20210191E002 Stark Residence Foundation Repairs 2022-11-22 FR 008FIELD REPORT 8A I Associated Earth Sciences Kirkland I Tacoma I Mount Vernon 42S-827-7701 1 www.aesgeo.com Date Project Name Project No. Report No. 11/22/2022 Stark Residence Foundation Repairs 20210191EO02 AESI Project Manager 008 AESI Field Rep Location Municipality 133 Sunset Ave N City of Edmonds Client/Owner Stephen Siebert, P.E. Attn Devon Nutter Requested By Permit No. BLD2022-0463 Susan Stark Client Contractor Engineer/Architect Pile Contractor Weather General Contractor CG Engineering NA Advanced Foundation 40s, Sunny Supports LLC. /Evan THE FOLLOWING WAS NOTED: Helical Piles: AESI was onsite today at 10am, as requested by the contractor to observe and document installation of helical piles. The contractor set up and installed helical pile H1 to a depth of 20 feet below the bottom of the foundation where the torque pressure met 1,700 psi. The helical pile appeared to be installed to minimum specifications, per plan. Afterwards, the contractor began installing two helical on either side of pile H10 that will serve as reaction piles for the load test planned for Monday (11/28). Table 1: Installation Details Helical Depth measured PSI range during Design Min -Max Install Torque (ft- Comments Pile # from bottom of installation. Load Ibs) 3,100-5,500 per design footing Ending psi (kips) achieved? H1 20' 500-1750, 1,750 14 5,440 Lead section 7', then 5'-long sections Table 2: Sheet S2.1 PILE & ANCHOR SCHEDULE PILE TYPE DESIGN LOAD PILE SHAFT HELIX CONFIGURATION MIN INSTALL TORQUE MAX INSTALL TORQUE KT NOTES Pl-P24 2"0 PIN PILE 6.OK 2" STD PIPE - - - Hl-Hll PIPE HELICAL PILE 14.OK 2 7/8" x 0.203" PIPE HELIX DOUBLE HELIX (8",10") 3.100 FT# 5,500 FT# 9 LOCK OFF SNUG TIGHT ONLY H32-1­135 PIPE HELICAL PILE 13.OK 2 7/8" x 0.203" PIPE HELIX DOUBLE HELIX (8",10") 2,800 FT# 5,500 FT# 9 LOCK OFF SNUG TIGHT ONLY H16-142O PIPE HELICAL PILE I 14.0K 2 7/8" x 0.203" PIPE HELIX I DOUBLE HELIX (8",10") 3,100 FT# 5,500 FT# 9 LOCK OFF SNUG TIGHT ONLY NOTES: 1. CONTRACTOR SHALL VERIFY HELIX CONFIGURATION CAPABLE OF DEVELOPING THE DESIGN LOADS. 2. MIN INSTALLTORQUE ASSUMES Kt= 9.0IF A PILE WITH A DIFFERENT Kt VALUE IS USED MIN INSTALL TORQUE SHALL BE ADJUSTED. 3. MIN INSTALL TORQUE INCLUDES A FACTOR OF SAFETY OF 2.0. 4. ALL PILES SHALL INSTALLED TO TWICE THE DESIGN LOAD. Date Mailed: v.2.20 Principal / PM: Stephen Siebert, P.E. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 2 FIELD REPORT 8A S1 Associated Earth Sciences Date Project Name Project No. OBReport No. 11/22/2022 Stark Residence Foundation Repairs 1620210191E002 2Boo8 Figure 1: Pipe Pile and Helical Anchor Plan. Helical anchors installed today shown in purple shade, previously installed shown as purple circles. LOWER LEVEL PLAN sut: tea" = s o• 2'-0" D 2'-0" 4'-0" OUTPUT SPEED & TORQUE HH-61K Digga HH-6K Screw Anchor Drive MODEL OUTPUT SPEED GPM RPM 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 OUTPUTTORQUE Theoretical Torque (ft-Ibs) PSI FT-LBS 500 1,554 750 2,331 1,000 3,108 1,250 3,886 1,500 4,663 1,750 5,440 2,000 6,217 2,100 6,528 Expected Torque (ft-Ibs) Max Pressure Max Flow Max Horse Power Pressure Relief Valve Standard Output Shaft Weight (Ibs) Overall Length (in) Diameter (in) SPECIFICATIONS Re HH-6K MM-10K 6,528 @ 2,100psi 10,478 @ 3,000psi 4,765 @ 2,100psi 8,040 @ 3,000psi (73%efficiency) (77%efficiency) 2,100psi @ 11gpm 3,000psi @ 18.5gpm 15gpm @ 2300psi 18.5gpm @ 3000psi 20 33 Included NA 2"Hex 2.5"Hex-Short 90 138 20" 24.1" 9.5" 11.4" HH-6K Hand-held unit is not suitable for machine mounting. Warranty void if used on machines. Page 2 of 2