REV1 - APPROVED PLN ENG BLD2023-1251+Architectural_Plan+11.25.2023_11.50.18_AM+39172041 1C a I' VWNEN NTED ON 11 X1APER
t
ATV DGM 00
NO UA@Kff V KW TH
6
D
u
I
PW 011MINSIN. 1s
b irk 1A
inisrby rw
r" ILAW booed M M
10 1 am pa ow
NO No" 01"
WIND RAIL
MsEo ON THE InnERnwrK*M RESIDENTIAL coop
construction standards apply as attached the permit. All work subject to field
inspection.
WANRWAYTI ' ALL 1DT9TAPIWAVS 04ALL K
L,LLA4NArED AT THE Top LANDOOM TO TME STAARWAY
0WILLP0 OR T PrALLY A TMRT
APPROVED BY PLANNING
Dec 05 2023
Zone RM
2.4 Corner
Flag
Setbacks:
Required
Actual
Front
.................
15
> 15'
Sides
�................1
10,
>10'
15'
N/A
Rear
10,
> 10'
S side
25'
9'
Height
Nothing in the permit approval process shall be
interpreted as allowing or permitting the maintenance
of any currently existing illegal, nonconforming or
unpermitted building, structure or site condition which
is outside the scope of the permit application, regardless
of whether such building, structure or condition is
shown on the site plan or drawing. Such building,
structure or condition may be the subject of a separate
enforcement action.
ENGINEERING DIVISION
APPROVED AS NOTED
2/18/2023
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
F FRAMIM WRY M&1
WT VW"
REVISION
Nov 27 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
BLD2023-1251
CEVISED PLAN APPROVED
CITY OF EDMONDS BUILDING DIVISION
Eri.c/ C4rhe4-
BUILDING OFFICIAL
Nov 28 2023
APPROVED DATE
0
9
I
f
SCALE I /ArmV ON I X17 PAPER
`�wltMl
-
I 7j'j," IF-@-F
AIY XLSTAIRW SHALLN
FP40A OMW TM
DWELLM CA TY Af
Y T TIM
' I 0 FOR FPAMM WERLM. NEVM 9ffVM Sir I WOOM CA
T OVALIL
t