Building PermitType: COMMERCIAL BLDG Subtype: COM ALTERATION OR REPAIR I Status: ISSUED
Parcel No: 00434208800000
Subdivision: 004342
Fire Sprinklers:
Valuation: $200,000.00
Code Edition: 2018
Site Address: 700 MAIN ST EDMONDS,WA 98020-3032
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: FRANCES ANDERSON CTR- WINDOW REPLACEMENT.
Applied: 11/13/2023
Issued:12/4/2023
Final:
Expiration Date: 11/28/2024
Issued by: NED
I WA State Contractor L & I #: DISTIW1932B4 I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
THOM SULLIVAN
7110 210 ST. SW, EDMONDS WA
(425)760-3334
THOM.SULLIVAN@EDMONDSWA.GO
98026
V
CONTACT
CITY OF EDMONDS
7110 210 ST. SW, EDMONDS WA
(425)760-3334
thom.sullivan@edmondswa.gov
98026
CONTRACTOR
DISTINCTIVE WINDOWS INC
PO BOX 1172, LYNNWOOD WA
(425)275-9150
Inquiries@distinctivewindowsinc.com
98046
250 5TH AVE N, EDMONDS WA
OWNER
EDMONDS CITY OF
98020
7COMDESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
VALUE BASED FEE
001.000.345.83.000.00
$2,020.00
$2,020.00
12/4/23
R32977
BLD - COM VALUE BASED PLAN
001.000.345.83.000.00
$1,717.00
$1,717.00
11/9/23
R32591
REVIEW
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
11/9/23
R32591
PERMIT
STATE BUILDING CODE SURCHARGE
001.000.237.150
$25.00
$25.00
12/4/23
R32977
COM
TOTALS: $3,807.00
$3,807.00
CONDITION TYPE
STATUS
NOTES
Printed: Monday, December 04, 2023 11:44:03 AM 1 of 2
•MERCIAL BLDG PermitCity
• • • • -
•:0iBLD2023-1417
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
L INSPECTIONS
- Schedule Online
at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR
COMPLETED
RESULT
NOTES
B-4 FRAMING
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
B-3 EXTERIOR INSULATION
Please request this inspection, if large areas of
insulation are removed.
B-3 ROOF SHEATHING
Please request this inspection, if large areas of roof
sheathing are removed.
B-5 INSULATION ENERGY
Please request this inspection, if large areas of
insulation are removed.
Printed: Monday, December 04, 2023 11:44:03 AM 2 of 2