Loading...
APPROVED ENG RESUB 1 BLD2022-1105+Transportation_Impact_Form+11.2.2022_4.59.31_PM+3200263R E S U B APPENDIX A BLD2022-1105 Nov 03 2022 Page 1 of 2 CITY OF EDMONDS DEVELOPMENT SERVICES Transportation ImPpa"ct Analysis Worksheet PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: 19910 88th Ave W ( Lot 2 of 88th Short Plat) Owner/Applicant Select Homes Name Edmonds WA 98026 Street/Mailing Address Edmonds WA 98026 City State Zip Telephone: (425) 742-6044 Applicant Contact Person: Kayla Clark Nichols Name Edmonds WA 98026 Street/Mailing Address City State Zip Telephone: (206) 963-3365 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): RAM Engineering, Inc. Rob Long, PE Firm Name Contact Name Telephone: (425) 678-6960 1. PROJECT DESCRIPTION E-mail: RobL@RAMengineeringlnc.com a. Location - Street address: 19510 88th Ave W ( Lot 2 of 88th Short Plat) (Attach a vicinity map and site plan.) b. Specify existing land use: Single Family Residential c. Specify proposed type and size of development: Single Family Residential, One Lot/SFR (# of residential units and/or square footage of building) d. Date construction will begin and be completed: e. Define proposed access locations: APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X Prior Use I I$ I X I I - New Use Fee: $ 1 - I Prior Use Fee: $ ® NEW DEVELOPMENT ITE Land Use Category New Use I SFR, ITE 210 ❑ OTHER Per Unit Fee Rate $ 6,249.14 1 X Units in square feet, # of dwelling, vfp, etc. 1 MITIGATION FEE RECOMMENDATION: INDEPENDENT FEE CALCULATION: $240.00 + consultant fee $ TOTAL TRANSPORTATION IMPACT FEE $ City of Edmonds, Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.