Loading...
20210191E002 Stark Residence Foundation Repairs 2022-12-19 FR 016FIELD REPORT 8A I Associated Earth Sciences Kirkland I Tacoma I Mount Vernon 42S-827-7701 1 www.aesgeo.com Date Project Name Project No. Report No. 12/19/2022 Stark Residence Foundation Repairs 20210191EO02 016 Location Municipality AESI Project Manager AESI Field Rep 133 Sunset Ave N City of Edmonds Stephen Siebert, P.E. Devon Nutter Permit No. Client/Owner Attn Requested By BLD2022-0463 Susan Stark Client Contractor Engineer/Architect General Contractor Pile Contractor Weather CG Engineering Howard Clark Construction Advanced Foundation 20s, cloudy Supports LLC. /Evan THE FOLLOWING WAS NOTED: Helical Piles: AESI was onsite today at 10:30am, as requested by the contractor to observe and document helical pile installation. AESI did receive updated plans from CG Engineering, detailing which helical piles were kept, moved, and switched to pin piles (see Fig 2). Today, the contractor set up and installed helical piles H14 and H6 (see Figure 1). See Table 1 for helical pile installation details. The helical piles appeared to be installed to minimum specifications, per plan. Work finished around noon, and AESI plans to return to continue observing helical pile observation, but this would likely be next week due to the upcoming holidays and cold weather. Table 1: Installation Details Helical Depth measured PSI range during Design Min -Max Install Torque (ft- Comments Anchor from bottom of installation. Load Ibs) 3,100-5,500 per design Pile # footing Ending psi (kips) achieved? H14 26' 1000-2000, 13 6,217 Lead section 7', then 5'-long 2,000 sections H6 23.5' 1000-1600, 14 4,973 Lead section 7', then 5'-long 1,600 sections Date Mailed: v.2.20 Principal / PM: Stephen Siebert, P.E. This document is considered a DRAFT until signed or initialed by on AESI Principal or Project Manager Page 1 of 4 FIELD REPORT 8A S1 Associated Earth Sciences Date Project Name Project No. Report No. 12/19/2022 Stark Residence Foundation Repairs 20210191EO02 016 Table 2: Sheet S2.1 PILE & ANCHOR SCHEDULE PILE TYPE DESIGN LOAD PILE SHAFT HELIX CONFIGURATION MIN INSTALL TORQUE MAX INSTALL TORQUE KT NOTES P1-P24 2"0 PIN PILE G.OK 2" STD PIPE - - - - - H1-H11 PIPE HELICAL PILE 14.OK 2 7/8" x 0.203" PIPE HELIX DOUBLE HELIX (8", 10") 3,100 FT# 5,500 FT# 9 LOCK OFF SNUG TIGHT ONLY H12-H15 PIPE HELICAL PILE 13.OK 2 7/8" x 0.203" PIPE HELIX DOUBLE HELIX (8", 10") 2,800 FT# 5,500 FT# 9 LOCK OFF SNUG TIGHT ONLY H16-1-12O PIPE HELICAL PILE 14.OK 2 7/8" x 0.203" PIPE HELIX DOUBLE HELIX (8", 10") 3,100 FT# 5,500 FT# 9 LOCK OFF SNUG TIGHT ONLY NOTES: 1. CONTRACTOR SHALL VERIFY HELIX CONFIGURATION CAPABLE OF DEVELOPING THE DESIGN LOADS. 2. MIN INSTALL TORQUE ASSUMES Kt = 9.0IF A PILE WITH A DIFFERENT Kt VALUE IS USED MIN INSTALL TORQUE SHALL BE ADJUSTED. 3. MIN INSTALL TORQUE INCLUDES A FACTOR OF SAFETY OF 2.0. 4. ALL PILES SHALL INSTALLED TO TWICE THE DESIGN LOAD. Figure 1: Pipe Pile and Helical Pile Plan. Helical piles installed today shown in purple Shade, previously installed shown as purple circles. LOWER LEVEL PLAN 2.41 U 2'-0., 4.-0., Page 2 of 4 FIELD REPORT 8A S1 Associated Earth Sciences Date Project Name Project No. Report No. 12/19/2022 Stark Residence Foundation Repairs 20210191E002 016 Figure 2: Updated Pipe Pile and Helical Pile Plan Page 3 of 4 FIELD REPORT 8A S1 Associated Earth Sciences Date Project Name Project No. Report No. 12/19/2022 Stark Residence Foundation Repairs 20210191EO02 016 OUTPUT SPEED & TORQUE HH-6K SPECIFICATIONS Digga HH-6K Screw Anchor Drive MODEL HH-6K MM-10K OUTPUTSPEED OUTPUTTORQUE Theoretical Torque (ft-Ibs) 6,528gil2,t00pzi 10,478 @ 3,000psi GPM RPM PSI FT-LBS 4,765 @ 2,100psi 8,040 @ 3,000psi 7 7 500 1,554 Expected Torque (ft-Ibs) 73% efficiency) ( y) (77%efficienc ) y 8 8 750 2,331 Max Pressure 2,100psi @ l lgpm 3,000psi @ 18.5gpm Max Flow 15gpm @ 2300psi 18.5gpm @ 3000psi 9 9 1,000 3,108 Max Horse Power 20 33 10 10 1,250 3,886 Pressure Relief Valve Included NA 11 11 1,500 4,663 Standard Output Shaft 2'Hex 2.51Hex-Short 12 12 1,750 5,440 13 13 2,000 6,217 Weight (Ibs) 90 138 14 14 2,100 6,528 Overall Length (in) 20" 24.1' Diameter (in) 9.5" 11.4' 15 15 HH-6K Hand-held unit is not suitable for machine mounting. Warranty void K used on machines. Page 4 of 4