Loading...
ENG2023-0587 ROW PERMITRIGHT OF WAY EUC PERMIT PERMIT NU �!B E City of Edmonds 98020 - EENG2023-05871 LM www.edmondswa.gov i Description: PUD-EMERGENCY POLE REPLACEMENT; ALREADY DONE NJUNS #5719475 ISSUED: 11/30/2023 Address: 923 MAPLE ST EDMONDS WA 98020-3330 EXPIRES: 05/30/2024 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00434206903200 NAME TYPE NAME ADDRESS PHONE APPLICANT MOE MATTHEWS PO BOX 1107, EVERETT WA 98206 (425)783-5681 CONTACT SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-5681 CONTRACTOR SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-4353 OWNER JORDAN D & BARBARA T KOSTELYK 923 MAPLE ST, EDMONDS WA 98020 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00 ENG - INSPECTIONS $126.00 $126.00 RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: MAJ DATE: 11/30/2023 Printed: Thursday, November 30, 2023 9:14:28 AM 1 of 2 RIGHT OF WAY EUC PERMIT PERMIT NUMBE3 City of Edmonds www.edmondswa.gov • • CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START X-2 ENGINEERING FINAL** Printed: Thursday, November 30, 2023 9:14:28 AM 2 of 2 RECEIVED of EpM04O� SECTION A RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right-of-Wgy permit Handout E6�. Nov 13 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A' instead of leaving blank. All fields required. Incomplete Applications will be denied. General • Project Name Bad order pole replacement Site Address or if no site address use Property Address at NW corner of project area: 923 Maple Way, Edmonds, 98020-3330 Associated Permits: BLD N/A PLN N/A ENG N/A Owner and Entity Holding Name of Company Snohomish County PUD applicable) Franchise Ordinance No: N/A Point of Contact William Graham Title Design Engineer Address 1802 75th St SW City Everett State WA Zip 98203 Phone (360)703 1910 Email permits@snopud.com wlgraham@snopud.com Contractor and Authorized Agent of Owner Name of Company SAME AS ABOVE (see note below) Contractor Contacts During Construction Primary Name Agent Name Title Title Mobile Address Email City State Zip Secondary Name Phone Title Email Mobile City of Edmonds Business License No: NSA Email State License No: 313-005-741 pf Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC18.6o.o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as welt ❑ Traffic Control Only (no associated development) • Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 Of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) Repair - Pole pli 955 was deteriorated and replaced with a similar 45-foot class 2 wood pole. The new pole (pli 29461o) was buried 6.5 ftEDFNILOOHGZLWKFUXVKLaIvs also rebuilt the 3-inch secondary riser PUD crews topped the old pole and left it on -site to allow Ziply and Comcast to transfer their equipment to the new pole.Ptme crews also replaced the existing overhead primary and neutral copper conductors with new #2 ACSR conductors, between the new pole and the pole to the west.:RUNKDVDOUHDG\EHHQFRPSOHBWGRQRQDQHPHUJHQF\EDVLV VRQRWUDIILFFRQWUROk VKLVDSSOLFDWLRQ RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + N/A LF x N/A LF N/A SF N/A Alley 72 hours + N/A LF x N/A LF N/A SF N/A Parking 72 hours + N/A LF x N/A LF N/A SF N/A SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable ® power ❑ gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes es No 2. Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? NO If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? y es 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? NO 5. Does the work involve proposed additions to an aboveground utility stem? If es: NO Are the additions for the purpose of serving new commercial development? N/A Are the additions for the purpose of serving a single-family residential subdivision? N/A Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? If yes, answer the following questions related to project area, i.e. the actual area in which the yes project is proposed: 6a. Does your project involve wires/cables/lines? If yes: yes How many are existing? 1 2 1 How many are to be added? O City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: yes How many poles are existing in the project area? 1 What is the height of the existing poles? 45 ft How many poles are to be removed? 0 Are additional poles to be laced? NO How many? I N/A I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: yes How many? 1 1 1 What is the height of the poles after? 45 ft Describe the modification rebuild: Deteriorated pole, replaced w similar 45ft class 2 wood pole SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATE APPLICANT PRINTED APPLICANT TITLE: Design Engineer NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM REV 1 AUG 1 8 Toz3 PUBLIC UTILITY DISTRICT N0.1 OF SNOHOMISH COUNTY LOCATION 923 MAPLE WAY LYNNWOODAREA POLE No. 955 SE1/4S 24 T 27 R 03 DATE 7/7/2023 ORDER 100092667 REASON FOR WORK REPLACE BO POLE ENGINEER A. RIFE OPERATION 0030 DRAFTER U.G. NO. SCALE 1" = 100' APPROVED{ DATE 7/7/2023 DATE PRINTED DATE WORK COMPLETED MF 7/7/23 FOREMAN , //XF% FEES REO'D ❑ YES ■ NO PRIMARY OVERHEAD ❑ RESIDENTIAL ❑ COMMERCIAL LEO NO. SECONDARY OVERHEAD BASIC FEE s '@s =s T R/CONV. POLE s �NPLRGROUN7 —"'-- COMMERCIAL AN u0py FEE 3 �sL & RVTU—R WF `�NDE `� BAsic:� UNDERGROUND PLAT BASIC FEE s ri FT.@s =s STREET LIGHTING q FT.Cs '=S WORK IN RIGHT OF WAY S-BVII.T vs MISCEERAIQMOS,''R�VED BY: ZIPiyREp VAULT s (PRINT NAMES s DAB TOTAL DUE s DATE PAID RECEIPT NO._ SERVICE ORDER NO. I FI;FNn: NESC VIOLATIONS ■ NO ❑ YES (SEE NOTES) PERMITS (DATE GRANTED) ❑ TREE TRIM ❑ STATE ❑ COUNT ■ CITY O MNTS I ED ■ NOT REQUIRED DATE RELEASED rORETGN CONTACTS ■ JPN# 100092667 EM ❑ JOINT TRENCH ZIPLY & CATV ❑ JOINT BORE ZIPLY & CATV POLE STENCILING FROM TO TAKE OFF POLE PRE- ONST. REQUIRMENTS ❑ THE TRIM ❑ PUD LOCATOR ❑ BAC HOE ❑ FLAGGING ■ ONE CALL DATE 6/98/93 STR T LIGHTING -6-*& ■ NO F P&R AS -BUILT DP GIS DM GIS QC DH M&R DPH G►S Ph EM JOINT USE LOCATION MAP PAGE 454 G RECEIVED O EXISTING POLE Nov 13 2023 X EXISTING POLE -TO BE REMOVED CITY OFEDMONDS DEVELOPMENT SERVICES • NEW POLE DEPARTMENT )1( NEW POLE TO REPLACE EXISTING POLE SUBSTATION WSG CIRCUIT NO. 12-404 PHASE 1 ENGR'S TEL. # 425-783-8559 ENGR'S CELL # 425-239-8210 Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. TRANSFER OF UTILITIES, REMOVAL OF POLE AND FINAL RESTORATION TO BE CONSISTENT WITH APPLICABLE POLE ATTACHMENT AGREEMENT(S) AND JOINT OWNERSHIP POLE AGREEMENT. W Q rOA PLI 955, NEW PLI # -------------- SET 45 CL2 POLE W/GND TIGHT EAST (PW2045, N0110) FRAME (12V109) 10 VERTICAL DEADEND INSTL 3/8" PRl DIG TO NEW 12" AHR, L=10' E (GO113, A0102) XFR 25 KVA OH XFMRA(12V601) UTC # __ b3Z� �DP45-------- SER#---------- XFR OH SVCS RMV EXIST SEC UG RISER INSTL 3" SEC RISER (FO106) RUN 50' OF 350 KCMIL TPX TO PED (C1204) STRIP AND TeP PE) E FOR CE)M\1UNI T1/1NS - PUD TO ENFORCE POLE ATTACHMENT AGREEMENT. - PUD IS RESPONSIBLE FOR ENSURING THAT THE OLD POLES ARE REMOVED. 25 1 � ------------------ T O W S G 1VAL*9 Cv /0�Rz i- i1,te'417- 12-404 NTS OWNER/CONTRACTOR IS RESPONSIBLE FOR 1 EROSION CONTROL AND DRAINAGE 0 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 6 1'205 14 20 %926 932-CCa SL-131640-H SJ 15-9751 947 FU15 N rn 17 cl- SL-131647-H 9 ENGINEERING DIVISION `j APPROVED AS NOTED JX iAlQ.iJu. wz 11/29/2023 VV 25-1D32� MAPLE VVY 955 Op ---------------- 294610 915 0; g23 15-9 92 LAYOUT 1" = 50' 205 4 45 ,933 935 S -�129783-A 3 50-3517 0 OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. RECEIVED CITY OF EDMONDS Project Name: Original WO has been closed' lease use 100106479. DEVELOPMENRVICES g � p DEPART MMENENT Scope of Work: Distribution pole was BO. PUD crews replaced the pole with a similarly sized one (45-foot class 2), and rebuilt a 3" secondary riser on the new pole. The crew also replaced the primary and neutral copper conductors between the newly installed pole and the pole to the west with #2 ACSR wire. PUD crew topped old pole and left it for Ziply to remove once they transfer their equipment to the new pole. No cuts in asphalt were made. Location: Pole is located at 923 Maple Way, Edmonds. (pli 294610) Which lane direction is being closed: (Job has already been worked) Crews would have had to occupy the entirety of Maple Way. Maple way is single -lane, and more akin to a driveway than a residential road Hours and Duration at the Location: All work was completed on 8/16/2023, in approximately 6 hours. Traffic control plan: This job has already been worked, so no traffic control plan is included. RECEIVED Nov 13 2023 --- CITY OF EDMONDS , MyBuildingPermit.com DEVELOPMENT SERVICES CITY OF EDMONDS DEPARTMENT Right -of -Way Application #1403377-100106479 (After action req 923 Maple St, Edm( Applicant First Name Last Name Company Name Moe Matthews Snohomish County PUD Number Street Apartment or Suite Number E-mail Address PO Box 1107 permits@snopud.com City State Zip Phone Number Extension Everett WA 98206 (425) 783-5681 Contractor Company Name Owner Number Street Apartment or Suite Number City State Zip Phone Number Extension State License Number License Expiration Date UBI # E-mail Address Project Location Number Street Floor Number Suite or Room Number 923 MAPLE ST City Zip Code County Parcel Number EDMONDS 98020 00434206903200 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name Jordan D & Barbara T Kostelyk Number Street Apartment or Suite Number 923 MAPLE ST City State Zip EDMONDS WA 98020 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 11/13/2023 Submitted By: Moe Matthews Page 1 of 2 CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1403377-100106479 (After action req 923 Maple St, Edmi Project Contact Company Name: Snohomish County PUD Name: Moe Matthews Email: permits@snopud.com Address: PO Box 1107 Phone #: (425) 783-5681 Everett WA 98206 Project Type Activity Type Scope of Work Utility Purveyor Utility Work Disturbance of Surface Project 100106479 (After action req 923 Maple St, Edmonds) Name: This is one of several emergency pole replacement jobs in Edmonds that have already been worked on an emergency basis without a permit. A traffic control plan is not included because the work is already complete and work order 100092667 is closed so we are using work order 100106479 to apply for this permit. Distribution pole, PLI 955 was BO. PUD crews replaced the Description pole with a similarly sized one (45-food class 2) and rebuilt a 3" secondary riser on the new pole. of Work: The crew also replaced the primary and neutral copper conductors between the newly installed pole and the pole to the west with #2 ACSR wire. PUD crew topped the old pole and left it for Ziply to remove once they transfer their equipment to the new pole. No cuts in asphalt were made. Pole is located at 923 Maple St, Edmonds. Crews would have had to occupy the entirety of Maple Way. All work was completed on 8/16/23 in approximately 6 hours. Project Details Project Information Job Number 100106479 Page 2 of 2