Loading...
REV1 - APPROVED PLN ENG BLD2023-1251+Architectural_Plan+11.25.2023_11.50.18_AM+39172041 1C a I' VWNEN NTED ON 11 X1APER t ATV DGM 00 NO UA@Kff V KW TH 6 D u I PW 011MINSIN. 1s b irk 1A inisrby rw r" ILAW booed M M 10 1 am pa ow NO No" 01" WIND RAIL MsEo ON THE InnERnwrK*M RESIDENTIAL coop construction standards apply as attached the permit. All work subject to field inspection. WANRWAYTI ' ALL 1DT9TAPIWAVS 04ALL K L,LLA4NArED AT THE Top LANDOOM TO TME STAARWAY 0WILLP0 OR T PrALLY A TMRT APPROVED BY PLANNING Dec 05 2023 Zone RM 2.4 Corner Flag Setbacks: Required Actual Front ................. 15 > 15' Sides �................1 10, >10' 15' N/A Rear 10, > 10' S side 25' 9' Height Nothing in the permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, structure or site condition which is outside the scope of the permit application, regardless of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. ENGINEERING DIVISION APPROVED AS NOTED 2/18/2023 OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. F FRAMIM WRY M&1 WT VW" REVISION Nov 27 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2023-1251 CEVISED PLAN APPROVED CITY OF EDMONDS BUILDING DIVISION Eri.c/ C4rhe4- BUILDING OFFICIAL Nov 28 2023 APPROVED DATE 0 9 I f SCALE I /ArmV ON I X17 PAPER `�wltMl - I 7j'j," IF-@-F AIY XLSTAIRW SHALLN FP40A OMW TM DWELLM CA TY Af Y T TIM ' I 0 FOR FPAMM WERLM. NEVM 9ffVM Sir I WOOM CA T OVALIL t