20210191E002 Stark Residence Foundation Repairs 2022-12-06 FR 014FIELD REPORT 8A I Associated Earth Sciences Kirkland I Tacoma I Mount Vernon 42S-827-7701 1 www.aesgeo.com Date Project Name Project No. Report No. 12/06/2022 Stark Residence Foundation Repairs 20210191EO02 014 Location Municipality AESI Project Manager AESI Field Rep 133 Sunset Ave N City of Edmonds Stephen Siebert, P.E. Devon Nutter Permit No. Client/Owner Attn Requested By BLD2022-0463 Susan Stark Client Contractor Engineer/Architect General Contractor Pile Contractor Weather CG Engineering NA Advanced Foundation 30s, cloudy Supports LLC. /Evan THE FOLLOWING WAS NOTED: Helical Piles: AESI was onsite today at 10am, as requested by the contractor to observe and document helical pile installation. Today, the contractor set up and installed helical piles H17, H15, and H8 (see Figure 1). See Table 1 for helical pile installation details. The helical piles appeared to be installed to minimum specifications, per plan. The crew from Advanced Foundation Supports was very efficient, and all helical piles were installed without problem. We understand that the contractor is waiting on direction from the structural engineer regarding installation of helical piles H3, H4, and H6. Helical Pile H3 and H4 are both located in tight, confined spaces with very low clearance, making installation very difficult. We understand that the contractor has suggested using pipe piles as an alternate in these locations and is waiting for a response from CG Engineering. In addition, what appears to be a timber pile was found at the original location of helical pile H6 (see Photo 1). Relocating H6 around the corner of the foundation, closer to H7, would provide enough room for installation, but this can't be done until it has been reviewed and approved by CG Engineering. Work finished at 1:30PM, and AESI plans to return later in the week to continue observing helical pile installation. Table 1: Installation Details Helical Depth measured PSI range during Design Min -Max Install Torque (ft- Comments Anchor from bottom of installation. Load Ibs) 3,100-5,500 per design Pile # footing Ending psi (kips) achieved? H17 22' 1000-1900, 14 5,906 Lead section 7', then 5'-long 1,900 sections H15 22.5' 800-1750, 1,750 14 5,440 Lead section 7', then 5'-long sections H8 23' 1000-1650, 14 5,130 Lead section 7', then 5'-long 1,650 sections Date Mailed: v.2.20 Principal / PM: Stephen Siebert, P.E. This document is considered a DRAFT until signed or initialed by on AESI Pri ipa or Project Manager Page 1 of 3 FIELD REPORT 8A S1 Associated Earth Sciences Date Project Name Project No. Report No. 12/06/2022 Stark Residence Foundation Repairs 20210191EO02 014 Table 2: Sheet S2.1 PILE & ANCHOR SCHEDULE PILE TYPE DESIGN LOAD PILE SHAFT HELIX CONFIGURATION MIN INSTALL TORQUE MAX INSTALL TORQUE KT NOTES Pl-P24 2"0 PIN PILE 6.OK 2" STD PIPE - - - H1-H11 PIPE HELICAL PILE 14.OK 2 7/8" x 0.203" PIPE HELIX DOUBLE HELIX (8",10") 3,100 FT# 5,500 FT# 9 LOCK OFF SNUG TIGHT ONLY H12-HIS PIPE HELICAL PILE 13.OK 2 7/8" x 0.203" PIPE HELIX DOUBLE HELIX (8",10") 2,800 FT# 5,500 FT# 9 LOCK OFF SNUG TIGHT ONLY H16-H2O PIPE HELICAL PILE I 14.0K 2 7/8" x 0.203" PIPE HELIX I DOUBLE HEUX (8",10") 3,100 FT# 5,500 FT# 9 1 LOCK OFF SNUG TIGHT ONLY NOTES: 1. CONTRACTOR SHALL VERIFY HELIX CONFIGURATION CAPABLE OF DEVELOPING THE DESIGN LOADS. 2. MIN INSTALL TORQUE ASSUMES Kt= 9.0IF A PILE WITH A DIFFERENT Kt VALUE IS USED MIN INSTALL TORQUE SHALL BE ADJUSTED. 3. MIN INSTALL TORQUE INCLUDES A FACTOR OF SAFETY OF 2.0. 4. ALL PILES SHALL INSTALLED TO TWICE THE DESIGN LOAD. Figure 1: Pipe Pile and Helical Pile Plan. Helical piles installed today shown in purple Shade, previously installed shown as purple circles. LOWER LEVEL PLAN Page 2 of 3 FIELD REPORT 8A S1 Associated Earth Sciences Date Project Name Project No. Report No. 12/06/2022 Stark Residence Foundation Repairs 20210191EO02 014 OUTPUT SPEED & TORQUE Digga HH-6K Screw Anchor Drive HH-61K SPECIFICATIONS OUTPUTSPEED OUTPUTTORQUE MODEL HH-61K MM-10K Theoretical Torque (ft-Ibs) 6,528 @ 2,100psi 10,478 @ 3,000psi GPM RPM PSI FT-LBS Expected Torque (ft-Ibs) 4,765 @ 2,100psi 8,040 @ 3,000psi 7 7 500 1,554 (73%efficiency) (77%efficiency) 8 8 750 2,331 Max Pressure 2,100psi @ I Igpm 3,000psi @ 18.5gpm 9 9 1,000 3,108 Max Flow 15gpm @ 2300psi 18.5gpm @ 3000psi Max Horse Power 20 33 10 10 1,250 3,886 Pressure Relief Valve Included NA 11 11 1,500 4,663 Standard Output Shaft 2'Hex 2.5'Hex-Short 12 12 1,750 5,440 13 13 2,000 6,217 Weight (Ibs) 90 138 14 14 2,100 6,528 Overall Length (in) 20' 24.1' 15 15 Diameter (in) 9.5" 11.4' HH-6K Hand-held unit is not suitable for machine mounting. Warranty void if used on machines. Photo 1: Timber Pile Found at helical pile H6 Original Location Page 3 of 3