Loading...
Building PermitType: COMMERCIAL BLDG Subtype: COM ALTERATION OR REPAIR I Status: ISSUED Parcel No: 00871500010000 Site Address: 130 21ND AVE S EDMONDS,WA 98020-3512 Subdivision: 004344, 004548, 008715 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $350,000.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: SOUNDVIEW PLAZA -STUCCO AND WINDOW REPLACEMENT Applied: 8/3/2023 Issued:11/8/2023 Final: Expiration Date: 11/2/2024 Issued by: NED I WA State Contractor L & I #: PACIFBE89011 I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT CAELUM ROBERTS 12721 30TH AVE NE 2ND FLOOR, (206)271-1595 CAELUMR@TEAM4EA.COM SEATTLE WA 98125 CONTACT 4EA 12721 30TH AVE NE 2ND FLOOR, (206)271-1595 caelumr@team4ea.com SEATTLE WA 98125 CONTRACTOR PACIFIC BUILDING ENVELOPE 17120 9TH AVE SE, MILL CREEK (425)512-8455 jon@pacificbuildingenvelope.com WA 98012 OWNER SOUNDVIEW PLAZA-JIM 15691 104TH AVENUE 205, (604)488-5252 PATTISON DEVELOPMENTS SURREY BC V4N 21-14 19 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # BLD - COM VALUE BASED FEE 001.000.345.83.000.00 $3,100.00 $3,100.00 11/8/23 R32576 BLD - COM VALUE BASED REVIEW 001.000.345.83.000.00 $2,635.00 $2,635.00 8/14/23 R30692 CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 8/14/23 R30692 PERMIT STATE BUILDING CODE SURCHARGE 001.000.237.150 $25.00 $25.00 11/8/23 R32576 COM TOTALS: $5,805.00 $5,805.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Wednesday, November 08, 2023 4:46:26 PM 1 of 3 •MERCIAL BLDG PermitCity • • • • - •:0i 1 1.. www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ESC REQUIREMENTS FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD INFORMATION REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. INSPECTIONS FOR SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INFORMATION www.mybuildingpermit.com Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. TRAFFIC CONTROLS FOR Traffic Control per approved plan and MUTCD. All Flaggers shall be certified. NFORMATION FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. Printed: Wednesday, November 08, 2023 4:46:26 PM 2 of 3 •MMERCIAL BLDG Permit PERMIT NUM City of Edmonds 98020 1 19 . •. INSPECTIONS• •. INSPECTOR COMPLETED RESULT NOTES AdINSPECTIONTYPE A-1 BUILDING PRECON B-3 EXT WALL SHEATHING B-3 STUCCO B-4 FRAMING B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" X-2 ENGINEERING FINAL Note to Inspector: This inspection was added to ensure that the ROW permit was finaled prior to/at the same time as the building permit. Printed: Wednesday, November 08, 2023 4:46:26 PM 3 of 3