Loading...
REV2 APPROVED PLN_ENG BLD2021-0929+MITIGATION PLAN+1.29.2023_7.14.02_PM+3339378NOTES: 1. OWNER / CONTRACTOR TO OBTAIN ALL NECESSARY PERMITS AND SCHEDULE ALL NECESSARY INSPECTIONS. 2. LOCATE ALL UTILITIES PRIOR TO CONSTRUCTION. 3. ALL EXISTING CONDITIONS AND LAYOUT ARE TO BE VERIFIED IN THE FIELD PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 4. ALL WORK SHALL CONFORM TO MUNICIPAL REQUIREMENTS AND STANDARD SPECIFICIATIONS. 5. CONTRACTOR IS TO NOTIFY AND RECEIVE APPROVAL FROM OWNER / LANDSCAPE ARCHITECT CONCERNING ANY CHANGES OR DEVIATIONS MADE TO LAYOUT, DETAILS, OR INDUSTRY STANDARDS PRIOR TO CONSTRUCTION. 6. CONTRACTOR / OWNER IS SOLELY LIABLE FOR ALL WORK NOT COVERED IN CONTRACT, WRITTEN OR VERBAL, FOR WHICH THE LANDSCAPE ARCHITECT WAS RETAINED. FAILURE OF ANY WORK OR PRODUCT NOT COVERED IN CONTRACT, OR APPROVED BY LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION, IS SOLELY THE RESPONSIBILITY OF THE CONTRACTOR / OWNER. FAILURE OF CONTRACTOR / OWNER TO NOTIFY LANDSCAPE ARCHITECT OF CHANGES MADE TO PLANS OR DETAILS, OR ANY CHANGE RESULTING IN DEVIATION FROM INDUSTRY STANDARDS, RELEASES THE LANDSCAPE ARCHITECT FROM ASSOCIATED LIABILITY FOR SAID WORK. APPROVED BY PLANNING /" y"l Feb 27 2023 -MONITORING REPORT REQUIRED AS NOTED IN CRITICAL AREA REPORT DATED JUNE 25, 2021. -SUBMISSION OF MONITORING REPORTS REQUIRED FLOLLOWING PLANTING AT 1 YEAR, 3RD YEAR AND 5TH YEAR. ALL DISTURBED SOILS SHALL BE COMPOST AMENDED PER CITY OF EDMONDS STANDARD DETAIL SD-642 OR APPROVED EQUAL. REVISION FOR PLANTING MITIGATION ONLY. SEE APPROVED PLANS DATED 1/13/2022 FOR ALL OTHER ENGINEERING REQUIREMENTS. I SCALE:NOT TO SCALE NORTH KPK E N N E T H P H I L P L A LANDSCAPE ARCHITECTS PS 2288 W COMMODORE WAY STE 105 tel 206-783-5840 S E A T T L E, WA 9 8 1 99 w w w. k e n n e t h p h i I p. c o m FLYNN RESIDENCE 8229 TALBOT ROAD EDMONDS WA 98026 CALL 2 DAYS BEFORE YOU DIG 1-800-424-5555 Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. BLD2021-0929 REVISION Jan 30 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Issue Title CONSTRUCTION DOCUMENTATION Issue Date 01.28.2023 DESIGNED BY: KS DRAWN BY: KS, DJ Rev Date Description A 01-28-2023 HARDSCAPE REVISIONS Sheet Title MITIGATION PLANTING PLAN Sheet Number L3•