APPROVED BLD PLN ENG RESUB 3 BLD2023-0138+Civil_Plan+8.7.2023_2.41.39_PM+3711407SW 1/4, NE 1/4, SECTION 25, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M.
WEISS LAND DISTURBANCE
10139THAVES
EDMONDS WA 98020
OWNER
JOHN WEISS
10139THAVES
EDMONDS, WA 98020
206.484.0372
GENERAL NOTES
CONSULTANTS
CIVIL ENGINEER
CG ENGINEERING
250 4TH AVE S, SUITE 200
EDMONDS, WA 98020
425.778.8500 FAX 778.5536
CONTACT: DARED UNDERBRINK, PE
SURVEYOR
PACIFIC COAST SURVEYS, INC
PO BOX 13619
MILL CREEK, WA 98082
425.512.7099
CONTACT: DARREN RIDDLE
GEOTECHNICAL ENGINEER
NELSON GEOTECHNICAL ASSOC, INC
17311 135TH AVE NE, SUITE A-500
WOODINVILLE, WA 98072
425.486.1669
CONTACT: KHALED SHAWISH
GENERAL NOTES
1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS
STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE
LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS:
- CURRENT INTERNATIONAL BUILDING CODE (IBC)
- CURRENT WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL
CONSTRUCTION
- WASHINGTON STATE DEPARTMENT OF ECOLOGY STORM WATER MANAGEMENT MANUAL FOR THE
PUGET SOUND BASIN (CURRENT EDITION)
2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS
STANDARD DETAILS, UNLESS NOTED OTHERWISE
3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN
PROGRESS.
4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL
GOVERNING AUTHORITY.
5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT"
DRAWINGS AND SHALL SUMMARIZE ALL ASBUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS
FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT
DRAWINGS SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING
OCCUPANCY/FINAL PROJECT APPROVAL.
6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION.
7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY
OTHERS BY FIELD SURVEYOR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE
CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF
THE CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO
FURTHER DISCOVER AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED
BY THE IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND
CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR
NEW UTILITIES. ENGINEER ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE
EXISTING UTILITIES AND SITE FEATURES PRESENTED ON THESE DRAWINGS. ENGINEER SHALL BE NOTIFIED
IMMEDIATELY OF CONFLICTS THAT ARISE.
8. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL CONTACT
THE UNDERGROUND UTILITIES REVISED 05.15.2017 LOCATION SERVICE (1-800-424-5555) AT LEAST 48
HOURS PRIOR TO CONSTRUCTION.
9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING
WORK AND SHALL NOTIFY OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES.
10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS.
11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL
THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE
PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT.
12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE
PROJECT GEOTECHNICAL REPORT.
13. SUBGRADE SOILS IN ALL AREAS WHERE RAIN GARDENS, INFILTRATION OR PERVIOUS PAVEMENT IS TO BE
PLACED SHALL BE DELINEATED AND PROTECTED AT ALL TIMES FROM COMPACTIVE ACTIVITIES (I.E. HEAVY
EQUIPMENT, STOCKPILING).
14. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE
NATIVE SOIL OR COMPACTED STRUCTURAL FILL. IF SOIL IS DISTURBED, SOFT, LOOSE, WET OR IF ORGANIC
MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL
FILL PER GEOTECHNICAL REPORT.
15. SEE SURVEY FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED AREAS AND OTHER
PROPOSED OR EXISTING SITE FEATURES.
16. ALL REQUIRED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO
INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER.
17. ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL
BE CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE.
18. ALL FOOTING DRAINS SERVING BUILDINGS, WALLS, ROCKERIES, ETC. SHALL CONNECT TO THE DRAINAGE
SYSTEM.
19. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE
IMPROVEMENTS INDICATED ON THESE DRAWINGS.
20. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED TO THE
EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION IN ACCORDANCE WITH APPROPRIATE
REQUIREMENTS AND STANDARDS.
21. ALL DISTURBED SOIL AREAS SHALL BE COMPOST AMENDED AND SEEDED OR STABILIZED BY OTHER
ACCEPTABLE METHODS FOR THE PREVENTION OF ONSITE EROSION AFTER THE COMPLETION OF
CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL
REQUIREMENTS.
22. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE
STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL.
23. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK
MATERIALS ARE REQUIRED.
LEGAL DESCRIPTION
PORTION OF THE SOUTHEAST QUARTER OF THE NORTHEAST QUARTER OF SECTION 25, TOWNSHIP 27
NORTH, RANGE 3 EAST, W.M., RECORDS OF SNOHOMISH COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS:
BEGINNING AT THE SOUTHWEST CORNER OF SAID SUBDIVISION THAT IS SOUTH 88°54'23" EAST ALONG THE
SOUTH LINE OF SAID SUBDIVISION 30 FEET;
THENCE NORTH 00°30'35" EAST PARALLEL WITH THE WEST LINE OF SAID SUBDIVISION A DISTANCE OF
1078.82 FEET TO THE TRUE POINT OF BEGINNING;
THENCE CONTINUE NORTH 00°30'35" EAST 82.97 FEET;
THENCE SOUTH 88°52'41" EAST 148.52 FEET;
THENCE SOUTH 00°31'15" WEST 82.96 FEET;
THENCE NORTH 88°52'27" WEST 148.51 FEET TO THE TRUE POINT OF BEGINNING;
TOGETHER WITH AN EASEMENT FOR INGRESS, EGRESS AND UTILITIES OVER, UNDER AND UPON THAT
PORTION OF THE SOUTHWEST QUARTER OF THE NORTHEAST QUARTER OF SECTION 25, TOWNSHIP 27
NORTH, RANGE 3 EAST, W.M., RECORDS OF SNOHOMISH COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS:
BEGINNING AT THE SOUTHWEST CORNER OF SAID SUBDIVISION;
THENCE SOUTH 88°54'23" EAST ALONG THE SOUTH LINE OF SAID SUBDIVISION 30 FEET;
THENCE NORTH 00°30'35" EAST PARALLEL WITH THE WEST LINE OF SAID SUBDIVISION 1068.82 FEET TO THE
TRUE POINT OF BEGINNING OF THE TRACT OF LAND HEREIN DESCRIBED;
THENCE CONTINUING NORTH 00°30'35" EAST 20 FEET;
THENCE SOUTH 88°52'27" EAST 178.51 FEET;
THENCE SOUTH 00°31'15" WEST 20 FEET;
THENCE NORTH 88°52'27" WEST 178.51 FEET TO THE TRUE POINT OF BEGINNING;
EXCEPT THAT PORTION OF SAID EASEMENT LYING WITH THE ABOVE DESCRIBED PREMISES
SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON.
BASIS OF BEARING
THE MONUMENTED CENTERLINE
OF 9TH AVENUE S., AS THE
BEARING OF N 00°30'35" EAST
DATU M
� ::
A TI N!
ALL BEF RE Y DI
������ ������ •..;
;.':/1,.,.. a �� y,,,. v /1,./
;;� �-;
'�'� ���� �'"' �����'
�s'l i l�.
,,',
BURIED UTILITIES EXIST IN THE AREA AND UTILITY
���""
INFORMATION SHOWN MAY NOT BE COMPLETE. CONTACT
Q �,
THE ONE- CALL UTILITY LOCATE SERVICE A MINIMUM OF 48
��
HOURS PRIOR TO CONSTRUCTION
- - -
24.
SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS
CONSTRUCTION SEQUENCE NOTES
SHOWN.
1.
SCHEDULE APRE-CONSTRUCTION MEETING WITH CITY ENGINEERING DIVISION
25.
CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING
AT 425-771-0220, EXT. 1326. TWO DAY (48 HR) NOTICE IS REQUIRED.
AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILITIES AND
OTHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF GROUND OR
2.
REVIEW TEMPORARY EROSION AND SEDIMENT CONTROL NOTES.
CAVING EMBANKMENTS. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND
BRACING, AS REQUIRED.
3.
CALL FOR UTILITY LOCATES.
26.
CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL
4.
INSTALL TESC MEASURES AND MAINTAIN DUST CONTROL WHILE PREVENTING
WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS
DISTURBANCE OF ANY AREAS OF VEGETATIONOUTSIDETHE CONSTRUCTION
RESTRICTIONS. CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST
ZONE.
OBTAINING WRITTEN APPROVAL FROM THE FIRE MARSHAL.
5.
HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS CITY
27.
COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS AND/OR SERVICE
ENGINEERING INSPECTOR. ALL TEMPORARY SEDIMENTATION AND EROSION
INTERRUPTIONS WITH THE AFFECTED OWNERS AND APPROPRIATE UTILITY COMPANIES. CONNECTIONS
CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO ANY
TO EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN APPROVAL OF THE
CONSTRUCTION OR SITE CLEARING. EROSION AND SEDIMENTATION CONTROL
AUTHORITIES GOVERNING SAID UTILITIES.
PRACTICES AND/OR DEVICES SHALL BE MAINTAINED UNTIL PERMANENT
VEGETATION IS ESTABLISHED.
28.
ALL UTILITIES SHALL BE PLACED UNDERGROUND.
6.
ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES.
29.
EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE TO CONSTRUCTION WORK SHALL BE
REPAIRED AT CONTRACTOR'S EXPENSE AND INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND
7.
INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS.
OWNER'S REPRESENTATIVE PRIOR TO BACKFILLING.
8.
CONSTRUCT RETAINING WALLS.
30.
NEW UTILITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE
INDICATED, LOCATIONS MAY BE SCALED FROM DRAWINGS. FIELD ADJUSTMENTS SHALL BE APPROVED
9.
ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. ALL TEMPORARY
BY OWNER'S REPRESENTATIVE AND CITY.
EROSION CONTROL MEASURES SHALL BE REMOVED UPON FINAL SITE
STABILIZATION AND APPROVAL BY CITY INSPECTOR.
31.
FIELD STAKE ALL UTILITY STUBS AT THE PROPERTY LINE.
HAUL ROUTE
32.
TRENCH BACKFILL OF UTILITIES LOCATED WITHIN THE CITY RIGHT-OF-WAY SHALL BE COMPACTED TO
95%. COMPACTION TEST REPORTS SHALL BE PROVIDED TO THE CITY PRIOR TO PAVING.
TO SITE: I-5 TO 220TH ST SW
R ONTO 9TH AVE S
33.
WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE POLYETHYLENE PLASTIC
FOAM AS A CUSHION BETWEEN THE UTILITIES. FROM SITE: SON 9TH AVE S
L ONTO 220TH ST
34. PIPE MATERIAL AND SIGNAGE SUBMITTALS SHALL BE PROVIDED TO CITY ENGINEERING DIVISION FOR SW
APPROVAL PRIOR TO INSTALLATION. 220TH ST SW TO I-5
35. A SEPARATE RIGHT-OF-WAY CONSTRUCTION PERMIT IS REQUIRED FOR ALL WORK WITHIN THE CITY
RIGHT-OF-WAY
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
36. UNDERGROUND WIRING REQUIREMENTS OF ECDC 18.05 SHALL BE FOLLOWED. ALL UTILITY SERVICES OWNER/CONTRACTOR IS RESPONSIBLE FOR
SHALL BE INSTALLED UNDERGROUND. EROSION CONTROL AND DRAINAGE
I � � I 1 IE 4" CPP=322.99 I
I ... I I 12.2' I
�c� � / / i i 11.4 � � SEE DETAIL 'C'
• ° - - - I N 88' 2'41 " W 148.52' / WOOD FENCE l , �
- --- --- " --- .x
_ WOOD FENCE � - - - - -
I <.�. END F 0.1'(N) "� �� �/ l �( � ------
OF PROPERTY LINE 0.5' OVERLAP "�' �� I '
/7T/%TT/7f/TT7/7T/TT//Tl/7T/Tf7/7T/TT/ �
REFER TO SHEET C3.1 �/ '�'
I FOR THE GRADING / / I
� � AND DRAINAGE PLAN I
W � - S - -� -, �5 � # ois3 LOT AREA /�{ // I
I I \ � F.F.=336.32' 12,321 SF jJ / �
� j �, � ROOF HEIGHT=347.91 ' 27032500109200 / � � �
Q 4.a � / 1
I
o I \ /,{ �,� I ao
� / \\ laa / I .: a ASPHALT � I ,:�
// \ �I. z lo/ �"a/ � /�� 1 0
/ I vv I ��3 �� / /��- � �
I / i /
/ I \ f - WA _ - - A- -'- A- - J WA�I / / � -' / /
_p� I < � W - WA- - - WA .. - WAS WAJJ / / / /
%` � I r \ \ le, . ' � A - - I?OOIn - - WA - U/A - - - WA / 21.1 ' / � �
\
30.00' � �h - I- �, ��2
1_______________ _ I CB RIM-3 4.93 I
N 88'S25�W 148.50' - -------- -
--
1 c •. / IE 6" RCf�(S)=323.03 � I I I - - -
I I I � I FOUND NAIL W/WASH
--�- - = x- �_ _ � - � i "' I AT CORNER
I � WOOD FENCE X � )` -I- -
I I
I REFER TO SHEET C2.1 20' EASEMENT FOR I
I FOR THE EROSION INGRESS/EGRESS &UTILITIES I
I � a� II CONTROL PLAN i
I
SITE PLAN
SCALE: 1" = 20'
20
10 20 40
SHEET INDEX
C1.1
COVER SHEET &GENERAL NOTES
C2.1
TEMPORARY EROSION CONTROL PLAN
C3.1
GRADING &DRAINAGE PLAN
APPROVED BY PLANNING
Aug 21 2023
N
D
Spruce St
U1 Spruce St
Spruce PI � rn w �
D
� n
< �
'e Laurel Ln
N
Hemlock St l�e�ilock Way
_� D
i0 Laurel Way 214th PI SW
N N
Laurel St
215th PI SW ,°
� D
Pine S• Pine St F�in.�:.r Pine Sl a �
D a C �
N�, r - � 216Ih PISW
L J
D
PROJECT SITE
i
Fir SI Fir `,• S
n
„It ,, �:�
D
".\`:e$
VICINITY MAP
N TS
LEGEND
DESCRIPTION
EXISTING
PROPOSED
ABBREVIATIONS
PROPERTY LINE
- -
- -
ABN
ABANDONED
MIN
MINIMUM
ADJACENT PROPERTY LINE
- -
-
- -
-
BLDG
BUILDING
BOTTOM OF WALL
MJ
MECHANICAL JOINT
CENTERLINE
BOW
MON
MONUMENT
CLEARING LIMITS
-
�
CENTERLINE
NTS
NOT TO SCALE
SILT FENCE
X X
X X
CB
CATCH BASIN
CORRUGATED METAL PIPE
OC
ON CENTER
CONTOUR LINE
- - - - -100 - - - - -
00
CMP
PC
POINT OF CURVATURE
FENCE
SANITARY SEWER LINE
CO
CLEANOUT
PI
POINT OF INTERSECTION
- � - -S5 - � - -ss -
�ss�ss-
CONC
CONCRETE
PIV
POST INDICATOR VALVE
MANHOLE
®
®
CONST
CONSTRUCTION
i'L
PROPERTY LINE
STORM DRAIN MAIN
- � - -s�- � - -s�-
Aso-�sc-
CP
CONCRETE PIPE
PT
POINT OF TANGENCY
STORM DRAIN PIPE
- - - - - �
CU YD
CUBIC YARD
DOUBLE DETECTOR CHECK
VALVE ASSEMBLY
DUCTILE IRON PIPE
PVC
POLYVINYL CHLORIDE PIPE
ROOF DRAIN
FOOTING DRAIN
- - - R - - - R - - - R -
R R
DDCVA
PVI
POINT OF VERTICAL
INTERSECTION
PAVEMENT
- - - F - - - F - - - F -
F F
DI
PVMT
PRESSURE LINE
CATCH BASIN (TYPE 1)
- - - P - - - P - - - P -
P P
DIA
DIAMETER
DUCTILE IRON PIPE
PVT
POINT OF VERTICAL TANG.
❑
■
DIP
R
RADIUS
CATCH BASIN (TYPE 2)
CLEANOUT
f�j;
I�;
e
EA
EJ
EACH
REINF
REINFORCEMENT
o
EXPANSION JOINT
RJ
RESTRAINED JOINT
CLEANOUT AND WYE
��
��'
ELEV
ELEVATION
RET
RETAINING
GRADE BREAK
- - -
- - - - - - -
EOP
EDGE OF PAVEMENT
RT
RIGHT
SURFACE SWALE
� � -
- � � - � �
EX
EXISTING
FIRE DEPT. CONNECTION
SD
STORM DRAIN
SECTION
DRAINAGE ARROW
_
FDC
SECT
WATER LINE
- - wA- - - wA
wn�wn�
FFE
FINISHED FLOOR ELEVATION
FIRE HYDRANT
SDMH
STORM DRAIN MANHOLE
SIMILAR
WATER METER
®
�
FH
SIM
FIRE HYDRANT
�
�
FL
FLANGE
SQ
SQUARE
FDC
V
i
•
FT
FEET/FOOT
SS
SANITARY SEWER
PIV
O
GV
GATE VALVE
SSMH
SANITARY SEWER
MANHOLE
GATE VALVE
g
Z
HP
HIGH POINT
STA
STATION
TEE
ILI
�
HT
HEIGHT
STD
STANDARD
90° BEND
�T
�T
ID
INSIDE DIAMETER
STL
STEEL
THRUST BLOCKING
0
♦
�
_
IE
L
LCPE
LF
INVERT ELEVATION
TB
THRUST BLOCK
CAP
CONCRETE PAVEMENT
ASPHALT PAVEMENT
�
LENGTH/LINE
LINED CORRUGATED
POLYETHYLENE PIPE
TOC
TOP OF CURB
TOP OF WALL
TOP ELEVATION
a
TOW
LINEAL FOOT
TOP
CRUSHED SURFACING
ROCKERY
� � • . . '
LP
LOW POINT
LEFT
TYP
TYPICAL
LT
VC
VERTICAL CURVE
SPOT ELEVATION
f 20.0
f 20.0
MAX
MAXIMUM
W/
WITH
TELEPHONE LINE
- - - T - - - T - - - r -
r r
MECH
MECHANICAL
WM
WATER METER
POWER LINE
- - - E - - - E - - - � -
E E
MH
MANHOLE
GAS LINE
G G
SIGN
�
(A retaining wall over exceeding the height of 4' wills
require a Building Permit.
City Of Edmonds
RI lilydir�r lior��r�mor�+
""""` RC1/111VIIVV VV/'1LL
----------------------------------------
Address ---------------------1013 9TH-AVE S
Owner WEISS
Approved Date 8/09/2023
rermlt l�umr�er gLD2023-0138
PLN2022-0089
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
ENGINEERING DIVISION
DATE: � ---�� �-- � � � �7TED
�� `�' �� 18/08/202�
CITY ENGINEERING DIVISION
C3�J
ENGINEERING
250 4TH AVE. S., SUITE 200
EDMONDS, WASHINGTON 98020
PHONE (425) 778-8500
FAX (425) 778-5536
G GUIL
4�' of wash, l�
� �'�' j'�,G>
�� �
i
i
��is B�� ti�
S`sIONAL
0�/ 12/ 23 II
J
H
H
Z
O
m
�
�
�_
N
�
~
U
�
(n
�
w
w
�
�
m
W
Q
�
�
�
O
Y
Q
DESIGN: BJL
DRAWN: JCP
CHECK: JPU
JOB NO: 23064.20
DATE: 04/ 1 2/23
BLD2023-0138
RESUB
Aug 08 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
U
Z
Q
�
Q
�
cV
W
�
N
V I
o�
W
O
Q
�
Z
,,^^
V /
J
N
Q
�
�
�
Z
W
W
V /
�
O
woo
O
w
��w
UCH
SHEET:
C1.1
SW 1/4, NE 1/4, SECTION 25, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M.
�.
T
/
l
l
/
l
I
I
r
EMPOF
%��
v J ;.
00
a
W�
w
0
� z�
/
i
1
1
1
1
1
1
1
1
��`
rev
,..
/
I
I
tARY EROSI�
�,
a
a'
DEMO EXIS
BLOCK WALL
I
I
I
_-J
I
I�
j � IE 4" CPP=322.99
I� � 12.2' I
6 �, � , � i 11.4'
r
�`�' '� e �', �� ` I ,' � SEE DETAIL 'C'
:� I
' � X N 88/52 41 W 148.52 � , WOOD FENCE ! ,-�--�,/�
� WOOD FENCE ,' --- ---_--�----�--��----------------------
OF PROPERTY LINE 0.5 OVERLAP ;�� ���-' �;�-; �'
T
- �T/T/7T/T/7T/T/T/7T/T/7T/T/T/7T%T/7T/T/TT/, , ,' �
S J LIMITS OF CLEARING / � �
• x Q � AND GRADING � � /
4 � I" / ' �
� /
. a.. � � HOUSE /� �� �
--55-� -SS-{ 5 o�--ss-E--ss-�- �- 1013 SOT ,�RE,� / ,� rl
.� m ; #
. ,' �, (/ F.F. = 336.32' 12, 321 SF /� ,'
� ��' / ROOF HEIGHT=347.91 ' 27032500109200 /. �� �
1
W z I ,1 ��.� I
x � � �� / , � � � I �
} / T / w
I a/ � •L- � STOCKPILE LOCATION . a� �� � �
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
�� / . dq � � W/PLASTIC COVERING / d / , � �
� ��f � �- � �/ PER DOE BMP C123
�-.
a ,' a ASPHALT ��'� ,��' �
� � � f p OWNER/CONTRACTOR IS RESPONSIBLE FOR
� � /� �/ � .�- � i I EROSION CONTROL AND DRAINAGE
i �� -�.3 Cam- � /
/ ' �.
I INSTALL SILT FENCE � j I I Q � // � / r � �
OR STRAW WATTLES � I I � j j / � / ,. �
I � I I V � �
IF OVER PAVEMENT � � �
:.j
I '• ! I E
� � • !.
I � � �
� �
d .
� � I
� ` �
� � . �'
I �� ��
'� 1. .
;' 30.00' '�•
'� USE EXISTING
� DRIVEWAY FOR
i CONSTRUCTIO d'
� N ACCESS AND
STAGING OF
� BLOCKS •
�� c
INSTALL CB INSERTS .'
(SEE NOTE 4)
.d
DN CONTROL PLAN
1// / / � � �' OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
� �� / L_ �/��L1�/� I � � ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
� �� i� / � a / � � r UTILITIES MAY REQUIRE A SEPERATE PERMIT.
�-wA---wA-- �aar�--,�6A---w - ----wA-- �wA---wA 3 / �' ��
- 1f�As - - 1�VA- - - WA- - - WA- - - WA- - W - WA- - - WA- - - WA- - - WA I / / � -
.- /
- -� WA- - - _f\-O��CT�-7 - - WA - - WA- = - A- - � WA- - - WA- - - WAJ / 21.1 ' /�
\ ` /
- � -� _ -
-.% -
Bloc�cstagingarea /I//// //////.- �� I / � ---- ----------�
} � r� �
//�/////////�///////////.// , r�a �
l�� I
IC RIM=3,24.93 � I - - � � � � _ _, �,_ - -�- - - - _ --------------------
��� , N 88 52 55 � W 148.50 I I
,' IE " RC - (S)=323.03 I � � �� � � I
� � � I , ��_ I FOUND NAIL W�WASHER I
s-- ',�_--=X�---_ - - -__- - i 'i � I AT CORNER
_J
W OOD FENCE I - - - -
ALL STAGING SHALL BE ON PRIVATE PROPERTY. � I
20 EASEMENT FOR I
DO NOT BLOCK DRIVEWAY ACCESS - I
COORDINATE WITH NEIGHBORS INGRESS/EGRESS &UTILITIES �
I
SCALE: 1" = 10'
EROSION CONTROL PLAN NOTES:
1. BEFORE BEGINNING LAND -DISTURBING ACTIVITIES, INCLUDING CLEARING AND GRADING, CLEARLY MARK ALL CLEARING LIMITS.
2. ALL DISTURBED AREAS ON AND OFF -SITE SHALL BE COMPOST -AMENDED PER THE REQUIREMENTS OF BMP T5.13 IN THE STORMWATER MANUAL VOLUME V, CHAPTER 11.
3. SOILS MUST BE STABILIZED AT THE END OF THE SHIFT BEFORE A HOLIDAY OR WEEKEND IF NEEDED BASED ON THE WEATHER FORECAST.
4. INNTALL CATCH BASIN INLET PROTECTION PER DETAIL 4 FOR ALL EXISTING INLETS ON -SITE AND WITHIN 500' OF CONSTRUCTION SITE IN ROW AND AS PROPOSED DRAINAGE STRUCTURES ARE INSTALLED.
5. ADDITIONAL BMPS MAY BE REQUIRED DURING CONSTRUCTION.
FOUND REBAR W/ILLEGIBLE �
CAP 0. T(S) OF CORNER
I _ _ � r
Y
� �_ � 2 � 1.5' � m END FENCE 0.4'(N) &
� -� 2.0'(W) OF CORNER
°p � I#- 3.0
0.3'-►I � ,'� � Z
__ 1
1.9' � � � o " �--,� WOOD FENCE '�
I 2.2 - -
J � i
i '
I � 2.5' 0.2 • Imo- 1.3' r
��, o � 3 `, � f � 0.6' 0.4 �
m� - � Imo- 3.2'
o � FENCE COR. 0.4'(N) &
o m � z z � 2.0'(W) ,OF CORNER
I c� ti J o 3
- - - U � U
f � l ) 7 1
DET,�IL A DETAIL B DET,�I� C
2 SURVEY DETAILS
SCALE: NTS
�,
J
i
:'
w
Q
H
o,
m
PRE -GRADE TOPOGRAPHY �EDMONDS GIS
SCALE: NTS
10
0 5 10 20
M
PLN2022-0089
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
ENGINEERING DIVISION
DATE: - --- -• •-- - - - • JTED
_ p(I C� 18/08/202?
f:37a
CITY ENGINEERING DIVISION
�i
250 4TH AVE. S., SUITE 200
EDMONDS, WASHINGTON 98020
PHONE (425) 778-8500
FAX (425) 778-5536
GUI L
��
P� s'�,,, ,��
�jO1VAL ��
o�� i2� z3
�F=
O �
~ N
�_
U
� �
W w
o a
m
N
�
N
�
�
0
Y
Q
DESIGN:
BJL
DRAWN:
JCP
CHECK:
JPU
JOB NO: 230fi4.20
DATE:
04/ 12/23
W
U
Z
m
O
�
N
0
(�
p
W
Q
oaf
Z
2
�
~
�
0
Z
cliMO
-
�
�
w
o
0
W
SHEET:
RESU
Aug 08 20
CITY OF EDMONI
DEVELOPMENT SER
DEPARTMENT
Z
O
�
Z
WQ
J
J
NQ
1..�
O
Z
w
O
�
�
U
C2.1
1
1
II
1
1
1
II
1
I
I
I
/
/
/
/
/
/
/
/
I
/
/
/
/
/ �
J
O
O
"�
\\ I
\ I
\ I �
3.0' MAX HEIGHT RETAINING
WALL PER GEOTECH
323.08
TOP: 325.0
TOW: 324.E
BOW: 323.2
TOP: 325.0
TOW: 324.8
BOW: 323.3
TOP:325.0 a
TOW: 325.0
BOW: 323.4 -
TOP: 326.0
TOW: 325.2
BOW: 323.5
TOP: 326.0
TOW: 325.4
BOW: 323.E
TOP: 326.0
TOW:325.6 d
BOW:323.7 a
� _ r r
PROPOSED RETAINING WALL
TOP: 326.0
TOW: 325.8
BOW: 323.8
�23 R �
TOP: 326.0
TOW: 326.0
BOW: 323.9
TOP: 327.0 a
TOW: 326.2
��
BOW: 324.0 I
�� TOP: 327.0 I
\ TOW: 326.4 �
\ BOW: 324.1 a � �O
` TOP:327.0
\ TOW:326.6
\ BOW:324.2
` TOP:327.0 I
\ TOW:326.8
BOW: 324.3 I
\ 324.33 I
�� TOP:327.0 I'
TOW: 327.0
BOW: 324.3 I.
a
� SDCO IE: 323.45 I a
v I
\ I�
� \
i \
I
30.00' �\I .
---------- --------------- --'-- ---J
GRADING AND DRAINAGE PLAN
SCALE: 1" = 10'
GRADING AND DRAINAGE PLAN NOTES:
m
SW 1/4, NE 1/4,
NEW RETAINING WALL SHALL BE
LOCATED ENTIRELY ON PRIVATE
PROPERTY
SECTION 25, TOWNSHIP 27
SCHEDULE
INSPECTION FOR
NORTH,
I
I
-----J
RANGE 3 EAST, W . M .
DRYWELL PRIOR I
co 3' X 3' X 3' DRYWELL TO BACKFILL OF I
IE: 323.25 TOP: 323.0 � TRENCH AND ALL I
BOT:320.0 Q PIPING INTO I
I 4" CPP=322.99 IE (4 PVC): 323.0 m
DRYWELL. �
TOP: 326.0 �.2 w
TOW:326.0 � N � i 11.4'
BOW: 326.0 � � o /�`� �� I /
.. I �' 88152'41 " W 148.52' �� ; WOOD FENCE 11
---------- --�- _ �L �____ _ � � _X_ � _ /
�� _ 10 LF � 4" PERF �I WOOD FENC �- �
/ -�--��
PVC @ 0.5/ / � /
RTY LINE 0.5 OVERLAP � � �
/ / /
p------T--------- l
-----------------
F I �--------------- ----
T/T/7T/T/7� /T/7T/T/�T/T/T/7/%T/7T/T/lT//
I
I
I SEE DETAIL 'C'
I
-I--.
�I ,
-r-- � ---------------------
�I '
'r ,�
I
10 LF ^' 4" PERF I / I ,
PVC @ 2.0% I , � APPROX LOCATION OF � I / I
I EXISTING SIDE SEWER � / 1
I ; / PER AS BUILT � I // I
SDCO IE: 323.20 r I I
I HOUSE /1 ' ,� '
I 1013 SOT ,AREA / I'
--�5��--SSA'/ � � � I
�I \ /
�/ F.F.=336.32' 12, 321 SF /� ,'
I I \ /.
I ' � / ROOF HEIGHT-347.91 ' 27032500109200 /1 /�
25'STREETSETBACK I I � � / I �
II / / I
I I � � �� � I 00
I � � /J
/ 20 REAR SEtBACK I
37.56' III // � '
I I \ � �-` � / / / I � I �I
,I I . / � 1/�1/ /1 �/1/11/1/1 1J I
50 LF ^' 4" PERF �I� _ _ _ _ � aq � / d I / I
PVC @ 0.5% i /� �� a� �' as ASPHALT /' ' � `-
I I I �"�
l / I I �
I i � APPROX LOCATION OF JI � , I � I
7h Q � EXISTING WATER / - _ \ _ i � I z
� �J v i � � I/ SERVICE LINES � / / � - � I I
Q f //' / / I
I L_ � ///�v // I � ��
/�/L1L/ m` / a l , I �-
/ I
it WA- - - WA- - - WA- - -I WA- - WA- - A- - - A- - � WA- - - WA cwn � / // I � � �
-- A---wA---wAl---wA---wA •- wA---w�---wA--awA I / � �- I
- i
--wA---,�oE���--wA---wA-=- A--�/wA---wA- o wAJ i21.1' ' -'/ ' /
- /
I � /
I /
I /
-L i I
I I � -�- -
I I � �
I
II � � � i 2
I I � ��
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
I�--��____I__�__ __ ,/
-----------------------
�, ', N 88°52'S5"II W 148.50' � I
I ''rl'� I II II � I FOUND NAIL W/WASHER
�---rl------ -- I i II ', '�' I AT CORNER
x X X ----�- X---x �-- X -- *---------- I
I I WOOD FENCE - - I
I
I I
I ' 20' EASEMENT FOR I
I' I
INGRESS/EGRESS &� UTILITIES I
I
/I/ / /� / / / / I / / / .
! CB Kiiui=�,�4.93
1. SOILS REPORT
REPORT NUMBER: 1415122
PREPARED BY: NELSON GEOTECHNICAL ASSOC. INC
DATED: FEBRUARY 1, 2023
2. ALL DISTURBED AREAS ON AND OFF -SITE SHALL BE COMPOST -AMENDED PER THE REQUIREMENTS OF BMP
T5.13 IN THE STORMWATER MANUAL VOLUME V, CHAPTER 11.
3. TOW AND BOW REFER TO FINISHED GRADE AT THE TOP AND BOTTOM OF THE WALLS, RESPECTIVELY. TOP
REFERS TO THE TOP ELEVATION OF THE WALL.
4. A MINIMUM OF 3' HORIZONTAL SEPARATION AND 1' VERTICAL SEPARATION IS REQUIRED BETWEEN DRY
UTILITIES (POWER, GAS, PHONE, CABLE, ETC) AND SEWER, WATER, AND STORM, AND A MINIMUM OF 5'
HORIZONTAL SEPARATION AND 1' VERTICAL SEPARATION FROM ANY CITY -OWNED LINES.
5. A MINIMUM OF 2' OF COVER IS REQUIRED FOR ALL PIPES LOCATED UNDER DRIVEABLE SURFACES AND 1' OF
COVER UNDER LANDSCAPE SURFACES.
GRADING QUANTITIES
TOTAL EXCAVATION (CUT) - 5 CU YDS TOTAL
EMBANKMENT (FILL) - 10 CU YDS
TOTAL 15 CU YDS
THE QUANTITIES SHOWN ABOVE ARE FOR THE PERMIT PROCESS
ONLY. THESE VALUES ARE APPROXIMATE. DO NOT USE FOR
BIDDING, PAYMENT, OR ESTIMATING PURPOSES.
10
C3�J
ENGINEERING
250 4TH AVE. S., SUITE 200
EDMONDS, WASHINGTON 98020
PHONE (425) 778-8500
FAX (425) 778-5536
G GUIL
4�' of wash, l�
ti� �
i
i
��is B�� ,�.�
S`sIGNAL ��
0�/ 12/ 2�
M
w
�
o
O
Y
Q
DESIGN:
BJL
DRAWN:
JCP
CHECK:
JPU
JOB NO: 23064.20
DATE:
04/ 1 2/23
Z
0 5 10 20 RESUB Q
Aug 08 2023 �
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
PLN2022-0089
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
ENGINEERING DIVISION
DATE: - --- -- --- - - - � JTED
_ � Cj ��%� 18/08/202?
f:3�i
CITY ENGINEERING DIVISION
I..1..1
U
Z
m
�
N
�
O
N
(n
�
Q
W
Q
Q
Z
J
�
�
�
N
�
Z
O
(n
�
�
w
o
0
�
�
w
SHEET:
C3.1
ZIJ