APPROVED PLN_BLD BLD2022-0479+Site_Plan+4.14.2022_7.20.01_PM+2804138`St. 189�'
CITY OF EDMONDS
PUBLIC WORKS
DEPARTMENT
2" x 2" WOOD/STEEL
FILTER FABRIC SECURED
TO 2" x 2" 14 GA
WIRE FABRIC EQUAL
CATCH BASIN
^MATr
FILTER SOCK WITH
OVER FLOW HOLES
(n'P)
31N
NOTES:
1. CONTRACTOR/DEVELOPER SHALL MAINTAIN
THIS APPLICATION AT ALL TIMES DURING
CONSTRUCTION PERIOD.
2. ANY SEDIMENT IN CATCH BASIN INSERT
SHALL BE REMOVED WHEN INSERT IS
ONE—THIRD FULL.
3. CITY INSPECTION REQUIRED ON ALL
EROSION CONTROL METHODS BEFORE
OTHER WORK CAN BEGIN.
TEMPORARY
SEDIMENT TRAP
FOR CATCH BASINS
APPROVED BY: R. ENGLISH
NATIVE BACKFILL MATERIAL J 4
FILTER FABRIC MATERIAL IN CONTINOUS ROLLS
USE STAPLES OR WIRE RINGS TO ATTACH
FABRIC TO WIRE
2" x 2" WOOD/STEEL POSTS —\
11 WIRE MESH FENCE
TO SUPPORT FILTER
FABRIC
BURY BOTTOM OF FILTER
N MATERIAL 8" TO 12"
REVISION DATE
JANUARY 2018
STANDARD
D ETAI L
ER-902
NOTES:
1. CONTRACTOR/DEVELOPER SHALL MAINTAIN AND
ENSURE PROPER
EROSION
CONTROL THROUGHOUT PROJECT.
CITY INSPECTION
REQUIRED ON
2. SILT FENCE
TO BE PLACED DOWNSLOPE OF CONSTRUCTION
ALL EROSION CONTROL METHODS
ACTIVITY.
BEFORE OTHER
WORK CAN BEGIN
REVISION DATE
FILTER FABRIC FENCE
JANUARY 2018
F
CITY OF EDMONDS
FILTRATION SYSTEMS
r'
PUBLIC WORKS
STANDARD
DEPARTMENT
DETAIL
FSt. 189�
APPROVED BY: R. ENGLISH
ER-900
D
\ /
i
/ ram✓-////' 1� -16
xV9
Ile000
APPROVED PLANS TO
REMAIN ON JO$ /SITE
City Of Edmonds
i
Buildig,q Department
--------- - - - ----------------
Work � / BRCZE REPAIR
------------ ____ ________________
Address
/ 8229 TAL�OT RD
Owner / FLYNN�
jppfoved Date ; 05/04/2022
00,
Building Official \
-0479
Permit Number BLD2022 \
------------------------------------ \
CITY OF EDMONDS
BUILDING DIVISION
APPROVED PLAN
Nothing in the permit approval process shall be
interpreted as allowing or permitting the maintenance
of any currently existing illegal, nonconforming or
unpermitted building, structure or site condition which
is outside the scope of the permit application, regardless
of whether such building, structure or condition is
shown on the site plan or drawing. Such building,
structure or condition may be the subject of a separate
enforcement action.
r—-—-—-—-—-—-—-—-—-—-—- — - — - —- \
The issuance of this permit in no way constitutes \
pproval from any other agencies having regulatory \
a thority over the facility and this construction activity. \
It is the responsibility of the property owner to obtain \
a y and all such required approvals. \
/ / / J'
000l
APPROVED BY PLANNING \ \
\\\\\ \\ , \ \ \ \ \ May 05 2622 \
/ / �. \��� \ \� \iti \ �� \ \ APPROVAL IS FOR BRIDGE REPAIR WORK \
ONLY. A MITIGATION PLANTING PLAN \
CONSISTENT WITH THE CRITICAL AREA
REPORT BY "WETLAND RESOURCES
ENVIRONMENTAL CONSULTING DATED JUNE
\ +; - 25, 2021 IS PROVIDED FOR THE SITE UNDER
\ ��9, � � \ \ \ �'- PLAN FILE BLD2021-0929. THE APPROVED
\\� MITIGATION PLANTING PLAN UNDER /
I-ol4 oo \ l \ \ \ \ � BLD2021-0929 PLAN SHEETS L1.0, L3.1, AND
NOTES:
1. CONSTRUCTION EROSION CONTROL MEASUKE� MUST BE IN PLACE AND APPROVED BY CiTY OF
EDMONDS PRIOR TO ANY EARTH DISTURBANCE. SCHEDULE AN INSPECTION APPOINTMENT FOR THIS ITEM.
2. NO SEDIMENT SHALL DE TRACKED ONTO FAVEV STREET OR ROADWAYS. SEDIMENT SHALL BE
REMOVED FROM TRUCKS AND EQUIPMENT PRIOR TO LEAVING THE CONSTRUCTION SiTE. iN THE EVENT OF
FAILURE OF THE TESC SYSTEM RESULTING IN SE&MiNT TRACKING ONTO PAVEMENT, THE CONTRACTOR
SHALL IMPLEMENT MEASURES IMMEDIATELY TO CQRRECT THE SITUATION. THE CONTRACTOR SHALL
EMPLOY EMERGENCY MEASURES TO REMOVE SEDIMENT FROM PAVED SURFACES, AS NECESSARY.
STREET SWEEPING SHALL DE CONSIDERED AN EMERGENCY MEASURE.
3. AFTER CONSTRUCTION 15 COMPLETE, ALL EXPOSER EARTH SURFACES WiLL DE LANDSCAPED WiTH
SUITABLE VEGETATION TO PREVENT EROSION FOR THE PERMANENT CONDITION.
4. ALL DISTURBED SOILS WiLL DE COMPOST AMENDED\FER CiTY OF EDMONDS DMP T5.13.
5. CONTRACTOR TO VERIFY LOCATION OF ALL EXISTING TiLiTPES.
6. REFER TO LANDSCAPE ARCHITECT FOR IRRIGATION LXYOUT AND LANDSCAPE LIGHTING PLAN.
7. INSTALL AND MAINTAIN ALL TESC MEASURES ACCORAING TO APPROVED PLANS. CiTY OF EDMONDS
STANDARD DETAILS, AND ALL OTHER MEASURES THAT M Y BE REQUIRED DURING CONSTRUCTION.
Gmorn f v i S+ n i E
*REFER ALSO TO SEPARATE BUILDING PERMIT D02021-092�
N
SITE PLAN - BRIDGE WORK\ m
�` G / / / \\, V SS
100,
.o;.O\
SS
000,
o
REFER TO THE ATTACHED
TOPOGRAPHIC SURVEY TO
REFERENCE THE DATUM POINT
\ \ \ \
\
L3.2 PROVIDES ADEQUATE MITIGATION
\ \ \ \
\
PLANTING.
/
O
/
\
\
o
\
REFER ALSO TO STRUCTURAL
\
\ o
\
\
\
ENGINEERING, STRUCTURAL
\
OBSERVATION REPORT, AND
®
\
\
\
\ TALDOT BRIDGE EVALUATION
/
® I
\
\ REPORT DY CG ENGINEERS
Q
iN T
1�OCKE�'
HT E1G
O"\
MAX48",
L11GTI1`
VARIES
I
A
0
I /
FX
DECK BOARD
,REPLACEMI=NI D
o'%' l RE�A�R AT D GE
_ X — — — z A-
\ \ o INSTALL ADDITIONAL
\ \ OR RE -PLACE GRAVEL / 1
\ -0 AREAS OF ®/ / O \
�\ EXISTING GRAVEL _ / 4(F \
\ RiViNG SURFACE
CATION A5 NEEDED _V�i'
ALL SAF�T�f , o I I �Q► / / \
\ LPGH G AT BRIDGE i
\ / \ LOATP5co
KO 4 CORNER p���ti I / I /
®Y I /
I /
/ 2Q.
��\ i
\ / i
/
.01/ /
ovo,
7Z 1:)
/
jl
LU
U
Z
o
0
Lu
121�
00
U
m
LU
Q
U)
<
0
Z
N
O
Z
�
2i
C)
J
LL I
ILL
9716 REGISTERED
ARCHITECT
HEIDI MICHELLE HELGESON
STATE OF WASHINGTON
H 2 D
A R C H I T E C T U R E
D E S I G N
23020 EDMONDS WAY, #113
EDMONDS, WA 98020
P.206.542.3734
www.h2darchitects.com
DATE: 4/15/2022
PERMIT SET
SITE PLAN
RECEIVED
Apr 18 2022
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
BLD2022-0479