Loading...
Building PermitType: COMMERCIAL BLDG Subtype: COM DECK OR PATIO I Status: ISSUED Parcel No: 00906500040300 Site Address: 654 5TH AVE S 403 EDMONDS,WA 98020-3617 Subdivision: 007200, 009065, 004096 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $1,725.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: LALLY- DECK REPAIR Applied: 10/23/2023 Issued:11/21/2023 Final: Expiration Date: 5/21/2024 Issued by: BAC I WA State Contractor L & I #: STEADC1984J7 I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT ISAIAH PARK 4913 70TH AVE W, UNIVERSITY (253)579-5505 ISAIAH.PARK@THESTEADFAST.COM PLACE WA 98467 CONTACT STEADFAST CONSTRUCTION 4913 70TH AVE W, UNIVERSITY (253)579-5505 isaiah.park@thesteadfast.com INC. PLACE WA 98467 CONTRACTOR STEADFAST CONSTRUCTION 4913 70TH AVENUE W, (253)722-4336 nickm@thesteadfast.com INC UNIVERSITY PLACE WA 98467 BELLA COOLA 654 5TH AVE S 403, EDMONDS OWNER CONDOM INIUMS-ANN M WA 98020-3617 LALLY 0•' • DESCRIPTION I!ACCOUNT AMOUNT PAID PAID DATE RECEIPT# BLD - COM VALUE BASED FEE 01.000.345.83.000.00 $182.80 $182.80 11/20/23 R32795 BLD - COM VALUE BASED PLAN 001.000.345.83.000.00 $155.38 $155.38 10/23/23 R32191 REVIEW CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 10/23/23 R32191 PERMIT STATE BUILDING CODE SURCHARGE 001.000.237.150 $25.00 $25.00 11/20/23 R32795 -COM TOTALS: $408.18 $408.18 CONDITION TYPE STATUS NOTES Printed: Tuesday, November 21, 2023 10:55:04 AM 1 of 2 •MERCIAL BLDG PermitCity • • • • - •:0iBLD2023-1322 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. L INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES B-4 FRAMING B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" Printed: Tuesday, November 21, 2023 10:55:04 AM 2 of 2