Loading...
Engineering Permit FormOF WAY PERMIT PERMIT ER City •EdmondsRIGHT 98020 ENG2023-0455 www.edmondswa.gov i Description: ROW IMPROVEMENTS PER FILL/GRADE BLD2022-0694 PINE PARK ISSUED: 12/28/2023 Address: 614 5TH AVE S EDMONDS WA 98020-3404 EXPIRES: 12/22/2024 rmit Type: RIGHT OF WAY Permit Subtype: MIXED USE Parcel Number: 27032600100900 i NAME TYPE NAME ADDRESS PHONE APPLICANT JACOB YOUNG 10 DRAVUS STREET, SEATTLE WA 98109 (206)535-7908 CONTACT CITIZEN DESIGN COLLABORATIVE 10 DRAVUS STREET, SEATTLE WA 98109 (206)535-7908 CONTRACTOR SEATTLE LUXURY HOMES, LLC PO BOX 1478, EDM0NDS WA 98020 OWNER BK INVESTMENT GROUP LLC 557 ROY ST 125, SEATTLE WA 98109 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00 ENG - INSPECTIONS $126.00 $126.00 RIGHT-OF-WAY PERMIT - STANDARD $378.00 $378.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: NED DATE: 12/28/2023 Printed: Thursday, December 28, 2023 3:50:53 PM 1 of 3 OF WAY PERMIT PERMIT ER City •EdmondsRIGHT 98020 ENG2023-0455 www.edmondswa.gov i CONDITIONS CONDITION TYPE NOTES 48 HRS NOTICE-ENGR FINAL 48 Working hours notice is required when requesting your FINAL engineering inspection. ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. INSP PRIOR TO BACKFILL Call for all required inspections. All work shall be inspected prior to backfill. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. Asbuilt shall be PROJECT CIVIL ASBUILT submitted to Engineeringpermits@edmondswa.gov. ROW COMPACTION TEST Right of way compaction tests are required per City standards. SEWER AND WATER MAINTAIN 10 FEET OF SEPARATION BETWEEN THE SANITARY SIDE SEWER AND THE WATER SERVICE SEPARATION LINE. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. TRAFFIC CONTROLS Traffic Control per approved plan and MUTCD. All Flaggers shall be certified. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT NOTES COMPLETE X-2 ENGINEERING FINAL" A-1 TESC AND MOBILIZE E-7 CONCRETE SIDEWALK E-7 CURB GUTTER E-7 DRY UTILITY LOCATION E-7 DWY APPROACH E-7 PARKING OPEN -CLOSED E-7 PAVEMENT COMPACTION TEST REPORT E-7 PVMT SUBGRADE E-7 RESTOR LIMITS E-7 SEWER LATERAL E-7 SIDEWALK OPEN -CLOSED Printed: Thursday, December 28, 2023 3:50:53 PM 2 of 3 Printed: Thursday, December 28, 2023 3:50:53 PM 3 of 3