Loading...
20210191E002 Stark Residence Foundation Repairs 2022-12-28 FR 018FIELD REPORT 8A I Associated Earth Sciences Kirkland I Tacoma I Mount Vernon 42S-827-7701 1 www.aesgeo.com Date Project Name Project No. Report No. 12/28/2022 Stark Residence Foundation Repairs 20210191EO02 018 Location Municipality _ AESI Project Manager AESI Field Rep 133 Sunset Ave N Edmonds Stephen Siebert Devon Nutter Permit No. Client/Owner Attn Requested By BLD2022-0463 Susan Stark Client Contractor Engineer/Architect General Contractor Weather Pile Contractor CG Engineering NA Advanced Foundation 40s, Cloudy Supports LLC./ Evan THE FOLLOWING WAS NOTED: Associated Earth Sciences Inc. (AESI) was onsite at 10am, as requested by the contractor to observe and document pipe pile installation. Pile Installation: A total of three, 2-inch diameter pipe piles were installed today. Their lengths are summarized in the table below. The pipe piles were installed using a pneumatic, 140 lb. Rhino hammer. Refusal was defined as 60 seconds/inch. These pipe piles replace helical pile H3 on the updated plans from CG Engineering (see Fig. 1). The piles appeared to be installed to minimum specifications, per plan. This will be AESI's final site visit as all helical and pipe pile installations have been completed as presented on the project plans. AESI left the site at 1:30PM. Date Mailed: v.2.20 Pile # Pile Length (ft measured from bracket cutoff) P27 20 P25 18.5 P26 17 Principal / PM: Stephen Siebert This document is considered a DRAFT until signed or initialed by on AESI Principal or Project Manager Page 1 of 2 FIELD REPORT 8A S1 Associated Earth Sciences Date Project Name Project No. OBReport No. 12/28/2022 Stark Residence Foundation Repairs 1620210191E002 2BO18 Figure 1: Updated Pipe Pile and Helical Pile Plan (installed piles in red) Page 2 of 2