Loading...
ENG2023-0594 ROW PERMITRIGHT OF WAY EUC PERMIT PERMIT NUMBER City of • • . :0•i LM www.edmondswa.gov i Description: ZIPLY - REMOVE DROPS AND BO POLE ISSUED: 12/21/2023 Address: 703 SPRUCE ST EDMONDS WA 98020 EXPIRES: 06/21/2024 it Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00484500303901 I 11-1411 a W NAME TYPE NAME ADDRESS PHONE APPLICANT CAITLIN REID 426 E CASINO ROAD, EVERETT WA 98208 (425)375-0838 CONTACT ZIPLY FIBER NORTHWEST LLC 426 E. CASINO RD, EVERETT WA 98208 (425)583-4057 CONTRACTOR ZIPLY FIBER NORTHWEST LLC 1220 75TH ST SW, EVERETT WA 98203 (425)231-3928 OWNER ROBERT B JR & SANDRA 703 SPRUCE ST, EDMONDS WA 98020 SEIDENSTICKER FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00 ENG - INSPECTIONS $252.00 $252.00 RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: MAJ DATE: 12/21/2023 Printed: Thursday, December 21, 2023 10:06:43 AM 1 of 2 RIGHT OF WAY EUC PERMIT PERMIT NUMIJBE City of Edmonds www.edmondswa.gov • • CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START X-2 ENGINEERING FINAL** E-7 RESTOR LIMITS Printed: Thursday, December 21, 2023 10:06:43 AM 2 of 2 RECEIVED Lti�y of ED%�O� ANC. 1 g90 SECTION A RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit Handout E63. NOV 20 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. General Info Project Name 5261273 Site Address or if no site address use Property Address at NW corner of project area: 703 Spruce St, Edmonds, WA 98020 Associated Permits: BLD PLN ENG Owner and Entity Holding Franchise (if applicable) Name of Company Ziply Fiber Northwest, LLC Franchise Ordinance No: WN U-17 PointofContact Mike Hakahan Title Engineer Address426 E Casino Rd city Everett State WA zip 98208 Phone 425-949-0230 Email mike.hakahan@ziply.com AuthorizedContractor and Agent •below) Name of Company Ziply Fiber Northwest, LLC Primary Name Mike Hakahan Agent Name Mike Hakahan Title Engineer Title Engineer Mobile 425-949-0230 Address426 E Casino Rd. Email mike.hakahan@ziply.com city Everett I State WA zip 98208 Secondary Name Phone 425-949-0230 Title Email mike.hakahan@ziply.com Mobile City of Edmonds Business License No: 3 1 3-0 1 3-420 Email State License No: ZIPLYFN782L3 ID Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) A Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 ❑ Utility Franchise Work (no associated development) Project Description Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) Telecommunications and broadband provider Ziply Fiber to ZIPLY TO REMOVE DROPS AND REMOVE OLD POLE RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF JxJ LF SF Alley 72 hours + LF JxJ F SF Parking 72 hours + LF JxJ LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: * telecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details 1. of Work to be Completed Does the utility owner have existin overhead infrastructure in the area of work? 2. Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? 5. Does the work involve proposed additions to an aboveground utility system? If es: V Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of • to be Completed ®i 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: How many are existing? I I How many are to be added? 6b. Does your project involve poles? If yes: How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: How many? What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: Z�)MAZ,�,el, /l� DATE: 11.17.2023 APPLICANT PRINTED NAME: Derrick Kasuske Traffic Control Permitter APPLICANT TITLE: NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM AT PLI 2 79509 RMV OH SVCE TPX FROM PLI 279509/XFMR 25-456232 TO PLI 270984. STRIP TOP AND ABANDON POLE 270984 TO FRONTIER. 101 RESTORATION LIMITS TO BE DETERMINED BY CITY ENGINEERING INSPECTOR E-62 96 1713 E-6 296 SPRUCE ST ENGINEERING DIVISION APPROVED AS NOTED .loll LVI g1,1, 4,t 12/20/2023 VV RECEIVED NOV 20 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT SNOHOMISH COUNTY [Floal PUBLIC UTILITY DISTRICT NO 1 1112 Rev. 4/19 ORIGINAL APPENDIX A JOINT POLE NOTIFICATION Yeor Price List To CATV: FRONTIER Exchange Date 00 Lin FRONTIER COMCAST 2100 3/23/2020 c c Z Customer Name Service Address a 7- GARY CLICK/425-742-6044 703 SPRUCE ST EDMONDS, WA 98020 o is r" ii N PUD Order/Operation No. PUD Engineer PUD Approved u, N 100060758/0030 ANDY TRAIN 425-670-3208 PUD INTENDS TO PERFORM THE FOLLOWING ON THIS WORK ORDER: out ❑ Set Poles ❑ Set Additional 8'' Helix Anchors 3/24/2020 ❑ Replace Poles ❑ Set Additional 12'' Helix Anchors In 0 Eliminate (1) 30' Poles From PUD System ® Customer Pay 100% Contacts Free To FRONTIER 3/26/2020 ❑ PUD To Contact FRONTIER Pole(s) At Locations) BM Number Other FRONTIER Pay 45% Of The Following (Estimates Only) PUD Work Completed Easement Estimate FRONTIER Transfer ❑ �CATV Transfer ❑ Customer information 16531 13th Ave W STE A-107 Lynnwood, WA OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY E-Mail: UTILITIES MAY REQUIRE A SEPERATE PERMIT. julie@selecthomeswa.com Phone#: 425-742-6044 OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE Return to Joint Use By 4/3/20 Adam Diaz ism 425-261-0134 N C N C Pole/Location o ° Recovery Pole/Location o Recovery Reference (n Size (Size/Year) Cost Reference N C :E o Size (S Size/Year) Cost � w < � w < A N/C Additional Anchors At The Following Locations WO/USDA Codes Fielded B te: baz 3-26-2� Approved By: Date: 3-26-20 Adam Shannon Parr LEGEND: OSIGNALIZED INTERSECTION OCONE (CANDLESTICK) ® TYPE III BARRICADE WORKTRUCK WORK ZONE LIMITS OWE WARNING SIGN ARROW BOARD REQUIRED) (WHERE 0 DIRECTION OF TRAFFIC (NOT PAVEMENT MARKINGS) n FLAGGER-SPOTTER FLAGGER STATION ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) SIGN LEGEND: ROAD ROAD WORK ROAD CLOSED CLOSED LOCAL AHEAD TRAFFIC ONLY W20-1 R11-2 K-6664 7TH AVE S (25 MPH) �j at b4 BUFFER AREA LONGITUDINAL BUFFER SPACE = B POSTED SPEED (MPH) 25 30 35 40 45 50 55 60 64 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R HOST VEHICLE WEIGHT (Ibs) 9,900 TO 22,000 HOST VEHICLE WEIGHT (Ibs) > 22,000 < 45 MPH 45 - 55 MPH > 55 MPH < 45 MPH 45 - 55 MPH > 55 MPH 100, 123' 172' 74' 100, 150' NOTE: MON. - FRI. = 7:00am TO 4:00pm WORK DETAILS: ZIPLY TO REMOVE DROPS AND REMOVE OLD POLE CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 50/70 1 40 1 80 35/45 30 60 25/30 20 40 MINIMUM SHOULDER TAPER LENGTH = L/3 (feet) SHOULDER POSTED SPEED (MPH) WIDTH (feet) 25 30 35 40 45 50 55 60 65 70 8 40 40 60 90 120 130 150 160 170 190 10 40 60 90 90 150 170 190 220 220 240 USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8' PHASE 1 b NOT NEEDED ALLEY IS A DEAD END RECEIVED NOV 20 2023 ENGINEERING DIVISION APPROVED AS NOTED tt,,,, CITY OF EDMONDS 1Qi/ Ly/"J,H.. 4z 12/20/2023 DEVELOPMENT SERVICES DEPARTMENT VV SIGN SPACING = X (1) FREEWAY & EXPRESSWAYS 55 / 70 MPH 1500' ± RURAL HIGHWAYS 60 / 65 MPH 800' ± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH 350' ± RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200' ± (2) URBAN STREETS 25 MPH OR LESS 100'± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. O ATCO COMMUNICATIONS SERVICES, LLC www.atcoteiecom.com 360.563.9000 708 First Street Snohomish, WA 98290 ziPylfiber Everett, WA 98206 co NCD O 00 U) UJI Cm j > a zLo N � 0 °� N ui o E w U) w U I U U Q U 0 c co O z O U U w w L� m0 zQ U U z w ILL! ILL!O z � CL � a- U o LL DATE: 11.16.2023 REVIEWED BY: M. LUNA WSTCS# 013184 DESIGNED BY: D. KASUSKE ATCO CONTACT: 425.367.2685 derrick.kasuske@atcotelecom.com SCALE: SHEET: =5F 02 NO: 2OF2 LEGEND: EXISTING UTILITY POLE ® PROPOSED NEW POLE WORK DETAILS: ZIPLY TO REMOVE DROPS AND REMOVE OLD POLE f Cedar St @afta � I a - s /jam, , 3 r r�' • r y � IF tiA.-j -. 1M N RECEIVED NOV 20 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ziPylfiber Everett, WA 98208 o U) a, N � Lu a c Q U) z cc N o G i (n lLl a W e- W ? 7 N a L N U cr l!) 2 a Q CM O N� 1� O c w w � m � Z Q Z LLI O Q z O O U w LL DATE: 11.14.2023 DESIGNED BY: D. KASUSKE SCALE: SHEET: NOT TO O' SCALE N0: 1 OF 1 L ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS' GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) Walnut St 'Walnut St zr D Walnut St I Cedar St Cedar StCedar St PHASE ON�� 3 S D D m r4e Vl illl 0 I,- ___� F� L 0 E VICINITY MAP Walnut St _Cedar 5t MAKE Desvign - VISUal COf_PMLM!catlons 19 10 - _Cea RECEIVED NOV 20 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT O ATCO COMMUNICATIONSSERVICES. LLC www.atcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 ziPIy fiber Everett, WA 98206 I- N N LU N Q N o6 C o � E w LU U w � o a U U) 7 Q Co O m a M N N 0- 0 F_ DATE: 11.16.2023 REVIEWED BY: M. LUNA WSTCS# 013184 DESIGNED BY: D. KASUSKE ATCO CONTACT: 425.367.2685 derrick.kasuske@citcotelecom.com SCALE: SHEET: NOT TO U SCALE N0: 1 OF 2 RECEIVED Letter of Intent NOV 20 2023 CITY OLMONDS Frontier DEVELOPMENT SERVICES DEPARTMENT COMMUNICATIONS Frontier Communications Northwest, Inc. Network Eng & Planning 1800 4111 St MC: 20S Everett, Washington 98203 Date: 03/25/2020 To: Gary Click 16531 13`h Ave W STE A-107 Lynnwood, WA Re: 703 Spruce St, Edmonds, WA: Frontier to remove one joint owned PUD pole and rcmovc acrial facilities. Dear Gary, This is in response to your request for Frontier to perform the following work: Frontier to remove one joint owned PUD pole and remove aerial facilities. FTR Project # 5261273 PUD JPN# 100060758 We have estimated that the cost of this work effort will be: S 2,889.23 Less the first LOI payment received (NA): - S 0.00 Balance due Frontier: $ 2,889.23 This is the amount of the advance payment that you will be required to make. You must return this signed agreement, along with the full advance payment, before your work will be scheduled. Upon job completion, you will be issued either: (1) a refund for any overpayment, or (2) an invoice, if the final actual costs exceed the advance payments received. Any unapplied portion of advance payments will be refunded to you within sixty (60) days of the final bill or cancellation of the job. If you agree to these terms, please sign below and forward this signed letter agreement, a check for $2,889.23 made payable to Frontier Communication and noted with 5261273 to: Frontier Communications Attn: Jamie Evans Engineering Department 1800 41s` ST MC: 20S Everett, Washington 98203 REV 2 05/23/2013 Pagel of 2 For your convenience and use, we have enclosed a self-addressed envelope. If you are signing for a company or other entity, then by signing below, you warrant that you are authorized to bind the company or entity to the terms of this letter agreement. Upon receipt of your signed agreement and advance payment, your work order will be released to our Construction Department for scheduling. Frontier shall not be responsible to the extent its performance is delayed or prevented due to causes beyond its control, including but not limited to acts of God or the public enemy, terrorism, civil commotion, embargo, acts of government, any law, order, ordinance, regulation, or requirement of any government, fires, explosions, weather, quarantine, strikes, labor disputes, lockouts, and other causes beyond the reasonable control of Frontier. Should you have any questions or concerns regarding these terms, please contact me at (425) 261- 0134. Please be advised that the price estimate quoted above is only valid for sixty (60) days from the date of this letter. If this work request is cancelled after you have signed the agreement, you will be billed for any Engineering and Construction cost incurred after the date of signature that may include the cost to place and/or remove facilities. If we do not receive this signed agreement and your full advance payment within this sixty (60) day period, we will assume that you do not want the work to be undertaken and the project will be cancelled. Sinccrcly, Adam Diaz Frontier — Signature Network Enizineer Frontier — Title I agree to the terms of this agreement: Accepted (Signature): Print Name & Title: Company Billing Address: Telephone #: RECEIVED NOV 20 2023 Date: CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT REV 2 05/23/2013 Page 2 of 2 RECEIVED CITY OF EDMONDS Right -of -Way Application #1406085 - 5261273 NOV 20 2023 MyBuildingPermit.com CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Applicant First Name Last Name Company Name Caitlin Reid Ziply Fiber Northwest LLC Number Street Apartment or Suite Number E-mail Address 426 E Casino Road caitlin.reid@ziply.com City State Zip Phone Number Extension Everett WA 98208 (425) 375-0838 Contractor Company Name ZIPLY FIBER NORTHWEST LLC Number Street Apartment or Suite Number 1220 75th St SW City State Zip Phone Number Extension Everett WA 98203 (425) 231-3928 State License Number License Expiration Date UBI # E-mail Address ZIPLYFN782L3 5/25/2024 iyini i4gn caitlin.reid@ziply.com Project Location Number Street Floor Number Suite or Room Number 703 SPRUCE ST City Zip Code County Parcel Number EDMONDS 98020 00484500303901 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name Robert B Jr & Sandra B Seidensticker Number Street Apartment or Suite Number 703 SPRUCE ST City State Zip EDMONDS WA 98020 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 11/17/2023 Submitted By: Caitlin Reid Page 1 of 2 i CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1406085 - 5261273 Project Contact Company Name: Ziply Fiber Northwest LLC Name: Arianne Mommsen Email: arianne.momsen@ziply.com Address: 426 E. Casino RD Phone #: (425) 583-4057 Everett WA 98208 Project Type Activity Type Scope of Work Utility Purveyor Utility Work No Disturbance of Surface Project Name: 5261273 Description of Work: ZIPLY TO REMOVE DROPS AND REMOVE OLD POLE Project Details Project Information Job Number 5261273 Page 2 of 2