BLD2022-0421+Supplementals+3.31.2022_11.47.22_AM+2773596 (2)MyBuildingPermitxom
. •cr of eCltyGev_nH
Jurisdiction: Edmonds
Project Name: 19508 88th Ave W - demo
Application ID: 1 ] 17101
Supplemental Name: Demolition - Asbestos
Asbestos
Asbestos is a carcinogen that is easily transported by air and breathed into the lungs so it must be handled very carefully. Prior to
performing any renovation or demolition, Puget Sound Clean Air Agency (Clean Air Agency) and Washington Department of Labor
and Industries (L&I) regulations require an asbestos survey be performed to determine if there are asbestos -containing materials in
the work area or structure. The asbestos survey must be conducted by an EPA certified (AHERA) Building Inspector and be kept on
the work site during the entire demolition project, including site cleanup.
A Clean Air Agency "notification", which may entail a waiting period of up to 10 days, is required for ALL demolition projects and
those renovation projects containing asbestos, except the renovation of a single-family dwelling performed by the homeowner living
in the residence. All asbestos must be removed by an � & I certified asbestos abatement contracts, before any demolition activities
begin and be properly disposed of in accordance with state regulations.
For more information, please contact Puget Sound Clean Air Age. through their web site at vww.pscleanair.org/asbestos or by
phone at 1-800-552-3565 and the —apartment of Labor and Indt— through their website at
http://www.ini.wa.gov/TradesLicensing/LicensingReq/AsbestL or by phone at 360-902-5435.
Did you have an AHERA Asbestos Survey done?
EGA
Enter the PSCAA number obtained through Puget Sound Clear Air.
If you have not applied for one yet go to: www.pscleanair.org/asbestos