May 4, 2021 Earth Solutions NW LLC
ES-7841 Ceotechnical Engineering, Construction
Observation/Testing and Environmental Services
Select Homes, Inc.
16531 — 13th Avenue West, Suite A107
Lynnwood, Washington 98037
Attention: Ms. Kayla Nichols
Subject: Geotechnical Evaluation
Proposed Single -Family Residences
19508 — 88th Avenue West
Edmonds, Washington
Reference: Department of Ecology
Stormwater Management Manual for Western Washington
Amended December 2014
James P. Minard
Geologic Map of the Edmonds East and Part of the Edmonds West Quadrangles
Washington, 1983
Web Soil Survey (WSS)
Edmonds City Code (ECC)
Chapter 23.80 (Geologically Hazard Areas)
Dear Ms. Nichols:
As requested, Earth Solutions NW, LLC (ESNW) has prepared this geotechnical evaluation report
for the proposed single-family residences project. As part of our scope of services, we completed
a subsurface exploration, in -situ infiltration testing, laboratory and engineering analyses, and
prepared this written report with our findings and recommendations for the proposed project.
Based on our evaluation, the proposed project is feasible from a geotechnical standpoint.
Protect Description
The subject site is located at 19508 — 88th Avenue West in Edmonds, Washington. The subject
site consists of two parcels (Snohomish County parcel numbers
2704180030-3200 and -3400) covering 0.96 acres. The property is currently developed with a
single-family residence and associated improvements. Based on ESNW's understanding of the
proposed development, the boundary lines will be adjusted to create two residential lots behind
the existing residence, with access along the southern property line. The subject site generally
descends towards the west with total elevation change on the order of 10 to 15 feet. The subject
site is bordered by single-family residences on the north, south, and west sides, and 88th Avenue
West to the east.
15365 N.E. 90th Street, Suite 100 • Redmond, WA 98052 • (425) 449-4704 • FAX (425) 449-4711
Select Homes, Inc. ES-7841
May 4, 2021 Page 2
We anticipate grading activities will include cuts and fills of about two to four feet to establish the
planned building alignments. We understand infiltration and low impact development methods
are being evaluated for stormwater management. Site improvements will also include
underground utility installations.
At the time this report was prepared, specific building load values were not available. However,
we anticipate the proposed residential structures will consist of relatively lightly loaded wood
framing supported on conventional foundations. Based on our experience with similar
developments, we estimate wall loads on the order of one to two kips per linear foot and slab -on -
grade loading of 150 pounds per square foot (psf).
If the above design assumptions are incorrect or change, ESNW should be contacted to review
the recommendations in this report. ESNW should review the final design to verify the
geotechnical recommendations provided in this report have been incorporated into the plans.
Subsurface Conditions
As part of this geotechnical evaluation, an ESNW representative observed, logged, and sampled
three test pits on March 15, 2021, excavated at accessible locations within the proposed
development area, using a mini-trackhoe and operator provided by the client. The approximate
locations of the test pits are depicted on the Test Pit Location Plan (Plate 2). Please refer to the
test pit logs provided as an attachment to this report for a more detailed description of subsurface
conditions. Representative soil samples collected at the test pit locations were analyzed in
general accordance with the Unified Soil Classification System (USCS) and United States
Department of Agriculture (USDA) methods and procedures.
Topsoil and Fill
Native topsoil was observed extending to depths of approximately 3 to 12 inches below the
existing ground surface (bgs). The topsoil was characterized by dark brown color and fine organic
material.
Fill was not encountered within the test pits. If fill is encountered during construction, ESNW
should be consulted to verify the suitability for support of the proposed structures and/or reuse
as structural fill.
Native Soil
Underlying the topsoil, native soil conditions at the test pit locations was observed to consist
primarily of silty sand (USCS: SM). Overall soil relative density increased with depth, extending
to the maximum exploration depth of about seven feet bgs. The native soil was generally
observed in a weakly to moderately cemented condition at about four feet bgs.
Earth Solutions NW. LLC
Select Homes, Inc.
May 4, 2021
Geologic Setting
ES-7841
Page 3
The referenced geologic map resource identifies Vashon till (Qvt) across the site and surrounding
areas. As reported on the geologic map resource, Vashon till typically consists of a nonsorted
mixture of clay, silt, sand, pebbles, cobbles, and boulders. The till was deposited directly by ice
advanced over previously deposited sediment and rocks. In addition, the referenced WSS
resource identifies Alderwood-urban land complex (Map Unit Symbol: 6) as the primary soil units
underlying the subject site. The Alderwood series was formed in glacial till plains. Based on our
field observations, native soils on the subject site are generally consistent with the geologic
setting outlined in this section.
Groundwater
Natural groundwater seepage was not observed at the test pit locations during the fieldwork
(March 2021). However, light seepage was documented after the infiltration test at TP-1 when
the test pit was advanced to eight feet bgs. Seepage should be expected in deeper excavations
at this site, particularly during the winter, spring, and early summer months. Groundwater
seepage rates and elevations fluctuate depending on many factors, including precipitation
duration and intensity, the time of year, and soil conditions.
Geologically Hazardous Areas Assessment
As part of this geotechnical evaluation, the referenced chapter of the ECC was reviewed. Based
on our investigation and review, there are no geologically hazardous areas present on or adjacent
to the site.
Foundations
The proposed structures can be supported on conventional spread and continuous footings
bearing on undisturbed, competent native soil, compacted native soil, or new structural fill.
Competent native soils, suitable for support of the foundation, should be encountered beginning
at depths of approximately two to three feet bgs. Where loose or unsuitable soil conditions are
encountered at foundation subgrade elevations during site preparation activities, compaction of
the soils to the specifications of structural fill, or overexcavation and replacement with granular
structural fill will be necessary. Structural fill should consist of suitable granular soils compacted
to 95 percent of Modified Proctor (ASTM D1557). Compaction of the soil to the levels necessary
for use as structural fill will be difficult during wet weather conditions. Organic material exposed
at foundation subgrade elevations must be removed and grades restored with structural fill.
Provided the structures will be supported as described above, the following parameters can be
used for design of the new foundations:
• Allowable soil bearing capacity 2,500 psf
• Passive earth pressure 300 pcf (equivalent fluid)
• Coefficient of friction 0.40
Earth Solutions NW. LLC
Select Homes, Inc. ES-7841
May 4, 2021 Page 4
The passive earth pressure and coefficient of friction values include a safety factor of 1.5. A one-
third increase in the allowable soil bearing capacity can be assumed for short-term wind and
seismic loading conditions.
With structural loading as expected, total settlement in the range of one inch is anticipated, with
differential settlement of about one-half inch. The majority of the settlements should occur during
construction, as dead loads are applied.
Retaining Walls
Retaining walls must be designed to resist earth pressures and applicable surcharge loads. The
following parameters may be used for retaining wall design:
• Active earth pressure (unrestrained condition)
• At -rest earth pressure (restrained condition)
• Traffic surcharge (passenger vehicles)
• Passive earth pressure
• Coefficient of friction
• Seismic surcharge
* Where H equals the retained height (in feet)
35 pcf
55 pcf
70 psf (rectangular distribution)
300 pcf
0.40
8H psf*
The passive earth pressure and coefficient of friction values include a safety factor of 1.5.
Additional surcharge loading from adjacent foundations, sloped backfill, or other loads should be
included in the retaining wall design.
Retaining walls should be backfilled with free -draining material that extends along the height of
the wall and a distance of at least 18 inches behind the wall. The upper 12 inches of the wall
backfill may consist of a less permeable soil, if desired.
Drainage should be provided behind retaining walls such that hydrostatic pressures do not
develop. If drainage is not provided, hydrostatic pressures should be included in the wall design.
A perforated drainpipe should be placed along the base of the wall and connected to an approved
discharge location. A typical retaining wall drainage detail is provided on Plate 3.
Earth Solutions NW. LLC
Select Homes, Inc.
May 4, 2021
Seismic Design
ES-7841
Page 5
The 2018 International Building Code (2018 IBC) recognizes the most recent edition of the
Minimum Design Loads for Buildings and Other Structures manual (ASCE 7-16) for seismic
design, specifically with respect to earthquake loads. Based on the soil conditions encountered
at the boring locations, the parameters and values provided below are recommended for seismic
design per the 2018 IBC.
Parameter
Value
Site Class
C*
Mapped short period spectral response acceleration, Ss (g)
1.294
Mapped 1-second period spectral response acceleration, S1 (g)
0.457
Short period site coefficient, Fa
1.200
Long period site coefficient, F„
1.500
Adjusted short period spectral response acceleration, SMs (g)
1.553
Adjusted 1-second period spectral response acceleration, SM1 (g)
0.685
Design short period spectral response acceleration, SIDS (g)
1.036
Design 1-second period spectral response acceleration, SD1 (g)
0.457
* Assumes very dense soil conditions, encountered to a maximum depth of 7 feet bgs during the March 2021 field
exploration, remain very dense to at least 100 feet bgs. Based on our experience with the project geologic setting
(glacial till) across the Puget Sound region, soil conditions are likely consistent with this assumption.
In our opinion, the site susceptibility to liquefaction is negligible. The native soil relative density
and the absence of an established, shallow groundwater table are the primary bases for this
opinion.
Drainage
Temporary measures to control surface water runoff during construction would likely involve
passive elements such as interceptor trenches and sumps. ESNW should be consulted during
preliminary grading activities to evaluate seepage areas and provide recommendations to reduce
the potential for seepage -related instability.
Finish grades should be designed to direct surface water away from structures and slopes.
Grades adjacent to buildings should be sloped away at a gradient of either at least 2 percent for
a horizontal distance of up to 10 feet or the maximum allowed by adjacent structures. In our
opinion, foundation drains should be installed along building perimeter footings. A typical footing
drain detail is attached to this letter (Plate 4).
Earth Solutions NW. LLC
Select Homes, Inc.
May 4, 2021
Infiltration Evaluation
ES-7841
Page 6
As indicated in the Subsurface Conditions section, native soils encountered during our fieldwork
were characterized primarily as silty sand glacial till deposits. Based on the results of USDA
textural analyses, the native silty sand soils at depth were classified primarily as slightly gravelly
sandy loam with fines contents of about 32 to 36 percent.
In -situ testing was completed in accordance with the Small-scale PIT procedure, as outlined in
Volume III, Chapter 3, Page 526 of the 2014 SMMWW. The testing was completed at a depth of
approximately four and one-half feet at TP-1. The in -situ rate obtained during testing was 1.25
inches per hour. The test pit was advanced deeper after completion of the test and light water
seepage from the test was observed at a depth of about five feet, indicating that some of the
measured infiltration traveled horizontally rather than vertically.
Because the infiltration rate obtained from in -situ testing is considered to be a short-term rate,
correction factors must be applied in order to determine a long-term design rate. The correction
factors outlined below were used in accordance with Table III-3.3.1 of the 2014 SMMWW outlined
in Volume III, Chapter 3, Page 529.
The correction factors, along with the measured infiltration rate, were incorporated into the
following equation: Ksat design = Ksat initial x CFv x CFr x CF..
• Measured (Ksat initial) 1.25 inches per hour
• Site variability CFv = 0.5
• Test method CFt = 0.5
• Degree of influent control CFm = 0.9
• Long-term design infiltration rate (Ksat design) 0.28 inches per hour
The design infiltration rate is applicable to facilities located in proximity to the infiltration test
location and depth. Infiltration facilities must incorporate overflow provisions. If overflow
provisions are not or cannot be included, ESNW does not consider the native glacial till a suitable
receptor for infiltration facilities from a geotechnical standpoint. ESNW should be retained to
observe the construction of infiltration facilities on the subject site in order to confirm soil
conditions are as anticipated and perform confirmation infiltration testing at the infiltration design
depth and locations. Overexcavation of low permeability lenses may be required. Supplementary
geotechnical recommendations may be provided at the time of construction, where necessary.
Earth Solutions NW. LLC
Select Homes, Inc.
May 4, 2021
Discussion
ES-7841
Page 7
Infiltration should be situated as high in the native soil as possible, to provide maximum capacity
for infiltration. Infiltration into the upper soil zone will require protection from traffic, compaction
or other activities that may impede or otherwise degrade the infiltration capacity. The weathered
section of the glacial till deposit is susceptible to unintentional compaction if subject to
vehicle/machine traffic, and fill placement. In order to preserve the undisturbed infiltration
characteristics of the weathered section, any area that will have shallow infiltration facility must
be identified and protected prior to, and throughout, mass earthwork operations. Failure to do so
may reduce the infiltration characteristics of the near surface soils.
Based on subsurface conditions observed before, during, and after the PIT, it is our opinion that
the low measured infiltration rate represents horizontal infiltration as well as vertical infiltration,
which was exhibited by the seepage observed after advancing the test pit deeper. Infiltration into
native soils would move laterally along the relatively impermeable unweathered till soils, with
some infiltrating vertically. Potential offsite impacts (basements, crawlspaces, utilities, etc.)
should be evaluated prior to final engineering and facility construction. Additionally, ESNW
should review the proposed grading and drainage plans to confirm the recommendations in this
report are followed, and to provide additional recommendations as necessary.
On -site Stormwater Management
Pursuant to City of Edmonds stormwater management requirements, implementation of on -site
stormwater BMPs are required for proposed developments in accordance with specified
thresholds, standards, and lists. The intent of BMP implementation is to infiltrate, disperse, and
retain stormwater runoff on site to the extent feasible. The table below summarizes our
evaluation of low impact development methods, as outlined in the referenced stormwater manual,
from a geotechnical standpoint. It is instructed in the referenced stormwater manual that BMPs
are to be considered in the order listed (from top to bottom) for each surface type, and the first
BMP that is determined to be viable should be used. For completeness, however, we have
evaluated each listed BMP for the proposed surface types.
Earth Solutions NW. LLC
Select Homes, Inc.
May 4, 2021
ES-7841
Page 8
BMP
Viable?
Limitations or
Infeasibility Criteria
Lawns and Landscaped Areas
T5.13: Post -construction soil
quality and depth (Volume V,
Yes
None.
Chapter 5)
Roofs
T5.30: Full dispersion (Volume
Limitation: Adequate vegetative flow paths will likely not
V, Chapter 5)
Maybe*
be available.
T5.10A: Downspout full
Limitation: Infiltration facilities should be shallow and
infiltration systems (Volume III,
Yes
designed with overflow.
Chapter 3)
Roofs
Bioretention Volume V, Chapter
p
Yes
Limitation: Infiltration facilities should be shallow and
7)
designed with overflow.
T5.10B: Downspout dispersion
Maybe*
Limitation: Adequate vegetative flow paths will likely not
systems (Volume III, Chapter 3)
be available.
T5.10C: Perforated stub -out
Limitation: Soil and groundwater conditions to be verified
connections (Volume III, Chapter
Yes
during installation.
3
T5.30: Full dispersion (Volume
Maybe*
Limitation: Adequate vegetative flow paths will likely not
V, Chapter 5)
be available.
T5.15: Permeable pavement
Yes
Limitation: Infiltration facilities should be shallow and
(Volume V, Chapter 5)
designed with overflow.
Bioretention (Volume V, Chapter
Yes
Limitation: Infiltration facilities should be shallow and
7)
designed with overflow.
T5.12: Sheet flow dispersion
T5.11: Concentrated flow
Maybe*
Limitation: Adequate vegetative flow paths will likely not
dispersion (Volume V, Chapter
be available.
5
* Viability to be determined by storm designer.
Limitations
The recommendations and conclusions provided in this geotechnical evaluation report are
professional opinions consistent with the level of care and skill that is typical of other members in
the profession currently practicing under similar conditions in this area. A warranty is not
expressed or implied. Variations in the soil and groundwater conditions observed at the test pit
locations may exist and may not become evident until construction. ESNW should reevaluate
the conclusions in this geotechnical evaluation report if variations are encountered.
Earth Solutions NW. LLC
Select Homes, Inc.
May 4, 2021
Additional Services
ES-7841
Page 9
ESNW should be retained to provide additional geotechnical services in association with this
project, including testing and consulting services during construction. ESNW should have an
opportunity to review final project plans with respect to geotechnical recommendations provided
in this letter.
We trust this letter meets your current needs. Should you have questions, or if any additional
information is required, please call.
Sincerely,
EARTH SOLUTIONS NW, LLC
Adam Z. Shier, L.G.
Project Geologist
4/2021
Henry T. Wright, P.E.
Senior Project Manager
Attachments: Plate 1 — Vicinity Map
Plate 2 — Test Pit Location Plan
Plate 3 — Retaining Wall Drainage Detail
Plate 4 — Footing Drain Detail
Test Pit Logs
Grain Size Distribution
cc: RAM Engineering, Inc.
Attention: Mr. Rob Long, P.E. (Email only)
Earth Solutions NW. LLC
ie
❑c.? ❑
YQ -._Qp
SefeetS
/X//,( \ T�/ 179Ch
-J
-'-----
.. Oo• �O da 180th Street 5au[hw
qAp,./
41 dq r0
�O B P o
�� ���
Puget Sound
.°
'O 0''fl. a tie
Ol.-,
�
Oq 0 a°
f74S> o c, \\�. .caY
0 a o` A
l anm street Southwest�
n o
Perrinville--
�Oa
2•
186th Street southwest
Ip y7 G
rfr
N
187[h Street Southwest
N
vim°
—188tRStreer8outhwest --'
< YL nndale�r`
a
a
Park
o'
n
°
a
<
Blake Place
Cherry Street
Edmonds
3 m oo
<¢ 191 st super Southwest t�,
--
n
I92r d Street southwest
-
y 192
Nor[hs e ° t`C ja e C PP
am
`
D
a'Dhve 193rd PI
Lan
SITE
PO9er tang
III■ "
a5
�
PG9
_
Puget Or— - — P�
get Driye� P
outhW_est
�196th Street S_.
_—` yy
.O
n
¢ w 3 r
m Melody Lane D
m Hlndley Lane Viewland Way
S-
199th Street Southwest
WA 524 _ _ 0
_ 200th Street Southwest
3
> n
zolstStreet Southwest
Aloha Street Z f0 w
Carol Wayo ¢'
202nd Street Southwest
^ 202nd Place Southwest
.. s
°
OK
a Glen Street < zGlen Street Glen Street
?
5
203rd Street Southwest r
-
°
--Lynn
oDaley Streets 4 Daley street
c Mun
:. ��
Sprague Street r%P o+ Sprague Street .>
a
e0� Golf
5
^
Edmonds street
y -206th Street Southwest
College
r
Place Middle
Bell street
"
1p " School
m
Main Street Main_Street-
--
" 208th Street Southwest
Dayton Street
Maple Way
\
<Maple street Maple Street O
m
- °' 210th
c Yost Pork
Alder Street
street Sou
z
� Q
o
"
J J
�
°¢
w w
m n c r
m m
Walnut Street Walnut Street
r
NORTH
Earth
i i
Earth Solutions NWLLC
Geotechnical Engineering,
Reference:
Snohomish County, Washington
•. - .. Environmental Services
OpenStreetMap.org40
Vicinity Map
19508
- 88th Avenue West
Edmonds,
Washington
NOTE: This plate may contain areas of color. ESNW cannot be
responsible for any subsequent misinterpretation of the information
Drwn. CAM
Date 04/09/2021
Proj. No. 7841
resulting from black & white reproductions of this plate.
Checked AZS
Date Apr. 2021
Plate 1
� � I
E::D F-I
I I
350 { .360
-_ _ ---I
TP-1
T-
' ❑ 1 TP-�
'm I El I
-------------
\�
10 1 I
F -I I I I
I
------� ---- --- -----------—-------!------------
196TH STREET S.W.
LEGEND
TP-1 Approximate Location of
— ■ — ESNW Test Pit, Proj. No.
ES-7841, March 2021
Subject Site
Existing Building
NOTE: The graphics shown on this plate are not intended for design
purposes or precise scale measurements, but only to illustrate the
approximate test locations relative to the approximate locations of
existing and / or proposed site features. The information illustrated
is largely based on data provided by the client at the time of our
study. ESNW cannot be responsible for subsequent design changes
or interpretation of the data by others.
NOTE: This plate may contain areas of color. ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black & white reproductions of this plate.
NORTH
NOT - TO - SCALE
Test Pit Location Plan
19508 - 88th Avenue West
Edmonds, Washington
Drwn. CAM
Date 04/09/2021
Proj. No.
7841
Checked AZS
Date Apr. 2021
Plate
2
18" Min.
00 0o o oUoo
00
o 00 0o00�° �o 00000 o B
00 o o 0 o00 0
0
0 o 0 0 0 00 00 'o o
o �o
o oao 0 0000oo 8o
00 0 0 0 o
o 0 o O o o
oo
Oo 00 o -0 000 o 0
0 0 o 0 o O o o 0
0 0 0 o0 00C 0 o 0
0o oo0 'o o O o
O o0 0 0
O
coo 00 0 0 0o Oo O oo o
0 0 oo o o
ogoo o�000 oo oo o o 6 o
o o 0 o00�00 0 oo
o0 09'
0000 0 o o
oo o ° o o
oo.
0 0
oo 0 o 0 0o 0 o 0 d o 0
0 6 o o oo Oo0 0o O
o o 0 o 0 �r.'r ?�
NOTES:
• Free -draining Backfill should consist
of soil having less than 5 percent fines.
Percent passing No. 4 sieve should be
25 to 75 percent.
• Sheet Drain may be feasible in lieu
of Free -draining Backfill, per ESNW
recommendations.
• Drain Pipe should consist of perforated,
rigid PVC Pipe surrounded with 1-inch
Drain Rock.
LEGEND:
0 .0- O
0 oo 00 Free -draining Structural Backfill
1-inch Drain Rock
.}.r.r.r.
Structural
Fill
Perforated Rigid Drain Pipe
(Surround in Drain Rock)
SCHEMATIC ONLY - NOT TO SCALE
NOT A CONSTRUCTION DRAWING
Retaining Wall Drainage Detail
19508 - 88th Avenue West
Edmonds, Washington
Drwn. CAM
Date 04/09/2021
Proj. No.
7841
Checked AZS
Date Apr. 2021
Plate
3
Perforated Rigid Drain Pipe
(Surround in Drain Rock)
NOTES:
• Do NOT tie roof downspouts
to Footing Drain.
• Surface Seal to consist of
12" of less permeable, suitable
soil. Slope away from building.
LEGEND:
Surface Seal: native soil or
other low -permeability material.
ti.ti•ti•ti•
1-inch Drain Rock
r�r�r�r�r
ti•ti•ti•ti•
SCHEMATIC ONLY - NOT TO SCALE
NOT A CONSTRUCTION DRAWING
Footing Drain Detail
19508 - 88th Avenue West
Edmonds, Washington
Drwn. CAM
Date 04/09/2021
Proj. No.
7841
Checked AZS
Date Apr. 2021
Plate
4
Earth Solutions NWLLC
SOIL CLASSIFICATION CHART
MAJOR DIVISIONS
SYMBOLS
TYPICAL
DESCRIPTIONS
GRAPH
LETTER
GRAVEL
AND
CLEAN
GRAVELS
''�
I.�•� �
� � A.
GW
WELL -GRADED GRAVELS, GRAVEL -
SAND MIXTURES, LITTLE OR NO
FINES
GRAVELLY
SOILS
(LITTLE OR NO FINES)
° �° o �°
o pOo p
Q Q oQ
GP
POORLY -GRADED GRAVELS,
GRAVEL - SAND MIXTURES, LITTLE
OR NO FINES
COARSE
GRAINED
SOILS
MORE THAN 50%
OF COARSE
GRAVELS WITH
FINES
o
Q
0
°°
o
'
p
GM
SILTY GRAVELS, GRAVEL - SAND -
SILT MIXTURES
FRACTION
RETAINED ON NO.
4 SIEVE
(APPRECIABLE
AMOUNT OF FINES)
�±�
V
CLAYEY GRAVELS, GRAVEL - SAND -
CLAY MIXTURES
SAND
AND
CLEAN SANDS
SW
WELL -GRADED SANDS, GRAVELLY
SANDS, LITTLE OR NO FINES
MORE THAN 50%
OF MATERIAL IS
LARGER THAN
SANDY
NO. 200 SIEVE
SIZE
SOILS
(LITTLE OR NO FINES)
::.
SP
POORLY -GRADED SANDS,
GRAVELLY SAND, LITTLE OR NO
FINES
SANDS WITH
FINES
c•M
c
SILTY SANDS, SAND - SILT
MIXTURES
MORE THAN 50%
OF COARSE
FRACTION
PASSING ON NO.
4 SIEVE
(APPRECIABLE
AMOUNT OF FINES)
cC
�7
CLAYEY SANDS, SAND - CLAY
MIXTURES
INORGANIC SILTS AND VERY FINE
ML
SANDS, ROCK FLOUR, SILTY OR
CLAYEY FINE SANDS OR CLAYEY
SILTS WITH SLIGHT PLASTICITY
FINE
GRAINED
SOILS
SILTS
AND LIQUID LIMIT
LESS THAN 50
CLAYS
CL
INORGANIC CLAYS OF LOW TO
MEDIUM PLASTICITY, GRAVELLY
CLAYS, SANDY CLAYS, SILTY CLAYS,
LEAN CLAYS
OL
ORGANIC SILTS AND ORGANIC
SILTY CLAYS OF LOW PLASTICITY
MORE THAN 50%
OF MATERIAL IS
SMALLER THAN
NO. 200 SIEVE
MH
INORGANIC SILTS, MICACEOUS OR
DIATOMACEOUS FINE SAND OR
SILTY SOILS
SIZE
SILTS
AND LIQUID LIMIT
CLAYS GREATER THAN 50
CI I
INORGANIC CLAYS OF HIGH
PLASTICITY
OH
ORGANIC CLAYS OF MEDIUM TO
HIGH PLASTICITY, ORGANIC SILTS
HIGHLY ORGANIC SOILS
'/ ` 1/ 01/ 01/ N
\„ \„ „
0 0„
PT
PEAT, HUMUS, SWAMP SOILS WITH
HIGH ORGANIC CONTENTS
DUAL SYMBOLS are used to indicate borderline soil classifications.
The discussion in the text of this report is necessary for a proper understanding of the nature
of the material presented in the attached logs.
v Earth Solutions NW, LLC
15365 N.E. 90th Street, Suite 100
Redmond, Washington 98052
Telephone: 425-449-4704
Fax: 425-449-4711
TEST PIT NUMBER TP-1
PAGE 1 OF 1
PROJECT NUMBER ES-7841 PROJECT NAME 19508 - 88th Avenue West
DATE STARTED 3/15/21 COMPLETED 3/15/21 GROUND ELEVATION TEST PIT SIZE
EXCAVATION CONTRACTOR Client Provided GROUND WATER LEVELS:
EXCAVATION METHOD AT TIME OF EXCAVATION --
LOGGED BY AZS CHECKED BY HTW AT END OF EXCAVATION --
NOTES Depth of Topsoil & Sod 10"-12": grass AFTER EXCAVATION -
L
=
}�
H L
U
w
Lu
g
TESTS
Q O
MATERIAL DESCRIPTION
❑
2 Z
�
Q
C0
0
Dark brown TOPSOIL
TPSL
,'/. i.i
_
1.0
Brown silty SAND, loose to medium dense, moist
MC = 10.4%
-
SM
_
3.0
Gray silty SAND, medium dense, moist
MC = 15.2%
MC = 19.7%
5
Fines = 32.3%
SM
infiltration test at 4.5'
[USDA Classification: slightly gravelly sandy LOAM]
-light groundwater seepage from infiltration test
MC = 14.5%
Fines = 36.4%
7.0 [USDA Classification: slightly gravelly sandy LOAM]
Test pit terminated at 7.0 feet below existing grade. Groundwater seepage encountered at 5.0
feet during excavation. No caving observed
y Earth Solutions NW, LLC TEST PIT NUMBER TP-2
15365 N.E. 90th Street, Suite 100 PAGE 1 OF 1
Redmond, Washington 98052
Telephone: 425-449-4704
Fax: 425-449-4711
PROJECT NUMBER ES-7841 PROJECT NAME 19508 - 88th Avenue West
DATE STARTED 3/15/21 COMPLETED 3/15/21 GROUND ELEVATION TEST PIT SIZE
EXCAVATION CONTRACTOR Client Provided GROUND WATER LEVELS:
EXCAVATION METHOD AT TIME OF EXCAVATION --
LOGGED BY AZS CHECKED BY HTW AT END OF EXCAVATION --
NOTES Depth of Topsoil & Sod 8": grass AFTER EXCAVATION -
L
=
}�
H L
U
2
w
g
TESTS
Q O
MATERIAL DESCRIPTION
❑
2 Z
U
Q
U
0
TPSL -
Dark brown TOPSOIL
I- oql 0
Brown poorly graded GRAVEL with silt and sand, loose to medium dense, moist
GP -
MC = 11.0% GM
Fines = 10.1 % ° 2.5
[USDA Classification: extremely gravelly sandy LOAM]
Gray silty SAND with gravel, medium dense to dense
MC = 15.8%
weakly cemented
5 SM
MC = 15.3% 7.0
Test pit terminated at 7.0 feet below existing grade. No groundwater encountered during
excavation. No caving observed.
y Earth Solutions NW, LLC TEST PIT NUMBER TP-3
15365 N.E. 90th Street, Suite 100 PAGE 1 OF 1
Redmond, Washington 98052
Telephone: 425-449-4704
Fax: 425-449-4711
PROJECT NUMBER ES-7841 PROJECT NAME 19508 - 88th Avenue West
DATE STARTED 3/15/21 COMPLETED 3/15/21 GROUND ELEVATION TEST PIT SIZE
EXCAVATION CONTRACTOR Client Provided GROUND WATER LEVELS:
EXCAVATION METHOD AT TIME OF EXCAVATION --
LOGGED BY AZS CHECKED BY HTW AT END OF EXCAVATION --
NOTES Depth of Topsoil & Sod 3": grass AFTER EXCAVATION -
L
}� U
= H L
2
w g TESTS Q O MATERIAL DESCRIPTION
❑ 2 Z
Q U
U
0
TPSL Dark brown TOPSOIL
Brown silty SAND, loose to medium dense, moist
MC = 14.1 % SM
2.0
Gray silty SAND, medium dense to dense, moist
MC = 13.4%
-weakly cemented
SM
5
MC = 16.1% 7.0
Test pit terminated at 7.0 feet below existing grade. No groundwater encountered during
excavation. No caving observed.
Earth Solutions NW, LLC
15365 N.E. 90th Street, Suite 100
' Redmond, Washington 98052
Telephone: 425-449-4704
Fax: 425-449-4711
GRAIN SIZE DISTRIBUTION
PROJECT NUMBER ES-7841 PROJECT NAME 19508 - 88th Avenue West
U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS I HYDROMETER
100
95
90
85
80
75
70
65
x
w
60
m
55
w 50
z
LL
45
z
w
rr 40
w
a
35
30
25
20
15
10
5
0
rc � 1/4N[:>•�= l.�:f I loll L'!I L74i�Us Ui.1�1:71�1 Ul1�l L' 1114411
I■11®■■■ui■■�\AID■■■■■■WII�■■■■■■■■III®1
100 10 1 0.1 0.01 0.001
GRAIN SIZE IN MILLIMETERS
COBBLES
GRAVEL
SAND
SILT OR CLAY
coarse fine
coarse medium fine
Specimen Identification Classification Cc CU
• TP-01 4.50ft. USDA: Gray Slightly Gravelly Sandy Loam. USCS: SM.
m TP-01 7.00ft. USDA: Gray Slightly Gravelly Sandy Loam. USCS: SM.
A TP-02 2.00ft. USDA: Brown Extremely Gravelly Sandy Loam. USCS: GP -GM with Sand. 3.81 232.83
Specimen Identification D100 D60 D30 D10 LL PL PI %Silt %Clay
• TP-01 4.5ft. 19 0.359 32.3
m TP-01 7.Oft. 19 0.31 36.4
A TP-02 2.Oft. 37.5 17.06 2.183 10.1