPerCity mit
-
• • •
•: i 1 �24
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR COMPLETED RESULT
NOTES
X-1 FIRE FINAL
X-3 BUILDING FINAL"
Printed: Wednesday, November 08, 2023 3:11:40 PM 2 of 2