Special Inspection ReportSFA
Design Group
NSTRUCTURAL ENGINEERING VN
FINAL SUMMARY LETTER
Project Name:
Kovacic Residence Underpinning
Contractor:
MatVey Foundation Repair, Inc.
Site Address:
750 Nort stream Ln., Edmonds, WA
Crew Lead:
Alex
98020
Date:
11/13-15/23
Permit #:
BLD2023-1271
SFA Inspector:
John Jr. Howard
Jurisdiction:
City of Edmonds
ATTN: City of Edmonds Inspections and Permitting
Dear Building Inspection Division:
This letter serves to certify that in accordance with Chapter 17 of State and International Building Code requirements outlined
in the General Structural Notes on S1.1 of the approved permit drawings, SFA Design Group, LLC has performed special
inspection as detailed below.
The inspector verified the installation of (8) Push Piers & (2) Helcial Tiebacks
Observations include specifications, locations and spacing. (8) Push Piers & (2) Helcial Tiebacks
were installed per the intent of the design and any installation deviations were reviewed and approved by this office with no
outstanding non-compliance items.
Our inspection and testing services do not constitute a warranty or guarantee of any type and were provided and intended to
help reduce the risk of construction defects, deficiencies or omissions that may arise during and after construction. It is the
contractor's responsibility to perform their work in accordance with the approved construction documents. All inspections and
tests were performed and reported according to the requirements of the City Building Regulations and these Administrative
Rules and, to the best of my knowledge, the work was in conformance with the applicable workmanship provisions of the State
Building Code and Standards.
Sincerely,
SFA Design Group
407 Q°
Johnathon Barrie o stoIST
EIT, Engineer Technician _
EXPIRES: 12/24/24
CC: Olga Ticot , Structural Project Coordinator, MatVey Foundation Repair, Inc.
Reviewed By: Jeff Fitch , PE, P. Eng
5FA
Design Group
sfa STRUCTURAL ENGINEERING VN
FIELD INSTALLATION LOG
Project Name:
Kovacic Residence Underpinning
Contractor:
MatVey Foundation Repair, Inc.
Site Address:
750 Northstream Ln., Edmonds, WA 98020
Crew Lead:
Alex
Inspection Date:
11/13-15/23
Permit #:
BLD2023-1271
SFA Inspector:
John Jr. Howard
Jurisdiction:
City of Edmonds
SPECIAL INSPECTION COVER SHEET
Project Layout (Ref Sheet 52.1 For Enlarged Plan)
r 22'-6 „'-p- ,5'-6. 11'-8
(E) CRAVIL
SPACE
ACE
I
- - - I I I _ ut�E OF (E)
DECK lYP
I I I QOg� , _6
I I
I I
Z —I (E)17000 I I �—___—__
I + BEAM IYP-, I I
%I
I I I
I I Ia
(I 1 �_ — — — — — — — CHIAIW[Y TYP I
I _� i 5 . I io
I I Iv
o I I I
I I
I (E) GONG SLAD 1 -
6
5 I I ON GRACE 1 L6xW/ex3'-0'L ttP g 7
6 l
I
I I
I �1
ICI-------1�J L-------�
O7—Ll------_-----------J
(E) FOUNDATION/(N) PIER, TIE -BACK, &
STABILIZER LAYOUT PLAN
SCALE: N75 ;.. N ,
1 PLAN