Loading...
Building PermitType: RESIDENTIAL BLDG Subtype: ADDITION I Status: ISSUED Parcel No: 00488800801100 Site Address: 7011 LAKE BALLINGER WAY EDMONDS,WA 98026- 8544 Applied: 3/2/2023 Subdivision: 004888 Lot: 0 Issued: 1/11/2024 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $400,000.00 Occupancy Type: Construction Type: Expiration Date: 1/5/2025 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: TRIEU- 2ND STORY ADD/REMODEL M INC P SEP (FLOOD ZONE) WA State Contractor L & I #: CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT PAUL TRIEU 7011 LAKE BALLINGER WAY, (206)321-9514 PAUL-OA@LIVE.COM EDMONDS WA 98026 7011 LAKE BALLINGER WAY, CONTACT PAUL TRIEU (206)321-9514 paul-oa@live.com EDMONDS WA 98026 CONTRACTOR HOMEOWNER EXEMPTION OWNER PAUL M & NANCY TRIEU 7011 LAKE BALLINGER WAY, (206)321-9514 EDMONDS WA 98026 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# AC OR HEAT PUMP - 1.75 BTU OR 001.000.345.83.000.00 $57.00 $57.00 1/11/24 R33938 LESS AIR HANDLERS - 10000 CFM OR 001.000.345.83.000.00 $34.00 $34.00 1/11/24 R33938 LESS APPLIANCE VENT 001.000.345.83.000.00 $34.00 $34.00 1/11/24 R33938 BLD - RES VALUE BASED FEE 001.000.345.83.000.00 $2,900.00 $2,900.00 1/11/24 R33938 BLD - RES VALUE BASED REVIEW 001.000.345.83.000.00 $2,465.00 $2,465.00 3/14/23 R27091 CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 3/14/23 R27091 PERMIT ENG - INSPECTIONS 001.000.345.83.400.00 $378.00 $378.00 1/11/24 R33938 FAN CONNECTED TO A SINGLE 001.000.345.83.000.00 $119.00 $119.00 1/11/24 R33938 DUCT FURNACE OR FIREPLACE 001.000.345.83.000.00 $34.00 $34.00 1/11/24 R33938 MECHANICAL BASE PERMIT FEE 001.000.322.10.000.00 $57.00 $57.00 1/11/24 R33938 STATE BUILDING CODE SURCHARGE 001.000.237.150 $6.50 $6.50 1/11/24 R33938 RES TOTALS: $6,129.50 $6,129.50 • R • CONDITION TYPE STATUS NOTES Printed: Thursday, January 11, 2024 3:18:28 PM 1 of 5 'RESIDENTIAL BLDG PermitCity - • • • • EL 98020 1 1 . •. • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at DEMOLITION REQUIREMENTS O property line. Water Service must be disconnected from Water Meter and or hose bib INFORMATION with AVB installed. Dump at approved dump site only. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FOR ELEVATION CERTIFICATE INFORMATION FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS INFORMATION REQUIREMENTS. FOR The engineering division requires 48 hours notice prior to the date of the FINAL FINAL INSPECTION SCHEDULING INFORMATION Inspection. FOR The engineering division requires 48 hours notice prior to the date of the FINAL FINAL INSPECTION SCHEDULING INFORMATION Inspection. FIRE FINAL INSPECTION FOR Request final Fire Department Inspection 425-775-7720. NFORMATION Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Printed: Thursday, January 11, 2024 3:18:28 PM 2 of 5 : Permit PERMIT NUM City of Edmonds Edmonds98020 1 1 iit www.edmondswa.gov INSP PRIOR TO BACKFILL FOR Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION FOR SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS INFORMATION www.mybuildingpermit.com LOT LINES STAKED FOR Lot line stakes must be in place at the time of foundation setback inspection. NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These MAXIMUM HEIGHT FOR items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street POST ADDRESS FOR or road fronting the property. Address numbers shall be Arabic numerals or alphabet INFORMATION letters Numbers shall be legible from the public way, at least 6 inches high with a .75inch min stroke width on a contrasting background. FOR Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. PROJECT CIVIL ASBUILT INFORMATION Asbuilt shall be submitted to Engineeringpermits@edmondswa.gov. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Special inspections have been called for on this project and are noted on the approved FOR construction plans. It is the owner and or contractors responsibility to ensure that reports INFORMATION are provided to the City on a weekly basis. Special Inspections are required for this permit: SPECIAL INSPECTION BUILDING DIVISION 1. Soils per Geo. Tech Report FOR 2 Concrete Expansion anchor and Drilled in dowels INFORMATION 3. Structural steel 4.High Strength Bolting 5. Installation and construction of pin piles FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. Installer shall provide the manufacturer installation, operating instructions, and a whole WHOLE HOUSE FAN FOR house ventilation system operation description. A label shall be affixed to the whole INFORMATION house timer control that reads "Whole house ventilation, see operating instructions". Printed: Thursday, January 11, 2024 3:18:28 PM 3 of 5 RESIDENTIAL BLDG '-rmit PERMIT NUM of Edmonds AveCity •:� i 1 1 LW. www.edmondswa.gov A& INSPECTIONS• •. AdINSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES B-1 SETBACKS B-2 FOUNDATION WALL B-2 SLAB INSULATION B-3 EXT WALL SHEATHING B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 RETROFIT ANCHORAGE B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING B-4 FRAMING B-4 HEIGHT VERIFICATION B-4 INTERIOR SHEAR B-4 SHOWER PAN B-5 BLDG SPECIAL INSPECTION B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP A-1 BUILDING PRECON Special Inspections are required for this permit: 1. Soils per Geo. Tech Report 2 Concrete Expansion anchor and Drilled in dowels 3. Structural steel 4.High Strength Bolting 5. Installation and construction of pin piles B-2 FOOTINGS Special Inspections are required for this permit: 1. Soils per Geo. Tech Report 2 Concrete Expansion anchor and Drilled in dowels 3. Structural steel 4.High Strength Bolting 5. Installation and construction of pin piles X-3 BUILDING FINAL" Special Inspections are required for this permit: 1. Soils per Geo. Tech Report 2 Concrete Expansion anchor and Drilled in dowels 3. Structural steel 4.High Strength Bolting 5. Installation and construction of pin piles A-1 TESC AND MOBILIZE E-3 STRM TIGHTLINE Printed: Thursday, January 11, 2024 3:18:28 PM 4 of 5 'RESIDENTIAL BLDG PermitCity - • • • • Edmonds98020 1 1 . •. E-9 COMPOST AMEND E-9 PROJECT ASBUILTS E-4 WATER SERVICE LINE NOTE TO INSPECTOR: APPLICANT PAID FOR THE CITY TO DO THE RESTORATION FOR THE NEW WATER METER INSTALL. X-2 ENGINEERING FINAL NOTE TO INSPECTOR: APPLICANT PAID FOR THE CITY TO DO THE RESTORATION FOR THE NEW WATER METER INSTALL. E-7 PUBLIC ROAD NOTE TO INSPECTOR: APPLICANT PAID FOR THE CITY TO DO THE RESTORATION FOR THE NEW WATER METER INSTALL. Printed: Thursday, January 11, 2024 3:18:28 PM 5 of 5