Loading...
Building PermitI Type: DEMO Subtype: COM PRIMARY STRUCTURE DEMO I Status: FINAL I Parcel No: 00463303200303 Site Address: 8509 244TH ST SW EDMONDS,WA 98026-9068 Subdivision: 008454, 004633, 006781, 006680, 008120 Lot: Fire Sprinklers: No Lot Area: 0 Zoning: Valuation: Occupancy Type: Construction Type: Code Edition: 2015 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: DEMO OF 4 UNIT APARTMENTPSCAA# 201802655 WA State Contractor L & I #: Applied: 8/15/2019 Issued:9/16/2019 Final: 7/1/2021 CAE Expiration Date: 2/3/2022 Issued by: CONTACTS NAME TYPE NAME ADDRESS I PHONE EMAIL APPLICANT STEVE BARNES 6161 NE 175TH ST, KENMORE (206)682-5000 WA 98026 CONTRACTOR MURPHY BUILDING 28720 SE 63RD ST, ISSAQUAH (206)228-2564 COMPANY WA 98027 8509 244TH ST SW, EDMONDS OWNER GURSLI FAMILY LP WA 98026-9068 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# B-BUILDING PERMIT - OTHER FEES 001.000.322.10.000.00 $200.00 $200.00 9/16/19 REC077482 ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $100.00 $100.00 9/16/19 REC077482 X-TECHNOLOGY FEE 001.000.321.99.100.00 $35.00 $35.00 9/16/19 REC077482 TOTALS: $335.00 $335.00 CONDITIONS CONDITION TYPE STATUS NOTES 48 hours notice is required when requesting your FINAL Engineering Inspection. 425-771- 48 Hrs Notice-ENGR Final 0220, ext.1326. Damage to Frontage Applicant shall repair/replace all damage to utilities or frontage improvements in City Improvments right-of-way per City standards that is caused by or occurs during the permitted project. *Pre -inspection required. *Street to be cleaned of debris. *Side sewer must be capped at property line. Demolition Requirements *Water Service must be disconnected from Water meter and or hose bib with AVB installed. *Dump at approved dump site only. *See demolition inspection checklist on back of job card for inspection requirements. ESC Required Maintain erosion & sedimentation control per city standards. Printed: Monday, November 20, 2023 1:55:58 PM 1 of 2 DEMO PerCity mit • • • - www.edmondswa.gov • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, Hold Harmless arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Final approval on a project or final occupancy approval must be granted by the Building Occupancy Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Permit Disclaimer Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of Sound/Noise 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Underground Utility Locates Call for locates of underground utilities prior to any excavation. INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES A-1 TESC AND MOBILIZE 6/15/2021 APPROVED 12:00:00 AM E-6 DEMO WATER AVB 6/15/2021 APPROVED 12:00:00 AM X-2 ENGINEERING FINAL 6/15/2021 APPROVED 12:00:00 AM E-6 DEMO SEWER CAP 6/15/2021 APPROVED 12:00:00 AM X-3 BUILDING FINAL** 7/1/2021 APPROVED 12:00:00 AM Printed: Monday, November 20, 2023 1:55:58 PM 2 of 2