Loading...
REV 2 APPPOVED BLD-BLD2023-0126+Holdown_Schedule+5.10.2023_9.46.04_PM+3538091C REVISED PLAN APPROVED CITY OF EDMONDS BUILDING DIVISION 4'e BLarx� 'ew BUILDING OFFICIAL Jun 15 2023 APPROVED DATE ALL WORK SUBJECT TO FIELD APPROVED INSPECTION FOR PLANS MUST BE CODE COMPLIANCE ON JOB SITE r..............................................� The following documentation shall be available on : site for the building inspector: ; ■ 0 COE APPROVED ARCHITECTURAL PLAN SET - 0 COE APPROVED STRUCTURAL PLAN SET COE REVIEWED CALCULATION PACKET ■ � ENERGY CREDIT WORKSHEET ■ ■ SITE PLAN CIVIL PLAN ' ® Revision 1 and 2 Plan sheets dated 6/01/2023 and 5/11/2023. ■ ■ ■ ............................................ REVIEWED BY CITY OF EDMONDS BUILDING DEPARTMENT REVISION May 11 2023 C­ OF EDMONDS DEVELOPMENTSERVICES DEPARTMENT BLD2023-0126 HOLDOWN SCHEDULE MARK TYPE MIN CHORD STUD NAILS OR BOLTS ANCHOR BOLT CAPACITY (LB) O HDU5 (2) 2x (14) SDS 1/4" x 2 1/2" SCREWS 5/8110 4,220 1. REFER TO THE LATEST SIMPSON STRONG -TIE CATALOG FOR ADDITIONAL INSTALLATION REQUIREMENTS. 2. AT ALL HOLDOWN CHORDS, PROVIDE PANEL EDGE NAILING PER SHEAR WALL SCHED. �111 GUILL 4 of WAs�, CID A � 25385� ZONAL W 09123 ENGINEERING WONG RESIDENCE DECK 21718 85TH PL W EDMONDS, WA 98026 DATE 05/09/23 SHEET PROJECT NO. 22242.11 SCALE NTS 250 4TH AVE. S., SUITE 200 EDMONDS, WASHINGTON 98020 PHONE (425) 778-8500 FAX (425) 778-5536 TITLE REVISED SCHEDULE REFER TO S 3.1, REV #2 DRAWN BY ATD SS-1 CHECKED BY BTJ APPROVED BY CMJ PLOT DATE: 5 9 23 FILE NAME: SS-1