ENG2023-0579 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMIT NU BE
City of Edmonds
20
98091
LM
www.edmondswa.gov i
Description: ZIPLY - REMOVE BO POLE SET HH UG TO NEXT POLE AND OVERLASH
ISSUED: 12/07/2023
Address: 115 EDMONDS ST EDMONDS WA 98020-3125
EXPIRES: 06/07/2024
Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 27032300101700
NAME TYPE NAME ADDRESS PHONE
APPLICANT ARIANNE MOMMSEN 426 E CASINO ROAD, EVERETT WA 98208 (402)670-8384
CONTACT ZIPLY FIBER NORTHWEST, LLC 426 E CASONI RD, EVERETT WA 98208 (402)670-8384
CONTRACTOR ZIPLY FIBER NORTHWEST LLC 426 E CASINO RD, EVERETT WA 98208 (425)231-3928
OWNER CHRISTOPHILIS KONSTANTINOS 155 EDMONDS ST, EDMONDS WA 98020
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT
$45.00 $45.00
ENG - INSPECTIONS
$504.00 $504.00
RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING- WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 12/07/2023
Printed: Thursday, December 07, 2023 9:06:49 AM 1 of 2
RIGHT OF WAY EUC PERMIT
PERMIT NU �!BEJ
City of Edmonds
www.edmondswa.gov • •
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on
SOUND AND NOISE
weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL**
E-7 TRAFFIC CTRL
E-7 ALLEY OPEN -CLOSED
E-7 CONCRETE SIDEWALK
E-7 RESTOR LIMITS
Printed: Thursday, December 07, 2023 9:06:49 AM 2 of 2
RECEIVED
Lti�y of ED%�O�
ANC. 1 g90
SECTION A
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Requirements outlined in Right -of -Way permit Handout E63.
NOV 08 2023
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
General Info I
Project Name5501164 115 Edmonds St.
Site Address or if no site address use Property Address at NW corner of project area: 344 SUMSET AVE N. EDMONDS WA
Associated Permits: BLD PLN ENG
Owner and Entity Holding Franchise (if applicable)
Name of Company Ziply Fiber Northwest, LLC Franchise Ordinance No: WN U-17
PointofContact Mike Hakahan
Title Engineer
Address426 E Casino Rd
city Everett
State WA
zip 98208
Phone 425-949-0230
Email mike.hakahan@ziply.com
AuthorizedContractor and Agent •below)
Name of Company Ziply Fiber Northwest, LLC
Primary Name Mike Hakahan
Agent Name Mike Hakahan
Title Engineer
Title Engineer
Mobile 425-949-0230
Address426 E Casino Rd.
Email mike.hakahan@ziply.com
city Everett
I State WA
zip 98208
Secondary Name
Phone 425-949-0230
Title
Email mike.hakahan@ziply.com
Mobile
City of Edmonds Business License No: 313-013-420
Email
State License No: ZIPLYFN782L3
0 Contractor verifies it is currently bonded
Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as well)
❑ Traffic Control Only (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
❑ Utility Franchise Work (no associated development)
Project Description
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
Telecommunications and broadband provider Ziply Fiber to Remove cable from a pole at the alley between
2nd ave n and 3rd Ave N west to pole C. Remove Pole C and Place a17x30 hh where pole C was located. Remove cable from pole C to Bole B. Pull cable from new
HH to Pole B through existing 2" conduit and riser up. Then over -lash cable south crosing Bell St. Continue over -lash east on the south side of Bell St. to a pole at an alley
between 3rd Ave N and 4th Ave N. Then oaer-lash nort across Bell Street to Pole 6 and splice cable.
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
JxJ
LF
SF
Alley 72 hours +
LF
JxJ
F
SF
Parking 72 hours +
LF
JxJ
LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
* telecommunications ❑ cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
1.
CompletedDetails of Work to be
Does the utility owner have existin overhead infrastructure in the area of work?
x
•
2.
Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)?
x
If yes, describe: New HH where pole c was removed from.
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
X
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility system?
X
5.
Does the work involve proposed additions to an aboveground utility system? If es:
x
Are the additions for the purpose of serving new commercial development?
Are the additions for the purpose of serving a single-family residential subdivision?
Details of • to be Completed
®i
6. Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
X
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
X
How many are existing? 13 1 How many are to be added? 10
6b.
Does your project involve poles? If yes:
X
How many poles are existing in the project area? 3
What is the height of the existing poles? unsure
How many poles are to be removed?
Are additional poles to be laced?
How many? I NA I What is the height of the additionalpoles? NA
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
x
How many? I I What is the height of the poles after?
Describe the modification/rebuild-
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: �� ` "6 yPX4'4.
APPLICANT PRINTED NAME: Michael Comer
APPLICANT TITLE: Traffic Controll Specialist
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
10/23/2023
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
/
Hi SNOIiCl3 I _1V 3-lpa3HOS/
422' , i
AE 50 24 i
C9EDM DCL,501-550 f „V
422'
O AE 50 24 /
C9EDM DCL,25XD+651-675 /
/
/
137' / NEW
U'2524 \�. OLE
M °CL'6s1-7 6S'�,
A�
�0\ y
I
HLLKWAXX 87832
HLLKWAXX H5022
(HLLKWAXX 2S2)
(45-2) (01.1966)
/ 01
/
� A X ' 022
/
NO $
/
XX 87832)
iAGa °GAT AR �W_CAP 50 PAIR
/HLLKWAXX 87837\ LE ••B" A�'o�
c,4
HLLKWAXX H5022J -� �OFo O
5-51 8 2' 9
25 2 CL,651-675 OTC\
C9EDM D OS S\
(150') (01.1970) T
HLLKWAXX87837 OLE "A" �<v� (AE50) (C9EDM
® O Q/ DCL,501-550)
HLLKWAXX H5022,45-51+XD,8 O
/
/ 933'
FTTP PIGTAIL1000'
/
CONSTRUCTION NOTES:
PATH CREATION
-PUD TO PROVIDE PATH (2" PVC)& BORE FROM POLE "B" TO POLE "C" (110")
-PAC CABLE TO PLACE 17X30 HH AT POLE "C"
-*NOTE* PUD WILL BE REMOVING SIDEWALK
PLACING
-PLACE 8 PORT TERM TAIL FROM POLE"C" TO POLE"E"- WILL GO THROUGH NEW 2" CONDUIT -
FROM POLE"C" TO POLE"B" THEN AERIAL ALL THE WAY TO POLE "E"
-PLACE 2ND 8 PORT TERM TAIL FROM LOC "A" AERIAL TO POLE "E"(SPLICE LOCATION)
-PLACE 25 PAIR IN NEW 2" CONDUIT FROM POLE "B" TO NEW HH @ POLE "C"
-HAND DIG FROM POLE "C" TO NEW HH- EXISTING RISER WILL LAY DOWN TO NEW HH
-FIBER - 2 - 8 PORT TERM TAILS- ONE 1000', ONE 1500'
-COPPER 25-24 COPPER 110'
SPLICING
-SPLICE 2 NEW 8 PORT TERM TAILS @ SPLICE LOC @ POLE"E"
-SPLICE 25 PAIR @ POLE "B" AERIAL LOCATION AND NEW HH @ POLE "C"
50 PAIR COUNT CHANGE TO 25XD + 651-675
1 WORKER IN 50 PAIR(501-550) ON PAIR 531 LOCATED AT 606 SUNSET AV TERM#6523
-CHANGE COUNT ON COPPER WORKER TO PAIR 656.
-CLEAR AND CAP 50 PAIR AT POLE "D" @ 2ND AV N & EDMONDS ST
NO WORKERS IN FIBER TERM 87832
REMOVAL
-REMOVE AERIAL STRAND, FIBER TAILS, COPPER
-REMOVE POLE "C"
THE OBJECTIVE IS TO CONVERT FROM AERIAL TO
UNDERGROUND
SO WE CAN REMOVE POLE "C" DUE TO BO POLE AND CITY
1212' OF EDMONDS
ITP PIGTAIL 1500'
VERLASHAERIAL/ REQUIREMENTS FOR NEW POLE PLACEMENT
RECEIVED COPPER TERMINAL WORKER
AT 606 SUNSET AV N- TERM#6523
�l NOV 08 2023
/ >RM
/ CITY OF EDMONDS /
DEVELOPMENT /
\/ DE)VNI`d2JC8 �GUELNOD4FIc1S0 � �\
TRM Q''2JOd D�81SNOdS32J SI 2JOiOV2J1NOO/ N
i
�o
Z G
60
POLE "E" /
\ \/ 0
% \ . C9Fn n _ TRM
/ \ -loafoad pallluaaad a4l 6ulanp sin000
ao pasneo si fetal spiepuels Alio aad
/ \ \ leM-;0-l4g1a 4II0 ul sluawanoidwl
abeluoi; ao salllllln of abewep
Ile aoeldaa/aiedaa pegs lueollddV
I CERTIFY THAT THE WORK I COMPLETD ON THIS WORK
ORDER AND AS -BUILT IS IN COMPLIANCE WITH ZIPLY
QUALITY STANDARDS AS IDENTIFIED ON THE IPQIP
CHECKLIST.
(SIGNATURE AND DATE)
TOTAL ALLOTTED HOURS
CONTACT SUPERVISOR IF ADDITIONAL
HOURS ARE REQUIRED TO COMPLETE PROJECT
CAP. X-TIME MAINT
CREW 0 0 0
SPLICING 0 0 0
W.O. DRIVER I CONSTRUCTION START
❑ ETHERNET 7/20/2020
❑ CIAC IN SERVICE DATE
❑ DAMAGE 8/31/2020
® OTHER
CONSTRUCTION
® FLAGGING ❑ BRUSHING ❑ CONTRACTOR
PERMITS
MUNICIPALITY: EDMONDS
❑ BLANKET
2 TCP/TRAFFIC
❑ DETAILED (NOT BLANKET)
❑ NO PERMIT REQUIRED
JOINT POLE
JFN/NJUNS# 100053672
❑ NO JPN REQUIRED
POLE JPN JPN
OWNER TO FROM
❑ ❑ Q POWER
❑ Q ❑ CATV
❑ q ❑ FRONTIER
ACCOUNT CODES
)EI 2411.001
POLES
)o 2421.101
OH COPPER
�3 2421.201
OH FIBER
t] 2422.101
UG COPPER
Q 2422.201
UG FIBER
a 2441.001
CONDUIT
p 34XX.XXX
REMOVAL
la 64XX.XXX
MAINT.
POINT OF CONTACT
SCHEDULING: JOHN WOOD
PHONE: 425-261-1412
ENGINEER: RICH EVANS
PHONE: 425-261-6282
FACILITIES: PATRICK WINKLER
PHONE: 425-263-4010
FIELDED BY: OSP CONSTRUCTION
zi Iy fiber
�►
HLLK UG CONV JPN 53672
344 SUNSET AV N
PROJECT C.O. AREA: 967
NUMBER: 5501164 EXCH. CODE: 51419
DRAWN DATE: ENGR: RICH EVANS NTY: SNOHOMISH
DATE 7/8/2020 PHONE: 425-261-6282 FILE:
SCALE: 1:100 TAX DISTRICT: DWG 1 OF 1
TWNSHP: 27N RING: 3E SEC:23
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
LEGEND:
OS
SIGNALIZED INTERSECTION
OCONE
(CANDLESTICK)
TYPE III BARRICADE
WORKTRUCK
WORK ZONE LIMITS
OWE
WARNING SIGN
ARROW BOARD
REQUIRED)
(WHERE
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER-SPOTTER
FLAGGER STATION
ALLEY
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
C❑NSTRUCTI❑N TO PLACE NO PARKING SIGNS 72
HOURS PRI❑R TO START WORK RECEIVED
SIGN LEGEND: NOV 08 2023
ROAD SHOULDER CITY OF EDMONDS
WORK> < WORK DEVELOPMENT
AHEAD SERVICES DEPARTMENT
W21-5 AR-217
4
EDMONDS ST x w20-1� X
(25 MPH) POLE C WORK AR-217
AREA
8
DRIVEWF
ENGINEERING DIVISION
APPROVED AS NOTED
.1111 12/04/2023
Vill
PHASE 1
WORK DETAILS:
REMOVE CABLE FROM A POLE LOCATED
AT THE ALLEY BETWEEN 2ND AVE N
AND 3RD AVE N WEST TO POLE C.
REMOVE POLE C AND PLACE A 17X30
HH WHERE POLE C WAS REMOVED.
SPOTTER NEEDED FOR PEDESTRIAN
TRAFFIC AND DRIVEWAY ACCESS.
TRAFFIC CONTROL INSPECTION SHALL BE
2ND AVE N REQUIRED WHENEVER WORK ZONE IS SET UP
(25 MPH) n r r �lY
SHOULDER W20-
CLOSURE (L/3) X
l W20-1� X W21-
POLE D WORK WORK AREA X AREA POLE AR 217
�4 W20-1
v w
a. b4
ALLEY
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25
30
35
40
45
50
55
60
64
70
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
2ND AVE N
(25 MPH)
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
a
]EWALK SIDEWALK
EDMONDS ST
(25 MPH)
W20-1
b4
ALLEY
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER
TANGENT
50/70 40
80
35/45 30
60
25/30 20
40
MINIMUM SHOULDER TAPER LENGTH = L/3 (feet)
SHOULDER
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
8
40
40
60
90
120
130
150
160
170
190
10
40
60
90
90
150
170
190
220
220
240
USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8'
3RD AVE N
(25 MPH)
`W20-1
{` )EWALK
0
a
EE -=>
EEE
`1
a
w
n
owl ut
3RD AVE N
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
O
ATCO COMMUNICATIONS SERVICES, LLC
Www.atcctelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
ziPylfiber
Everett, WA 98206
�
Qui
~
�
J
3
Lo Lo
0wm
Z
J
Z a
U
U)
H
v
LU
z
LU
p
z
0
o
�
>
Q
u
W
W
U)
z
0
'IT
�—
z
0
U
U
W
U.1
LL
m
z
�
U
Q
U
Z
O
LLI
z
of
D-
�
a-
U
O
LL
DATE: 10.20.2023
REVIEWED BY: M. BERNERT
WSTCS# ES2 000313
DESIGNED BY: M. COMER
ATCO CONTACT: 830.329.1982
michael.comer*atcotelecom.com
SCALE:
SHEET:
=5C
02
N0: 2OF6
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
LEGEND:
OS
SIGNALIZED INTERSECTION
OCONE
(CANDLESTICK)
TYPE III BARRICADE
WORKTRUCK
WORK ZONE LIMITS
OWE
WARNING SIGN
ARROW BOARD
REQUIRED)
(WHERE
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER-SPOTTER
FLAGGER STATION
SIGN LEGEND:
ROAD BE
WORK SHOULDER BE
AHEAD WORK TO STOP
W20-1 W21-5 W20-713
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
W20-7A
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25
30
35
40
45
50
55
60
64
70
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
TRAFFIC HALT NO MORE THEN 5 MIN, ACROSS
(STREET) TO ALLOW AERIAL CR❑SSING
EDMONDS ST
(25 MPH)
1
AR-217
W20-1/T
DRIVEWAY
N
1 POLE C WI / WORK
ARI A
_—POLE B
7A
7B
qLo
b4 �=
X X
W21
W20-7A. rW20-
0
PHASE 2
WORK DETAILS:
REMOVE CABLE FROM POLE C TO POLE
B, PULL CABLE FROM NEW 17X30 HH
THROUGH EXISTING 2' C❑NDUIT TO
POLE B AND RISER UP.
o
w SPOTTER NEEDED FOR PEDESTRIAN
TRAFFIC AND DRIVEWAY ACCESS.
SIDEWALK
EDMONDS ST
y (25 MPH)
RAFFIC CONTROL INSPECTION SHALL BE
REQUIRED WHENEVER WORK ZONE IS SET UP
I ENGINEERING DIVISION
APPROVED AS NOTED
jilt "j j,.,,,nQ 12/04/2023
VV
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER
TANGENT
50/70 40
80
35/45 30
60
25 / 30 20
40
MINIMUM SHOULDER TAPER LENGTH = L/3 (feet)
SHOULDER
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
8
40
40
60
90
120
130
150
160
170
190
10
40
60
90
90
150
170
190
220
220
240
USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8'
RECEIVED
NOV 08 2023
T
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100' ± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
O
ATCO COMMUNICATIONS SERVICES, LLC
www.atcoteiecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
ziPylfiber
Everett, WA 98206
�
<cn
~
�
J
3
Do
p
z
J
wm
Z a
°
p
U)
H
Q v
LU
Z
w
p
z
°Do
o
>
<
LU
W
�
w
z
Z
0
'IT
�—
z
0
U
W
cn
W
'U
1�
LL
m
7
�
p
Z
U
<
U
Z
°
LLI
Z
of�
CL
a-
°ILL
°
LL
DATE: 10.20.2023
REVIEWED BY: M. BERNERT
WSTCS# ES2 000313
DESIGNED BY: M. COMER
ATCO CONTACT: 830.329.1982
michael.comer*atcotelecom.com
SCALE:
SHEET:
=5C
03
NO: 3OF6
SIGNALIZED INTERSECTION
CONE (CANDLESTICK)
TYPE III BARRICADE
WORKTRUCK
WORK ZONE LIMITS
WARNING SIGN
ARROW BOARD
(WHERE REQUIRED)
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER-SPOTTER
FLAGGER STATION
ALLEY a�
DRIVEWAY DRIVEWAY
RECEIVED
NOV 08 2023
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
11
R11-2--'
SIGN LEGEND:
ROAD ROAD
WORK CLOSED
ROAD
CLOSED
AHEAD AHEAD
W20-1 W20-3
_j
R11-2
�zu
t
TRAFFIC CONTROL INSPECTION SHALL BE
REQUIRED WHENEVER WORK ZONE IS SET UP
ALLEY
I DRIVEWAY DRIVEWAY
WORK
AREA
WORK
AREA
ALLEY I DRIVEWAY
DRIVEWAY I DRIVEWAY
PHASE 3
WORK DETAILS:
Q OVER -LASH CABLE FROM SOUTH FROM
POLE B CROSSING BELL ST, C❑NTINUE
OVER -LASHING CABLE EAST ON THE
SOUTH SIDE OF BELL ST TO A POLE
AT AN ALLEY BETWEEN 3RD AVE N
AND 4TH AVE N, THEN C❑NTINUE
OVER -LASH NORTH ACROSS BELL ST
UP THE ALLEY TO POLE E AND
SPLICE CABLE,
SPOTTER NEEDED FOR PEDESTRIAN
TRAFFIC AND DRIVEWAY ACCESS,
W20-
W20-
J"o
ATCO COMMUNICATIONS SERVICES, LLC
Www.atcctelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
ziPylfiber
Everett, WA 98206
Lo Lo
ui
0wm
Z
J
J
Z
a
U
t�j
p
U)
Q
H
D
D
�o
z
DJ
z
o
L0
r
Q
hT _
/1
w
LLI
J
<
z
O
`<
o C/)
y
�
�n
m
m
a
�t
cM
�—
z
ALLEY
0
_
-—Rll-2 I �
WORK m
POLE BAREA D
N b4
D
NOTIFY AFFECTED RESIDENTS, POLICE, FIRE DEPARTMENT, AND TRASH
HAULERS A MINIMUM OF 24 HOURS PRIOR TO ALLEY CLOSURE.
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25
30
35
40
45
50
55
60
64
70
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER
TANGENT
50/70 1 40
1 80
35/45 1 30
1 60
25/30 1 20
1 40
MINIMUM SHOULDER TAPER LENGTH = L/3 (feet)
SHOULDER
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
8
40
40
60
90
120
130
150
160
170
190
10
40
60
90
90
150
170
190
220
220
240
USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8'
C
3
ENGINEERING DIVISION
APPROVED AS NOTED
ldl IN j jg, 4.g 12/04/2023
VV
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
U
ww
co
Z
U
Q
U
z
O
6i
Z
ULU
o
o_
_j
ILL
DATE: 10.20.2023
REVIEWED BY: M. BERNERT
WSTCS# ES2 000313
DESIGNED BY: M. COMER
ATCO CONTACT: 830.329.1982
michael.comer*atcotelecom.com
SCALE:
SHEET:
=5C
04
NO: 4 OF 6
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
LEGEND:
OS
SIGNALIZED INTERSECTION
OCONE
(CANDLESTICK)
TYPE III BARRICADE
WORKTRUCK
WORK ZONE LIMITS
OWE
WARNING SIGN
ARROW BOARD
REQUIRED)
(WHERE
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER-SPOTTER
FLAGGER STATION
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
SIGN LEGEND:
ROAD BE �
WORK PREPARED
AHEAD TO STOP
W20-1 W20-713 W20-7A AR-217
TRAFFIC CONTROL INSPECTION SHALL BE
REQUIRED WHENEVER WORK ZONE IS SET UP
3 W20-1
X W
w
x
J X W20-7B
a v4 wa
X w20-7B a
4 / o w20-7A 3 2
BELL ST w20-7Al
(25 MPH)
-� ommmmmm
PARK 8
n o 0
`W20-
ENGINEERING DIVISION
APPROVED AS NOTED —
jell LVIL ""„p 12/04/2023
VV
4
^W20-1
L
AR-217
WORK
AREA
x
IW20-7B
1 W a
fW20-1
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25
30
35
40
45
50
55
60
64
70
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
1f
W20-1/
SIDEWALK
PARKING
a
7 BELL ST
(25 MPH)
I
11
B
I
PHASE 3
WORK DETAILS:
Q OVER —LASH CABLE FROM SOUTH FROM
POLE B CROSSING BELL ST, C❑NTINUE
OVER —LASHING CABLE EAST ON THE
SOUTH SIDE OF BELL ST TO A POLE
AT AN ALLEY BETWEEN 3RD AVE N
AND 4TH AVE N, THEN C❑NTINUE
OVER —LASH NORTH ACROSS BELL ST
UP THE ALLEY TO POLE E AND
SPLICE CABLE,
SPOTTER NEEDED FOR PEDESTRIAN
TRAFFIC AND DRIVEWAY ACCESS,
TRAFFIC HALT NO MORE THEN S MIN, ACROSS
(STREET) TO ALLOW AERIAL CROSSING
X W
I Lo X W20 7BJ
cn
w20-7AJ X X X��
�- wzo-7 w2o-7B w20-
SIDEWALK
PARKING
a a
WORK
X AREA x 3 AREA
000 AR-217x BELL ST
^ W20-7A (25 MPH)
U I
X q Lo x
`W20-76 � = W2o-76
/W20-1
CHANNELIZATION DEVIC�
SPACING (feet)
MPH TAPER TANGENT
50/70 40 80
35/45 30 60
25/30 20 40
MINIMUM SHOULDER TAPER LENGTH = L/3 (feet)
SHOULDER POSTED SPEED (MPH)
WIDTH
(feet) 25 30 35 40 45 50 55 60 65 70
8 40 40 60 90 120 130 150 160 170 190
10 40 60 90 90 150 170 190 220 220 240
USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8'
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
OT 0
`W20-1
w
m
w
�
RECEIVED
L)
L)
o
NOV 08 2023
°
LU
°
o
0-
a-
J
lW20-1 CITY OF EDMONDS
/ DEVELOPMENT
SERVICES DEPARTMENT
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100'± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
O
ATCO COMMUNICATIONS SERVICES. LLC
www.otcoteiecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
ziPylfiber
Everett, WA 98206
J
J
Lo z m Z U
U) Q v
LU p <°
Z Z o
W O Lo
Lo
<
W
W
co
z O
cz
z
O
U
U
LL
L�
w
I� g
z
LU
J
ILL
DATE:
10.20.2023
REVIEWED BY:
M. BERNERT
WSTCS# ES2 000313
DESIGNED BY:
M. COMER
ATCO CONTACT:
830.329.1982
michael.comer*atcotelecom.com
SCALE:
SHEET:
I"=7o�
05
NO: 5OF6
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
LEGEND:
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
OS SIGNALIZED INTERSECTION MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. PHASE
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
CONE (CANDLESTICK) ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN O SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) Al(\vim/
o
TYPE III BARRICADE ATCO COMMUNICATIONS SERVICES, LLC
w3
WORKTRUCK WORK DETAILS:60.563.9000 com
SIGN LEGEND: 708 First Street
WORK ZONE LIMITS 0 OVER —LASH CABLE FROM SOUTH FROM Snohomish, WA 98290
POLE B CR❑SSING BELL ST. C❑NTINUE
OWE ❑VER—LASHING CABLE EAST ON THE �I I I I
WARNING SIGN SOUTH SIDE OF BELL ST TO A POLE SHOULDER b e
ROAD AT AN ALLEY BETWEEN 3RD AVE N
ARROW BOARD WORK AND 4TH AVE N. THEN C❑NTINUE
(WHERE REQUIRED) AHEAD WORK OVER —LASH NORTH ACROSS BELL ST
DIRECTION OF C TO POLE E AND SPLICE CABLE, Everett, WA 98206
(NOT PAVVEMENTRAFF MARKINGS)
w SPOTTER NEEDED FOR PEDESTRIAN �
R, FLAGGER-SPOTTER W20-1 W21-5 AR-217 TRAFFIC AND DRIVEWAY ACCESS,
Q
11 v �
U) 3
J
J
Lo p uj
mm Z a
• FLAGGER STATION � 1-:
~
TRAFFIC CONTROL INSPECTION SHALL BE o c Q
REQUIRED WHENEVER WORK ZONE IS SET UP w °
Z Z o
w °Lo
>
Q
DJ �
w
z z 0
BELL ST 4 X
(25 MPH) x w2o-1 w20-1,"] �
'IT
�—
SIDE'
z
PARKING
O
PARKING 0 O O O O O PARKING
SIDEWALK SIDEWALK
WORK LL
W20-1 W21-5 \AR-217 AREA BELL ST w U) L�
POLE E (25 MPH)
X X RECEIVED z Q z w
°
ENGINEERING DIVISION NOV 08 2023 0 0 < ~ w
4 APPROVED AS NOTED a a LL
jell tVl,,U,4z 12/04/2023 CITY OF EDMONDS
VV DEVELOPMENT
SERVICES DEPARTMENT
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25
30
35
40
45
50
55
60
64
70
LENGTH (feet)
155
200
250
305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
9,900 TO 22,000
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
NOTE:
MON. - FRI. = 7:00am TO 4:00pm
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER
TANGENT
50/70 40
80
35/45 30
60
25 / 30 20
40
MINIMUM SHOULDER TAPER LENGTH = L/3 (feet)
SHOULDER
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
8
40
40
60
90
120
130
150
160
170
190
10
40
60
90
90
150
170
190
220
220
240
SIGN SPACING = X (1)
FREEWAY &EXPRESSWAYS 55 / 70 MPH
1500' ±
RURAL HIGHWAYS 60 / 65 MPH
S00' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS &URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS &URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL &BUSINESS DISTRICTS
200' ± (2)
DATE: 10.20.2023
REVIEWED BY: M. BERNERT
WSTCS# ES2 000313
DESIGNED BY: M. COMER
ATCO CONTACT: $30.329.1982
michael.comerC�?atcotelecom.com
SCALE:
SHEET:
=5�
06
N0: 60F6
Edmonds
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
Brackett's
Landing
Shoreline
Sanctuary,,,
&.,Irlset Beac:'i19 4W
OW
Edmonds Ferry Teri
y
Cascadia Art M
i
W Dayton St ; Dayton St
r_s
" x:
=a
Q'
r..". Al Cha Way
U�
G3rofway
g
Community
Christian Fellowship
0IEn S
Edmonds Center ..
For the Arts T3
: .0,1a -
Della Sou[ Hair Design Daley St
r
Salt and Iroli
f']
Sprague St
WORK AREA
Edmonds Police Lq
Department
Bell St
-40'es st MARKET Edmonds 91---qo
Dayton St
w
VICINITY MAP
Dayton St
-►
CJ+
z
Holy Rost
Holy Rosary
t 9ja6k,a
9 Holy Trim
D2
3
rD
Z
SP
Ed
3
Be
n
Molly Moon's Ice Cream Fra
19 Edmonds Library -
Sno-Isle Libraries
Edmonds Library'
OVA >
RECEIVED
NOV 08 2023
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
O
ATCO COMMUNICATIONSSERVICES. LLC
www.atcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
ziPIy fiber
Everett, WA 98206
a U)
J 3
J �
L p w a
LO Z m
0
U
o
W �
z
w LO
0
Q LU
U) �J
z III
co
U )
I�
0
U
mLI
L
lY
Z
U
a
U
Z
O
W
2
w
w
F-
a
Z
O
a.
O
CL
U
o
J
LL
DATE:
10.20.2023
REVIEWED BY:
M. BERNERT
WSTCS# ES2 000313
DESIGNED BY:
M. COMER
ATCO CONTACT:
830.329.1982
michael.comer@atcotelecom.com
SCALE:
SHEET:
NOT TO
U
SCALE
NO: 1 OF 6
RECEIVED
CITY OF EDMONDS
Right -of -Way Application #1393975 - 5501164
NOV 08 2023
MyBuildingPermil:.com
CITY OF EDMONDS
DEVELOPMENT
SERVICES DEPARTMENT
Applicant
First Name Last Name Company Name
Arianne Mommsen Ziply Fiber
Number Street Apartment or Suite Number E-mail Address
426 E Casino Road grpatcopermits@ziplyfiber.com
City State Zip Phone Number Extension
Everett WA 98208 (402) 670-8384
Contractor
Company Name
ZIPLY FIBER NORTHWEST LLC
Number Street Apartment or Suite Number
426 E Casino Rd
City State Zip Phone Number Extension
Everett WA 98208 (425) 231-3928
State License Number License Expiration Date UBI # E-mail Address
ZIPLYFN782L3 5/25/2024 iyini i4g6 caitlin.reid@ziply.com
Project Location
Number Street Floor Number Suite or Room Number
115 EDMONDS ST
City Zip Code County Parcel Number
EDMONDS 98020 27032300101700
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
Property Owner
First Name Last Name or Company Name
CHRISTOPHILIS KONSTANTINOS
Number Street Apartment or Suite Number
155 Edmonds St
City State Zip
EDMONDS WA 98020
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 11/7/2023 Submitted By: Arianne Mommsen
Page 1 of 2
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1393975 - 5501164
Project Contact
Company Name: Ziply Fiber Northwest, LLC
Name: Arianne Mommsen Email: grpatcopermits@ziplyfiber.com
Address: 426 E Casoni Rd Phone #: (402) 670-8384
Everett wa 98208
Project Type Activity Type Scope of Work
Utility Purveyor Utility Work Disturbance of Surface
Project Name: 5501164
Description of Remove Cable. Pull Cable through existing conduit from HH where pole C was removed.
Work: Riser Up pole B and over lash south and east to Pole E located on the north side of Bell ST
at an alley between 3rd Ave N and 4th Ave N.
Project Details
Project Information
Job Number
5501164
Page 2 of 2