Loading...
Building PermitType: RESIDENTIAL BLDG Subtype: NEW SINGLE FAMILY ATTACHED I Status: ISSUED Parcel No: 27032600100900 Site Address: 614 5TH AVE S C104 EDMONDS,WA 98020-3404 Subdivision: 008806, 006493, 004096 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $217,860.16 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: PINE PARK - NEW RES ATTACHED SFR - UNIT C104 Applied: 4/29/2022 Issued:12/28/2023 Final: Expiration Date: 12/22/2024 Issued by: NED I WA State Contractor L & I #: SEATTLH822JB I CONTACTS NAME TYPE NAME ADDRESS I PHONE EMAIL APPLICANT JACOB YOUNG 10 DRAVUS STREET, SEATTLE (206)535-7908 JYOUNG@COLLABORATIVECO.COM WA 98109 CONTACT CITIZEN DESIGN 10 DRAVUS STREET, SEATTLE (206)535-7908 jyoung@collaborativeco.com COLLABORATIVE WA 98109 PO BOX 1478, EDMONDS WA CONTRACTOR SEATTLE LUXURY HOMES, LLC 98020 OWNER Bank Investment Group 557 Roy Street #125, SEATTLE (206)673-4543 abukowski@bayeq.com WA 98109 OM•por DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 17BASEFEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 12/28/23 R33544 PERMITS AIR CONITIONING SYSTEM OR HEAT 001.000.345.83.000.00 $50.00 $50.00 12/28/23 R33544 PUMP - 1.75 BTU OR LESS APPLIANCE VENTS 001.000.345.83.000.00 $30.00 $30.00 12/28/23 R33544 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 5/3/22 R19912 PER PERMIT FAN CONNECTED TO SINGLE DUCT 001.000.345.83.000.00 $60.00 $60.00 12/28/23 R33544 GAS PIPING - NEW OR LOCATED 001.000.345.83.000.00 $30.00 $30.00 12/28/23 R33544 PARK IMPACT - ADMIN FEE RES 001.000.345.83.000.00 $50.00 $50.00 12/28/23 R33544 PARK IMPACT FEE - SINGLE FAMILY 332.100.345.85.000.00 $2,734.05 $2,734.05 12/28/23 R33544 PERMIT FEE - RESIDENTIAL 001.000.345.83.000.00 $1,808.00 $1,808.00 12/28/23 R33544 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $1,332.80 $1,332.80 5/3/22 R19912 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 12/28/23 R33544 TOTALS: $6,191.3S $6,191.35 CONDITIONS CONDITION TYPE STATUS NOTES 48 HRS NOTICE-ENGR FINAL FOR 48 Working hours notice is required when requesting your FINAL engineering inspection. NFORMATION Printed: Thursday, December 28, 2023 3:37:49 PM 1 of 4 'RESIDENTIAL BLDG Permit PERMIT NUM of Edmonds EdmondsCity 98020BLD2022-05417 www.edmondswa.gov 48 HRS NOTICE-ENGR FINAL FOR 48 Working hours notice is required when requesting your FINAL engineering inspection. NFORMATION FOR ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. NFORMATION 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:00am to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. FOR BUILDING SPECIAL INSP REQUIRED SPECIAL INSPECTIONS NFORMATION It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FOR ELEVATION CERTIFICATE INFORMATION FOR ELEVATION CERTIFICATE INFORMATION FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS INFORMATION REQUIREMENTS. FOR The engineering division requires 48 hours notice prior to the date of the FINAL FINAL INSPECTION SCHEDULING INFORMATION Inspection. Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION Printed: Thursday, December 28, 2023 3:37:49 PM 2 of 4 'RESIDENTIAL BLDG Permit PERMIT NUM City of Edmonds . •:� i 1 1 . •. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. HOSE BIBBS FOR Hose Bibbs are required to have a permanently affixed anti -siphon device installed. NFORMATION MAINTENANCE BONDS FOR Maintenance Bond(s) required at FINAL. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These MAXIMUM HEIGHT FOR items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. A SUBDIVISION IS REQUIRED TO CREATE A LOT LINE WEST OF BUILDINGS A & B IN ORDER FOR THE GROUND FLOOR DEPTHS TO SATISFY THE 30' MINIMUM REQUIREMENT IN ECDC FOR PLANNING CONDITION 16.43.030.B.10.E. A CERTIFICATE OF OCCUPANCY CANNOT BE ISSUED FOR ANY OF THE INFORMATION BUILDINGS UNTIL THE SUBDIVISION IS RECORDED AT THE SNOHOMISH COUNTY AUDITOR. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street POST ADDRESS FOR or road fronting the property. Address numbers shall be Arabic numerals or alphabet INFORMATION letters Numbers shall be legible from the public way, at least 6 inches high with a .75inch min stroke width on a contrasting background. FOR Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. PROJECT CIVIL ASBUILT INFORMATION Asbuilt shall be submitted to Engineeringpermits@edmondswa.gov. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. FOR Heat pumps, AC units and similar equipment greater than 36 inches in height are not SIDE YARD EQUIPMENT INFORMATION allowed within required building setbacks. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Special inspections have been called for on this project and are noted on the approved SPECIAL INSPECTION BUILDING FOR construction plans. It is the owner and or contractors responsibility to ensure that reports DIVISION INFORMATION are provided to the City on a weekly basis. Installer shall provide the manufacturer installation, operating instructions, and a whole WHOLE HOUSE FAN FOR house ventilation system operation description. A label shall be affixed to the whole INFORMATION house timer control that reads "Whole house ventilation, see operating instructions". Printed: Thursday, December 28, 2023 3:37:49 PM 3 of 4 RESIDENTIAL BLDG '-rmit AveCity of Edmonds PERMIT NUM •:� i 1 1 www.edmondswa.gov Lw.A& INSPECTIONS• •. AdINSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES A-1 BUILDING PRECON A-1 TESC AND MOBILIZE B-1 SETBACKS B-2 FOOTINGS B-2 FOUNDATION WALL B-2 SLAB INSULATION B-3 EXT GYP SHEATHING B-3 EXT WALL SHEATHING B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING B-4 FRAMING B-4 HEIGHT VERIFICATION B-4 INTERIOR SHEAR B-4 SHOWER PAN B-5 BLDG SPECIAL INSPECTION B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-1 FIRE FINAL X-1 PLANNING FINAL X-2 ENGINEERING FINAL X-3 BUILDING FINAL" Printed: Thursday, December 28, 2023 3:37:49 PM 4 of 4