Loading...
APPROVED PLN_BLD BLD2022-0479+Site_Plan+4.14.2022_7.20.01_PM+2804138`St. 189�' CITY OF EDMONDS PUBLIC WORKS DEPARTMENT 2" x 2" WOOD/STEEL FILTER FABRIC SECURED TO 2" x 2" 14 GA WIRE FABRIC EQUAL CATCH BASIN ^MATr FILTER SOCK WITH OVER FLOW HOLES (n'P) 31N NOTES: 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN THIS APPLICATION AT ALL TIMES DURING CONSTRUCTION PERIOD. 2. ANY SEDIMENT IN CATCH BASIN INSERT SHALL BE REMOVED WHEN INSERT IS ONE—THIRD FULL. 3. CITY INSPECTION REQUIRED ON ALL EROSION CONTROL METHODS BEFORE OTHER WORK CAN BEGIN. TEMPORARY SEDIMENT TRAP FOR CATCH BASINS APPROVED BY: R. ENGLISH NATIVE BACKFILL MATERIAL J 4 FILTER FABRIC MATERIAL IN CONTINOUS ROLLS USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE 2" x 2" WOOD/STEEL POSTS —\ 11 WIRE MESH FENCE TO SUPPORT FILTER FABRIC BURY BOTTOM OF FILTER N MATERIAL 8" TO 12" REVISION DATE JANUARY 2018 STANDARD D ETAI L ER-902 NOTES: 1. CONTRACTOR/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER EROSION CONTROL THROUGHOUT PROJECT. CITY INSPECTION REQUIRED ON 2. SILT FENCE TO BE PLACED DOWNSLOPE OF CONSTRUCTION ALL EROSION CONTROL METHODS ACTIVITY. BEFORE OTHER WORK CAN BEGIN REVISION DATE FILTER FABRIC FENCE JANUARY 2018 F CITY OF EDMONDS FILTRATION SYSTEMS r' PUBLIC WORKS STANDARD DEPARTMENT DETAIL FSt. 189� APPROVED BY: R. ENGLISH ER-900 D \ / i / ram✓-////' 1� -16 xV9 Ile000 APPROVED PLANS TO REMAIN ON JO$ /SITE City Of Edmonds i Buildig,q Department --------- - - - ---------------- Work � / BRCZE REPAIR ------------ ____ ________________ Address / 8229 TAL�OT RD Owner / FLYNN� jppfoved Date ; 05/04/2022 00, Building Official \ -0479 Permit Number BLD2022 \ ------------------------------------ \ CITY OF EDMONDS BUILDING DIVISION APPROVED PLAN Nothing in the permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, structure or site condition which is outside the scope of the permit application, regardless of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. r—-—-—-—-—-—-—-—-—-—-—- — - — - —- \ The issuance of this permit in no way constitutes \ pproval from any other agencies having regulatory \ a thority over the facility and this construction activity. \ It is the responsibility of the property owner to obtain \ a y and all such required approvals. \ / / / J' 000l APPROVED BY PLANNING \ \ \\\\\ \\ , \ \ \ \ \ May 05 2622 \ / / �. \��� \ \� \iti \ �� \ \ APPROVAL IS FOR BRIDGE REPAIR WORK \ ONLY. A MITIGATION PLANTING PLAN \ CONSISTENT WITH THE CRITICAL AREA REPORT BY "WETLAND RESOURCES ENVIRONMENTAL CONSULTING DATED JUNE \ +; - 25, 2021 IS PROVIDED FOR THE SITE UNDER \ ��9, � � \ \ \ �'- PLAN FILE BLD2021-0929. THE APPROVED \\� MITIGATION PLANTING PLAN UNDER / I-ol4 oo \ l \ \ \ \ � BLD2021-0929 PLAN SHEETS L1.0, L3.1, AND NOTES: 1. CONSTRUCTION EROSION CONTROL MEASUKE� MUST BE IN PLACE AND APPROVED BY CiTY OF EDMONDS PRIOR TO ANY EARTH DISTURBANCE. SCHEDULE AN INSPECTION APPOINTMENT FOR THIS ITEM. 2. NO SEDIMENT SHALL DE TRACKED ONTO FAVEV STREET OR ROADWAYS. SEDIMENT SHALL BE REMOVED FROM TRUCKS AND EQUIPMENT PRIOR TO LEAVING THE CONSTRUCTION SiTE. iN THE EVENT OF FAILURE OF THE TESC SYSTEM RESULTING IN SE&MiNT TRACKING ONTO PAVEMENT, THE CONTRACTOR SHALL IMPLEMENT MEASURES IMMEDIATELY TO CQRRECT THE SITUATION. THE CONTRACTOR SHALL EMPLOY EMERGENCY MEASURES TO REMOVE SEDIMENT FROM PAVED SURFACES, AS NECESSARY. STREET SWEEPING SHALL DE CONSIDERED AN EMERGENCY MEASURE. 3. AFTER CONSTRUCTION 15 COMPLETE, ALL EXPOSER EARTH SURFACES WiLL DE LANDSCAPED WiTH SUITABLE VEGETATION TO PREVENT EROSION FOR THE PERMANENT CONDITION. 4. ALL DISTURBED SOILS WiLL DE COMPOST AMENDED\FER CiTY OF EDMONDS DMP T5.13. 5. CONTRACTOR TO VERIFY LOCATION OF ALL EXISTING TiLiTPES. 6. REFER TO LANDSCAPE ARCHITECT FOR IRRIGATION LXYOUT AND LANDSCAPE LIGHTING PLAN. 7. INSTALL AND MAINTAIN ALL TESC MEASURES ACCORAING TO APPROVED PLANS. CiTY OF EDMONDS STANDARD DETAILS, AND ALL OTHER MEASURES THAT M Y BE REQUIRED DURING CONSTRUCTION. Gmorn f v i S+ n i E *REFER ALSO TO SEPARATE BUILDING PERMIT D02021-092� N SITE PLAN - BRIDGE WORK\ m �` G / / / \\, V SS 100, .o;.O\ SS 000, o REFER TO THE ATTACHED TOPOGRAPHIC SURVEY TO REFERENCE THE DATUM POINT \ \ \ \ \ L3.2 PROVIDES ADEQUATE MITIGATION \ \ \ \ \ PLANTING. / O / \ \ o \ REFER ALSO TO STRUCTURAL \ \ o \ \ \ ENGINEERING, STRUCTURAL \ OBSERVATION REPORT, AND ® \ \ \ \ TALDOT BRIDGE EVALUATION / ® I \ \ REPORT DY CG ENGINEERS Q iN T 1�OCKE�' HT E1G O"\ MAX48", L11GTI1` VARIES I A 0 I / FX DECK BOARD ,REPLACEMI=NI D o'%' l RE�A�R AT D GE _ X — — — z A- \ \ o INSTALL ADDITIONAL \ \ OR RE -PLACE GRAVEL / 1 \ -0 AREAS OF ®/ / O \ �\ EXISTING GRAVEL _ / 4(F \ \ RiViNG SURFACE CATION A5 NEEDED _V�i' ALL SAF�T�f , o I I �Q► / / \ \ LPGH G AT BRIDGE i \ / \ LOATP5co KO 4 CORNER p���ti I / I / ®Y I / I / / 2Q. ��\ i \ / i / .01/ / ovo, 7Z 1:) / jl LU U Z o 0 Lu 121� 00 U m LU Q U) < 0 Z N O Z � 2i C) J LL I ILL 9716 REGISTERED ARCHITECT HEIDI MICHELLE HELGESON STATE OF WASHINGTON H 2 D A R C H I T E C T U R E D E S I G N 23020 EDMONDS WAY, #113 EDMONDS, WA 98020 P.206.542.3734 www.h2darchitects.com DATE: 4/15/2022 PERMIT SET SITE PLAN RECEIVED Apr 18 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2022-0479