REV2 APPROVED PLN_ENG BLD2021-0929+MITIGATION PLAN+1.29.2023_7.14.02_PM+3339378NOTES:
1. OWNER / CONTRACTOR TO OBTAIN ALL NECESSARY PERMITS AND SCHEDULE ALL NECESSARY INSPECTIONS.
2. LOCATE ALL UTILITIES PRIOR TO CONSTRUCTION.
3. ALL EXISTING CONDITIONS AND LAYOUT ARE TO BE VERIFIED IN THE FIELD PRIOR TO THE COMMENCEMENT OF
CONSTRUCTION.
4. ALL WORK SHALL CONFORM TO MUNICIPAL REQUIREMENTS AND STANDARD SPECIFICIATIONS.
5. CONTRACTOR IS TO NOTIFY AND RECEIVE APPROVAL FROM OWNER / LANDSCAPE ARCHITECT CONCERNING ANY
CHANGES OR DEVIATIONS MADE TO LAYOUT, DETAILS, OR INDUSTRY STANDARDS PRIOR TO CONSTRUCTION.
6. CONTRACTOR / OWNER IS SOLELY LIABLE FOR ALL WORK NOT COVERED IN CONTRACT, WRITTEN OR VERBAL,
FOR WHICH THE LANDSCAPE ARCHITECT WAS RETAINED. FAILURE OF ANY WORK OR PRODUCT NOT COVERED IN
CONTRACT, OR APPROVED BY LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION, IS SOLELY THE
RESPONSIBILITY OF THE CONTRACTOR / OWNER. FAILURE OF CONTRACTOR / OWNER TO NOTIFY LANDSCAPE
ARCHITECT OF CHANGES MADE TO PLANS OR DETAILS, OR ANY CHANGE RESULTING IN DEVIATION FROM
INDUSTRY STANDARDS, RELEASES THE LANDSCAPE ARCHITECT FROM ASSOCIATED LIABILITY FOR SAID WORK.
APPROVED BY PLANNING
/" y"l
Feb 27 2023
-MONITORING REPORT REQUIRED AS NOTED IN
CRITICAL AREA REPORT DATED JUNE 25, 2021.
-SUBMISSION OF MONITORING REPORTS
REQUIRED FLOLLOWING PLANTING AT 1 YEAR, 3RD
YEAR AND 5TH YEAR.
ALL DISTURBED SOILS SHALL BE
COMPOST AMENDED PER CITY OF
EDMONDS STANDARD DETAIL SD-642 OR
APPROVED EQUAL.
REVISION FOR PLANTING
MITIGATION ONLY. SEE APPROVED
PLANS DATED 1/13/2022 FOR ALL
OTHER ENGINEERING
REQUIREMENTS.
I
SCALE:NOT TO SCALE
NORTH
KPK E N N E T H P H I L P
L A LANDSCAPE ARCHITECTS PS
2288 W COMMODORE WAY STE 105 tel 206-783-5840
S E A T T L E, WA 9 8 1 99
w w w. k e n n e t h p h i I p. c o m
FLYNN RESIDENCE
8229 TALBOT ROAD
EDMONDS WA 98026
CALL 2 DAYS
BEFORE YOU DIG
1-800-424-5555
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
BLD2021-0929
REVISION
Jan 30 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Issue Title
CONSTRUCTION
DOCUMENTATION
Issue Date
01.28.2023
DESIGNED BY: KS
DRAWN BY: KS, DJ
Rev Date Description
A 01-28-2023 HARDSCAPE REVISIONS
Sheet Title
MITIGATION
PLANTING PLAN
Sheet Number
L3•