APPROVED Trang SP-Bond Quantity Work Sheet 6-22-20Site Improvement Bond Quantity Worksheet
LIM King County
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266
206-296-6600 TTY Relay 711
Project Name:
Location:
TRANG SHORT PLAT
23135 75th Ave W
Clearing greater than or equal to 5,000 board feet of timber?
yes
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
Trang SP-Bond Quantity Work Sheet
X no
S15 Web date: 04/03/201:
For alternate formats, call 206-296-6600.
Date: 6/22/2020
Project No.:
Activity No.:
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from IRS Means data adjusted for the Seattle area
or from local sources if not included in the IRS Means database.
ENGINEERING DIVISION
APPROVED AS NOTED
6/24/2020
Refer to calculations on
last page.
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 6/22/2020
Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/201:
Reference #
Unit
Price
Unit
Quantity
# of
Applications
Cost
EROSION/SEDIMENT CONTROL
Number
Backfill & compaction -embankment
ESC-1
$ 6.00
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 80.00
Each
$0.00
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 95.00
CY
$0
Ditching
ESC-4
$ 9.00
CY
$0
Excavation -bulk
ESC-5
$ 2.00
CY
$0
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.50
LF
188
$282
Catch basin filter sock
ESC-7
$ 10.00
EACH
1
$10
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.80
SY
$0
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 3.50
SY
$0
Mulch, by hand, straw, 3" deep
ESC-10
SWDM 5.4.2.1
$ 2.50
SY
1500
$3,750
Mulch, by machine, straw, 2" deep
ESC-11
SWDM 5.4.2.1
$ 2.00
SY
$0
Piping, temporary, CPP, 6"
ESC-12
$ 12.00
LF
$0
Piping, temporary, CPP, 8"
ESC-13
$ 14.00
LF
$0
Piping, temporary, CPP, 12"
ESC-14
$ 18.00
LF
$0
Plastic covering, 6mm thick, sandbagged
ESC-15
SWDM 5.4.2.3
$ 4.00
SY
60
$240
Rip Rap, machine placed; slopes
ESC-16
WSDOT 9-13.1(2)
$ 45.00
CY
$0
Rock Construction Entrance, 50'x15'x1'
ESC-17
SWDM 5.4.4.1
$ 1,800.00
Each
1
$1,800
Rock Construction Entrance, 100'x15'x1'
ESC-18
SWDM 5.4.4.1
$ 3,200.00
Each
$0
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$ 2,200.00
Each
$0
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 19.00
LF
$0
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 70.00
LF
$0
Seeding, by hand
Sodding, 1" deep, level ground
ESC-22
SWDM 5.4.2.4
$ 1.00
SY
$0
ESC-23
SWDM 5.4.2.5
$ 8.00
SY
$0
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 10.00
SY
$0
TESC Supervisor
ESC-25
$ 110.00
HR
$0
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 140.00
HR
$0
WRITE -IN -ITEMS **** (see page 91
Each
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
Page 2 of 9
Trang SP-Bond Quantity Work Sheet
$ 6,082.00
$ 1,824.60
$ 7,906.60
A
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 6/22/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
GENERAL ITEMS
No.
Backfill & Compaction- embankment
GI - 1
$ 6.00
CY
Backfill & Compaction- trench
GI - 2
$ 9.00
CY
Clear/Remove Brush, by hand
GI - 3
$ 1.00
SY
Clearing/Grubbing/Tree Removal
GI - 4
$ 10,000.00
Acre
0.2
2,000.00
Excavation - bulk
GI - 5
$ 2.00
CY
Excavation - Trench
GI - 6
$ 5.00
CY
123
615.00
5
25.00
Fencing, cedar, 6' high
GI - 7
$ 20.00
LF
Fencing, chain link, vinyl coated, 6' high
GI - 8
$ 20.00
LF
Fencing, chain link, gate, vinyl coated, 20'
GI - 9
$ 1,400.00
Each
Fencing, split rail, 3' high
GI - 10
$ 15.00
LF
Fill & compact - common barrow
GI - 11
$ 25.00
CY
Fill & compact - gravel base
GI - 12
$ 27.00
CY
Fill & compact - screened topsoil
GI - 13
$ 39.00
CY
Gabion, 12" deep, stone filled mesh
GI - 14
$ 65.00
SY
Gabion, 18" deep, stone filled mesh
GI - 15
$ 90.00
SY
Gabion, 36" deep, stone filled mesh
GI - 16
$ 150.00
SY
Grading, fine, by hand
GI - 17
$ 2.50
SY
Grading, fine, with grader
GI - 18
$ 2.00
SY
Monuments, 3' long
GI - 19
$ 250.00
Each
Sensitive Areas Sign
GI - 20
$ 7.00
Each
Sodding, 1" deep, sloped ground
GI - 21
$ 8.00
SY
Surveying, line & grade
GI - 22
$ 850.00
Day
0.5
425.00
Surveying, lot location/lines
GI - 23
$ 1,800.00
Acre
0.5
900.00
Traffic control crew (3 flaggers)
GI - 24
$ 150.00
HR
16
2,400.00
Trail, 4" chipped wood
GI - 25
$ 8.00
SY
Trail, 4" crushed cinder
GI - 26
$ 9.00
SY
Trail, 4" top course
GI - 27
$ 12.00
SY
Wall, retaining, concrete
GI - 28
$ 55.00
SF
Wall, rockery
GI - 29
$ 15.00
SF
Page 3 of 9
SUBTOTAL
3,440.00
2,925.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Trang SP-Bond Quantity Work Sheet Report Date: 6/22/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
ROAD IMPROVEMENT
No.
AC Grinding, 4' wide machine < 1000sy
RI - 1
$ 30.00
SY
276
8,280.00
AC Grinding, 4' wide machine 1000-2000sy
RI - 2
$ 16.00
SY
AC Grinding, 4' wide machine > 2000sy
RI - 3
$ 10.00
SY
AC Removal/Disposal
RI - 4
$ 35.00
SY
184
6,440.00
Barricade, type III ( Permanent)
RI - 6
$ 56.00
LF
Curb & Gutter, rolled
RI - 7
$ 17.00
LF
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
123
1,537.50
Curb and Gutter, demolition and disposal
RI - 9
$ 18.00
LF
Curb, extruded asphalt
RI - 10
$ 5.50
LF
Curb, concrete traffic
RI - 11
$ 7.00
LF
Sawcut, asphalt, 3" depth
RI - 12
$ 1.85
LF
774
1,431.90
Sawcut, concrete, per 1" depth
RI - 13
$ 3.00
LF
Sealant, asphalt
RI - 14
$ 2.00
LF
192
384.00
Shoulder, AC, ( see AC road unit price)
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
RI - 16
$ 15.00
SY
Sidewalk, 4" thick (CSTC)
RI - 17
$ 38.00
SY
Sidewalk, 4" thick, demolition and disposal
RI - 18
$ 32.00
SY
Sidewalk, 5" thick
RI - 19
$ 41.00
SY
18
738.00
Sidewalk, 5" thick, demolition and disposal
RI - 20
$ 40.00
SY
Sign, handicap
RI - 21
$ 85.00
Each
4" Striping
RI - 22
$ 1.00
LF
276
276.00
Striping, thermoplastic, (for stop bar & sharrow)
RI - 23
$ 20.00
SY
5
100.00
Striping, 4" reflectorized line
RI - 24
$ 0.50
LF
Page 4 of 9
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Trang SP-Bond Quantity Work Sheet Report Date: 6/22/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. I Cost
Quant. Cost
ROAD SURFACING
No.
(4" Rock = 2.5 base & 1.5" top course) 9 1/2" Rock= 8" base & 1.5" top course)
Additional 2.5" Crushed Surfacing
RS - 1
$ 3.60
SY
HMA 1/2" Overlay, 1.5"
RS - 2
$ 14.00
SY
HMA 1/2" Overlay 2"
RS - 3
$ 18.00
SY
HMA Road, 4", 6" rock, First 2500 SY
RS - 4
$ 45.00
SY
200
9,000.00
10
450.00
HMA Road, 4", 6" rock, Qty. over 2500 SY
RS - 5
$ 50.00
SY
HMA Road, 2", 6" Rock, First 2500 SY
RS - 6
$ 25.00
SY
HMA Road, 3", 9 1/2" Rock, Qty Over 2500 SY
RS - 7
$ 35.00
SY
4" Concrete Walkway
RS - 8
$ 26.00
SY
Curb (vertical & roll)
RS - 9
$ 10.00
LF
HMA Road, 6" Depth, First 2500 SY
RS - 10
$ 33.10
SY
HMA Road, 6" Depth, Qty. Over 2500 SY
RS - 11
$ 30.00
SY
HMA 3/4" or 1 ", 4" Depth
RS - 12
$ 20.00
SY
Gravel Road, 4" rock, First 2500 SY
RS - 13
$ 15.00
SY
Gravel Road, 4" rock, Qty. over 2500 SY
RS - 14
$ 10.00
SY
PCC Road (Add Under Write -Ins w/Design)
I RS - 15
Thickened Edge
I RS - 17
$ 8.60
LF
I
I
I
I
I
I
I �j
Page 5 of 9
SUBTOTAL
9,000.00
450.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Trang SP-Bond Quantity Work Sheet Report Date: 6/22/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. T Cost
Quant. Cost
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pip
Access Road, R/D
D - 1
$ 21.00
SY
Bollards - fixed
D - 2
$ 240.74
Each
Bollards - removable
D - 3
$ 452.34
Each
* (CBs include frame and lid)
CB Type I
D - 4
$ 1,500.00
Each
CB Type 11
D - 5
$ 1,750.00
Each
Pipe, ADS N12 / PVC, 6"
D - 6
$ 10.00
LF
Pipe, ADS N12, 8"
D - 7
$ 14.00
LF
Pipe, DI, 6"
D - 7
$ 30.00
LF
Pipe, DI, 8"
D - 8
$ 35.00
LF
Pipe, DI, 12"
D - 8
$ 45.00
LF
Pipe, ADS N12, 12"
D - 9
$ 25.00
LF
54" flow control MH
D - 10
$ 5,000.00
Each
for additional depth over 4'
D - 11
$ 600.00
FT
CB Type 11, 72" diameter
D - 12
$ 3,600.00
Each
60' CMP detention PIPE
D - 13
$ 41,000.00
LS
CONTECH stormfilter (CB)
D - 14
$ 12,000.00
Each
Cleanout, PVC, 4"
D - 15
$ 150.00
Each
2
300.00
Cleanout, PVC, 6"
D - 16
$ 170.00
Each
3
510.00
Cleanout, PVC, 8"
D - 17
$ 200.00
Each
Culvert, PVC, 4"
D - 18
$ 10.00
LF
42
420.00
Culvert, PVC, 6"
D - 19
$ 13.00
LF
108
1,404.00
Culvert, PVC, 8"
D - 20
$ 15.00
LF
Culvert, PVC, 12"
D - 21
$ 23.00
LF
Culvert, CMP, 8"
D - 22
$ 19.00
LF
Culvert, CMP, 12"
D - 23
$ 29.00
LF
Culvert, CMP, 15"
D - 24
$ 35.00
LF
Culvert, CMP, 18"
D - 25
$ 41.00
LF
Culvert, CMP, 24"
D - 26
$ 56.00
LF
Culvert, CMP, 30"
D - 27
$ 78.00
LF
Culvert, CMP, 36"
D - 28
$ 130.00
LF
Culvert, CMP, 48"
D - 29
$ 190.00
LF
Culvert, CMP, 60"
D - 30
$ 270.00
LF
Culvert, CMP, 72"
D - 31
$ 350.00
LF
*KCC 27A authorizes only one bond reduction.
Trang SP-Bond Quantity Work Sheet
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 6/22/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Page 6 of 9
SUBTOTAL
2,634.00
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
No.
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
Culvert, Concrete, 8"
D - 32
$ 25.00
LF
Culvert, Concrete, 12"
D - 33
$ 36.00
LF
Culvert, Concrete, 15"
D - 34
$ 42.00
LF
Culvert, Concrete, 18"
D - 35
$ 48.00
LF
Culvert, Concrete, 24"
D - 36
$ 78.00
LF
Culvert, Concrete, 30"
D - 37
$ 125.00
LF
Culvert, Concrete, 36"
D - 38
$ 150.00
LF
Culvert, Concrete, 42"
D - 39
$ 175.00
LF
Culvert, Concrete, 48"
D - 40
$ 205.00
LF
Culvert, CPP, 6"
D - 41
$ 14.00
LF
Culvert, CPP, 8"
D - 42
$ 16.00
LF
Culvert, CPP, 12'
D - 43
$ 24.00
LF
Culvert, CPP, 15"
D - 44
$ 35.00
LF
Culvert, CPP, 18"
D - 45
$ 41.00
LF
Culvert, CPP, 24"
D - 46
$ 56.00
LF
Culvert, CPP, 30"
D - 47
$ 78.00
LF
Culvert, CPP, 36"
D - 48
$ 130.00
LF
Ditching
D - 49
$ 9.50
CY
Flow Dispersal Trench (1,436 base+)
D - 50
$ 28.00
LF
French Drain (3' depth)
D - 51
$ 26.00
LF
Geotextile, laid in trench, polypropylene
D - 52
$ 3.00
SY
Mid -tank Access Riser, 48" dia, 6' deep
D - 54
$ 2,000.00
Each
Pond Overflow Spillway
D - 55
$ 16.00
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,150.00
Each
Restrictor/Oil Separator, 15"
D - 57
$ 1,350.00
Each
Restrictor/Oil Separator, 18"
D - 58
$ 1,700.00
Each
Riprap, placed
D - 59
$ 42.00
CY
Tank End Reducer (36" diameter)
D - 60
$ 1,200.00
Each
Trash Rack, 12"
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ 410.00
Each
Trash Rack, 18"
D - 63
$ 480.00
Each
Trash Rack, 21"
D - 64
$ 550.00
Each
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Trang SP-Bond Quantity Work Sheet Report Date: 6/22/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Page 7 of 9 SUBTOTAL
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Price
Quant. T Cost
Quant. Cost
PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders
No.
2" AC, 6" rock
PL- 1
$ 21.00
SY
NA
NA
2" AC, 1.5" top course & 2.5" base course
PL - 2
$ 28.00
SY
NA
NA
4" select borrow
PL - 3
$ 5.00
SY
NA
NA
1.5" top course rock & 2.5" base course
PL-4
$ 14.00
SY
NA
NA
UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied byFranchise Utility's Cost Estimate
Utility Pole(s) Relocation
UP-1
Lump Sum
Street Light Poles w/Luminaires
UP-2
$ 7,500.00 Each
WRITE -IN -ITEMS
(Such as detention/water quality vaults.)
No.
WI - 1
$ 150.00
Each
Infiltration System including pipes & CB
WI - 2
$ 1,500.00
LS
1
1,500
Water Main, 8" DI, CL 52
WI - 3
$ 85.00
LF
277
23545
Gate Valve, 6"
WI - 4
$ 250.00
Each
1
250
Gate Valve, 8"
WI - 5
$ 385.00
Each
5
1925
Fire Hydrant Assembly
WI - 5
$ 2,500.00
Each
1
2,500
Water Main, 6" DI, CL 52
WI - 6
$ 65.00
LF
9
585
Connection to Main
WI - 7
$ 2,500.00
LS
1
2,500
Water Main Miscellaneous
WI - 8
$ 30,000.00
LS
1
30,000
1.5" Water Service Line
WI=9
$ 3.00
LF
1421
426
Pervious Conc. Sidewalk
$ 7.00
SF
1 4601
3220
SUBTOTAL 64, 951.00
SUBTOTAL (SUM ALL PAGES): 96,578.40
30% CONTINGENCY & MOBILIZATION: 28,973.52
GRANDTOTAL: 125,551.92
COLUMN: B
Page 8 of 9
C
1,500.00
7,509.00
2,252.70
9,761.70
D
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
Trang SP-Bond Quantity Work Sheet Report Date: 6/22/2020
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Original bond computations prepared by:
Name: Han Phan Date: 6/22/2020
PE Registration Number: 42815 Tel. #: 206-229-6422
Firm Name: PBG, LLC
Address: 5130 S. 166th Lane, SeaTac WA 98188 Project No: R17410
Stabilization/Erosion Sediment Control (ESC)
Existing Right -of -Way Improvements
Future Public Right of Way & Drainage Facilities
Private Improvements
Calculated Quantity Completed
(First $7,500 of bond* shall be cash.
(A+B+C+D) = TOTAL
Maintenance/Defect Bond* Total
NAME OF PERSON PREPARING BOND* REDUCTION:
FINANCIAL GUARANTEE REQUIREMENTS '
PERFORMANCE BOND" MINIMUM BOND*AMO LTA p OAD & D E
AMOUNT REQ OR R INGO R
OR MAINTEN BOND*
TEMPOR NCYAT
(A) $ 7,906.6 SU TIAL COMPLE
(B) $ 125,551.9
(C) $ -
(D) $ 9,761.7 3.3% Inspection Fee $4726.27
(T) $
Minimum is
Performance Bond Am�Ount (@120%) = $171,864.24
Maintenance Bond Amount @15% = $21 ^83.f3
Minimum is $2000.
LCorred
(B+C)
0. P 6-
Minimum is $2000.
Date:
* NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County.
** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
*** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY
Page 9 of 9 Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kingcounty.poy/permits Version: 03/02/2015
Trang SP-Bond Quantity Work Sheet Report Date: 6/22/2020