Loading...
20210191E002 Stark Residence Foundation Repairs 2022-11-29 FR 010FIELD REPORT 8A I Associated Earth Sciences Kirkland I Tacoma I Mount Vernon 42S-827-7701 1 www.aesgeo.com Date Project Name Project No. Report No. 11/29/2022 Stark Residence Foundation Repairs 20210191EO02 010 Location Municipality AESI Project Manager AESI Field Rep 133 Sunset Ave N City of Edmonds Stephen Siebert, P.E. Devon Nutter Permit No. Client/Owner Attn Requested By BLD2022-0463 Susan Stark Client Contractor Engineer/Architect General Contractor Pile Contractor Weather CG Engineering NA Advanced Foundation 30s, cloudy Supports LLC. /Evan THE FOLLOWING WAS NOTED: Helical Piles: AESI was onsite today at 10am, as requested by the contractor to observe and document helical pile installation. The contractor set up and installed piles H2 and H2O today as shown on Figure 1. See Table 1 for helical installation details. The helicals appeared to be installed to minimum specifications, per plan. Initially, H2 wasn't reaching a suitable depth before pressure would spike to more than the max install torque. AESI recommended releasing the pressure from the Digga HH-61K Screw Anchor Drive and unscrewing the helical before attempting to push through the obstruction, but the several attempts using this method also reached max pressure. At the discretion of the contractor, H2 was drilled again with the intent of pushing past the max installation PSI. During this attempt, the helical was drilled to suitable depth without going past the max install PSI, moving past what was previously obstructing it. AESI asked the contractor about whether the helical piles used to perform the load test on H10 would be left or removed. Evan from Advanced Foundation Supports said the helical piles would be removed, but it wasn't specified when this would occur. Work finished at 2:00PM, and AESI plans to return Thursday (12/1) to continue observing helical pile installation. Table 1: Installation Details Helical Depth measured PSI range during Design Min -Max Install Torque (ft- Comments Anchor from bottom of installation. Load Ibs) 3,100-5,500 per design Pile # footing Ending psi (kips) achieved? H2O 19'8" 500-1650, 1,650 14 5,130 Lead section 7', then 5'-long sections H2 20' 400-1750,1750 14 5,440 Lead section 5', then 5'-long sections Date Mailed: v.2.20 Principal / PM: Stephen Siebert, P.E. This document is considered a DRAFT until signed or initialed by on AESI Principal or Project Manager Page 1 of 3 FIELD REPORT 8A S1 Associated Earth Sciences Date Project Name Project No. OBReport No. 11/29/2022 Stark Residence Foundation Repairs 1620210191E002 2BO10 Table 2: Sheet S2.1 PILE & ANCHOR SCHEDULE PILE TYPE DESIGN LOAD PILE SHAFT HELIX CONFIGURATION MIN INSTALL TORQUE MAX INSTALL TORQUE KT NOTES P1-P24 2"0 PIN PILE G.OK 2" STD PIPE - - - - - H1-H11 PIPE HELICAL PILE 14.OK 2 7/8" x 0.203" PIPE HELIX DOUBLE HELIX (8", 10") 3,100 FT# 5,500 FT# 9 LOCK OFF SNUG TIGHT ONLY H12-H15 PIPE HELICAL PILE 13.OK 2 7/8" x 0.203" PIPE HELIX DOUBLE HELIX (8", 10") 2,800 FT# 5,500 FT# 9 LOCK OFF SNUG TIGHT ONLY H16-1-12O PIPE HELICAL PILE 14.OK 2 7/8" x 0.203" PIPE HELIX DOUBLE HELIX (8", 10") 3,100 FT# 5,500 FT# 9 LOCK OFF SNUG TIGHT ONLY NOTES: 1. CONTRACTOR SHALL VERIFY HELIX CONFIGURATION CAPABLE OF DEVELOPING THE DESIGN LOADS. 2. MIN INSTALL TORQUE ASSUMES Kt = 9.0IF A PILE WITH A DIFFERENT Kt VALUE IS USED MIN INSTALL TORQUE SHALL BE ADJUSTED. 3. MIN INSTALL TORQUE INCLUDES A FACTOR OF SAFETY OF 2.0. 4. ALL PILES SHALL INSTALLED TO TWICE THE DESIGN LOAD. Figure 1: Pipe Pile and Helical Anchor Plan. Helical anchors installed today shown in purple shade, previously installed shown as purple circles. LOWER LEVEL PLAN sca 77 = t o 2.41 U 2'-0„ 4,-0„ Page 2 of 3 FIELD REPORT 8A S1 Associated Earth Sciences Date Project Name Project No. OBReport No. 11/29/2022 Stark Residence Foundation Repairs 1B20210191EO02 2BO10 OUTPUT SPEED & TORQUE Digga HH-6K Screw Anchor Drive HH-6K SPECIFICATIONS MODEL HH-6K MM-10K OUTPUTSPEED OUTPUTTORQUE Theoretical Torque (ft-Ibs) 6,528 @ 2,100psi 10,478 @ 3,000psi GPM RPM PSI FT-LBS Expected Torque (ft-Ibs) 4,765 @ 2,100psi 8,040 @ 3,000psi 7 7 500 1,554 (73%efficiency) (77%efficiency) 8 8 750 2,331 Max Pressure 2,100psi @ I Igpm 3,000psi @ 18.5gpm 9 9 1,000 3,108 Max Flow 15gpm @ 2300psi 18.5gpm @ 3000psi Max Horse Power 20 33 10 10 1,250 3,886 Pressure Relief Valve Included NA 11 11 1,500 4,663 Standard Output Shaft 2'Hex 2.5'Hex-Short 12 12 1,750 5,440 13 13 2,000 6,217 Weight (Ibs) 90 138 14 14 2,100 6,528 Overall Length (in) 20" 24.1" 15 15 Diameter (in) 9.5" 11.4" HH-6K Hand-held unit is not suitable for machine mounting. Warranty void if used on machines. Page 3 of 3