Building Permit - SEE BLD2019-1429 FOR PLANSI Type: DEMO Subtype: RES PRIMARY STRUCTURE DEMO I Status: FINAL I
Parcel No: 00488800300602
Subdivision: 004888
Fire Sprinklers: No
Valuation:
Code Edition:
Site Address: 23521 75TH AVE W EDMONDS,WA 98026-8521
Lot:
Lot Area: 0
Occupancy Type:
No. Stories: 0
Scope of Work: DEMO DETACHED 2 CAR GARAGE
Zoning:
Construction Type:
# of Dwelling Units: 0
WA State Contractor L & I #:
Applied: 11/7/2019
Issued: 2/4/2020
Final: 6/1/2021 CAE
Expiration Date: 6/3/2021
Issued by: NED
CONTACTS
NAME TYPE NAME
ADDRESS I PHONE EMAIL
APPLICANT MARK MCDOWELL
23521 75TH AVE W, EDMONDS (206)949-9180
MHMCDOWELLI@GMAIL.COM
WA 98026
CONTRACTOR MARK MCDOWELL
23521 75TH AVE W, EDMONDS (206)949-9180
MHMCDOWELLI@GMAIL.COM
WA 98026
OWNER MARK MCDOWELL
23521 75TH AVE W, EDMONDS (206)949-9180
MHMCDOWELLI@GMAIL.COM
WA 98026
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT PAID PAID DATE RECEIPT #
B-BUILDING PERMIT - OTHER FEES
001.000.322.10.000.00
$150.00 $150.00
11/7/19 REC077918
X-TECHNOLOGY FEE
001.000.321.99.100.00
$35.00 $35.00
11/7/19 REC077918
TOTALS: $185.00 $185.00
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
Hold Harmless
officials, employees, and agents from any and all claims for damages of whatever nature,
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Final approval on a project or final occupancy approval must be granted by the Building
Occupancy
Official prior to use or occupancy of the building or structure. Check the job card for all
required City inspections including final project approval and final occupancy inspections.
Any request for alternate design, modification, variance or other administrative deviation
(hereinafter "variance") from adopted codes, ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such request
shall be established by Council and shall be paid upon submittal and are non-refundable.
Permit Disclaimer
Approval of any plat or plan containing provisions which do not comply with city code
and for which a variance has not been specifically identified, requested and considered
by the appropriate city official in accordance with the appropriate provision of city code
or state law does not approve any items not to code specification.
Printed: Monday, November 20, 2023 1:54:37 PM 1 of 2
DEMO Permit
Pw1w2w1
City of Edmonds PERMIT NUM
Ave N, • ••� iMD0 430
.5etdhm. •. �
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
Sound/Noise
7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
INSPECTIONS
- Schedule Online at https://inspection.mybuildingpermit.com
11
INSPECTIONTYPE
INSPECTOR COMPLETED RESULT
NOTES
A-1 TESC AND MOBILIZE
2/18/2020
APPROVED
TESC adequate at time of inspection. Bottom of
12:00:00 AM
swimming pool completely broken up. Ok to back fill.
X-2 ENGINEERING FINAL
6/1/2021
APPROVED
All demo is completed.
12:00:00 AM
X-3 BUILDING FINAL"
6/1/2021
APPROVED
2069499180
12:00:00 AM
Printed: Monday, November 20, 2023 1:54:37 PM 2 of 2