REV 2 APPPOVED BLD-BLD2023-0126+Holdown_Schedule+5.10.2023_9.46.04_PM+3538091C
REVISED PLAN APPROVED
CITY OF EDMONDS BUILDING DIVISION
4'e BLarx� 'ew
BUILDING OFFICIAL
Jun 15 2023
APPROVED DATE
ALL WORK SUBJECT
TO FIELD APPROVED
INSPECTION FOR PLANS MUST BE
CODE COMPLIANCE ON JOB SITE
r..............................................�
The following documentation shall be available on
: site for the building inspector: ;
■ 0 COE APPROVED ARCHITECTURAL PLAN SET -
0 COE APPROVED STRUCTURAL PLAN SET
COE REVIEWED CALCULATION PACKET
■ � ENERGY CREDIT WORKSHEET
■
■ SITE PLAN
CIVIL PLAN '
® Revision 1 and 2 Plan sheets dated 6/01/2023 and 5/11/2023.
■
■ ■
............................................
REVIEWED
BY
CITY OF EDMONDS
BUILDING DEPARTMENT
REVISION
May 11 2023
C OF EDMONDS
DEVELOPMENTSERVICES
DEPARTMENT
BLD2023-0126
HOLDOWN SCHEDULE
MARK
TYPE
MIN CHORD
STUD NAILS OR BOLTS
ANCHOR BOLT
CAPACITY (LB)
O
HDU5
(2) 2x
(14) SDS 1/4" x 2 1/2" SCREWS
5/8110
4,220
1. REFER TO THE LATEST SIMPSON STRONG -TIE CATALOG FOR ADDITIONAL INSTALLATION REQUIREMENTS.
2. AT ALL HOLDOWN CHORDS, PROVIDE PANEL EDGE NAILING PER SHEAR WALL SCHED.
�111 GUILL
4 of WAs�,
CID
A
�
25385�
ZONAL
W 09123
ENGINEERING
WONG RESIDENCE DECK
21718 85TH PL W
EDMONDS, WA 98026
DATE 05/09/23
SHEET
PROJECT NO. 22242.11
SCALE NTS
250 4TH AVE. S., SUITE 200
EDMONDS, WASHINGTON 98020
PHONE (425) 778-8500
FAX (425) 778-5536
TITLE
REVISED SCHEDULE
REFER TO S 3.1, REV #2
DRAWN BY ATD
SS-1
CHECKED BY BTJ
APPROVED BY CMJ
PLOT DATE: 5 9 23 FILE NAME: SS-1