ENG2023-0498 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMIT NUMBER
City of Edmonds
NG21 1 498
i
J.E www.edmondswa.gov
Description: COMCAST-PULL FIBER TO 210 RAILROAD; EXP. PERMIT ENG2021-0135
ISSUED: 11/09/2023
Address: 190 W DAYTON ST EDMONDS WA 98020
EXPIRES: 05/09/2024
rmit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 27032300406400
i
NAME TYPE NAME ADDRESS PHONE
APPLICANT JESSAMIN SANTOS 410 VALLEY AVE NW, PUYALLUP WA 98371 (206)401-2188
CONTACT COMCAST 410 VALLEY AVE NW, PUYALLUP WA 98371 (206)401-2188
CONTRACTOR CABLECOM LLC 19910 NORTHCREEK PARKWAY N, BOTHHELL WA 98011 (363)608-6700
OWNER PORT OF EDMONDS 336 ADMIRAL WAY, EDMONDS WA 98020-7214
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT
$45.00 $45.00
ENG - INSPECTIONS
$252.00 $252.00
RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING- WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 11/09/2023
Printed: Thursday, November 09, 2023 11:18:38 AM 1 of 2
RIGHT OF WAY EUC PERMIT
PERMIT NUMBE3
City of Edmonds
,...Ave
N, Edmonds WA 9:01 14•:
www.edmondswa.gov • •
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
COMPLETE
A-1 JOB START
E-7 TRAFFIC CTRL
X-2 ENGINEERING FINAL**
Printed: Thursday, November 09, 2023 11:18:38 AM 2 of 2
of EOMoz
RECEIVED
RIGHT OF WAY CONSTRUCTION OCT 03 2023
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal CITY OF EDMONDS
p pp DEVELOPMENT
'Vci s')3 Requirements outlined in Right -of -Way permit Handout E6�. SERVICES DEPARTMENT
If any field is not applicable to your project, write "N/A' instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General •
Project Name JB-613572
Site Address or if no site address use Property Address at NW corner of project area: 190 W DAYTON ST, Edmonds, WA 98020
Associated Permits: BLD PLN ENG (resub of expired ENG2021-0135)
Owner and Entity Holding
Name of Company Comcast Cable Communications Management, LLC. Franchise Ordinance No:
Point of Contact Jessamin Santos
Title Permit Coordinator
Address 410 Valley Ave NW
City Puyallup
State WA
Zip 98371
Phone (2o6) 401-2188
Email jessamin_santos@cable.comcast.com
Contractor and Authorized Agent of Owner
Name of Company Cablecomm, LLC
(see note below)
Contractor Contacts During Construction
Primary Name CHRIS ATKINSON
Agent Name Leah Ihlenfeldt
Title Construction Supervior
Title Permit Coordinator
Mobile 36o-926-3437
Address 1316 BONNEVILLE AVE ,BLDG A,
Email CHRIS.ATKINSON@CABLECOMLLC.NET
City Snohomish
State wA
Zip 98�90
Secondary Name
Phone (36o) 668-1300
Title
Email leah.ihlenfeldt@cablecomllc.net
Mobile
City of Edmonds Business License No: NR-o21818
Email
State License No: CABLE-971DP
® Contractor verifies it is currently bonded
® Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as welt
❑ Traffic Control Only (no associated development)
X Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 Of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
The proposed work in the right of way is to dig and intercept 4" conduit on north side of W Dayton St, overset
with new vault in landscape- (medium duty/pedestrian grade); bore new 2" conduit from ROW to private
(approx 25' in ROW) towards address 190 W DAYTON ST (210 RAILROAD AVE), Edmonds, WA 98020;
pull new go' of 24ct fiber from vault on south side of W Dayton St toward address 210 Railroad Ave.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
x
LF
SF
NA
Alley 72 hours +
LF
x
LF
SF
NA
Parking 72 hours +
LF
x
LF
SF
NA
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications X cable (fiber) ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
X
2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
X
If yes, describe: vault
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
X
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
X
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
X
Are the additions for the purpose of serving new commercial development?
X
Are the additions for the purpose of serving a single-family residential subdivision?
X
Details
of Work to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
X
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
X
How many are existing? 1 1-2 1How many are to be added? 1
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
X
How many poles are existing in the project area? 2
What is the height of the existing Poles? 45-50
How many poles are to be removed? o
Are additional poles to be laced? no
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
X
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsibleforall permit fees.
APPLICANT SIGNATURE: Je SaW(n , Saht0S
APPLICANT PRINTED NAME: Jessamin Santos
APPLICANT TITLE: Permit Coordinator
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
9/29/2023
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
Route Overview
Completed By:
KCS
Address:
210 RAILROAD AVE, EDMONDS, WA 98020
Completion Date:
3/20/2021
Footages
C^ � � A � T
(�J) I
Survey Revision Date:
New Aerial Coax
0
Overlash Coax
0
New UG Fiber
677
Survey Revision Task ID:
New Aerial Fiber
0
Overlash Fiber
0
Existing UG Fiber
0
Engineered For:
ISP Footage
0
New UG Coax
0
Total Aerial
0
Project Manager:
Conduit Only
0
Existing UG Coax
0
Total Underground
677
P2 ID:
JB0000613572
Are Additional Pages Needed
No
r Total Private Footage
0
Legend
,, ♦yeo�b . - ; -�'
` e4eeee♦♦e~'♦e,� ,e♦���♦�;.:; /j �..
o''. ":�` ;= �/ ;;/ CONTINUE PULLING 1-24CT INTO
,
Existing Vault
New Vault ❑V
Pole
Lock Box
Existing U/G
Footage 150'
PROOF AND PULL 1-24CT FIBER • `�♦210 BUILDING TO SERVER
• �� +`�♦♦4 '' �*�� 55' `
FROM TIE IN TO VAULTS LABELED - / i� ♦`� LOCATION. LEAVE COIL FOR
_ �:♦.e♦♦
Existing Aerial
New U/G
Text Box Text
Callout Arrow
"SYSTEMS" r INSTALL
, i ��, �
r • -
New Aerial
73,
Interior Path
New Tap 0
Phase Identifier ❑1
•. '•r,. !� / ;� , I ..
' 0 o ;
3 �' ,' i
Footage Break
Power Supply
Bro Ee Se� • ;� � %" �' �
Fiber Splice Point
Storage Loop
Hard Surface Cut •
, --
�1
��• / �. -*' " %
22s' .. �- `�AV�
p r/ h
Route Overview
Provide Clear Detail about the Project
Construction Notes:
RECEIVED
BORE 120' AND PULLBACK 1-2"
CONDUIT TO VAULT IN b_ , / • �•.
ENGINEERING DIVISION
OCT 03 2023
SIDEWALK LABELED "SYSTEMS"
DIG AND INTERCEPT 4"
APPROVED AS NOTED
CITY OF EDMONDS
DEVELOPMENT
•, 194' - CONDUIT ON NORTH SIDE OF W t
=• '
r 4 , '"- , / i
v�- DAYTON ST. PLACE NEW
-' 1T'f .�^ ' 24"x36"x36" VAULT in
jr� '`� �.�` `" t%
Jill LIlQ✓..7,u...�np 11 /06/2023
vv
SERVICES DEPARTMENT
1�•f
` .-` � `�, � / , - LANDSCAPE BEHIND SIDEWALK
Q"��•. ' °" �;
2.W--W,
1201,
APPROVAL FOR ALL WORK
PROOF EXISTING 4" ��. �'O�
PROOF
.N CITY RIGHT-OF-WAY.
COMCAST CONDUIT _
'
COMCAST TO
COORDINATE WITH ALL
WORK ON CUSTOMER'S
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
ngtheperdards iscausedor
_ _ PLACE NEW STRAP OUT OF
AND PULL NEW FIBER �: _
b5'
, CROSSING
DAYTON ST
J — --
PRIVATE PROPERTY.
oper ccurs during
occursduring the permitted project.
r•t' -
— �:. �� � - ;�l 4�!'n. ���i►°•�:,.'' �'- _ - �t� Map data t�S2020 Google. C�i202t
OWNER/CONTRACTOR IS RESPONSIBLE FOR OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
EROSION CONTROL AND DRAINAGE ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
Route Overview
Completed By:
KCS
Address:
210 RAILROAD AVE, EDMONDS, WA 98020
Completion Date:
3/20/2021
Footages
COMICAST
Survey Revision Date:
New Aerial Coax
0
Overlash Coax
0
New UG Fiber
677
Survey Revision Task ID:
New Aerial Fiber
0
Overlash Fiber
0
Existing UG Fiber
0
Engineered For:
ISP Footage
0
New UG Coax
0
Total Aerial
0
Project Manager:
Conduit Only
0
Existing UG Coax
0
Total Underground
677
P2 ID:
JB0000613572
Are Additional Pages Needed
No
Total Private Footage
0
Legend
_=14wo
_9+r ,7
• . - . N.
r �,.•'f y
.
!
Existing Vault
Pole.,
New Vault ❑V
Lock Box
BORE 120' AND PULLBACK 1-2"
;
Existing U/G
Footage
g
150'
CONDUIT TO VAULT IN
SIDEWALK LABELED "SYSTEMS"
"
r
Existing Aerial
Text Box
Text
120'
/ -
New U/G
Callout Arrow
.`
-
�±
f
New Aerial
New Tap
- ��
DIG AND INTERCEPT 4"
Interior Path
Phase Identifier
❑1
• .
CONDUIT ON NORTH SIDE OF W
DAYTON ST. PLACE NEW
Footage Break
Fiber Splice Point H
Power Supply
Hard Surface Cut
Ps
OC
�J
°. °
- -
_
24"x36"x36" VAULT in
= ' LANDSCAPE BEHIND SIDEWALK
r
11
Storage Loop CD
AM V A -A
ROW WORK OverviewtA
Provide Clear Detail about the Project
Construction Notes:,
, END CITY OF
EDMONDS
LIN°
—
*ZOOM OF ROW WORK LOCATION
ROW
'
66,
r•r
lV o 6$' o . o
Dayton
PROOF EXISTING 4" COMCAST
4 CONDUIT AND PULL NEW
— o
—
RECEIVED
h' FIBER CROSSING W DAYTON
Wiz"
' ST
r
—
OCT 03 2023
1
CITY OF EDMONDS
DEVELOPMENT
:
i PLACE NEW STRAP OUT OF
CASE SP.WALY.8815IN
SERVICES DEPARTMENT
EXISTING VAULT AND TIE IN
Right of Way
Completed By:
KCS
N
° 7
�( o •- _ : E
a.
• ••• �
s
Completion Date:
3/20/2021
Address
210 RAILROAD AVE, EDMONDS, WA 98020
COMCAST
Survey Revision Date:
Survey Revision Task ID:
Footages Entered On Route Overview Sheet
Engineered For:
Project Manager:
-
P2 ID:
JB0000613572
Additional Pages Needed
No
Legend
Existing Vault
Pole
New Vault IV]
Lock Box
Existing U/G
Footage
Existing Aerial
Text Box
New U/G
Callout Arrow
New Aerial
New Tap
Interior Path
Phase Identifier
Footage Break
Power Supply
Fiber Splice Point
Hard Surface Cut
Storage Loop
w
Right of Way
Provide Clear Detail about the Project
Construction Notes:
RECEIVED
OCT 03 2023
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
150'
Text
�1
PS
O
PLACE NEW STRAP OUT OF ;` PROOF EXISTING 4"
i CASE SP.WALY.8815 IN VAULT COMCAST CONDUIT
AND TIE IN AND PULL NEW FIBER
CROSSING W
DAYTON ST
;20 - -
65' BEER
PATIO
V
BORE 120' AND PULLBACK 1-2"
CONDUIT TO VAULT IN
SIDEWALK LABELED "SYSTEMS"
■
V
DIG AND INTERCEPT 4"
CONDUIT ON NORTH SIDE OF W
DAYTON ST. PLACE NEW
24"x36"x36"VAULT in
LANDSCAPE BEHIND SIDEWALK
1
T
PROOF AND PULL 1-24CT
FIBER FROM TIE IN TO
VAULTS LABELED "SYSTEMS"
Ir .1=
225'
Q
Grade Level Box BULK®
z4 /oiv mm aeptn
RECEIVED
OCT 03 2023
• TM
th Covers
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
FEATURES
Upgradeable
Lightweight/Strong (TIER 22)
Patented Anti -Slip Technology
Anti -Seize Bolt Technology
Industry Leader in Anti -Trip
Hazard Prevention
Superior Fatigue Resistance (EST)'"
Vertical and Horizontal Rib Design
Embedded Vertical Racking
• Reduced Installation Cost
Highest Load Rating to Weight
Ratio in the Industry
TESTING CRITERIA
Covers meet or exceed:
EST'" 3 Million Cycles
Telecordia GR-902-CORE
Western Underground Committee
Guide 3.6
ANSI/SCTE 77 2013-TIER 22
EN124 Class B125
Bodies meet or exceed:
Telecordia GR-902-CORE
Western Underground Committee
Guide 3.6
ANSI/SCTE 772013-TIER 22
EN 124 Class 13125/C250
ASTM-457
AASHTO M-306 (H-20/25)
AS3996-Class B/C
PRODUCT SUMMARY
With over 90 years experience in global (OSP)
infrastructure, Channell has developed the
most advanced pit and chamber technology
in the world! Channell's BULK and SHIELD
patented designs with the complement of
SUPER BULK for roadway applications offer
global users, consumer, and craft installers
safety benefits never before contemplated, but
critical when considering new global health and
safety standards.
BULK's lightweight design increases installation
efficiencies while improving overall body weight
carrying load capacities versus concrete,
polymer concrete, and many other body
materials. Reduction of BULK's body weight
protects the safety of installers while shortening
installation times. Additionally, with BULK
bodies, cutting ducts in the field produces no
harmful dust contaminants which could lead to
installer respiratory issues.
All SHIELD covers meet or exceed 33,750
pound -force or 150 kilonewtons in strength.
They never break and offer a lid weight
reduction over concrete and polymer concrete
of 50%, and over 70% when compared to cast
iron. SHIELD's lighter weight design cover
reduces craft injuries while improving health
and safety specifications.
ECEIVED
CT 03 2023
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
Consumers also benefit from SHIELD's
patented anti -slip design and anti -trip features.
SHIELD's cover tread design raises global
industry standards by offering 20% greater
slip resistance when compared to concrete,
polymer concrete, steel or cast iron covers.
SHIELD meets and exceeds Australia AS4586
skid specification, the highest global standard in
the world!
Overall, BULK's strength in combination with
Channell's SHIELD covers offers a universal
solution to meet and exceed every company's
needs. Safety always comes first, and that's why
BULK and SHIELD are tested to the highest
standards available in the global market and
Channell is proud to have pioneered Endurance
Stress Testing (ESTTI) which analyzes cover
fatigue in the field. ESTTI provides essential data
on the life expectancy of a SH I ELD lid in the
field and confirms its potential life expectancy.
Product design, product innovation, safety
attributes, and new manufacturing technology is
why global customers are specifying Channell's
BULK and SHIELD products for their new OSP
infrastructure requirements.
STANDARD FEATURES
lE
Anti -Slip Tread Design Anti -Trip Cover Recessed Lifting Pin Non -Seizing Bolt System Flush Mounted Sidewall Racks
with Cover Allows Field Replacement Increase Usable Space
Mounting Studs
OPTIONAL FEATURES
L-Bolt Security System
(SHIELD Cover Shown)
Design and specifications may vary.
Logo Puck
(Custom Options Available)
Winterized Cable
Drop Slide
Marker Locator Device Swing -Arm with Butterfly Cable Hook Step Bracket
Mounting Plate Bracket with Wedge
THE NEW SOLUT
3 covers
Composite Ring
Optional
RECEIVED
OCT 03 2023
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
Ibady
14-im.� ,�►
HDPE Plastic Cover
Light Duty 3,000 Ibf (13.5 kN)
,�Ww
Composite Cover
33,750 Ibf (150 kN)
IMT7.
Ductile Iron Cover
with steel Ring
56,200 Ibf (250 kN)
SPECIFICATION
PROOF LOAD
PRnnijrTS
STANDARDSAMERICAS
Pedestrian/Light Duty
3,000 Ibf (13.5 kN)
Q
ANSI/SCTE 77TIER 15
22,500 Ibf (100 kN)
F=K
ANSI/SCTE 77 TIER 22
33,750 IF (150 kN)
eq
Q
AASHTO M-306-10 H 20
40,000 Ibf (178 kN)
AASHTO M-306-10 H 25
50,000 Ibf (222.4 kN)
ASTM-457
46,000 Ibf (205 kN)
r1ff fit
Pedestrian/Light Duty 2,250 Ibf (10 kN) Q
EN 124 Class B125 28,100 Ibf (125 kN) Q
EN 125 Class C125 56,200 Ibf (250 kN)
Pedestrian/Light Duty 3,370 Ibf (15 kN) f ^e AM—
AS3996-Class B 18,000 Ibf (80 kN)
AS3996-Class C 33,750 Ibf (150 kN)� ���'n��►�
:•X044Z
Ribbed sidewall design secures
body into backfill soil and
eliminates sidewall deflection.
Straight wall design improves lid
load strength.
Flush mounted racks enhance sidewall
and vertical strength of pit while
increasing usable space.
HDPE bodies provide easy field
alteration while eliminating water
absorption and material degradation
while maintaining structural integrity,
and eliminating toxic fiberglass dust.
RECEIVED
OCT 03 2023
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
BODY SPECIFICATIONS
Cover Weight 50 Ibs [23 kg]
Pit Weight 82 Ibs [37 kg]
Assembled Weight 132 Ibs [60 kg]
Drawing shown with
(9
Composite Cover
MW
BULK 4 Vault Body
36" [914 mm] Depth
Shown
RECEIVED
OCT 03 2023
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
BULK
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
16' Lane width
42' EOP to EOP
ROLL SPACING
(MIN 50' MAX 1001
*Spotter to assist pedestrians
through work zone
BUFFER SPACE
(SEE TABLE A)
D 0 0 0 0 0 0 0 0 0 0 0 0 0
W 1-4L
O
W20-1
ROAD
WORK
AHEAD
TAPER LENGTH
(SEE TABLE A)
SEE
NOTE 1
SEE
NOTE 1
I@
ER Oo
0 ❑
****4 0 0 0 0 0 0 0 0 0 0 0 0 � Q 0�° O
4o00o00o000o WDAYTONST
-k4
i
SEE SEE TAPER LENGTH
NOTE 1 NOTE 1 (SEE TABLE A) TRAFFIC CONTROL INSPECTION SHALL BE
REQUIRED WHENEVER WORK ZONE IS SET UP
ROAD ROAD NOTES LEGEND
WORK NARROWS 1. DISTANCE BETWEEN SIGNS SHALL BE 100' FOR 0 CONE OR CHANNELIZING DEVICE SEE STANDARD
AHEAD RESIDENTIAL STREET (25 MPH) AND 350' FOR ARTERIAL DRAWING 713.
ROADWAYS.
W20-1 W5-1
TABLE A
SPEED
(MPH)
TAPER LENGTH
FOR SHIFT WIDTH
CONE SPACING
(FT)
BUFFER
SPACING
5'
6'
TANGENT
TAPER
(FT)
25
26'
31'
25
20
55
30
38'
45'
30
85
35
51'
61'
35
120
40
67'
80'
40
170
45
113'
135'
45
220
2. FLASHING BEACON INSTALLED AT EACH SIGN FOR
NIGHT-TIME USE (OPTIONAL).
3. DISTANCES MAY VARY AS APPROVED BY THE ENGINEER.
4. SPOTTERS REQUIRED TO CONTROL TRAFFIC WHENEVER
THE CONTRACTOR MUST INTERRUPT TRAFFIC FLOW TO
ACCESS THE WORK SITE WITH MATERIALS OR EQUIPMENT
(FLAGGING REQUIRES 3 OR 4 SIGN SETUP).
5. FOR ALTERNATE LANE SHIFT WIDTH REFER TO "MANUAL
ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD)
TABLE 6C-2 PAGE 6C-10.
ENGINEERING DIVISION
APPROVED AS NOTED
Jell WQ✓..y.a.nno 11/06/2023
vv
RECEIVED
OCT 03 2023
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
6. SIGN SIZE PER MUTCD.
7. THIS PLAN IS PROVIDED AS A GUIDE ONLY. FOR SPECIFIC TITLE TRAFFIC CONTROL PLAN
INFORMATION ON THE TRAFFIC CONTROL PLANS SEE 2 LANE ROADWAY:
CURRENT MUTCD.
PARTIAL LANE CLOSURE
I
RECEIVED
OCT 03 2023
CITY OF EDMONDS M BuildingPermit.com
CITY OF EDMONDS
DEVELOPMENTRight-of-Way Application #1383442 - Comcast JB-613572 SERVICES DEPARTMENT
Applicant
First Name Last Name Company Name
Jessamin Santos COMCAST
Number Street Apartment or Suite Number E-mail Address
410 Valley Ave NW jessamin_santos@cable.comcast.com
City State Zip Phone Number Extension
Puyallup WA 98371 (206) 401-2188
Contractor
Company Name
Cablecom LLC
Number Street Apartment or Suite Number
1316 BONNEVILLE AVE BLDG A
City State Zip Phone Number Extension
SNOHOMISH WA 98290 (360) 668-1300 (360) 454-3163
State License Number License Expiration Date UBI # E-mail Address
CABLEL*971 DP 8/21/2025 Rn99RSS79 leah.ihlenfeldt@cablecomllc.net
Project Location
Number Street Floor Number Suite or Room Number
190 W DAYTON ST
City Zip Code County Parcel Number
EDMONDS 98020 27032300406400
Associated Building Permit Number Tenant Name
00984006040400
Additional Information (i.e. equipment location or special instructions)_
Work Location
Property Owner
First Name Last Name or Company Name
* PORT OF EDMONDS
Number Street Apartment or Suite Number
336 ADM I RAIL WAY
City State Zip
EDMONDS WA 98020-7214
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 9/29/2023 Submitted By: Jessamin Santos
Page 1 of 2
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1383442 - Comcast JB-613572
Project Contact
Company Name: COMCAST
Name: Jessamin Santos Email: jessamin_santos@cable.comcast.com
Address: 410 Valley Ave NW Phone #: (206) 401-2188
Puyallup WA 98371
Project Type Activity Type Scope of Work
Utility Purveyor Utility Work Disturbance of Surface
Project Name: Comcast JB-613572
resubmittal of expired permit: ENG2021-0135 . The proposed work in the right of way is to dig
Description of and intercept 4" conduit on north side of W Dayton St, overset with new vault in landscape -
Work: (medium duty/pedestrian grade); bore new 2" conduit from ROW to private (approx 25' in ROW)
towards address 190 W DAYTON ST (210 RAILROAD AVE), Edmonds, WA 98020; pull new
90' of 24ct fiber from vault on south side of W Dayton St toward address 210 Railroad Ave.
Project Details
Project Information
Job Number
JB - 613572
Page 2 of 2