Loading...
APPROVED ENG BLD2023-1030+Transportation_Impact_Form+8.14.2023_4.13.11_PM+3724829RECEIVE Aug 17 202..§ CITY OF EDMON DEVELOPMENT SERVI DEPARTMENT BLD2023-1030 APPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: 218 Change of Use Owner/Applicant Tin Nguyen Name 220 Main St Street/Mailing Address Edmonds WA 98020 City State Zip Telephone: 206-235-3979 Applicant Contact Person: Same Name Street/Mailing Address City State zip Telephone: Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): N/A N/A Firm Name Telephone: 1. PROJECT DESCRIPTION Contact Name E-mail: a. Location - Street address: 218 Main St Edmonds, WA 98020 Attach a vicinity map and site plan.) b. Specify existing land use: Specialty - Salon c. Specify proposed type and size of development: There will be no change in structure (# of residential units andlor square footage of building) d. Date construction will begin and be completed: N/A e. Define proposed access locations: N/A Define proposed sight distance at site egress locations f. N/A HANDOUT UPDATED 05.09.2023 APPENDIX A Page 2 of 2 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 3.36.130. Check the applicable box below and calculate the fees as necessary: IX NO CHANGE SPECIALTY RETAIL USE TO SPECIALTY RETAIL USE. NO CHANGE. ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. ITE Land Use Category Per Unit Fee Rate New Use $ Prior Use $ Units in square feet, # of dwelling, vfa. etc. XI 1= XI 1= Use Fee New Use Fee: $ - Prior Use Fee: $ = FEE DUE: $ 0.00 1 ❑ NEW DEVELOPMENT ITE Land Use Category Per Unit FeeRate New Use $ ❑ INDEPENDENT FEE CALCULATION Units in square feet, # of dwelling, vfa, etc. X Impact/Mitigation Fee: 1 $ Independent Review Fee: $296.00 (+ peer review fee) 1 $ FEE DUE FEE DUE ENGINEERING DIVISION APPROVED AS NOTED :41�7YL-<—��4"9/08/2023 City of Edmonds, Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 05.09.2023