Loading...
20210191E002 Stark Residence Foundation Repairs 2022-12-02 FR 012FIELD REPORT 8A I Associated Earth Sciences Kirkland I Tacoma I Mount Vernon 42S-827-7701 1 www.aesgeo.com Date Project Name Project No. Report No. 12/02/2022 Stark Residence Foundation Repairs 20210191EO02 012 Location Municipality AESI Project Manager AESI Field Rep 133 Sunset Ave N City of Edmonds Stephen Siebert, P.E. Devon Nutter Permit No. Client/Owner Attn Requested By BLD2022-0463 Susan Stark Client Contractor Engineer/Architect Pile Contractor Weather General Contractor CG Engineering NA Advanced Foundation 30s, cloudy Supports LLC. /Evan THE FOLLOWING WAS NOTED: Helical Piles: AESI was onsite today at 10am, as requested by the contractor to observe and document helical pile installation. The contractor set up and installed pile H7 today as shown on Figure 1. See Table 1 for helical installation details. The helical appeared to be installed to minimum specifications, per plan. After the installation of pile H7, the contractor planned to install H18, but while repositioning equipment, the pressure gauges were damaged and began leaking fluid. AESI recommended drilling and installing H7 regardless and rechecking the pressure Monday (12/5) once new gauges were available. During installation, though, a sewer line that was unknown to Advanced Foundation Supports was broken, requiring the removal of the helical. This ended work for the day as a plumber needed to be called to fix the damage. Work finished at 12:30PM, and AESI planned to return the following week to continue observing helical pile installation. Table 1: Installation Details Helical Depth measured PSI range during Design Min -Max Install Torque (ft- Comments Anchor from bottom of installation. Load Ibs) 3,100-5,500 per design Pile # footing Ending psi (kips) achieved? H7 21' 1000-1900, 14 5,906 Lead section 7', then 5'-long 1,900 sections Date Mailed: v.2.20 Principal / PM: Stephen Siebert, P.E. 441? This document is considered a DRAFT until signed or initialed by on AESI Principal or Project Manager Page 1 of 3 FIELD REPORT 8A S1 Associated Earth Sciences Date Project Name Project No. OBReport No. 12/02/2022 Stark Residence Foundation Repairs 1620210191E002 2BO12 Table 2: Sheet S2.1 PILE & ANCHOR SCHEDULE PILE TYPE DESIGN LOAD PILE SHAFT HELIX CONFIGURATION MIN INSTALL TORQUE MAX INSTALL TORQUE KT NOTES P1-P24 2"0 PIN PILE G.OK 2" STD PIPE - - - - - H1-H11 PIPE HELICAL PILE 14.OK 2 7/8" x 0.203" PIPE HELIX DOUBLE HELIX (8", 10") 3,100 FT# 5,500 FT# 9 LOCK OFF SNUG TIGHT ONLY H12-H15 PIPE HELICAL PILE 13.OK 2 7/8" x 0.203" PIPE HELIX DOUBLE HELIX (8", 10") 2,800 FT# 5,500 FT# 9 LOCK OFF SNUG TIGHT ONLY H16-1-12O PIPE HELICAL PILE 14.OK 2 7/8" x 0.203" PIPE HELIX DOUBLE HELIX (8", 10") 3,100 FT# 5,500 FT# 9 LOCK OFF SNUG TIGHT ONLY NOTES: 1. CONTRACTOR SHALL VERIFY HELIX CONFIGURATION CAPABLE OF DEVELOPING THE DESIGN LOADS. 2. MIN INSTALL TORQUE ASSUMES Kt = 9.0IF A PILE WITH A DIFFERENT Kt VALUE IS USED MIN INSTALL TORQUE SHALL BE ADJUSTED. 3. MIN INSTALL TORQUE INCLUDES A FACTOR OF SAFETY OF 2.0. 4. ALL PILES SHALL INSTALLED TO TWICE THE DESIGN LOAD. Figure 1: Pipe Pile and Helical Anchor Plan. Helical anchors installed today shown in purple shade, previously installed shown as purple circles. LOWER LEVEL PLAN sca 77 = t o 2.41 U 2'-0„ 4,-0„ Page 2 of 3 FIELD REPORT 8A S1 Associated Earth Sciences Date Project Name Project No. OBReport No. 12/02/2022 Stark Residence Foundation Repairs 1B20210191EO02 2BO12 OUTPUT SPEED & TORQUE Digga HH-6K Screw Anchor Drive HH-6K SPECIFICATIONS OUTPUTSPEED OUTPUTTORQUE GPM RPM PSI FT-LBS 7 7 500 1,554 8 8 750 2,331 9 9 1,000 3,108 10 10 1,250 3,886 11 11 1,500 4,663 12 12 1,750 5,440 13 13 2,000 6,217 14 14 2,100 6,528 15 15 MODEL HH-61K MM-10K Theoretical Torque (ft-Ibs) 6,528 @ 2,100psi 10,478 @ 3,000psi Expec[edTorque(ft-Ibs) 4,765 @ 2,100psi 8,040 @ 3,000psi (73%efficiency) (77%efficiency) Max Pressure 2,100psi @ I Igpm 3,000psi @ 18.5gpm Max Flow 15gpm @ 2300psi 18.5gpm @ 3000psi Max Horse Power 20 33 Pressure Relief Valve Included NA Standard Output Shaft 2'Hex 2.51Hex-Short Weight (Ibs) 90 138 Overall Length (in) 20" 24.1' Diameter (in) 9.5" 11.4' HH-6K Hand-held unit is not suitable for machine mounting. Warranty void if used on machines. Page 3 of 3