Building PermitType: SOLAR Subtype: SOLAR RESIDENTIAL I Status: ISSUED
Parcel No: 00602600002600 Site Address: 8909 218TH ST SW EDMONDS,WA 98026-7862 Applied: 12/4/2023
Subdivision: 006026 Lot: 0 Issued: 12/5/2023
Fire Sprinklers: Lot Area: Zoning: Final:
Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 6/2/2024
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED
Scope of Work: GHENOV- ROOFTOP SOLAR
I WA State Contractor L & I #: BLOSSSL823M7 I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
STEPHANIE STEWART
3609 168TH ST NE 3507,
(425)610-7067
OFFICE@BLOSSOMSOLAR.COM
ARLINGTON WA 98223
CONTACT
BLOSSOM SOLAR LLC
3609 168TH ST NE 3507,
(425)610-7067
office@blossomsolar.com
ARLINGTON WA 98223
CONTRACTOR
BLOSSOM SOLAR LLC
1706 LOMBARD AVE, EVERETT
(425)330-4322
OFFICE@BLOSSOMSOLAR.COM
WA 98201
OWNER
DAVID GHENOV
PO BOX 771, EDMONDS WA
(206)795-4955
98020
•' •
DESCRIPTION
7BLDPERMITIT
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
BASE FEE
001.000.322.10.000.00
$100.00
$100.00
12/4/23
R32993
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
12/4/23
R32993
PERMIT
SOLAR - RESIDENTIAL
001.000.345.83.000.00
$38.00
$38.00
12/4/23
R32993
STATE BUILDING CODE SURCHARGE
001.000.237.150
$6.50
$6.50
12/4/23
R32993
RES
TOTALS: $189.50
$189.50
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Tuesday, December 05, 2023 10:08:49 AM 1 of 2
SOLAR PerCity mit
• • •
�149•:i 1
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR COMPLETED RESULT
NOTES
X-1 FIRE FINAL
X-3 BUILDING FINAL"
Printed: Tuesday, December 05, 2023 10:08:49 AM 2 of 2