SI Field Report 11.7.23FIELD REPORT Group Northwest, Inc. Job # Date I Page # I Field Report # - Geotechnical Engineers, Geologists, & G-5710 11/1/2023 1 of 1 1 Environmental Sciertists Project Name & Addresses: 13705 Bel -Red Road Bellevue, WA 98005 1 946 - Maple St, Edmonds, Washington 98020 Phone 425-649-8757 Fax 425-649-8758 lPermit# BLD2022-0877 Garrett Dean with GEO Group Northwest, Inc. was on site at the above address on November 1 st, 2023 for the following geotechnical inspection. Soil Bearing Verification At the time of our site visit, we observed that the footings were poured and the structure was essentially complete, minus several miscellaneous interior items. We used a 1/2 inch diameter, T-handled probing rod to probe the soil adjacent to the footings. Very dense soils were identified at a depth of approximately 26 to 28 inches below the surface grade. Very dense soils were also encountered at similar depths in boring HA-1 of our investigation. Based on photographs obtained from the contractor, Ron Good with Norsk Design -Build, the footings were placed at a depth of approximately 28 inches. Based on these considerations, it is our opinion that the footings are founded on a dense and unyielding, acceptable subgrade. Copy to: Ron Good, Norsk Design -Build Continued John & Ruth Jewell on next page Office File